HomeMy WebLinkAboutPlanning Board - 081920 Agenda PacketORANGE COUNTY PLANNING DEPARTMENT
131 W. MARGARET LANE, SUITE 201
HILLSBOROUGH,NORTH CAROLINA 27278
AGENDA
ORANGE COUNTY PLANNING BOARD
Wednesday, August 19, 2020
Special Meeting – 7:00 pm
Due to current public health concerns, the meeting will be virtual. Members of the Planning
Board and staff will be participating in the meeting remotely. Interested persons can view
and participate in the meeting by pre-registering at:
https://orangecountync.zoom.us/webinar/register/WN_nCekqph0TKi2KOo1qIOtuw
After registering, Zoom will email registrants additional information and a link which must be
used to access the meeting.
No.Page(s)Agenda Item
1.BRIEF SUMMARY BY STAFF ON TECHNOLOGY PROTOCOLS FOR MEETING
Presenter:Perdita Holtz, Planning Systems Coordinator
2.CALL TO ORDER
3. 3 – 32 INFORMATIONAL ITEMS
a.DRAFT Minutes for the August 5, 2020 Regular Meeting (to be
approved at the next regular meeting; provided here for
information purposes)
4. CONSIDERATION OF ADDITIONS TO AGENDA
5.PUBLIC CHARGE
Introduction to the Public Charge
The Board of County Commissioners, under the authority of North Carolina General Statute,
appoints the Orange County Planning Board (OCPB) to uphold the written land development
laws of the County. The general purpose of OCPB is to guide and accomplish coordinated and
harmonious development. OCPB shall do so in a manner which considers the present and
future needs of its residents and businesses through efficient and responsive process that
contributes to and promotes the health, safety, and welfare of the overall County. The OCPB
will make every effort to uphold a vision of responsive governance and quality public services
during our deliberations, decisions, and recommendations.
Public Charge
The Planning Board pledges its respect to all present. The Board asks those attending this
meeting to conduct themselves in a respectful, courteous manner toward each other, County
staff, and Board members. At any time should a member of the Board or the p ublic fail to
No.Page(s)Agenda Item
observe this charge, the Chair will take steps to restore order an d decorum. Should it
become impossible to restore order and continue the meeting, the Chair will recess the
meeting until such time that a genuine commitment to this public charge is observed.
The Planning Board asks that all electronic devices such as cell phones, pagers, and
computers should please be turned off or set to silent/vibrate.
Please be kind to everyone.
6.CHAIR COMMENTS
7. 33 – 38 CLARIFICATION OF PLANNING BOARD ACTIONS ON PROPOSED AMENDMENTS
TO THE TOWN OF HILLSBOROUGH/ORANGE COUNTY CENTRAL ORANGE
COORDINATED AREA (COCA) LAND USE PLAN AND TO THE ORANGE
COUNTY COMPREHENSIVE PLAN FUTURE LAND USE MAP (FLUM) -To
clarify the motion made at the August 5, 2020 Planning Board meeting
and revote on the clarified motion regarding County-initiated
amendments to the COCA and FLUM in the vicinity of the southern
portion of the Hillsborough Area Economic Development District. This
item is scheduled for BOCC public hearing on September 15, 2020.
Presenter:Tom Altieri, Comprehensive Planning Supervisor
8. 39 – 125 ZONING ATLAS AMENDMENT (MASTER PLAN DEVELOPMENT APPLICATION –
RESEARCH TRIANGLE LOGISTICAL PARK)-To continue review and make a
recommendation to the BOCC on a developer-initiated application for an
MPD-CZ (Master Plan Development Conditional Zoning). The proposed
project encompasses approximately 180 acres in the Hillsborough
Economic Development District (EDD) south of Interstate 40 and west of
Old Highway 86, within Hillsborough Township. 168 acres are currently
zoned MPD-CZ (Settler’s Point) and 12 acres are currently zoned R-1
(Rural Residential). This item was continued from the August 5 regular
meeting and is scheduled for BOCC public hearing on September 15,
2020.
Presenter:Michael Harvey, Current Planning Supervisor
9. ADJOURNMENT
IF AN EMERGENCY OCCURS,OR IF YOU ARE RUNNING LATE FOR THE MEETING,PLEASE LEAVE A VOICE
MAIL FOR PERDITA HOLTZ (919-245-2578).
D R A F T
MEETING MINUTES1
ORANGE COUNTY PLANNING BOARD2
AUGUST 5,20203
REGULAR MEETING4
(Due to current public health concerns, this meeting was held virtually.5
Members of the Planning Board, staff and public participated remotely)6
7
MEMBERS PRESENT: David Blankfard (Chair), Hillsborough Township Representative; Adam Beeman (Vice-Chair),8
Cedar Grove Township Representative; Kim Piracci, Eno Township Representative; Susan Hunter, Chapel Hill 9
Township Representative; Patricia Roberts, Cheeks Township Representative; Randy Marshall, At-Large 10
Representative; Hunter Spitzer, At-Large Representative; Alexandra Allman, At-Large Representative; Melissa 11
Poole, Little River Township Representative; Carrie Fletcher, Bingham Township Representative12
13
MEMBERS ABSENT:Gio Mollinedo, At-Large Representative; Vacant, At-Large Representative14
15
STAFF PRESENT: Craig Benedict, Planning Director; Perdita Holtz, Planning Systems Coordinator; Tom Altieri, 16
Comprehensive Planning Supervisor; Michael Harvey, Current Planning Supervisor; Brian Carson, GIS Tech III, Tom 17
Ten Eyck, Transportation/Land Use Planner, Christopher Sandt, Staff Engineer; Tina Love, Administrative Support; 18
Steve Brantley, Economic Development Director, Amanda Garner, Assistant Economic Development Director; 19
20
APPLICANT AND ASSOCIATES PRESENT:Bill Aucoin, Vice President - Avison Young; Chris Bostic, Project Manager –21
Kimley-Horn and Associates, Inc.; Jack Graham, Principal – Avison Young; Michael Birch, Partner – Longleaf Law 22
Partners; Christa Greene, Senior Principal – Stantec; Frank Csapo, CEO – Barrister Commercial Group; Wes Hall, 23
Civil Engineer Analyst – Kimley-Horn; Matt Peach, Senior Transportation Engineer – Stantec; Rick Ogburn, Director 24
of Construction – Barrister Commercial Group; Doug Short, Partner – Manning Fulton25
26
OTHERS PRESENT:Penny Rich (BOCC Chair); Sarah Shore; Joseph Shore; Stephen Williams; Frederick Tapp; Kaila 27
Mitchell; Brandon Sneed; Gerald Scarlett; Leslie Robert;, Ellen Mayer; Jayse Sessi; Myra Gwin-Summers; Franklin 28
Garland; Isabel Garland; Clare Brennan; Karen Fernandez; Theresa Gilliam; Maryanne Ross; Jill Bauer; Dennis 29
Hagerman; Ronald Sieber; Jared Jurkiewicz; Matthew Kostura; Jon Lorusso; Richard Wagoner; Ted Bryant; Bob 30
Bundschuh; Allen Rynish; Brian Lapham; Steve Kaufmann; Gina Rhoades; Doug Short; Betty Garland; Kevin 31
Nicholson, Jonathan Espitia, William Clayton, Beatrice Brooks, Rowdy and Kim Walker, Beth Rosenberg, Diane and 32
Erik Dunder; Noah Chase; Cedar Eagle; Jack Rupplin; Tammy Grubb; 3 callers33
34
35
AGENDA ITEM 1: BRIEF SUMMARY BY STAFF ON TECHNOLOGY PROTOCOLS FOR MEETING36
PRESENTER:Perdita Holtz, Planning Systems Coordinator37
38
Perdita reviewed the technical processes and rules 39
40
41
AGENDA ITEM 2: CALL TO ORDER AND ROLL CALL42
Chair David Blankfard called the meeting to order. 43
44
45
AGENDA ITEM 3: INFORMATION ITEMS46
a. Planning Calendar for August and September47
48
49
AGENDA ITEM 4: APPROVAL OF MINUTES50
February 5, 202051
52
MOTION by Randy Marshall to approve the February 5, 2020 Meeting Minutes. Seconded by Hunter Spitzer.53
VOTE:Unanimous54
55
3
D R A F T
56
AGENDA ITEM 5: CONSIDERATION OF ADDITIONS TO AGENDA. 57
There were none 58
59
60
AGENDA ITEM 6: PUBLIC CHARGE61
62
INTRODUCTION TO THE PUBLIC CHARGE63
The Board of County Commissioners, under the authority of North Carolina General Statute,64
appoints the Orange County Planning Board (OCPB) to uphold the written land development law of 65
the County. The general purpose of OCPB is to guide and accomplish coordinated and 66
harmonious development. OCPB shall do so in a manner, which considers the present and future 67
needs of its citizens and businesses through efficient and responsive process that contributes to 68
and promotes the health, safety, and welfare of the overall County. The OCPB will make every 69
effort to uphold a vision of responsive governance and quality public services during our 70
deliberations, decisions, and recommendations.71
72
PUBLIC CHARGE73
The Planning Board pledges to the citizens of Orange County its respect. The Board asks its 74
citizens to conduct themselves in a respectful, courteous manner, both with the Board and with 75
fellow citizens. At any time, should any member of the Board or any citizen fail to observe this 76
public charge, the Chair will ask the offending member to leave the meeting until that individual 77
regains personal control. Should decorum fail to be restored, the Chair will recess the meeting 78
until such time that a genuine commitment to this public charge is observed.79
80
81
AGENDA ITEM 7: CHAIR COMMENTS82
There were none 83
84
85
AGENDA ITEM 8: PROPOSED AMENDMENTS TO THE TOWN OF HILLSBOROUGH/ORANGE COUNTY CENTRAL ORANGE 86
COORDINATED AREA (COCA) LAND USE PLAN AND TO THE ORANGE COUNTY COMPREHENSIVE PLAN 87
FUTURE LAND USE MAP (FLUM) -To review and make a recommendation to the BOCC on County-88
initiated amendments to the COCA and FLUM in the vicinity of the southern portion of the 89
Hillsborough Area Economic Development District. The amendments related to COCA affect 17 90
parcels (in whole or part) encompassing 84 acres. The amendments related to the FLUM affect 20 91
parcels (in whole or part) encompassing 89 acres. The COCA proposed land use category is 92
Suburban Office and the FLUM proposed category is Economic Development. This item is 93
scheduled for BOCC public hearing on September 15, 2020. 94
PRESENTER:Tom Altieri, Comprehensive Planning Supervisor95
96
Tom Altieri reviewed the abstract and proposed changes97
98
Hunter Spitzer: The first question that I have, no residential zoning will be permitted under this new County Land Use 99
under the Economic Transitionary correct?100
101
Tom Altieri: As part of these amendments, there is no associated rezoning at this time. The residential structures, 102
the homes that are there now will continue to be conforming, the planning term, because the Rural Residential or R1103
Zoning District will remain in place.104
105
Hunter Spitzer: So could these properties potentially be rezoned to say medium or low intensity residential 106
development is my question, are those allowable zonings under this new land use?107
108
Tom Altieri: Yes109
4
D R A F T
110
Hunter Spitzer: I noticed in the Comprehensive Land Use map that there are protected areas identified in green but 111
in the areas selected to be rezoned as Suburban Office, there are no protected areas and I was wondering why not 112
but they are identified as protected in the County Land Use map. I suppose I know why, because we don’t want to 113
restrict development but I was wondering if you could lend anything to that.114
115
Tom Altieri: It’s really for no particular reason, it’s just a matter of the Town took the initial step in the development of 116
the Joint Land Use Plan and it used the Land Use categories that it already had in its existing plan and it is just not 117
shown on the map in the Joint Land Use Plan. Those areas there certainly exist, I did mention that if or how 118
development occur in those resource protection areas is really handled through our Zoning Ordinance with stream 119
buffers and so forth. I think the resource protections area is really shown on the County’s Future Land Use map as 120
more, let’s just say, a reminder, if you would. That layer that land use category does not have a direct companion-121
zoning district or applicable zoning districts that would be applied in a resource protection area. It’s more or less just 122
an overlay just to show where there is a high likelihood of wetlands or steep slopes and so forth.123
124
Hunter Spitzer: Ok, thank you.125
126
David Blankfard: I have a question, so Orange County Comprehensive Plan map says it’s 20 parcels and 89 acres 127
and Hillsborough says it’s 17 parcels and 84 acres. Is that just the Town and Orange County finally coming together 128
to make the map match up?129
130
Tom Altieri: That is correct. There are just a few parcels that are addressed in the COCA Land Use Plan on the 131
north side of the amendment area that are also covered in the County’s Future Land Use map so there’s a little 132
overlap there. That’s why when we’re looking at amendments to the COCA Land Use Plan the acreage amount is 133
different from the County’s Land Use Plan. I can point those out if you’d like to see the differences, I know you have 134
the maps in your packets but there is just a few parcels and a few acres difference between the two amendments 135
and that’s right along the northern boundary of the amendment area.136
137
Melissa Poole: Will you flip back – I think it was 17, one of the maps where it had the star. (Map was shown) This is 138
currently Rural Residential and the star is where the RTLP is planned to go.139
140
Tom Altieri: Correct.141
142
Melissa Poole: So, I guess my questions is that it seems like we are doing this backwards, for me if this is Rural 143
Residential then why is RTLP planned to go there but we are only now talking about rezoning? It seems like we are 144
doing this backwards. Am I misunderstanding?145
146
Tom Altieri: What we are doing is responding to the Town’s expansion of its Urban Services area and we are 147
reflecting that on the Joint Land Use Plan with Hillsborough and when that’s done, we need to apply a Future Land 148
Use category to the map and that is the addition of the Suburban Office Complex. We also need to add a County 149
Land Use classification which is Economic Development District. The County is not proposing rezoning so this 12 150
acres would stay R1. However, there is another item on your agenda tonight where the developer is initiating a 151
process to also amend the zoning, not just for the 12 acres where the star is, but for a couple of the parcels to the 152
north as well. I hope that answers your question. These are really separate amendments. We have a County 153
initiated amendment to implement the expansion of the Town’s Urban Services Area that is different and separate 154
from the developer’s proposal and the rezoning required for RTLP. It’s just a matter of the two amendments share 12 155
acres. Does that help?156
157
Melissa Poole: Yes, thank you.158
159
David Blankfard: Ok, we will take comments from the public. Please say your name and if you received a letter from 160
the County about this amendment. Thank you.161
162
Franklin Garland: My name is Franklin Garland and I live off of Ode Turner Road. It seems like this was tried 163
already and I have a lot to say. Some people have ceded their time to me because I have spent the last two weeks 164
actually doing research. Nobody on the south side of the I-40 wants this, ok, the residents. There’s approximately 165
5
D R A F T
2000 residents that get involved in this. I know that you’re looking at just one particular piece of land out there but 166
what does the public, what do the people of Orange County have to say about this? I am looking at the Code of 167
Ethics, I’m looking at the Mission Statements, it says here “serve the residents of Orange County” “our residents 168
come first”. Now the residents don’t want this, ok. I know that, I personally put out 2000 flyers last week and it’s 169
unanimous out there that nobody wants it. So how can you force this on us, ok. Even though we don’t want it. That’s 170
another question for the Planning and Inspections Board out here. I have many, many questions that go along here 171
and I’m going to read a statement later on that maybe clarifies a whole lot but right now, my main question is what 172
give you the right to just force this on us? Anybody? Want to care to answer? Who’s win?173
174
David Blankfard: Your elected officials, they are the ones that started this with the Town... (interrupted) 175
176
Franklin Garland: So our elected officials…177
178
David Blankfard: Hold on, let me finish, your elected officials are the ones that started this land use planning, years 179
and years ago so I don’t know what to tell you.180
181
Franklin Garland: in 1991, this was planned as an EDD, actually all this area out here was rural, and it was 182
designated possibly as an Economic Development Area because I-40 wasn’t in place then. Once I-40 went in place, 183
I believe in 1984, actually you said 1981. It actually was designated as is and this is 39 years ago. This whole area 184
has grown to be residential now. It’s no longer open space and rural and like I said it’s a whole lot of people out 185
there. If our elected officials are choosing to do this, why are they going in there with perceived ideas, and already 186
made up their mind that this is going to happen. That’s not the democratic way. That’s called a fascist way when you 187
do it that way. It’s very offensive, most people are offended by this and we’re trying to put a stop to this. By the way, 188
I think this is a ridiculous way to hold a meeting. I am going to add that, that we have 42 attendees where in person 189
you would probably have several thousand today, ok. It’s not valid for anybody in there, we actually are trying to take 190
some legal action on this as well. I will have more to say, I have a statement that I mailed out to the Commissioners 191
already, I hope that they have the courtesy to read it, I asked them to actually reply via email, text, call any which way 192
that they had actually received the email. I have one of the Commissioners actually respond, that said they received 193
it, not that they had read it, it would be nice if they actually went with how their constituency actually feels. I think 194
they are the ones that count out here. Again, like I said earlier, as that our residents come first and you’re putting the 195
Town of Hillsborough first. You’re putting the Planning Board first, what the whims are there. We are perfectly happy 196
with our wells, we don’t want city water necessarily out here. We don’t want city sewer, we are out of the Town, we 197
don’t want to be annexed and this is not just me. I happen to hold a chunk of property that is immediately adjacent to 198
this that I’m structure out there that basically, 2.5 million square feet big. This is about 3 times the size of Carter 199
Findlay Stadium and you say that doesn’t have an impact. You’re putting this in middle of an area that is completely 200
at this point basically residential. So you’re going to put an industrial park for lack of a better word, because this light 201
manufacturing, any manufacturing as you actually look carefully in there, warehousing and logistic center. That 202
translates into industrial park, this is a pretty hefty size industrial park. It would actually, just to give you a couple 203
comparison numbers, the PNC Center is 700,000 square feet including all the levels, so that’s 700,000 this is 2.5 204
million that you want to put in there. Carter Findlay Stadium is 107,000 square feet. How can this not going to have 205
an impact on this whole area, doing this. 206
207
David Blankfard: I think your comments, most of the stuff you are wanting to talk about is going to be held up in the 208
later item. Right now we’re talking about something else. Thank you.209
210
Franklin Garland: I know you’re trying to approve something that is going to be the infrastructure for something else.211
212
Craig Benedict: Good evening, my name is Craig Benedict, Orange County Planning Director. Just a little bit about 213
how we can answer some questions from the public in how we will handle it moving forward. If staff can address with 214
a quick answer, if it’s a or b we will provide that during this meeting, if it is a more lengthy question, we will make 215
note of the public comment and we can provide in writing the justification of the goals of the County and how the 216
process has come forward.217
218
Franklin Garland: (background discussion of a personal nature)219
220
Perdita Holtz: I have gone ahead and muted Franklin Garland221
6
D R A F T
222
Randy Marshall: I was just going to say that since we have a number of people who want to speak tonight, it seems 223
to me we want to try to institute some limit to the amount of time that people have to speak. Otherwise, we’re going 224
to be here terribly late. The other thing is in the past, it’s never been quite productive to have Planning Board 225
members respond to presenters individually. I agree with what Craig had to say in that we need to take the 226
information that people are offering to us and we can get back to them or staff can get back to them at an appropriate 227
time.228
229
David Blankfard: Thank you Randy.230
231
Perdita Holtz: We have asked for folks to limit comments to no more than 5 minutes.232
233
Ronald Sieber: This is Ronald Sieber speaking; I live in the New Hope Springs neighborhood, which is along David 234
Road. I have two short comments to make and a question. My first comment is that the signs that have been 235
provided by the Planning Department to announce these meetings are too small, the print on them is too small, and 236
they are placed in dangerous venues that if a person such as myself wants to stop and try to interrupt what is on 237
them, we’ll get run over by cars. This actually happened to me on Davis Road when I stopped to photograph one of 238
the signs because it was really too small to read. As I was doing that, a truck came up behind me and almost hit my 239
car which was parked by the side of the road. I would ask the Planning Department to please come up with a sign 240
that’s got larger print in it, is more intelligent in its presentation and doesn’t present a danger to us folks who want to 241
read what’s going on. My second comment is that the July 21st meeting invited only those people within a 1000 242
square feet of the affected area along David Road, which is a mile and a half long, there are 100s of homes, 243
thousands of people who live on Davis and Ode Turner and all of us are going to be effected by this change. Not 244
only from the development itself in parcels one and two but also the proposed change of planning along Davis for 245
that little 12 acre parcel that the RTLP is planning to incorporate as part of their zoning change. That goes to my 246
questions, my questions is if this is a rural neighborhood of farms, legacy businesses and homes, why are we 247
allowing a major corporation come in and annex this piece and make it part of their monstrosity of a development. 248
This is just going to change everything not only in our neighborhood but on the road itself on Old 86 and potentially 249
on Davis Road. That’s the end of my question. Thank you for taking it.250
251
Richard Wagoner: My question is more of a question than a comment. I was unable to attend the earlier July 252
meeting for the public and my question is about the residential areas right when you come off I-40 onto Old 86. Right 253
now, I think it is in the Neighborhood Mixed Use on one map but on another map, it’s the Economic Development 254
Transition so I am trying to get an idea of what is proposed for that area in the future. My mother-in-law lives when 255
you are coming off 86 on the right hand side, my wife is the property owner along with my mother-in-law so we are 256
trying to find out what is proposed for that area.257
258
Tom Altieri: The parcels you are inquiring about are to the north of the amendment area that I discussed in my 259
presentation. They are addressed in that Central Orange Joint Land Use Plan as well as the County’s 260
Comprehensive Plan it is located in an area that would have the potential for economic development. The properties 261
there that are residential if zoned for non-residential uses those parcels are allowed to continue to be there to have 262
residential uses. They are what’s called non-conforming uses meaning that it may be a house if it’s rezoned to non-263
residential it’s not within the conforming zoning district but those houses are certainly allowed to stay. We did receive 264
a question at our public information session about would it increase potentially the developers interests in purchasing 265
those houses and the response at that time was that yes it could so it is possible there could be some transitioning 266
there if property owners want to willingly sell their property to developers for non-residential uses in the future.267
268
Richard Wagoner: There would be no requirement at this time, you could stay there if you wanted to or sell if you 269
wanted to?270
271
Tom Altieri: Absolutely, that is correct. I know it’s hard to really separate the development proposal from some of the 272
land use amendments that I’ve been discussing but things like buffer requirements around the development to 273
provide buffers between it and adjacent residential uses will certainly be discussed later this evening.274
275
Richard Wagoner: Ok, thank you.276
277
7
D R A F T
Clare Brennan: Hi, Clare Brennan, like one of my neighbors earlier, I also live down Davis Road in the New Hope 278
Springs subdivision. I wanted to specifically talk about that little parcel of land that had the star on it. That’s of 279
concern to me and I think a lot of my neighbors since we live down Davis Road. As I see it, I think this big planned 280
economic development is likely going to happen but I would like to sort of try to get a win out of this somehow and 281
maybe will a battle but lose the war. My position is that we need not be rezoning or annexing that little parcel that 282
had the star on it. I think that was 17 acres that was on the west side of 86 and adjacent to Davis Road. I think there 283
was plans to change that zoning from Rural Residential to an Economic Development Transitional Zone, I am totally 284
opposed to that, and speaking for my neighbors, I think we all are in the subdivision. I also want to step back and 285
remind people that Old 86 is one of 57 scenic byways in the State of North Carolina and appeared on colonial maps 286
of this state dating back to 1770 so we’ve had 250 years of living off of Old 86, families, generations enjoying this 287
rural life so it is really with a lot of dismay and disappointment that we are seeing the plans for this huge rezoning 288
here right at the corner of our neighborhood. I also take a bit of issue with the term RTP Logistics Park. We are at 289
least 30 miles from RTP, surely this is a bit of a misnomer should we maybe consider calling this the Hillsborough 290
Manufacturing District, it’s kind of what we are looking at, right? This is not a RTP associated park in any way shape 291
or form. Also this might go onto the next agenda item but I have a real concern about the PIN 9862-99-8894 that is a 292
warehouse that has an access road off of Davis Road and this is planned to be 300,000 square feet again according 293
to my math that is some sort of building that would be 300 ft. by 1000 ft. right as you turn off of Old 86 onto Davis 294
Road. Quite frankly, that is really unacceptable. We moved out here to this lovely part of Hillsborough and Orange 295
County for the luxury and the privilege of living in the country and that is really just going to totally deface the whole 296
entryway into what is supposed to be our gateway into historic Hillsborough. I also want to mention in this COVID 297
environment, that Davis Road has really become a place that our neighbors cherish. We cycle out there and walk out 298
there you see families walking hand in hand with children on Davis Road especially because people are home now 299
and not able to go out and socialize. Folks cycle out there this is a great place to ride bikes and again that quality of 300
life that we’re used to maybe gone if this huge development comes to fruition so my pitch again is to remove any 301
service road, any development from encroaching down that Davis Road corridor and let’s leave Davis Road in as 302
much of the pristine condition as we can. My last question is once this large manufacturing and industrial 303
warehousing site is approved, will residents be notified about the potential new owners of these facilities and what 304
sort of manufacturing and industrial plans do we have for these parcels are we looking at a rubber tire plant, a swine 305
pig manufacturing site, pharmaceuticals what are we really approving here? It’s quite nebulas in my mind and a little 306
frightening so I’ll stop now and just take any questions if need be. Thank you.307
308
David Blankfard: Thank you. 309
310
Randy Marshall: How far is your development from 86?311
312
Clare Brennan: 1.75 miles, it’s right the Ode Turner fork, go left at the fork.313
314
Randy Marshall: Ok, so you’d have to go 1.7 miles down Davis Drive from 86 to get to your development?315
316
Clare Brennan: Correct.317
318
Randy Marshall: Thank you.319
320
Hunter Spitzer: My question was if we do not approve this Land Use Plan amendment, can this area still be rezoned 321
in the following amendment or would it be passed to the Board of County Commissioners? The one for the Research 322
Triangle Logistic Park if we don’t change our land use map?323
324
Tom Altieri: Any rezoning needs to be consistent with the Land Use Plan. If it is not consistent with the Land Use 325
Plan then the Land Use Plan needs to change concurrently. So the answer to your question is no.326
327
Craig Benedict: I can add on to that. North Carolina State Law allows rezoning to proceed and independent and if 328
the rezoning is approved in an area such as this then we would have to, as Tom said, go back and change the Land 329
Use Plan.330
331
Hunter Spitzer: So it would be inconsistent but because our Land Use Plan didn’t agree with this, it wouldn’t 332
necessarily stop it?333
8
D R A F T
334
Craig Benedict: That’s correct.335
336
Jared Jurkiewicz: My name is Jared Jurkiewicz; I live down Davis Road as well just past the New Hope Subdivision. 337
I’m actually in the Windsong Subdivision, which is a tenth of a mile from them. I am also the president of the 338
homeowners association for the Windsong Subdivision representing approximately 15 households on this call and I 339
would just like us all to go on record saying that we oppose making these changes here all of us are extremely 340
concerned about the detrimental effects it will have to our community, to the traffic on Davis and to the overall 341
lifestyle of the area. It has been summarized by Franklin and several others beforehand that many of us moved out 342
here specifically because it was a rural area and we wanted to be outside of the city. We did not come here to 343
suddenly have a massive manufacturing facility and warehouse district pop up in our back yards. A lot of us are 344
incredibly unhappy about this and I don’t know if it is true or not but I know it has been discussed among people here 345
as we feel like this is being snuck in and hidden with the things such as the signs that are unreadable on the road 346
unless you stop and endanger your life to read them. That the stuff is being done very under the table and sort of an 347
underhanded fashion and it is breeding a lot of resentment with the residents of this area. I can that’s true for my 348
entire subdivision, it’s come up in our homeowners association meetings several time now and as Franklin said, it 349
really feels like, even though the statute said or the creed said that Hillsborough residents come first, it feels like we 350
are all coming last. That this corporation, which is from out of state, is getting more preferential treatment than the 351
2000 + citizens that live here and that’s pretty much my entire comment. Thank you.352
353
Hunter Spitzer: New question, I know that the Town is planning to expand sewer service area to the north of this 354
parcel that’s in question right now and they will provide services to the proposed RTLP development but I remember 355
reading the plan that they’re also planning a long term vision to build a sewer loop that will return back across 86 and 356
I wondered if the Town needs this area to complete that project?357
358
Craig Benedict: Tom, I can handle that one. The loop that they would be providing would be for a water system and 359
not a sewer system. So it’s likely that in order to get the fire flows for development of this type, that a loop would 360
occur back from I-40 near the service road through the development and back out to Old 86 where there is presently 361
a large water line in 86 now. As far as the sewer system, this area even this additional 12 acre area and the other 362
roughly 70 acres on the east side all flows by gravity naturally to the sewer systems within Hillsborough. That’s why 363
this both could be served easily by the sewer system and also water main loop that would go back to the existing 364
facilities along Old 86.365
366
Hunter Spitzer: Right, the Town doesn’t necessarily need this area to complete the water loop.367
368
Craig Benedict: There’s multiple engineering solutions. One of them would be a loop system so it’s something that’s 369
being explored to provide those fire flows that are necessary.370
371
David Blankfard: I think the other way they could do it is to have a fire pump inside each room and each building 372
could generate the flows that they would need for a sprinkler system but those are costly.373
374
Bob Bundschuh: My name is Bob Bundschuh; I also live in New Hope Springs, a couple of miles down Davis. I’ll try 375
to keep this to this particular amendment. The first question I have is when did Hillsborough actually approve this? 376
You said that this is the next step the County has to then follow suit but why now? What made it pertinent this month 377
to actually start doing this and is it related to the second part of the agenda? Looking at your first five slides, you 378
looked at all the areas that are slated for development, there are a lot of areas that are slated for development, 379
already zoned for development and aren’t developed yet. So why the push to do this right now, why don’t we wait 380
until we actually let the demand start catching up with the supply. Or as some people have said is this a quick way to 381
get this kind of rezoned and then call it the master plan which back when Settler’s Point was going on this was phase 382
3 and some type of retirement place and we’re going to go ahead and table that as kind of a negotiation tactic that 383
was used back then. So why is it suddenly become a thing to, it’s not a rezoning but we’re going to match it up with 384
the master plan for the Suburban Office. The second one is the 12 acre parcel at the northwest corner, it’s kind of 385
funny that it is connected to the redrawing of the lines to say, we need that little 12 acre parcel to become part of this 386
complex across the way. So we had 89 acres and 12 of it is across the street. Is it really realistic that someone 387
would actually go in and get that 12 acres, develop it you said, a walkable office building without drive up traffic or is 388
that a way to let’s get this little corner across the street, and Hunter even eluded to it, do we have to do it in the right 389
9
D R A F T
order to say yeah we do the land use first and then we can go and rezone it. Is that a way of saying let’s get this first 390
because somebody wants to rezone that later. It’s not, it doesn’t make sense that we have to put that little 12 acre 391
piece in there, it’s just a way to get it in line so that in your next agenda you can then rezone it. Like other people, 392
that connection to Davis, and we’ll talk about that more in the second one, it makes no sense. Davis is a two-lane393
road where the white line actually will go into the gravel sometimes it’s so narrow. The development on Davis is not 394
where you want to put it. And lastly, so how do we change it? Every time we come to one of these meetings, we 395
want to change the master plan of the development to zone it more industrial and take away rural and you said well 396
that’s been the plan for 20 years. Well obviously, it can be changed so how do we change it back. Do we go to the 397
zoning board? Do we go to the County Commissioners? How do we put restrictions as the people that live out here, 398
so that every year we don’t have to keep doing this and that a decision made 20, 30 years, is not going to come up 399
all the time. One last comment, and Randy with all due respect, you said earlier that we have to make this quick or 400
we’ll be here terribly late. I understand we got to make it quick but we live here. We’re the one that have to deal with 401
the decisions being made so if people have to stay up a little later, I think that’s a small sacrifice for those of us who 402
have to live with being up terribly late with development so with all due respect, I’m ok with staying up a little late and403
I think everybody else is to. Thank you.404
405
Maryanne Ross: Hi, thank you for having this meeting and thank you Bob for that. We are community members and 406
with all due respect, if we are here later, this is our neighborhood. The last meeting that we attended it was put off to 407
a later date and they waited until we forgot, they waited until something else happened and they passed a rezoning. 408
It’s the same thing that Ronald said, the sign was put out and it was so small, the meeting had passed, it was only for 409
a few people and then the next thing I knew, I drove by and there were like 20 signs out. And then the meeting 410
happened a week later. So, speaking to David and Hunter and Melissa, welcome, the OCPB charge is that 411
‘harmonious development, future needs, homes, homestead, wildlife habitat’ we have deer, we have endangered 412
bluebirds, we have many wildlife that are living in this neighborhood community. Whether or not we live 1.75 miles, 413
2.3 miles, we live on Davis, we live on Ode Turner, we live in this neighborhood. This is where we live now. We 414
didn’t live here 20 years ago this is where we live this is where our families are this is our harmonious development 415
we are your constituents we would appreciate you listening to what we have to say. I’m talking to you Hunter, I’m 416
talking to you Melissa, I’m talking to you David. Apparently, you weren’t here when we had this meeting two years 417
ago and they wanted to rezone yet again these same areas and that fell through and what Mr. Altieri described 418
earlier, the whole kit and caboodle was this is an example of the Town giving an inch and a developer taking a mile 419
because there’s a little bit of an extra parcel and that’s what they want to do. And we implore you to please put a 420
stop to it. Let us have our green area. Let us live our lives where we live it best. I do not need nor do we want to 421
have this traffic, this green space taken away, Thank you.422
423
Jon Lorusso: Good evening, I don’t have a lot to say. I wanted to voice my opposition to this. I also live off Davis 424
Road across from the New Hope Springs Subdivision. I am against this I concur with previous speakers about the 425
signs. I almost got into an accident myself trying to read information off a sign. It does feel like this is being done 426
without the, no one voices their opposition. I came in from a meeting late tonight and I missed the meeting in July. I 427
wasn’t at the meeting a few years ago that the previous speaker mentioned. I don’t know how long in the process we 428
are but once it’s done you cannot undo it. You cut down a tree the tree is gone it’s not coming back you can’t just put 429
a new one there. If this is done, it’s permanent. It will change forever the place that we live. The phrase Not in My 430
Back Yard comes to mind. I don’t know how many of the County Commissioners live in this area if this was being 431
done on the other side of the County, I probably wouldn’t care but it is being done in my backyard like the previous 432
speakers have said, I didn’t move here so that I could live next to a giant manufacturing district. This is just not why I 433
moved here not why I live here. I would also like to reiterate what speakers said about the potential use. What’s 434
going to go on here? No idea. I think she mentioned a rubber tire factory, who knows? It’s really none of our 435
business right? It’s private property, they can do whatever they want. I am very upset by this and I really wish you 436
wouldn’t do this to us. That’s all I have to say.437
438
