Loading...
HomeMy WebLinkAboutOUTBoard Agenda Packet - 081920AGENDA ORANGE UNIFIED TRANSPORTATION BOARD Wednesday, August 19, 2020 OUTBoard Meeting – 6:30 pm GO TO MEETING Please join my meeting from your computer, tablet or smartphone. https://global.gotomeeting.com/join/405258197 You can also dial in using your phone. United States: +1 (408) 650-3123 Access Code: 405-258-197 No. Page(s) Agenda Item 1. Call to Order 2. 3 – 4 Approval of Minutes February 19, 2020 OUTBoard Meeting 3. Consideration of Additions or Changes to Agenda 4. Regular OUTBoard Agenda 4.a. 5 - 62 Orange County Comprehensive Transportation Plan (CTP) (Nish Trivedi) Action: Receive the presentation and discuss in preparation for the September 16 OUTBoard meeting to complete recommendations for the BOCC. 5. Staff Report/Updates 5.a. 63 – 68 MPO/RPO and NCDOT (Nish Trivedi) Action: Receive the Update. 5.b. NA Bike Safety Materials and Events (Tom Ten Eyck) Action: Receive the Update. 5.c. 69 – 72 MTSA Study along Orange Grove Road (Tom Ten Eyck) Action: Receive the Update. 6. Information Items 7. Adjournment The next OUTBoard meeting date is September 16, 2020 Charge of the OUTBoard (from Section I, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. From time to time the OUT Board may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUT Board shall serve in an advisory capacity to the Planning Board. Meetings (from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings 3. Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Meetings are held on the third Wednesday of the month. The start time and location of the meeting shall be included on the agenda and shall typically be 6:30 p.m. at the Orange County West Campus Office Building located at 131 West Margaret Lane, Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any special circumstances, provided the information is included on the distributed agenda. D R A F T 1 MINUTES 1 ORANGE COUNTY OUTBOARD 2 FEBRUARY19, 2020 3 REGULAR MEETING 4 5 6 MEMBERS PRESENT: Eric Broo (Chair), At-Large Representative Amy Cole (Vice Chair), At-Large Representative, Art 7 Menius, At-Large Representative; Jenn Sykes, At-Large Representative; Ed Vaughn, Cedar Grove Township 8 Representative; David Laudicina, Cheeks Township Representative;; Randy Marshall, Bingham Township 9 Representative; Heidi Perry, At-Large Representative; 10 11 12 MEMBERS ABSENT: Johanna Birckmayer, At-Large Representative; Brantley Wells, Hillsborough Township 13 Representative; Vacant, Eno Township Representative; Vacant, At-Large Representative; Vacant, Chapel Hill 14 Township Representative; 15 16 17 TRANSIT ADVISORY SERVICES MEMBERS PRESENT: Theo Letman, Allyson Coltrane; TeLeishia Holloway, Percy 18 Mahone, Allison Smith; Erica Bryant, Janice Tyler; Corinthia Barber; Donna King; Maricruz Rios; Ana Sienra; 19 20 21 STAFF PRESENT: Nish Trivedi, Transportation Planner; Tina Love, Administrative Assistant III; 22 23 24 AGENDA ITEM 1: CALL TO ORDER AND DETERMINATION OF QUORUM 25 26 27 AGENDA ITEM 2: APPROVAL OF MINUTES 28 29 MOTION by Art Menius to approve the January 16, 2019, OUTBoard Minutes with corrections. Seconded by Randy 30 Marshall. 31 VOTE: UNANIMOUS 32 33 34 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 35 There were none 36 37 38 AGENDA ITEM 4: TRANSIT ADVISORY SERVICES (TAS)/ORANGE COUNTY PUBLIC TRANSPORTATION (OCPT) 39 40 AGENDA ITEM 4A: OCPT ADMINISTRATIVE UPDATES 41 Theo Letman, Allyson Coltrane, TeLeishia Holloway and Percy Mahone gave updates on OCPT projects and data 42 with a PowerPoint Presentation (available upon request) 43 44 Heidi Perry: Can you share what Orange County did to qualify for Best Work Places, do they have the bus passes 45 and the covered bike parking, and the …… 46 47 Allyson Coltrane: We do have the bus passes for all Orange County employees. As of July 1, 2019 Orange County 48 offers bus passes to employees they will just have to call and request one. Certain campuses like Southern Human 49 Services and West Campus Office Building, have showers and lockers for their employees to use. The Orange 50 County Telework program has over 10% of employees enrolled and activity teleworking. 51 3 D R A F T 2 52 Erik Broo: Can you send us this PowerPoint Presentation so we can review it especially the funding information. 53 54 Staff will email to members 55 56 57 AGENDA ITEM 4.B.: TRANSIT ADVISORY SERVICES (TAS) COMMENTS/QUESTIONS 58 There were no questions 59 60 61 AGENDA ITEM 5: REGULAR OUTBOARD AGENDA 62 No new items 63 64 65 AGENDA ITEM 6: STAFF UPDATES 66 67 Heidi Perry: I have updates for the upcoming bike season; there has been talk about another bike rodeo. We did one 68 in Cedar Grove for the summer camp and there is talk about doing it again this year. There is a Bike the Eno 69 walk/ride coming up in May, no date yet. The TarWheels ride in Hillsborough will be June 20th this year. If you have 70 little kids, there is a new pump track in Carrboro that is pretty amazing and full of kids every day. 71 72 Erik Broo: The rules of the road pamphlet that we have as well as the bicycle map, I have passed a couple hundred 73 to bike shops and outdoor stores and will continue to meter the out. If anyone has a place they want to put those, by 74 all means, ask. There are a lot of them. I’ll ask for an update from Tom Ten Eyck at the next meeting on the bike 75 materials and reaching out to the police and sheriff. 76 77 Heidi Perry: I would be happy to table the Riverwalk ride with some of that information, it is sometime in May. 78 79 Amy Cole: Do we have an update at to when DOT will have their assessment done on the safety conditions on 80 Orange Grove Road? 81 82 Nish Trivedi: Tom Ten Eyck is handling that project. I will follow up with him and get back to you at the next meeting. 83 The Municipal School Transportation Assistance (MSTA) is still underway. 84 85 AGENDA ITEM 6A: MPO/RPO AND NCDOT UPDATES 86 OUTBoard Members were referred to the attachment, there were no questions 87 88 89 AGENDA ITEM 7: INFORMATION ITEMS 90 There were no new items 91 92 93 AGENDA ITEM 8: ADJOURNMENT 94 OUTBoard meeting was adjourned. 95 96 97 ____________________________________ 98 Erik Broo, Chair 99 100 4 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: August 19, 2020 Action Agenda Item No. 4 SUBJECT: Durham-Chapel Hill-Carrboro Metropolitan Planning Organization Comprehensive Transportation Plan Amendment DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Staff Recommendations 2. Project Sheets Nishith Trivedi, Transportation Planner, 919-245-2582 PURPOSE: To receive an update on the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) Comprehensive Transportation Plan (CTP) Amendment process, present staff recommendations, and prepare to return to a subsequent on-line Orange Unified Transportation Board (OUTBoard) meeting in September to complete recommendations to the Board of County Commissioners (BOCC). BACKGROUND: Orange County’s CTP is split among DCHC MPO, Burlington-Graham Metropolitan Planning Organization (BG MPO) and Triangle Area Rural Planning Organization (TARPO). Each MPO/RPO covers different portions of Orange County’s Transportation network and helps ensure it is planned in a comprehensive, coordinated and collaborative manner. The CTPs are adopted and amended through different processes established by MPO/RPO. While