HomeMy WebLinkAboutAgenda - 09-15-20; 8-f - City of Durham’s Teer Quarry Reservoir – Resolution of Support from Orange County for Reclassifying a Segment of the Eno River for Water Supply in Durham County
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 15, 2020
Action Agenda
Item No. 8-f
SUBJECT: City of Durham’s Teer Quarry Reservoir – Resolution of Support from Orange
County for Reclassifying a Segment of the Eno River for Water Supply in
Durham County
DEPARTMENT: Planning & Inspections
ATTACHMENTS: INFORMATION CONTACT:
1. City of Durham’s Request for Resolution of Craig Benedict, Planning Director,
Support from Orange County 919-245-2592
2. Cost Estimate and Durham Statement Christopher Sandt, Staff Engineer,
of Cost Reimbursement to Orange County 919-245-2583
3. Timeline for Teer Quarry Initiatives
4. Executed Resolution of Support from the Town
of Hillsborough
5. Draft Orange County Resolution of Support
PURPOSE: To consider approval and signature by the Board Chair of a Resolution of Support
from Orange County related to the City of Durham’s (City’s) proposed initiative to make the Teer
Quarry Reservoir a new public water supply and reclassifying a segment of the Eno River within
Durham County as Water Supply, in conformance with the State’s Water Supply Watershed
Protection Program. The City has formally requested Orange County’s support for this effort
which would require the County to take the necessary steps to provide public notice and initiate
the associated public hearing(s), Planning Board meeting(s) and Board of County
Commissioners (BOCC) meeting(s) to amend land use restrictions imposed by water supply
watershed protection rules for the affected areas within Orange County.
BACKGROUND: The City of Durham owns and operates the Teer Quarry Reservoir (Quarry),
an emergency water storage reservoir located along the Eno River in Durham County
approximately 0.80 miles to the east of US-501 and approximately 15 miles downriver from the
USGS Eno River at Hillsborough gauge (USGS Gauge #02085000).
Attachment 1 is a written request by Mr. Donald F. Greeley (Director, City of Durham
Department of Water Management) for Orange County to approve a Resolution of Support to
make the Teer Quarry Reservoir a new public water supply and reclassifying a segment of the
Eno River within Durham County as Water Supply, in conformance with the State’s Water
Supply Watershed Protection Program.
The City plans to convert the Quarry to a non-emergency source of water supply for the City
once the Quarry has been appropriately classified for drinking water purposes and approved by
1
the North Carolina Environmental Management Commission (EMC). To convert the Quarry to a
Water Supply, the City must construct a new raw water intake on the Eno River approximately ¾
mile upstream of the City’s existing Eno River emergency intake. Construction and use of the
new raw water intake will require that all affected Orange County parcels located within the ¾
mile upstream shift adhere to land use ordinances imposed by the State’s Water Supply
Watershed Protection Program. Attachment 1 is an overall map showing the proposed location
of the new raw water intake, as well as a display of the affected areas within Orange County that
would require reclassification as a Water Supply Watershed.
Specifically, the location of the proposed new raw water intake would affect approximately 850
property owners within Orange County (i.e. owners of parcels that would be located within the
expanded Watershed Protection Overlay District). Approximately 700 additional property
owners within Orange County would have to be notified due to Orange County’s 1,000-ft
notification requirement. Orange County’s approval of a Resolution of Support would require
Orange County to commit to the following items:
A Public Information Meeting (PIM) would need to be held, requiring approximately 1,550
first class letters to be mailed out prior to the meeting.
A Planning Board Meeting would also need to be held, requiring approximately 850
Certified Mail letters and approximately 700 first class letters to be mailed out prior to the
meeting. Approximately 425 signs, at a minimum, would need to created and posted
prior to the Planning Board Meeting. A legal ad would also need to be published for the
Planning Board Meeting.
A BOCC Public Hearing would also need to be held, requiring the same mailings,
signage and legal ad postings as the required Planning Board Meeting.
