Loading...
HomeMy WebLinkAboutAgenda - 10-01-2003-9eORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 1, 2003 Action Agenda Item No. ~ r~ SUBJECT: A Resolution Initiating the Project to Expand the 1997 Efland Sewer Bond Area System and to Extend Water and Sewer Utilities to Serve the Buckhorn EDD Area and Community DEPARTMENT: County Manager PUBLIC HEARING: (Y/N) ATTACHMENT(S): Resolution with Attachment A Outline of Issues (Siting of Orange County Middle School #3) INFORMATION CONTACT: Rod Visser, Asst. County Manager Paul Thames, Co. Engineer, ext 2300 Craig Benedict, Planning Director Dianne Reid, Economic Dev. Director TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To provide for BOCC approval, a resolution authorizing staff to: 1. officially begin the RFP process for expanding the remaining part of the 1997 Efland Sewer Bond and Buckhorn Economic Development District (EDD) utility systems, and 2. begin the negotiation process with the City of Mebane to become the water & sewer system utility for the Buckhorn EDD. BACKGROUND: A. Introduction: The Efland Cheeks and Buckhorn areas are small, unincorporated villages and neighborhoods located within the I-85/I-40 between the Town of Hillsborough and the City of Mebane. This area under Orange County's planning jurisdiction has been the subject of various infrastructure, small area plans and economic development district plans, at different times, since 1984. These various studies have produced to a certain degree a mixture of goals that could be integrated better to improve the comprehensive and orderly development and upgrading of services in the area. What follows is a topical background of the various facets of study in the past and upcoming activities to plan for the future. B. Sewer Service History G. Land Use and Potential Annexation Issues C. EDD H. Sewer Service Implementation D. 1997 Efland Sewer Bond I. E. 2002 EPA Grant F. Sewer Service and Grant Challenges 1. Funding System 2. Orange County Middle School #3 3. Timing 4. Sewer Service Alternatives and Efland Sewer Operations Conclusion B. Sewer Service History Orange County has historically planned for specific areas of the US 70/ Efland/I-85/40 corridor to be provided with wastewater collection service to address both public health and economic development concerns. To that end, in the County contracted with a consulting engineer to develop a master plan -which was completed in 1984 - for a wastewater collection system to serve the area. This master plan, which outlined a phased development wastewater collection system serving almost the entire area along Hwy 70 from the Eno River to Buckhorn Road (including areas between I-85 and Norfolk-Southern Railroad and the Perry Hills subdivision) was never accepted or adopted by the BOCC. However the Board did contract with a second consulting engineer to modify a portion of the master plan which was limited to the area along Hwy 70 bounded on the east by Lloyd Dairy Road (SR 1327) and on the west by Redmon Road (SR 1311). Ultimately the second engineering firm was retained to develop construction plans, bid a wastewater collection system construction project and oversee actual construction for a core collection system that served roughly the area along US 70 from Redman Road (SR 1311) to Efland/Cedar Grove Road (SR 1004). The area between Eland Cedar Grove Road and Lloyd Dairy Road was not constructed due to an insufficiency in available funding. That system that was constructed has by now provided reliable wastewater collection service to the community for some 15 years. During the last several years, the system has been expanded slightly at the expense of the respective developers (Richmond Hills and Ashwick subdivisions) to ultimately provide service to approximately 100 additional households. C. Economic Development District In 1994 and 1996, the BOCC approved the creation of the Buckhorn Road Economic Development District to its current configuration, approximately 900 acres along the north and south sides of I-85/40 east of Buckhorn Road. This area was also designated as suitable for water and wastewater utility service. The area has not yet been served with either water distribution or wastewater collection. Soon after the creation of the Buckhorn Road EDD, the City of Mebane began a process of annexing the property at the southwest quadrant of the Buckhorn Road/I-85/40 interchange, approving the development of the property as a PetroMart truckstop facility and allowing the extension of water and wastewater utilities to serve the site. During the same time period, residents along Buckhorn Road began formed a "neighborhood association", the People for Progress, to lobby both the City of Mebane and Orange County to extend wastewater collection services to the areas on Buckhorn Road on both sides of I-85/40 and to extend municipal water service to the area along Buckhorn Road on the south side of 1- 85/40. D. 1997 Efland Sewer Bond In 1997, the BOCC adopted the