BG MPO and TARPO maintain their portion of Orange County’s CTP, this item focuses on DCHC MPO CTP Amendment process scheduled to start at the MPO Board in September. On August 8, 2019, North Carolina Department of Transportations (NCDOT) adopted a new Complete Street Policy, to “encourage non-vehicular travel without compromising the safety, efficiency, or function of the facility”. Following this policy update, DCHC MPO initiated a public process to amend the 2045 Metropolitan Transportation Plan (MTP) to take the new state policy into consideration. On November 13, 2019 the DCHC MPO 2045 Metropolitan Transportation Plan was amended to include new Complete Street Policy. Subsequently, NCDOT distributed a Complete Street Implementation Guide that specifies, “The adopted CTP will be considered the controlling plan for the identification of non-motorized facilities to be evaluated as part of a roadway project.” Since then, MPO staff has been working with local jurisdictions to identify potential CTP amendments so that they will be consistent with the amended MTP and new state policy. Though no project has been implemented through the new policy to date, the CTP sets the stage for NCDOT assistance in non-highway improvements as part of roadway projects. 5 This policy gives NCDOT the opportunity to consider paying for non-highway improvements as facilities within improved highway projects through NCDOT’s new Cost Share (section 6 of the new Complete Street Implementation Guide): • In CTP – NCDOT pays full – pedestrian and on road bicycle facility, side path, greenway crossing, bus pull out, bus stop (pad only) • Not in CTP but Needs Identified – NCDOT pays full – on road bicycle facility, all other’s costs shared by local jurisdiction using new percent cost-share based on population. o Needs Identified are non-highway projects in locally adopted plans (e.g. local bike/ped or transit plans) • Betterment – Local jurisdictions pays for all non-highway improvements. o Section 6.3 describes this as “A requested bicycle, pedestrian or public transportation improvement that exceeds the recommendations appearing in an adopted plan and/or exceeds the needs identified through the project development process” The following changes were made to DCHC MPO’s 2045 MTP so that NCDOT may pay for non- motorized improvements: • Shared Use Paths (SUPs): SUPs are the safest and most attractive bicycle/pedestrian facility for many major arterial roads. The draft highway table indicates which roadways should have a SUP by displaying an asterisk with the project number. • Premium Transit Corridors: Premium transit service is needed in several corridors such as the former Durham-Orange Light Rail Transit (D-O LRT) corridor and the corridors that connect with Wake County Bus Rapid Transit projects (BRT). These corridors are described in draft Section 7.3. • Other Changes: Draft Section 7.1 and 7.5 has policy changes related to roadway access and appropriate bicycle/pedestrian facilities on arterial roadways. This amendment package is focused on a very limited number of major arterial roads, and it did not take into consideration the entire transportation network. On January 13, 2020, DCHC MPO staff held a Technical Subcommittee meeting with all local jurisdiction staffs to discuss possible CTP Amendments in light of NCDOT’s new Complete Street Implementation Guide and the amended MTP. Since this meeting, Orange County Transportation Planning staff has completed multiple analyses of the County’s transportation network and continues coordinating and collaborating with local jurisdictions, MPO and NCDOT staff to consider if other changes should be made to the CTP for a more comprehensive amendment. Currently BG MPO, DCHC MPO and NCDOT have agreed that the recommendations identified in the Efland-Buckhorn-Mebane Access Management Plan – Adopted April 2019 – will be considered as part of the CTP Amendment. Though, the MPOs and NCDOT have not agreed to add other projects to the amendment list, staff sees this as an opportunity to get other non- motorized improvements incorporated into the CTP utilizing the NCDOT’s new Complete Street Policy. Methodology: Orange County staff analysis identified potential problems and determined possible amendments to the highway section of the CTP. This evaluation was based on the following: • Environmental Justice (EJ) - Environmental Justice Report – adopted August 2020 o County level analysis with County thresholds for each EJ criteria are incorporated into the report 6 o EJ criteria are: Percent of Blacks, Minority, Hispanic/Latino, Elderly, Poverty, Zero- Car Households and Limited English Proficiency within each U.S. Census Block Group. • Transit - 2017 Orange County Transit Plan and Update o Roads with transit routes and potentially funded projects (e.g. Chapel Hill North South Bus Rapid Transit and its possible extension to Hillsborough and other jurisdictions) • Freight - Regional Freight Plan – adopted May 2019 o Roads identified as Strategic Freight Corridors or have freight volume data • Traffic - Triangle Regional Model (TRM) – adopted March 2019 o Roads scheduled to reach Level of Service D-F (>1.0) based on 2045 Volume/Capacity • Crash Study – Safety Analysis, Severity Analysis and Bike/Ped Crashes o NCDOT point crash data; plus o NCDOT combined score (Density + Rate + Severity / 3); plus o NCDOT High Frequency Crash Locations (HFCL); plus o Orange County Hotspots The CTP identifies projects by their Status as either: • Existing – no improvement • Need Improvement – possible project • Recommended – actual project While unidentified improvements are covered in Chapter 2 of the CTP, no clear path forward was ever determined due to variety of reasons, some of which may be insufficient information, absence of any recommendation, or a lack of agreement or consensus, among others. Staff recommends the list of projects (Attachment 1) be added to DCHC MPO CTP Amendment list. Attachment 2 is the detail projects sheets of these recommendations and other Orange County CTP projects considered in DCHC MPO planning area. Summary of Attachment 1: • In CTP – #1 – 13 – Staff is not recommending any changes to current CTP. However, future highway improvements should consider all Complete Street opportunities. • Not in CTP – #14 – 24, 27, and 30 – Staff is recommended these CTP amendments so that they may qualify for Complete Street consideration. o Cross Section 2A – 60’ right-of-way, 12’ travel lane, 5’ paved shoulder o Cross Section 2E – 60’ right-of-way, 11’ travel lane, bike lane and sidewalk o Complete Street forms would be submitted requesting side path and transit be considered should such projects move to MTP and be submitted for future Strategic Prioritization of Transportation (SPOT) process. Even with COVID, like the Great Depression and the numerous Recessions, development continues to occur, and an increasing number of people will always use automobile as their primary means of travel. While these periods in time had significant impact on NCDOT funding, development continues to occur in Orange County and surrounding areas, leaving it to local jurisdictions to plan for its future. The following developments are on the books in Orange County: • Collins Ridge residential subdivision 7 • Shops at Lloyd Farm – Harris Teeter and other retail/office