Stephen Williams: I just wanted to voice my concerns and many people have already spoken on the topics I was 439
concerned about. I am wondering why the residents in this area haven’t be given any results as to if traffic studies 440
have been done on the impacts that this facility might have on traffic as well as green space. I spent one day this 441
week putting up my new mailbox because I am in the process of building on a property 3 acres that will border this 442
potential development and life others have said, as I was putting up my mailbox, bikers went by, people walking, 443
cars, it’s just unimaginable what the impacts will be on Davis Road to allow an entrance or exit to a facility of this 444
size. I am also confused as to why the 12 acres is so important. We keep saying that it’s, we’ll talk about something 445
10
D R A F T
separate but really they go hand and hands. I really thought it would have been best in the interest of everyone if this 446
had been addressed and then questions had been asked. There’s a major and no one has mentioned this, there are 447
major power lines that separate that 12 acres from the rest of this development. I don’t know if that has been brought 448
to anyone’s attention, I’m sure the planning committee is aware of that it just seems illogical that those 12 acres are 449
essential to them putting this development in. I concur the signs are super small, many people at the July meeting 450
voiced their concerns there weren’t many of us but there were a few there. I do feel like it’s absurd that we’re talking 451
about changing the zoning of a residential area with residents and people’s homes and lives that in and of itself 452
should say. What are we doing here? Why are we doing this? Are we doing this for money? I chose to buy land in 453
Orange County and pay the higher taxes because I wanted some space, I wanted 3 acres, I wanted some woods. I454
didn’t know at the time that all this was going to be occurring or I would have changed my mind. I could have bought 455
in a different county and paid a lot lower taxes so I hope the planners here will hear our voices and as it’s been said, 456
we do the voting and I guess we’ll need to remember that when we vote again. Again, time is of the essence but I’m 457
hearing a lot of questions from people on the planning committee so we might want to direct the time to constituents 458
and residents if we want to save time and save those planning committee questions for when you guys meet at a 459
later time. Thank you.460
461
Leslie Roberts: Thank you for letting me speak, this is Leslie Roberts and I live on Old 86 about a half a mile from 462
the Davis/86 intersection. I am opposed to this and I have some concerns that have not been mentioned yet. One of 463
them being that traffic on Old 86 is picking up quite a bit since I’ve moved here I’ve noticed and I think would be 464
erroneous to assume that the traffic will stay between this warehouse and 40 since 40 is right there. I think that traffic 465
will probably increase along Old 86 to New Hope Church Road as people bypassing go another to the interstate. I 466
think that is something that should be considered also considering the narrower parts of Old 86 out here as well as 467
cyclists and just people just trying to get out of their driveways. I am also concerned because I know that this is a 468
long time coming people have not heard that this has been in motion for many many years but the world we live in 469
now is not the same world we were in when this was thought of and I think it would behoove us to really take a step 470
back and consider the footprint that we are looking at leaving with this industrial complex. Many businesses are 471
opting to work from home options that may be permanent. They are finding that automation can make smaller 472
spaces for warehouses and not as big warehouses are needed. So I think it’s frivolous at this point to consider such 473
a big industrial impact when we’re very clearly seeing that in two or three years from now the same resources may 474
not be necessary and so I think that’s really important to consider that what we’re doing here will have a lasting 475
effect. I have a question to be considered for later, are there plans to consider that is there a pivot that can be made 476
if we realize that this is not going to be fruitful. So that’s where I’m coming from. I appreciate you taking my 477
questions, thank you.478
479
Matthew Kostura: Just a couple of comments. First there have been a lot of question about what might go in here. I 480
think it’s pretty clear what going to go in here, a very large warehousing distribution center, manufacturing is probably 481
not in the cards here. You are really talking about the big impacts is traffic and with all due respect to Randy about 482
asking where people live on Davis Road, 1.8 miles away, whatever. Last I heard cars move they are going to be 483
coming down this way and a point that I want to make is that for everybody out here on Davis Road, all the 484
comments about the biking and the walking and such are true and here’s the reason why, in 20 years’ time since I’ve 485
been living here based on North Carolina’s own annual average daily trip data, the traffic on David Road has not 486
increased one bit it’s been stuck around 800 trips a day. So this is not a road for us, it’s a driveway. We don’t view it 487
as a road it’s our driveway that we come home to. Now at the top of it, you’re going to be putting the traffic bog of 488
basically four years’ worth of trips on this road, four years 3000 trips. That just doesn’t make any sense. Secondly, I 489
want to go back to Melissa Poole’s question because I think it’s really important. It seems like this rezoning is 490
backwards. How I interrupt Tom Altieri’s commentary is basically this way, we can rezone it because in the future we 491
have it marked for rezoning. So we can rezone it now. That’s basically how I’m interrupting this, I think it’s true but 492
it’s really just as a way, an ad hoc way to say, we’re going to get this way in that is critical for this development. They 493
need a second egress from that site and that land is for that. Oh and by the way, they’re putting a 300,000 square 494
foot building there too. Right next to a bunch of homes, which they are free, to sell to anybody who wants to come in 495
and put up fence. It seems to me, I really want to address that issue of how this lays out because it seems to me like 496
this a very ad hoc exercise. I really like some explanations on how that works out because it seems to me what 497
you’re justifying a present change because the future overlay that’s going to occur. Really, that cuts back to Melissa 498
Poole’s comments. Thank you, I’m done.499
500
11
D R A F T
Adam Beeman: I am just wondering if we can just get past this first amendment, a lot of the problems and questions 501
would be addressed and answered in Mr. Harvey’s presentation over the rezoning of the MPZ-CD. We’re going 502
through stuff that they will get answers to once Mr. Harvey give his presentation. I don’t know if there is a way we 503
can vote on this first amendment and move along but a lot of the stuff will be answered once we get to that next504
presentation, I believe. 505
506
Gerald Scarlett: I will speak specifically to Item 8 let it be known that I am not in favor of any of this. I have been here 507
for 65 years; my family has been here for over 200 years. When you look at your map, West Scarlett Mountain Road508
is my driveway. It’s a half a mile long and I personally maintain all of it, all the expense and all the work. What I 509
would ask of the Board is that you recommend to the County Commissioners that Item 8 not be approved. I’d like for 510
all this to go away but I’ve been fighting this stuff since Interstate 40 took part of my property so I know how some of 511
it will turn out but we do not need to approve Item 8. If you look at that map, the change that you are making, I know 512
it’s not yet a rezoning, seems to be just because the Town wanted to do it and we want to match that. I think we 513
need to make everything as hard as possible for anybody to do anything in that section other than the R1. Part of my 514
reasoning for that is if you look at my driveway, that is the beginning of the Rural Buffer. My property is in the Rural 515
Buffer. There are a lot of things I cannot do with my property that people on Davis Road can because I’m in the 516
Rural Buffer. Some of my tax money has been spend over the last couple of years to put up signs that say ‘Entering 517
the Rural Buffer’. Some people love it, I personally don’t, it rubs my nose in the fact that I can’t do something on the 518
piece of property my family has been paying taxes on for 150 – 200 years but none of that matters at this point but if 519
you look at that map and you look at my driveway, it does not make sense to me that you have a Rural Buffer that 520
limits the use of property so that it has to stay the very rural, more rural than the rest of the County but I would have 521
to pass businesses and retail potential down the road to get off of my Rural Buffer property. If we are going to make 522
development, there has got to be a buffer between a Rural Buffer and the beginning of the Retail and Industrial. It 523
makes no sense to make a hard line to the Rural Buffer, don’t cut your trees, you can’t divide your property, right over 524
to here’s an industrial zone. If you are going to this and recommend to the County Commissioners that they do this 525
and approve this then you need to do away with the Rural Buffer. That needs to be forgotten about so I guess if 526
there is a question in all that, is there any intention of providing any kind of buffer between my driveway and the 527
changes that this might allow and the zoning that it might allow down the road and I know that the answer to that is 528
no. So, I would beg you please recommend to the Commissioners at least for Item 8 and of course, I think so for the 529
rest of it too, recommend to them that they do not change that. Let’s not make it easy for people to come in and ruin 530
what we’ve done here. Thank you.531
532
Sarah Shore: My name is Sarah Shore. Randy, I just want to let you know that my land backs up to this so we are 533
directly affected by this amendment. This proposed amendment that was snuck in, that was completely different for 534
Settler’s Point, is really upsetting because I will have a warehouse in my backyard, about a 100 yards away from my 535
children’s playset. I moved here to keep my kid’s childhood simple with the woods and being able to run around and 536
have fun and you are now telling me there will be a semi going past my backyard because of the is one little parcel of 537
land and I understand that we can’t fight it all but whoever said it earlier, fighting and winning this battle and losing 538
the war is looking like it might be but please do not put a semi in my backyard and this warehouse. One thing Randy, 539
this is my backyard, I don’t live down Davis Road, I live on Old 86. Thank you.540
541
Cedar Eagle: Hello, I have a question regarding the zoning basically. Can the constituents create a petition to keep 542
the zoning as Rural and Residential and if so, how many signature would be required on a petition like that before the 543
Town would have to address it? That’s my only question.544
545
Craig Benedict: There is a public hearing process that is part of these amendments. You are welcome to attend and 546
bring signatures or petitions if you would like to that public hearing and that will be part of the consideration for the 547
amendment so that’s the process within the laws of the County that are put up in the Unified Development 548
Ordinance.549
550
Cedar Eagle: Ok but there’s no set amount of signatures that is necessary. You can’t give me any kind of numerical 551
data to show how much outcry we would need to make it strongly … I mean I understand the County Commissioners 552
what this approved but pretty much everything I’ve heard from every resident wants it to keep agricultural and 553
residentially zoned so if had a public outcry of thousands of petitions saying they don’t want it how much impact 554
would that have?555
556
12
D R A F T
Craig Benedict: We regularly, as part of the public hearing process, take a look at the input that comes from 557
residents and it is gauged against our Comprehensive Plan. There is not a numerical limit that makes it go one way 558
or the other. There is a public hearing process.559
560
Cedar Eagle: Ok, thank you that’s all I needed to know.561
562
Tom Altieri: If I might add, what you are describing sounds a little bit like a reference to annexation law in that when 563
an area is proposed for voluntary annexation, a majority of the property owners have to agree to that annexation. 564
That could be what you are referring to. Annexation of course is not proposed here and there is no rezoning part of 565
Item 8.566
567
Jack Rupplin: Good evening, I appreciate the opportunity to talk to you about this issue. I was ignorant about it until 568
a few days ago until Franklin Garland told me about it because I noticed the little signs but they didn’t mean much to 569
me. He briefed me on this and I realized the impact that this would have on the total area and I was totally shocked. I 570
thought that this amount of time that he described was totally short fused especially on circumstances we are living 571
now with the COVID and so I contacted my attorney and he referred me to another attorney and in turn they referred 572
me to Morningstar Law and they are a very good group of attorneys who specialize in this sort of issue. I spoke with 573
them and I asked them what it would take for them to represent us in this case which I will oppose with all ingenuity 574
and money I can muster to stop this because it is totally a rough plan. It’s a plan without any thought there is no 575
special use zoning in here, it’s just all very broad stroked and that makes it very dangerous and very unpredictable 576
and we will suffer the consequences for a long time and I am personally very happy where I’m near and I will want to 577
continue living where I am. So, as to what I want from you all is a voluntary deferment or delay of any action so we, 578
the residents of this area, we can organize and we can retain legal counsel and we can prepare a plan or a counter 579
plan and suggest some modifications to the zoning or the rezoning and suggest some modifications to the RTLP and 580
come up with something that is reasonable. This is our area not the Planning Board’s area. We want to work with 581
you and we want to organize we are not going to be run over and we are not going to be forced into this so I would 582
like to ask you to consider postponing this and give us the time to organize and to get legal counsel. Hereby, I 583
pledge $1,000 dollars of my money as seed money to begin this action. I thank you very much for your attention and 584
God bless you.585
586
Betty Garland: I just wanted to say that this is going to be in my backyard. We do a brisk agritourism business in 587
general here and this is going to have a very negative impact on that. Also, regarding petitions and signatures we 588
had about 5000 against the Summit project but it got voted in anyway so like if we had 30,000 signatures would that 589
get somebody’s attention? I would like to get that really clarified if I can. That’s it.590
591
Kaila Mitchell: I’m Kaila Mitchell, I live on Jedi Way my parents live on one side and then my in-laws live on the other 592
we are about a quarter of a mile down the road from Old 86. Before we move here, at the end of 2017, my husband 593
Matt Mitchell spoke with Michael Harvey asking about the development plans as far as that expansion that plot that 594
will come up to Davis. He was told that were was no appetite for it and so we were under the impression that it would 595
not happen. If we had known that it would have, of course we would have chosen not to move here. Some of our 596
concerns, just like many of our neighbors that I agree with, we are concerned about light, and noise, pollution, air 597
pollution and of course safety because of the increase traffic, especially the big trucks. I’d also, the potential for the 598
decrease in the value of our property being so close to a warehouse district. So I wanted to make my concerns 599
known as well and that I stand in solidarity with my neighbors being 100% opposed to this. Thank you.600
601
Jon Lorusso: I spoke earlier, I’d just like to say that if this meeting were in person, the attendees, the residents would 602
have the opportunity to meet and meet each other in person a lot of my neighbors, share contact details and organize 603
in a way that Mr. Rupplin was speaking about. We don’t have the opportunity to do that because this is being done 604
virtually but if, I was made aware of this through Mr. Garland, Mr. Franklin Garland, I would say, just to keep it simple, 605
I am going to email him and see if he has any means of organizing the rest of us. Perhaps a Facebook group or 606
something along those lines would be useful. Mr. Rupplin if you have any ideas, I can’t really share my email with 607
you right now but I will try to get in touch with you through Mr. Garland and hopefully we can organize something that 608
way. That’s all I have thank you.609
610
13
D R A F T
Franklin Garland: Thank you for taking my questions again, I know I am using a lot of the time out here. Somethings 611
that haven’t been asked yet and I know this will come up later on in the meeting but are any Commissioners present 612
today for this meeting. That’s one question, ok.613
614
Perdita Holtz: Can I go ahead and answer that and say that Commission Chair Penny Rich is on the call as an 615
attendee.616
617
Franklin Garland: She the only one.618
619
Perdita Holtz: Yes, it is not typical that BOCC members attend Planning Board meeting.620
621
Franklin Garland: So this is moot, what we’re discussing the decision everything we’re saying.622
623
Perdita Holtz: Well this the Planning Board meeting and there will be a public hearing before the Board of County 624
Commissioners at a future date.625
626
Franklin Garland: It’s my understanding, and everybody that has spoken so far that this was in fact an information 627
meeting with the Commissioners present and once again it seems to me that the Planning Board is trying to sweep 628
everything under that rug. Ok, again pulling the wool in front of our eyes. Big questions for you guys, there is the 629
Research Triangle Logistic Park Company out there Terra Equity did a presentation for a hand full of people because 630
nobody else was notified and Planning Board has made it a point of not notifying all the people that really get 631
involved but just the ones that are in contact with the property. Ok, so sort of devious, ok because there are, like I 632
said, thousands of people that get affected by this not just the 12 parcels around it. However, big big question, we 633
did have an informational meeting on July 15th I believe it was and they said it was going to create 4500 jobs. The 634
same argument used by the planning that was going to create this jobs for from Northern Orange County. So, this 635
was with Summit Corporation. If we have 4500 new jobs out here and that are being created for the people who live 636
in Northern Orange County, that means we’re going to have approximately 4500 cars coming through Hillsborough 637
additional to the traffic that is a mess already there, in the morning and those cars are going to be returning in the 638
afternoon ok. I don’t think that is exactly good planning by the way. I mean we really need a different way other than 639
Churton to get through Hillsborough and that’s never going to happen but let’s go ahead and double the traffic out 640
there. 4600 people that almost the population of Hillsborough that you actually adding to the traffic conditions out 641
there ok. I don’t know if you guys have considered that apparently not because certainly that would require putting in 642
four lanes or at least 2 lanes in every direction and that’s not in the plans either. I understand that DOT doesn’t have 643
money to convert the roads at this one and to the work and Hillsborough doesn’t either ok. I also, actually good 644
question out here, everything we got pretty much blindsided with Summit and it got approved. I will ask someone 645
who is in the know, Summit got approved pretty much they just blew us away and said we’re going to do whatever we 646
want anyhow and you did and then they pulled out. Why did they pull out, when did they pull out, what did Terra offer 647
you that is making you do it. When did they let you know that they were going to do this and why weren’t we 648
informed that this all had happened? Any care to comment on that, it is planning, this is you know obviously 649
somebody planned Summit and decided to get out of it. Somebody now trying to just pull another one over us. I 650
wouldn’t mind if Mr. Harvey or Mr. Benedict answered this one cause apparently they’re the one in charge of this and 651
I hope they’re present because they are the planning commission and if they’re not there why are we even having 652
this meeting?653
654
Craig Benedict: I can give you a brief answer; we will provide something in writing. The developer of Settler’s Point 655
received approval in January 2018. At times, developers do not stay with the project and we are not privy to why they 656
left the project, cease to exist. Another project did pick that up.657
658
Franklin Garland: Have you seen the damage they did back there already? And the wildlife that the displaced? I 659
mean they literally raised it and then abandoned it.660
661
David Blankfard: I think that was the tornado.662
663
Franklin Garland: No, no, no, no, no, no we’re talking about 90 + acres that are devastated back there not tornados. 664
Raised, cut down and raised and leveled with grading already having started on it. I am just curious why they pulled 665
out. It seems like you guys would know. There would be some agreement that there have to do it since they went 666
14
D R A F T
forth and everything and they pulled out and you guy pulled out from who knows where this other mega corporation 667
that is not even in North Carolina that one of the stipulations is here that it’s going to help North Carolinians. This 668
company is from Kentucky for crying out loud. They gonna get their own crews in here and that is supposed to help 669
us? Orange County residents? I mean I don’t see where you guys are deciding this and pulling this out from and you 670
literally putting this whole thing in middle of a residential area. You look around your development zone and it is all 671
residential. It might be by I-40 but that doesn’t keep it from being residential. 672
673
David Blankfard: I think Michael Harvey has something to say.674
675
Franklin Garland: I’d be surprised.676
677
Michael Harvey: The applicant for Settler’s Point did not engage in any land clearing. The land clearing that Mr. 678
Garland is referring to is actually carried out, as I understand it, a timber operation and consistent with a forest 679
management plan to harvest it, the timber. The land disturbance activity did not occur as result of any actual 680
development activity for the Settler’s Point project.681
682
Franklin Garland: Why did Settler’s Point pull out Harvey. I mean you should know you’re in charge of this.683
684
Michael Harvey: Well, Mr. Garland, I responded to your email request. Summit has not pulled out the properties 685
have been rezoned, Summit is not moving forward with their development plans at this time. We have a new 686
applicant proposing a new project that is being processed in accordance with the provision of the Unified 687
Development Ordinance.688
689
Franklin Garland: So if Summit hasn’t done anything that doesn’t mean they’re out of the picture, they just have not 690
done anything yet. You gonna try to sell this to the second customer, how about we go ahead and do a proposal of 691
our own to put up whatever we want our community and try to counter that, would that fly too then.692
693
David Blankfard: You’re welcome to do it. 694
695
Franklin Garland: If our proposal calls for farmland for example, we want it rezoned to pasture. I mean that’s a 696
perfectly legitimate thing and that’s then, you’d have to accept it right if the people, if that’s what we want.697
698
Jayse Sessi: My name is Jayse Sessi, I live a little further away but I drive by that area all the time. We moved here 699
almost 14 years ago and we chose to live in a semi-rural area. Since we’ve been here that parcel that corner has 700
been put up for several different situations and I think it’s a little upsetting that the rural area, if that 12 acres, will 701
impact the neighborhoods that are nearer than I am but it also would have a negative impact, I think, for this area. 702
It’s not just that immediate, those immediate houses those people have mentioned but it’s further away that has an 703
impact as well. I am just basically wanting to voice my concerns and I am against it and my support to the local 704
community.705
706
David Blankfard: Ok, I think that’s everybody from the attendees. Does anybody on the Board have any further 707
questions or comments or anything?708
709
Perdita Holtz: There are two people with their hands up. They have already spoken and as is normal during an in-710
person meeting, normally people are able to speak once so I’ll have to let the Planning Board make a decision on 711
whether they want to hear from Cedar Eagle again and Franklin Garland again.712
713
David Blankfard: So what does the Board think?714
715
Hunter Spitzer: I think it’s time for a motion.716
717
Adam Beeman: I believe I’ve heard enough.718
719
David Blankfard: Yeah, they’ll have time to talk about what they really want to talk about in the next couple of items.720
Ok, so can I get a motion.721
722
15
D R A F T
Adam Beeman: Motion to approve the item – I don’t have it in front of me. A motion to approve the amendment for 723
the zoning for the COCA and FLUM.724
725
Tom Altieri: In the motion, sorry for interrupting, the motion would be to approve the resolution that is provided in 726
your packet as attachment 3 and that outlines the amendment and the parcels to be amended if indeed the Planning 727
Board wants to recommend approval they would do so by virtue of approving the resolution that you have.728
729
Adam Beeman: I move to approve Tom’s resolution.730
731
Kim Piracci: Wait a second, I really... I would like to hear from Michael Harvey before I vote on anything. Do I have to 732
vote to hear from Michael Harvey? 733
734
David Blankfard: You can ask Michael anything.735
736
Kim Piracci: Isn’t he going to present tonight?737
738
David Blankfard: Yes, the next one.739
740
Craig Benedict: The next two items.741
742
David Blankfard: We’ve got a long way to go. Tom spoke on this item.743
744
Tom Altieri: I’m sorry, I did not hear. I think the motion on the floor is to approve the Land Use Plan amendments 745
through the resolution. I believe Mrs. Piracci’s question is with regard to the rezoning and there are actually two 746
rezonings on the agenda but I think the one that she is referring to is Item 10, the MPD-CZ that Michael Harvey has a 747
presentation to introduce that item. This is for the Land Use Plan amendments and does not include the rezoning.748
749
Randy Marshall: I am prepared to read the proposal if you want to hear it from the agenda packet.750
751
MOTION by Randy Marshall to approve the amendment. The requirements of Section 2.8 of the UDO have been 752
deemed complete pursuant to Sections 1.1.5 and 1.1.7 of the UDO and Section 153a to 341 of the North Carolina 753
General Statutes the Board finds sufficient documentation within the record denoting that the amendment is 754
consistent with the adopted 2030 Comprehensive Plan. The amendment is reasonable and in the public interest 755
because it supports modifying existing non-residential zoning designations in an effort to provide each property 756
owner with an opportunity/path forward for the reasonable development of their property. I would recommend that 757
the Planning Board recommend to the Board of County Commissioners that they consider adoption of the proposed 758
Zoning Atlas amendments. Seconded by Adam Beeman. 759
760
ROLLCALL VOTE:761
Carrie Fletcher: No762
Adam Beeman: For it763
Hunter Spitzer: No764
Melissa Poole: No765
Randy Marshall: Yes766
Kim Piracci: No767
Patricia Roberts: Yes768
Susan Hunter: Yes769
Alexandra Allman: Yes770
David Blankfard: Yes771
MOTION PASSED 6-4772
773
774
AGENDA ITEM 9: ZONING ATLAS AMENDMENT (GENERAL USE REZONING)-To review and make a recommendation to 775
the BOCC on a County-initiated action to rezone 8 parcels totaling 45.96 acres from MPD-CZ 776
(Settler’s Point) to EDH-4 (Economic Development Hillsborough Office/Retail) (1 parcel 32.76 777
acres in size) or EDH-2 (Economic Development Hillsborough Limited Office) (7 parcels totaling 778
16
D R A F T
13.2 acres). The parcels are located in Hillsborough Township, south of Interstate 40 and east of 779
Old Highway 86. This item is scheduled for BOCC public hearing on September 15, 2020. 780
PRESENTER:Michael Harvey, Current Planning Supervisor781
Michael Harvey reviewed the abstract and proposed changes to the Zoning Atlas Amendment 782
783
David Blankfard: Anybody from the Board have any questions or comments?784
785
Hunter Spitzer: My first question is in rezoning these parcels back to what they were prior to this, particularly on the 786
east side of 86, could I recommend or ask for consideration to rezoning to low intensity to medium intensity 787
residential in this area? It seems as though the industrial land uses are not very in line with the vision that the 788
residents have and I would add this zoning in addition to the ones that you already have recommended and in place 789
of Rural Residential this would allow for a more transition, a different opportunity for development in the area that I 790
think would be more in line with what some people have voiced.791
792
Michael Harvey: Thank you for the question, that suggestion in my opinion is inconsistent with the Comprehensive 793
Plan, which identifies this area as Economic Development. I also think that these property owners would object to be 794
down zoning their property and loss of potential development value. There parcels have been zoned Economic 795
Development for several decades. I think that it is not something that I am comfortable with recommending or 796
supporting. I think that if you have an interest in restudying the area that statement needs to be made to the County 797
Commissioner who would need to take it under consideration. What I will say is that, as with other projects in this 798
general area, there has been an interest in expanding our current Hillsborough Economic Development District and 799
Economic Development opportunities in this area. I also think it’s not necessarily the best planning idea to put a low 800
intensity residential right up against an interstate. I think that the current land use categories and zoning that we 801
have recommended that would allow for purposeful development and expansion consistent with current County 802
policy.803
804
Hunter Spitzer: I have another, more of a comment and this is pertaining to the analysis section of the introduction of 805
this amendment. ‘It finds that this is consistent with land use goal 3, a variety of land uses that are coordinated within 806
a program and pattern that limits sprawl, preserves community and rural character, minimizes land use conflicts, 807
supported by an efficient and balanced transportation system.” This is not mentioned again in the actual motion or I 808
believe the resolution we have to recommend to the Board. So if that will not be included over in summary words 809
those things that we’ve accomplished then I have no further objections but I do find that land use goal in itself a little 810
bit contradictory and not applicable to this situation.811
812
David Blankfard: All right, anybody else have any comments? Ok, again I’d like to ask people from the community to 813
say if they received a letter from the planning department. 814
815
Stephen Williams: I did receive a letter from the County Planning Board. I just want to reiterate something that the 816
gentleman just said that was speaking. He said that he didn’t think that the residents or the owners, I’m sorry, the 817
owners of the property that we are discussing now would appreciate a rezoning that would devalue their property and 818
I think that that’s something that every resident here is concerned about. It’s interesting that we’re concerned about 819
these particular parcels and the owners of them and worried about decreasing the value they have in their property 820
but I think it should be noted that rezoning these areas and putting in this development which is the goal here, is also 821
going to devalue the properties of the residents that are around those areas. Thanks.822
823
Bob Bundschuh: I have a question if these go back to their old zoning and they’re allowed to develop independently, 824
two questions. Is water and sewer does the loop have to be supplied to them before they can do that and secondly, if 825
someone decided to develop again can you reiterate what steps they would have to take. Would it go through zoning 826
and then the County Commissioners again or since it is zoned does it just go to the zoning board?827
828
Michael Harvey: I think I can answer that question. So, any development of this property will have to be done in 829
compliance of the Orange County Unified Development Ordinance, it would be staff administrator review, it would not 830
go back to the Planning Board or the County Commissioners. If these property remain Settler’s Point, MPD-CZ it 831
would also not have to go back to the County Commissioners or the Planning Board it would develop under site plan 832
review. There are standards in the Unified Development Ordinance dealing with shared driveway access that any 833
17
D R A F T
development on these properties would have to abide by but the rezoning of these parcels would mean that the 834
concept access management strategy developed as part of the Settler’s Point MPD-CZ would not have to be 835
followed and from our standpoint, it is more appropriate to give these individual property owners a path forward to 836
development of their property as compliant with the various 18 or so pages of conditions associated with the Settler’s 837
Point MPD-CZ would be difficult for them to abide by.838
839
Bob Bundschuh: And water and sewer?840
841
Michael Harvey: I’m sorry sir; I forgot the water and sewer. These parcels are intended nor are they slated to be 842
served by water and sewer. In order for any of these eight parcels to get water/sewer, it is my opinion they would 843
have to request annexation of the Town of Hillsborough. My apologies for that. This rezoning does not somehow 844
give them the ability to tap onto water/sewer inconsistent with what the Town’s original reaction was back when 845
Settler’s Point was being reviewed.846
847
Franklin Garland: So, Mr. Harvey, it’s my understanding with these eight parcels and pretty much everything else out 848
there that what you decide goes and even though the ethics part of our webpage out here says that you can’t do that, 849
you just gonna railroad everything through no matter what as you saying this is not going to go to the Board of 850
Commissioners, what you’re doing right now. That they would have no say, they can’t tell you no, and hold on hold 851
on, I’m not done….852
853
Michael Harvey: No sir, this Zoning Atlas amendment has to go to the County Commissioners for eventual approval, 854
the development of these properties, as individual parcels would be handled by the staff consistent with the 855
requirements of the Unified Development Ordinance as all permitted land uses would be handled.856
857
Franklin Garland: Ok, so if you spending all this time and energy and all this money on it and all the people out here, 858
I can get 20 or 30 thousand people to go against what you’re trying to propose, you have wasted all this money and it 859
will go to the Board of Commissioners and they gonna say, well we agree with the community, maybe they will this 860
time. Apparently, you don’t. You don’t live here, I don’t know where you live, you know. I don’t know where the 861
Commissioners live, I don’t know where the rest of the Board lives but apparently they’re not being affected by this 862
because they could care less, including you, ok. I would really appreciate it if actually some of the Commissioners 863
and some of these planning people came and looked at these properties. I will gladly let you on my property and 864
show you what I mean. I have a drone I can fly over so you can see it because apparently you going by maps and 865
that’s good enough and that’s not good enough for the people that live here by the way. You know what’s good 866
enough is for you to leave us alone.867
868
David Blankfard: Thank you Mr. Garland869
870
Steve Kaufmann: Can I have video too. My name is Steve Kaufmann and I did receive a letter from the County for 871
this. First, let me introduce myself as a resident of Hillsborough for 25 years. I moved here to be a school teacher 872
here and I moved on Davis Road and like everyone else has spoken about Davis Road, I just love this road it’s like a 873
dream come true moving here and I opened up a martial arts school here. I’ve been teaching martial arts in 874
Hillsborough for 25 years also. Driving on Old 86 on my way to work, I saw some land for sale on the east side right 875
near 40 and I wanted to build a martial arts school so I purchased that land that was actually zoned for schools at 876
that time. Unfortunately, there as a moratorium for six months going on while I was purchasing it and once the 877
moratorium was over I was no longer able to build a school on it. So I’ve been waiting for 20 years and I had the 878
opportunity to have a school on it when Settler’s Point was approved because basically the codes changed a lot 879
during that time which they’re present still. Because of what Michael Harvey explained, it’s impossible for anyone to 880
do anything with that property given that everyone has to work together because there’s traffic ordinances and lots of 881
details that take lots of money to do anything within any of that property. So, I don’t want people to inflate those 882
properties on the east side with the this humongous thing that’s going on with the west side. They are very very 883
different things. I purchased this property exactly 20 years ago; I’m like a newcomer there. I purchased it from a 884
family who had lived there for generations and all my neighbors have lived there for generations, I mean, I’m 885
definitely the new guy there after 20 years. All those people have had property for many years and I don’t know what 886
they are planning to do with it but I don’t see anyone eager to build with it, they are just sitting on it, including myself 887
at the moment. We’re very very close to I-40 there’s already Dodson’s Construction is already a business right near 888
40 that’s been a business there ever since I’ve been there and that’s right next door to my house. Whatever is going 889
18
D R A F T
to go on there, those are like four to six acres lots. Once again, don’t inflate it with the these humongous warehouses 890
that are happening on the west side an especially that 12 acre lot on Davis Road which I’m definitely against. Those 891
are very very different things that are happening on the same night tonight so I just wanted to air my concerns. It 892
would definitely be a setback to me to have that as residential only, I purchased it to build the school on and I’ve 893
been struggling for 20 years to try to get a school on it and I’ve been in conversations with Orange County for 20 894
years about how to build a school on it and believe me it’s not easy to build anything in Orange County without going 895
through lots of red tape. If you are a very large building company and you have lawyers and you have architects and 896
