HomeMy WebLinkAboutOUTBoard Agenda Packet - 091620AGENDA
ORANGE UNIFIED TRANSPORTATION BOARD
Wednesday, September 16, 2020
OUTBoard Meeting – 6:30 pm
GO TO MEETING
Please join my meeting from your computer, tablet or smartphone.
https://global.gotomeeting.com/join/405258197
You can also dial in using your phone.
United States: +1 (408) 650-3123
Access Code: 405-258-197
No. Page(s) Agenda Item
1. Call to Order
2.
3 – 6
Approval of Minutes
August 19, 2020 OUTBoard Meeting
3. Consideration of Additions or Changes to Agenda
4. Transit Advisory Services(TAS)/Orange County Public Transportation (OCPT)
This section of the agenda is addressed jointly by the OUTBoard and supplemental
staff from other County departments (Aging; DSS; Housing, Human Rights and
Community Development; Health; and Child Support Enforcement) to address OCPT
transit services.
4.a. OCPT Administrative Updates (TeLeishia Holloway, Allyson Coltrane, Percy
Mahone) – Information provided through the meeting
OUTBoard/TAS Action: Receive and review information, provide comments
4.b. TAS Comments/Questions (OCPT Staff)
Opportunity for TAS members to offer transit related comments and ask questions
regarding issues on the agenda
5. Regular OUTBoard Agenda
5.a.
7 - 10
Durham-Chapel Hill-Carrboro Metropolitan Planning Organization Comprehensive
Transportation Plan Amendment (Nish Trivedi)
Action: Recommend Attachment 1 to the BOCC for inclusion in the upcoming
DCHC MPO CTP amendments.
6. Staff Report/Updates
6.a. 11 – 14 MPO/RPO and NCDOT (Nish Trivedi)
Action: Receive the Update.
7. Information Items
8. Adjournment
The next OUTBoard meeting date is October 21, 2020
Charge of the OUTBoard (from Section I, Part C of the adopted Rules and Procedures)
1. The OUT Board is charged with advising the Board of County Commissioners on the
planning and programming of transportation infrastructure improvements and other
County transportation planning initiatives, as directed by the Board.
2. From time to time the OUT Board may be directed to provide input on regulations on
which the Planning Board has primary statutory and local ordinance advisory duties.
In such instances, the OUT Board shall serve in an advisory capacity to the Planning
Board.
Meetings (from Section IV, Part C of the adopted Rules and Procedures)
C. Date, Time, and Location of Regular Meetings (Subject to County COVID-19 Protocols)
3. Regular meetings of the OUT Board shall be held as needed to address items that
require Board action consistent with its Charge and Duties identified herein. Meetings
are held on the third Wednesday of the month. The start time and location of the
meeting shall be included on the agenda and shall typically be 6:30 p.m. at the
Orange County West Campus Office Building located at 131 West Margaret Lane,
Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority
to change the start time and location of a regular meeting to meet any special
circumstances, provided the information is included on the distributed agenda.
