Loading...
HomeMy WebLinkAboutAgenda - 10-06-20; 6-a - Proposed Amendments to the Town of Hillsborough - Orange County Central Orange Coordinated Area (COCA) Land Use Plan and to the Orange County Comprehensive Plan Future Land Use Map (FLUM) 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 6, 2020 Action Agenda Item No. 6-a SUBJECT: Proposed Amendments to the Town of Hillsborough/Orange County Central Orange Coordinated Area (COCA) Land Use Plan and to the Orange County Comprehensive Plan Future Land Use Map (FLUM) DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Resolution Amending COCA Land Use Tom Altieri, Planner III, 245-2579 Plan and Orange County 2030 Tom Ten Eyck, Planner II, 245-2567 Comprehensive Plan Craig Benedict, Planning Director, 245-2575 2. September 30, 2020 Memorandum from Steve Brantley, Economic Development County Planning Staff Director, 245-2326 PURPOSE: To take action on a County-initiated request to amend the: • Town of Hillsborough/Orange County Central Orange Coordinated Area (COCA) Land Use Plan, and • Orange County Comprehensive Plan Future Land Use Map (FLUM). The amendments to these long-range plans work together to expand the southern boundary of the Hillsborough Economic Development area. BACKGROUND: Orange County and the Town of Hillsborough have been discussing potential expansion of the Hillsborough Economic Development area for several years as the County continued work towards investing in a sewer "trunk line", south of Interstate 40 and west of Old Highway 86, in accordance with its Capital Improvement Plan developed in 2012. With an eye towards maximizing the use of the sewer line, there is interest in designating additional lands that could be served via a "gravity sewer line" for non-residential purposes. In addition, Orange County evaluates the amount of land available for economic development, and due to lands being developed as the UNC Hospital and Durham Technical Community College over the last few years, the limited supply in this area was considered for expansion. At its June 6, 2017 meeting, the BOCC approved amendments to the Water and Sewer Management, Planning, and Boundary Agreement (WASMPBA) to expand the Hillsborough Primary Service Area. All parties have since approved the WASMPBA amendment, with the Town of Hillsborough Board as the last party to approve it in October 2017. Because of language included in the approval resolutions, the WASMPBA amendment is to become effective when the joint land use plan is amended to reflect the expanded Urban Service Area and assigned a future land use classification. Some of these background details, including notice to the Board when the land use plan amendments would be forthcoming, were included 2 as an Information Item on the Board's June 16, 2020 agenda. The link to that Information Item is: http://server3.co.orange.nc.us:8088/WebLink/0/doc/62679/Pagel.asDx In accordance with the provisions of Section 2.3 Comprehensive Plan Amendments of the Unified Development Ordinance, the Planning Director has initiated amendments to the Central Orange Coordinated Area (COCA) Land Use Plan and to the Orange County Comprehensive Plan Future Land Use Map (FLUM) in the vicinity of the southern portion of the Hillsborough Area Economic Development District. The amendments related to COCA affect 17 parcels (in whole or part) encompassing 84 acres. The amendments related to the FLUM affect 20 parcels (in whole or part) encompassing 89 acres. The COCA proposed land use category is Suburban Office and the FLUM proposed category is Economic Development. These related amendments are being proposed to prescribe the land uses that will be allowed in the expanded area for Economic Development. 1. The Town of Hillsborough/Orange County Central Orange Coordinated Area (COCA) Land Use Plan is a joint land use document that defines the locations of future land use categories to help achieve a desired and coordinated pattern of development over time. The COCA Land Use Plan includes several urban-style land use categories that are more specific than those provided in the County's Comprehensive Plan, which covers a much larger geographic area. Implementation of the COCA Land Use Plan is achieved through consistency with the County's Comprehensive Plan Future Land Use Map, application of County zoning, and a coordinated approach to rezoning. The amendment proposes a "Suburban Office Complex" land use in the expansion area which would designate the area for office and employment, businesses in a campus setting, and limited supporting services. The proposed amendment also reflects the expansion of the Town's Urban Service Boundary consistent with the WASMPBA to provide water and sewer service to the area. As part of a joint land use plan, this amendment requires approval by the Town of Hillsborough and Orange County. The Town of Hillsborough has already taken action and unanimously approved the amendment as follows. Town of Hillsborough Approval Process: March 15, 2018 — Town Public Hearing and Planning Board recommendation March 26, 2018 — Hillsborough Town