you have designers and you have site planners and you have lots of money to work with you can get things done but 897
as a small mom and pop operation that I have it’s very very very difficult to get anything done so I just want to assure 898
you that there aren’t going to be all these things popping up on the east side of that street. There’s no water and 899
sewer there, it’s almost like it’s impossible to build there the land doesn’t perk well and we don’t have water and 900
sewer. It’s probably going to be sitting there for a good many years still. Ok, that’s all I have to say, thank you very 901
much.902
903
Craig Benedict: Michael Harvey, can you confirm that these rezonings would facilitate him being able to do 904
something on his property besides the Settler Point district two.905
906
Michael Harvey: Yes, as I alluded, if the rezoning is approved then development of the individual parcels would have 907
to compliant with the County Unified Development Ordinance but they would be developed and could be developed 908
independently from one another consistent with the Table of Permitted Land Uses contained in Section 5.2.909
910
Perdita Holtz: Franklin Garland has put his hand up for a second time; it will be up to the Board whether you want to 911
allow additional comments from Mr. Garland.912
913
David Blankfard: I don’t think we need to hear anything else from Mr. Garland on this agenda item. 914
915
Gerald Scarlett: I’m Gerald Scarlett again from West Scarlett Mountain Road. I just have a quick question. I think I 916
know the answer but I want to make sure. Item 9 on the agenda, the only thing that is doing is reverting the zoning 917
for the property on the east side of Old 86 back to its previous zoning before the development for Settler’s Point, is 918
that correct?919
920
Michael Harvey: You are correct sir.921
922
Gerald Scarlett: Thank you.923
924
Randy Marshall: Ready to make a motion if that’s the desire of the Planning Board.925
926
David Blankfard: Yes927
928
MOTION by Randy Marshall this would be an ordinance amending the Orange County Zoning Atlas as established in 929
Section 1.2 of the Orange County Unified Development Ordinance and whereas the proposed rezoning consists of 930
the eight property owners and whereas the proposal has been found to be consistent with the 2030 Orange County 931
Comprehensive Plan and whereas the requirement of Section 2.8 of the UDO have been deemed complete and 932
whereas the Board has found that the proposed zoning atlas amendment to be reasonably necessary to promote the 933
public health, safety, and general welfare, we recommend that the Board of County Commissioners rezone the areas 934
described above and depicted on the attached maps.935
936
Michael Harvey: Chair Blankfard, this is Michael Harvey, can I ask for a clarification. Randy so your motion is that 937
you make a recommendation to approve the Statement of Consistency as contained in attachment 3 and the 938
proposed ordinance, which you have just summarized as contained in attachment 4 to the County Commissioners, is 939
that correct?940
941
Randy Marshall: My presumption was we had already approved the attachment 3 by our earlier vote and I was 942
recommending approval of attachment 4.943
944
Michael Harvey: No sir, this is a different item, so it’s both items.945
19
D R A F T
946
Randy well then I recommend both 3 and 4.947
948
MOTION by Randy Marshall to recommend approval of the Statement of Consistency and the ordinance amending 949
the Orange County Zoning Atlas. Seconded by Hunter Spitzer.950
951
ROLLCALL VOTE:952
Carrie Fletcher: Yes953
Adam Beeman: Yes954
Hunter Spitzer: Yes955
Melissa Poole: Yes956
Randy Marshall: Yes957
Kim Piracci: Yes958
Susan Hunter: Yes959
Alexandra Allman: Yes960
David Blankfard: Yes961
Patricia Roberts: Yes962
963
MOTION PASSED UNANIMOUSLY964
965
966
AGENDA ITEM 10: ZONING ATLAS AMENDMENT (MASTER PLAN DEVELOPMENT APPLICATION –RESEARCH TRIANGLE 967
LOGISTICAL PARK)-To review and make a recommendation to the BOCC on a developer-initiated 968
application for an MPD-CZ (Master Plan Development Conditional Zoning). The proposed project 969
encompasses approximately 180 acres in the Hillsborough Economic Development District (EDD) 970
south of Interstate 40 and west of Old Highway 86, within Hillsborough Township. 168 acres are 971
currently zoned MPD-CZ (Settler’s Point) and 12 acres are currently zoned R-1 (Rural Residential). 972
This item is scheduled for BOCC public hearing on September 15, 2020.973
PRESENTER:Michael Harvey, Current Planning Supervisor974
Michael Harvey reviewed the abstract and proposed changes to the Zoning Atlas Amendment 975
The Applicant for the RTLP proposal give a presentation976
977
Randy Marshall: I read in some of the material here that you are likely going to consider putting left turn only from 978
that service road onto Davis Drive, I didn’t see it in your presentation. Is that something you’re considering doing, left 979
turn only coming out of the service drive onto Davis?980
981
Michael Birch: Correct, we have added a condition that is part of the case that requires the developer to install 982
signage essentially stating ‘left hand turns only’ there at that access point. That is part of the conditions.983
984
Randy Marshall: I think that would help address some of the residents concern that there’d be a lot of increased 985
traffic going down Davis Road or at least intending to try to control traffic and encourage them to turn left, that might 986
allay some of their concerns.987
988
Michael Birch: Absolutely, and that access point is approximately 1000 feet from the intersection with 86 and as I 989
mentioned, the traffic engineers have been working with the County and the State to really anticipate only about 5% 990
of the site trips to come or to go on Davis Drive to the west, or coming from the west. We think that signage will 991
assist with that.992
993
Adam Beeman: My biggest concern is the traffic coming off of 40 or especially coming from Mebane. How do you 994
plan on solving that problem because it’s only a single lane coming down the ramp and there is no lights so right now 995
anybody that comes off that ramp could sit there for minutes before they can make a left turn to go towards the 996
hospital. I only see that increasing with all those, the developments that they put in over across the street from the 997
hospital and you want to add how many tractor-trailers coming off of that ramp? So, I’m just curious to know what 998
your plan is for the light situation coming off the ramp.999
1000
20
D R A F T
Matt Peach: Hello everybody, my name is Matt Peach with Stantec Consulting Services; I’m the engineer of record 1001
for the traffic impact analysis. Mr. Beeman, I did hear your question and I think your concern regarding the amount of 1002
traffic coming from Mebane and using I-40, that’s correct? We’re currently in the process of recommending and 1003
coordinating improvements with NCDOT. We know that the applicant has recommended improvements, particularly 1004
installing a traffic signal at the I-40 eastbound ramps there at Old NC 86. In addition to that, we’re trying to 1005
coordinate with NCDOT regarding two projects they have in the area along I-40 and to the north on Churton Street 1006
trying to make sure that our recommendations are in line with their future projects as well. That was the, part of the 1007
information that they had requested previously, that we supplied them today.1008
1009
Adam Beeman: So there’s no intention to add any extra lane, widen any lanes coming off the ramp or turning that 1010
corner towards your service road?1011
1012
Matt Peach: That’s what we’re coordinating with NCDOT right now. We would definitely try our best to work within 1013
the existing pavement to have turn lanes there at the service road. In terms of lanes at the ramps, we are not 1014
proposing any at this moment but that’s exactly what we’re coordinating with NCDOT.1015
1016
Adam Beeman: I come off of that ramp from Mebane, I go to the hospital, and I can sit there from minutes trying to1017
take that left. I just imagine if someone is trying to take the left and that ramp’s not any wider when you start stacking 1018
up trucks behind those people, you are going to be up on the highway before long so I am just curious. I know, 1019
understand you’re within the footprint but that right hand turning lane would be really nice so that the truck could just 1020
roll off and not have to sit there and stack up.1021
1022
Matt Peach: I certainly understand that and the purpose that and the purpose of putting a traffic signal in there would 1023
be to allow the side street to move more efficiently. In theory, that delay would be reduced.1024
1025
Adam Beeman: Well that’s my biggest concern; I mean all the other stuff is secondary. My biggest concern is just 1026
that whole intersection is a nightmare and I don’t if it’s going to be on you guys to deal with it or because the hospital 1027
is expanding, they’re building all those houses across the street from the hospital and all that development, that 1028
intersection is going to be a nightmare before long so I was just hoping that you guys would try to address it 1029
preemptively rather than reactively.1030
1031
Matt Peach: Our current recommendation to NCDOT is to install a signal at that location so we are right in line with 1032
you there and just to point upon the point you made regarding the hospital, we made sure to account for traffic for 1033
future phases of Waterstone in our analysis.1034
1035
David Blankfard: I have a question, so what kind of traffic is going to be coming out from the building onto David 1036
Drive? Is that going to be trucks or is it going to be automobiles or a combination?1037
1038
Matt Peach: We do foresee both. Really as we had kind of been mentioning previously, the trucks would be using 1039
Old NC 86 to get up to I-40 primarily. We see very little traffic going to and from the west on Davis Road. If traffic is 1040
on Davis Road it’s trying to get from that driveway to Old 86 for that 1000 feet and that’s about it.1041
1042
David Blankfard: What about when they get to Davis Road and it’s backed up from 1-40? What prevents them from 1043
taking a right on Old 86 going down to the stop sign and then turning onto New Hope to get onto 40?1044
1045
Matt Peach: Another recommendation we made in the traffic study was to install a signal at Davis Road as well at 1046
Old NC 86 so again the delay on the side street having no longer stop control will be reduced in this scenario.1047
1048
David Blankfard: But there’s nothing to stop them from turning right and going further into the rural….going toward 1049
Carrboro.1050
1051
Matt Peach: There will be no physical barrier, to answer that question specifically, but they would be losing time and 1052
which I don’t believe truckers, it’s in their best interests.1053
1054
21
D R A F T
David Blankfard: I guess, I’m just saying if it gets backed up where you’re proposing, over near the service road, if it 1055
gets backed up there then they would go the other way. Is there going to be a lot of stacking between the service 1056
road and I-40?1057
1058
Matt Peach: I don’t believe that would be any longer, to answer your question. We do foresee some queues going 1059
back from the ramp but that’s just normal for the installation of a traffic signal and quite frankly, we need that traffic to 1060
stop for brief periods so we can let the ramp move but our analysis show that the stacking would go back a couple 1061
hundred feet certainly nowhere near Davis Road and certainly not long enough to really deter anybody from taking 40 1062
up that way off Old 86.1063
1064
David Blankfard: Ok, so what you’re saying is it’s faster just to go down to towards the service road as opposed to 1065
taking a right?1066
1067
Matt Peach: Correct sir.1068
1069
David Blankfard: Now what about once they get to 40 and say they are going on 85 northbound, would it be faster to 1070
for them to get on 40 west and then looping around to 85 or to keep going straight past Waterstone to get to 85.1071
1072
Matt Peach: I’d imagine the faster way would be I-40 but that would be an individual decision that every individual 1073
driver would have to make.1074
1075
David Blankfard: Ok, so we don’t know?1076
1077
Matt Peach: I can’t say definitively what behavior individuals will choose. It depends on time of day, depends on 1078
their individual preferences. In my view, I would take I-40 to 85.1079
1080
David Blankfard: Ok, my next question is what the outcome of the high electric line going over the existing or one of 1081
the proposed buildings?1082
1083
Chris Bostic: Good evening, I’m Chris Bostic with Kimley-Horn; I’m the civil engineer of record for his project. To 1084
answer your question, Duke Energy does have regulations as to what is allowed underneath those transmission 1085
lines, no buildings are allowed within the easement of those transmission line, however, they do allow parking and 1086
our current conceptual plan does contemplate putting parking underneath the power lines and keeping the proposed 1087
structure the required distance away from the easement.1088
1089
David Blankfard: Ok, the entrance onto Davis Drive, there’s a parcel of land that’s very close and their house is very 1090
close to where the proposed driveway is or the road access. Is there concern about, I mean you’ve got the 100 foot 1091
setback but is it going, what kind of impact is that going to have for that property owner?1092
1093
Michael Birch: (Showed an exhibit) So, I think you are talking about this area (pointed out on exhibit) down here 1094
along Davis, so we really only have within that 100 foot area, really only have kind of the drive aisle and maybe a little 1095
bit of parking in that area with the building setback 60 feet. Excuse me the building setback with a maximum height 1096
of 60 feet but outside of that 100 foot setback line, in terms of impact, I was trying to see if there is a better image to 1097
try to get a sense of it there but I think with a mix of landscaping that we anticipate in that area that is a mitigating part1098
of the transition.1099
1100
David Blankfard: There is a similar part on the east side. That person’s home is quite close to the property line. I 1101
am just wondering is their backyard going to be your driveway and parking lot.1102
1103
Michael Birch: No, there was anticipate likely having a stormwater control facility in that area and then only outside of 1104
that, again, we are kind of showing a 100 foot buffer on this exhibit that the parking and drive aisle would be outside 1105
of that, largely outside of that 100 feet.1106
1107
David Blankfard: Is this going to be phased construction;are you starting with Building A and then going to Build B, 1108
C and then finishing up with D?1109
1110
22
D R A F T
Michael Birch: Likely, it will be phased. I don’t know exactly if it’s a Building A, B, C, D but we do anticipate that it 1111
would be phased. The building likely off the service road to be part of that initial phase.1112
1113
David Blankfard: Are they all one story, or are they going to be multiple stories or high bay?1114
1115
Michael Birch: Anticipated to be one story.1116
1117
David Blankfard: So, high bay?1118
1119
Michael Birch: Yes.1120
1121
David Blankfard: Are you going to put any photovoltaics on the roof?1122
1123
Hunter Spitzer: I was going to ask how far away is the nearest Duke Energy substation?1124
1125
Michael Birch: I want to make sure I heard the two questions to make sure we get the response for you. One, how 1126
far away are we from the closest Duke Energy substation and then two, are we planning to include any photovoltaic 1127
cells or panels on the roofs. Just from the developer it’s likely that some will be included. We don’t have the answer 1128
on what the distance is to the substation.1129
1130
Hunter Spitzer: Would the developer be willing to submit to a condition requiring roofs not to install solar immediately 1131
but to be readily available to solar installation? If that makes sense? Designed with the intent to install solar.1132
1133
Michael Birch: Yes, I think that’s something that the developer would be willing to agree to.1134
1135
Hunter Spitzer: Additionally, would the developer be willing to commit to electrical vehicle charging stations in 1136
addition to this?1137
1138
Michael Birch: Yes.1139
1140
Hunter Spitzer: I know for the Settler’s Point development we had, I am be confusing this with a different Special Use 1141
Permit, but we had agreed to a particular number of stations per parking spaces. I am sure one of the staff can 1142
remember because it was based on the parking deck for the Orange County Municipal Building downtown. What 1143
would be acceptable ratio?1144
1145
Michael Birch: My senses given the nature of this development and how different it is both from Settler’s Point and 1146
the project that was used as a reference point for that Settler’s Point ratio, my sense is we would not be agree on a 1147
ratio basis. I think we could discuss a flat number of station. 1148
1149
Hunter Spitzer: I see and are you intending to provide stations or availability to electrical fleet management 1150
particularly in the context of developing the distribution center?1151
1152
Michael Birch: Sorry, just to kind of answer your question, our sense is that something like that or having that 1153
available will be driven by the end user, a particular end user that we don’t have in mind right now or don’t have at 1154
the table. So I think it would be hard for us, difficult for us to commit to providing that and then there’s the potential, 1155
again if it’s not a warehouse, distribution use. Kind of having those and nothing to use it so I think given that is 1156
somewhat of a trend being driven by some of those types of users, if there is that type of use there, I would expect 1157
them to be there but I think not knowing who the users are going to be or what type of user there is going to be, I 1158
don’t think we can commit to that as a condition.1159
1160
Hunter Spitzer: Are you anticipating any fuel storage on the premises, gasoline, diesel or otherwise for backup 1161
generation or vehicle fueling? I’m not sure where the nearest gas station is immediately to this but I imagine if you 1162
are expecting a lot of traffic it wouldn’t be unreasonable.1163
1164
Michael Birch: There might be some diesel storage for backup generation but that’s really all that is anticipated.1165
1166
23
D R A F T
Hunter Spitzer: This is more of a question for the planning staff. There are UDO regulations to control that correct? 1167
Fuel storage.1168
1169
Michael Harvey: It’s actually regulated by the North Carolina State Fire Code, not necessarily by zoning. In terms of 1170
distance from structure, how stored, how protected, and how maintained it’s actually going to be addressed through 1171
compliance with the fire code and what I want to remind everybody that site plans that are submitted have to go 1172
through the development review process with Orange County which requires the fire marshal’s office to sign off on 1173
them. That is going to be a component of any and all review. So this will come up at the appropriate time by the 1174
appropriate entity if proposed.1175
1176
Hunter Spitzer: Can I simply request that the developer agree as a condition not to put fuel storage adjacent to their 1177
vegetative buffer of the flood plain.1178
1179
Michael Birch: Yes, we can agree to that.1180
1181
David Blankfard: This is a question for Michael, is the building height determined by how tall the fire department can 1182
raise their ladder?1183
1184
Michael Harvey: So Mr. Blankfard let me answer that question this way, obviously there are height limits enforced 1185
under Orange County General Use Zoning Districts and 60 feet is the potential building height that would be allowed. 1186
You are correct that building height is usually determined by the available or one of the factors in determining 1187
allowable building height is available infrastructure to fight fire. I think that without putting words in the applicant’s 1188
mouth or stealing their thunder, I think one of the reasons this site has so much traction is because the availability of 1189
water and sewer service is there will be potential for sprinklered buildings that would address some of that as well. 1190
There’s also, in their narrative discussions about the potential to allow for water towers on the property that might be 1191
used in addressing that very particular issue as well.1192
1193
David Blankfard: Is there any requirements for high beams on the trucks and cars spilling over our property line? 1194
Something similar to what happens in parking decks?1195
1196
Michael Birch: I think that’s likely addressed through the vegetated buffer around the perimeter. I think largely, I 1197
think Michael Harvey can correct me if I’m wrong, largely the County’s Lighting Ordinance with regard to site lighting 1198
but again I think we anticipate that vegetated buffer around the perimeter of the site would mitigate those headlights.1199
1200
Michael Harvey: Chair Blankfard, this is Michael Harvey, Mr. Birch is correct our lighting regulations particularly 1201
address outdoor lighting, building security lighting and whatnot they don’t address or they are not designed to 1202
address lights from vehicles.1203
1204
David Blankfard: Would the developer be willing to try to mitigate those high beams?1205
1206
Michael Birch: I think we’re trying to through the use of those perimeter buffer yards and also one, the vegetation 1207
and two the distance and also the location of where our parking area are or anticipate them to be. I think it would be 1208
hard for us to articulate an objective standard but just to answer your question more broadly, I think yes we will try to 1209
mitigate that but it’s hard for me to think of an objective standard that we could apply as a condition.1210
1211
Melissa Poole: So you don’t have actual companies going into this location into this space yet, is that correct?1212
1213
Michael Birch: That’s correct.1214
1215
Melissa Poole: Ok, so if you’re looking at manufacturing and possibly laboratory and research are you looking at that 1216
they would have the ability to operate multiple shifts?1217
1218
Michael Birch: Yes, potentially a building user could have multiple shifts that is correct?1219
1220
Melissa Poole: So, back to, I want to jump back to just to a moment to David, when he talking about particularly the 1221
residents most closely situated towards the lines, I mean I guess my question is how can you guarantee this will not 1222
24
D R A F T
disrupt their life if you are running multiple shifts. That’s 24 hours, could be 7 days a week 24 hours and you don’t 1223
know what kind of businesses are going in there.1224
1225
Michael Birch: Right but they are indoor activity in these buildings. In terms of like the primary use is inside, again 1226
building setbacks, vegetative buffers around the perimeter, and I mentioned earlier, those distances between just our 1227
property line in some of the closer structure to our west from the larger parcel over 1100 feet. To our south from that 1228
larger parcel over 800/900 feet so I think we are well buffered on the subject property but also a lot of the lots that 1229
surround us are deep lots with the houses situated far from the common boundary line.1230
1231
David Blankfard: Can you have the traffic engineer explain what is going on at Davis Drive and Old 86. Specifically, 1232
what the current traffic is and then when this is functioning what happens what will the new traffic pattern be.1233
1234
Matt Peach: Thank you, appreciate the question. Obviously, we recommended a traffic signal there at that location 1235
and I believe was touched on previously in the presentation but what we were concerned with at the intersection of 1236
Davis Road and Old NC 86, quite frankly, is sight distance. What our concern was traffic coming along Davis Road 1237
coming to a stop and being able to see in both direction down Old NC 86 for a sufficient distance to allow them to 1238
turn safely onto Old NC 86 to make sure there is a sufficient gap in traffic. We didn’t feel that it was there in terms of 1239
site distance so we had recommended a traffic signal to that end in addition to helping facilitate movement to and 1240
from the site. In terms of traffic today, we had full traffic counts. Currently on Davis Road at Old NC 86 there’s about 1241
170 cars along Davis Road in the morning peak hour. In the evening peak hour there is roughly 91 cars coming 1242
along Davis trying to turn onto Old NC 86. On Old NC 86 there’s a 300 northbound cars approximately in the 1243
morning and this is consistent with the evening rush hour southbound is similar about 300 in the morning and 1244
evening rush hour. 1245
1246
David Blankfard: That’s current?1247
1248
Matt Peach: That’s correct.1249
1250
Hunter Spitzer: I have a question for the County staff; does the Town’s sewer line currently follow along Cate’s 1251
Creek? Both sewer and water connections?1252
1253
Craig Benedict: I can answer that, yes the sewer line is known as the Cate’s Creek outfall and it would roughly follow 1254
those elevation changes flowing to the north. The water doesn’t have to follow the topography and it would be along1255
the service road and there is an existing 16 inch water main on Old 86 now at Davis Road all the way into 1256
Hillsborough and there is actually an emergency interconnect all the way down Old 86 to the Orange Water and 1257
Sewer Authority facility. The Old 86 line is in operation with the Town of Hillsborough now and it would be those two 1258
areas, Old 86, service road and then some sort of loop through the project would be likely with the final engineering.1259
1260
Hunter Spitzer: I was thinking less about water and sewer and more along the lines of co-locating some sort of 1261
pedestrian trail but then I remembered that you have to build a bridge over I-40, which would probably border on 1262
impossible. Maybe that should be a development …. If they are planning on redoing 40 in this area anyway which I 1263
think is the case. Ah, maybe we should see if the developer will build us a bridge, what do you say guys?1264
1265
David Blankfard: I still have a question for the traffic, what is going to be when it’s build out what are the numbers 1266
going to be?1267
1268
Matt Peach: When we put the development in, we’re looking at very little traffic coming from the south on Old NC 86. 1269
We’re looking at, we had estimated that being a maximum of 37 vehicle per hour. That’s particularly in the morning 1270
and it’s similar for the southbound on Old NC 86, that is a maximum of, we had estimated that at 28 that’s in the 1271
evening rush hour. Along Davis Road, since we are directing trucks to turn left out of this site and onto Davis for that 1272
short 1000 foot section to get to Old 86, we’re seeing a little bit higher, so we’re looking at staff, 62 in the morning 1273
traffic, an additional 62 and up to 200 vehicles per hour in the evening.1274
1275
David Blankfard: One of the comments was, did your, the traffic study was only for a.m. and p.m. was that the high 1276
times? The other times were fewer these were the maximums?1277
1278
25
D R A F T
Matt Peach: That’s correct, the other hours of the day we’re forecasting much less traffic. What NCDOT requires us 1279
to do is basically run the traffic study imagining that a shift change or some other operation were to occur during the 1280
rush hour on the road already. So, kind of trying to get that worst-case scenario, that’s what we ended up studying. 1281
We didn’t study any of the off-peaks where traffic would be less both at the development and along the roads within 1282
the study area.1283
1284
David Blankfard: Ok, on this slide that is being shown at the service road there is a right out only so how do the 1285
trucks get to I-40?1286
1287
Matt Peach: That’s correct. The back and forth that we are currently having with NCDOT right now is NCDOT had 1288
expressed concerns over whether queues at the interchange would extend past the service road and what they had 1289
requested we analyze and those are the numbers I was just quoting you, would be if left turns were prohibited out of 1290
the service road and if that traffic were relocated down to Davis but to get back over to Old NC 86 for that 1000 feet. 1291
That’s why you see that right turn there, that was at the request of NCDOT.1292
1293
David Blankfard: So the trucks leave the service road they take a right on Old 86 they go down to Old 86 and how do 1294
they turn back around?1295
1296
Matt Peach: So trucks would go through the site, they would exit at Davis go to Old NC 86 that way.1297
1298
David Blankfard: Ok, so they would go through, ok. They wouldn’t be exiting from the service road the trucks would 1299
be diverted towards David Road and then they take a left on Old 86 towards I-40.1300
1301
Matt Peach: That’s correct.1302
1303
Melissa Poole: So, with regards to manufacturing and the laboratory, I’m sorry to jump back to this, when we went 1304
through the list of prohibited, and this might be a question for Craig and Michael Harvey, when we went through the 1305
list of prohibited businesses, I did not see like biodefence or anything like that in that list. So, if it doesn’t come back 1306
to Planning Board once we go through this and it doesn’t go to Board of County Commissioners everything just kind 1307
of goes through. What are the protections for residents, not just nearby but Orange County in general, for things like 1308
insuring biodefence manufacturing in there or biodefence research is going in there?1309
1310
David Blankfard: I think the building codes, I’m not, hopefully, I’m not speaking out of turn Michael. I think the 1311
building codes would limit the amount of toxic chemicals and based on what is going on there. That would be …1312
1313
Melissa Poole: It doesn’t have to be chemical, it could be research on Corona, it could be research on, you know, it 1314
doesn’t have to emit a toxic chemical. You see what I’m saying?1315
1316
David Blankfard: Then it wouldn’t be lethal, right? If they’re just doing research? 1317
1318
Melissa Poole: I have a client in Maryland who’s doing the vaccine for COVID and everybody in the company’s got 1319
COVID. I’m just telling you.1320
1321
Michael Harvey: This is Michael Harvey, let me just provide Ms. Poole an answer. The permitted uses that the 1322
applicant put in their narrative are various categories with sample uses, and then they have a prohibited use list. The 1323
direct answer to your question is if a proposed activity falls into those general uses and is similar to the uses listed as 1324
the example, much like the current County’s Table of Permitted Uses, you could have an activity that is consistent 1325
with research and development that, not to make a judgement call, you may not necessarily find viable as others but 1326
it could go because you’re allowing research and development. We wouldn’t have the authority to say no you can’t 1327
do that. David is correct there would be building and other regulatory standards that the applicant would have to 1328
comply with but if they meet the standard proposed by the applicant and approved by the County Commissioners, the 1329
staff would not have the authority to prohibit it if it falls in that category. That would be the same answer with the 1330
current Table of Permitted Uses. If you are proposing for example, a rec amenity and while you as an adjacent 1331
property may not like amenity someone has chosen, if we have the broad category and it meets that requirement and 1332
criteria then it goes, it’s permitted as a rec amenity. The Planning Board and County Commissioners wouldn’t have 1333
any ability to, I hate to use the word challenge but I’m going to, whether or not the validity of that land use is 1334
26
D R A F T
consistent with the approval. I will also say that every decision that the County makes as it relates to the 1335
enforcement of the UDO and as it relates to the enforcement of the conditions imposed on this project, is subject to1336
appeal to the Orange County Board of Adjustment. That’s not a great answer but that is the answer, part of the 1337
answer I’m going to give you to try to address your question.1338
1339
Ronald Sieber: Hello, this is Ronald Sieber again and first of all, I’m just trying to process the change from 800 cars 1340
per day traveling on our road, Davis Road, to 200 per hour. I mean that is a stunning, I repeat that is a stunning 1341
change in numbers. I want the Planning Board to think about that, you work for us. This is unreal that you are 1342
allowing this development to go forward. I just can’t believe it so therefore, I’ve prepared several and a couple of 1343
questions and I’d like to just run them by you and you don’t need to respond, I would just like you to hear, record and 1344
react to it at a later date.1345
1346
David Blankfard: Ronald, before you start, can you tell us if you received a letter from the Planning …1347
1348
Ronald Sieber: No, I receive no letter because I live, as Mr. Marshall would point out, 1.7 miles away from this1349
development so therefore, I’m not relevant, so you know.1350
1351
David Blankfard: I didn’t say that but thank you.1352
1353
**Planning Board Member Melissa Poole left the meeting**1354
1355
Ronald Sieber: Yes, ok, thank you Mr. Blankfard and I’ll proceed. First of all, I just want to point out that the 1356
developer does not seem to supportive of electrical charging stations. We’re at a point, and I’ve followed the 1357
automotive industry because that’s what I write about, I’m a professional writer. We’re at a point where fleets, I’m 1358
talking about fleets of trucks are developing electrical charging stations to charge and support their electrical fleets. I 1359
think it’s time that developers, especially those who are putting warehouses up for such facilities to be used by fleets 1360
of trucks. They need to start providing the infrastructure for these folks to attract them as businesses. I think that 1361
also, I’d like to point out, that on amendment 8 and I know this goes back to 8 and we’re talking about 10 but 8 is 1362
involved with 10. Four members of the Planning Board voted against amendment 8 and I do appreciate their 1363
support, however, I just want to put it on, put the remainder on notice that that property that you want to rezone from 1364
rural to something else is along a road that is inhabited by 100s of people, some of them are legacy businesses, 1365
some of them are farms, and many of them are residents who moved out here without any knowledge, like myself, 1366
without any knowledge of some sort of planned economic development section that is going to change our lives 1367
forever. We did not move out here to be next to an industrial park, we moved out here to be in a rural neighborhood 1368
and that’s what we want to preserve and I think it’s high time we change that development or designation and I’m 1369
going to work every way I can to change that if we can have a chance to do that but apparently it seems like the dice 1370
and the deck is stacked against us. Nevertheless, we as a community are going to fight this every way we can. We 1371
are opposed to this proposed change. Having said all that this community is not opposed to intelligent development. 1372
That’s in sync, that somehow aligns with some of the goals of this community, which is to have a nice place to live, a 1373
Rural Buffer. Now Steve Kaufmann had an intention to build a school and he’s going to get that zoning returned to 1374
him so he can do that. That’s an example of the kind of development that we can support as a community not a 1375
warehouse. Come on guys think about it. In closing I would just like to say we are totally opposed to an access road, 1376
as I mentioned, the number of trips on this road are going to be drastically increased. The size of the vehicles are 1377
going to be on this road which is Davis Road are going to be drastically changed. Planning Board will you think 1378
about what you are deciding on, you work for us. That’s the end of my comments. Thank you.1379
1380
Joseph Shore: Hi everyone my name is Joseph Shore, I live on Old 86 between Davis and 40 most of the 1381
conversation tonight has been about the effect on 40 but this going to completely alter my life and I can’t emphasize 1382
that enough. If it’s impossible to get out of my driveway with 300 cars during rush hour as the traffic engineer 1383
mentioned and you double that it means cars are going to be coming by my driveway every 5 to 6 seconds, 18 1384
wheels are going to be coming by every 5 to 6 seconds. That will literally make my property worthless because I 1385
won’t be able to access my own home anymore I won’t be able to get to work or I’ll have to stay in my travel lane for I 1386
don’t even know how long to try to get in and out. There’s a preschool right down the road, there’s a preschool by 1387
the corner of Davis and Old 86. I can’t imagine trying to be a parent to drop off my 3 or 4 year old there when there’s 1388
18-wheelers coming by every 10 seconds or 5 seconds. Just imagine the traffic trying to turn in and out of the 1389
preschool in the morning. To the previous gentleman’s quoting, we aren’t opposed to development but this is the 1390
27
D R A F T
absolutely wrong thing for this area. I can’t emphasize that enough this is a residential area. In the 1980s when this 1391
plan was originally developed, my house was a cow pasture so sure put a warehouse there it doesn’t matter to them1392
but things have changed dramatically, it doesn’t make sense to have this development here any longer so Planning 1393
Board please hear me I’m begging you, oppose this. Please don’t make my family collateral damage from this 1394
economic development building.1395
1396
Jon Lorusso: Hello, it’s quite late thank you for giving me a chance to speak. I wrote down a few notes of what I’d 1397
like to say before I get to them I just want to agree with previous speaker this really does come down to a 40 year old 1398
plan that is no longer relevant and yet the Planning Board feels that they need to stick with it because it’s on the 1399
books so we might as well, I’m almost tempted to say that there is some kind of conspiracy going on some kickbacks 1400
because there really, this is the Planning Board, you are supposed to plan for the communities and the people who 1401
live here. Not for out of state businesses, not for lawyers in Raleigh this is for the people, you work for us the people 1402
who live here. Yes, the people here need jobs but not at the expense of their fellow citizens, this is absurd. So just 1403
to go through a few points. The traffic engineer mentioned that is would be up to the individual truck drivers whether 1404
or not they took 40 west to get to 85 north that’s absurd no one would ever do that. People who live here know that 1405
you wouldn’t do that, you are obviously going to take Churton to get 85 north. We’ve already had, the Planning 1406
Board has a plan in action to extend 70 from Orange Grove because of already existing traffic issues. They already 1407
exist the traffic issues this is going to make it so much worse and yet are we planning or are we reacting. We’re going 1408
to allow this to be built and then react later on. We’ll figure it out 20 years from now when people are fed up. So, this 1409
neighborhood, one if the improvement that Mr. Birch mentioned was oh we get a traffic signal at the end of Davis 1410
Road and all we have to do it to get it is build a 2.1 million square foot warehouse inside of our neighborhood. Great 1411
thanks a lot thank you for that wonderful improvement. The left only sign coming out of the place onto Davis Road, 1412
are there any laws that, is there going to be a cop stationed there and if they make a right are they subject to a 1413
summons? A ticket? No, it’s really just up to the individual driver if they see that the traffic is backed up to the light 1414
on Old 86 you know maybe I’ll just make a right and take Orange Grove up or maybe I’ll make a left on Orange 1415