Attachment 2 provides a detailed/itemized list of Orange County public notice and meeting
requirements associated with the City’s proposed Teer Quarry Initiatives.
The City has provided Orange County with a general timeline in Attachment 3 for the Teer
Quarry initiatives (e.g. permitting, engineering/design, construction). The City hopes to have the
new raw water intake and distribution lines constructed by the 3rd Quarter of 2025.
The City has also requested a Resolution of Support for this initiative from the Town of
Hillsborough (Town). The Town Board of Commissioners reviewed and approved the Town’s
Resolution of Support at its March 9, 2020 Regular meeting. Attachment 4 is a copy of the
Town’s executed Resolution of Support.
Resolution of Support from Orange County: Orange County Staff has no objection to the
City’s intent to classify the Teer Quarry Reservoir as a Water Supply and construct a new raw
water intake on the Eno River approximately ¾ mile upstream of the City’s existing Eno River
emergency intake within Durham County. While Orange County’s public notice and public
meeting requirements for these initiatives are quite substantial, Orange County Staff is in
support of the City’s initiative to ensure reliable future water supply for their
constituents/customers. Attachment 5 is a draft Orange County “Resolution of Support” for
proposed Board approval, signature by the Board Chair, and distribution to the City.
2
Orange County understands that City’s initiatives to classify the Quarry as a Water Supply and
to construct a new intake on the Eno River approximately ¾ mile upstream of the City’s current
water intake location will not be undertaken until the City obtains all necessary approvals from
the NC Department of Environmental Quality Division of Water Resources (DWR) and the EMC.
FINANCIAL IMPACT: The estimated financial impact to Orange County for the required public
meetings, mailings and signage is estimated to range from $24,657.50 to $39,532.50. The
actual cost will depend on whether Orange County will adhere to Orange County public notice
requirements (i.e. the higher estimate), or the minimum public notice requirements under State
las (i.e. the lower estimate). The City has committed in writing (Attachment 2) that it will
reimburse Orange County for all costs related to the expansion of the water supply watershed
protection zone (i.e. the Watershed Protection Overlay District) within Orange County, given a
detailed and approved invoice.
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to
this item:
• GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND
ENVIRONMENTAL POLICIES
The fair treatment and meaningful involvement of people of all races, cultures, incomes
and educational levels with respect to the development and enforcement of
environmental laws, regulations, policies, and decisions. Fair treatment means that no
group of people should bear a disproportionate share of the negative environmental
consequences resulting from industrial, governmental and commercial operations or
policies.
ENVIRONMENTAL IMPACT: The following Orange County Environmental Responsibility Goal
impacts are applicable to this item:
• RESULTANT IMPACT ON NATURAL RESOURCES AND AIR QUALITY
Assess and where possible mitigate adverse impacts created to the natural resources of
the site and adjoining area. Minimize production of greenhouse gases.
RECOMMENDATION(S): The Manager recommends that the Board approve the attached
Orange County “Resolution of Support” (Attachment 5) for signature by the Board Chair and
subsequent distribution to the City.
3
4
5
6
From:Miller, Sydney
To:Craig Benedict
Cc:Michael Harvey; Christopher Sandt; Elaina Cheek; Whiteman, Scott; Greeley, Don
Subject:[EXTERNAL MAIL!] RE: City of Durham"s Teer Quarry Reservoir - Proposed Intake Relocation - General
Discussion
Date:Wednesday, July 15, 2020 2:57:09 PM
Attachments:image001.png
image002.png
Craig,
We understand that the cost estimate for the public notification required by Orange County and
related costs of the water supply watershed protection land use ordinance change for the Teer
Quarry project is from $24,657.50 to $39,532.50. We would reimburse those costs given a detailed
invoice.
1.When might a resolution of support for the reclassification of the Eno River for water supply
be placed before the Orange County Board of Commissioners?
2.What are our next steps?