D R A F T
1
MINUTES 1 ORANGE COUNTY OUTBOARD 2 AUGUST 19, 2020 3
REGULAR MEETING 4 (Due to current public health concerns, this meeting was held virtually. 5
Members of the OUTBoard, staff and public participated remotely) 6
7 MEMBERS PRESENT: Art Menius, At-Large Representative (Chair); Jenn Sykes, At-Large Representative; Ed Vaughn, 8
Cedar Grove Township Representative; David Laudicina, Cheeks Township Representative; Eric Broo, At-Large 9
Representative; Johanna Birckmayer, At-Large Representative; Heidi Perry, At-Large Representative; Brantley Wells 10
(Vice Chair), Hillsborough Township Representative; Tony Blake, At-Large Representative; Roy Schonberg, Chapel 11
Hill Township Representative; 12 13 MEMBERS ABSENT: Amy Cole, At-Large Representative; Randy Marshall, Bingham Township Representative; 14
Vacant, Eno Township Representative; 15
16 STAFF PRESENT: Nish Trivedi, Transportation Planner; Tom Ten Eyck, Transportation/Land Use Planner; 17
18 OTHERS PRESENT: Matt Day, TARPO 19
20 AGENDA ITEM 1: CALL TO ORDER, DETERMINATION OF QUORUM AND INTRODUCTION OF NEW MEMBERS 21
Eric Broo called the meeting to order and roll call was taken 22 23 AGENDA ITEM 2: APPROVAL OF MINUTES 24
MOTION by Art Menius to approve the February 19, 2020, OUTBoard Minutes. Seconded by Heidi Perry. 25 VOTE: UNANIMOUS 26 27 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 28
29 AGENDA ITEM 4: REGULAR OUTBOARD AGENDA 30
31 AGENDA ITEM 4A: ORANGE COUNTY COMPREHENSIVE TRANSPORTATION PLAN (CTP) – (NISH TRIVEDI) 32
Nish presented the item and reminded Board members that no action is required at this time. Action will be requested 33
at the September meeting. Key highlights from the presentation include the preliminary work started last year 34
following the MTP amendment, subcommittee meeting with all jurisdictions, and forthcoming schedule. The focus of 35
the amendment is highway projects in Orange County’s portion of DCHC MPO. 36
37
Heidi Perry: Freight, does that mean rail? I have never seen it considered part of complete street as part of 38
multimodal. Maybe it should be reworded. 39
40
Nish Trivedi: No, US 70 is considered a strategic freight corridor. I’ve received pushback from NCDOT and MPO and 41
they want to see multiple reasons and data to back up those reasons why these should be considered for multimodal. 42
That is why I am requesting your assistance to get them considered. I am adding freight because we are 43
experiencing lots of development around Hillsborough. The Planning Board is considering one major development 44
tonight and there are economic development involving lots of freight along US-70. 45
46
Tony Blake: Regarding the consideration tonight, is this area being considered? I was wondering if this is being 47
considered across other issues or is this going ahead. 48
49
Nish Trivedi: Yes, #9 is Old NC-86 around this new development proposal. It is an approved County Priority it as a 50
County priority. We are also keeping an eye on Davis Road. 51
52
Heidi Perry: I am in favor of modernization but confused, are we seeking widening? 53
3
D R A F T
2
54
Nish Trivedi: No, the first 13 are seeking your approval for complete street consideration so that they can have the 55
option for any multimodal improvements like sidewalk, side paths, and transit stops paid by NCDOT. Later, I will need 56
you to recommend we study US-70. 57
58
Heidi Perry: Why wouldn’t you say future projects should have Complete Street Policy applied? 59
60
Nish Trivedi: I am getting push back from MPO and NCDOT. They are considering it, but they are not pushing this 61
forward. Right now I’m trying to get local support, your support and BOCC support. If I can show local support, 62
perhaps they will push this forward. I am also showing you the data that goes with them. In your attachment, the first 63
13 sheets include that data that goes with these projects already in the CTP. I don’t want them to go ahead with their 64
amendment and these projects not get Complete Street consideration. 65
66
Heidi Perry: Simply confused by the wording. If they will be considered for Complete Streets great, just use Complete 67
Streets. 68
69
Heidi Perry: Can LOS be removed? 70
71
Nish Trivedi: It is standard practice for NCDOT and MPO because it is used to measure capacity for a road. It is like 72
a letter grade on a road to see if it will fail in the future. It is simply the division of Future Volume over the total 73
Capacity of the road. Due to development, certain corridors in the County will fail in the future. 74
75
Heidi Perry: I understand NCDOT’s use but if we are going to have more people or destinations, we should be 76
thinking more about how we move them without more vehicles on the road. It is tied to road widening. 77
78
Tony Blake: LOS is more about the quality of the road. It is also about how traffic backs up, delays, intersections, 79