Grove and go down to Arthur Minnis, who cares right? Who cares about the people who live here, who cares. 200 1416
vehicles per hour additional on Davis Road that is absurd an average tractor-trailer is 72 feet. How many tractor-1417
trailers can fit between Old 86 and 1000 foot entrance on Davis Road? I don’t know what the math is divide 1000 by 1418
72 it’s somewhere around 14. If you have 200 per hour, it sounds to me like it’s going to get backed up. It sounds to 1419
me like there’s a lot of conjecture, a lot of estimates based on businesses that we don’t even know what kind of traffic 1420
they’ll have. I think Michael Birch again that the primary use is indoor yet he doesn’t actually know what kind of 1421
business is going to be there. How does he know they’re going to be indoor? They’re asking for approval when 1422
they’re still back and forth with NCDOT how can you approve something when thinks haven’t even been settled? We 1423
are not talking about little things; we’re talking about huge changes. Oh, the traffic is backed up on 40 west, on the 1424
40 east who cares if there’s an ambulance that can’t get to the hospital, who cares right? It’s all at the expense of 1425
business, who cares, who cares if people are backed up on the highway, who cares? I mean this is absurd; it’s 1426
absurd that our Planning Board the people who are supposed to plan this are the ones that are selling up the river. 1427
It’s crazy. I could expect it from the lawyers in Raleigh who don’t care what happens here because they don’t live 1428
here. They’re going to get this signed and they’re done they get their check but from our own Planning Board the 1429
people who are supposed to protect the citizens of this county they are the ones who are selling us up the river. It’s 1430
insane, it really is insane. That’s all I have to say.1431
1432
David Blankfard: One thing, did you receive a letter from the planning department?1433
1434
Jon Lorusso: No I did not.1435
1436
Perdita Holtz: David as you can see there are 12 people with their hands up and it now 11 p.m. I don’t know if there 1437
wants to be any discussion among the Planning Board on how to handle the rest of the meeting, what some options 1438
might be. 1439
1440
Hunter Spitzer: I do recall that Michael had some comments that he wanted to make pertaining to us making 1441
recommendation. So I would like to hear those at the very least before we move forward.1442
1443
Michael Harvey: As I indicated, your abstract had suggested that the Board, if they felt comfortable, would make a 1444
recommendation in time for the County Commissioner’s September 15th hearing. Obviously the applicant will also 1445
need to weigh in on this. As I see it, there’s a couple of different options and scenarios here. Through no fault of the 1446
28
D R A F T
applicant, we got comments from the Department of Transportation on this project Friday, July 31st and again that is 1447
not anything that staff or the applicant control. The applicant has responded to the Department of Transportation and 1448
we are waiting for those comments. We’ve heard tonight from Planning Board members on discussion points on 1449
potential conditions that you all would to see vetted before you make a final decision. We have obviously heard 1450
some comments from the public and there’s going to be obviously some additional comments so as I see it the Board 1451
technically has a couple of options. The Board could table any decision providing the applicant with areas of specific 1452
focus that they want answers to, I’ve heard loud and clear and in my note the primary concerns is traffic impact and 1453
more review of the DOT comments and the applicants responses and what DOT says to some of the traffic concerns 1454
I’ve heard. So you could certainly delay any decision til or table the item until your next regular meeting, which would 1455
be September 2nd to wait for that information. Craig and I have had a texting discussion about this very topic over the 1456
last hour, you could identify areas where you have less concerns or you are satisfied with the conditions and the 1457
applicant’s responses and identify specific conditions you’d like to see fleshed out, you could adjourn this meeting to 1458
a date and time certain in a couple of weeks conceivably to revisit this discussion or the Board could vote either to 1459
make a recommendation to approve or make a recommendation to deny this evening. I’m not trying to say you don’t 1460
have any of those options but staff was going to recommend was that we’re still waiting on DOT to get us some 1461
documentation as is the applicant and hearing some of the discussion tonight, I think that there is a comfort level 1462
lacking with the transportation component from staff, the applicant who is waiting on DOT and you all and that might 1463
need some discussion. Whatever you all’s decision is, I would like to strongly urge you to identify any specific areas 1464
of concern be it traffic, be it alternative energy conditions, whatnot so that the applicant and staff have a clear 1465
understanding of what we need to be working on in the interim to provide you the feedback you’re asking for so you 1466
can make an informed decision. If that makes sense and thank you Hunter for asking.1467
1468
David Blankfard: So what does everybody have a concern with?1469
1470
Adam Beeman: My biggest concern is I want to see whatever the DOT is come to them with and determine whatever 1471
steps necessary to rectify, my biggest concern is coming off of the highway and right there at the highway. I am not 1472
so concerned as Davis Road as much as the highway but that’s all part of the study so I’d like to see what DOT’s 1473
response was.1474
1475
Hunter Spitzer: I would like the applicant to consider removing access to Davis Road as they move forward with the 1476
process cause I suspect that we will probably vote to delay at least until our Planning Board meeting and potentially 1477
until we, until you end negotiations with the DOT. Conditionally, I would like a more concise proposal on electrical 1478
vehicle charging. I will just put the number out there at 1 station per 100.000 square feet of space to be built. Those 1479
are my largest concerns at the moment.1480
1481
Michael Harvey: Chair Blankfard, if I could interject quickly. I’m sorry I know that Ms. Poole lost her internet access if 1482
I recall what Perdita said. One of her concerns was more specificity in land uses. In terms of what would fall into this 1483
categories and what would not. At least that’s what I have in my notes.1484
1485
Hunter Spitzer: If I may say one more thing, particularly to the residents that are listening. A lot of what we’ve been 1486
doing over the past hour has been talking about conditions that we would like to request from the developer, that’s 1487
the nice part about this master planning conditional zoning is that we can ask for certain conditions to be met and so 1488
if you all and I understand that you are all very opposed to this but in the off chance that it can’t be stopped, you do 1489
have the opportunity to shape this development through this process and so I encourage you to consider what you 1490
might want to put in as conditions if at all possible.1491
1492
David Blankfard: I have a huge concern about the traffic being dumped onto Davis Drive. Not just some of the traffic 1493
but everything is going to be dumped onto Davis Drive because NCDOT does not want anybody to come out the 1494
service road. So I don’t know if anybody else feels that way or if we want to see if the applicant can come up with a 1495
better way of getting access to the site. Are we comfortable making a decision now or wanting to wait?1496
1497
Hunter Spitzer: I move that we delay a decision on our recommendation until our next meeting on September 2nd.1498
1499
Michael Birch: This is Michael Birch, the applicant, I think the outstanding issues that appear to be out there are one 1500
responses from DOT but I want to reiterate that whatever DOT comes back with in terms of requested improvements, 1501
those will be made. So it’s not really a negation in that respect. Second with regard to some of the comments about 1502
29
D R A F T
Davis Drive, I just think it is not possible for us to prohibit access onto Davis Drive. Third, with regard to some of the 1503
comments or requests for the conditions the design of the buildings with intent to accommodate solar, providing 1504
some electric vehicle charging stations and no fuel storage adjacent to the flood plain. I am comfortable with we can 1505
craft those conditions and extremely short order and so I would respectfully ask but because of the date of the next 1506
Planning Board meeting being on the 2nd essentially eliminates our opportunity to get to the Board of Commissioner’s 1507
meeting on the 15th. I would ask that the Planning Board please consider meeting or adjourning to a date certain 1508
possibly 2 weeks from today on the 19th.1509
1510
David Blankfard: I think we could do the 19
th to reconvene. 1511
1512
Adam Beeman: I was going to ask Craig or Michael Harvey, with what Mr. Birch said about whatever DOT comes 1513
back and they’re going to rectify whatever DOT says they need to do. Do you guys feel comfortable with moving 1514
forward knowing whatever DOT may say or would it be better to meet a date later once the DOT issues have been 1515
straightened out?1516
1517
Craig Benedict: Let me just give a brief introduction about NCDOT is in charge of the roads within Orange County so 1518
they are the ultimate authority on what improvements are made because counties in North Carolina are not in the 1519
road business so they take, their recommendations are of prime importance and as the developer said they will have 1520
to do whatever NCDOT says. We work with DOT and we will take the comments that we have from tonight and 1521
impart them to NCDOT for any alternatives that there may be but NCDOT is also in the business to use taxpayer 1522
money to use the roadways to their best ability. My opinion if you want to call it that is that we will be satisfied with 1523
what NCDOT suggest as improvements for the project.1524
1525
Kim Piracci: I just want to say that it seems to me that the traffic that’s being talked about, even if it could be 1526
arranged in such a way that the traffic only comes and goes from 40 to Old 86 and never hits Davis it just seems like 1527
an enormous amount of traffic even just for Old 86. Even though I understand there’ll be road expansion and 1528
whatnot so I just, I feel like the scope of the project is just too big for this space in Orange County. Maybe smaller 1529
warehouses or two instead of three. I don’t know but in any case it just seems like too much. To me it seems all 1530
that’s too much.1531
1532
Hunter Spitzer: Do you have an expected return date from NCDOT on those comments? An anticipated time?1533
1534
Michael Harvey: Hunter, let me jump in and Mr. Birch may be able to also provide some detail. I don’t know if it’s fair 1535
to say if we have any expectation from DOT. They obviously took a prolonged period of time to get us the comment 1536
they got us on Friday and we can obviously impress to Mr. Edwards who is our district engineer the need for 1537
expediency but I can’t and will not tell you that I can guarantee that within two weeks we’ll have an answer. I can’t 1538
guarantee that within four weeks we’ll have an answer. But I think it’s reasonable for us to try if the Board sees fit to 1539
adjourn to at date and time certain in two weeks. We’ll do the best we can to address this concern as best we can 1540
and I know so will the applicant but I do think it’s also important for me to make clear one think to the Board. It’s been 1541
sort of danced around but I think it’s important to say it. One of the, this same issue came up with Settler’s Point, the 1542
Department of Transportation is not satisfied with the current condition of service road which parallels 40 and they 1543
had requested or indicated that in order for Settler’s Point to be developed they had to have secondary means of 1544
ingress/egress. At Settler’s Point chose to try and secure access off Old NC Hwy 86 directly. That was a gamble 1545
they took and unfortunately it didn’t pay off at the time they had the approval they couldn’t negotiate an access point. 1546
I know that this applicant has looked for alternative access points and I’m not telling you this to say, it’s a fait 1547
accompli, but I’m telling you this that one of the reasons there’s two access points is because DOT has mandated it 1548
from day one. This applicant is obviously proposing Davis Road there’s obviously concerns about that and there’s1549
request for more information and that needs to be processed to move forward but I think the Board just needs to be 1550
put back in the loop that the reason there’s two is because DOT is mandating it.1551
1552
Michael Birch: This is Michael Birch, the applicant just to reiterate on the timing of DOT responses. We will hound 1553
them as best we can to get responses so we can this resolved in advance of a possible meeting on the 19th.1554
1555
Randy Marshall: I’m not sure we are going to continue to be productive tonight so I’d like to make a recommendation 1556
that we adjourn or postpone or continue the meeting until two weeks from tonight at 7 p.m. 1557
1558
30
D R A F T
Hunter Spitzer: Seconded.1559
1560
Adam Beeman: I vote going ahead and solving the problem tonight if anybody else is ready to vote. I’m ready to 1561
vote. I’m got my choices made so if everybody else wants to shelve it that’s fine but I’m ready to move forward 1562
tonight.1563
1564
Kim Piracci: I would like to postpone voting but to me it doesn’t make sense to meet in two weeks if we haven’t 1565
heard from the DOT though it could be a conditional two weeks from tonight sort of thing.1566
1567
Michael Harvey: Kim, let me just interject that it unfortunately can’t be conditional you are going to be adjourning to a 1568
date and time certain so there will be a meeting if you all elect to do it this way on the 19th and if we don’t have the 1569
response unfortunately we don’t have the response and I hate to say it that way but it’s the truth. The two options 1570
you have are to adjourn this meeting matter or table this matter until the September meeting which obviously the 1571
applicant I know has a concern with or to say you’re going to attempt to do a special meeting on the 19th. If there’s 1572
Board consensus to try that and we don’t have answers, we don’t have answers. That’s the unfortunately blunt way 1573
I’m going to have to put it to you.1574
1575
Randy Marshall: Part of my thinking was that we still have a number of people who wanted to address this some of 1576
them we may have already have heard from and understand what their positions are but there may be others that 1577
we’ve not heard from at all and I’m not sure we want to start listening to them at this late time. The other things is 1578
we’ve not been able to address the DOT issues and nothing may change as Michael suggests in two weeks but at 1579
least in two weeks we will have a little bit more information and can get a little bit more input from the public and 1580
make an informed decision at that time. I can vote tonight, I know where I stand but I just want to make sure that 1581
everybody feels like they’ve had enough opportunity to get all the information they need or to provide all the 1582
information they need.1583
1584
David Blankfard: I think that we should postpone it to the 19th. I guess we’ll have to have a motion again. But we’ll 1585
wait and until the 19th we can listen to more of the constituents, the public right because they were saying they were 1586
not notified this will give them more time to rally their forces and then if the DOT isn’t there, we’ll just listen to the 1587
public and if the DOT we can finish it then and there. 1588
1589
Craig Benedict: Perdita how many people do you have still want to speak tonight?1590
1591
Perdita Holtz: There are 14 people that have their hands raised.1592
1593
Adam Beeman: I have a question if we come back on the 19th and we don’t have the information from DOT are we 1594
going to push it out again.1595
1596
David Blankfard: We’ll just listen to the public.1597
1598
Adam Beeman: I understand that but are we going to push the vote out again or are we going to vote on the 19th? 1599
1600
Randy Marshall: I suggest that we have a vote on the 19th we’ll have all the information available and I think we 1601
should go ahead and vote then and I would also recommend for people who want to speak, to try not to continue to 1602
repeat yourselves and to provide us with new information or insight which will help us get closer to making a decision.1603
1604
Michael Harvey: Chair Blankfard, just to remind the Board that if you adjourn the meeting to a date and time certain 1605
and adjourn to a specific format, we will not be resending out notifications because this is a continuation of the 1606
meeting. We will not be sending out new notices, we’re not obligated to send out new notices because you are 1607
adjourning to a date time certain. We will post it on the website as we have done with tonight’s meeting but we will 1608
not be sending out notices to everyone within 1000 feet.1609
1610
MOTION by Randy Marshall to adjourn the Planning Board meeting to August 19, 2020 at 7:00 PM via Zoom. 1611
Seconded by Hunter Spitzer.1612
VOTE:9-2 (Adam Beeman and Kim Piracci opposed)1613
1614
31
D R A F T
Craig Benedict: Staff will be making a summary of some of the questions.1615
1616
1617
AGENDA ITEM 11: ADJOURNMENT1618
Meeting was adjourned by consensus1619
1620
1621
1622
1623
David Blankfard, Chair1624
32
ORANGE COUNTY
PLANNING BOARD
ACTION AGENDA ITEM ABSTRACT
Meeting Date:August 19, 2020
Action Agenda
Item No.7
SUBJECT:Clarification of Planning Board Actions on Proposed Amendments to the Town
of Hillsborough/Orange County Central Orange Coordinated Area (COCA) Land
Use Plan and to the Orange County Comprehensive Plan Future Land Use Map
(FLUM)
DEPARTMENT:Planning and Inspections
ATTACHMENT(S):
1.Resolution Amending COCA Land Use
Plan and Orange County 2030
Comprehensive Plan Hillsborough/Orange
County COCA Land Use Plan Amendment
Map
INFORMATION CONTACT: (919)
Tom Altieri, Planner III, 245-2579
Tom Ten Eyck, Planner II, 245-2567
Craig Benedict, Planning Director, 245-2575
Steve Brantley, Economic Development
Director, 245-2326
PURPOSE:To clarify the motion made at the Aug ust 5, 2020 Planning Board meeting and
revote on the clarified motion regarding County-initiated amendments to the:
x Town of Hillsborough/Orange County Central Orange Coordinated Area (COCA) Land
Use Plan, and
x Orange County Comprehensive Plan Future Land Use Map (FLUM).
BACKGROUND:At the August 5, 2020 Planning Board meeting, following staff presentation of
land use amendments, public comments and questions, and Planning Board comments and
questions, the Planning Board proceeded with a motion and action on the item. While the intent
of the Board’s action was clear, through review of the meeting recording, staff discovered that
the motion included reading from materials related to a subsequent agenda item. Therefore,
staff is asking that the Pl anning Board revisit its motion tonight and revote on th e
aforementioned plan amendments tonight.
Planning staff is not suggesting that the Planning Board revisit its discussion but for the benefit
of the public, following is a link to the Planning Board’s previous agendas where all of the
agenda packet materials from the August 5 meeting can be found. The Resolution provided
as Attachment 1 to this Abstract was provided on pp. 14-16 of the August 5 Planning Board
packet:https://www.co.orange.nc.us/AgendaCenter/Planning-Board-26
The draft minutes of the August 5, 2020 meeting are included in tonight’s agenda packet as an
informational item. The minutes reflect the Board’s conversation immediately before the motion,
the motion itself, and the rollcall vote.
33
Rollcall and Vote Located on pages 14 and 15 of the August 5, 2020 Draft Meeting Minutes
ROLLCALL VOTE:
Carrie Fletcher: No
Adam Beeman: For it
Hunter Spitzer: No
Melissa Poole: No
Randy Marshall: Yes
Kim Piracci: No
Patricia Roberts:Yes
Susan Hunter: Yes
Alexandra Allman: Yes
David Blankfard:Yes
MOTION PASSED 6-4
Planning Director’s Recommendation: The Planning Director recommends approval of the
Resolution contained in Attachment 1. The following may be helpful as a guide:
1. Motion to recommend to the B OCC approval of the Resolution (Attachment 1), which
reflects the proposed Town of Hillsborough/Orange County Central Orange Coordinated
Area (COCA) Land Use Plan and Orange County Comprehensive Plan Future Land Use
Map (FLUM) amendments (reading the Resolution aloud is optional);
2. Second the Motion;
3. Rollcall vote and announce results.
(If needed, the Chair or Planning Administrative staff may request any clarification that may be
needed to ensure that all of the essential aspects are heard and noted for the minutes.)
FINANCIAL IMPACT:Consideration and approval will not create the need for additional funding
for the provision of County services. Costs for mailed notifications and the required legal
advertisement will be paid from FY2020-21 Departmental funds budgeted for this pu rpose.
Existing Planning staff included in the Departmental staffing budget will accomplish the work
required to process this amendment.
RECOMMENDATION(S):The Planning Director recommends the Planning Board:
1. Consider the Planning Director’s recommendation, and
2. Make a recommendation to the BOCC on the Resolution (Attachment 1) in time for a
September 15, 2020 Public Hearing.
34
Resolution #:________
1
A RESOLUTION AMENDING THE
TOWN OF HILLSBOROUGH/ORANGE COUNTY CENTRAL ORANGE COORDINATED AREA
LAND USE PLAN
ORANGE COUNTY COMPREHENSIVE PLAN FUTURE LAND USE MAP
WHEREAS,Orange County has initiated amendments to the:
x Town of Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan,
x Orange County Comprehensive Plan Future Land Use Map, as established in Section 1.7 of
the Orange County Unified Development Ordinance (UDO), and
WHEREAS, the proposed amendment to the Town of Hillsborough/Orange County Central Orange
Coordinated Area Land Use Plan consists of the following:
x Extend the Town’s Urban Service Boundary for public water and sewer consistent with previously
approved Water and Sewer Management, Planning, and Boundary Agreement amendment by all
parties, and
x Add the Suburban Office Complex Future Land Use Classification to all or portions of 17 parcels,
totaling 84 acres, located on both sides of Old Highway 86, south of Interstate 40, and
WHEREAS, the proposed amendment to the Orange County Comprehensive Plan Future Land Use
Map consists of the following:
x Amend all or portions of 20 parcels, totaling 89 acres, located on both sides of Old Highway 86,
south of Interstate 40 from Rural Residential to Economic Development Transition. Additionally,
1.64 acres of road right-of-way is included, and
x One overlay land use classification applies in this geographic area (Resource Protection Area). No
modifications are being proposed to the boundary, and
WHEREAS, the following parcels are affected by the Orange County Comprehensive Plan Future
Land Use Map amendment proposal:
Parcel
Identification
Number
(PIN)
Entire or Partial
Parcel to be
Changed?
Owner on Record Acreage
Proposed to
be Changed
9862998894 Partial LANDMARK MANAGEMENT PARTNERS LLC 11.69
9872087570 Partial CHARLENE W HAMLETT 0.03
9872095945 Partial LARRY B LEE 1.64
9872098324 Partial THEODORE L BRYANT and BEVERLY N BRYANT 7.45
9872183072 Partial JOE L JERNIGAN 0.02
9872187626 Partial THEODORE L BRYANT and BEVERLY N BRYANT 7.98
9872188329 Partial JOE L JERNIGAN and VICKIE R JERNIGAN 1.87
9872191961 Entire JEANINE L DUKE and JAMES N POULOS 1.18
9872193459 Entire THEODORE L BRYANT and BEVERLY N BRYANT 10.23
9872196844 Entire MICHAEL WILLIAM SUDYK 3.26
9872198336 Entire THEODORE L BRYANT and BEVERLY N BRYANT 10.44
9872286360 Partial REA LANDCOM INC 0.04
9872286779 Partial THEODORE L BRYANT and BEVERLY A BRYANT 0.59
9872292222 Entire THEODORE L BRYANT and BEVERLY N BRYANT 10.18
9872298289 Partial THEODORE L BRYANT and BEVERLY N BRYANT 7.99
9873007189 Entire JOHN JR BOXTER and SHANNON MARTIN 1.06
9873008345 Entire JOSEPH S SHORE and SARAH C SHORE 2.71
9873104230 Entire MICHAEL W SUDYK and GEORGE W SUDYK 4.45
9873104310 Partial BEATRICE S BROOKS 0.72
9873108103 Entire MICHAEL WILLIAM SUDYK 3.51
Attachment 1 35
WHEREAS, the proposals have been found to be internally consistent with the 2030 Orange
County Comprehensive Plan or part thereof including, but not limited to, the following:
Objective ED-1.5:
Identify barriers to development of desirable businesses and local busi nesses, and m itigate
these barriers.
Objective ED-2.1:
Encourage compact and higher density development in areas served by water and sewer. (See
also Land Use Objective LU-1.1 and Water and Wastewater Objective WW-5.)
Objective ED-2.5:
Identify lands suitable to accommodate the expansion and growth of commercial and industrial
uses in the County.
Objective ED-2.7:
Select industrial sites in Economic Development Areas based on present and planned
supporting systems, such as public water and sewer, access to adequate highway, rail, or public
transportation infrastructures, and minimize detrimental environmental or negative social
outcomes. (See also Water and Wastewater Objective WW-15.)
Land Use Goal 1: Fiscally and environmentally responsible, sustainable growth, consistent with
the provision of adequate services and facilities and a high quality of life.
Objective LU-1.1:
Coordinate the location of higher intensity / high density residential and non- residential
development with existing or planned locat ions of public tr ansportation, commercial and
community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed
internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural
resources. This could be achieved by increasing allowable densities and creating new mixed-
use zoning districts where adequate public ser vices are available. (See also Econom ic
Development Objectives ED-2.1, ED-2.3, ED-2.10, and Water and Wastewater Objective WW-
2.)
Land Use Goal 4: Land development regulations, guidelines, techniques and/or incentives that
promote the integrated achievement of all Comprehensive Plan goals, and
WHEREAS, the requirements of Sections 2.3 of the Unified Development Ordinance (UDO) has
been deemed complete, and
NOW THEREFORE BE IT RESOLVED by the Board of Commissioners of Orange County that
the Town of Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan and Orange
County Comprehensive Plan Future Land Use Map are hereby amended as depicted on the attached
maps.
Upon motion of Commissioner ________________________, seconded by Commissioner
________________________, the foregoing ordinance was adopted this ________ day of
___________________, 2020.
I, Donna S. Baker, Clerk to the Board of Commissioners for Orange County, DO HEREBY
CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting
36
held on ________________________, 2020 as relates in any way to the adoption of the foregoing and
that said proceedings are recorded in the minutes of the said Board.
WITNESS my hand and the seal of said County, this ______ day of ______________, 2020.
SEAL __________________________________
Clerk to the Board of Commissioners
37
38
ORANGE COUNTY
PLANNING BOARD
ACTION AGENDA ITEM ABSTRACT
Meeting Date:August 19, 2020
Action Agenda
Item No.8
SUBJECT: Continued Review of Zoning Atlas Amendment: Research Triangle Logistics
Park (RTLP) Master Plan Development Conditional Zoning District (MPD-CZ)
DEPARTMENT:Planning and Inspections
ATTACHMENTS: INFORMATION CONTACT:
1. NC Department of Transportation (DOT)
Letter – July 31, 2020
2. Applicant’s Response to DOT Comments
– August 5, 2020
3. Staff Memorandum on T ransportation
Issues – August 13, 2020
4. Copies of E-mails from Local Property
Owners
5. Statement of Consistency
6. Ordinance Amending the Zoning Atlas
Michael D. Harvey, Planner III (919) 245-2597
PURPOSE: To continue review of an applicant initiated Zoning Atlas Amendment for 3 parcels
west of Old NC Highway 86/south of Interstate 40 to Master Plan Development Conditional
Zoning (MPD-CZ) district and make a r ecommendation on the application to the Board of
County Commissioners (BOCC). The complete application package, including full size maps
and available correspondence, is available on the C ounty website at:
https://www.orangecountync.gov/1722/Current-Interest-Projects.
BACKGROUND:The Planning Board began its review of this request on August 5, 2020.
Agenda materials for this item can be access ed at:
https://www.orangecountync.gov/AgendaCenter/ViewFile/Agenda/_08052020-1013 and draft
minutes of the meeting are an informational item in the agenda packet.
Attachment 4 contains copies of the numerous e-mails staff has received from local property
owners regarding the pr oject. Additionally, emails have been sent to t he Board of County
Commissioners and t hese emails are viewable at:
https://groups.google.com/forum/?nomobile=true#!forum/ocbocc.
During the Aug ust 5 meeting, the following comment(s) related to th e proposal, including
potential conditions, were made by Planning Board members:
1. Board members requested more information related to the review of the traffic impact
analysis submitted as part of the MPD-CZ;
39
STAFF COMMENT: At the onset of the meeting, staff indicated comments had
been received from the NC Department of Transportation (NC DOT) related to
their review of the MPD-CZ on Friday July 31, 2020 (Attachment 1).
The applicant has reviewed and responded to these comments (Attachment 2).
Staff prepared a memorandum (Attachment 3) discussing traffic impact concerns
along Davis Road in response to these 2 documents.
As of the writing of this abstract, staff has not received any further comment(s) or
responses.
2. A Board member suggested the driveway onto Davis Road be removed to address traffic
impact concerns.
STAFF COMMENT: NC DOT has indicated the MPD-CZ will require a second
access point as Service Road is not sufficiently sized or located to safely handle
the traffic needs for the project.
At this time, NC DOT staff has indicated their support for the proposed driveway
off of Davis Road based o n submitted traffic count data, and recommended
roadway improvements, as detailed within the applicant’s traffic impact analysis.
Staff has discussed alternatives to the proposed driveway off of Davis Road,
specifically focusing on development of a driveway off of Old NC Highway 86. At
this time, however, the applicant is not able to secure the necessary property to
accommodate the proposal.
3. A suggestion was made to prohibit truck traffic utilizing the Davis Road driveway.
STAFF COMMENT: Unfortunately, this suggestion is inconsistent with NC DOT
expectations for the project. Staff is concerned over our ability to enforce such a
standard.
4. Several Board members indicated there ought to be a condition requiring trucks, seeking
to access Interstate 85, to utilize Interstate 40 rather than drive down Churton Street.
STAFF COMMENT: Staff does not believe we would have the ability to enforce
such a condition as Churton Street is a State maintained roadway that does not
preclude truck traffic.
5. A Board member suggested the project provide 1 electric vehicular (EV) charging station
for every 100,000 sq.ft. of proposed building area. If this condition is imposed, it is
anticipated there would be approximately 40 EV spaces at project build-out;
STAFF COMMENT: The applicant has agreed to provide 2 charging stations per
building.
6. Board members expressed concern over proposed permitted uses indicating more
specificity was needed. Specifically, there was a concern manufacturing could include
bio-weapon research/development and unethical testing of products on animals;
7. Several Board members suggested a condition requiring placement of vegetation along
external property lines designed to address light trespass concerns from vehicles utilizing
their ‘high beams’ while driving within the project.
STAFF COMMENT: The applicant indicated they believed their proposed
landscaping along the common property lines would address the issue.
40
Staff is unsure how such a condition would be enforced in the event of a
complaint.
8. A condition was recommended that all structures erected within the project be designed
to accommodate alternative energy devices (i.e. solar panels, etc.);
STAFF COMMENT: The applicant agreed to a condition indicating building design
would not preclude incorporation of alternative energy systems.
9. A condition was recommended that no fuel/chemical storage occur near the floodplain.
STAFF COMMENT: Current regulations (Section(s) 6.13 and 6.21 of the UDO)
prohibit the storage of chemicals within the floodplain or floodplain buffer. The
applicant indicated their willingness to impose an additional 30 ft. setback from the
edge of the required floodplain/stream buffers related to the storage of
fuel/chemicals.
Planning Director’s Recommendation: The Planning Director continues to recommend approval
of the:
1. Statement of Consistency indicating the zoning atlas amendment(s) are reasonable
and in the public interest as contained in Attachment 5.
2. Ordinance amending the Zoning Atlas, as well as imposing development conditions,
for the identified parcels as contained in Attachment 6.
FINANCIAL IMPACT: This request has been reviewed by various County departments who
have determined that the approval or denial of the request would not create the need for
additional funding for the provision of County services. C osts associated with advertising,
including the public hearing notice and mailings, were paid by the applicant in accordance with
the adopted Orange County Fee Schedule.
RECOMMENDATION: The Planning Director recommends the Board:
1. Continue deliberation on the proposal,
2. Consider the Planning Director’s recommendation,
3. Vote on the imposition of conditions, as detailed herein, and
4. Make a recommendation to the BOCC on the Statement of Consistency (Attachment 5)
and the proposed ordinance (Attachment 6) in time for the September 15, 2020 BOCC
meeting.
41
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J. ERIC BOYETTE
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION 7, DISTRICT 1
PO BOX 766
GRAHAM, NC 27253-0766
Telephone: (336) 570-6833
Fax: (336) 570-6873
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
115 EAST CRESCENT SQUARE DRIVE
GRAHAM, NC 27253
July 31, 2020
ORANGE COUNTY
Mr. Matthew Peach, PE
Stantec Consulting Services Inc.
801 Jones Franklin Road
Suite 300
Raleigh, NC 27606
Subject: Proposed Research Triangle Logistics Park
Located on SR 1223, Service Road and SR 1129, Davis Road
Review of Traffic Impact Analysis (TIA)
Dear Mr. Peach,
NCDOT Congestion Management Unit, Division and District staff have completed
review of the TIA for the above-mentioned development. Based on the information
provided, I offer the following comments.
General:
The proposed site consists of 2,251,200 SF of industrial warehousing with four buildings
interconnected via an internal road network. Access is provided via three proposed full-
movement driveways on the existing service road and a fourth full movement driveway
located on Davis Road. The site is expected to generate approximately 3648 new daily
trips upon buildout in 2023. The TIA did not provide any information or analysis
regarding phasing of the project. It is assumed the site will be developed as single entity
in a continuous manner.
Methodology:
Due to the current NCDOT moratorium on traffic volume data collection as a result of
Covid-19 impacts, background traffic was determined utilizing data provided in the
previously submitted Settler’s Pointe TIA and adjusted accordingly for background
growth and contributing traffic from approved development. This is consistent with the
scoping document previously approved by the Department.
42
Committed NCDOT Projects:
The TIA indicates the proposed development is proximal to two NCDOT projects
currently programmed in the State Transportation Improvement Program(STIP). Namely,
U-5845(Churton Street Widening) and I-3306A(I-40 Widening). Neither of these projects
include committed improvements at any of the intersections included in the study area of
this TIA.
Analysis Results and Mitigation Requirements:
Old NC 86 and Waterstone Drive/Rippy Lane Intersection:
The analysis indicates that this intersection is expected to operate acceptably in the 2023
build scenario.
We concur with the TIA recommendation that no improvements are required.
Old NC 86 and I-40 Westbound Ramps Intersection:
The analysis indicates a significant increase in delay and drop in LOS from D-F on the
westbound approach with the addition of site traffic.
Pursuant to NCDOT guidelines, the applicant will need to provide additional analysis and
recommendations for mitigation of this impact to include assessment for warrant and
need for a traffic signal.
Old NC 86 and I-40 Eastbound Ramps Intersection:
The TIA recommends installation of a traffic signal at this location. The applicant should
provide additional traffic signal warrant assessment supporting this recommendation. In
the event that a signal is verified to be warranted and needed, it is noted that the analysis
indicates that a substantial queue for the southbound left turn movement that may exceed
existing storage may result. Additionally, the analysis indicates that the queue for the
northbound through/right movement is expected to spill beyond the existing Old NC 86
and Service Road intersection which would be expected to result in significant
operational and safety issues at that location. The applicant will need to provide
additional analysis and recommendations to mitigate the queue spillback or consider
restrictions of left turn movements at the service road.
Old NC 86 and Service Road Intersection:
As noted above, queue spill back from the adjacent eastbound ramps will need to be
mitigated or restrictions of left turns at this intersection will need to be considered with
appropriate internal circulation patterns provided to route traffic to the proposed Davis
Road as an alternate access route. In the event that a full movement intersection is
approved at this location, then the following improvements are required.
43
x Construct an exclusive northbound left turn lane with 125’ of full storage and
appropriate transitions
x Construct and exclusive southbound right turn lane with 100’ of full storage and
appropriate transitions.
x Construct and exclusive eastbound right turn lane with 200’ full storage and
appropriate transitions.
Alternate improvements will need to be considered based on the final determination of
the intersection configuration.
Old NC 86 and Davis Road Intersection:
The analysis indicates a significant increase in delay and drop in LOS from B to D on the
eastbound approach with the addition of site traffic. The TIA recommends installation of
a traffic signal at this location. The applicant should provide additional traffic signal
warrant assessment supporting this recommendation. Regardless of final determination
regarding signalization, the following improvements are required to ensure safe and
efficient operation.
x Construct an exclusive northbound left turn lane with 100’ of full storage and
appropriate transitions.
x Construct an exclusive southbound right turn lane with 100’ of full storage and
appropriate transition.
Service Road and Site Driveway A,B,C Intersections:
We concur with the recommendation to construct each of these accesses as a two lane-
two-way approach operated under stop sign control.
Each access will need to provide a minimum internal protected stem length of 100’
Davis Road and Site Driveway D intersections:
We concur with the recommendation to construct this access as a two lane-two-way
approach operated under stop sign control.
Provide a minimum internal protected stem length of 100’.
The following improvement is required to better accommodate commercial vehicle
maneuvers and to ensure safe and efficient operation at this location:
x Construct and exclusive westbound right turn with 100’ of full storage and
appropriate transitions.