Board adopted 2. The Orange County Comprehensive Plan Future Land Use Map (FLUM) defines the location of future land use categories, consistent with any joint land use plans, and is designed to accommodate a particular combination of general land uses. The FLUM helps achieve a desired pattern of development over time and is implemented primarily through zoning. The proposed amendment to this plan would change the expansion area from a Rural Residential land use to an Economic Development Transition Activity Node, which would designate the area for light industrial, distribution, office, service/retail uses, and flex space (typically one-story buildings designed, constructed, and marketed as suitable for use as offices but able to accommodate other uses such as a warehouse, showroom, manufacturing assembly, or similar operations). The County has not initiated any rezoning at this time. Currently, the area is zoned Rural Residential (R-1). However, approximately 12-acres of a developer initiated and proposed Research Triangle Logistics Park (RTLP) are located in the amendment area discussed herein. Any rezoning that comes forward in the future will require a subsequent item on a public hearing and finding that it is consistent with the plans. 3 Planning Board Recommendation: The Orange County Planning Board, at its August 5, 2020 regular meeting, voted 6-4 to recommend approval of the proposed amendments. Clarification of the motion voted upon was deemed necessary and the Planning Board considered a clarified motion at its special meeting on August 19, 2020 when the board voted 6-4 to recommend approval of the amendments. Agenda materials from these meetings can be viewed at: http://orangecountync.gov/AgendaCenter/Planning-Board-26 Public Hearing: A public hearing was opened on September 15, 2020 and continued without public comment to September 22, 2020 so that all members of the public signed up to speak on the RTLP proposal, a separate item on the agenda, would have adequate opportunity to speak and be heard by the Board. At the September 22 hearing, four (4) people spoke on this item. Materials from the September 15 and 22 meetings are available at: https://www.orangecountync.gov/1707/BOCC-Agendas. Video from the September 22, 2020 meeting and public hearing on this item can be accessed at: https://www.orangecountync.gov/967/Meeting-Videos. In accordance with Session Law 2020-3 Section 4.31(a), regarding remote meetings during declared emergencies, written comments were allowed to be sent for 24-hours after the public hearing was closed. Comments sent to ocbocc@orangecountync.gov are viewable at: https://groups.google.com/g/ocbocc?pli=1. The public comment period closed at 9:OOAM on September 24, 2020. The BOCC will not accept any further public comment. A RTLP Frequently Asked Questions document, which includes a section on Land Use and Zoning, was prepared in response to public comments and is available via the following link: https://www.orangecountync.gov/DocumentCenter/View/12732/Final-Research-Triangle- Logistics-Park-FAQ?bidld= Planning Director's Recommendation: The Planning Director recommends approval of the Resolution contained in Attachment 1, indicating consistency with the County's land use and economic development goals. Text shown in the Resolution in "Track Changes" format is new text that was not included in the version received by the Planning Board and provides greater detail of the County's efforts, over time, to prepare additional area for Economic Development purposes. Attachment 2 is a Memo from the County Planning and Inspections Director that includes a Justification Outline for the proposed plan amendments. FINANCIAL IMPACT: Consideration and approval will not create the need for additional funding for the provision of County services. Costs for mailed notifications and the required legal advertisement will be paid from FY2020-21 Departmental funds budgeted for this purpose. Existing Planning staff included in the Departmental staffing budget will accomplish the work required to process this amendment. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of 4 environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or policies. • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. ENVIRONMENTAL IMPACT: There are no Orange County Environmental Responsibility Goal impacts associated with this item. RECOMMENDATION(S): The Manager recommends the Board approve the Resolution in Attachment 1 amending the COCA Land Use Plan and the Orange County Comprehensive Plan FLUM, as recommended by the Planning Board and Planning Director. Attachment 1 5 Resolution#:RES-2020-053 A RESOLUTION AMENDING THE TOWN OF HILLSBOROUGH/ORANGE COUNTY CENTRAL ORANGE COORDINATED AREA LAND USE PLAN ORANGE COUNTY COMPREHENSIVE PLAN FUTURE LAND USE MAP WHEREAS, Orange County has initiated amendments to the: • Town of Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan, • Orange County Comprehensive Plan Future Land Use Map, as established in Section 1.7 of the Orange County Unified Development Ordinance (UDO), and WHEREAS, the