signalization, it is used for lot of things. 80
81
Eric Broo: Downtown Chapel Hill took out a couple lanes and driving there was great. Even though LOS has gone 82
down, my enjoyment has gone up. I understand Heidi Perry’s point on LOS and widening. 83
84
Nish Trivedi: Just to clarify. Staff is not recommending any widening. We are not using LOS to widen the road, 85
mainly to show the future failure of the road and something needs to be done about it. 86
87
Eric Broo: When they consider LOS do they consider other modes or just vehicles? 88
89
Nish Trivedi: NCDOT has gotten to use LOS to measure safety of the road. They are working on the data and 90
clarifying it but have not published it. It is supposed to include other users, not just vehicular. 91
92
Eric Broo: NC-86 from Caswell to Chatham cuts through the heart of Chapel Hill. Do they see fright going through 93
the area? I hope truckers don’t take their freight through the campus. 94
95
Nish Trivedi: NC-86 is a strategic freight corridor and it does have some freight. The Chapel Hill has already 96
approved the Locally Preferred Alternative for the NS BRT. 97
98
Nish provided a summary of Environmental Justice Report focusing on County Level analysis. 99
100
Nish Trivedi: When a block group meets multiple county thresholds, it is a Community of Concern. The highlighted 101
areas are the block groups that meet 4 or more overlapping criteria and Communities of Concerns. These are areas 102
that need special focus on transportation improvements. Just to remind everyone, staff is not recommending 103
widening, adding additional lanes or addressing substandard conditions. We are mainly recommending regional 104
corridors like NC and US and part of Orange Grove Road and New Hope Church Road because they are school 105
areas. Like the Access Management Plan, we are recommending these corridors be considered for multimodal. 106
4
D R A F T
3
107
Ed Vaughn: I have a question about ID 20 – 23 – NC-86 between Hillsborough and Chapel Hill. Is there any way to 108
add Shared Use Path? It would also get access to Blackwood Farm Park. It would be a great way to connect the two 109
areas. 110
111
Nish Trivedi: We can but if that is what the OUTBoard recommends. As staff, we are not recommending anything 112
specific complete street option, only that all options be available for these corridors. We would need you as the board 113
to make that specific recommendation for NC-86. If you have any specifics like where you want bike lanes or 114
sidewalks, we will need that support to hopefully get NCDOT and MPO to change their minds. 115
116
Eric Broo: It would be nice to be able to ride that corridor safety, in our next meeting would we just have to take a 117
vote on what we want for these corridors. Is that correct? 118
119
Nish Trivedi: In your attachment 2, you will see the overall project list map and each individual project sheets. You 120
will either recommend BOCC approve or not approve this project and provide comments. In the next meeting, I will 121
request you approve attachment 1. If there are any other recommendations you would like to make, I would need you 122
to vote on it as a board. 123
124
Eric Broo: Would these other recommendations be considered a hindrance, if we were to recommend a specific 125
improvement, would that be considered favorable or hindrance in trying to get it approved in the amendment. 126
127
Nish Trivedi: We as a local jurisdiction do not have final say in the amendment process. The MPO Board does. All 128
we can do is show support. I do not know what you want to see in these corridors, I would need those 129
recommendations from you. If you recommend more than what staff is recommending, MPO may see this as local 130
support and they may move them forward but I cannot speak for the MPO Board or NCDOT. Right now, they have 131
given me a no and I’m trying to change that no. 132
133
Eric Broo: If we blanked approve this, will we have opportunity to make specific recommendations later? 134
135
Nish Trivedi: Yes, until a project gets committed in the future STIP, we will have more time to make 136
recommendations. Right now the CTP is a visionary document and it is changing. Only after SPOT does design 137
actually get involved. We will have more opportunities than. Right now I’m just trying to get you involved in the 138
process to help me change their mind. 139
140
Heidi Perry: Will you give us a statement we can support or modify when we see this again? It would make this go 141
faster if we had it. I think when you include Safety, you should include NC is a Vision Zero state. 142
143
Nish Trivedi: You can email me a draft or I can put something together. 144
145
Ed Vaughn: Where does the I-40 and NC-86 interchange fit into this? 146
147