44
Multi-modal and Streetscape Enhancements:
Any locally stipulated multi-modal enhancements including but not limited to sidewalk,
bike lanes, bus pull offs, lighting, landscaping etc. on State maintained routes are subject
to NCDOT requirements and approval through the encroachment process.
General Requirements:
It is necessary to obtain an approved driveway permit and/or encroachment agreement(s)
prior to performing work on the NCDOT right of way. As a condition of the permit, the
permitee shall be responsible for design and construction of the above stipulated
improvements in accordance with NCDOT requirements. An approved permit will be
issued upon receipt of approved roadway and signal construction plans, inspection fee,
and any necessary performance and indemnity bonds.
The applicant shall dedicate any additional right of way necessary to accommodate the
required road improvements or future improvements as stipulated.
Intersection radii and geometry shall be designed to accommodate turning movements of
the largest anticipated vehicle.
All pavement markings shall be long life thermoplastic. Pavement markers shall be
installed if they previously existed on the roadway.
The permitee shall be responsible for the installation and relocation of any additional
highway signs that may be necessary due to these improvements and shall comply with
the requirements of the MUTCD.
Feel free to contact me if you have any questions.
Sincerely,
C. N. Edwards Jr., PE
District Engineer
Cc: J.M. Mills, PE, Division Engineer
D. M. McPherson, Division Traffic Engineer
Brian Thomas, PE, Regional Traffic Engineer
Doumit Ishak, PE, Congestion Management Regional Engineer
Orange County
Town of Hillsborough
45
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
August 5, 2020
File: 171002240
Attention: Mr. Chuck Edwards, PE, District Engineer
NCDOT Division 7, District 1
115 East Crescent Square Drive
P. O. Box 766
Graham, NC 27253
Dear Mr. Edwards,
Reference: Research Triangle Logistics Park TIA Supplement
This supplement is to respond to a memo dated 7/31/2020 providing NCDOT comments on the Research
Triangle Logistics Park TIA. Based on the comments, we are recommending a change in the proposed
access at the intersection of SR 1009 (Old NC 86) and the service road. Instead of operating with the
existing condition, an unsignalized full movement intersection, this memorandum will summarize the
impacts of converting the service road to a right in / right out with a left over. Therefore, all traffic exiting the
site heading north to access I-40 or continue north will have to turn left out of Davis Road.
The following sections respond directly to the comments in the NCDOT Memorandum.
Committed NCDOT Projects
As noted, there are two proposed State Transportation Improvement Program (STIP) Projects in proposed
development’s study area, U-5845 and I-3306A.
According to the 2020 – 2029 STIP, project U-5845 (South Churton Street Widening) is proposed to start
right of way acquisition in State Fiscal Year (SFY) 2022 and construction would be started in SFY 2025.
This project will install traffic signals at the Old NC 86 ramps (eastbound and westbound) accessing I-40. A
southbound right turn lane is recommended at the westbound on-ramp and an additional southbound left
turn lane and a northbound right turn lane are recommended at the eastbound on-ramp. These
improvements are noted in the attached figure from the U-5845 Capacity Analysis Report prepared by
Kimley-Horn and Associates (Figure ES-1). Due to current NCDOT funding issues, most projects are
currently on hold and this project schedule is subject to change. This project is funded with $15 Million in
Build NC Bonds that were noted to be paid back in 2025 – 2039.
Project I-3306 will widen Interstate 40 to six-lanes and install ITS along a 20.7-mile corridor. The section of
the project in the vicinity of the proposed development, I-3306 AA (I-40 from I-85 to NC 86), is scheduled to
start right of way acquisition and utilities in SFY 2021 with construction scheduled to start in SFY 2023. As
noted earlier, schedules are being re-evaluated as a result of the funding crisis, but this project is reported
to be a top priority for Orange County. As part of this study, improvements are recommended at the I-40 /
46
August 5, 2020
Mr. Chuck Edwards, PE, District Engineer
Page 2 of 15
Reference: Research Triangle Logistics Park TIA Supplement
Old NC 86 interchange. The I-3306 Traffic Capacity Analysis prepared by Kimley-Horn and Associates
recommends that signals be installed at both ramps with an additional southbound left turn lane and an
exclusive northbound right turn lane at the eastbound ramp. The improvements are illustrated in the
attached Figure 7A. The I-3306A Public Meeting Map (Sheet 2 of 6) from the January 24, 2019 illustrates
improvements at the intersection, but they are not consistent with the recommendations in the Capacity
Report. According to this figure, traffic signals are not being shown at the ramps. A southbound right turn
at the I-40 westbound on-ramp is shown on the plan as well as a northbound right turn lane and an
additional receiving lane on the I-40 eastbound ramp. Although there will be two receiving lanes on the
ramp, the plan does not show dual southbound left turns even though the volume of traffic making this
movement is extremely high. The interchange portion of the Public Hearing Map is attached to this
supplement.
Analysis Results and Mitigation Requirements:
Old NC 86 and Waterstone Drive / Rippy Lane Intersection:
All parties are all in agreement that no improvements are required.
Old NC 86 & I-40 Westbound Ramps
According to the TIA that was completed for Settler’s Point, signal warrant analyses were conducted for this
intersection and it was noted that warrants were met for signalization in the no build condition. Due to the
data collection restrictions caused by the Covid Pandemic, the same data were used for the Research
Triangle Logistics Park, so the same results would apply to this study. The section of Settler’s Pointe
discussing signal warrants is attached.
As noted in the TIA, we recognize that there is an increase in delay for the westbound approach at the Old
NC 86 intersection with the I-40 WB ramp. It is not unusual for a minor approach at an unsignalized
intersection to have an unacceptable level of service. According to the NCDOT Congestion Management
Capacity Analysis Guidelines, “a poor level of service on a side street does not always result in a
recommendation for signalization if v/c ratios and queuing are acceptable”. The v/c ratio for the westbound
left turn is 0.59 and 0.65 in the AM and PM peak hours, respectively. Based on SimTraffic models,
although there will be delay on the ramp, there is sufficient storage to ensure that traffic accessing Old NC
86 will be stored on the ramp with no impacts on I-40. Additionally, it should be noted that the TIA assumed
full build out of Waterstone while the development is only partially built out. Therefore, delay estimates are
very conservative. The U-5845 project will install a signal at this location.
Therefore, based on this additional information, we do not recommend improvements at this location as a
result of the proposed development.
47
August 5, 2020
Mr. Chuck Edwards, PE, District Engineer
Page 3 of 15
Reference: Research Triangle Logistics Park TIA Supplement
Old NC 86 & I-40 Eastbound Ramps
Similar to the adjacent ramp intersection, the TIA that for Settler’s Point included a signal warrant analyses
for this intersection. It was noted that warrants were met for signalization in the no build condition. Due to
the data collection restrictions caused by the Covid Pandemic, the same data were used for the Research
Triangle Logistics Park, so the same results would apply to this study.
A signal was recommended at this location due to the excessive delays for the overall intersection and the
eastbound approach in the no-build condition. There is a significant southbound left turn movement
(exceeds 500 under the existing condition) coming from Hillsborough and the Waterstone Development.
The reported delays and queues from Synchro are assuming a very conservative analysis with protected
only movements and optimized splits. With the proposed left-over at the Service Road, a greater amount of
green time can be given to the southbound left since it will not be an issue to queue beyond the Service
Road. Additionally, it should be noted that the TIA assumed full build out of Waterstone while the
development is only partially built out. Therefore, delay estimates are very conservative. The I-3306A
project will install additional lanes while the U-5845 project will install a traffic signal and additional turn
lanes at this location.
Therefore, based on this additional information, we recommend that the developer install a temporary signal
with wood poles at this location to accommodate traffic until the planned projects construct additional turn
lanes and a signal in the final configuration can be installed.
Old NC 86 and Service Road Intersection:
Based on the current spacing of intersections and issues noted , the development will revise the access at
this location to provide a right in / right out with a left over into the site. Just north of the service road, there
is a residential parcel that has a property line which appears to extend almost to the edge of pavement and
may prohibit widening of pavement in this area. This is shown on the attached public hearing map.
Therefore, the following improvements are recommended at this location assuming that they can be
accomplished within the existing right of way by shifting the existing lanes and restriping the pavement.
x Restripe Old NC 86 in the vicinity of the Service Road to provide the following within the existing edges
of pavement:
An exclusive northbound left-turn lane with the amount of full-width storage with appropriate
transitions to the greatest extent possible within the existing pavement.
An exclusive southbound right-turn lane with 100 feet of full-width storage or a lesser amount to the
greatest extent possible with appropriate transitions within the existing pavement.
48
August 5, 2020
Mr. Chuck Edwards, PE, District Engineer
Page 4 of 15
Reference: Research Triangle Logistics Park TIA Supplement
Old NC 86 and Davis Road Intersection:
Since we only have peak hour traffic volumes for this location, it was verified that this location will meet the
peak hour warrant for signalization. Based on this, a traffic signal should be installed at this location. With
the traffic signal, all approaches operate at a Level of Service C or better in both peak hours and there are
no excessive queues. Additional turn lanes were noted in the TIA review, but based on the results, the
traffic signal mitigates the impact of the proposed development with acceptable levels of service on all
approaches.
Service Road and Site Driveways A, B, and C:
NCDOT concurred with the recommendations in the TIA. It is noted that a 100’ minimum internal protected
stem should be provided at each driveway.
Davis Road and Site Driveway D:
It is anticipated that almost all commercial vehicles will enter via the Service Road, so most vehicles
entering at Driveway D will be employees in personal vehicles. Due to the very low volume of westbound
through traffic, we are requesting that this location have a shared through / right turn lane on Davis Road.
In the morning, it is anticipated that there will be 24 vehicles turning right at this location with 81 vehicles
going through. In the afternoon, 8 vehicles are expected to turn right with 176 travelling through. It is noted
that a 100’ minimum internal protected stem should be provided at this driveway.
Multi-modal and Streetscape Enhancements:
These were not included in the TIA. Any enhancements required by Orange County will be coordinated
with NCDOT.
An updated traffic analysis has been performed and is included in the attachments.
49
August 5, 2020
Mr. Chuck Edwards, PE, District Engineer
Page 5 of 15
Reference: Research Triangle Logistics Park TIA Supplement
Regards,
Stantec Consulting Services, Inc.
Matt Peach, PE, PTOE
Senior Transportation Engineer
Phone: 919-865-7375
Matt.Peach@Stantec.com
Attachement: 1. Improvements Figure from U-5845,
2. U-5845 Public Hearing Map,
3. Improvements Figure From I-3306A,
4. I-3306 A Public Hearing Map,
5. Signal Warrants Section from Settler’s Pointe TIA,
6. Revised Site Trip Distribution as result of Revised Access,
7. Revised Site Trips as a result of Revised Access,
8. Revised Recommended Improvements
9. Synchro Reports
10. Revised LOS Summary Table
50
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 1: Improvements Figure from U-5845
51
52
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 2: U-5845 Public Hearing Map
53
54
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 3: Improvements Figure from I-3306A
55
56
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 4: I-3306A Public Hearing Map
57
58
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 5: Signal Warrants Section from Settler’s Pointe TIA
59
Settler’s Pointe Development – Traffic Impact Analysis
59
6.0 SIGNAL WARRANT ANALYSIS
As outlined in the Manual of Uniform Traffic Control Devices (MUTCD), a traffic si gnal should
not be installed unless traffic volumes and intersection characteristics meet a set of warrants or
requirements. The MUTCD outlines nine warrants, which are listed below.
Warrant 1: Eight-Hour Traffic Volume
Warrant 2: Four-Hour Traffic Volume
Warrant 3: Peak Hour
Warrant 4: Pedestrian Volume
Warrant 5: School Crossing
Warrant 6: Coordinated Signal System
Warrant 7: Crash Experience
Warrant 8: Roadway Network
Warrant 9: Intersection Near Roadway Grade Crossing
An analysis was conducted at two major intersections north of the Settler’s Pointe development
as part of the 2020 Build Analysis:
I-40 Westbound Ramps and Old NC 86
I-40 Eastbound Ramps and Old NC 86
For both intersections, thirteen-hour (6 AM to 7 PM) traffic counts were completed on October
18, 2016. Using Highway Capacity Software (HCS) with 2016 existing traffic conditions, the
intersection of Old NC 86 at I-40 Westbound Ramps meets the following signal warrants:
Warrant 1: Eight-Hour Vehicular Volume
Warrant 2: Four-Hour Vehicular Volume
Warrant 3B: Peak Hour (Peak-Hour Vehicular Volumes)
Warrant 6: Coordinated Signal System
Additionally, the I-40 E astbound Ramps meet Warrant 3 B: Peak Hour (Peak-Hour Vehicular
Volumes), and Warrant 6 (Coordinated Sig nal System) under the 2016 existing traffi c
conditions.
Traffic volumes were then grown out to 2020 with a 1% annual growth rate and the adjacent
development volumes were added to the AM and PM peak hours. The following signal warrants
were met at both intersections in 2 020 and should be considered for signalization based on
projected adjacent development traffic:
Warrant 1B: Eight-Hour Vehicular Volume (Interruption in Continuous Traffic)
Warrant 2: Four-Hour Vehicular Volume
Warrant 3B: Peak Hour (Peak-Hour Vehicular Volumes)
Warrant 6: Coordinated Signal System
60
Settler’s Pointe Development – Traffic Impact Analysis
60
Also, an analysis was conducted at the Service Road intersection at Old NC 86 for the 2020
Build Analysis; however, since trip generation practices only provide peak hour turn movements,
the only da ta available for a warr ant analysis was for A M and PM peak hour s. For this
intersection, the 2020 Build volumes generated by the pro posed site were utilized for the AM
and PM peak hour traffic. Data was not formally collecte d at this int ersection with the other
study intersections, but the turn counts colle cted at the nearby I-40 eastbound ramps were
provided via a video recording, and a review of the video indicated that there were no peak hour
turn movements in or out of the Service Road. The Service Road provides public street access
to tracts of land that are presently vacant, so this is a reasonable conclusion.
Using HCS with 2020 p rojected traffic conditions, the intersection of Old NC 86 at the Service
Road met the following signal warrants:
Warrant 3B: Peak Hour (Peak-Hour Vehicular Volumes)
Warrant 6: Coordinated Signal System
In similar fashion, the 2 022 Build volumes generated by th e proposed site were uti lized for the
AM and PM peak hour traffic for the following intersections:
Old NC 86 and proposed Retail Drive
Old NC 86 and Davis Road
Peak hour (AM and PM) turn move ment count data was co llected for the Davis Road and Old
NC 86 intersection on t he same day as the oth er study intersections, October 18, 2016. The
existing turn movement counts were then grown out to 2022 using a 1% annual growth rate, and
the proposed trips generated by the residentia l retirement driveway connection to the existing
intersection added to form the basis for the AM and PM count data. For the proposed retail
driveway, the projected volumes for the through move ments represent the 2022 background
traffic, plus the trips generated by the site itself. Similar to the scenario with the Service Road,
the only data used for the warrant analysis at the Retail Drive intersection and Davis Road
intersection warrant analysis was the peak hour turn movement counts.
Using HCS with 2022 projected traf fic conditions, the intersection of Old NC 86 at the Retail
Drive met the following signal warrants:
Warrant 3B: Peak Hour (Peak-Hour Vehicular Volumes)
Warrant 6: Coordinated Signal System
Additionally, the intersection of Old NC 86 at Davis Road met the following signal warrant:
Warrant 3B: Peak Hour (Peak-Hour Vehicular Volumes)
HCS reports for the signal warrant analysis are located in Appendix D.
61
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 6: Revised Site Trip Distribution as result of Revised Access
62
63
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 7: Revised Site Trips as a result of Revised Access
64
65
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 8: Revised Recommended Improvements
66
67
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 9: Synchro Reports
68
HCM 6th TWSC
110: Old NC 86 & I-40 WB Ramp 08/05/2020
Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report
Stantec Page 1
Intersection
Int Delay, s/veh 5.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 93 4 470 93 517 0 0 915 95
Future Vol, veh/h 0 0 0 93 4 470 93 517 0 0 915 95
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - Free - - None - - None
Storage Length - - - 225 - 0 225 -----
Veh in Median Storage, # - 2 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 0 0 103 4 522 103 574 0 0 1017 106
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1289 1903 - 1123 0 - - - 0
Stage 1 780 780 - - - - - - -
Stage 2 509 1123 - - - - - - -
Critical Hdwy 6.636.53-4.13-----
Critical Hdwy Stg 1 5.43 5.53 - - - - - - -
Critical Hdwy Stg 2 5.83 5.53 - - - - - - -
Follow-up Hdwy 3.519 4.019 - 2.219 -----
Pot Cap-1 Maneuver 168 68 0 620 - 0 0 - -
Stage 1 451 405 0 - - 0 0 - -
Stage 2 569 280 0 - - 0 0 - -
Platoon blocked, %-- -
Mov Cap-1 Maneuver 140 0 - 620 -----
Mov Cap-2 Maneuver 140 0 - - - - - - -
Stage 1 376 0 - - - - - - -
Stage 2 569 0 - - - - - - -
Approach WB NB SB
HCM Control Delay, s 86.6 1.8 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBTWBLn1WBLn2 SBT SBR
Capacity (veh/h)620 - 140 - - -
HCM Lane V/C Ratio 0.167 - 0.77 - - -
HCM Control Delay (s) 12 - 86.6 0 - -
HCM Lane LOS B - F A - -
HCM 95th %tile Q(veh) 0.6 - 4.7 - - -
69
Lanes, Volumes, Timings
120: Old NC 86 & I-40 EB Ramp 08/05/2020
Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report
Stantec Page 4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 157 4 153 0000453996313770
Future Volume (vph) 157 4 153 0000453996313770
Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft)0 200 0 0 0 0 0 0
Storage Lanes 0 1 0 0 0 0 1 0
Taper Length (ft)100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.976
Flt Protected 0.953 0.950
Satd. Flow (prot)0 1775 1583 00001818 0 1770 1863 0
Flt Permitted 0.953 0.950
Satd. Flow (perm)0 1775 1583 00001818 0 1770 1863 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph)55 55 45 45
Link Distance (ft)1173 557 452 723
Travel Time (s)14.5 6.9 6.8 11.0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph)174 4 170 00005031107014190
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 178 170 000061307014190
Enter Blocked Intersection No No No No No No No Yes No No Yes No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft)0 0 24 24
Link Offset(ft)0000
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 1 2
Detector Template Left Thru Right Thru Left Thru
Leading Detector (ft)20 100 20 100 20 100
Trailing Detector (ft)0 0 0 0 0 0
Detector 1 Position(ft)0 0 0 0 0 0
Detector 1 Size(ft)20 6 20 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft)94 94 94
Detector 2 Size(ft)6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.0 0.0 0.0
Turn Type Perm NA Perm NA Prot NA
Protected Phases 4 2 1 6
Permitted Phases 4 4
70
Lanes, Volumes, Timings
120: Old NC 86 & I-40 EB Ramp 08/05/2020
Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report
Stantec Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 4 2 1 6
Switch Phase
Minimum Initial (s)7.0 7.0 7.0 12.0 7.0 12.0
Minimum Split (s)25.0 25.0 25.0 25.0 11.5 25.0
Total Split (s)25.0 25.0 25.0 45.0 50.0 95.0
Total Split (%)20.8% 20.8% 20.8%37.5% 41.7% 79.2%
Maximum Green (s) 18.0 18.0 18.0 38.0 45.5 88.0
Yellow Time (s)5.0 5.0 5.0 5.0 3.5 5.0
All-Red Time (s)2.0 2.0 2.0 2.0 1.0 2.0
Lost Time Adjust (s)-2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s)5.0 5.0 5.0 2.5 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None C-Min None C-Min
Walk Time (s)7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0
Act Effct Green (s)18.1 18.1 40.0 49.4 91.9
Actuated g/C Ratio 0.15 0.15 0.33 0.41 0.77
v/c Ratio 0.67 0.71 1.01 0.96 0.29
Control Delay 60.5 65.2 76.7 57.7 3.7
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 60.5 65.2 76.7 57.7 3.7
LOS E E E E A
Approach Delay 62.7 76.7 37.5
Approach LOS E E D
Intersection Summary
Area Type:Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 1 (1%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.01
Intersection Signal Delay: 53.3 Intersection LOS: D
Intersection Capacity Utilization 85.4%ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 120: Old NC 86 & I-40 EB Ramp
71
HCM 6th TWSC
130: Old NC 86 & Service Road 08/05/2020
Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report
Stantec Page 7
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 11 29 552 340 189
Future Vol, veh/h 0 11 29 552 340 189
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 50 - - 100
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 0 12 32 613 378 210
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 378 588 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.22 4.12 - - -
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.318 2.218 - - -
Pot Cap-1 Maneuver 0 669 987 - - -
Stage 1 0 -----
Stage 2 0 -----
Platoon blocked, %- - -
Mov Cap-1 Maneuver - 669 987 - - -
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 10.5 0.4 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h)987 - 669 - -
HCM Lane V/C Ratio 0.033 - 0.018 - -
HCM Control Delay (s) 8.8 - 10.5 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0.1 - 0.1 - -
72
Lanes, Volumes, Timings
140: Old NC 86 & Davis Road 08/05/2020
Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report
Stantec Page 8
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 219 23 40 362 287 65
Future Volume (vph) 219 23 40 362 287 65
Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.987 0.975
Flt Protected 0.957 0.995
Satd. Flow (prot)1759 0 0 1853 1816 0
Flt Permitted 0.957 0.935
Satd. Flow (perm)1759 0 0 1742 1816 0
Right Turn on Red No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 45
Link Distance (ft)1029 1406 754
Travel Time (s)15.6 21.3 11.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph)243 26 44 402 319 72
Shared Lane Traffic (%)
Lane Group Flow (vph) 269 0 0 446 391 0
Enter Blocked Intersection No No No Yes Yes No
Lane Alignment Left Right Left Left Left Right
Median Width(ft)12 0 0
Link Offset(ft)0 0 0
Crosswalk Width(ft)16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Number of Detectors 1 1 2 2
Detector Template Left Left Thru Thru
Leading Detector (ft)20 20 100 100
Trailing Detector (ft)0 0 0 0
Detector 1 Position(ft)0 0 0 0
Detector 1 Size(ft)20 20 6 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0
Detector 2 Position(ft)94 94
Detector 2 Size(ft)6 6
Detector 2 Type Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0
Turn Type Prot Perm NA NA
Protected Phases 4 2 6
Permitted Phases 2
Detector Phase 4 2 2 6
Switch Phase
Minimum Initial (s) 7.0 12.0 12.0 12.0
73
Lanes, Volumes, Timings
140: Old NC 86 & Davis Road 08/05/2020
Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report
Stantec Page 9
Lane Group EBL EBR NBL NBT SBT SBR
Minimum Split (s)25.0 25.0 25.0 25.0
Total Split (s)26.0 34.0 34.0 34.0
Total Split (%)43.3% 56.7% 56.7% 56.7%
Maximum Green (s) 19.0 27.0 27.0 27.0
Yellow Time (s)5.0 5.0 5.0 5.0
All-Red Time (s)2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0
Total Lost Time (s)5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0
Recall Mode None C-Min C-Min C-Min
Walk Time (s)7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s)16.2 33.8 33.8
Actuated g/C Ratio 0.27 0.56 0.56
v/c Ratio 0.57 0.45 0.38
Control Delay 23.1 10.6 8.3
Queue Delay 0.0 0.0 0.0
Total Delay 23.1 10.6 8.3
LOS C B A
Approach Delay 23.1 10.6 8.3
Approach LOS C B A
Intersection Summary
Area Type:Other
Cycle Length: 60
Actuated Cycle Length: 60
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.57
Intersection Signal Delay: 12.8 Intersection LOS: B
Intersection Capacity Utilization 66.4%ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 140: Old NC 86 & Davis Road
74
HCM 6th TWSC
180: Davis Road & Warehouse D Dvwy.08/05/2020
Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report
Stantec Page 17
Intersection
Int Delay, s/veh 2.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 12 176 81 24 66 4
Future Vol, veh/h 12 176 81 24 66 4
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 13 196 90 27 73 4
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 117 0 - 0 326 104
Stage 1 - - - - 104 -
Stage 2 - - - - 222 -
Critical Hdwy 4.12---6.426.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1471 - - - 668 951
Stage 1 - - - - 920 -
Stage 2 - - - - 815 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1471 - - - 661 951
Mov Cap-2 Maneuver - - - - 661 -
Stage 1 - - - - 911 -
Stage 2 - - - - 815 -
Approach EB WB SB
HCM Control Delay, s 0.5 0 11
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1
Capacity (veh/h)1471 - - - 673
HCM Lane V/C Ratio 0.009 - - - 0.116
HCM Control Delay (s) 7.5 0 - - 11
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 0.4
75
HCM 6th TWSC
110: Old NC 86 & I-40 WB Ramp 08/05/2020
Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report
Stantec Page 4
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 70 4 580 144 500 0 0 868 159
Future Vol, veh/h 0 0 0 70 4 580 144 500 0 0 868 159
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - Free - - None - - None
Storage Length - - - 225 - 0 225 -----
Veh in Median Storage, # - 2 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 0 0 78 4 644 160 556 0 0 964 177
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1358 2017 - 1141 0 - - - 0
Stage 1 876 876 - - - - - - -
Stage 2 482 1141 - - - - - - -
Critical Hdwy 6.636.53-4.13-----
Critical Hdwy Stg 1 5.43 5.53 - - - - - - -
Critical Hdwy Stg 2 5.83 5.53 - - - - - - -
Follow-up Hdwy 3.519 4.019 - 2.219 -----
Pot Cap-1 Maneuver 152 58 0 610 - 0 0 - -
Stage 1 406 366 0 - - 0 0 - -
Stage 2 588 275 0 - - 0 0 - -
Platoon blocked, %-- -
Mov Cap-1 Maneuver 112 0 - 610 -----
Mov Cap-2 Maneuver 112 0 - - - - - - -
Stage 1 300 0 - - - - - - -
Stage 2 588 0 - - - - - - -
Approach WB NB SB
HCM Control Delay, s 96.5 2.9 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBTWBLn1WBLn2 SBT SBR
Capacity (veh/h)610 - 112 - - -
HCM Lane V/C Ratio 0.262 - 0.734 - - -
HCM Control Delay (s) 13 - 96.5 0 - -
HCM Lane LOS B - F A - -
HCM 95th %tile Q(veh) 1 - 4 - - -
76
Lanes, Volumes, Timings
120: Old NC 86 & I-40 EB Ramp 08/05/2020
Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report
Stantec Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 121 4 66 0000522925114260
Future Volume (vph) 121 4 66 0000522925114260
Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft)0 200 0 0 0 0 0 0
Storage Lanes 0 1 0 0 0 0 1 0
Taper Length (ft)100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.980
Flt Protected 0.954 0.950
Satd. Flow (prot)0 1777 1583 00001825 0 1770 1863 0
Flt Permitted 0.954 0.950
Satd. Flow (perm)0 1777 1583 00001825 0 1770 1863 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph)55 55 45 45
Link Distance (ft)1173 557 452 723
Travel Time (s)14.5 6.9 6.8 11.0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph)134 4 73 00005801025684730
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 138 73 000068205684730
Enter Blocked Intersection No No No No No No No Yes No No Yes No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft)0 0 24 24
Link Offset(ft)0000
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 1 2
Detector Template Left Thru Right Thru Left Thru
Leading Detector (ft)20 100 20 100 20 100
Trailing Detector (ft)0 0 0 0 0 0
Detector 1 Position(ft)0 0 0 0 0 0
Detector 1 Size(ft)20 6 20 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft)94 94 94
Detector 2 Size(ft)6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s)0.0 0.0 0.0
Turn Type Perm NA Perm NA Prot NA
Protected Phases 4 2 1 6
Permitted Phases 4 4
77
Lanes, Volumes, Timings
120: Old NC 86 & I-40 EB Ramp 08/05/2020
Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report
Stantec Page 6
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 4 2 1 6
Switch Phase
Minimum Initial (s)7.0 7.0 7.0 12.0 7.0 12.0
Minimum Split (s)25.0 25.0 25.0 25.0 14.0 25.0
Total Split (s)25.0 25.0 25.0 51.0 44.0 95.0
Total Split (%)20.8% 20.8% 20.8%42.5% 36.7% 79.2%
Maximum Green (s) 18.0 18.0 18.0 44.0 37.0 88.0
Yellow Time (s)5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s)-2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s)5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None C-Min None C-Min
Walk Time (s)7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0
Act Effct Green (s)16.2 16.2 47.0 41.9 93.8
Actuated g/C Ratio 0.14 0.14 0.39 0.35 0.78
v/c Ratio 0.58 0.34 0.96 0.92 0.32
Control Delay 58.0 50.5 58.0 59.2 5.6
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 58.0 50.5 58.0 59.2 5.6
LOS E D E E A
Approach Delay 55.4 58.0 34.8
Approach LOS E E C
Intersection Summary
Area Type:Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 4 (3%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 45.2 Intersection LOS: D
Intersection Capacity Utilization 80.8%ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 120: Old NC 86 & I-40 EB Ramp
78
HCM 6th TWSC
130: Old NC 86 & Service Road 08/05/2020
Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report
Stantec Page 8
Intersection
Int Delay, s/veh 0.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 28 13 614 423 70
Future Vol, veh/h 0 28 13 614 423 70
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 50 - - 100
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 0 31 14 682 470 78
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 470 548 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.22 4.12 - - -
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.318 2.218 - - -
Pot Cap-1 Maneuver 0 594 1021 - - -
Stage 1 0 -----
Stage 2 0 -----
Platoon blocked, %- - -
Mov Cap-1 Maneuver - 594 1021 - - -
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 11.4 0.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h)1021 - 594 - -
HCM Lane V/C Ratio 0.014 - 0.052 - -
HCM Control Delay (s) 8.6 - 11.4 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.2 - -
79
Lanes, Volumes, Timings
140: Old NC 86 & Davis Road 08/05/2020
Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report
Stantec Page 9
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 261 39 45 367 312 139
Future Volume (vph) 261 39 45 367 312 139
Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.983 0.959
Flt Protected 0.958 0.995
Satd. Flow (prot)1754 0 0 1853 1786 0
Flt Permitted 0.958 0.911
Satd. Flow (perm)1754 0 0 1697 1786 0
Right Turn on Red No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 45
Link Distance (ft)1029 1406 754
Travel Time (s)15.6 21.3 11.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph)290 43 50 408 347 154
Shared Lane Traffic (%)
Lane Group Flow (vph) 333 0 0 458 501 0
Enter Blocked Intersection No No No Yes Yes No
Lane Alignment Left Right Left Left Left Right
Median Width(ft)12 0 0
Link Offset(ft)0 0 0
Crosswalk Width(ft)16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Number of Detectors 1 1 2 2
Detector Template Left Left Thru Thru
Leading Detector (ft)20 20 100 100
Trailing Detector (ft)0 0 0 0
Detector 1 Position(ft)0 0 0 0
Detector 1 Size(ft)20 20 6 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0
Detector 2 Position(ft)94 94
Detector 2 Size(ft)6 6
Detector 2 Type Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0
Turn Type Prot Perm NA NA
Protected Phases 4 2 6
Permitted Phases 2
Detector Phase 4 2 2 6
Switch Phase
Minimum Initial (s) 7.0 12.0 12.0 12.0
80
Lanes, Volumes, Timings
140: Old NC 86 & Davis Road 08/05/2020
Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report
Stantec Page 10
Lane Group EBL EBR NBL NBT SBT SBR
Minimum Split (s)25.0 25.0 25.0 25.0
Total Split (s)25.0 35.0 35.0 35.0
Total Split (%)41.7% 58.3% 58.3% 58.3%
Maximum Green (s) 18.0 28.0 28.0 28.0
Yellow Time (s)5.0 5.0 5.0 5.0
All-Red Time (s)2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0
Total Lost Time (s)5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0
Recall Mode None C-Min C-Min C-Min
Walk Time (s)7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s)17.5 32.5 32.5
Actuated g/C Ratio 0.29 0.54 0.54
v/c Ratio 0.65 0.50 0.52
Control Delay 24.6 11.8 15.3
Queue Delay 0.0 0.0 0.0
Total Delay 24.6 11.8 15.3
LOS C B B
Approach Delay 24.6 11.8 15.3
Approach LOS C B B
Intersection Summary
Area Type:Other
Cycle Length: 60
Actuated Cycle Length: 60
Offset: 52 (87%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.65
Intersection Signal Delay: 16.5 Intersection LOS: B
Intersection Capacity Utilization 76.0%ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 140: Old NC 86 & Davis Road
81
HCM 6th TWSC
180: Davis Road & Warehouse D Dvwy.08/05/2020
Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report
Stantec Page 18
Intersection
Int Delay, s/veh 5.8
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 4 94 176 8 206 12
Future Vol, veh/h 4 94 176 8 206 12
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 4 104 196 9 229 13
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 205 0 - 0 313 201
Stage 1 - - - - 201 -
Stage 2 - - - - 112 -
Critical Hdwy 4.12---6.426.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1366 - - - 680 840
Stage 1 - - - - 833 -
Stage 2 - - - - 913 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1366 - - - 678 840
Mov Cap-2 Maneuver - - - - 678 -
Stage 1 - - - - 831 -
Stage 2 - - - - 913 -
Approach EB WB SB
HCM Control Delay, s 0.3 0 13.1
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1
Capacity (veh/h)1366 - - - 685
HCM Lane V/C Ratio 0.003 - - - 0.354
HCM Control Delay (s) 7.6 0 - - 13.1
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - - - 1.6
82
Stantec Consulting Services Inc.