recommendations of the Capital Needs Advisory Task Force which included a component addressing the failing septic tank/public health situation in central Efland. The Board approved a bond order providing for a referendum on a proposal fora $1.2 million bond that would fund the expansion of the existing/core Efland wastewater collection system to serve that portion of Efland (the area along US 70 between Efland/Cedar Grove Road and Lloyd Dairy Road) that was included in the BOCC approved master plan but which could not be built in 1987-88. The Efland Sewer Bond was approved by the voters of Orange County, but the actual project to be funded by the bond has not yet received BOCC approval. E. 2002 EPA Grant In 2002, County Commissioners worked with Congressman David Price to secure an EPA grant to address the wastewater collection needs of the Buckhorn Community and to create the nucleus (a main pumping station and force main) of a system that would ultimately provide wastewater collection for the Buckhorn EDD. Approximately $900,000 in EPA funding was awarded to the County to address these needs in early 2003. Subsequent to the award of the EPA grant, County Planning and Engineering staff began working with the Orange County School system to identify potential school sites in the Efland area that could be served with public utilities. The County Manager's and Planning Department staff were also working with City of Mebane staff to determine the feasibility of using the EPA grant to fund the development of a Buckhorn Road community and EDD utility service area connected to the City's wastewater collection and water distribution systems at and near the Buckhorn Road PetroMart site. These discussions led to the conclusions that it was possible to connect the Buckhorn community and EDD are to Mebane's utilities, pending the successful outcome of formal negotiations between the County and the City on utility extension and annexation agreements. An opportunity now exists to coordinate the use of funds from the 1997 Efland Bond with the EPA wastewater grant to develop a relatively large wastewater utility project for Efland. This project can provide for: a) the long awaited extension of wastewater collection service for central Efland: b) the extension of utility service to the Buckhorn EDD (without which the EDD may not become a viable entity). F. Sewer Service and Grant Challenges There are a number of challenges that must be met before these opportunities can come to fruition. The EPA grant is a matching fund grant (55% EPA/45% local) which means that the County must: 1) tie the Efland Sewer Bond project to the Buckhorn project so that the bond funds serve as the grant match; 2) not tie the projects together, but come up with another source of funds to match the grant; or 3) decline the grant funding. Tying the Bond and Grant funding together means that simultaneous design and bidding of both projects will be required although actual construction may be accomplished in two phases. Furthermore, if the County accepts the EPA grant, it must adhere to all EPA guidelines dealing with selecting consultants, bidding, contract administration, etc. for both phases of the contract. Orange County Middle School #3 The Orange County School District, with approval from the Board of County Commissioners on June 27, 2003, has pursued an option on 102 acres within the Buckhorn EDD. Feasibility of a school site include as priority the investigation of utilities. The school board may be able to purchase a site at relatively low costs in the portion of the EDD where the core portion (initial developed phase) of the overall utility system would be built. Other public uses in conjunction with the school as determined by the county could also share in the expanded utility system. Timing is a fairly serious issue insofar as developing a school in the EDD is concerned. The Orange County School Board hopes to open a new middle school in the fall of 2006. In the interim, it must secure the site, the have the site and school designed, approved and constructed. If the Buckhorn site does not prove to be suitable for any number of reasons, including the unavailability of utility service, a new site must be secured (and the school designed, approved and constructed). Insofar as the Efland/Buckhorn utility project is concerned, the time frame required for consultant selection, surveying, design, bidding, construction, etc., is approximately 30 months from the time that the BOCC gives staff the go ahead to proceed with consultant selection. Assuming that BOCC authorization comes in mid- September 2003, the soonest utilities will be available adjacent to the Buckhorn EDD school site is mid-March 2006. G. Land Use and Potential Annexation Issues In addition to its interests in securing utility service for the Buckhorn community and EDD, the County has an overarching interest in ensuring that the EDD and adjacent land develop in accordance with the County's Land Use Plan and EDD