Nish Trivedi: This interchange improvement has been delayed due to NCDOT funding issues as part of the I-40 148
widening. It is split into 3 projects. 149
150
Eric Broo – Nish will you put a statement together and bring it before us at the next meeting. 151
152
Nish Trivedi: I’ll put something together and get it to you for the next meeting. Reviewed the Cross Section, rural 153
areas will get the wide paved shoulder while urban areas like Hillsborough, Carrboro, Mebane, and Chapel Hill will 154
get curb and gutter. 155
156
Nish Trivedi: This item is for information and review tonight and will go back to the OUTBoard as part of the 157
September 16, 2020 OUTBoard/TAS meeting for recommendations 158
159
5
D R A F T
4
AGENDA ITEM 5: STAFF REPORTS/UPDATES 160
161 AGENDA ITEM 5A: MPR/RPO AND NCDOT UPDATES (NISH TRIVEDI) - 162
Nish provided MPO, RPO and NCDOT update, with the disclaimer that NCDOT project schedule is subject to change 163
due to state funding issues. 164
165
Heidi Perry: I’m confused by NC-54 Operation Improvements with bike/ped accommodations. Is this the project 166
before widening 54? What were the bike/ped accommodations? I think they put in trippers and signals. 167
168
Nish Trivedi: Yes, this is an old funded project in the previous STIP. This is adding traffic signals and improve the 169
function without widening. I don’t have all the details but I think this project was completed last year. But we can see 170
if there is any more information on it. 171
172 AGENDA ITEM 5B: BIKE SAFETY MATERIALS AND EVENTS (TOM TEN EYCK) - 173
Tom T provided a presentation on the item. 174
175
Eric Broo: What about unanticipated costs? 176
177
Tom Ten Eyck: They are not part of the approved County Budget, they are on us separately. We may pursue County 178
budget in the future but right now, they are on us to pay. This includes ongoing maintenance. 179
180 AGENDA ITEM 5C: MTSA STUDY ALONG ORANGE GROVE ROAD (TOM TEN EYCK) - 181
Tom T provided a presentation on the item, including schedule and process. Page 70, Orange County School Board 182
currently does not have any walkable schools zones in the district. Will provide the Grady Brown study to those 183
members who want it. Cedar Ridge Study is forthcoming. 184
185
Tom Ten Eyck will email the report to the Board via admin. 186 187 AGENDA ITEM 6: INFORMATION ITEMS 188
189
AGENDA ITEM 7: ADJOURNMENT 190
OUTBoard meeting was adjourned 191
192
193
194
____________________________________
Erik Broo, Chair
6
ORANGE COUNTY
ORANGE UNIFIED TRANSPORTATION BOARD
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 16, 2020
Action Agenda
Item No. 5.a
SUBJECT: Durham-Chapel Hill-Carrboro Metropolitan Planning Organization
Comprehensive Transportation Plan Amendment
DEPARTMENT: Planning and Inspections
ATTACHMENT(S): INFORMATION CONTACT:
1. Staff Recommendations
Nishith Trivedi, Transportation Planner,
919-245-2582
PURPOSE:
To provide recommendations to the Board of County Commissioners (BOCC) on Orange
County’s portion of the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization
(DCHC MPO) Comprehensive Transportation Plan (CTP) Amendment.
BACKGROUND: On August 19, Orange Unified Transportation Board (OUTBoard) received a
presentation on Orange County’s CTP, focusing on DCHC MPO CTP Amendment. This
amendment seeks to coordinate potential highway improvement projects in Orange County to
NCDOT’s new Complete Street Policy, to “encourage non-vehicular travel without compromising
the safety, efficiency, or function of the facility”. This policy gives NCDOT the opportunity to
consider paying for non-highway improvements as facilities that lie within improved highway
projects through NCDOT’s new Cost Share (section 6 of the new Complete Street
Implementation Guide):
• In CTP – NCDOT pays full – pedestrian and on road bicycle facility, side path, greenway
crossing, bus pull out, bus stop (pad only)
• Not in CTP but Needs Identified – NCDOT pays full – on road bicycle facility
o All other project types are based on a cost share by local jurisdiction using new
percent cost-share based on population.
o Needs Identified are non-highway projects in locally adopted plans (e.g. local
bike/ped or transit plans)
• Betterment – Local jurisdictions pay for all non-highway improvements.
o Section 6.3 describes this as “A requested bicycle, pedestrian or public
transportation improvement that exceeds the recommendations appearing in an
adopted plan and/or exceeds the needs identified through the project development
process”
Staff requests OUTBoard review and recommend BOCC approve Attachment 1 and submit it to
DCHC MPO for inclusion in the CTP Amendment project list. Below is summary of staff request:
7
• Highway projects #1 – 13 – Are currently in the CTP and requesting future highway
improvements along these segments should consider all Complete Street opportunities.