spaces • Danial Boone Mixed Use • Mebane’s growth in Orange County • Economic Development between Hillsborough and Mebane • Carraway Village – Mixed use • Carrboro Flex District – Eubanks and Old NC-86 Staff estimates over 30,000 more cars on Orange County rural roads by the year 2045. This does not take into consideration any development in the surrounding Counties and cities. Staff is recommending the County’s long-term transportation vision – it’s CTP – be updated in light of these developments. Process: DCHC MPO CTP Amendment is scheduled to go before the Technical Committee in September and DCHC MPO Board in October to formally initiate the public process. Staff anticipates the amendment will be adopted by December 2020. • Staff requests the OUTBoard review Attachment 2 and complete its recommendations to the BOCC in time for its October meeting • Staff will submit BOCC action to DCHC MPO Board at MPO Board October meeting to be included in the CTP Amendment FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends that the OUT Board: 1. Receive the presentation; 2. Discuss and ask questions as needed; and 3. Return on September 19 to finalize OUTBoard recommendations to BOCC. 8 Attachment 1Staff RecommendationsIDProjectFromToStatusProblem StatementCross Section1 US 70N Churton StWest Hill Ave N Needs Improvement Minimum 4G2 US 70N Churton StUS 70ANeeds Improvement Minimum 4G3 US 70I-85/US 70 Connector West Hill Ave N Needs Improvement Minimum 4G4 US 70Mt Hermon Church Rd US 70ANeeds Improvement Minimum 4A5 NC 86I-85OLD NC 10Needs Improvement Minimum 4D6 NC 86 NNC 57Cornelius StNeeds Improvement Minimum 4D7 I-85/US 70 connector I-40/85US 70Needs Improvement Minimum 4A8 NC 54Old Fayetteville Rd MPO Boundary Needs Improvement Minimum 2A9 Old NC 86Eubanks RdI-40Needs Improvement Minimum 2A10 Eno Mtn Rd realignment Eno Mountain Rd Mayo StRecommended Minimum 2A11 Mt. Willing RdI-40/85US 70Needs Improvement None 2E12 Erwin RdSage RdWhitfield RdNeeds Improvement Minimum 2E13 Homestead RdRogers RdOld NC 86Needs Improvement Minimum 2EStatus (CTP "Existing")Problem Statement Cross Section 14 US 70Ffland Cedar Grove Rd MPO Boundary Needs Improvement Minimum 2A/2E15 US 70Efland Cedar Grove Rd I-85/US 70 Connector Needs Improvement Minimum 2A/2E16 US 70 / US 70 BUS NC 751Pleasant Green Rd Needs Improvement Minimum 2A/2E17 US 70 BUSSparger RdNC 751Needs Improvement Minimum 2A/2E18 US 70ALawrence RdUS 70Needs Improvement Minimum 2A/2E19 US 70ALawrence RdElizabeth Brady Rd Needs Improvement Minimum 2A/2E20 US 70A/NC 86Elizabeth Brady Rd S Churton StNeeds Improvement Minimum 2A/2E21 NC 86 I-40Whitfield RdNeeds Improvement Minimum 2A/2E22 NC 86Whitfield RdNew Hope Church Rd. Needs Improvement Minimum 2A/2E23 NC 86New Hope Church Rd. OLD NC 10Needs Improvement Minimum 2A/2E24 NC 86 NColeman Loop (N) NC 57Needs Improvement Minimum 2A/2E27 Orange Grove Rd Oakdale DrDimmocks Mill Rd Needs Improvement Minimum 2A/2E2 public schools, alternative freight route, increasing traffic, MSTA, safety,30 New Hope Church Rd. I-40OLD NC 10Needs Improvement Minimum 2A/2ESchool area, parks, access to Highway 10, alternative freight route, traffic, safety, etcSee Attachment 2 - Project Sheets for detail assessmentDue to large scale economic development properties in process (eg. Medline, ABB plant expansion, North Campus) Mebane's continued growth in Orange County, Hillisborough growth, regional corridor is alternative for I-85, increasing freight and transit use, NCDOT delay I-85 widening puts burden on local government, safety, etc.Due to increasing traffic going north to Danville, NC and its future casino, increasing freight and transit use, Hillsborough growth in population and businesses, safety, etc.Adopted CTP status is Needs Improvement and provides potential cross sections. Future improvements should include multimodal accomodations for transit, freight, and bike/ped so all users are safe. Regional Corridors (US and NC) routes will continue increasing in vehicular and freight traffic due to rising number of economic development and large scale subdivisions and commercial projects In CTPReasonNot In CTP9 Durham Alamance Hillsborough Mebane Carrboro Chapel Hill Durham Caswell Person Chatham ¬«21 ¬«6 ¬«5 ¬«43 ¬«11 ¬«40 ¬«20 ¬«35 ¬«33 ¬«34 ¬«7 ¬«3 ¬«18¬«28 ¬«44 ¬«19 ¬«41 ¬«51 ¬«15 ¬«26 ¬«29 ¬«16 ¬«1 ¬«49 ¬«27 ¬«12 ¬«52 ¬«13 ¬«4 ¬«48 ¬«30 ¬«14 ¬«8 ¬«45 ¬«32 ¬«23 ¬«37 ¬«24 ¬«42 ¬«36 ¬«38 ¬«22 ¬«2 ¬«39 ¬«31 ¬«9 ¬«50 ¬«46 ¬«47 CTP SegmentCity Limits CTP Overview Map Orange County Planning and InspectionsNishith Trivedi (8/5/2020) ¯0 2Miles 1 in = 3 miles 10 ID 1 Project US 70 From N Churton St To West Hill Ave N Adopted CTP Problem  Statement Minimum Cross Section 4G Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 4G Staff Analysis Traffic Transit Freight Safety Current  Volume 9800 Capacity 12700 2045 Volume 19700 Future LOS 1.55 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 510 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 3 High  Frequency Crash  Location, Hotspot NCDOT  Score 77.80 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 11 ID 2 Project US 70 From N Churton St To US 70A Adopted CTP Problem  Statement Minimum Cross Section 4G Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 4G Staff Analysis Traffic Transit Freight Safety Current  Volume 12000 Capacity 12400 2045 Volume 22200 Future LOS 1.79 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 580 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 5 High  Frequency Crash  Location, Hotspot NCDOT  Score 55.60 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 12 ID 3 Project US 70 From I‐85/US 70 Connector To West Hill Ave N Adopted CTP Problem  Statement Minimum Cross Section 4G Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 4G Staff Analysis Traffic Transit Freight Safety Current  Volume 8800 Capacity 12400 2045 Volume 17200 Future LOS 1.38 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 510 Rank  and  Reason Moderate severity (<2  cashes/year), 1 High  Frequency Crash  Location NCDOT  Score 88.90 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 13 ID 4 Project US 70 From Mt Hermon Church Rd To US 70A Adopted CTP Problem  Statement Minimum Cross Section 4A Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 4A Staff Analysis Traffic Transit Freight Safety Current  Volume 12000 Capacity 12400 2045 Volume 19800 Future LOS 1.59 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 620 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 4 High  Frequency Crash  Location, Hotspot NCDOT  Score 55.50 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 14 ID 5 Project NC 86 From I‐85 To OLD NC 10 Adopted CTP Problem  Statement Minimum Cross Section 4D Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 4D Staff Analysis Traffic Transit Freight Safety Current  Volume 9900 Capacity 12400 2045 Volume 32700 Future LOS 2.63 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 432 Rank  and  Reason Moderate severity (<2  cashes/year), 3 High  Frequency Crash  Location, Hotspot NCDOT  Score 88.90 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 15 ID 6 Project NC 86 N From NC 57 To Cornelius St Adopted CTP Problem  Statement Minimum Cross Section 4D Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 4D Staff Analysis Traffic Transit Freight Safety Current  Volume 