HomeMy WebLinkAboutAgenda - 10-06-20; 8-k - Approve Contract for Building Commissioning Services of Northern Campus Project 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 6, 2020 Action Agenda Item No. 8-k SUBJECT: Approve Contract for Building Commissioning Services of Northern Campus Project DEPARTMENT: Asset Management Services (AMS) ATTACHMENT(S): INFORMATION CONTACT: Facilities Dynamics Engineering Steve Arndt, AMS Director, 919-245- Proposal, dated July 7, 2020 2658 PURPOSE: To authorize the County Manager to execute a contract upon review by the County Attorney, between Orange County and Facilities Dynamics Engineering to perform building commissioning services for the Northern Campus construction project. BACKGROUND: On September 3, 2019, the County voted to accept a Guaranteed Maximum Price (GMP) of $36,354,082 as presented by Bordeaux Construction for the development of the Orange County Northern Campus. The Campus, located on Highway 70 in Hillsborough, is intended to include a replacement Detention Center, Environment and Agriculture Center, and a Parks Base. The construction of this project is now in progress and is expected to be finished by July of 2021. Building commissioning (Cx) is an integrated, systematic process to ensure, through documented verification, that all building systems perform interactively according to the "Design Intent". The focus of this commissioning will be electrical, mechanical, plumbing and heating, ventilation, and air conditioning (HVAC) systems in all three facilities. These systems will be inspected, tested and balanced according to established standards prior to the Owner's acceptance. The commissioning agent provides a third party, independent, assessment of building functionality, reporting inspection and test results to the Owner. The performance of building commissioning will provide necessary quality assurance of building systems prior to Owner acceptance of the completed project. 2 FINANCIAL IMPACT: Facilities Dynamics Engineering was selected through an RFQ process and has provided a quote of$109,816 to provide these services for the Northern Campus project. There are adequate Owner's Contingency funds available to cover the cost of this proposal. SOCIAL JUSTICE IMPACT: There are no social justice impacts as a result of this request. ENVIRONMENTAL IMPACT: Commissioning of this project will ensure building systems are operating in an optimal, energy and resource efficient fashion. RECOMMENDATION(S): The Manager recommends that the Board authorize the County Manager to execute the contract upon review by the County Attorney, between Orange County and Facilities Dynamics Engineering to perform building commissioning services for the Northern Campus construction project. 3 Facility Dyn_ ENGINEERING July 7, 2020 Angel Barnes Capital Projects Manager Orange County Asset Management Services 131 West Margaret Lane Hillsborough,NC 27278 Re: Orange County Northern Campus - Commissioning Services Proposal, Revision 1 Dear Ms. Barnes, Facility Dynamics Engineering is pleased to propose our engineering services to provide Commissioning (Cx) services for the Orange County—Northern Campus project. This proposal is for construction phase commissioning services only. The Cx services will cover Electrical, Plumbing, HVAC, and related HVAC Control systems. Our scope of work is based on the conformed set of Construction Documents sent to FDE on 6/5/2020. The scope if further detailed below. CONSTRUCTION PHASE Cx SERVICES SCOPE OF WORK TASK 1 —Execution Phase 1) Plan/Conduct/Document Cx Kickoff Meeting 2) Coordinate Cx Schedule with GC 3) Conduction miscellaneous Cx Meetings -before the start of FPTs (5 budgeted) 4) Prepare & submit meeting minutes for miscellaneous Cx Meetings 5) Review Mechanical/Electrical/Plumbing Equipment Submittals for familiarity (all were stated to be reviewed and approved at this time) 6) Review initial pipe