• Highway projects #14 – 26 – Staff requests these CTP amendments are included so that
they may qualify for Complete Street consideration and all opportunities.
o Cross Section 2A – 60’ right-of-way, 12’ travel lane, 5’ paved shoulder, rural areas
o Cross Section 2E – 60’ right-of-way, 11’ travel lane, bike lane and sidewalk, urban
areas
o Complete Street forms would be submitted requesting bike lane, sidewalk, side path
and/or transit be considered should such projects be submitted for future Strategic
Prioritization of Transportation (SPOT) process.
Even during the COVID-19 pandemic, an increasing number of people are exclusively using
automobiles as their primary means of travel with US roadways nearly restored to pre-pandemic
VMT levels. While the pandemic does have significant impact on NCDOT funding, development
continues to occur in Orange County and surrounding areas, leaving it to local jurisdictions to
plan for its future.
At August 19, 2020 OUTBoard meeting, staff was requested to draft a unifying statement for all
recommendations rather than separate statements for each project. The prepared drafts are
below:
Attachment 1, page 1
The OUTBoard recommends that the BOCC approve projects 1-13, which already are in the
DCHC MPO CTP, to be considered for all Complete Streets opportunities. Attachment 1, page
1 contains the recommended cross-sections and multi-modal instruments and shall accompany
our recommendation.
Attachment 1, page 2
The OUTBoard recommends that the BOCC approve projects 14-26 to be added to the DCHC
MPO CTP Amendment list and that they be considered for all Complete Streets
opportunities. Attachment 1, page 2 contains the recommended cross-sections and multi-modal
instruments and shall accompany our recommendation.
Authorization to proceed with DCHC MPO CTP amendments is scheduled to go before the
MPO Technical Committee in September and the DCHC MPO Board in October, which will
formally initiate the public process. Staff anticipates the amendment will be adopted by
December 2020.
• Staff will submit BOCC action, when complete, to the DCHC MPO Board for
consideration as part of its CTP Amendment.
FINANCIAL IMP ACT: There is no immediate financial impact associated with this item.
RECOMMENDATION(S): Staff requests that the OUT Board recommend Attachment 1 to the
BOCC for inclusion in the upcoming DCHC MPO CTP amendments.
8
Attachment 1Staff RecommendationsID ProjectFromToStatusProblem StatementCross Section1US 70N Churton StWest Hill Ave NNeeds Improvement Minimum 4G2US 70N Churton StUS 70ANeeds Improvement Minimum 4G3US 70I‐85/US 70 Connector West Hill Ave NNeeds Improvement Minimum 4G4US 70Mt Hermon Church Rd US 70ANeeds Improvement Minimum 4A5NC 86I‐85OLD NC 10Needs Improvement Minimum 4D6NC 86 NNC 57Cornelius StNeeds Improvement Minimum 4D7I‐85/US 70 connector I‐40/85US 70Needs Improvement Minimum 4A8NC 54Old Fayetteville Rd MPO Boundary Needs Improvement Minimum 2A9Old NC 86 Eubanks Rd I‐40 Needs Improvement Minimum 2A10 Eno Mtn Rd realignment Eno Mountain Rd Mayo St Recommended Minimum 2A11 Mt. Willing Rd I‐40/85 US 70 Needs Improvement None 2E12 Erwin Rd Sage Rd Whitfield Rd Needs Improvement Minimum 2E13 Homestead Rd Rogers Rd Old NC 86 Needs Improvement Minimum 2EStaff CommentsFuture improvements should include all Complete Street opportunities ‐ sidewalk, side path, bike lane, and/or bus stop pad per NCDOT's new Complete Street Policy and Implementation Guide. # 1 ‐ 8 Traffic along regional corridors (US and NC) will continue escalating resulting in poor level of service due to:* Increasing local development in the County and local jurisdictions; and* Regional growth in surrounding counties and neighboring cities. # 10 ‐ 13 Local jurisdictions may need to adopt local plans to address their portion of secondary roads per NCDOT's new Complete Street Policy.In CTPCurrent CTP Page 19