development standards. The City of Mebane has an interest in tying utility service extension and annexation issues together (municipal utilities typically require that the owners of all properties that are to receive municipal utility services sign a voluntary annexation agreement as a condition of receiving those services). Furthermore, the City will want to assume ownership of the utility extensions (insuring the continuity of system design, operation and maintenance standards and simplifying billing/rate issues). Accordingly, the County and the City must be able to reach accord on the coordination of land use, development standards, utility extension and annexation issues. H. Sewer Service Implementation It is possible for wastewater collection service to be extended to the Buckhorn EDD through a connection to the existing Efland sewer system. It is unlikely that the Buckhorn community can be served by connection to the existing Efland system, at least in the near term or with the funds available through the EPA grant. In any event, connecting the Buckhorn EDD and community to the Efland system would be much more expensive to the County in terms of costs for constructing, operating and maintaining the system. Other costs that must be considered relative to the extension of sewer service from Mebane or Efland is the cost of the County's ongoing subsidization of Efland sewer rates. Currently the County is subsidizing as much as 75% of the actual operational costs for the Efland system (that is, the sewer rates would have to quadruple for the system to be financed through the rate structure). Adding the sewer service for the Buckhorn EDD and community to that situation only exacerbates that problem. In comparison to the necessity of developing interlocal agreements with Mebane for the Buckhorn EDD and community, the situation in central Efland is very simple. The central Efland area has long been master planned; the BOCC has approved the service area delineation; and no other local government is involved. The complexities facing the central Efland portion of the project involve construction activities adjacent to and amid developed small lot properties, occupied homes and existing transportation and utility (water, power, telephone, etc.) networks. However, utility construction in such conditions is not unusual and the residents of the proposed construction area have a generally positive outlook on the project. I. Conclusion The choreography of events between the County Engineer, Planning Director, Economic Development Director, Consultants, Utility Providers and/or local governments and the school district make this proposal a complex project. Notwithstanding this complexity and timing sensitivity, the proposal does bring forth the comprehensive nature of planning in the area. This proposed work will exhibit the county's strong commitment to public service provision, economic development, community needs, environmental and public health issues and coordinated school district/county school site planning. The Resolution attached formulates the history and action steps necessary to accomplish aforementioned goals. FINANCIAL IMPACT: Initially the RFP will identify a consultant who will design the systems. After which the project will be bid. The project will entail $2.2 million in costs; approximately $1.3 million from 1997 Efland Sewer Bond and $.9 million from EPA grant. RECOMMENDATION(S): The Manager recommends that the Board adopt the proposed resolution and direct staff to proceed accordingly. 6 ORANGE COUNTY BOARD OF COMMISSIONERS A Resolution Initiating the Project to Expand the Efland Sewer System into the Area Defined by the 1997 Efland Sewer Bond and to Extend Water and Sewer Utilities to Serve the Buckhorn Road EDD and Community WHEREAS, Orange County has a central role in protecting public health within the entire County and providing for economic development opportunities in the unincorporated portions of the County; and has developed and continues to own and operate the Efland sewer system which was created to address failing septic tank/public health issues in Efland; and 2. recognizes that there still remain unaddressed failing septic tank/public health issues affecting the citizens of central Efland; and 3. has historically committed to addressing the failing septic tank/public health issues in central Efland; and 4. the Orange County voters approved a $1.2 million bond issue in 1997 to help finance an extension of the existing Efland sewer system to address the failing septic tank/public health issues in central Efland; and WHEREAS, Orange County has a role in helping locate schools on appropriate sites having desirable characteristics such as compatability with County land use planning and having readily available water and sewer utility services; and 1. County elected officials and staff have worked with the County's School Boards to identify desirable characteristics of school sites and have developed a collaborative