15400 Capacity 12900 2045 Volume 20300 Future LOS 1.57 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 1000 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 2 High  Frequency Crash  Location, Hotspot NCDOT  Score 100.00 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 16 ID 7 Project I‐85/US 70 connector From I‐40/85 To US 70 Adopted CTP Problem  Statement Minimum Cross Section 4A Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 4A Staff Analysis Traffic Transit Freight Safety Current  Volume 3600 Capacity 77800 2045 Volume 6300 Future LOS 0.08 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 134 Rank  and  Reason 1 High Frequency  Crash Location, NCDOT  Score 55.70 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 17 ID 8 Project NC 54 From Old Fayetteville Rd To MPO Boundary Adopted CTP Problem  Statement Minimum Cross Section 2A Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A Staff Analysis Traffic Transit Freight Safety Current  Volume 15000 Capacity 12400 2045 Volume 24900 Future LOS 2.01 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 630 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 3 High  Frequency Crash  Location, Hotspot NCDOT  Score 44.40 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 18 ID 9 Project Old NC 86 From Eubanks Rd To I‐40 Adopted CTP Problem  Statement Minimum Cross Section 2A Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A Staff Analysis Traffic Transit Freight Safety Current  Volume 4800 Capacity 12400 2045 Volume 15300 Future LOS 1.24 Transit Route No Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 3 High  Frequency Crash  Location NCDOT  Score 77.80 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 19 ID 10 Project Eno Mtn Rd realignment From Eno Mountain Rd To Mayo St Adopted CTP Problem  Statement Minimum Cross Section 2A Staff Recommendation Status Recommended Problem  Statement Minimum Cross Section 2A Staff Analysis Traffic Transit Freight Safety Current  Volume 0 Capacity 0 2045 Volume 0 Future LOS 0.00 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 2 High Frequency  Crash Location,  Hotspot NCDOT  Score 33.30 Staff  Comments In adopted CTP as  Recommended, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Recommended 20 ID 11 Project Mt. Willing Rd From I‐40/85 To US 70 Adopted CTP Problem  Statement None Cross Section 2E Staff Recommendation Status Needs  Improvement Problem  Statement None Cross Section 2E Staff Analysis Traffic Transit Freight Safety Current  Volume 6600 Capacity 11600 2045 Volume 8900 Future LOS 0.76 Transit Route No Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 2 High Frequency  Crash Location,  Hotspot NCDOT  Score 77.80 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 21 ID 12 Project Erwin Rd From Sage Rd To Whitfield Rd Adopted CTP Problem  Statement Minimum Cross Section 2E Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2E Staff Analysis Traffic Transit Freight Safety Current  Volume 7600 Capacity 12900 2045 Volume 16000 Future LOS 1.24 Transit Route No Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), 2 High  Frequency Crash  Location, Hotspot NCDOT  Score 33.30 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 22 ID 13 Project Homestead Rd From Rogers Rd To Old NC 86 Adopted CTP Problem  Statement Minimum Cross Section 2E Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2E Staff Analysis Traffic Transit Freight Safety Current  Volume 7100 Capacity 11600 2045 Volume 15600 Future LOS 1.34 Transit Route No Environmental  Justice  Community of  Concern No Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 2 High  Frequency Crash  Location, Hotspot NCDOT  Score 33.30 Staff  Comments In adopted CTP as Needs  Improvement, should be  considered for all Complete  Street facilities INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Needs  Improvement 23 ID 14 Project US 70 From Ffland Cedar Grove Rd To MPO Boundary Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 6700 Capacity 12400 2045 Volume 11200 Future LOS 0.90 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 400 Rank  and  Reason 3 High Frequency  Crash Location,  Hotspot NCDOT  Score 88.90 Staff  Comments Transit, County  Resolution/Priority, Economic  Development area, Hillsborough  supports Complete Street  consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 24 ID 15 Project US 70 From Efland Cedar Grove Rd To I‐85/US 70 Connector Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 4400 Capacity 12400 2045 Volume 9200 Future LOS 0.74 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 242 Rank  and  Reason 3 High Frequency  Crash Location,  Hotspot NCDOT  Score 88.90 Staff  Comments Transit, County  Resolution/Priority, Economic  Development area, Hillsborough  supports Complete Street  consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 25 ID 16 Project US 70 / US 70 BUS From NC 751 To Pleasant Green Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 6800 Capacity 29700 2045 Volume 17400 Future LOS 0.59 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 371 Rank  and  Reason High Frequency Crash  Location NCDOT  Score 0.00 Staff  Comments Transit, County  Resolution/Priorty, Hillsborough  supports Complete Street  consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 26 ID 17 Project US 70 BUS (Hillsborough Rd) From Sparger Rd To NC 751 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 8500 Capacity 12700 2045 Volume 12300 Future LOS 0.97 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 550 Rank  and  Reason High Frequency Crash  Location NCDOT  Score 0.00 Staff  Comments Transit, County  Resolution/Priorty, Hillsborough  supports Complete Street  consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 27 ID 18 Project US 70A From Lawrence Rd To US 70 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 2500 Capacity 12400 2045 Volume 4800 Future LOS 0.39 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 102 Rank  and  Reason 4 High Frequency  Crash Location,  Hotspot NCDOT  Score 66.70 Staff  Comments Hillsborough supports Complete  Street consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 28 ID 19 Project US 70A From Lawrence Rd To Elizabeth Brady Rd Adopted CTP Problem  Statement UAD Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 6700 Capacity 12400 2045 Volume 13800 Future LOS 1.12 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 102 Rank  and  Reason 4 High Frequency  Crash Location,  Hotspot NCDOT  Score 66.70 Staff  Comments Hillsborough supports Complete  Street consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 29 ID 20 Project US 70A/NC 86 From Elizabeth Brady Rd To S Churton St Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 9200 Capacity 12400 2045 Volume 12100 Future LOS 0.98 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 392 Rank  and  Reason 4 High Frequency  Crash Location,  Hotspot NCDOT  Score 66.70 Staff  Comments Hillsborough supports Complete  Street consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 30 ID 21 Project NC 86 From  I‐40 To Whitfield Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 0 Capacity 36600 2045 Volume 16700 Future LOS 0.46 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 271 Rank  and  Reason 3 High Frequency  Crash Location NCDOT  Score 77.80 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 