cleaning, flushing, hydrostatic & duct pressure testing reports 7) Review TAB Plan 8) Write/Review Pre-Functional tests/checklists 9) Maintain/Update Action Item List- Assist in resolution 10)Prepare Functional Performance Tests 11)Review RFIs (as applicable) 12)Attend startups of major M/E/P equipment 13)Pre Cx "readiness" & Install Inspection visits (3 Budgeted). TASK 2—Acceptance Phase 1) Perform FPT & TAB verification(refer to detailed breakout) 1) HVAC Detention Center • OAU-1 • RTUs with Energy Recovery (5ea) 1811 Bearhollow Road,Greensboro,NC 336-297-9977 kshortt@facilitydynamics.com 6760 Alexander Bell Drive, Suite 200 Columbia,MD 21046 Phone: (410)290-0900 Fax: (410)290-0901 4 • RTUs (2ea) • Gas Fired Unit Heater(2ea) • Electric Unit Heater/Electric Wall Heater(5ea) • Water Source Heat Pump (17 ea) • Water-to-Water Heat Pump/ System • Split System Unit • Ductless Split System Unit(3ea) • Misc. Exhaust Fans (9ea) • Smoke Exhaust/ Supply Fans (31 ea) • MAU-1/Kitchen Hood Environment&A Center enter • RTU-1 • VAV Terminal Units (32 ea) • Ductless Split System Unit(2 ea) • Misc. Exhaust Fans (6 ea) • Electric Unit Heater(3ea) Parks Operations Base • H&V Unit • Packaged Heat Pump (2ea) • Infrared Heaters (3 ea) • Misc. Exhaust Fans (10 ea) 2) TAB Verification • Review TAB reports, select 20% sample (typical for all 3 buildings) 3) Electrical Detention Center • Emergency Generator • ATS Switches (3ea @ 100%) • Building Loss of Power(incl. verification of E.P. systems) • UPS • Exterior Lighting Control/Occ Sensor controlled lighting • Panelboards/ Switchboards Environment&A Center enter • Lighting Control • PV System • NITS setup and test with Mobile Generator • Panelboards/ Switchboards Parks Operations Base • Lighting Control • PV System 2 Page 5 • MTS setup and test with Mobile Generator • Panelboards/ Switchboards 4) Plumbing Detention Center • Domestic Water Heating System (Geo +4-NG Instant) • Mixing Valves/Recirc Pumps • Water Pressure Booster System Environment&A Center enter • Solar Water Heater System+EWH • Miscellaneous Tempering Valves Parks Operations Base • Domestic Water Heating System) 2) Retesting allowance (32 hours) 3) Documentation all functional testing 4) Maintain and Update Action Item List—Assist in resolution 5) Attend/Conduct Cx Progress Meetings (5 budgeted) 6) Prepare Final Commissioning report. TASK 3 —Post Acceptance Phase 1) Perform Opposite Season Testing, Trend Review, etc. 2) Update Cx report 3) End of Warranty Site Visit(-10 months from completion). 4) Prepare End of Warranty Site Visit FEES The following is a breakdown of our costs for each phase: TASK ITEM FEES 1 Execution Phase $ 28,076 2 Acceptance Phase $ 76,913 3 Warrant Phase $ 4,827 Total $ 109,816 The following overall clarifications are noted relative to the above fee and scope proposals. 1. Facility Dynamics will develop checklists and functional tests based on their experience for systems of these types. 2. Facility Dynamics will coordinate the certification of contractors for readiness, completion of installation,prestart and startup. 3. Testing reports will be included that document the FPT's tested. Additional retesting for failed tests will be limited to the allowance above or considered an extra service. 3 1 P a g e 6 4. Facility Dynamics assumes that the general contractor(and its Subcontractors, as applicable)will contribute the appropriate Trade Specialists to participate in all required startup tests/checks and FPT's where appropriate. 5. This fee includes the use of our commissioning software tool (CACEA)to manage much of the information necessary for Commissioning electronically. Feel free to contact me if you need any further information or breakdown of costs. We would be glad to meet with you or any other staff to review our detailed cost estimate and scope for this project. Sincerely, FACILITY DYNAMICS ENGINEERING CORPORATION '( Kevin D. Shortt, PE 4 1 P a g e