--Syd
--
Sydney Paul Miller
Water Resources Manager
Department of Water Management
City of Durham
1600 Mist Lake Drive
Durham, NC 27704
919.560.4381 ext. 35201
Sydney.Miller@durhamnc.gov
Please note that e-mail correspondence to and from this sender may be subject to
the provisions of North Carolina Public Records Law and disclosed to third parties.
From: Michael Harvey [mailto:mharvey@orangecountync.gov]
Sent: Monday, July 13, 2020 11:18 AM
To: Miller, Sydney <Sydney.Miller@durhamnc.gov>; Whiteman, Scott
<Scott.Whiteman@durhamnc.gov>
Cc: Craig Benedict <cbenedict@orangecountync.gov>; Christopher Sandt
<csandt@orangecountync.gov>; Elaina Cheek <echeek@orangecountync.gov>
Subject: FW: City of Durham's Teer Quarry Reservoir - Proposed Intake Relocation - General
Discussion
Attachment 2 7
Syd: hope you are well.
While you and I reviewed this information in a phone call in late June, I was asked by Mr. Benedict if I
could forward this e-mail chain on advertising costs to you today.
Let me know if I can be of additional assistance.
Michael D. Harvey AICP, CFM, CZO
Current Planning Supervisor
Orange County
131 West Margaret Lane
Suite 201
PO Box 8181
Hillsborough, NC 27278
(919) 245-2597
Permit and Inspection Information is NOW AVAILABLE ONLINE!! Click here to access our portal
Pursuant to North Carolina General Statute 132, correspondence sent and received from this account
is a public record and may be disclosed to third parties.
SERVICE IMPACTS FROM COVID-19
PLEASE NOTE: Orange County and the State of North Carolina has issued Declaration(s) of a
State of Emergency due to the COVID-19 pandemic. The Order shall remain in effect until
August 3, 2020 at 5:00 p.m. The Order shall be reviewed periodically to determine whether it
should be extended, modified, or rescinded. For the latest information and guidance relating
to Orange County’s COVID-19 response, visit https://www.orangecountync.gov/Coronavirus
Effective immediately, the following adjustments have been made to protect employees and the
general public and to ensure that service levels can be maintained throughout the duration of the
COVID-19 pandemic.
Office Hours: Current Planning offices shall be open from 11 a.m. to 2 p.m. daily for the receipt of
applications and handling of previously scheduled appointments. Until further notice, members of
the general public needing to see a planner will need to schedule an appointment to do so and wear
face coverings (i.e. masks).
Planning staff can be reached at the following:
8
Michael Harvey, Supervisor: (919) 245-2597 or mharvey@orangecountync.gov
Patrick Mallett, Planner 2: (919) 245-2577 or pmallett@orangecountync.gov
Molly Boyle, Planner 1: (919) 245-2599 or mboyle@orangecountync.gov
Tyler Sliger, Planning Technician: (919) 245-2598 or tsliger@orangecountync.gov
Meetings: Meeting(s) shall occur by appointment only during revised operating hours listed above.
Please note staff will observe appropriate social distancing requirements and staff 6 feet away
from parties attending a meeting at all times.
Plan Review: Applications for development projects shall be accepted:
Electronically via e-mail;
By Mail sent to: Orange County Planning
ATTN: Current Planning Division
PO Box 8181
Hillsborough, NC 27278
Dropped off in person during the revised operating hours listed above. PLEASE NOTE:
Applications physically dropped off at Planning offices shall be placed in an appropriately labeled
drop box and shall not be handed by staff until appropriate social distancing protocols can be
observed. Staff will be unable to review and discuss the proposal with you at the time of submittal.
Submittal of Fees: Fees can be submitted with the application (mail and in person). Those
applicant’s needed to pay using a credit card shall be contacted by staff to process a payment
over the phone. PLEASE NOTE: Until further notice, cash shall not be accepted/handled by staff.
Permits: Permits shall be processed as quickly as possible. Please note deficiencies in the
application submittal will impact staff’s ability to process the development request.