31 ID 22 Project NC 86 From Whitfield Rd To New Hope Church Rd. Adopted CTP Problem  Statement UAD Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 6400 Capacity 14600 2045 Volume 17700 Future LOS 1.21 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 210 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 4 High  Frequency Crash  Location, 3 Hotspots NCDOT  Score 100.00 Staff  Comments Transit, multiple disconnected  multi‐use paths & ped projects INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 32 ID 23 Project NC 86 From New Hope Church Rd.To OLD NC 10 Adopted CTP Problem  Statement UAD Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 10000 Capacity 12400 2045 Volume 29700 Future LOS 2.40 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 406 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 6 High  Frequency Crash  Location, 2 Hotspots NCDOT  Score 55.50 Staff  Comments Transit, multiple disconneted  multi‐use paths, w/ Hillsborough  support INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 33 ID 24 Project NC 86 N From Coleman Loop (N)To NC 57 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 10000 Capacity 12700 2045 Volume 12100 Future LOS 0.95 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor Yes Daily Truck  Traffic 284 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 3 High  Frequency Crash  Location NCDOT  Score 77.80 Staff  Comments Transit, County  Resolution/Priority INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 34 ID 25 Project Eno Mountain Rd From Dimmocks Mill Rd To Orange Grove Rd. Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3300 Capacity 11600 2045 Volume 11100 Future LOS 0.95 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason High Frequency Crash  Location NCDOT  Score 33.30 Staff  Comments Hillsborough supports complete  street consideration,  INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 35 ID 26 Project Orange Grove Rd From Oakdale Dr To S Churton St Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3200 Capacity 11600 2045 Volume 9100 Future LOS 0.79 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 4 High  Frequency Crash  Location, Hotspot NCDOT  Score 77.80 Staff  Comments Hillsborough supports Complete  Street consideration, part of  County Resolution/Priority INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 36 ID 27 Project Orange Grove Rd From Oakdale Dr To Dimmocks Mill Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3586 Capacity 12400 2045 Volume 7800 Future LOS 0.63 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 2 High  Frequency Crash  Location NCDOT  Score 77.80 Staff  Comments County Resolution/Priority,  submitted for TARPO SPOT 6  Modernization INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 37 ID 28 Project Oakdale Dr From Old NC 86 To Orange Grove Rd. Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3800 Capacity 12400 2045 Volume 11500 Future LOS 0.93 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), 2 High  Frequency Crash  Location, Hotspot NCDOT  Score 66.70 Staff  Comments Hillsborough supports Complete  Street consideration INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 38 ID 29 Project New Hope Church Rd. From I‐40 To Old NC 86 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3400 Capacity 12400 2045 Volume 9600 Future LOS 0.77 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 2 High Frequency  Crash Location NCDOT  Score 77.80 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 39 ID 30 Project New Hope Church Rd. From I‐40 To OLD NC 10 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 1900 Capacity 12400 2045 Volume 6900 Future LOS 0.56 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), 2 High  Frequency Crash  Location NCDOT  Score 77.80 Staff  Comments School zone INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 40 ID 31 Project Dairyland Rd. From Dodsons Crossroads To Old NC 86 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 5500 Capacity 12400 2045 Volume 8000 Future LOS 0.65 Transit Route No Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 2 High  Frequency Crash  Location NCDOT  Score 0.00 Staff  Comments Multiple disconnected multi‐use  paths/ped projects, County  Resolution/Priority INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 41 ID 32 Project Efland Cedar Grove Rd From Brookhollow Rd To US 70 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3100 Capacity 12400 2045 Volume 5100 Future LOS 0.41 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 2 High  Frequency Crash  Location NCDOT  Score 66.70 Staff  Comments OC Resolution/Priority, HILC  funded, transit INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 42 ID 33 Project Eubanks Rd. From Old NC 86 To Rogers Rd. Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3800 Capacity 12400 2045 Volume 10600 Future LOS 0.86 Transit Route No Environmental  Justice  Community of  Concern Yes, 1 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 3 High Frequency  Crash Location NCDOT  Score 33.30 Staff  Comments Subject to Carrboro and Chapel  Hill coordination INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 43 ID 34 Project Eubanks Rd. From Rogers Rd To Mill House Rd Adopted CTP Problem  Statement Minimum Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 6200 Capacity 12400 2045 Volume 12700 Future LOS 1.02 Transit Route No Environmental  Justice  Community of  Concern Yes, 1 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), 3 High  Frequency Crash  Location NCDOT  Score 33.30 Staff  Comments Subject to Carrboro and Chapel  Hill coordination INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 44 ID 35 Project Jones Ferry Rd. From NC 54 To Old Greensboro Rd. Adopted CTP Problem  Statement UAD Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 11000 Capacity 12400 2045 Volume 15300 Future LOS 1.24 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 3 High Frequency  Crash Location NCDOT  Score 33.30 Staff  Comments Requires coordination with  Carrboro INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 45 ID 36 Project Jones Ferry Rd. From Ferguson Rd.To Old Greensboro Rd. Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 4100 Capacity 12400 2045 Volume 6100 Future LOS 0.49 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 2 High Frequency  Crash Location NCDOT  Score 66.70 Staff  Comments NCDOT considering bridge  replacement and questions if  corridor will be bike/ped INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 46 ID 37 Project Lawrence Rd From Old NC 10 To St Marys Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3400 Capacity 12400 2045 Volume 8900 Future LOS 0.72 Transit Route Yes Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 4 High  Frequency Crash  Location, Hotspot NCDOT  Score 0.00 Staff  Comments Trucks use corridor to bypass  traffic INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 47 ID 38 Project Lebanon Rd From Efland Cedar Grove Rd To Doe Run Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 1800 Capacity 12400 2045 Volume 3000 Future LOS 0.25 Transit Route No Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), High  Frequency Crash  Location NCDOT  Score 55.60 Staff  Comments County Resolution/Prioity,  submitted for SPOT 6 INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 