proposed amendment to the Town of Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan consists of the following: • Extend the Town's Urban Service Boundary for public water and sewer consistent with previously approved Water and Sewer Management, Planning, and Boundary Agreement amendment by all parties, and •Add the Suburban Office Complex Future Land Use Classification to all or portions of 17 parcels, totaling 84 acres, located on both sides of Old Highway 86, south of Interstate 40, and WHEREAS, the proposed amendment to the Orange County Comprehensive Plan Future Land Use Map consists of the following: •Amend all or portions of 20 parcels, totaling 89 acres, located on both sides of Old Highway 86, south of Interstate 40 from Rural Residential to Economic Development Transition. Additionally, 1.64 acres of road right-of-way is included, and • One overlay land use classification applies in this geographic area (Resource Protection Area). No modifications are being proposed to the boundary, and WHEREAS, the following parcels are affected by the Orange County Comprehensive Plan Future Land Use Map amendment proposal: Parcel Owner on Record Acreage Identification Entire or Partial Proposed to Number Parcel to be be Changed (PIN) Changed? 9862998894 Partial LANDMARK MANAGEMENT PARTNERS LLC 11.69 9872087570 Partial CHARLENE W HAMLETT 0.03 9872095945 Partial LARRY B LEE 1.64 9872098324 Partial THEODORE L BRYANT and BEVERLY N BRYANT 7.45 9872183072 Partial JOE L JERNIGAN 0.02 9872187626 Partial THEODORE L BRYANT and BEVERLY N BRYANT 7.98 9872188329 Partial JOE L JERNIGAN and VICKIE R JERNIGAN 1.87 9872191961 Entire JEANINE L DUKE and JAMES N POULOS 1.18 9872193459 Entire THEODORE L BRYANT and BEVERLY N BRYANT 10.23 9872196844 Entire MICHAEL WILLIAM SUDYK 3.26 9872198336 Entire THEODORE L BRYANT and BEVERLY N BRYANT 10.44 9872286360 Partial REA LANDCOM INC 0.04 9872286779 Partial THEODORE L BRYANT and BEVERLY A BRYANT 0.59 9872292222 Entire THEODORE L BRYANT and BEVERLY N BRYANT 10.18 9872298289 Partial THEODORE L BRYANT and BEVERLY N BRYANT 7.99 9873007189 Entire JOHN JR BOXTER and SHANNON MARTIN 1.06 9873008345 Entire JOSEPH S SHORE and SARAH C SHORE 2.71 9873104230 Entire MICHAEL W SUDYK and GEORGE W SUDYK 4.45 9873104310 Partial BEATRICE S BROOKS 0.72 1 6 9873108103 1 Entire MICHAEL WILLIAM SUDYK 3.51 1 WHEREAS, the approved Article 46 '/4-Cent County Sales and Use Tax, effective in April 2012, allocates 50% of the funds to Orange County Economic Development District initiatives including infrastructure improvements in the Hillsborough EDD area, and WHEREAS, Orange County and the Town of Hillsborough have been discussing potential expansion of the Hillsborough Economic Development area for several years as the County continued work towards investing in a sewer "trunk line", in accordance with its Capital Improvement Plan developed in 2012, and WHEREAS, the proposals have been found to be internally consistent with the 2030 Orange County Comprehensive Plan or part thereof including, but not limited to, the following: Objective ED-1.5: Identify barriers to development of desirable businesses and local businesses, and mitigate these barriers. Objective ED-2.1: Encourage compact and higher density development in areas served by water and sewer. (See also Land Use Objective LU-1.1 and Water and Wastewater Objective WW-5.) Objective ED-2.5: Identify lands suitable to accommodate the expansion and growth of commercial and industrial uses in the County. Objective ED-2.7: Select industrial sites in Economic Development Areas based on present and planned supporting systems, such as public water and sewer, access to adequate highway, rail, or public transportation infrastructures, and minimize detrimental environmental or negative social outcomes. (See also Water and Wastewater Objective WW-15.) Land Use Goal 1: Fiscally and environmentally responsible, sustainable growth, consistent with the provision of adequate services and facilities and a high quality of life. Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed- use zoning districts where adequate public services are available. (See also Economic Development Objectives ED-2.1, ED-2.3, ED-2.10, and Water and Wastewater Objective WW- 2.) Land Use Goal 4: Land development regulations, guidelines, techniques and/or incentives that promote the integrated achievement of all Comprehensive Plan goals, and WHEREAS, the requirements of Sections 2.3 of the Unified Development Ordinance (UDO) has been deemed complete, and NOW THEREFORE BE IT RESOLVED by the Board of Commissioners of Orange County that the Town of Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan and Orange County Comprehensive Plan Future Land Use Map are hereby amended as depicted on the attached maps. 7 Upon motion of Commissioner seconded by Commissioner the foregoing ordinance was adopted this day of , 2020. I, Greg Wilder, Interim Clerk to the Board of Commissioners for Orange County, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on , 2020 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of the said Board. WITNESS my hand and the seal of said County, this day of 2020. SEAL Interim Clerk to the Board of Commissioners • • • - • • • • • • • • , • - • - • • - • • • , - • ' • COW An o. OF OF. Ar 00, �t i �VO', Parcels (in whole/in part) • . • 84 acres m :. 