HomeMy WebLinkAboutAgenda - 06-19-2001-8eORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: June 19, 2001
Action Agenda
Item No. $~- P~
SUBJECT: Petition for Addition of Subdivision Roads to the State Maintenance Program: Wendy
Lane (Cheeks Township) and Maple Ridge Drive (Chapel Hill Township)
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Petition letters, Secondary Rd. Addition Reports, and
vicinity maps for
1. Wendy Lane
2. Maple Ridge Drive
INFORMATION CONTACT:
Karen Lincoln Ext. 2594
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane (336)227-2031
PURPOSE: To consider petitions to add Wendy Lane, Cheeks Township, and Maple Ridge
Drive, Chapel Hill Township, to the State-maintained Secondary Road System.
BACKGROUND: Wendv Lane: Residents of Wendy Lane (10 homes) in Mt. Willing's Summit
Subdivision have petitioned NCDOT to accept maintenance responsibilities for Wendy Lane. Mt.
Willing's Summit Subdivision, approved by the Board in 1994, is located on the north side of Mt.
Willing Road (SR 1120) between the intersections of Mt. Willing Road with Chestnut Ridge Church
Road and Holmes Road.
Maple Ridge_Drive: Residents of Maple Ridge Drive (9 homes) in Tupelo Ridge II Subdivision have
petitioned NCDOT to accept maintenance responsibilities for that road. Tupelo Ridge II, approved
by the Board in 1997, is located on the east side of Union Grove Church Road (SR 1111) south of
the intersection of Union Grove Church Road and Albert Road.
NCDOT has investigated these requests (see attached Secondary Road Addition Reports) and has
submitted the petitions to the Board of Commissioners for its review and approval. The Board must
take an administrative action to approve the petitions to NCDOT in order for NCDOT to accept
Wendy Lane and Maple Ridge Drive into the State Maintenance Program.
FINANCIAL IMPACT: There is no direct financial impact associated with this decision item.
RECOMMENDATION(S): The Administration recommends that the Board approve the request to
add Wendy Lane and Maple Ridge Drive to the State Secondary Road Maintenance Program.
2
d M XIJEa~
re
ti
r+:~
•0~~.
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EA5LEY LYNDO TIPPETT
GOVERNOR SECRETARY
May 3, 2o0i
ORANGE COUNTY
Mr. John M. Link, Jr., Manager
Orange County
106 E. Margaret Lane
Hillsborough, NC 27278
Subject: Petition for Addition
Wendy Lane
Cheeks Township
Dear Mr. Link:
Attached is Form SR-4, Secondary Road Addition Investigation Report, for the above subject
road, and a location map.
This is being forwarded to you for review by your Board of Commissioners.
Yours very truly,
c.~ .~
D. Chad Kimes
DISTRICT ENGINEER
/kww
Attachment(s)
P. O. BOX 76G, GRAHAM, NC 27253-07b6
NORTH CAROLINA STATE DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SECONDARY ROAD ADDITION INVESTIGATION REPORT
County Oran e Co. File No.
Township Cheeks Div. File No.
Date
Local Name Wend Lane Subdivision Name Mt_Willing Summit
Length 0.35 rni Width 16' Type I-2 Condition Good
Is this a subdivision street subject to the construction requirements for such
streets? yes Recording Date 11-10-94 Book 72 Page 124
Number of homes having entrances into road 10
Other uses having entrances into road none
Right-of-Way Width SO' If right-of-way is below the desired width,
give reasons under "Remarks and Recommendations."
Is petition (SR-1) attached? ~s _
Is the County Commissioners Approval (SR-2) attached? e~Ls
If not, why?
Is a map attached indicating information for reference in locating road by the
Planning Department? ves
Cost to place in acceptable maintenance condition: Total Cost $ NA
Grade, drain, stabilize $ NA ,Drainage $ NA ,Other $ NA
Remarks and Recommendations Road meets minimum re- uirements. Recommend
addition.
Reviewed and Approved
BOARD OF TRANSPORTATION MEMBER
Reviewed and Approved
!. M. MiIIs.P.$.
DNISION ENGINEER
~~,~ LLB" D. Chad Kimes
DISTRICT ENGINEER
See attached
(Do not write in this space-
For use of Secondary Roads Dept.)
Petition No.
(Do not write in this space -
For use of Planning Dept.)
3
QFi'.aNGt \ ~
13~ 1 U !r-~ ~'
1323 ~
~ c? ~ ` Fj r 1 CA i
1 d'
r
• Kann~dq r I `~$'S
c~ 1332 ~ .. V . ,~ -
.7 1341 ~ ~ / `• ~ 1
' . •`~
1~L I GYJa •~.~ ~• ,~ 133'3 I • ~/ -
1
. 7 ` 1
.2 1 _~-- ~ y N t5S a .~
lat4 ~' •-~ ~ ~
141!5 ~ ~
1418 ~ ~ t ~~\
. I a 1335 1 1 / 1 ~ S7
415 •~ 1334 1
1339 "~ ;~. Fvlr ftelb •'~ ~ 13~
. 1 ~ ' `~ . e I"3 ~ C h. ~ x 1332 'S ~ J -+ 2 6
337 ~ / `;~
1342 ,}, 1333 ~p ~
J 1341 I'~ I ( '- ~~ ~ ,.=_-'- -
O 1338 ~ ~ 13;9 ~ ~ "~ 1•~- -IG~
•3 .8 r„ 13'...2' ~ ~ ,
1 3C6 • 2 -- - ,-----1•----
. _ 133Fa ~~~ ~ .