48 ID 39 Project Mt Sinai Rd From Erwin Rd.To NC 86 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 2700 Capacity 12400 2045 Volume 7700 Future LOS 0.62 Transit Route No Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason High Frequency Crash  Location NCDOT  Score 33.30 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 49 ID 40 Project Mt. Moriah Rd From Erwin Rd.To US 15‐501 Adopted CTP Problem  Statement UAD Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 5100 Capacity 11600 2045 Volume 13400 Future LOS 1.16 Transit Route No Environmental  Justice  Community of  Concern No, 0 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), High  Frequency Crash  Location NCDOT  Score 3.30 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 50 ID 41 Project NC 157 (Guess Rd) From New Sharon Church Rd To St Marys Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 5400 Capacity 12400 2045 Volume 5800 Future LOS 0.47 Transit Route No Environmental  Justice  Community of  Concern No, 0 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 255 Rank  and  Reason Serious severity (2 ‐5  crashes/year), High  Frequency Crash  Location NCDOT  Score 88.90 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 51 ID 42 Project NC 57 From NC 86 To Phelps Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 6600 Capacity 12700 2045 Volume 11600 Future LOS 0.91 Transit Route No Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 161 Rank  and  Reason Serious severity (2 ‐5  crashes/year), High  Frequency Crash  Location NCDOT  Score 77.80 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 52 ID 43 Project NC 751 Hwy From Erwin Rd.To Hillsborought Rd (US 70) Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 4800 Capacity 12400 2045 Volume 12400 Future LOS 1.00 Transit Route Yes Environmental  Justice  Community of  Concern Yes, +4 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 102 Rank  and  Reason Serious severity (2 ‐5  crashes/year), High  Frequency Crash  Location NCDOT  Score 66.90 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 53 ID 44 Project Old Fayetteville Rd. From Jones Ferry Rd.To NC 54 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3900 Capacity 11600 2045 Volume 7700 Future LOS 0.67 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 2 High Frequency  Crash Location NCDOT  Score 55.50 Staff  Comments Subject to Carrboro bike plan  update INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 54 ID 45 Project Old Greensboro Rd. From Jones Ferry Rd To MPO Boundary Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 4600 Capacity 12400 2045 Volume 6500 Future LOS 0.53 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), 2 High  Frequency Crash  Location, Hotspot NCDOT  Score 88.90 Staff  Comments County Resolution/Priority,  submitted in SPOT 5 INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 55 ID 46 Project Old NC 10 From NC 86 To Hillsborough Rd (US 70 Bus) Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 2400 Capacity 12400 2045 Volume 7800 Future LOS 0.63 Transit Route No Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), High  Frequency Crash  Location NCDOT  Score 88.90 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 56 ID 47 Project Pleasant Green Rd From New Sharon Church Rd To US 70 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 3500 Capacity 12400 2045 Volume 6200 Future LOS 0.50 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Serious severity (2 ‐5  crashes/year), 3 High  Frequency Crash  Location NCDOT  Score 77.80 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 57 ID 48 Project Smith Level Rd From Rock Haven Rd To US 15‐501 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 7800 Capacity 12400 2045 Volume 11900 Future LOS 0.96 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 4 High Frequency  Crash Location,  Hotspot NCDOT  Score 66.70 Staff  Comments Subject to Carrboro Extra  Territorial Jurisdiction INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 58 ID 49 Project St Marys Rd From Guess Rd To Pleasant Green Rd Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 2900 Capacity 12400 2045 Volume 6900 Future LOS 0.55 Transit Route No Environmental  Justice  Community of  Concern Yes, 3 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Critical severity (+6  crashes/year), 5 High  Frequency Crash  Location NCDOT  Score 88.90 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 59 ID 50 Project St Marys Rd From Pleasant Green Rd To US 70 Bypass Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 2400 Capacity 12400 2045 Volume 6000 Future LOS 0.48 Transit Route No Environmental  Justice  Community of  Concern Yes, 2 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Critical severity (+6  crashes/year), 5 High  Frequency Crash  Location NCDOT  Score 88.90 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 60 ID 51 Project Whitfield Rd From Erwin Rd.To Sunrise Rd Adopted CTP Problem  Statement UAD Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 4700 Capacity 12400 2045 Volume 16000 Future LOS 1.29 Transit Route No Environmental  Justice  Community of  Concern No, 0 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason Moderate severity (<2  cashes/year), 3 High  Frequency Crash  Location NCDOT  Score 33.30 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 61 ID 52 Project Whitfield Rd From Sunrise Rd To NC 86 Adopted CTP Problem  Statement None Cross Section ADQ Staff Recommendation Status Needs  Improvement Problem  Statement Minimum Cross Section 2A/2E Staff Analysis Traffic Transit Freight Safety Current  Volume 4000 Capacity 12400 2045 Volume 10500 Future LOS 0.84 Transit Route No Environmental  Justice  Community of  Concern No, 0 Overlap Strategic  Freight  Corridor No Daily Truck  Traffic 0 Rank  and  Reason 3 High Frequency  Crash Location NCDOT  Score 33.30 Staff  Comments INSERT MAP BOCC approve BOCC not approve OUTBoard  Recommends OUTBoard  Comments Status Existing 62 TIP/WBS # Description LET/Start Date Completion Date Cost Status Project Lead W-5707K 48283 Remove and replace existing curb & gutter and sidewalk, add pedestrian signals, concrete island, and signal modifications on SR 1010 (E. Main St / W. Franklin St) from Brewer Ln to Graham St. in Chapel Hill and Carrboro 5/31/2019 Jul. 2020 $350,000 Construction - 100% complete, RTE final inspection pending Chris Smitherman Derek Dixon SM-5707H 48912.3.1 “To Pass Bicycles, 4 ft Min Clearance or Change Lane” sign installations on portions of no passing zones on SR 1107 (Hillsborough Road) and SR 1104 (Dairyland Road). Oct. 2019 Jun. 2020 $5,000 Signs installed 10/17/19 - 100% complete, RTE final inspection pending Dawn McPherson SS-6007C 48888.1.1 48888.3.1 Guardrail installation on NC 86 just north of SR 1839 (Alexander Drive). Oct. 2020 Apr. 2021 $50,400 Funds approved 9/5/19 but not released Chad Reimakoski Derek Dixon P-5701 46395.1.1 46395.3.1 Construct Platform, Passenger Rail Station Building at Milepost 41.7 Norfolk Southern H-line in Hillsborough 6/30/2021 FY2023 $7,200,000 PE funding scheduled 7/1/2020, Coordinate with U-5848 Matthew Simmons I-3306AB 34178.1.5 34178.2.4 34178.3.8 I-40 widening from NC86 to Durham Co. line (US 15/501 Interchange). Includes a portion of interchange improvements I-3306AC in Chapel Hill 3/15/2022 