process for identifying and evaluating school sites; and 2. the Orange County School Board has identified the Efland community as the area where an new middle school would best meet the needs of the school population in the district; and 3. the Orange County School Board staff has worked with County Planning and Land Records/GIS Departments to narrow the site search for Orange County Middle School #3 to an area outside of Efland but within the Orange County Service Area of the Water and Sewer Management Planning and Boundary Agreement and Map; and 4. the Orange County School Board has identified a potential school site within the I-85/Buckhorn Road Economic Development District (hereafter "the EDD") and adjacent to the core elements of a proposed wastewater collection system intended to serve the EDD; and 5. the BOCC has approved the Orange County School Board's request for funds to secure options on property for a potential Efland middle school site in the EDD and the School Board has in fact acquired these options; and 6. the projected Fall 2006 opening for a new Orange County Schools middle school puts time constraints on school site acquisition, school design, school construction activities and whatever utility construction is required to ensure that water and wastewater utilities are available to the site; and WHEREAS, Orange County has long been involved in the processes of dealing with public health and economic development issues in the Efland-Cheeks community; and the County recognizes that there are failing septic tank/public health issues affecting the citizens residing in the community along Buckhorn Road (hereafter "the Buckhorn Road community"); and 2. the County has agreed to help address the water supply and failing septic tank/public health issues in the Buckhorn Road community; and 3. the County, having recognized the need to diversify its tax base and enhance employment opportunities for its citizens, has created three economic development zones or districts, including the EDD, zoned them for appropriate non-residential uses, and created development standards for each; and 4. the Buckhorn EDD contains approximately 900 acres along the north and south sides of Interstate 85/40 east of the Buckhorn Road interchange; and 5. the zoning and land use aspects of the EDD are consistent with the availability of water distribution and wastewater collection utilities; and 6. the County recognizes that providing at least the core elements of water and sewer infrastructure to the EDD will help promote non-residential 8 development in the Buckhorn EDD, which will in turn help to stabilize and make permanent zoning of the Buckhorn EDD; and 7. the County has secured a $900,000 Environmental Protection Agency (EPA) grant for the construction of portions of a wastewater collection system that could provide the core of wastewater utilities for the EDD and could also provide wastewater collection for the Buckhorn Road community and for the proposed middle school site; and 8. the County's EPA grant is a matching fund grant which the County will match with proceeds from the 1997 Efland Sewer Bond; and 9. the use of the Bond funds as the match for the EPA grant requires that both the bond funded project and the grant funded project be configured such that system design and construction activities be carried out as two sections or phases of a single project and adhere to the rules and requirements of EPA funded utility projects; and 10. Orange County and the City of Mebane have previously cooperated to provide municipal utility service to economic development areas to the mutual benefit of both the City and County; and 11. County officials and staff have held discussions with City of Mebane officials and staff about the engineering feasibility of, and the City's willingness to allow, the extension of City water distribution and wastewater collection utilities to the Buckhorn Road community and the EDD; and 12. City of Mebane and Orange County officials and staff have determined that extending City water distribution and wastewater collection utilities to the Buckhorn Road community and the EDD is feasible and offers significant benefits to the County, the City and the community; and 13. the County wishes to ensure that its adopted development standards for the EDD and the integrity of the County Land Use Plan for the area surrounding the Buckhorn Road community and the EDD remain intact regardless of the availability or ownership of water and wastewater utilities, and: 14. the County wishes to insure that the integrity of the Efland Community is not compromised and that it remain distinct from the EDD and the Buckhorn Road community; and 15. the City of Mebane desires to secure the right of annexation to property to which it provides municipal utility service and needs to control by virtue of ownership the use, operation, maintenance, rate and fee structure, etc., of the utility infrastructure and service it provides; and 9 16. accordingly, if