Loading...
HomeMy WebLinkAboutAgenda - 12-15-2020; 8-i - Construction Bid Award for the Orange County Visitors Bureau 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 15, 2020 Action Agenda Item No. 8-i SUBJECT: Construction Bid Award for the Orange County Visitors Bureau DEPARTMENT: Asset Management Services (AMS) ATTACHMENT(S): INFORMATION CONTACT: 1. Certified Bid Tabulation Steven Arndt: 919-245-2658 2. Designers Bid Recommendation/Value Engineering Worksheet PURPOSE: For the Board of Orange County Commissioners to: 1. Award a bid to Racanelli Construction South, Inc., Apex, North Carolina in the amount of $268,370 for the renovation of a former restaurant at 308 West Franklin, Chapel Hill, NC to create offices, meeting rooms, and support spaces for the Orange County Visitors Bureau. 2. Authorize the County Manager to sign the construction agreement and execute any amendments for unforeseen requirements up to the approved budget amount on behalf of the board, contingent upon final review of the County Attorney. BACKGROUND: On November 19, 2019, it was announced that Orange County would lease two of its facilities, 501 and 503 West Franklin Street, Chapel Hill, NC to Well Dot. Inc, a healthcare technology company, at terms to be determined at a later date. Well Dot. plans to renovate the facilities for the purpose of establishing a new operations and corporate center in Chapel Hill that will create about 400 high-paying jobs over five years. As a result of this announcement, it became necessary to find new facilities for the County departments and County supported agencies housed at these facilities. One of those displaced agencies was the Orange County Visitors Bureau. On January 21, 2020 the Orange County Board of County Commissioners approved the lease 308 West Franklin Street, Chapel Hill, NC, a former restaurant, as the future home for the Orange County Visitors Bureau. Josh Gurlitz Architecture, Chapel Hill, NC was retained on March 1, 2020 to develop the plans and specifications necessary to renovate this facility. Competitive bids from five qualified general contractors were received and opened on September 10, 2020. A review of the bid documents was conducted by County staff and the project designer, and it was determined that the lowest responsive bid for this project was Racanelli Construction 2 South, Inc., Apex, North Carolina at a cost of $276,000. A certified bid tabulation is provided in Attachment 1. After opening bids, the County engaged in a value engineering process necessary to reduce the cost of the project, which resulted in a revised cost of$268,370. A designer's bid recommendation letter containing details regarding the value engineering is provided in Attachment 2. Should the board of County Commissioners award the bid, the projected construction period is four months. Depending upon the construction process, management of unforeseen conditions, and project close-out, the renovations should be finished by the end of April, 2021. FINANCIAL IMPACT: The construction contract with Racanelli Construction South, Inc., totals $268,370. The total cost of the project, including professional services, construction, contingency allowances and miscellaneous costs totals $408,083. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal impacts are applicable to this item: • Foster a community culture that rejects oppression and inequity The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. This low bidder complied with the Historically Underutilized Business (HUB) bid requirements and will employ certified HUB contractors as a part of the performance of this work. ENVIRONMENTAL IMPACT: The following Orange County Environmental Responsibility Goal impacts are applicable to this item: • Energy Efficiency and Waste Reduction Initiate policies and programs that: 1) conserve energy; 2) reduce resource consumption; 3) increase the use of recycled and renewable resources; and 4) minimize waste stream impacts on the environment. The scope of work includes the replacement of old outdated light fixtures and replaces them with high efficiency LED light fixtures. In renovating an existing space rather than constructing a new facility, the project reduces resource consumption. RECOMMENDATION(S): The Manager recommends that the Board: 1) Award the bid to Racanelli Construction South, Inc. of Apex NC in the amount of$268,370 for the Orange County Visitors Bureau renovation. 2) Authorize the County Manager to sign the construction agreement and execute any amendments for unforeseen requirements up to the approved budget amount on behalf of the board, contingent upon final review of the County Attorney. 3 CHAPEL HILL ORANGE COUNTY VISITORS BUREAU BID TABULATION BIDDER SUB Addendum 1 Addendum 2 Low Volt Alt 1 Alt 1 HUB HUB Bid Amount LIST Acknowledge Acknowledge Breakout cost Time List Affidavit Yes Yes Yes No $8,330.00 0 days Yes Yes $337,213.00 C.T.Wilson Construction Co. Inc. Yes Yes Yes $400.00 $3,400.00 0 days Yes Yes $334,700.00 H.M.Kern Corporation Yes Yes Yes $200.00 $9,435.00 0 days Yes Yes $276,000.00 Racanelli Construction South, Inc. Yes Yes Yes No $10,690.00 5 days Yes Yes $313,300.00 Resolute Building Company Yes Yes Yes No $9,500.00 0 days Yes Yes $343,468.00 W.L.Bishop Construction J A Architects, Jos4GurIfi RACANELLI CONSTRUCTION SOUTH, INC. 4 OC VISITORS BUREAU Value Engineering 9/23/2020 By: Peter Muzzillo Description Savings Comment Eliminate tile demo and major floor prep excludes tile demo at bar $ (4,200.00) Add carpet in lieu of LVT at 006 HOSPITALITY, 007 STORAGE, 010 WORK ROOM, 014 UTILITY, 015 $ (630.00) Metal framing in lieu of wood framing $ (1,800.00) limited to new wall construction Delete floor boxes at 001 LOBBY $ (1,300.00) Keep existing water heater $ (1,000.00) Assuming exisitng HWH is in good working Economical Light Fixtures $ (500.00) Sub Total VE Savings $ (9,430.00) Contract Amount $ 276,000.00 New contract amount $ 266,570.00 5 CHAPEL HILL ORANGE COUNTY VISITORS BUREAU November 28,2020 308 WEST FRANKLIN,CHAPEL HILL,NC VALUE ENGINEERING NARRATIVE ON ACCEPTED VE ITEMS ITEM NARRATIVE AMOUNT 1 Eliminate tile demolition and major floor prep. excludes tile demo at bar. With Deduct: this VE item the tile in the lobby will be demolished allowing the lobby to retain ($4,200) a consistent wood floor. At other locations, especially at the work room and hos- pitality areas the tile floor will be cleaned. For finish changes to these other areas see Item#2 below. 2 Add carpet in lieu of LVT at 006 Hospitality; 007 Storage; 010 Work Room; 014 Deduct: Utility; 015 Storage. With this VE item the tile will be cleaned and will remain in ($630) place(see Item 1 above). Plywood sub-floor will be attached over the tile and carpet installed in lieu of LVT. This change will be reflected on the Room Finish Schedule on sheet A-701. 3 Metal framing in lieu of wood framing for walls. This change will eliminate wood Deduct: framing at new walls. Engineered wood beams remain as does miscellaneous ($1,800) blocking and shimming. 4 Deleted 5 Keep existing water heater. The existing water heater located in the attic space Deduct has functional capacity to satisfy demand. The existing water heater will be tested ($1,000) to confirm output. 6 Deleted