Inspections: Inspections shall be completed either on a first come basis or via appointment. If
staff is required to meet applicants in the field, appropriate social distancing policies shall be
adhered to.
Communications: Current Planning staff can be reached at the e-mail addresses and phone
numbers listed above.
From: Michael Harvey
Sent: Monday, June 08, 2020 11:43 AM
To: Craig Benedict (cbenedict@orangecountync.gov); Christopher Sandt; Elaina Cheek
Subject: FW: City of Durham's Teer Quarry Reservoir - Proposed Intake Relocation - General Discussion
Based on my read of available information, I have the following:
1. Project will directly impact 850 property owners (i.e. now within the Watershed Protection
9
Overlay District);
2. Approximately 700 property owners will have to be notified given the County’s 1,000 ft.
notification requirement.
Cadence: my review of the UDO, as well as past practice, indicates to me:
Public Information Meeting (NIM):
a. County will hold a public information meeting (consistent with past projects);
b. Will need to coordinate with Durham staff to attend the public information meeting;
c. 1,550 first class letters will be sent (impacted property owners and within 1,000 ft.) with a
total cost of $852.50 ($0.55 first class rate per letter);
Format of meeting unknown at this time (i.e. on-line versus in person meeting)
Estimated advertising costs: $852.50
Planning Board Meeting:
a. ‘Impacted property owners’ have to be notified of the Planning Board meeting via certified
mail (Section 2.8.7 (D)) – 850 property owners at $4.80 per letter: Total Cost: $4,080.00
b. 700 property owners within 1,000 ft. will get a first class mailed notice of Planning Board
meeting (700 letters at $0.55 per letter): Total Cost: $385.00
c. Signs have to be placed on the impacted properties (staff conservatively figures there will
need to be at a minimum of 425 signs – each property has to be posted. Staff can post a
sign on 2 properties at once) advertising the Planning Board meeting. Total cost of signs will
depend on the order, size of sign, etc. When we completed signs for atlas amendment
removing the ‘special flood hazard area overlay district’ we paid approximately $35 per sign
(including wire support brackets). Total anticipated cost: $14,875.00
d. Legal ad will have to be published for the Planning Board meeting. Price will be based on
inclusion of a map and size. Unknown what format this will take.
Estimated Planning Board meeting advertising costs: $ 19,340.00
BOCC – Public Hearing:
a. ‘Impacted property owners’ have to be notified of the Public Hearing via certified mail
(Section 2.8.7 (D)) – 850 property owners at $4.80 per letter: Total Cost: $4,080.00
b. 700 property owners within 1,000 ft. will get a first class mailed notice of Public Hearing
(700 letters at $0.55 per letter): Total Cost: $385.00
c. Signs have to be placed on the impacted properties (staff conservatively figures there will
need to be at a minimum of 425 signs – each property has to be posted. Staff can post a
sign on 2 properties at once) advertising the Public Hearing. Total cost of signs will depend
on the order, size of sign, etc. When we completed signs for atlas amendment removing the
‘special flood hazard area overlay district’ we paid approximately $35 per sign (including wire
10
support brackets). Total anticipated cost: $14,875.00
NOTE: We can print out new sign messages using plotter and re-use signs from
Planning Board meeting. I have no way of estimating cost of paper, ink, or laminating
materials we will incur. Not to mention staff time printing out new sign messages.
d.Legal ad will have to be published for the Public Hearing. Price will be based on inclusion of
a map and size. Unknown what format this will take.
Estimated Public Hearing advertising costs: $4,465.00 (presumes re-use Planning Board signs BUT
does not include costs of materials for printing new signs and does not include legal ad fee
estimate) to $19,340.00 (presumes new signs BUT without legal ad fee estimate)
As a general reminder, the County’s public notice requirements exceed what is required under State
law, which increases advertising costs.
Craig: do I have your permission to share this with Durham or do you want an internal discussion
first?