the City is to provide water and wastewater service to the EDD and The Buckhorn Road community, it will assume ownership of the completed infrastructure and provide the operation and maintenance of the systems. NOW, THEREFORE, the Orange County Board of Commissioners, does hereby resolve to: 1. Approve the scope of utility planning, development and design work as generally outlined in ATTACHMENT "A"; and 2. Direct County staff to move forward with the process of soliciting proposals for utility design consultants and selecting a design consultant on the basis of those proposals; and 3. Direct County staff to move forward with the process of developing, negotiating and submitting for Board approval the necessary interlocal utility extension and annexation agreements with the City of Mebane; and 4. Direct the County staff to move forward with developing financing strategies such as utility assessments or acquiring additional grant funding for utility extension costs not addressed by funds available from the EPA grant or Efland Sewer Bond; and 5. Direct the County staff to undertake a public education campaign to advise citizens and property owners who will benefit from the availability of the expansion of utility service in the Efland-Cheeks community about what costs of that expansion that they may be required to bear. This, the 1st day of October, 2003. Margaret Brown, Chair Orange County Board of Commissioners 10 ATTACHMENT "A" General Scope of Work for Engineering Design/Planning Consultant • Preparing Environmental Assessment Reports necessary to meet EPA grant requirements • Providing necessary design and easement surveying • Preparing construction documentation for the Efland Bond area sewer extension • Preparing construction documentation for the Buckhorn Road EDD and Community water and sewer extension • Preparing awater/sewer utility master plan for the Buckhorn EDD • Revising the existing (unapproved) sewer master plan for Efland as necessary to conform to the County's Land Use Plans • Preparing technical documentation necessary to seek additional water/sewer construction grants • Preparing technical documentation necessary to support water utility extension assessment process for Buckhorn EDD • Providing necessary project construction administration and oversight; and 11 Outline of Issues Siting of Orange County Middle School #3 Buckhorn Economic Development District Sewer Service to "Downtown" Efland I. For land use planning purposes, Efland is distinct, discreet and not related to the Buckhorn EDD. Any development of the Efland area different than present Land Use Plan and zoning requirements should/would follow an update of the Efland Area Small Area Plan. II. Both "Downtown" Efland and the Buckhorn EDD are planned to be served by public water and sewer. Efland would be served by the County's sewer system and by Orange Alamance water. The Buckhorn EDD would be served public water and sewer by Mebane. III. Providing sewer to "Downtown" Efland and providing the basic water and sewer infrastructure for service to the Buckhorn EDD can be done as one master project, the construction of which can be phased. That will enable the use of County bond funds designated for the central business area of Efland and federal grant funds designated for economic development to be efficiently used to build these public utility systems. IV. Providing water and sewer infrastructure to the Buckhorn EDD may jump-start non-residential development in the Buckhorn EDD. This should help to stabilize and make 12 permanent zoning of the Buckhorn EDD. Presently the Buckhorn EDD is all "Primary," which allows no residential use. It is desirable to maintain that zoning to avoid the Buckhorn EDD "bleeding" into Efland and avoid providing an opportunity for a residential project (e.g. Meadowmont) locating in a place that it is not intended. Providing sewer infrastructure to solve septic system issues in the area represented by the People for Progress may also be accomplished. V. Provides an opportunity to continue the positive dialogue between Orange County and Mebane concerning mutual concerns and interests and sets the stage for an interlocal agreement between Orange County and Mebane relating to water and sewer planning, annexation boundaries and land use planning. VI. Locating an Orange County middle school (and other schools) in the Buckhorn EDD is consistent with the County Land Use Plan, the Water and Sewer Planning and Boundary Agreement and Map and is directed to the area of the Orange County School District where the most residential development pressure presently exists. This EDD is already within a planned public utility service boundary. The only Orange County regulatory change necessary to accommodate an elementary, middle or high school in the Buckhorn EDD is a 13 text amendment to the EDD zoning regulations allowing schools in this EDD. Vocational schools are already permitted in the Buckhorn EDD. lsg:orangecounty\Outline of Issues.doc