801 Jones Franklin Road, Suite 300
Raleigh, North Carolina 27606-3563
Attachment 10: Revised LOS Summary Table
83
RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS iv Table ES-1: Level of Service & Delay Summary for Revised Access Scenario Intersection Approach Existing Intersection Control Proposed Intersection Control 2020 Existing 2023 No-Build 2023 Build 2023 Build-Improved AM Peak LOS (Delay in sec./veh.) PM Peak LOS (Delay in sec./veh.) AM Peak LOS (Delay in sec./veh.) PM Peak LOS (Delay in sec./veh.) AM Peak LOS (Delay in sec./veh.) PM Peak LOS (Delay in sec./veh.) AM Peak LOS (Delay in sec./veh.) PM Peak LOS (Delay in sec./veh.) Old NC 86 at I-40 WB Ramps Overall Intersection One-Way Stop Controlled Signalized A (1.0) A (1.6) A (1.0) A (1.7) A (5.5) A (5.2) WB Approach C (21.9) C (22.0) D (30.2) D (34.3) F (86.6) F (96.5) NB Left-Turn A (9.9) A (9.9) B (11.3) B (11.8) B (12.0) B (13.0) SB Approach A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) Old NC 86 at I-40 EB Ramps Overall Intersection One-Way Stop Controlled Signalized F (51.2) A (7.0) F (###) F (158.3) F (###) F (268.2) D (53.3) D (45.2) EB Approach F (###) F (54.6) F (###) F (###) F (###) F (###) E (62.7) E (55.4) NB Approach A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) E (76.7) E (58.0) SB Left-Turn (unsignalizid) SB Approach (Signalized) B (12.1) A (9.8) C (15.9) B (3.1) C (17.9) C (15.3) D (37.5) C (34.8) Old NC 86 at Service Road Overall Intersection One-Way Stop Controlled One-Way Stop Controlled A (0.2) A (0.2) A (0.2) A (0.2) A (1.6) A (7.5) A (0.3) A (0.4) EB Approach B (13.1) B (13.5) B (13.8) B (14.4) D (25.2) E (48.5) B (10.4) B (11.2) NB Left-Turn A (8.0) A (8.2) A (8.0) A (8.3) A (8.8) A (8.6) A (8.8) A (8.6) Old NC 86 at Davis Road Overall Intersection One-Way Stop Controlled Signalized A (4.8) A (2.3) A (5.2) A (2.4) A (7.2) A (4.6) B (12.8) B (16.5) EB Approach C (21.1) C (17.2) C (24.8) C (19.4) D (34.7) D (28.5) C (23.1) C (24.6) NB Left-Turn (unsignalized) NB Approach (Signalized) A (8.0) A (8.3) A (8.1) A (8.4) A (8.3) A (8.6) B (10.6) B (11.8) SB Approach A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (8.3) B (15.3) Davis Road at Warehouse D Driveway Overall Intersection One-Way Stop Controlled A (2.4) A (5.8) EB Approach A (0.5) A (0.3) SB Approach B (11.0) B (13.1) ###: Delay exceeds 300 seconds / vehicle 84
3/$11,1* ,163(&7,216'(3$570(17
&UDLJ1%HQHGLFW$,&3'LUHFWRU
$GPLQLVWUDWLRQ
)$;
ZZZRUDQJHFRXQW\QFJRY
:0DUJDUHW/DQH
6XLWH
32%R[
+LOOVERURXJK1&
0(025$1'80
72&UDLJ%HQHGLFW2UDQJH&RXQW\3ODQQLQJ'LUHFWRU
0LFKDHO+DUYH\&XUUHQW3ODQQLQJ6XSHUYLVRU
)5201LVKLWK7ULYHGL2UDQJH&RXQW\7UDQVSRUWDWLRQ3ODQQHU
&&7RP$OWLHUL&RPSUHKHQVLYH3ODQQLQJ6XSHUYLVRU
7RP7HQ(\FN7UDQVSRUWDWLRQ/DQG8VH3ODQQHU,,
'$7($XJXVW
68%-(&7)XWXUH'DYLV5RDGDQG2OG1&GXHWRGHYHORSPHQW
$WWDFKPHQW6WDII$VVHVVPHQW
7KLVPHPRUDQGXPLVWRSURYLGHDQXSGDWHRQ'DYLV5RDGDQG2OG1&DVSRWHQWLDO
SODQQHGGHYHORSPHQWVFRQWLQXHWR
1RUWK&DUROLQD'HSDUWPHQWRI7UDQVSRUWDWLRQ1&'27PDLQWDLQV'DYLV5RDG65
DVSDUWRIWKHLU6HFRQGDU\5RDGV\VWHP,WLVIXQFWLRQDOO\FODVVLILHGDVDORFDOFROOHFWRUZLWK
DPD[LPXPFDSDFLW\RIDSSUR[LPDWHO\DYHUDJHDQQXDOGDLO\WUDIILFRU$$'7RUWKH
PD[LPXPYHKLFOHVLWFDQKROGSHUGD\:KHQURDGVH[FHHGWKLVFDSDFLW\GULYHUFRPIRUW
GHWHULRUDWHV1&'27W\SLFDOO\PHDVXUHVFDSDFLW\EDVHGRQWKHURDGVODQHZLGWKVSHHG
OLPLWIXQFWLRQDOFODVVLILFDWLRQDQGRWKHUIDFWRUV1&'27VWDUWHGPRQLWRULQJWUDIILFYROXPH
DORQJWKLVURDGLQDQGUHSRUWVDJUDGXDOWUDIILFLQFUHDVHIURP$$'7LQWR
$$'7LQ
&XUUHQWO\'DYLVURDGLVRQO\EHLQJXWLOL]HGDWRILWVIXOOFDSDFLW\EDVHGRQWUDIILF
YROXPHHJ$$'7YROXPH$$'7FDSDFLW\7KHSURSRVHG5HVHDUFK7ULDQJOH
/RJLVWLF3DUW57/37UDIILF,PSDFW$QDO\VLV7,$DVVXPHVDJURZWKUDWHVHFWLRQ
YHUVXVWKHDQQXDOJURZWKEDVHGRQFXUUHQWWUHQGV:LWKDQDQQXDOWUDIILFLQFUHDVHRI
XVDJHRI'DYLV5RDGLVJURZLQJ+RZHYHUWUDIILFRQ'DYLV5RDGZLOOQRWUHDFK
DQ\ZKHUHQHDULWV$$'7FDSDFLW\(YHQLIGHYHORSPHQWRIDQ\NLQGGRHVQRWRFFXULQ
WKLVDUHDWUDIILFZLOOFRQWLQXHLQFUHDVLQJDORQJ'DYLV5RDG'DYLV5RDGLVQRWDQ\ZKHUH
QHDUFDSDFLW\HYHQLIWKHSURMHFWZDVLQSODFHWRPRUURZDQG2OG1&RQO\H[FHHGV
FDSDFLW\LIDOOSRWHQWLDOFRXQW\GHYHORSPHQWVZHUHIXOO\EXLOWDWWKHVDPHWLPH
7KH2UDQJH&RXQW\WUDQVSRUWDWLRQQHWZRUNLVSDUWRIWKHWULDQJOHDUHDWUDYHOGHPDQGPRGHO
UHIHUUHGWRKHUHDV7ULDQJOH5HJLRQDO0RGHO750,WLVDGRSWHGHYHU\\HDUVDVSDUWRI
WKH 'XUKDP&KDSHO +LOO&DUUERUR 0HWURSROLWDQ 3ODQQLQJ 2UJDQL]DWLRQ '&+& 032
0HWURSROLWDQ 7UDQVSRUWDWLRQ 3ODQ 073 7KH 073 LV D ILVFDOO\FRQVWUDLQHG SODQ WKDW LV
IHGHUDOO\UHTXLUHGIRUDOO032V7509HUVLRQ073ZDVDGRSWHGLQ7KH
750HVWLPDWHVIXWXUHWUDIILFYROXPHRQORFDODQGUHJLRQDOVWDWHPDLQWDLQHGURDGVEURXJKW
RQ E\ GHYHORSPHQW LQ DFFRUGDQFH ZLWK ORFDO ODQG XVH UHJXODWLRQV 750 FDSDFLWLHV DUH
FRQVHUYDWLYHFRPSDUHGWRVWDWHFDSDFLW\VWDQGDUGVHVSHFLDOO\RQORFDOFROOHFWRUV
85
7KHFXUUHQWDGRSWHG750SURYLGHVDQRXWORRNRQWKHIXWXUHWUDQVSRUWDWLRQQHWZRUNWDNLQJ
LQWRDFFRXQW
x 3RSXODWLRQ DQG HPSOR\PHQW SURMHFWLRQV WR ZLWK WKH XQGHUVWDQGLQJ 2UDQJH
'XUKDP:DNH&KDWKDPDQGVXUURXQGLQJFRXQWLHVLQFOXGLQJWKHLUPHPEHUMXULVGLFWLRQV
DUHIXOO\GHYHORSHGDQGZLOOUHDFKPD[LPXPJURZWKEDVHGRQFXUUHQWODQGXVH
UHJXODWLRQV
x $OOFXUUHQWDQGIXWXUHIHGHUDODQGUHJLRQDOO\IXQGHGWUDQVSRUWDWLRQSURMHFWVOLNH,DQG
,ZLGHQHGZLGHQLQJDUHFRPSOHWHG
x $OO H[LVWLQJ DQG FRPPLWWHG URDG LPSURYHPHQWV SURMHFWV DUH FRPSOHWHG LQFOXGLQJ
ELNHSHGHVWULDQWUDQVLWDQGUDLOSURMHFWVDUHFRPSOHWHG
x $OOIXWXUHWUDQVSRUWDWLRQSURMHFWVIURP±DVDSSURYHGLQWKH073DUH
FRPSOHWHG
x 'DWD DQDO\VLV DOWHUQDWLYH VFHQDULRV DQG UHVXOWV DUH FKHFNHGE\ PXOWLSOH VRXUFHV
LQFOXGLQJ7ULDQJOH-&RXQFLORI*RYHUQPHQW8QLYHUVLW\RI1RUWK&DUROLQD'&+&032
DQG&DSLWDO$UHD0HWURSROLWDQ3ODQQLQJ2UJDQL]DWLRQ&$032
1&'27PHDVXUHV/HYHORI6HUYLFH/26DV³the relationship of travel demand compared
to the roadway capacity of a roadway. Six levels of service identify the range of possible
conditions. Designations range from LOS A, which represents the best operating
conditions, to LOS F, which represents the worst operating conditions.”750DOVRSURYLGHV
IXWXUH/267KH750/26LVWKHDGRSWHGUHFRUG&RQVXOWDQWVDOVRXVH/26WRDVVHVV
FXUUHQW DQG IXWXUH WUDYHO FRQGLWLRQV /26 LV V\QRQ\PRXV WR OHWWHU JUDGHV IRU URDG
SHUIRUPDQFH1&'27/26VWDQGDUGVVWDWH
>ĞǀĞůŽĨ^ĞƌǀŝĐĞ>ĞǀĞůŽĨ^ĞƌǀŝĐĞ>ĞǀĞůŽĨ^ĞƌǀŝĐĞ
>ĞǀĞůŽĨ^ĞƌǀŝĐĞ>ĞǀĞůŽĨ^ĞƌǀŝĐĞ>ĞǀĞůŽĨ^ĞƌǀŝĐĞ&
ƌŝǀĞƌŽŵĨŽƌƚ͗
,ŝŐŚ
ƌŝǀĞƌŽŵĨŽƌƚ͗
,ŝŐŚ
ƌŝǀĞƌŽŵĨŽƌƚ͗
^ŽŵĞdĞŶƐŝŽŶ
ƌŝǀĞƌŽŵĨŽƌƚ͗
WŽŽƌ
ƌŝǀĞƌŽŵĨŽƌƚ͗
džƚƌĞŵĞůLJWŽŽƌ
ƌŝǀĞƌŽŵĨŽƌƚ͗
dŚĞ>ŽǁĞƐƚ
86
/26LVPHDVXUHGE\YROXPHRYHUWRWDOFDSDFLW\ZKHUH/26& DQG'!$Q\/26
WKDWLV$%RU&LVDFFHSWDEOHZKLOH/26'(DQG)LQGLFDWHLVVXHVZLWKWKHV\VWHP
$FFRUGLQJWRWKH750LQWUDIILFYROXPHWUDYHOLQJDORQJ'DYLV5RDGLVSURMHFWHGWR
LQFUHDVHWRYHKLFOHVSHUGD\ZKLFKLVVWLOORQO\RI'DYLG5RDG¶VWRWDOFDSDFLW\
$FFRUGLQJWRWKHFRQVXOWDQW¶V7,$IURP'DYLG5RDGVDZYHKLFOHVSHUGD\RU
DERXWRIWKHURDG¶VWRWDOFDSDFLW\
,I+LOOVERURXJKDQG2UDQJH&RXQW\ZHUHWREHFRPHIXOO\GHYHORSHG'DYLV5RDGZRXOG
UHPDLQ/26&DFFRUGLQJWRWKHDQDO\VLV7KH7UDIILF,PSDFW$QDO\VLV7,$SURYLGHGE\WKH
GHYHORSHUDVVXPHVRIWUDIILFZLOOXVH'DYLV5RDG%\WUDIILFRQ'DYLV5RDGZLOO
RQO\LQFUHDVHWRDYHUDJHDQQXDOGDLO\WUDIILFUHVXOWLQJLQ/26RI/26$(YHQ
LIRIQHZWUDIILFJHQHUDWHGE\WKHSURSRVHGGHYHORSPHQWZHUHWRRQO\XVH'DYLV
5RDGWUDIILFYROXPHZRXOGRQO\LQFUHDVHWR/26ZHOOEHORZ/26&
7KHVDPHDQDO\VLVZDVSHUIRUPHGIRU2OG1&QHDUWKHSURMHFWDUHD2OG1&LVD
VWDWHPDLQWDLQHGURXWHFODVVLILHGDV0LQRU$UWHULDOZLWKDSSUR[LPDWHO\DFDSDFLW\RI
YHKLFOHVSHUGD\¶WUDYHOODQHVPSKVSHHGOLPLW
7KHFRQVXOWDQW¶V7,$DVVXPHVDSSUR[LPDWHO\RIWUDIILFZLOOXVH2OG1&%\
WUDIILFRQ2OG1&ZLOOLQFUHDVHWRYHKLFOHVSHUGD\UHVXOWLQJLQ/26&
6KRXOGRIQHZWUDIILFJHQHUDWHGE\SURSRVHGGHYHORSPHQWRQO\XVH2OG1&DQG
QRWDQ\RWKHUURDGWUDIILFYROXPHZRXOGLQFUHDVHWRUHVXOWLQJLQ/26'RUZRUVH
6WDIILVDZDUHRIYDULRXVSURSRVHGGHYHORSPHQWVDORQJ2OG1&LQFOXGLQJ6KRSVDW/OR\G
)DUPLQ&DUUERURDQGWKHIXWXUH'DQLHO%RRQHUHGHYHORSPHQWDQGWKHSRWHQWLDOLPSDFW
WKH\FRXOGKDYHRQWKH&RXQW\¶VWUDQVSRUWDWLRQQHWZRUN
2UDQJH&RXQW\%RDUGRI&RXQW\&RPPLVVLRQHUVDSSURYHG2OG1&IRUPRGHUQL]DWLRQRQ
)HEUXDU\ DV D &RXQW\ SULRULW\ DQG LW LV EHLQJ VXEPLWWHG IRU WKH VWDWH¶V 6WUDWHJLF
3ULRULWL]DWLRQ RI 7UDQVSRUWDWLRQ 6327 SURFHVV WKURXJK 7ULDQJOH $UHD 5XUDO 3ODQQLQJ
2UJDQL]DWLRQ7$5326KRXOG1&'27IXQGWKLVLPSURYHPHQWLWFRXOGLQFUHDVHFDSDFLW\
DORQJWKLVVHJPHQWRIWKHURDGWRDSSUR[LPDWHO\WKHUHE\UHGXFLQJ/26WR%RU
EHWWHUVKRXOGIXWXUHWUDIILFLQFUHDVHWRLQDVSURMHFWHG
$EULHIEUHDNGRZQRIWKHDQDO\VLVLVSURYLGHGLQWKHDWWDFKHG6WDII$VVHVVPHQW1&'27
/HYHORI6HUYLFH'VWDQGDUGVFDQEHIRXQGRQOLQHKHUH
)HHOIUHHWRFRQWDFWVWDIIZLWKDQ\TXHVWLRQV
87
ƚƚĂĐŚŵĞŶƚϭ^ƚĂĨĨƐƐĞƐƐŵĞŶƚĂƐĞĚŽŶƚŚĞƐƚĂĨĨ͛ƐĐĂƉĂĐŝƚLJĂŶĂůLJƐŝƐ͕ƚŚŝƐĚĞǀĞůŽƉŵĞŶƚǁŝůůŶŽƚĐĂƵƐĞĂǀŝƐZŽĂĚƚŽƌĞĂĐŚĐĂƉĂĐŝƚLJ͘/ƚŝƐƉŽƐƐŝďůĞĨŽƌKůĚEͲϴϲƚŽƌĞĂĐŚĐĂƉĂĐŝƚLJ͕ďƵƚƚŚŝƐǁŽƵůĚŽŶůLJŽĐĐƵƌŝĨƐĞǀĞƌĂůŽƚŚĞƌĚĞǀĞůŽƉŵĞŶƚƐďĞŝŶŐĐŽŶƐŝĚĞƌĞĚďLJŵƵůƚŝƉůĞũƵƌŝƐĚŝĐƚŝŽŶƐŝŶKƌĂŶŐĞŽƵŶƚLJǁĞƌĞƚŽďƵŝůĚŽƵƚĂƚƚŚĞƐĂŵĞƚŝŵĞĂŶĚŶŽƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐǁĞƌĞƉƌŽǀŝĚĞĚĂůŽŶŐKůĚEϴϲ͘^ƚĂĨĨŚĂƐƌĞǀŝĞǁĞĚƚŚĞĚĞǀĞůŽƉĞƌ͛Ɛd/͕EKdĚĂƚĂĂŶĚƚŚĞĚŽƉƚĞĚdƌŝĂŶŐůĞZĞŐŝŽŶĂůDŽĚĞů;dZDͿĂƐĂďĂƐŝƐĨŽƌƚŚŝƐĐŽŶĐůƵƐŝŽŶ͘ůůƚŚƌĞĞƌĞƐŽƵƌĐĞƐŚĂǀĞĚŽĐƵŵĞŶƚĞĚƚŚŝƐĂƌĞĂĂƐ͗EKdZŽĂĚdZD&ƵƚƵƌĞdƌĂĨĨŝĐsŽůƵŵĞ&ƵŶĐƚŝŽŶĂůůĂƐƐŝĨŝĐĂƚŝŽŶEKdZŽĂĚŚĂƌĂĐƚĞƌŝƐƚŝĐƐ;ϮŶĚƋƵĂƌƚĞƌϮϬϮϬͿ sŽůƵŵĞ;dͿdŽƚĂůĂƉĂĐŝƚLJ>K^;sŽůƵŵĞͬĂƉĂĐŝƚLJͿ>K^;Ͳ&ͿZKt^ƉĞĞĚ>ŝŵŝƚ>ĂŶĞtŝĚƚŚ^ŚŽƵůĚĞƌtŝĚƚŚWĂǀĞŵĞŶƚtŝĚƚŚ dŽƚĂůWĞĂŬ,ŽƵƌĂǀŝƐZŽĂĚ;^ZͲϭϭϮϵͿϮϬϮϱ>ŽĐĂůŽůůĞĐƚŽƌ ϲϬ ϰϱ ϭϬ ϭ͘ϱ ϮϬ ϭϬϴϮ ϯϴϮ ϵϬϯϲ Ϭ͘ϭϮ ϮϬϯϱ>ŽĐĂůŽůůĞĐƚŽƌ ϲϬ ϰϱ ϭϬ ϭ͘ϱ ϮϬ Ϯϴϲϰ ϱϬϮ ϵϬϯϲ Ϭ͘ϯϮ ϮϬϰϱ>ŽĐĂůŽůůĞĐƚŽƌ ϲϬ ϰϱ ϭϬ ϭ͘ϱ ϮϬ ϯϰϵϲ ϲϬϴ ϵϬϯϲ Ϭ͘ϯϵ KůĚEͲϴϲ;^ZͲϭϬϬϵͿϮϬϮϱ DŝŶŽƌƌƚĞƌŝĂů ϲϬ ϰϱ ϭϭ ϭ͘ϱ ϮϮ ϳϰϲϴ ϭϰϲϴ ϭϬϬϰϱ Ϭ͘ϳϰ ϮϬϯϱ DŝŶŽƌƌƚĞƌŝĂů ϲϬ ϰϱ ϭϭ ϭ͘ϱ ϮϮ ϳϰϲϭ ϭϰϯϬ ϭϬϬϰϱ Ϭ͘ϳϰ ϮϬϰϱ DŝŶŽƌƌƚĞƌŝĂů ϲϬ ϰϱ ϭϭ ϭ͘ϱ ϮϮ ϵϮϵϲ ϭϵϮϮ ϭϬϬϰϱ Ϭ͘ϵϯ 88
ƚƚĂĐŚŵĞŶƚϭ
^ƚĂĨĨƐƐĞƐƐŵĞŶƚ
dŚĞd/ƐƚĂƚĞƐ͗
xƵŝůĚŽƵƚʹϮϬϮϯ
xdŽƚĂůĂŝůLJƚƌŝƉƐʹϯ͕ϲϰϴ;dͿ
xϮϬϭϴdƌĂĨĨŝĐsŽůƵŵĞʹϮ͕ϯϬϬ;dͿĂǀŝƐZŽĂĚ͕ϲ͕ϱϬϬ;dͿKůĚEͲϴϲ
x'ƌŽǁƚŚZĂƚĞʹϭй
xdƌŝƉŝƐƚƌŝďƵƚŝŽŶʹĂǀŝƐZŽĂĚϱй͕KůĚEͲϴϲϭϱͲϱϬй
,LJƉŽƚŚĞƚŝĐĂů^ĐĞŶĂƌŝŽͲͲƵƐŝŶŐd/ŝŶƉůĂĐĞŽĨdZD
EKd
ZŽĂĚ
dZD
&ƵƚƵƌĞ
dƌĂĨĨŝĐ
sŽůƵŵĞ
&ƵŶĐƚŝŽŶĂů
ůĂƐƐŝĨŝĐĂƚŝŽŶ
ϮϬϭϴ
sŽůƵŵĞ
sŽůƵŵĞ
;dͿ
dŽƚĂů
ĂƉĂĐŝƚLJ
>K^
;sŽůƵŵĞͬ
ĂƉĂĐŝƚLJͿ
ĂǀŝƐ
ZŽĂĚ;^ZͲ
ϭϭϮϵͿ
ϮϬϮϱ
>ŽĐĂůŽůůĞĐƚŽƌ ϮϯϬϬ
ϮϰϴϮ ϵϬϯϲ Ϭ͘Ϯϳ
ϮϬϯϱϮϳϯϭ ϵϬϯϲ Ϭ͘ϯϬ
ϮϬϰϱϯϬϬϰ ϵϬϯϲ Ϭ͘ϯϯ
KůĚEͲϴϲ
;^ZͲϭϬϬϵͿ
ϮϬϮϱ
DŝŶŽƌƌƚĞƌŝĂů ϲϱϬϬ
ϳϮϮϵ ϭϬϬϰϱ Ϭ͘ϳϮ
ϮϬϯϱϳϵϱϯ ϭϬϬϰϱ Ϭ͘ϳϵ
ϮϬϰϱϴϳϰϴ ϭϬϬϰϱ Ϭ͘ϴϳ
,LJƉŽƚŚĞƚŝĐĂů^ĐĞŶĂƌŝŽͲͲĂƐƐƵŵŝŶŐĂůůϯ͕ϰϲϴŶĞǁƚƌŝƉƐǁŽƵůĚďĞŽŶĂǀŝƐZŽĂĚKZ
KůĚEͲϴϲKE>zďLJϮϬϮϯďƵŝůĚŽƵƚ͘EŽŶĞǁĞŵƉůŽLJĞĞƐ͕ǀĞŶĚŽƌƐ͕ĐƵƐƚŽŵĞƌƐ͕ĞƚĐ͘ŽŶ
ŽƚŚĞƌƌŽĂĚƐ
ĂǀŝƐ
ZŽĂĚ;^ZͲ
ϭϭϮϵͿ
ϮϬϮϱ
>ŽĐĂůŽůůĞĐƚŽƌ ϮϯϬϬ
ϱϵϰϴ ϵϬϯϲ Ϭ͘ϲϲ
ϮϬϯϱϲϱϰϯ ϵϬϯϲ Ϭ͘ϳϮ
ϮϬϰϱϳϭϵϳ ϵϬϯϲ Ϭ͘ϴϬ
KůĚEͲϴϲ
;^ZͲϭϬϬϵͿ
ϮϬϮϱ
DŝŶŽƌƌƚĞƌŝĂů ϲϱϬϬ
ϭϬϭϰϴ ϭϬϬϰϱ ϭ͘Ϭϭ
ϮϬϯϱϭϭϭϲϯ ϭϬϬϰϱ ϭ͘ϭϭ
ϮϬϰϱϭϮϮϳϵ ϭϬϬϰϱ ϭ͘ϮϮ
89
90
91
92
93
94
95
From: Jon Lorusso <jonlorusso@gmail.com>
Sent: Sunday, August 9, 2020 12:48 PM
To: Perdita Holtz; ALL_BOCC_MANAGER_CLERK
Cc: Ashley Kesling Lorusso; jrupplin123@aol.com; Franklin Garland; jweaver@hillsboroughnc.gov
Subject: [EXTERNAL MAIL!] Millstone Dr.
Hi,
Jon here with my daily "thoughts on the MPD-CZ rezoning".
My wife works at a school on Millstone Dr. If you've ever tried to make a left out of of Millstone
onto Old 86, you know it is *very* difficult. It's a dangerous intersection, at least as dangerous
if not more so than Davis Rd. and Old 86.
As mentioned at Wednesday's planning meeting, we're likely to see a large increase in traffic as
a result of the RTLP site. The argument that this will not impact Old 86 north of 40 holds
absolutely no water, and as members of the planning board I am sure you know that.
Has any consideration been given to the addition of a signal at Millstone Dr. and Old NC
86? Without a new signal, there absolutely will be more accidents.
Thanks once again for listening to my input.
--jon
96
97
98
From: Jon Lorusso <jonlorusso@gmail.com>
Sent: Tuesday, August 11, 2020 11:10 AM
To: ALL_BOCC_MANAGER_CLERK <OCBOCC@orangecountync.gov>; Perdita Holtz
<pholtz@orangecountync.gov>; Tina Love <tlove@orangecountync.gov>; Todd McGee
<tmcgee@orangecountync.gov>
Subject: [EXTERNAL MAIL!] jobs
Hi,
I would like to address the issue of jobs. It is hoped that the Research Triangle Logistics Park will
employ 4500 people in, as the name suggests the logistics industry. Most of these jobs will consist of
warehouse workers and truck drivers. As it so happens, these two jobs in particular are ripe for
automation. This is not something will occur in the far off future. Warehouse automation has already
begin, and trucking automation has already begun. Does this not undermine the very premise of
providing good paying jobs to the residents of Orange County? If we must build something in this
location, why can't it be something that will benefit the people who live here rather than out of state
corporations? I have included a few slides that demonstrate my point.
While I respect the planning board's position on the regulatory components of land use, has anyone
considered the economic aspects of this plan? I believe it is vital to consider this project from all angles
and try to anticipate all of the possible outcomes before making a decision. This is a major change and
once in motion it will be difficult to reverse course.
Thank you,
--jon
99
100
101
From: Karen Fernandez <ksmithfernandez@gmail.com>
Sent: Tuesday, August 11, 2020 4:41:47 PM
To: Perdita Holtz
Subject: [EXTERNAL MAIL!] Research Triangle Logistics Park Development Proposal
Karen Smith Fernandez
3902 Ode Turner Road
Hillsborough, NC 27278
Dear Ms. Holtz,
I am writing in regard to the application to develop the Research Triangle Logistical Park south and west of the
I-40 and Highway 86 intersection in Hillsborough. First, thank you for your skillful facilitation of a contentious
meeting on August 5. I appreciate that the planning board members are volunteers and regret that not all of
my neighbors were able to contain their emotions appropriately. I was not able to speak that evening and so
am writing to the planning board via your email instead. I have written to my commissioners and will attend the
future virtual meetings on this topic as well.
I attended the Planning Board meeting of August 5 where the developer presented their proposed plan to the
board and where several of my Orange County neighbors along Davis Drive, Ode Turner Road and Highway 86
expressed their opposition to this development. I, too, oppose this particular development in this location for
the following reasons:
1) Reputation. Currently Orange County enjoys the reputation of a livable community with services
that support both the reputation and the reality of being a livable community. This development which
consists of several million feet of warehouses does not fit with our reputation or reality particularly in
light of the fact that the lessors or purchasers of the warehouse facilities will be largely unknown. I
understand that there are restrictions in place for the classification of this zoning district, but they do
not appear to be so restrictive as to deter animal research or chemical research or other activities that
may or may not “fit” the Orange County ethic. The vagueness of the usage, along with the appearance
and impact of this huge warehouse complex seem out of place in our County.
2) Fit. Although not generally opposed to the zoning of this area as described in the Future Land Use
Management Plan, I don’t feel that this type of development is the right fit. Not only am I concerned
for the Town of Hillsborough and Orange County “brand” or reputation as described above, but I think
we can do better in finding a project that is more aligned with the citizens of the County and Town. I
understand that the developer projects 4500 potential new jobs, but these will be individuals and
businesses from out of area largely, providing no direct service or benefit to residents. Storage,
research, transportation, manufacture – any of these are possible, none of these are secured. With no
ability to regulate the types of businesses that would use large warehouse spaces, we really don’t know
who we are inviting into the neighborhood/county/town. We do not know what skills will be needed
for these jobs, what types of jobs they will be or any other details. In fact, without knowing who the
tenants of the warehouses will be, how can we be certain of the projected 4500 jobs becoming
available. Many of these jobs will be taken, not be residents, but by individuals outside of the area who
will commute. How does that specifically help the residents that you serve? If there are positive
impacts, it would be helpful to have them spelled out for the citizens.
3) Traffic. 4500 cars/trucks per day. 200 cars/tractor trailers per hour. These are the numbers the
developer’s traffic engineer gave in the presentation. The increase in traffic onto Davis Road, currently
a residential street, due to the DOT requirement that the planned service road NOT be used for I-40
access is more than this street and neighborhood can tolerate. That, in combination with the need for
some part of this traffic to access I-85, meaning that the traffic flow north on I-86, down Churton and
102
onto the I-85 access ramps, should give us all pause for traffic congestion and additional road
maintenance. I am also concerned for the viability of the Hillsborough Church of Christ located directly
across from the Davis Road access point If this project proceeds.
4) Crime and safety. Without knowing what types of businesses will be using this huge warehouse
area, we can’t be sure what the project will bring to this side of the County except much more access
and use from the I-40 and I-85 corridors. Is the County ready to increase patrols and enforcement to
keep citizens that are literally at the back door of this development safe? Have studies been performed
on the effect of this type of development on the crime rate in a residential area? Can we see those
studies? Can we be assured that Orange County and the Town of Hillsborough will maintain their
reputations as safe? Or that Orange County will be seen in a good light if/when crime increases?
5) Light pollution. A complex of this size will create a tremendous new source of light pollution that
will affect citizens for miles around. If this, or any complex, is allowed to move forward please insert a
condition that lighting must be downward facing. Please.
6) Noise. Again, we do not know what industry will reside in this type of complex, but we do know
that a 100 foot vegetative barrier will not be enough to subdue the sound of tractor trailers moving
about in proximity to a residential area during 3 shifts day and night. If this, or any complex, is allowed
to move forward on this site, please require more substantial noise barriers to protect the residents
from the din of trucks and traffic.
Please do not hesitate to reach out to me if that would be helpful. Thank you for your attention and
consideration of my concerns, and the concerns of Orange County residents.
Respectfully,
Karen
Karen Smith Fernandez
919-259-2856
ksmithfernandez@gmail.com
"In every crisis,doubt or confusion,take the higher path -
the path of compassion,courage,understanding and love." –Amit Ray
103
From: Margo T. Pinkerton <BC@zapphoto.com>
Sent: Wednesday, August 12, 2020 4:45 PM
To: Tina Love <tlove@orangecountync.gov>
Cc: Ronn Sieber (rdsieber@gmail.com) <rdsieber@gmail.com>; Mare Hermanson
(Hermanson.mary@gmail.com) <Hermanson.mary@gmail.com>; Denny Hermanson
(dennishermanson@gmail.com) <dennishermanson@gmail.com>; Arnie Zann
(Arnie@BCphotoadventures.com) <Arnie@BCphotoadventures.com>
Subject: [EXTERNAL MAIL!] Opposed to PROCESSING OF NEW MASTER PLAN DEVELOPMENT
CONDITIONAL ZONING DISTRICT (MPD-CZ) APPLICATION – RESEARCH TRIANGLE LOGISTICS PARK (RTLP)
Importance: High
To: Orange County Planning Board
I am vehemently opposed to the above cited application for Research Triangle Logistics Park. When we
bought our house in Cornwallis Hills in 2005, we thought we were buying in a residential neighborhood
that was relatively quiet except for the I-40 traffic noise. With the advent of Waterstone, it is near
impossible for the residents of Cornwallis Hills to exit via Lafayette Drive. When that
development/complex was put in, we were assured we would get a traffic light. That was a lit, because
while the wiring for it is there, it was never done. I must assume that the NC-DOT is waiting for a traffic
fatality before they will do anything.
Now, the County Planning Board wants to lower our property values, reduce our quality of life, and
remove the relative peace and quiet of our neighborhood by adding RTLP at our borders and that of the
residential neighborhoods on or near Davis Road. Already, traffic has made it noisy and unsafe at the
junction of Lafayette Drive and Old-86. Impatient people regularly and illegally use the turning lane into
Cates Creek Parkway as a passing zone. I have complained about this numerous times, and the NC-DOT
will do nothing, citing parameters within which they have to work. The exit out of Lafayette Drive
heading north onto Old-86 is impossible if one were to stay within the lines. One would have to come to
nearly a dead stop in order to make the turn somewhat back over your left shoulder, something that is
totally unsafe. Again, the NC-DOT doesn’t care.