FY2024 $37,635,000 Planning and design activities underway, Environmental document completed 3/21/19 under I-3306A, LET combined with I-3306AC and W-5707C Laura Sutton I-3306AC 34178.1.6 34178.2.5 34178.3.9 Interchange improvements at I-40 and NC86 in Chapel Hill 3/15/2022 FY2024 $15,200,000 Planning and Design activities underway, Environmental document completed 3/21/19 under I-3306A, LET combined with I-3306AB and W-5707C Laura Sutton W-5707C 44853.1.3 44853.3.3 47490 Revise pavement markings and overhead lane use signs for removal of inside lane drop configuration on I-40 Westbound in vicinity of US 15-501 interchange in Chapel Hill. Resurfacing I-40 WB by use of contingency funds 3/15/2022 FY2022 $425,000 No bids on most recent letting, LET combined with I-3306AB and AC Chad Reimakoski SS-4907CD 47936.1.1 47936.2.1 47936.3.1 Horizontal curve improvements on SR 1710 (Old NC 10) west of SR 1561/SR 1709 (Lawrence Road) east of Hillsborough. Improvements consist of wedging pavement and grading shoulders. Jun. 2022 Nov. 2022 $261,000 Planning and design activities underway Chad Reimakoski NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT Page 1 DCHCMPO June 2020 Technical Committee 7/22/2020 Item 14 Page 10 of 13 63 TIP/WBS # Description LET/Start Date Completion Date Cost Status Project Lead NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT SS-6007E 49115.1.1 49115.3.1 All Way Stop installation and flashing beacon revisions at the intersection of SR 1005 (Old Greensboro Road) and SR 1956 (Crawford Dairy Road/Orange Chapel Clover Garden Road) Jun. 2022 Sept. 2022 $28,800 Funds approved 3/5/20 but not released Dawn McPherson R-5821A 47093.1.2 47093.2.2 47093.3.2 Construct operational improvements including Bicycle/Pedestrian accommodations on NC 54 from SR 1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville Road). 6/21/2022 FY2024 $3,194,000 Planning and design activities underway, coordinating with NC54 West Corridor Study Chris Smitherman I-3306AA 34178.1.4 34178.2.3 34178.3.7 I-40 widening from I-85 to NC86 in Chapel Hill 3/21/2023 FY2025 $88,000,000 Planning and Design activities underway, Environmental document completed 3/21/19 under I-3306A Laura Sutton I-5958 45910.1.1 45910.3.1 Pavement Rehabilitation on I-40/I-85 from West of SR 1114 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) 11/21/2023 FY2025 $7,455,000 Funding approved 10/10/17 Chris Smitherman U-5845 50235.1.1 50235.2.1 50235.3.1 Widen SR 1009 (South Churton Street) to multi-lanes from I- 40 to Eno River in Hillsborough 7/16/2024 FY 2027 $39,390,000 Planning and Design activities underway, Coordinate with U-5848 and I-5967 Laura Sutton I-5967 45917.1.1 45917.2.1 45917.3.1 Interchange improvements at I-85 and SR 1009 (South Churton Street) in Hillsborough 10/15/2024 FY2027 $16,900,000 Planning and Design activities underway, Coordinate with I-0305 and U-5845 Laura Sutton I-5959 45911.1.1 45911.3.1 Pavement Rehabilitation on I-85 from West of SR 1006 (Orange Grove Road) to Durham County line 11/19/2024 FY2026 $11,155,000 Funding approved 10/10/17, Coordinate with I-5967, I-5984 and I-0305 Chris Smitherman I-5984 47530.1.1 47530.2.1 47530.3.1 Interchange improvements at I-85 and NC 86 in Hillsborough 11/18/2025 FY2027 $11,000,000 Planning and Design activities underway, Coordinate with I-0305 and I-5959 Laura Sutton I-0305 34142.1.2 34142.2.2 34142.3.2 Widening of I-85 from west of SR1006 (Orange Grove Road) in Orange Co. to west of SR 1400 (Sparger Road) in Orange Co. 10/17/2028 FY2032 $132,000,000 Planning and design activities underway, Project reinstated per 2020-2029 STIP (funded project) and delete project I-5983 Laura Sutton Page 2 DCHCMPO June 2020 Technical Committee 7/22/2020 Item 14 Page 11 of 13 64 North Carolina Department of Transportation 6/8/2020 Active Projects Under Construction - Orange Co. Contract Number TIP Number Location Description Contractor Name Resident Engineer Contract Bid Amount Availability Date Completion Date Work Start Date Estimated Completion Date Progress Schedule Percent Completion Percent C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5 S T WOOTEN CORPORATION Nordan, PE, James M $4,614,460.00 5/28/2019 2/15/2021 5/28/2019 2/15/2021 0 1.98 C204078 B-4962 REPLACE BRIDGE #46 OVER ENO RIVER ON US-70 BYPASS.CONTI ENTERPRISES, INC Howell, Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 12/28/2021 24 26.36 DG00393 RESURFACE FOLLOWING SR'S: SR 1101, SR 1118, SR 1119, SR 1124, SR 1125, SR 1127,SR 1128 SR 1130, SR 1134, SR 1135, SR 1137, SR 1141, SR 1143, ETC. RILEY PAVING INC Howell, Bobby J $1,084,520.40 4/2/2018 10/12/2018 6/18/2018 12/7/2018 100 99.97 DG00435 AST RETREATMENT ON 22 SECONDARY ROADS WHITEHURST PAVING CO INC Lorenz, PE, Kris $846,340.66 4/1/2019 10/11/2019 43977 DG00445 R-5787BB W-5707A INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS INTERSECTIONS LITTLE MOUNTAIN BUILDERS OF CATAWBA COUNTY INC Howell, Bobby J $319,319.80 6/25/2018 2/15/2020 8/6/2018 2/15/2020 100 92.94 DG00461 REHAB. BRIDGE #031 ON SR 1010 (E. FRANKLIN ST.) OVER BOLIN CREEK & BOLIN CREEK TRAIL M & J CONSTRUCTION CO OF PINELLAS COUNTY INC Howell, Bobby J $2,456,272.12 11/12/2018 7/15/2019 3/15/2019 11/26/2020 73.86 56.95 DG00462 REHAB. BRIDGES 264, 288, 260, 543 IN GUILFORD COUNTY AND BRIDGE 031 IN ORANGE COUNTY ELITE INDUSTRIAL PAINTING INC Snell, PE, William H $967,383.15 8/1/2019 1/1/2020 DG00478 RESURFACE PORTIONS OF 41 SECONDARY ROADS IN ORANGE COUNTY CAROLINA SUNROCK LLC Hayes, PE, Meredith D $3,270,144.99 7/8/2019 10/30/2020 12/9/2019 10/30/2020 19.8 60.89 DG00483 RESURFACE SR 1010 (MAIN STREET/FRANKLIN STREET) FROM SR 1005 (JONES FERRY ROAD) TO NC 86 (COLUMBIA STREET) CAROLINA SUNROCK LLC Howell, Bobby J $845,631.59 5/18/2019 8/7/2020 DG00485 U-5846 SR 1772 (GREENSBORO STREET) AT SR 1780 (ESTES DRIVE), CONSTRUCT ROUNDABOUT FSC II LLC DBA FRED SMITH COMPANY Howell, Bobby J $3,375,611.30 5/28/2019 3/1/2022 7/29/2019 6/10/2022 36 33.65 Page 1 of 1 Technical Committee 7/22/2020 Item 14 Page 12 of 13 65 TIP/WBS # Description Let/Start Date Completion Date Cost Status Project Lead SS-4907CD 47936.1.1 47936.2.1 47936.3.1 Horizontal curve improvements on SR 1710 (Old NC 10) west of SR 1561/SR 1709 (Lawrence Road) east of Hillsborough. Improvements consist of wedging pavement and grading shoulders. Jun. 2022 Nov. 2022 $261,000 Planning and design activities underway Chad Reimakoski SS-6007E 49115.1.1 49115.3.1 All Way Stop installation and flashing beacon revisions at the intersection of SR 1005 (Old Greensboro Road) and SR 1956 (Crawford Dairy Road/Orange Chapel Clover Garden Road). Jun. 2022 Oct. 2022 $28,800 PE funds approved 3/5/20 but not released Dawn McPherson R-5821A 47093.1.2 47093.2.2 47093.3.2 Construct operational improvements including Bicycle/Pedestrian accommodations on NC 54 from SR 1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville Road). 6/21/22 FY2024 $3,194,000 Planning and design activities underway, coordinating with NC54 West Corridor Study Chris Smitherman I-5958 45910.1.1 45910.3.1 Pavement rehabilitation on I-40 / I-85 from west of SR 1114 (Buckhorn Road) to west of SR 1006 (Orange Grove Road). 