Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2020-141-E AMS - Summit Northern Campus CMAT testing
DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 [Departmental Use Only] TITLE CMT & Special Testing FY 2019-20 NORTH CAROLINA SERVICES AGREEMENT OVER $90,000.00 RFPIRFQ ORANGE COUNTY This Services Agreement (hereinafter"Agreement"), made and entered into this 18th day of October, 2019, ("Effective Date") by and between Orange County, North Carolina a political subdivision of the State of North Carolina (hereinafter, the "County") and Summit Design and Engineering Services, PLLC, (hereinafter, the "Provider"). WITNESSETH: That the County and Provider, for the consideration herein named, do hereby agree as follows: 1. Services a. Scope of Work. i) This Services Agreement ("Agreement") is for professional services to be rendered by Provider to County with respect to (insert type of project): Northern Campus Expansion - Construction Materials Testing (CMT) and Special Inspections (SI) Services. ii) By executing this Agreement, the Provider represents and agrees that Provider is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. iii) Time is of the essence with respect to this Agreement. iv) The services to be performed under this Agreement consist of Basic Services, as described and designated in Section 3 hereof. Compensation to the Provider for Basic Services under this Agreement shall be as set forth herein. 2. Responsibilities of the Provider a. Services to be provided. The Provider shall provide the County with all services required in Section 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. b. Standard of Care. i) The Provider shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Provider practice throughout the United States and in accordance Revised 12/18 1 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 with applicable federal, state and local laws and regulations applicable to the performance of these services. Provider is solely responsible for the professional quality, accuracy and timely completion and/or submission of all work related to the Basic Services. ii) Provider shall be responsible for all errors or omissions of its agents, contractors, employees, or assigns in the performance of the Agreement. Provider shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to the County. iii) The Provider shall not, except as otherwise provided for in this Agreement, subcontract the performance of any work under this Agreement without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. iv) Provider is an independent contractor of County. Any and all employees of the Provider engaged by the Provider in the performance of any work or services required of the Provider under this Agreement, shall be considered employees or agents of the Provider only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Provider. v) If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Provider represents that it and/or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. 3. Basic Services a. Basic Services. i) The Provider shall perform as Basic Services the work and services described herein and as specified in the County's Request for Proposals or Request for Qualifications (the "RFP") "RFP Number 5268 for "CONSTRUCTION MATERIAL TESTING AND SPECIAL INSPECTIONS SERVICES FOR THE NEW ORANGE COUNTY DETENTION CENTER AND VARIOUS PROJECTS" issued August 15, 2019, and the Provider's proposal, which are fully incorporated and integrated herein by reference together with Attachments A- Request for Qualifications 5268 dated August 15, 2019, B - RFQ5268 Addendum #1 dated August 23, 2019, C- Summit Design & Engineering Services, PLLC Response to RFQ dated September 5, 2019 and D - Bordeaux Bid Basis Schedule dated 9-17-2019 (designate all attachments). In the event a term or condition in any document or attachment conflicts with a term or condition of this Agreement the term or condition in this Agreement shall control. Should such conflict arise the priority of documents shall be as follows: This Agreement, the County's RFP together with attachments, Provider's Proposal together with attachments. Revised 12/18 2 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ii) The Basic Services will be performed by the Provider in accordance with the following schedule: (Insert task list and milestone dates) Task Milestone Date 1. Construction Materials Testing 5/14/21 2. Special Inspections 5/14/21 3. 4. 5. 6. 7. 8. 9. 10. iii) Should County reasonably determine that Provider has not met the Milestone Dates established in Section 3(a)(ii), County shall notify Provider of the failure to meet the Milestone Date. The County, at its discretion may provide the Provider seven (7) days to cure the breach. County may withhold the accompanying payment without penalty until such time as Provider cures the breach. In the alternative, upon Provider's failure to meet any Milestone Date the County may modify the Milestone Date schedule. Should Provider or its representatives fail to cure the breach within seven(7) days, or fail to reasonably agree to such modified schedule, County may immediately terminate this Agreement in writing, without penalty or incurring further obligation to Provider. This section shall not be interpreted to limit the definition of breach to the failure to meet Milestone Dates. 4. Duration of Services a. Term. The term of this Agreement shall be from October 15, 2019 to May 14, 2021. b. Scheduling of Services i) The Provider shall schedule and perform its activities in a timely manner so as to meet the Milestone Dates listed in Section 3. ii) Should the County determine that the Provider is behind schedule, it may require the Provider to expedite and accelerate its efforts, including providing additional resources and working overtime, as necessary, to perform its services in accordance with the approved project schedule at no additional cost to the County. iii) The Commencement Date for the Provider's Basic Services shall be October 15, 2019. 