Now, the Planning Board must be looking at its pockets rather than at the citizens it is supposed to
serve. You want to add more traffic to an already dangerous and congested corridor by bringing 18
wheelers from I-85 down Old-86, through Hillsborough’s Historic District, and past the Cornwallis
Neighborhood to service this ill-conceived project that the developers and the Planning Board are trying
to ram down our throats. This is totally unacceptable and frankly smacks of political skullduggery and
corruption. And what you are planning to do at the entrance to Davis Road is totally unacceptable, too.
No one is going to persuade me that there are not other sites better suited to this project, for example
where US-70 meets I-40 at the western end, off Route 1144.
Please do not lower our property values. Please allow us to maintain a residential feel to our
neighborhoods. Pick a site away from residential areas. Work with the NC-DOT before the fact, not put
the traffic in the hands of the NC-DOT after the fact as has been the case with recent, ill-conceived
developments.
And please point me to a site, such as that of the County Commissioners, where I can see a bio of each
one of you. Orange County needs transparency.
Sincerely,
Margo T. Pinkerton
Cornwallis Hills
104
---------- Forwarded message ----------
From: Chris Lamb <clamb2411@gmail.com>
To: <planningdept@orangecountync.gov>
Cc: Chris Lamb <clamb2411@gmail.com>, <ocbocc@orangecountync.gov>
Bcc:
Date: Wed, 12 Aug 2020 22:25:31 -0400
Subject: [EXTERNAL MAIL!] Development at Old 86 and Davis Rd/I40
Neighbor,
Through social media I have learned that the rezoning approval for this project may have been fast-tracked, perhaps due to the current
pandemic. I hope that this is not true. Given the challenges that the pandemic presents to all, this hardly seems the time to rush
community decisions and limit the opportunity for discussion and input.
I spent my childhood in a small rural, New England mill village, where the textile mill had long ago closed, and the business moved south
for lower costs. I spent my teenage years in Houston, watching the boom and bust cycles of the oil and real-estate industries and the
growth of a city w/o zoning. An I moved to North Carolina in '92 to watch the spams caused by the loss of textile and furniture
jobs. Times change, land use changes, often and quickly.
Since moving away from my childhood home, I have morned as the woods and fields I grew up roaming have been slowly developed. As
a result, I find the rampant clearcutting and thoughtless development commonly seen here and around the country painful and
unfortunate. However, I recognize that 'progress' can not be stopped and there are limits to the role of govenment.
That said, I think it is the role of the county commissioners to speak and act on behalf of all their constituents, especially those most
directly affected.
How will the noise and traffic limit their ability to enjoy their own property, and therefore reduce it's value, tangibly and intangibly? How
will their health be affected by the truck exhaust? I live a few miles away and fear the traffic will be a detriment to my air quality, increase
the noise pollution and make my area a less pleasant place to live.
How will the development reflect the long term values of the community? How often have we seen that land use changes over
time? From the abandoned mills of my childhood to the dying stripcenters of the past few decades to the malls that are now dying.How
many visitors and citizens will look forward to visiting Hillsborough if forced to drive by this neighbor, unattractive, noisy and polluting?
How well will the traffic planning actually be done to protect the non-commercial traffic and neighbors? Why should we expect it to be any
better or safer than the Walmart/Home Depot area w/o an upgrade to the bridge? Will it be any better than the connections to Old and
New 86 from the hostpital and surrounding developments - unmetered intersections with poor visability and lights forcing unnecessary
idling when a simple traffic circle would be superior? As well as the I40/15-501 interchange? Where an entrance ramp merge occurs at
the same time as the third lane merges, a deadly and criminal arrangement. A safer alternative would have been to simply configure the
right lane as an exit only lane and resolve multiple issues.
How about drainage and water quality? The neighborhood across the street from us of about 20 houses went through a fair amount of
planning, but nothing done in that process has protected my property and pond, which flows into Lake Ben Johnson, from the increased
run-off coming from their roads and homes. Will the planning for containment during and after development be any better? Will it really be
sufficient?
In closing, I am urging you to vote against this project until a plan is presented that protects the health, safety, property values (of all
types) and quality of life of the neighbors and community. And until a plan is presented that protects the character and values of the
community and it's long term appeal and potential. And until a clear plan to really manage the runoff and water quality has been
presented. Until there is a plan you are proud to discuss with citizens, there really isn't a option to approve it.
Too long have we allowed narrow commercial and self interested parties freedom to do what they want while failing to provide the
neighbors and community freedom from pollution, personal infringements and environmental destruction. It is long past time to stand up
for what we will value in 50 or 100 years. No one will miss the mixed use development of their childhood. No one will appreciate the
architecture and design, not now, not ever. There will be no value derived from the noise, air, and water pollution. No one will ever
suggest visiting the development with their families for an evening stroll and no realtor will list it as a feature when selling adjact
properties.
We can't stop progress, but we can guide it and we can do what is right for the long term and insist that proper planning is completed
before the project is approved.
Chris Lamb
OC resident since 1996.
105
0LFKDHO+DUYH\
)URP-HVVLFD:LQJHUWMHVVZLQJHUW#JPDLOFRP!
6HQW)ULGD\$XJXVW$0
7RSODQQLQJGHSW
6XEMHFW>(;7(51$/0$,/@4XHVWLRQVIRU3ODQQLQJ0HHWLQJ
*RRG0RUQLQJ
0\TXHVWLRQVLQUHJDUGWRWKH5HVHDUFK7ULDQJOH/RJLVWLF3DUNSURMHFW
:LOOWKHWUXFNVEHOLPLWHGWRGD\WLPHKRXUV":LOOWUXFNVEHSURKLELWHGIURPGULYLQJRQDQ\URDGV
RWKHUWKDQWKHRQUDPS",IWUXFNVVWDUWGULYLQJRQ:DWHUVWRQHWRJHWRYHUWRZLOOWKHUHEHD
OLJKWLQVWDOOHGDWWKDWLQWHUVHFWLRQLW
VDOUHDG\GLIILFXOWWRPDNHDOHIWIURP:DWHUVWRQHWR1"
7KDQN\RXLQDGYDQFH
-HVVLFD:LQJHUW
%HUU\PDQ%OYG+LOOVERURXJK
106
0LFKDHO+DUYH\
)URP*UXEE7DPP\WJUXEE#KHUDOGVXQFRP!
6HQW:HGQHVGD\$XJXVW30
7R0LFKDHO+DUYH\
6XEMHFW>(;7(51$/0$,/@57/3TXHVWLRQ
+H\0LFKDHO
,KRSH\RXDUHGRLQJZHOO
7KH57/3WUDIILFVWXG\VHHPVWRLQGLFDWHWKDWOHIWWXUQVRXWRIWKHVHUYLFHURDGWRZDUG,DQG+LOOVERURXJKDUH
EHLQJFRQVLGHUHG0\XQGHUVWDQGLQJKRZHYHUZDVWKDWWKH1&'27ZDVQRWJRLQJWRDOORZOHIWWXUQVWKHUH
&DQ\RXFOHDUXSWKHGLVFUHSDQF\IRUPH"$QGKRZLVWKHFXUUHQWSODQXQGHUFRQVLGHUDWLRQJRLQJWRDIIHFWWUDIILF
YROXPHVRQ'DYLV5RDG"
7KDQNV
7DPP\
7DPP\*UXEE
2UDQJH&RXQW\UHSRUWHU
7KH+HUDOG6XQ7KH1HZV 2EVHUYHU
)DFHERRNKWWSVZZZIDFHERRNFRPVSHHGFKLFNXVD
7ZLWWHU#7DPP\*UXEE
107
STATEMENT OF CONSISTENCY
OF A PROPOSED UNIFIED DEVELOPMENT ORDINANCE MAP AMENDMENT
WITH THE ADOPTED ORANGE COUNTY 2030 COMPREHENSIVE PLAN
An applicant initiated amendment to the Zoning Atlas to rezone 3 parcels as follows:
Parcel
Identification
Number
(PIN)
Township Owner of
Record
Current Zoning District Proposed Zoning District
9863-71-8857 Hillsborough Suzanne
McGrady
Master Plan Development
Conditional Zoning (MPD-
CZ) Settlers Point;
Major Transportation
Corridor (MTC) Overlay
District
Master Plan Development
Conditional Zoning (MPD-CZ)
Research Triangle Logistics
Park;
Major Transportation Corridor
(MTC) Overlay District.
9863-91-6573 Hillsborough Christy Bailey
–ETAL
John Clayton
Master Plan Development
Conditional Zoning (MPD-
CZ) Settlers Point;
Economic Development
Hillsborough Limited
Office (EDH-2) - north of
Interstate 40
Major Transportation
Corridor (MTC) Overlay
District
Master Plan Development
Conditional Zoning (MPD-CZ)
Research Triangle Logistics
Park;
Economic Development
Hillsborough Limited Office
(EDH-2) – north of Interstate
40
Major Transportation Corridor
(MTC) Overlay District.
9862-99-8894 Hillsborough Facility Care
Services Inc.
Rural Residential (R-1)
Rural Buffer (RB) –
approximately 26,000
sq.ft. along Davis Road
Master Plan Development
Conditional Zoning (MPD-CZ)
Research Triangle Logistics
Park;
Rural Buffer (RB) –
approximately 26,000 sq.ft.
along Davis Road
The Planning Board finds:
a. The requirements of Section 2.8 of the UDO have been deemed complete; and,
b. Pursuant to Sections 1.1.5, and 1.1.7 of the UDO and to Section 153A-341 of the
North Carolina General Statutes, the Board finds sufficient documentation within
the record denoting that th e amendment is consistent with the adopted 2030
Comprehensive Plan.
1. The amendment is consistent with applicable plans because it supports the
following 2030 Comprehensive Plan goals and objectives:
x Objective LU-1.1: Coordinate the location of higher intensity / high
density residential and non-residential development with existing or
planned locations of public transportation, commercial and
community services, and adequate supporting infrastructure (i.e.,
Attachment 5
108
water and sew er, high-speed internet access, streets, and
sidewalks), while avoiding areas with protected natural and cultural
resources. This could be achieved by increasing allowable
densities and creating new mixed-use zoning districts where
adequate public services are available. (See also Economic
Development Objectives ED-2.1, ED-2.3, ED-2.10, and Water and
Wastewater Objective WW-2.)
The atlas amendment is consistent with this goal and
objective with the approval of a rezoning of property creating a
district allowing for the development of high density non-
residential land uses in an area of the County designated for
the location of adequate supporting infrastructure (i.e. water
and sewer).
c. The amendment is reasonable and in the public interest because it:
1. Expands economic development prospects within the C ounty while
continuing to protect adjacent and nearby land uses.
The atlas amendment involves the appr oval of a mast er plan
establishing a detailed list of allowable non-residential land uses to
aid in the mar keting on an ar ea designated within the
Comprehensive Plan as bei ng suitable for high intensity non-
residential development.
The expansion is consistent with County and Town of Hillsborough
plans outlining those parcels suitable for service by water/sewer
that are prime for high intensity non-residential development.
Further, the approved master plan establishes mandatory land use
buffers and setbacks for development within the project to ensure
off-site impacts are mitigated.
The Planning Board of Orange County hereby recommends that the Board of County
Commissioners consider adoption of the proposed Zoning Atlas amendments.
______________________________________________
David Blankfard, Chair Date
109
$XJXVW±,1,7,$/'5$)7&21',7,216)257+(5(6($5&+75,$1*/(
/2*,67,&63$5.57/30$67(53/$1'(9(/230(17&21',7,21$/=21,1*
03'&=',675,&7
, *(1(5$/
D $SSURYDORIWKH3URMHFWGRHVQRWFRQVWLWXWHDQH[SOLFLWJXDUDQWHHIRUXWLOLW\
VHUYLFHVLHZDWHUDQGVHZHUE\WKH7RZQRI+LOOVERURXJK3URYLVLRQRI
VHUYLFHVVKDOOEHFRQVLVWHQWZLWKDSSOLFDEOH7RZQXWLOLW\FRQQHFWLRQSROLFLHV
DQGWKHXWLOLW\DJUHHPHQWEHWZHHQWKH7RZQDQG2UDQJH&RXQW\
E 7KH3URMHFWVKDOOEHFRPSRVHGRILQGLYLGXDOSURSHUWLHVWRWDOLQJDFUHV
RIODQGDUHD
L 3,1$QDSSUR[LPDWHO\DFUHSDUFHOFXUUHQWO\]RQHG
03'&=6HWWOHUV3RLQWDQG0DMRU7UDQVSRUWDWLRQ&RUULGRU07&
2YHUOD\'LVWULFW
67$))127(07&2YHUOD\GLVWULFWERXQGDULHVQRWLPSDFWHG
E\WKLVDSSURYDO
LL 3,1$QDFUHSDUFHOFXUUHQWO\]RQHG
$SSUR[LPDWHO\DFUHVVRXWKRI,QWHUVWDWH]RQHG03'
&=6HWWOHUV3RLQW
$SSUR[LPDWHO\ DFUHV QRUWK RI ,QWHUVWDWH ]RQHG
(FRQRPLF'HYHORSPHQW+LOOVERURXJK/LPLWHG2IILFHU('+
0DMRU7UDQVSRUWDWLRQ&RUULGRU07&2YHUOD\'LVWULFW
67$))127(07&2YHUOD\GLVWULFWERXQGDULHVQRWLPSDFWHG
E\WKLVDSSURYDO('+]RQHGSRUWLRQRISURSHUW\QRUWKRI
,QWHUVWDWHLVQRWLPSDFWHGE\WKLVDSSURYDODQGZLOOUHPDLQ
]RQHG('+
LLL 3,1$QDSSUR[LPDWHO\DFUHSDUFHOFXUUHQWO\VSOLW
]RQHG5XUDO5HVLGHQWLDO5DQG5XUDO%XIIHU5%
67$))127(7KH5%]RQHGSRUWLRQRISURSHUW\DORQJ'DYLV
5RDGLVQRWLPSDFWHGE\WKLVDSSURYDODQGZLOOUHPDLQ]RQHG
5%7KLVDUHDVKDOOUHPDLQHLWKHULQXQGLVWXUEHGRSHQVSDFH
XVHGWRVXSSRUWUHTXLUHGXWLOLW\LPSURYHPHQWVFRQVLVWHQWZLWK
7RZQRI+LOOVERURXJKRU&RXQW\UHTXLUHPHQWVRUWRVXSSRUW
H[WHUQDOURDGZD\LPSURYHPHQWVFRQVLVWHQWZLWK&RXQW\DQG
1&'HSDUWPHQWRI7UDQVSRUWDWLRQUHTXLUHPHQWV
ƚƚĂĐŚŵĞŶƚϲ
110
F 7KH =RQLQJ $WODV IRU 2UDQJH &RXQW\ VKDOO EH GHVLJQDWHG 03'&=
'HYHORSPHQWVKDOOEHLQDFFRUGDQFHZLWKWKHDSSURYHGDSSOLFDWLRQSDFNHW
PDVWHUFRQFHSWSODQDQGWKHFRQGLWLRQVGHWDLOHGKHUHLQ
,, $&&(66$1'75$163257$7,21
D ,QWHUQDOURDGZD\VVKDOOEHGHYHORSHGLQDFFRUGDQFHZLWK6HFWLRQ$
RIWKH8'2,QWHUQDOVWUHHWVVKDOOEHSULYDWHO\PDLQWDLQHG
E $OO LQWHUQDO DQG H[WHUQDO URDGZD\ FRQVWUXFWLRQLPSURYHPHQWVVKDOO EH
FRPSOHWHGRUDSSURSULDWHO\ERQGHGSULRUWRWKHLVVXDQFHRID&HUWLILFDWHRI
&RPSOLDQFH & RI & DOORZLQJ WKH RFFXSDQF\ RI D VWUXFWXUH WULJJHULQJ
FRPSOHWLRQRIVDPH
F ([WHUQDOURDGZD\LPSURYHPHQWVVKDOOEHFRQVWUXFWHGLQDFFRUGDQFHZLWK
1&'HSDUWPHQWRI7UDQVSRUWDWLRQUHTXLUHPHQWVDQGJXLGHOLQHVDSSURYHG
7UDIILF,PSDFW$QDO\VLV7,$DQGWKHVWDQGDUGVRXWOLQHGKHUHLQ
G 7KHULJKWRIZD\IRU6HUYLFH5RDGVKDOOEHH[WHQGHGWRWKHZHVWHUQHGJH
RIWKH3,1WRVHUYHDVDIXWXUHDFFHVVSRLQWIRUDGMDFHQWODQG
DUHDWRWKHZHVW
H )LQDOURDGZD\OD\RXWLQFOXGLQJSDYHPHQWZLGWKVDQGGULYHZD\VVKDOOEH
DSSURYHGE\WKH7RZQRI+LOOVERURXJKDQG2UDQJH&RXQW\)LUH0DUVKDO¶V
RIILFHDVSDUWRIWKHILQDOVLWHSODQUHYLHZSURFHVV
I &RPPHUFLDOWUXFNWUDIILFH[LWLQJWKH3URMHFWRQWR'DYLV5RDGVKDOOEHOLPLWHG
WRWXUQLQJOHIW1RULJKWWXUQVRIFRPPHUFLDOYHKLFOHVVKDOOEHSHUPLWWHGRQWR
'DYLV5RDG
67$))&200(176WDIIKDVVWDUWHGWRKHDUFRQFHUQVIURPORFDO
UHVLGHQWVRYHUWUDIILFDFFHVVLQJ 'DYLV5RDG7KLVFRQGLWLRQZDV
VXJJHVWHGDVDPHDQVWRFKDQQHOLQJFRPPHUFLDOWUXFNODUJHYHKLFOH
WUDIILF DZD\ IURP H[LVWLQJ UHVLGHQWLDO DUHDV ZHVW RI WKH 3URMHFW
+DYLQJVDLGWKDWERWKWKHDSSOLFDQWDQGVWDIIKDYHZRQGHUHGKRZ
VXFKDFRQGLWLRQFRXOGEHHQIRUFHG
J 6LWHSODQVXEPLWWDOVVKDOOEHUHTXLUHGWRGHPRQVWUDWHLQWHUQDOH[WHUQDOWUDIILF
LPSURYHPHQWVQHFHVVDU\WRDGGUHVVGHYHORSPHQWLPSDFWVFRQVLVWHQWZLWK
WKHVXEPLWWHG7UDQVSRUWDWLRQ,PSDFW$QDO\VLV7,$
K $GGLWLRQDOULJKWRIZD\QHFHVVDU\WRVXSSRUWURDGZD\LPSURYHPHQWVVKDOO
EHVHFXUHGLQDFFRUGDQFHZLWK1RUWK&DUROLQD'HSDUWPHQWRI7UDQVSRUWDWLRQ
ULJKWRIZD\DFTXLVLWLRQSURFHVVHV7KHULJKWRIZD\VKDOOEHVHFXUHGSULRU
WR WKH &RXQW\ DFFHSWLQJ D VLWH SODQ DSSOLFDWLRQ SURSRVLQJ GHYHORSPHQW
UHTXLULQJVDPH
L $Q\ DQG DOO LQWHUQDO VWUHHWV VLGHZDONV ELF\FOH ODQHV HWF VKDOO EH
GHVLJQDWHGIRUSXEOLFDFFHVVXVH
111
M :KHQUHTXLUHGGULYHZD\SHUPLWVVKDOOEHLVVXHGE\WKH1RUWK&DUROLQD
'HSDUWPHQW RI 7UDQVSRUWDWLRQ SULRU WR WKH FRPPHQFHPHQW RI DQ\ HDUWK
GLVWXUELQJDFWLYLW\
N 2UDQJH &RXQW\ DQG 1RUWK &DUROLQD 'HSDUWPHQW RI 7UDQVSRUWDWLRQ VKDOO
DSSURYHWKHORFDWLRQRIDOOSURSRVHGXWLOLW\SROHVKRXVLQJVWUHHWVLJQDOVERWK
LQWHUQDODQGH[WHUQDOWRWKH3URMHFWSULRUWRLQVWDOODWLRQ
O 6HJUHJDWHGHQWUDQFHVDQGH[LVWVIRUSHGHVWULDQFRQVWUXFWLRQYHKLFOHDQG
QRQFRQVWUXFWLRQYHKLFXODUWUDIILFVKDOOEHGHYHORSHGWRDYRLGFRQIOLFWGXULQJ
FRQVWUXFWLRQDFWLYLWLHV
P%XVSXOORXWVDQGWUDQVLWVKHOWHUVVKDOOEHFRQVWUXFWHGWRVHUYHWKH3URMHFW
FRQVLVWHQW ZLWK WUDQVLW SODQV DGRSWHG E\ 2UDQJH &RXQW\ DQG VKDOO EH
GHYHORSHGLQDFFRUGDQFHZLWKWKHIROORZLQJ
L (DFKWUDQVLWVWRSVKDOOEHDFRYHUHGDQGHQFORVHGRQVLGHVWR
VKLHOGXVHUVIURPWKHHOHPHQWV
LL .LRVNVVKDOOEHGHYHORSHGWRSURYLGHWUDQVLWLQIRUPDWLRQLQFOXGLQJ
VFKHGXOHDQGURXWHLQIRUPDWLRQDQGVKDOOEHLOOXPLQDWHGWRILYH
DYHUDJHPDLQWDLQHGIRRWFDQGOHV
,,, ',0(16,21$/67$1'$5'6
D 7KH3URMHFWVKDOOREVHUYHDEXLOGLQJVTXDUHIRRWDJHOLPLWRIVTIW
67$))&200(176WDIILVEDVLQJWKLVUHFRPPHQGDWLRQRQWKH
ILJXUHXWLOL]HGLQWKHGHYHORSPHQWRIWKH7UDIILF,PSDFW$QDO\VLV7,$
$WWDFKPHQW + RI WKH DSSOLFDWLRQ RXWOLQLQJ LQWHUQDOH[WHUQDO WUDIILF
LPSURYHPHQWV QHFHVVDU\ WR VXSSRUW WKH 3URMHFW 7UDIILF
LPSURYHPHQWVIRUWKHSURMHFWZHUHEDVHGRQDQDQWLFLSDWHGVTXDUH
IRRWDJHOLPLWRIDSSUR[LPDWHO\VTIW
7KHDSSOLFDQW¶VUHYLVHGQDUUDWLYHIRUWKHSURMHFWGDWHG-XO\
UHTXHVWHGDIORRUDUHDUDWLR)$5OLPLWRIRUVTIWRI
DOORZDEOHEXLOGLQJVTXDUHIRRWDJHDUHDIRUWKH3URMHFW7RDSSURYH
WKLVUHTXHVWWKH7,$ZLOOKDYHWREHUHYLVHGXSGDWHG
E +HLJKW
L 3ULQFLSDOVWUXFWXUHVVKDOODELGHE\DKHLJKWOLPLWRIIW
LL $FFHVVRU\6WUXFWXUHV
:DWHUWRZHU
67$))&200(177KHQDUUDWLYHPDNHVUHIHUHQFHVWRµDFFHVVRU\
VWUXFWXUHV¶H[FHHGLQJWKHIWKHLJKWOLPLW
$W WKLV WLPH WKHUH LV QR VSHFLILF H[SODQDWLRQ RI WKH DQWLFLSDWHG
DFFHVVRU\VWUXFWXUHVWKDWZLOOH[FHHGIWLQKHLJKWRUZKDWWKH
XOWLPDWHKHLJKWOLPLWIRUVDLGVWUXFWXUHVZLOOEH
112
7KHDSSOLFDQWZLOOQHHGWRVSHFLI\DQRYHUDOOKHLJKWOLPLWIRUWKRVH
VSHFLILF ODQG XVHV ZKLFK VKDOO WKHQ EH LQFRUSRUDWHG LQWR WKH
FRQGLWLRQVRIDSSURYDO
F 6HWEDFNV
L 6WUXFWXUHVVKDOOREVHUYH
IWVHWEDFNIURPSURSHUW\OLQHVDEXWWLQJUHVLGHQWLDOO\]RQHG
SURSHUW\DQGWKH'DYLV5RDGULJKWRIZD\
IWVHWEDFNIURPSURSHUW\OLQHVDEXWWLQJQRQUHVLGHQWLDOO\
]RQHGSURSHUW\DQGWKH6HUYLFH5RDGULJKWRIZD\
67$))&200(176WDIIKDGUHFRPPHQGHGDIW
VHWEDFN IURP DOO H[WHUQDO SURSHUW\ OLQHV DEXWWLQJ
UHVLGHQWLDOO\]RQHGSURSHUW\DVZHOODVWKHULJKWRIZD\
RI'DYLV5RDGIRUVWUXFWXUHVDQGYHKLFXODUXVHDUHDV
LL 9HKLFXODUXVHDUHDVVKDOOREVHUYH
IWVHWEDFNIURPSURSHUW\OLQHVDEXWWLQJUHVLGHQWLDOO\]RQHG
SURSHUW\DQGWKH'DYLV5RDGULJKWRIZD\
IWVHWEDFNIURPSURSHUW\OLQHVDEXWWLQJQRQUHVLGHQWLDOO\
]RQHGSURSHUW\DQGWKH6HUYLFH5RDGULJKWRIZD\
67$))&200(176WDIIKDGUHFRPPHQGHGDIW
VHWEDFNIRUYHKLFXODUDUHDVEHREVHUYHGIURP6HUYLFH
5RDG7KLVZDVFRQVLVWHQWZLWKDUHFRPPHQGDWLRQIRU
DIWODQGXVHEXIIHUDORQJWKHURDGZD\DVZHOO
G 2SHQ6SDFHDFUHVRIODQGZLWKLQWKH3URMHFWVKDOOEHSUHVHUYHG
DVRSHQVSDFHDUHD
67$)) &200(17 6WDII KDG UHFRPPHQGHG DQ RSHQ VSDFH
UHTXLUHPHQWRIDFUHVRUIRUWKH3URMHFW
,9 6,7(3/$1
D $OOVLWHSODQVSURSRVLQJGHYHORSPHQWZLWKLQWKH3URMHFWVKDOOEHUHYLHZHG
E\ 7RZQ RI +LOOVERURXJK VWDII DV SDUW RI H[LVWLQJ FRXUWHV\ UHYLHZ
DJUHHPHQWV
E $OOVLWHSODQVVKDOOSURYLGHGHWDLOGHQRWLQJWKHDQWLFLSDWHGGDLO\ZDWHUDQG
VHZHUQHHGVIRUSURSRVHGODQGXVHV
F 3ULRUWRWKHDSSURYDORIDVLWHSODQDOORZLQJGHYHORSPHQWZLWKLQWKH3URMHFW
WKH &RXQW\ ZLOO QHHG GRFXPHQWDWLRQ IURP WKH 7RZQ RI +LOOVERURXJK
LQGLFDWLQJWKHUHLVVXIILFLHQWZDWHUDQGVHZHUFDSDFLW\WRVHUYHWKHSURMHFW
$ODFNRIZDWHUDQGRUVHZHUFDSDFLW\IRUDSURSRVHGXVHVKDOOUHVXOWLQWKH
GHQLDORIWKHVLWHSODQ
113
G 7KH 2UDQJH &RXQW\ DQG 7RZQ RI +LOOVERURXJK )LUH 0DUVKDOVLQ
FRQVXOWDWLRQZLWKWKH7RZQRI+LOOVERURXJK8WLOLW\'LUHFWRUVKDOOUHYLHZDQG
DSSURYHORFDWLRQVRISURSRVHGZDWHUDQGVHZHUOLQHVSULRUWRWKHLQLWLDWLRQ
RIODQGGLVWXUELQJDFWLYLW\
H 7KH2UDQJH&RXQW\DQG7RZQRI+LOOVERURXJK)LUH0DUVKDOVVKDOOUHYLHZ
DQGRIIHUFRPPHQWRQ
L 5RDGOD\RXWDQGFRQVWUXFWLRQPHWKRGRORJ\
LL /RFDWLRQRIILUHODQHV
LLL /RFDWLRQRIILUHK\GUDQWVDQG
LY /RFDWLRQRIWKHSURSRVHGVWDQGSLSHV
DVSDUWRIDOOVLWHSODQUHYLHZ
I (DFKVLWHSODQVKDOOEHUHTXLUHGWRGHPRQVWUDWHFRPSOLDQFHZLWK6HFWLRQ
Environmental Assessment RI WKH 8'2 ,Q WKRVH FDVHV ZKHUH
GHYHORSPHQW H[FHHGV HVWDEOLVKHG WKUHVKROGV D IRUPDO (QYLURQPHQWDO
,PSDFW6WDWHPHQW(,6PD\EHUHTXLUHGDOORZLQJIRUVLWHSODQDSSURYDO
J ,QDGGLWLRQWRWKHVWDQGDUGVGHWDLOHGLQ6HFWLRQRIWKH8'2DOO
ODQGVFDSLQJSODQVVKDOOLQFOXGHLQIRUPDWLRQGHQRWLQJWKHSURSRVHGPHWKRG
RIFDUHLHXQGHUJURXQGVSULQNOHUVPDLQWHQDQFHSHUVRQQHOHWFIRUWKH
GHYHORSPHQW
K ,GHQWLILHGFRQIOLFWVDVVRFLDWHGZLWKODQGVFDSLQJVKDOOEHUHVROYHGSULRUWRWKH
DSSURYDORIWKHVLWHSODQIRUDJLYHQSURMHFW5HTXLUHGSODQWLQJVVKDOOQRWEH
UHGXFHGWRDFFRPPRGDWHDFRQIOLFWZLWKXWLOLWLHVRUURDGZD\LVVXHV
L )RUDOOVLWHSODQVVXEPLWWHGIRUWKH3URMHFWWKH2UDQJH5XUDO9ROXQWHHU)LUH
'HSDUWPHQWVKDOOEHFRQVLGHUHGDPHPEHURIWKH&RXQW\'HYHORSPHQW
$GYLVRU\&RPPLWWHH'$&DVRXWOLQHGLQ6HFWLRQRIWKH8'2
9 3(5)250$1&(67$1'$5'6
D 7KH3URMHFWVKDOOFRPSO\ZLWK6HFWLRQVWKURXJKRIWKH8'2
LQFOXVLYH
E6ROLG:DVWH0DQDJHPHQW7KHIROORZLQJVSHFLILFVWDQGDUGVVKDOODSSO\
L ([WHUQDOVSDFHIRUFROOHFWLRQRIVROLGZDVWHDQGUHF\FODEOHPDWHULDOV
0DWHULDOVFROOHFWHGVKDOOEHFRQVLVWHQWZLWKWKH&RXQW\¶V6ROLG:DVWH
0DQDJHPHQWRUGLQDQFH
LL :DVWH FROOHFWLRQ DUHDV VKDOO EH ORFDWHG LQ VXFK D PDQQHU DVWR
SURYLGHFRQYHQLHQWDFFHVVIRUXVHUVRIWKHIDFLOLW\DQGVDIHSDVVDJH
IRUVHUYLFHYHKLFOHV
114
LLL 7KHIROORZLQJDGGLWLRQDOQRWHVVKDOOEHSURYLGHGRQDQ\VXEPLWWHG
VLWHSODQ
*DWHGHVLJQZLOOLQFOXGHJDWHUHWDLQHUV
,I DQ\ YHKLFOHV DUH SDUNHG LQ WKH UHIXVH RU UHF\FODEOHV
FROOHFWLRQYHKLFOHDFFHVVDUHDWKHFRQWDLQHUVZLOOQRWUHFHLYH
VHUYLFHXQWLOWKHQH[WVFKHGXOHGFROOHFWLRQGD\
67$))&200(176WDIIUHFRPPHQGVYHKLFOHVQRW
EHSDUHGLQDUHDVEORFNLQJSURKLELWLQJDFFHVVWRZDVWH
UHFHSWDFOHV
2UDQJH &RXQW\ ZLOO QRW EH UHVSRQVLEOH IRU DQ\ SDYHPHQW
GDPDJHWKDWPD\UHVXOWIURPVHUYLFHYHKLFOHV
&RQVLVWHQWZLWK&RXQW\UHJXODWLRQVFOHDQZRRGZDVWHVFUDS
PHWDODQGFRUUXJDWHGFDUGERDUGDOOSUHVHQWLQFRQVWUXFWLRQ
ZDVWHPXVWEHUHF\FOHG
&RQVLVWHQWZLWK&RXQW\UHJXODWLRQVDOOKDXOHUVRIFRQVWUXFWLRQ
ZDVWHPXVWEHSURSHUO\OLFHQVHG
67$))&200(171XPEHUVDQGPD\QRWEH
QHFHVVDU\LIWKHµ3URMHFW¶LVUHTXLUHGWRFRPSO\ZLWKWKH
&RXQW\ 6ROLG :DVWH 0DQDJHPHQW RUGLQDQFH DV
LQGLFDWHGKHUHLQ
,Q FDVHV ZKHUH ZDVWH FROOHFWLRQ DUHDV DUH ORFDWHG DFURVV
SURSHUW\OLQHVRUGLVWULFWOLQHVIRUVKDUHGDUHDVWKHGHYHORSHU
VKDOOSUHSDUHDQGUHFRUGDMRLQWDFFHVVDJUHHPHQWDQGD
VKDUHGGXPSVWHUDJUHHPHQWWRDVVXUHWKDWERWKSDUWLHVPD\
XVH WKH SURSRVHG WUDVKUHF\FOLQJ DUHD DQG WKDW LW FDQ EH
VHUYLFHGDFURVVSURSHUW\OLQHV
7KH GHYHORSHU VKDOO UHVHUYH VSDFH ZLWKLQ DOO VROLG ZDVWH
FROOHFWLRQ DUHDV IRU VHJUHJDWHG JUHDVH UHQGHULQJUHF\FOLQJ
FROOHFWLRQ IDFLOLWLHV DQG VKDOO SURYLGH VSDFH IRU VHJUHJDWHG
IRRG ZDVWH FROOHFWLRQ QHDU WKH GHOLYHU\ HQWUDQFH IRU DQ\
EXLOGLQJWKDWKRXVHVSURSRVHVWRLQFOXGHRUPD\DWVRPH
IXWXUHGDWHLQFRUSRUDWHDUHVWDXUDQWFDIHWHULDEDURURWKHU
IRRGVHUYLFHIDFLOLW\DWDQ\WLPH
$OO VROLG ZDVWH FRQWDLQHUV GXPSVWHUV UHF\FOLQJ ELQV HWF
VKDOOEHORFDWHGZLWKLQDQHQFORVXUHEXIIHUHGLQDFFRUGDQFH
ZLWK WKH VWDQGDUGV FRQWDLQHG KHUHLQ DQG PHHWLQJ WKH
IROORZLQJFULWHULD
D /RDGLQJDUHDVVKDOOEHGHVLJQHGDQGVLWXDWHGQRWWR
QHJDWLYHO\DIIHFWDGMDFHQWSURSHUWLHV
E 6ROLGZDVWHHQFORVXUHVVKDOOEHVRORFDWHGDVWRQRW
LPSDFWLQWHUQDOWUDIILFIORZ
115
F /RDGLQJ ]RQHV VKDOO QRW EH ORFDWHG ZLWKLQ DUHDV
GHVLJQDWHGDVKRXVLQJIRUVROLGZDVWHIDFLOLWLHV
F$UFKLWHFWXUDO'HVLJQ7KHIROORZLQJVSHFLILFVWDQGDUGVVKDOODSSO\
L )LQLVKHGEXLOGLQJPDWHULDOVVKDOOEHDSSOLHGWRDOOVLGHVRIDEXLOGLQJ
LL ([WHULRUZDOOPDWHULDOVVKDOOLQFOXGHEXWQRWEHOLPLWHGWR
6WXFFR
&RQFUHWH
7H[WXUHGFRQFUHWH
:RRG
*ODVV
6WHHO
%ULFN
6WRQHDQG
0DVRQU\
LLL 3URKLELWHGGHVLJQHOHPHQWVLQFOXGH
+LJKO\UHIOHFWLYHVXUIDFHV
([SRVHGXQWUHDWHGSUHFLVLRQEORFNZDOOV
%DUEHGZLUH
³6WXFNRQ´PDQVDUGURRIV
0DWHULDOV ZLWK KLJK PDLQWHQDQFH VXFK DV VWDLQHG ZRRG
VKLQJOHV
LY %XLOGLQJFRORUVVKDOOVWULYHWREHKDUPRQLRXVDQGFRPSDWLEOHZLWKWKH
QDWXUDOVXUURXQGLQJVDQGWKHJHQHUDORYHUDOOSDOHWWHVKDOOEHHDUWK
WRQHV SURYLGHG KRZHYHU LW LV UHFRJQL]HG WKDW EXLOGLQJV RIWHQ
LQWHJUDWH FRUSRUDWH LGHQWLW\ DQG QRWKLQJ KHUHLQ VKDOO SUHYHQW WKH
DELOLW\WRXWLOL]HFRUSRUDWHLGHQWLW\FRORUV
67$))&200(17,WLVXQFOHDUKRZWKLVFRQGLWLRQZLOOEH
HQIRUFHG
Y 6LQJOHGRPLQDQWPRQROLWKLFEXLOGLQJPDVVLVQRWDFFHSWDEOH9LVXDO
EUHDNV VKDOO EH XVHG WR SURYLGH µYLVXDO UHOLHI¶ IRU ORQJ EXLOGLQJ
IDFDGHV$FFHSWDEOHWHFKQLTXHVWRSURYLGHYLVXDOEUHDNVLQFOXGHEXW
DUHQRWOLPLWHGWR
&KDQJHVLQKHLJKWDQGWKHKRUL]RQWDOSODQH
&KDQJHVLQ0DWHULDOV
&KDQJHVLQ7H[WXUHV
&KDQJHVLQ&RORU
116
5HYHDOVDQGRU-RJV
8WLOL]DWLRQRIRWKHUDUFKLWHFWXUDOHQKDQFHPHQWV
67$))&200(17,WLVXQFOHDUKRZWKLVFRQGLWLRQZLOOEH
HQIRUFHG 7KHUH LV QR GHILQLWLYH SURSRVHG PHWKRG RI
GHWHUPLQLQJZKHQYLVXDOUHOLHIZLOOEHUHTXLUHG
YL 3ULPDU\EXLOGLQJHQWULHVVKDOOEHUHDGLO\LGHQWLILDEOHDQGZHOOGHILQHG
WKURXJKWKHXVHRISURMHFWLRQVUHFHVVHVFROXPQVURRIVWUXFWXUHVRU
RWKHUGHVLJQHOHPHQWV
YLL ([SDQVLRQV WR DQ H[LVWLQJ EXLOGLQJV VKDOO SURYLGH IRU FRQWLQXLW\
EHWZHHQ WKH H[LVWLQJ EXLOGLQJ DQG WKH SURSRVHG DGGLWLRQ 7KH
DGGLWLRQQHHGQRWVWULFWO\PDWFKWKHH[LVWLQJEXLOGLQJEXWVKDOOLQFOXGH
SURPLQHQWGHVLJQHOHPHQWVRIWKHROGEXLOGLQJWRSURYLGHDUFKLWHFWXUDO
FRPSDWLELOLW\EHWZHHQROGDQGQHZ
67$))&200(17,WLVXQFOHDUKRZWKLVFRQGLWLRQZLOOEH
HQIRUFHG6WDIILVFRQFHUQHGRYHUWKHODFNRIPHDVXUDEOH
VWDQGDUG
viii. Building design/construction shall not unnecessarily preclude
incorporation of alternative energy systems such as solar panels.