Attachment 1Staff RecommendationsID ProjectFromToStatusProblem StatementCross Section StatusProblem Statement Cross Section 14 US 70Ffland Cedar Grove Rd MPO BoundaryExistingNoneADQNeeds Improvement Minimum 2A/2E15 US 70Efland Cedar Grove Rd I‐85/US 70 Connector ExistingNoneADQNeeds Improvement Minimum 2A/2E16 US 70 / US 70 BUS NC 751Pleasant Green Rd ExistingNoneADQNeeds Improvement Minimum 2A/2E17 US 70 BUSSparger RdNC 751ExistingNoneADQNeeds Improvement Minimum 2A/2E18 US 70ALawrence RdUS 70ExistingNoneADQNeeds Improvement Minimum 2A/2E19 US 70ALawrence RdElizabeth Brady Rd ExistingNoneADQNeeds Improvement Minimum 2A/2E20 US 70A/NC 86Elizabeth Brady Rd S Churton StExistingNoneADQNeeds Improvement Minimum 2A/2E21 NC 86 I‐40 Whitfield Rd ExistingNoneADQNeeds Improvement Minimum 2A/2E22 NC 86 Whitfield Rd New Hope Church Rd. ExistingNoneADQNeeds Improvement Minimum 2A/2E23 NC 86 New Hope Church Rd. OLD NC 10 ExistingNoneADQNeeds Improvement Minimum 2A/2E24 NC 86 NColeman Loop (N) NC 57 ExistingNoneADQNeeds Improvement Minimum 2A/2E25 Orange Grove Rd Oakdale Dr Dimmocks Mill Rd ExistingNoneADQNeeds Improvement Minimum 2A/2E26 New Hope Church Rd. I‐40 OLD NC 10 ExistingNoneADQNeeds Improvement Minimum 2A/2EStaff CommentsFuture improvements should include all Complete Street opportunities ‐ sidewalk, side path, bike lane, and/or bus stop pad per NCDOT's new Complete Street Policy and Implementation Guide. #14 ‐ 24 ‐Traffic along regional corridors (US and NC) will continue escalating resulting in poor level of service due to:* Increasing local development in the County and local jurisdictions; and* Regional growth in surrounding counties and neighboring cities.#25 ‐ 2 public schools, alternative freight route, increasing traffic, safety, etc.#26 ‐ School area, parks, access to Highway 10, alternative freight route, traffic, safety, etc.Not In CTPCurrent CTPRecommended CTP Amendment Page 210
TIP/WBS # Description LET/Start
Date
Completion
Date Cost Status Project Lead
W-5707K
48283
Remove and replace existing curb & gutter and sidewalk,
add pedestrian signals, concrete island, and signal
modifications on SR 1010 (E. Main St / W. Franklin St) from
Brewer Ln to Graham St. in Chapel Hill and Carrboro
5/31/2019 Jul. 2020 $350,000 Construction - 100% complete, RTE final
inspection pending
Chris Smitherman
Derek Dixon
SM-5707H
48912.3.1
“To Pass Bicycles, 4 ft Min Clearance or Change Lane” sign
installations on portions of no passing zones on SR 1107
(Hillsborough Road) and SR 1104 (Dairyland Road).
Oct. 2019 Jun. 2020 $5,000 Signs installed 10/17/19 - 100% complete,
RTE final inspection pending
Dawn McPherson
SS-6007C
48888.1.1
48888.3.1
Guardrail installation on NC 86 just north of SR 1839
(Alexander Drive).
Oct. 2020 Apr. 2021 $50,400 Funds approved 9/5/19 but not released Chad Reimakoski
Derek Dixon
P-5701
46395.1.1
46395.3.1
Construct Platform, Passenger Rail Station Building at
Milepost 41.7 Norfolk Southern H-line in Hillsborough
6/30/2021 FY2023 $7,200,000 PE funding scheduled 7/1/2020,
Coordinate with U-5848
Matthew Simmons
I-3306AB
34178.1.5
34178.2.4
34178.3.8
I-40 widening from NC86 to Durham Co. line (US 15/501
Interchange). Includes a portion of interchange
improvements I-3306AC in Chapel Hill
3/15/2022 FY2024 $37,635,000 Planning and design activities underway,
Environmental document completed
3/21/19 under I-3306A, LET combined
with I-3306AC and W-5707C
Laura Sutton
I-3306AC
34178.1.6
34178.2.5
34178.3.9
Interchange improvements at I-40 and NC86 in Chapel Hill 3/15/2022 FY2024 $15,200,000 Planning and Design activities underway,
Environmental document completed
3/21/19 under I-3306A, LET combined
with I-3306AB and W-5707C
Laura Sutton
W-5707C
44853.1.3
44853.3.3
47490
Revise pavement markings and overhead lane use signs for
removal of inside lane drop configuration on I-40
Westbound in vicinity of US 15-501 interchange in Chapel
Hill. Resurfacing I-40 WB by use of contingency funds
3/15/2022 FY2022 $425,000 No bids on most recent letting, LET
combined with I-3306AB and AC
Chad Reimakoski
SS-4907CD
47936.1.1
47936.2.1
47936.3.1
Horizontal curve improvements on SR 1710 (Old NC 10)
west of SR 1561/SR 1709 (Lawrence Road) east of
Hillsborough. Improvements consist of wedging pavement
and grading shoulders.