_. • ,y 'S ~
13 I Z I ~~ ',,,
1 39 1 .''1 • ~ /
~ I ~ y ` ~~
7v ~~ ~ _ Q I 1~ --
~I+/'~ I ~r 1)
_ r ~~~.
1 a5 -~--; ___ .~ rv ~- ~ ~~ ' ~~a; - ~ ~'~~ i ~ 1 POP. 5.
v , ~
~' 1 -
\1 lip ~ ;• •I .1/ ~ -`. / ~ l,~ ~ ~ `f •
h 3'' ' -,.. / ''Q ' ~
f
chum ~-~~ ~ / I `'~ N
1176 1 ~ ,f
•~ ~ •. ~
~ ~~ .7 I ~ N
~,,~ ~ /
~ ~ f ~ I~51 1129
ila •~ •
-.. ~~
i ~~ ~ J e, 0106 ~ ~~' I ~~3
WENDY LANE, MT. WILLING'S SUMMIT SUBDIVISION
6
+~4~
w,.
•i y.,,d•
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR SECRETARY
May 4, 2001
ORANGE COUNTY
Mr. John M. Link, Jr., Manager
Orange County
106 E. Margaret Lane
Hillsborough, NC 27278
Subject: Petition for Addition
Maple Ridge Drive
Chapel Hill Township
Dear Mr. Link:
Attached is Form SR-4, Secondary Road Addition Investigation Report, for the above subject
road, and a location map.
This is being forwarded to you for review by your Soard of Commissioners.
Yours very truly,
1 . at ~--r~
~•
D. Chad Kimes
DISTRICT ENGINEER
/kww
Attachment(s)
P. O. BOX 766, GRAHAM, NC 27253.0766
North Carolina Department of Transportation
Division of Highways
Secondary Road Addition Investigation Report
County Oran a Co. File No.
Date
Township Chapel Hill Div. File No. Div. #
Local Name Maple Ridge Drive ~~ Subdivision Name Tu elo Rid a II
Length 0.27 mi Width 20' Type I-2 Condition Good
Is this a subdivision street subject to the construction requirements for such streets? Yes
Recording Date 08-08-97 Book 78
Number of homes having entrances into road
Other uses having entrances into road none
Page 175
9 -
If right-of-way is below the desired width, give reasons
Right-of-Way Width 50' under "Remarks and Recommendations."
Is petition (SR-1) attached? es
Is the County Commissioners Approval (SR-2) attached? '' es~~ if not, why not?
Is a map attached indicating information for reference in locating road by the
Planning Department? es
Cost to place in acceptable maintenance condition: Total Cast
Grade, drain, stabilize $0
Remarks and Recommendations
$0
Drainage $0 Other $0
Road meets minimum requirements. Recommend addition.
Submitted by
D, Chad Kimes Reviewed and Approved J.M, Mi11s,PE
iINEER _ DIVISIQN ENGINEER
Reviewed and Approved
BOARD OF TRANSPORTATION MEMBER
See attached
(Do not write in this space ~ For use of Secondary
Roads Dept.
Petition No.
(Do not write in this space -For use of Planning
Dept.)
7
Farm SR-4 (1/2001)
/ •'~ 12t2
~
; 8
~
.
~~ ' ~ 1727
\
12
1179
~ ry
a ' 1 B60
~ , 18~q
•~
~ II13 lllt o
I 186I~
1
'
_ I
I~
~_
I
. V '
•\
' 01
~ ~ ~
2<~6
r $
\
Q ' 2C~C
7263
~ ~ ~
1113
. ~
~ 1
• ~ -.~ ,`
.
I ,` ~_ '
~ ~
\. I 1111 ~ \ ~
3
1194 ~
.
..^ ~
~ I
1
~
IIp4 ~ 1241 $ .~ 1231 •~ ~ ~
~ ~ ~ 1233 I 1 Ga /
. 1234 ~ 1 ~ I /
~
. ~ ~„
~,
I IZ3Q
~
Coh~and~r
I
\ I ,
I
^~'~ ~ ~ , I
.4 I
~ ~ I
1009 \ ~
/ 1
( 1 I
/~ \
~ ~
1
1 /
,
I
~ 1
~.~
\
t ~~Lw~ ~~
1 `
O~
1` ~ ~
1;
144A ~ .r, ~ „~ ~ ~ ' ~ 1005
~ ~~ ~
MAPLE RIDGE DRIVE, TUPELO RIDGE SUBDIVISION -PHASE II
E RI
H