67$))&200(17$GGHGWRDGGUHVV3ODQQLQJ%RDUGFRPPHQWV
IURP$XJXVWPHHWLQJ
G/DQGVFDSLQJ%XIIHULQJ
L $OOUHTXLUHGODQGVFDSLQJVKDOOEHLQVWDOOHGDQGPDLQWDLQHGE\WKH
GHYHORSHURUWKHLUVXFFHVVRULQSHUSHWXLW\
LL ([LVWLQJYHJHWDWLRQVKDOOEHSUHVHUYHGLQLGHQWLILHGEXIIHUDUHDVDV
LQGLFDWHGRQWKHDSSURYHGPDVWHUFRQFHSWSODQ,QWKRVHLQVWDQFHV
ZKHUH IROLDJH LV GLVWXUEHG RU QRQH[LVWHQW ODQGVFDSLQJ VKDOO EH
LQVWDOOHGFRQVLVWHQWZLWKWKHIROORZLQJVFKHPDWLF
117
67$))&200(176WDIIUHFRPPHQGVWKHPLQLPXPOLQHDU
IRRWRISODQWLQJEHUHGXFHGWRIWLHWKHQXPEHURIWUHHV
IRUHYHU\IWRIUHTXLUHGEXIIHUDUHDYHUVXVIWDV
SURSRVHGE\WKHDSSOLFDQWFRQVLVWHQWZLWK6HFWLRQ)
RIWKH8'2
67$)) &200(17 6WDII KDV UHFRPPHQGHG D IW
SHULPHWHU EXIIHU EH REVHUYHG IRU SRUWLRQV RI WKH 3URMHFW
DEXWWLQJUHVLGHQWLDOO\]RQHGSURSHUW\DQG'DYLV5RDG
7KHDSSOLFDQWKDVH[SUHVVHGFRQFHUQRYHUWKLVVXJJHVWLRQ
EXWLQGLFDWHGDZLOOLQJQHVVWRGLVFXVVRSWLRQV3DUWRIWKLV
GLVFXVVLRQ LQFOXGHV D UHTXHVW WR PRGLI\ UHTXLUHG
VWUHDPIORRGSODLQEXIIHUUHTXLUHPHQWVGLVFXVVHGEHORZ
LLL ,QWHULRUODQGVFDSLQJVKDOOEHFRQVLVWHQWZLWKWKHIROORZLQJ
3DUNLQJORW
D $WHQIRRWYHJHWDWHGEXIIHUVKDOOEHSURYLGHGEHWZHHQ
YHKLFXODUXVHDUHDVDQGLQWHUQDODFFHVVURDGV
67$))&200(17,WLVUHFRPPHQGHGWKHUH
EH DGGLWLRQDO ODQJXDJH VSHFLI\LQJ WKH W\SH RI
IROLDJH UHTXLUHG LH VKUXEV IORZHULQJ SODQWV
HWF
E 6KDGHWUHHVVKDOOEHSURYLGHGDWDUDWLRRIRQHRQH
DQGRQHKDOILQFK´PLQLPXPFDOLSHUWUHHIRUHYHU\
WHQFDUSDUNLQJVSDFHV&DOLSHUVL]HLVPHDVXUHG
DWWKHWLPHRISODQWLQJ
118
F $OO VLWH SODQV VKDOO GHPRQVWUDWH D PLQLPXP RI VL[W\
SHUFHQWRISDVVHQJHUSDUNLQJVSDFHVDUHZLWKLQ
VHYHQW\ILYHIHHWRIWKHFHQWHURIDVKDGHWUHH,I
QRWDGGLWLRQDOODQGVFDSLQJVKDOOEHUHTXLUHG
67$))&200(176WDIIKDGUHFRPPHQGHG
WKH3URMHFWFRPSO\ZLWKWKHSURYLVLRQVRI
'LQGLFDWLQJWKDWXQGHUQRFLUFXPVWDQFHV
PD\DQ\SDUNLQJVSDFHEHORFDWHGPRUHWKDQ
IWIURPWKHWUXQNRIDFDQRS\WUHH
G 7KHPLQLPXPWUHHSODQWLQJDUHDVKDOOEHVTXDUH
IHHWH[FHSWZKHUHWUHHJUDWHVDUHSURYLGHG
H :KHUHWUHHVDUHSODQWHGZLWKLQWUHHJUDWHVDQGVXUIDFH
SDYLQJ HQFURDFKHV LQWR WKH SODQWLQJ DUHD WKHQ WKH
PLQLPXPSODQWLQJDUHDVKDOOEHVL[WHHQVTXDUH
IHHWLQDUHDE\WZRIHHWLQGHSWK
I 6FUHHQLQJ RI SDUNLQJ DUHDV DORQJ WKH SHULPHWHU
ERXQGDU\RIWKHSURMHFWVKDOOPDLQWDLQDPLQLPXPWUHH
VSDFLQJRIVL[W\IHHW
%XLOGLQJIRXQGDWLRQ
D 7ZHQW\SHUFHQWRIDEXLOGLQJ¶VSHULPHWHUVKDOOEH
ODQGVFDSHGZKLOHPDLQWDLQLQJWKHQHFHVVDU\VLGHZDON
DUHD
E 7KHVHDUHDVPD\FRQVLVWRIODZQSODQWHUVRUVKUXE
DUHDV VR ORQJ DV WKH VKUXE DUHDV WKDW KDYH WR EH
WZHQW\IRXULQFKHV´PLQLPXPLQZLGWKFRPSULVHD
PLQLPXPRIWZHQW\SHUFHQWRIWKHWRWDOOLQHDU
GLPHQVLRQDORQJWKHEXLOGLQJ¶VSHULPHWHU
:LWKUHVSHFWWRLQWHUQDOVWUHHWODQGVFDSLQJWKHUHVKDOOEHRQH
WUHHDWDRQHLQFK´FDOLSHUSURYLGHGHYHU\RQHKXQGUHG
IHHW
$OOJURXQGOHYHO+9$&PHFKDQLFDOHTXLSPHQWFDELQHWVVROLG
ZDVWH FRQWDLQHUV GXPSVWHUV UHF\FOLQJ ELQV HWF VKDOO EH
VFUHHQHGIURPYLHZWKURXJKWKHXVHRIODQGVFDSLQJZDOOV
DQGRUIHQFLQJLQDFFRUGDQFHZLWK6HFWLRQRIWKH8'2
LY 7KH3URMHFWVKDOOFRPSO\ZLWKWKHSURYLVLRQVRI6HFWLRQRIWKH
8'2 UHODWHG WR SUHVHUYDWLRQ RI UHTXLUHG EXIIHUV ZLWKLQ WKH 0DMRU
7UDQVSRUWDWLRQ&RUULGRU07&RYHUOD\GLVWULFW7KLVLQFOXGHVWKH
DELOLW\WRFUHDWHYLVXDOEUHDNVLQWKHEXIIHULQDFFRUGDQFHZLWK6HFWLRQ
$
119
H3DUNLQJ
L 3DUNLQJORWGHVLJQDQGOD\RXWVKDOOEHLQDFFRUGDQFHZLWK6HFWLRQ
RIWKH8'2
LL VSDFHVKDOOEHUHTXLUHGIRUHYHU\VTIWRIRIILFHVSDFH
LLL VSDFHSHUVTIWRIDGGLWLRQDOLQGRRUDUHDH[FOXVLYHRIRIILFH
DUHD
67$)) &200(17 7KH SURSRVHG VWDQGDUG GRHV QRW
DGGUHVVDOODQWLFLSDWHGODQGXVHVIRUWKH3URMHFW
6WDII KDV UHFRPPHQGHG WKH DSSOLFDQW FRPSO\ ZLWK WKH
SURYLVLRQVRI6HFWLRQRIWKH8'2VSHFLILFDOO\
x *HQHUDO2IILFHDQG6HUYLFH8VHVVSDFHIRUHYHU\
VTIWRIJURVVIORRUDUHD
x 0HGLFDO2IILFHVSDFHIRUHYHU\VTIWRIJURVV
IORRUDUHD
x 0DQXIDFWXULQJVSDFHSHUHPSOR\HHRQWKHVKLIW
RIPD[LPXPHPSOR\PHQW
x 5HWDLOVSDFHIRUHYHU\VTIWRIVTIWRI
JURVVIORRUDUHD
x :KROHVDOH 7UDGH VSDFH SHU HPSOR\HH RQ
PD[LPXPVKLIWSOXVVSDFHV
x 5HVHDUFKVSDFHSHUHPSOR\HH
x 'LVWULEXWLRQ)XOILOOPHQW 2SHUDWLRQV VSDFH SHU
HPSOR\HHRQWKHVKLIWRIPD[LPXPHPSOR\PHQW
8OWLPDWHO\ UHTXLUHG SDUNLQJ VWDQGDUGV QHHGV WR UHIOHFW
DOORZDEOHODQGXVHVZLWKLQWKHSURMHFWLHWKHUHQHHGVWREH
DSDUNLQJVWDQGDUGDGGUHVVLQJDOODQWLFLSDWHGODQGXVHVWREH
GHYHORSHGZLWKLQWKH3URMHFW
I6LJQDJHUHYLHZRIWKHDSSOLFDQW¶VSURSRVDOLVVWLOORQJRLQJ
J/LJKWLQJ
L /LJKWLQJSODQVVKDOOEHSUHSDUHGLQDFFRUGDQFHZLWK6HFWLRQRI
WKH8'2
LL $OOOLJKWLQJVKDOOEHIXOOFXWRIIIL[WXUHV
LLL /LJKWLQJLQSDUNLQJDUHDVVKDOOREVHUYHDKHLJKWOLPLWRIIW
LY $OOOLJKWLQJVKDOOFRPSO\ZLWKPD[LPXPIRRWFDQGOHOLPLWVDWSURSHUW\
OLQHVDVQRWHGLQ6HFWLRQ$RIWKH8'2
Y /LJKWLQJZLWKLQWKH3URMHFWVKDOODELGHE\WKHVWDQGDUGVGHWDLOHGLQ
6HFWLRQRIWKH8'2
120
K6WUHDP%XIIHUV7KH3URMHFWVKDOOFRPSO\ZLWKWKHSURYLVLRQVRI6HFWLRQ
RIWKH8'2
67$)) &200(17 7KH DSSOLFDQW KDG LQTXLUHG DERXW UHGXFLQJ
UHTXLUHGVWUHDPIORRGSODLQEXIIHUVWRDPLQLPXPVWDQGDUGRIIW
7KLVZDVVXJJHVWHGDVDZD\RIDOORZLQJIRUDSHULPHWHUEXIIHURI
IWDVUHTXHVWHGE\VWDII
$WWKLVWLPHVWDIIKDVQRWPDGHDGHWHUPLQDWLRQRQWKLVUHTXHVWEXW
EHOLHYHVLWZDUUDQWVGLVFXVVLRQ
L6WRUPZDWHUUHJXODWLRQV7KH3URMHFWVKDOOFRPSO\ZLWKWKHSURYLVLRQVRI
6HFWLRQRIWKH8'2
M(URVLRQ&RQWUROUHJXODWLRQV7KH3URMHFWVKDOOFRPSO\ZLWKWKHSURYLVLRQV
RI6HFWLRQRIWKH8'2
N)ORRGUHJXODWLRQV7KH3URMHFWVKDOOFRPSO\ZLWKWKHSURYLVLRQVRI6HFWLRQ
RIWKH8'2
9, 3(50,77('$1'352+,%,7('/$1'86(6
67$))&200(177KHUHLVQRFRQFHUQRYHUWKHSURSRVHGODQG
XVHVPRVWRIZKLFKZRXOGEHSHUPLWWHGXQGHUWKH&RXQW\¶VJHQHUDO
XVH]RQLQJGHVLJQDWLRQIRUWKHSURSHUW\LH('+RU('+6WDII
KDV H[SUHVVHG UHVHUYDWLRQV ZLWK UHVSHFW WR WKH IRUPDW RI KRZ
SHUPLWWHGSURKLELWHGODQGXVHVDUHOLVWHG
D0DQXIDFWXULQJ/DQGXVHVFDWHJRU\DVVRFLDWHGZLWKDVVHPEO\UHSDLURU
VHUYLFLQJ RI LQGXVWULDO EXVLQHVV RU FRQVXPHU PDFKLQHU\ HTXLSPHQW
SURGXFWV RU E\SURGXFWV PDLQO\ E\ SURYLGLQJ FHQWUDOL]HG VHUYLFHV IRU
VHSDUDWHUHWDLORXWOHWV&RQWUDFWRUVDQGEXLOGLQJPDLQWHQDQFHVHUYLFHVDQG
VLPLODUXVHVSHUIRUPVHUYLFHVRIIVLWH
3HUPLWWHGXVHVE\ZD\RIH[DPSOHDQGQRWOLPLWDWLRQLQFOXGHWKHIROORZLQJ
L %RWWOLQJ
LL %UHZHU\ZLQHU\GLVWLOOHU\FLGHU\ZLWKWDVWLQJVDPSOLQJIDFLOLWLHVDQG
DVVRFLDWHGUHWDLOVDOHV
LLL %XVRUUDLOWUDQVLWYHKLFOHPDLQWHQDQFHRUVWRUDJHIDFLOLW\
LY &RQWUDFWRUV VWRUDJH LQFOXGLQJ MDQLWRULDO DQG EXLOGLQJ PDLQWHQDQFH
VHUYLFHH[WHUPLQDWRURURWKHUPDLQWHQDQFH\DUGRUIDFLOLW\EXLOGLQJ
KHDWLQJSOXPELQJODQGVFDSLQJRUHOHFWULFDOFRQWUDFWRUDQGRWKHUV
ZKRSHUIRUPVHUYLFHVRIIVLWHEXWVWRUHHTXLSPHQWDQGPDWHULDOVRU
SHUIRUPIDEULFDWLRQRUVLPLODUZRUNRQVLWH
Y )RRGDQGEHYHUDJHSURGXFWV
YL /DZQWUHHRUJDUGHQVHUYLFH
YLL /DXQGU\GU\FOHDQLQJDQGFDUSHWFOHDQLQJSODQWV
YLLL /HDWKHUDQGOHDWKHUSURGXFWVH[FHSWWDQQLQJ
121
L[ 6KHHWPHWDOZHOGLQJPDFKLQHWRROUHSDLUVKRSRUVWXGLR
[ 6WRQHFOD\JODVVDQGFRQFUHWHSURGXFWV
[L :RRGZRUNLQJLQFOXGLQJFDELQHWPDNHUVDQGIXUQLWXUHPDQXIDFWXULQJ
[LL )DEULFDWHGPHWDOSURGXFWVDQGPDFKLQHU\
[LLL ,QGXVWULDOVLJQPDNLQJ
[LY /HDWKHUDQGOHDWKHUSURGXFWVLQFOXGHVWDQQLQJDQGILQLVKLQJ
67$)) &200(17 7KLV DOORZDQFH DSSHDUV LQFRQVLVWHQW
ZLWKWKHXVHGHVFULEHGLQYLLLDERYH
[Y 0DQXIDFWXUHGRUPRGXODUKRXVLQJVDOHV
[YL 3ULPDU\PHWDOPDQXIDFWXULQJ
E/LJKW 0DQXIDFWXULQJ /DQG XVH FDWHJRU\ DVVRFLDWHG ZLWK IDFLOLWLHV
FRQGXFWLQJOLJKWPDQXIDFWXULQJRSHUDWLRQVZLWKLQDIXOO\HQFORVHGEXLOGLQJ
3HUPLWWHGXVHVLQFOXGHE\ZD\RIH[DPSOHDQGQROLPLWDWLRQWKHIROORZLQJ
L &ORWKLQJWH[WLOHDSSDUHOPDQXIDFWXULQJ
LL )DFLOLWLHV HQJDJHG LQ WKH DVVHPEO\ GHVLJQ UHSDLU RU WHVWLQJ RI
DQDO\]LQJRUVFLHQWLILFPHDVXULQJLQVWUXPHQWVVHPLFRQGXFWRUDQG
UHODWHG VROLG VWDWH GHYLFHV LQFOXGLQJ EXW QRW OLPLWHG WR FORFNV
LQWHJUDWHG PLFURFLUFXLWV MHZHOU\ PHGLFDO PXVLFDO LQVWUXPHQWV
SKRWRJUDSKLFRURSWLFDOLQVWUXPHQWVDQGWLPLQJLQVWUXPHQWV
LLL 2IILFHVKRZURRPZDUHKRXVH
LY 3ULQWLQJSXEOLVKLQJDQGOLWKRJUDSK\
Y 3URGXFWLRQRIDUWZRUNDQGWR\VJUDSKLFGHVLJQVLJQPDNLQJPRYLH
SURGXFWLRQIDFLOLW\SKRWRILQLVKLQJODERUDWRU\
YL 5HSDLURIVFLHQWLILFRUSURIHVVLRQDOLQVWUXPHQWVDQGHOHFWULFPRWRUV
F5HVHDUFKDQG'HYHORSPHQW/DQGXVHFDWHJRU\DVVRFLDWHGZLWKIDFLOLWLHV
IRFXVHGSULPDULO\RQWKHUHVHDUFKDQGGHYHORSPHQWRIQHZSURGXFWV7KLV
LQFOXGHVDVVRFLDWHGPDQXIDFWXULQJRSHUDWLRQVIRUVDLGSURGXFWV
3HUPLWWHGXVHVLQFOXGHE\ZD\RIH[DPSOHDQGQRWOLPLWDWLRQWKHIROORZLQJ
L /DERUDWRULHV RIILFHV DQG RWKHU IDFLOLWLHV XVHG IRU UHVHDUFKDQG
GHYHORSPHQW E\ RU IRU DQ\ LQGLYLGXDO RUJDQL]DWLRQ RU FRQFHUQ
ZKHWKHUSXEOLFRUSULYDWH
LL 3URWRW\SHSURGXFWLRQIDFLOLWLHVWKDWPDQXIDFWXUHDOLPLWHGDPRXQWRI
DSURGXFWLQRUGHUWRIXOO\LQYHVWLJDWHWKHPHULWVRIVXFKDSURGXFW
LLL 3LORWSODQWVXVHGWRWHVWPDQXIDFWXULQJSURFHVVHVSODQQHGIRUXVHLQ
SURGXFWLRQHOVHZKHUH
122
G:DUHKRXVLQJ6WRUDJH /DQG XVH FDWHJRU\ DVVRFLDWHG ZLWK IDFLOLWLHV
SURYLGLQJVHSDUDWHVWRUDJHDUHDVIRUSHUVRQDORUEXVLQHVVXVHGHVLJQHGWR
DOORZSULYDWHDFFHVVE\WKHWHQDQWIRUVWRULQJRUUHPRYLQJSHUVRQDOSURSHUW\
3HUPLWWHGXVHVLQFOXGHE\ZD\RIH[DPSOHDQGQRWOLPLWDWLRQWKHIROORZLQJ
L :DUHKRXVHVHOIVHUYLFH
LL )XOO\HQFORVHGLQGRRUPXOWLVWRU\VWRUDJH
LLL 0LQLZDUHKRXVH
H:DUHKRXVLQJ'LVWULEXWLRQ6HUYLFHV/DQGXVHFDWHJRU\DVVRFLDWHGZLWK
IDFLOLWLHVLQYROYHGLQWKHVWRUDJHRUPRYHPHQWRIJRRGVIRUWKHPVHOYHVRU
RWKHU ILUPV *RRGV DUH JHQHUDOO\ GHOLYHUHG WR RWKHU ILUPV RU WKH ILQDO
FRQVXPHUZLWKOLWWOHRQVLWHVDOHVDFWLYLW\WRFXVWRPHUV
3HUPLWWHGXVHVLQFOXGHE\ZD\RIH[DPSOHDQGQRWOLPLWDWLRQWKHIROORZLQJ
L %XONVWRUDJHLQFOXGLQJQRQIODPPDEOHOLTXLGVFROGVWRUDJHSODQWV
LQFOXGLQJIUR]HQIRRGORFNHUVKRXVHKROGPRYLQJDQGJHQHUDOIUHLJKW
VWRUDJHVHSDUDWHZDUHKRXVHXVHGE\UHWDLOVWRUHVXFKDVIXUQLWXUH
RUDSSOLDQFHVWRUH
LL &RPPHUFLDOSDFNLQJIRUIUXLWVDQGYHJHWDEOHV
LLL 'LVWULEXWLRQIDFLOLW\FHQWUDOSRVWDOIDFLOLW\
LY )UHLJKWVHUYLFHIDFLOLW\
Y 3DUFHOVHUYLFHV
YL 7UDQVIHUDQGVWRUDJHEXVLQHVVZKHUHWKHUHDUHQRLQGLYLGXDOVWRUDJH
DUHDVRUZKHUHHPSOR\HHVRUDXWRPDWLRQDUHWKHSULPDU\PRYHUVRI
WKHJRRGVWREHVWRUHGRUWUDQVIHUUHG
YLL 7UDLOHUVWRUDJHGURSRIIORW
YLLL 7UXFNRUPRWRUIUHLJKWWHUPLQDOFURVVGRFNLQJRUVHUYLFHIDFLOLW\
L[ 7UXFNLQJRSHUDWLRQ
[ :DUHKRXVH
I:KROHVDOH7UDGH/DQGXVHFDWHJRU\DVVRFLDWHGZLWKIDFLOLWLHVLQYROYHGLQ
WKHVDOHOHDVHRUUHQWRISURGXFWVWRLQGXVWULDOLQVWLWXWLRQDORUFRPPHUFLDO
EXVLQHVVHV7KHXVHHPSKDVL]HVRQVLWHVDOHVRURUGHUWDNLQJDQGRIWHQ
LQFOXGHVGLVSOD\DUHDV%XVLQHVVHVPD\RUPD\QRWEHRSHQWRWKHJHQHUDO
SXEOLF3URGXFWVPD\EHSLFNHGXSRQVLWHRUGHOLYHUHGWRWKHFXVWRPHU
3HUPLWWHGXVHVLQFOXGHE\ZD\RIH[DPSOHDQGQRWOLPLWDWLRQWKHIROORZLQJ
L 0DLORUGHUKRXVH
LL 6DOHRUUHQWDORIPDFKLQHU\HTXLSPHQWKHDY\HTXLSPHQWEXLOGLQJ
PDWHULDOV VSHFLDO WUDGH WRROV ZHOGLQJ VXSSOLHV PDFKLQH SDUWV
123
HOHFWULFDOVXSSOLHVSOXPELQJVXSSOLHVMDQLWRULDOVXSSOLHVUHVWDXUDQW
HTXLSPHQWDQGVWRUHIL[WXUHV
LLL :KROHVDOHVDOHVRIIRRGFORWKLQJDXWRSDUWVEXLOGLQJKDUGZDUHDQG
VLPLODUSURGXFWV
J2WKHU )DFLOLWLHV LQFOXGLQJ E\ ZD\ RI H[DPSOH DQG QRW OLPLWDWLRQ WKH
IROORZLQJ
L &XVWRPDU\$FFHVVRU\8VHVWR3ULQFLSDOODQGXVHVGHYHORSHGRQVLWH
LL *RYHUQPHQW)DFLOLWLHVDQG2IILFH%XLOGLQJV
LLL *RYHUQPHQW3URWHFWLYH6HUYLFHV
LY %XV3DVVHQJHU6KHOWHU
Y 6XUIDFHDQGVWUXFWXUHSDUNLQJDVSULQFLSDOXVH
YL 0DLONLRVNVIRUFHQWUDOPDLOSLFNXS
YLL (OHYDWHG:DWHU6WRUDJH7DQNV
YLLL 3XEOLF RSHQ VSDFH IRU XVH RI RQVLWH EXVLQHVVHV HPSOR\HHV RI
VDPHDQGFXVWRPHUVUDWKHUWKDQWKHJHQHUDOSXEOLF
L[ 1DWXUDODQGPDQPDGHSHGHVWULDQELF\FOHSDWKV
K3URKLELWHG/DQG8VHV7KHIROORZLQJODQGXVHFDWHJRULHVDQGRUVSHFLILF
ODQGXVHVDUHH[SUHVVO\SURKLELWHGIURPGHYHORSLQJZLWKLQWKH3URMHFW
L $QLPDO6ODXJKWHULQJDQG3URFHVVLQJ
LL 9HJHWDEOH)DWV2LO0DQXIDFWXULQJDQG3URFHVVLQJ
LLL &RQFUHWH%DWFKLQJ3ODQW
LY /HDWKHUDQG+LGH7DQQLQJ
67$)) &200(17 6WDII DJUHHV WKH XVH VKRXOG EH
SURKLELWHG+DYLQJVDLGWKDWWKHUHLVODQJXDJHLQWKHSURSRVHG
DOORZDEOH XVHV LQGLFDWLQJ VXFK RSHUDWLRQV ZRXOG EH
SHUPLWWHG7KHDSSOLFDQWZLOOQHHGWRFODULI\
Y 3HWUROHXP DQG &RDO 3URFHVVLQJ 3UHSDUDWLRQ DQG 'LVWULEXWLRQ
LQFOXGLQJEXWQRWOLPLWHGWR$VSKDOW3ODQWV
YL 3XOS3DSHUDQG3DSHUERDUG0LOOV
YLL 6DZPLOOV
YLLL 8UDQLXP0LQLQJ
67$))&200(176WDIIVXJJHVWVµ0LQLQJ¶LQJHQHUDOEH
SURKLELWHG$VZULWWHQLWFRXOGEHDUJXHGQRQXUDQLXPPLQLQJ
RSHUDWLRQVZRXOGEHDOORZHG
L[ /DQGILOOV
[ %RG\DOWHUDWLRQLHWDWWRRDUWLVWERG\SLHUFLQJHWF
124
[L &HPHWHU\
[LL &UHPDWRULD
[LLL )XQHUDO+RPH
[LY 3DZQVKRS3D\GD\/RDQ
[Y -XQN6DOYDJH\DUG
[YL 0DVVDJH%XVLQHVV
[YLL 6H[XDOO\2ULHQWHG%XVLQHVV
9,, 87,/,7,(6
D 'HYHORSPHQWZLWKLQWKH3URMHFWVKDOOEHVHUYHGE\SXEOLFZDWHUDQGVHZHU
VHUYLFHV DV SURYLGHG DQG PDLQWDLQHG E\ WKH 7RZQ RI +LOOVERURXJK
DGGLWLRQDODQGRUDOWHUQDWLYHZDWHUDQGRUZDVWHZDWHUV\VWHPVVKDOOQRWEH
SHUPLWWHG
E $ZULWWHQVLJQHGDJUHHPHQWEHWZHHQDGHYHORSHU2UDQJH&RXQW\DQGWKH
7RZQRI+LOOVERURXJKVKDOOEH H[HFXWHGGHVFULELQJWKHWLPLQJSKDVLQJ
GHVLJQDQGILQDQFLQJRISXEOLFZDWHUGLVWULEXWLRQDQGSXEOLFVDQLWDU\VHZHU
FROOHFWLRQPDLQV
F :DWHUV\VWHPVDQGZDWHUSUHVVXUHVKDOOFRPSO\ZLWKDOODSSOLFDEOH7RZQRI
+LOOVERURXJK XWLOLW\ VWDQGDUGV EXLOGLQJ DQG ILUH FRGHV EDVHGRQ WKH
SURSRVHGODQGXVH
G 6L]LQJORRSLQJRIXWLOLW\OLQHVVKDOOEHEDVHGRQWKHSURSRVHGGHYHORSPHQW
LQFOXGLQJ ZDWHU IORZ WHVW GDWD DQG VKDOO EH UHYLHZHG DQG DSSURYHG E\
&RXQW\ VWDII 7RZQ RI +LOOVERURXJK 3ODQQLQJ 'LUHFWRU DQG WKH 7RZQ RI
+LOOVERURXJK8WLOLW\'LUHFWRU
H )LUHIORZWHVWVRIDOOLQVWDOOHGK\GUDQWVVKDOOEHFRQGXFWHGLQFRRUGLQDWLRQ
ZLWKWKH7RZQRI+LOOVERURXJKDQG2UDQJH&RXQW\(PHUJHQF\6HUYLFHVWR
HQVXUHFRPSOLDQFHZLWKDSSOLFDEOH6WDWH)LUH&RGHVWDQGDUGV
9,,, 27+(5
a. No permanent fuel or chemical storage shall occur within 30 ft. of a
floodplain/stream buffer established consistent with the provisions of
Section 6.13 of the County UDO.
b. A minimum of 2 electrical vehicle charging stations shall be installed for
every building constructed on-site. Additional stations may be proposed as
part of the site plan review process.
67$))&200(17$GGHGWRDGGUHVV3ODQQLQJ%RDUGFRPPHQWVIURP
$XJXVWPHHWLQJ
125