Thanks. Look forward to hearing from you.
MDH
11
Teer Quarry Project
5/7/2020
Begin End Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Permitting
Teer Quarry Operation
Hydrologic Modeling 6/1/2010 11/6/2012
Water Quality Modeling 2/18/2015 9/21/2016
Hydrologic Modeling 1/2/2018 7/2/2019
DEQ Approval of Teer Quarry Operation 5/2/2017 2/20/2019 !
Eno River Capicity Use Water Management
Letters of No Objection
Town of Hillsborough 8/30/2019 2/14/2020
Orange-Alamance Water System 8/30/2019 12/30/2019
Orange County 8/30/2019 3/10/2020
Resco Products, Inc. (formerly Piedmont Minerals)8/30/2019 2/4/2020
EMC Approval 3/17/2020 7/8/2020
Teer Quarry Ground Water Remediation
Phase II Remedial Investigation Work Plan 2/6/2020
Monitoring and Analysis
Eno River Water Supply Reclassification
Resolutions of Support
City of Durham 3/14/2019 4/20/2020
Durham County 3/14/2019 4/27/2020
Town of Hillsborough 12/7/2018 3/9/2020
Orange County 12/7/2018 9/1/2020
Water Supply Reclassification Request 9/7/2020 3/1/2022
DWR Data Collection & Analysis
EMC Approval
Teer Quarry Water Supply Reclassification
Water Supply Reclassification Request 9/7/2020 3/1/2022
DWR Data Collection & Analysis
EMC Approval
Preliminary Engineering
RFQ, Selection, Contracting
PER
Design and Permitting
RFQ, Selection, Contracting
Facility Permitting
Quarry Berm Design
Eno River Intake and Pump Station Design
Raw Water Line-In Design
Teer Quarry Intake and Pump Station Design
Construction
Bidding, Selection, Contracting
Quarry Berm Construction
Eno River Intake and Pump Station Construction
Raw Water Line-In Construction
Teer Quarry Intake and Pump Station Construction
2024 20252019 2020 2021 2022 2023
12
13
Res. #_RES-2020-056__
ORANGE COUNTY BOARD OF COMMISSIONERS
Resolution of Support for Reclassifying a Segment of the Eno River for Water Supply in
Durham County, North Carolina
WHEREAS, the City of Durham owns Teer Quarry located at 5090 Denfield Road in Durham County,
adjacent to the Eno River; and
WHEREAS, Teer Quarry is critical for meeting the City’s emergency water supply needs and will
improve the City’s water system reliability; and
WHEREAS, Orange County has an allocation of water supply storage in Jordan Lake with the
expectation that the City of Durham’s water supply system will serve a portion of Orange County with
water from Orange County’s Jordan Lake water supply allocation; and
WHEREAS, the City of Durham is at the center of an interconnected, regional water supply network
that includes the Town of Hillsborough, the Orange Water and Sewer Authority, Chatham County, the
City of Raleigh, and the Town of Cary; and
WHEREAS, improving the City of Durham’s water supply reliability improves water supply reliability
for the Town of Hillsborough, the Orange Water and Sewer Authority, and Orange County; and
WHEREAS, use of Teer Quarry as a water supply requires filling it from a new intake in the Eno
River; and
WHEREAS, the North Carolina General Statutes require that the segment of the Eno River in which
the new intake is located and its watershed, as well as Teer Quarry, be reclassified to protect the
quality of the water;
NOW, THEREFORE, we, the Orange County Board of Commissioners hereby resolves to support the
reclassification of the lands and waters identified by the North Carolina Department of Environmental
Quality as being within the new Eno River intake watershed to WS-IV NSW with a Critical Area (CA)
and Protected Area (PA), and Teer Quarry to WSIV NSW CA.
This 15th day of September, 2020.
Attest:
__________________________________ ________________________________
David Hunt, Deputy Clerk to the Board Penny Rich, Chair
Orange County Board of Commissioners
Attachment 5 14