Jun. 2022 Nov. 2022 $261,000 Planning and design activities underway Chad Reimakoski
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
Page 1 DCHCMPO June 2020
MPO Board 9/9/2020 Item 20
Page 7 of 10
11
TIP/WBS # Description LET/Start
Date
Completion
Date Cost Status Project Lead
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
SS-6007E
49115.1.1
49115.3.1
All Way Stop installation and flashing beacon revisions at
the intersection of SR 1005 (Old Greensboro Road) and SR
1956 (Crawford Dairy Road/Orange Chapel Clover Garden
Road)
Jun. 2022 Sept. 2022 $28,800 Funds approved 3/5/20 but not released Dawn McPherson
R-5821A
47093.1.2
47093.2.2
47093.3.2
Construct operational improvements including
Bicycle/Pedestrian accommodations on NC 54 from SR
1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old
Fayetteville Road).
6/21/2022 FY2024 $3,194,000 Planning and design activities underway,
coordinating with NC54 West Corridor
Study
Chris Smitherman
I-3306AA
34178.1.4
34178.2.3
34178.3.7
I-40 widening from I-85 to NC86 in Chapel Hill 3/21/2023 FY2025 $88,000,000 Planning and Design activities underway,
Environmental document completed
3/21/19 under I-3306A
Laura Sutton
I-5958
45910.1.1
45910.3.1
Pavement Rehabilitation on I-40/I-85 from West of SR 1114
(Buckhorn Road) to West of SR 1006 (Orange Grove Road)
11/21/2023 FY2025 $7,455,000 Funding approved 10/10/17 Chris Smitherman
U-5845
50235.1.1
50235.2.1
50235.3.1
Widen SR 1009 (South Churton Street) to multi-lanes from I-
40 to Eno River in Hillsborough
7/16/2024 FY 2027 $39,390,000 Planning and Design activities underway,
Coordinate with U-5848 and I-5967
Laura Sutton
I-5967
45917.1.1
45917.2.1
45917.3.1
Interchange improvements at I-85 and SR 1009 (South
Churton Street) in Hillsborough
10/15/2024 FY2027 $16,900,000 Planning and Design activities underway,
Coordinate with I-0305 and U-5845
Laura Sutton
I-5959
45911.1.1
45911.3.1
Pavement Rehabilitation on I-85 from West of SR 1006
(Orange Grove Road) to Durham County line
11/19/2024 FY2026 $11,155,000 Funding approved 10/10/17, Coordinate
with I-5967, I-5984 and I-0305
Chris Smitherman
I-5984
47530.1.1
47530.2.1
47530.3.1
Interchange improvements at I-85 and NC 86 in
Hillsborough
11/18/2025 FY2027 $11,000,000 Planning and Design activities underway,
Coordinate with I-0305 and I-5959
Laura Sutton
I-0305
34142.1.2
34142.2.2
34142.3.2
Widening of I-85 from west of SR1006 (Orange Grove
Road) in Orange Co. to west of SR 1400 (Sparger Road) in
Orange Co.
10/17/2028 FY2032 $132,000,000 Planning and design activities underway,
Project reinstated per 2020-2029 STIP
(funded project) and delete project I-5983
Laura Sutton
Page 2 DCHCMPO June 2020
MPO Board 9/9/2020 Item 20
Page 8 of 10
12
North Carolina Department of Transportation 6/8/2020
Active Projects Under Construction - Orange Co.