1 in 650 feet .. . . •.. • 0 400 Feet Orange County Comprehensive Plan Future Land Use9Map S ST. DR ER��CE�O r v z m 0 -14 /CE LOOP A i , i DAVIS RD G O v O �OVNT pFSTMY DR OAK-RIDGE p O R - Resource Protection Areas Overlay Rural Residential Water Supply Watersheds Overlay Rural Buffer Parcels - City Limits N 1 in=660 feet Proposed Economic Development Transition Activity Node ORANGE 0 400 NT COUY j Feet JPA Economic Development Transition Orange County Planning and Inspections Brian Carson(1/26/2018) 10 Attachment 2 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 MEMORANDUM TO: Board of County Commissioners Bonnie Hammersley, Orange County Manager Travis Myren, Deputy County Manager CC: Tom Altieri, Comprehensive Planning Supervisor David Blankford, Planning Board Chair FROM: Craig Benedict, Orange County Planning & Inspections Director DATE: September 30, 2020 SUBJECT: Orange County Town of Hillsborough Central Orange Coordinated Area (COCA)/ Orange County Future Land Use Map (FLUM) Changing Conditions and Justification Outline Abstract: Consistent with section 1.7.3 area plans of the Unified Development Ordinance (UDO) the comprehensive plan is continually analyzed and updated as necessary, especially in smaller focus areas coordinated with nearby local governments such as the Town of Hillsborough (TOH) and the Economic Development District (EDD) near the 140 interstate interchange and old NC 86. (1.7.3 Area Plans As part of the Comprehensive Plan, area plans may be prepared which focus on a portion of the County such as a township, a watershed or an interstate highway interchange. Likewise, technical information and/or task force reports prepared as part of a plan element or an area plan may be incorporated as part of the appendix of or as a supplement to the Comprehensive Plan.) The collaborative planning with the TOH since 2002 and annual related goals setting meetings with the Board of County Commissioners (BOCC) and Planning Board (PB) have provided justification for comprehensive plan amendments as noted in section 2.3 comprehensive plan amendments of the UDO. Specifically section 2.3.2 generally; subsection outline the rationale for amendments to the comprehensive plan including the future land use plan map (FLUM) and associated joint planning land use maps (Orange County/TOH central orange coordinated area (COCA)). (B) (1) (3) (2.3.2 Generally (A) The Comprehensive Plan shall be so prepared that all or individual elements and parts thereof may be adopted and/or amended by the Board of Commissioners. (B) For the purpose of establishing and maintaining sound, stable, and desirable development within Orange County, the Comprehensive Plan or portion thereof shall not be amended except as follows: (1) Because of changed or changing conditions in a particular area or areas of 11 the County; (2) To correct an error or omission; or (3) In response to a change in the policies, objectives, principles or standards governing the physical development of the County.) The below outlined list demonstrates the ongoing studies and analysis of conditions (i.e. That is changed or changing conditions land use, infrastructure, economy, balancing different goals, etc.) that have prompted minor changes in the land use pattern near the Hillsborough area EDD. Justification Outline • Long and Short range planning ➢ Joint planning with Town of Hillsborough 2002-2020 (ongoing) ➢ Land use locations (heavier traffic nonresidential jobs south of city) ➢ Water sewer capacity and service area (WASMPBA, urban service line) ➢ Transportation and traffic • Infrastructure Planning (Utility and Roads) ➢ 2012 Orange County Capital Improvement Project (CIP) funding in Hillsborough Economic Development District (EDD) ➢ Efficient use of public services, promote economic development; Board of County Commissioners (BOCC Goals) ➢ 2018 Water system to Davis road now operated by Town of Hillsborough and Town CIP contributions ➢ 2016 Engineering water and sewer analysis for CIP ➢ Close proximity to interstate interchange serviceable by gravity sewer ➢ 1-40 and Churton St/Old 86 State Transportation Improvement Plan (STIP) ➢ Comprehensive Transportation MPO plans ➢ Access Management Plans • Development potential ➢ Development in area (Waterstone) led a reduction/conversion of economic development lands to residential, therefore need to adjust expand land use for more nonresidential. ➢ Floodplain extent in EDD reduced usable development acreage (2016) ➢ Limited perk ability of soils for nonpublic water and sewer areas under amendment ➢ Not in protected or critical watershed ➢ Need for regional uses including distribution and retail ➢ Expanded EDD area has similar characteristics to adjacent EDD and has a finite extent due to the ridge line (anti-sprawl limit) ➢ Logistics distribution is more prominent in the economy