11/21/23 FY 2025 $7,455,000 Planning activities pending Chris Smitherman I-5959 45911.1.1 45911.3.1 Pavement rehabilitation on I-85 from west of SR 1006 (Orange Grove Road) to Durham County line. 11/19/24 FY2025 $11,155,000 Planning activities pending Chris Smitherman NCDOT DIV 7 PROJECTS LOCATED IN TARPO - UNDER DEVELOPMENT Page 1 TARPO-Orange Co June 2020 66 North Carolina Department of Transportation 6/8/2020 Active Projects Under Construction - Orange Co. Contract Number TIP Number Location Description Contractor Name Resident Engineer Contract Bid Amount Availability Date Completion Date Work Start Date Estimated Completion Date Progress Schedule Percent Completion Percent C202581 EB-4707A IMPROVEMENTS ON SR-1838/SR-2220 FROM US-15/501 IN ORANGE COUNTY TO SR-1113 IN DURHAM COUNTY. DIVISION 5 S T WOOTEN CORPORATION Nordan, PE, James M $4,614,460.00 5/28/2019 2/15/2021 5/28/2019 2/15/2021 0 1.98 C204078 B-4962 REPLACE BRIDGE #46 OVER ENO RIVER ON US-70 BYPASS.CONTI ENTERPRISES, INC Howell, Bobby J $4,863,757.00 5/28/2019 12/28/2021 6/19/2019 12/28/2021 24 26.36 DG00393 RESURFACE FOLLOWING SR'S: SR 1101, SR 1118, SR 1119, SR 1124, SR 1125, SR 1127,SR 1128 SR 1130, SR 1134, SR 1135, SR 1137, SR 1141, SR 1143, ETC. RILEY PAVING INC Howell, Bobby J $1,084,520.40 4/2/2018 10/12/2018 6/18/2018 12/7/2018 100 99.97 DG00435 AST RETREATMENT ON 22 SECONDARY ROADS WHITEHURST PAVING CO INC Lorenz, PE, Kris $846,340.66 4/1/2019 10/11/2019 43977 DG00445 R-5787BB W-5707A INSTALLATION OF ADA COMPLIANT CURB RAMPS AT VARIOUS INTERSECTIONS LITTLE MOUNTAIN BUILDERS OF CATAWBA COUNTY INC Howell, Bobby J $319,319.80 6/25/2018 2/15/2020 8/6/2018 2/15/2020 100 92.94 DG00461 REHAB. BRIDGE #031 ON SR 1010 (E. FRANKLIN ST.) OVER BOLIN CREEK & BOLIN CREEK TRAIL M & J CONSTRUCTION CO OF PINELLAS COUNTY INC Howell, Bobby J $2,456,272.12 11/12/2018 7/15/2019 3/15/2019 11/26/2020 73.86 56.95 DG00462 REHAB. BRIDGES 264, 288, 260, 543 IN GUILFORD COUNTY AND BRIDGE 031 IN ORANGE COUNTY ELITE INDUSTRIAL PAINTING INC Snell, PE, William H $967,383.15 8/1/2019 1/1/2020 DG00478 RESURFACE PORTIONS OF 41 SECONDARY ROADS IN ORANGE COUNTY CAROLINA SUNROCK LLC Hayes, PE, Meredith D $3,270,144.99 7/8/2019 10/30/2020 12/9/2019 10/30/2020 19.8 60.89 DG00483 RESURFACE SR 1010 (MAIN STREET/FRANKLIN STREET) FROM SR 1005 (JONES FERRY ROAD) TO NC 86 (COLUMBIA STREET) CAROLINA SUNROCK LLC Howell, Bobby J $845,631.59 5/18/2019 8/7/2020 DG00485 U-5846 SR 1772 (GREENSBORO STREET) AT SR 1780 (ESTES DRIVE), CONSTRUCT ROUNDABOUT FSC II LLC DBA FRED SMITH COMPANY Howell, Bobby J $3,375,611.30 5/28/2019 3/1/2022 7/29/2019 6/10/2022 36 33.65 Page 1 of 1 67 68 ORANGE COUNTY BOARD OF COMMISSIONERS CHAPEL HILL-CARRBORO BOARD OF EDUCATION ORANGE COUNTY BOARD OF EDUCATION AGENDA BOCC/Board of Education Joint Meeting February 25, 2020 Meeting—7:00 p.m. Richard Whitted Meeting Facility 300 West Tryon Street Hillsborough, NC Welcome and Opening Remarks— Chair Rich, Chair Wolf, and Chair Atherton 1. Update on State Budget 2. Budget Process/Timeline 3. School Capital Needs Maintenance SAPFO and Capacity 4. School Districts' Climate Action Plans 5. Walkable Schools 6. Other Business Potential Budget Topics for Future Discussion 7. Information Items Tradescraft Center Status Universal Pre-K Study Status CHCCS Pre-Kindergarten Programming Orange County Board of Commissioners' regular meetings and work sessions are available via live streaming video at oran egcounbmc.gov/occierks/granicus.asp and Orange County Gov-TV on channels 1301 or 97.6 (Time Warner Cable). 69 t Walkable School Zones The Orange County Schools is committed to providing safe, connected and engaged schools within our community. The Orange County School Boards currently has no designated "walkable school zones" within the district. School bus transportation is provided to all students with the exception of most student attending Hillsborough Elementary as it is a school of choice. There is a small designated transportation zone surrounding Hillsborough Elementary. Groups of parents and community members may gather and safely walk students to school from designated points; but,these paths are not identified as "walkable school zone" paths as not all are equipped with sidewalks and intersections staffed with crossing guards. 70 LHI APEL HILL- ORO igCITY SCHOOLS Walkable School Zones The Chapel Hill-Carrboro City Schools is committed to providing safe, connected and engaged schools within our community. As such, the Board of Education includes walkable school zones as part of the student assignment priorities within local policy and as a critical component within any redistricting plans. Students that live within 1.5 miles of a school are considered in the "walk zone" and are not provided school bus transportation unless: factors are present which may endanger the safety of students walking to the school; a student is medically certified as temporarily incapacitated; a student is identified as having special needs following procedures in the North Carolina Procedures Governing Programs and Services for Children with Special Needs and will be provided with transportation services as required by law The district further supports walk-to-school initiatives by permanent assignment of twenty school crossing guards to serve at several key intersections each morning and afternoon to assist students to safely cross roadways. Our school crossing guards support the following schools: Carrboro Elementary School - 5 Culbreth Middle School - 1 Ephesus Elementary School -1 Estes Hills Elementary School/Phillips Middle School - 4 McDougle Elementary & Middle School - 1 Northside Elementary School - 5 Rashkis Elementary School - 1 Scroggs Elementary School - 1 Smith Middle School/Chapel Hill High School— 1 71 Examples of Walkable Schools Mary Scroggs Elementary School 501 Kildaire Road I Chapel Hill, NC 27516 The school has a walk zone which extends throughout Southern Village, meaning no school buses pick up Mary Scroggs students who live in Southern Village. Out of 605 students who attend Mary Scroggs Elementary, an estimated 240 students are from Southern Village. How many walk or bike to school? About 200 on a typical day, or 83 percent of the students within the walk-zone. (About 100 students walk and 100 bike, according to the school.)" Reference: Good Schools-Good Neighborhoods, UNC Center for Regional and Urban Studies by David Salvesen (Principal Investigator) and Philip Hervey, 2003. https://curs.unc.edu/files/2013/05/goodschoolsreport.pdf l Northside Elementary Schoolmet, le- 350 Caldwell Street i Chapel Hill, NC 27516 Located on a previously developed site with nearby public transit,this 100,000-square-foot school is the heart of the neighborhood and serves as a place for community events. Northside Elementary School is home to 585 students and includes classrooms, a media center, a multipurpose room, support spaces, as well as dining and kitchen areas. Large windows in the classrooms provide natural light for the students and teachers. A building dashboard is located in the media center and is accessible to teachers who can integrate the facility's water and power usage into their lesson plans. While construction details such as skylights, solar heating, and a green roof evoke the future, the design celebrates the site's history of education by featuring a historical timeline component to the main staircase." Reference: Moseley Architects. https://www.moseleVarchitects.com/portfolio-item/ northside-elementary- schoolchapel-hill-carrboro-city-schools/ 72