Contract
Number
TIP
Number
Location Description Contractor Name Resident
Engineer
Contract Bid
Amount
Availability
Date
Completion
Date
Work Start
Date
Estimated
Completion
Date
Progress
Schedule
Percent
Completion
Percent
C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE
COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5
S T WOOTEN
CORPORATION
Nordan, PE,
James M
$4,614,460.00 5/28/2019 2/15/2021 5/28/2019 2/15/2021 0 1.98
C204078 B-4962 REPLACE BRIDGE #46 OVER ENO RIVER ON US-70 BYPASS.CONTI ENTERPRISES,
INC
Howell, Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 12/28/2021 24 26.36
DG00393 RESURFACE FOLLOWING SR'S: SR 1101, SR 1118, SR 1119, SR 1124,
SR 1125, SR 1127,SR 1128 SR 1130, SR 1134, SR 1135, SR 1137, SR
1141, SR 1143, ETC.
RILEY PAVING INC Howell, Bobby J $1,084,520.40 4/2/2018 10/12/2018 6/18/2018 12/7/2018 100 99.97
DG00435 AST RETREATMENT ON 22 SECONDARY ROADS WHITEHURST PAVING
CO INC
Lorenz, PE, Kris $846,340.66 4/1/2019 10/11/2019 43977
DG00445 R-5787BB
W-5707A
INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS
INTERSECTIONS
LITTLE MOUNTAIN
BUILDERS OF
CATAWBA COUNTY
INC
Howell, Bobby J $319,319.80 6/25/2018 2/15/2020 8/6/2018 2/15/2020 100 92.94
DG00461 REHAB. BRIDGE #031 ON SR 1010 (E. FRANKLIN ST.) OVER BOLIN
CREEK & BOLIN CREEK TRAIL
M & J CONSTRUCTION
CO OF PINELLAS
COUNTY INC
Howell, Bobby J $2,456,272.12 11/12/2018 7/15/2019 3/15/2019 11/26/2020 73.86 56.95
DG00462 REHAB. BRIDGES 264, 288, 260, 543 IN GUILFORD COUNTY AND
BRIDGE 031 IN ORANGE COUNTY
ELITE INDUSTRIAL
PAINTING INC
Snell, PE, William
H
$967,383.15 8/1/2019 1/1/2020
DG00478 RESURFACE PORTIONS OF 41 SECONDARY ROADS IN ORANGE
COUNTY
CAROLINA SUNROCK
LLC
Hayes, PE,
Meredith D
$3,270,144.99 7/8/2019 10/30/2020 12/9/2019 10/30/2020 19.8 60.89
DG00483 RESURFACE SR 1010 (MAIN STREET/FRANKLIN STREET) FROM SR
1005 (JONES FERRY ROAD) TO NC 86 (COLUMBIA STREET)
CAROLINA SUNROCK
LLC
Howell, Bobby J $845,631.59 5/18/2019 8/7/2020
DG00485 U-5846 SR 1772 (GREENSBORO STREET) AT SR 1780 (ESTES DRIVE),
CONSTRUCT ROUNDABOUT
FSC II LLC DBA FRED
SMITH COMPANY
Howell, Bobby J $3,375,611.30 5/28/2019 3/1/2022 7/29/2019 6/10/2022 36 33.65
Page 1 of 1
MPO Board 9/9/2020 Item 20
Page 9 of 10
13
Contract # or
WBS # or TIP #Description Let Date Completion
Date Contractor Project Admin.STIP Project
Cost Notes
U-6192 Add Reduced Conflict Intersections - from
US 64 Pitts. Byp to SR 1919 (Smith Level
Road) Orange Co.
FY 2027 TBD TBD Greg Davis
(910) 773-8022
$45,640,000 Right of Way FY 2025
R-5825 Upgrade and Realign Intersection 11/8/2022 TBD TBD Greg Davis
(910) 773-8022
$759,000
US 15-501
Chatham County - DCHC MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8--August 2020
Route
NC 751 at SR 1731
(O'Kelly Chapel Road)
MPO Board 9/9/2020 Item 20
Page 10 of 10
14