5. Compensation a. Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Provider from the County for all services under this Agreement. The maximum amount payable for Basic Services is Two Hundred Forty Five Thousand, Revised 12/18 3 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Two Hundred Thirty Eight Dollars ($245,238.00). In the event the amount stated on an invoice is disputed by the County, the County may withhold payment of all or a portion of the amount stated on an invoice until the parties resolve the dispute. Payment for Basic Services shall become due and payable in direct proportion to satisfactory services performed and work accomplished. Payments will be made as percentages of the whole as Project milestones as set out in Section 3(a)(ii) are achieved. (For example, if there are 10 Project Tasks with Milestone Dates then Provider may invoice for the first 10% of the whole upon County's acknowledgement of the satisfactory completion of Task one. Upon the County's acknowledgement that the second Task has been satisfactorily completed Provider may invoice for the next 10%of the whole.) b. Additional Services. County shall not be responsible for costs related to any services in addition to the Basic Services performed by Provider unless County requests such additional services in writing and such additional services are evidenced by a written amendment to this Agreement. 6. Responsibilities of the County a. Cooperation and Coordination. The County has designated (Steven Arndt) to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and/or the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 7. Insurance a. General Requirements. Provider shall obtain, at its sole expense, Commercial General Liability Insurance, Automobile Insurance, Workers' Compensation Insurance, and any additional insurance as may be required by County's Risk Manager as such insurance requirements are described in the Orange County Risk Transfer Policy and Orange County Minimum Insurance Coverage Requirements (each document is incorporated herein by reference and may be viewed at http://www.orangecountync.gov/departments/purchasing division/contracts.php.) If County's Risk Manager determines additional insurance coverage is required such additional insurance shall consist of N/A (if no additional insurance required mark N/A as being not applicable). Provider shall not commence work until such insurance is in effect and certification thereof has been received by the County's Risk Manager. 8. Indemnity a. Indemnity. The Provider agrees, without limitation, to defend, indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from property damage or bodily injury including death to any person or persons caused in whole or in part by the negligence or misconduct of the Provider except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Provider to indemnify the County to the fullest extent permitted under North Carolina law. 9. Amendments to the Agreement Revised 12/18 4 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 a. Changes in Basic Services. Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Provider. The Provider shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. 10. Termination a. Termination for Convenience of the County. This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days prior written notice to the Provider. b. Other Termination. The Provider may terminate this Agreement based upon the County's material breach of this Agreement; provided, the County has not taken all reasonable actions to remedy the breach. The Provider shall give the County seven (7) days' prior written notice of its intent to terminate this Agreement for cause. c. Compensation After Termination. i) In the event of termination, the Provider shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Provider. ii) Should this Agreement be terminated, the Provider shall deliver to the County within seven (7) days, at no additional cost, all deliverables including any electronic data or files relating to the Project. d. Waiver. The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Provider with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. e. Suspension. County may suspend the Basic Services and this Agreement at any time for County's convenience and without penalty to County upon three (3) days' notice to Provider. Upon any suspension by County, Provider shall discontinue the Basic Services and shall not resume the Basic Services until notified to proceed by County. 11. Additional Provisions a. Limitation and Assignment. The County and the Provider each bind themselves, their successors, assigns and legal representatives to the terms of this Agreement. Neither the County nor the Provider shall assign or transfer its interest in this Agreement without the written consent of the other. b. Governing Law. This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. Revised 12/18 5 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 c. Compliance with Laws. Provider shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal anti-discrimination laws, policies, rules, and regulations and the Orange County Non-Discrimination Policy and Orange County Living Wage Policy (each policy is incorporated herein by reference and may be viewed at http://www.oran ecountync. o�partments/purchasing division/contracts.php.) Any violation of this requirement is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County. This paragraph is not intended to limit and does not limit the definition of breach to discrimination. By executing this Agreement Provider affirms that Provider and any subcontractors of Provider are and shall remain in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. By executing this Agreement Provider certifies that Provider has not been identified, and has not utilized the services of any agent or subcontractor identified, on the list created by the State Treasurer pursuant to G.S. 147-86.58. By executing this Agreement Provider certifies that Provider has not been identified, and has not utilized the services of any agent or subcontractor identified, on the list created by the State Treasurer pursuant to G.S. 147-86.81. d. Dispute Resolution. Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non-performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina. It is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. Binding arbitration may not be initiated by either Party, however, the Parties may agree to nonbinding mediation of any dispute prior to the bringing of a suit or action. e. Entire Agreement. This Agreement, together with the RFP and its attachments and the Proposal and its attachments, represents the entire and integrated agreement between the County and the Provider and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. f. Severability. If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. g. Ownership of Work Product. Should Provider's performance of this Agreement generate documents, items or things that are specific to this Project such documents, items or things shall become the property of the County and may be used on any other project without additional compensation to the Provider. The use of the documents, items or things by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. h. Non-Appropriation. Provider acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. Revised 12/18 6 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Provider of the unavailability and non-appropriation of public funds. It is expressly agreed that County shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Provider of such limitation or change in County's legal authority. i. Signatures. This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures affixed hereto evidence the consent of the Parties to utilize electronic signatures and the intent of the Parties to comply with Article I IA and Article 40 of North Carolina General Statute Chapter 66. j. Notices. Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Provider's Name &Address Attention: Steven Arndt Summit Design and Engineering Services, PLLC P.O. Box 8181 320 Executive Court Hillsborough,NC 27278 Hillsborough,NC 27278 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. ORANGE COUNTY: PROVIDER: By; ��� ndq, z/z4/zozo By: .1�r� z/zi/zozo Penny Rich, Chair Orange County Board Troy Dover, President of County Commissioners Printed Name and Title Revised 12/18 7 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ORANGE COUNTY NORTH CAROLINA REQUEST FOR QUALIFICATIONS (RFQ) CONSTRUCTION MATERIAL TESTING AND SPECIAL INSPECTIONS SERVICES FOR THE NEW ORANGE COUNTY DETENTION CENTER AND VARIOUS PROJECTS DATE: AUGUST 15, 2019 Orange County is soliciting statement of qualifications (SOQs) for Construction Materials Testing and Special Inspections services needed during construction of the following Orange County facilities: Northern Detention Center, Northern campus Environment and Agricultural Center, and Parks Operations Base. PROJECT DESCRIPTIONS: • Orange County Detention Center — New 55,000 SF detention facility to include administrative offices, common areas, kitchen and booking wing,visitation area and inmate cells. Construction to consist of: typical shallow foundations, reinforced concrete, load bearing masonry and structural steel framing. • Orange County Environmental and Agricultural Center (EAC) — New 17,247 SF environment and agricultural center, to include administrative offices and multipurpose program and meeting spaces for County, State and Federal departments serving the agricultural community. This building is a single-story, steel-framed structure, with brick veneer cladding,fully sprinklered. • Orange County Parks Operations Base — New 8,692 SF government services operations base, to include administrative offices, staff workroom, and equipment and maintenance storage space for the Parks Division of the Orange County Dept. of the Environment, Agriculture, Parks, and Recreation. This building is a single-story, pre-engineered metal structure with metal panel cladding, fully sprinklered. Moseley Architects is the designer for the Detention Center and HH Architecture is the designer for the EAC and Parks Ops Buildings. The project delivery for these projects will be single prime Construction Manager at Risk (CMAR) in accordance with the State of North Carolina. For access to the construction documents in PDF format, contact Blair Bordeaux blair@bordeauxconstruction.com with Bordeaux Construction Company, Inc. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Interested firms may submit a Statement of Qualifications meeting the requirements as defined in this RFQ to: David Cannell, Purchasing Agent Orange County 200 S. Cameron Street, PO Box 8181, Hillsborough, NC 27278. Email: dcannell@orangecountync.gov. Delivery Methods: a. Electronic (PDF Format) submittals should be less than 15MB in size and submitted by 5:00 p.m. EST on September 5, 2019. (preferred) b. Alternatively, three (3) hard copy printed proposals may be delivered by hand or via U.S. Postal Service no later than 5:00 p.m. EST August 30, 2019. c. The County will not accept submittals for review that are received after the 5:00 p.m. deadline. It is the responsibility of the consultant to ensure that the proposal is received by the deadline date and time detailed herein. d. Questions relating to this RFQ can be directed to David Cannell in writing at the aforementioned address, emailed to dcannell@orangecountync.gov, or you may contact Mr. Cannell at (919) 245-2651. SUBMITTAL RESPONSE REQUIREMENTS Please limit submittals to twenty five (25) single-sided pages. Font size shall be no less than 11 point. If your firm elects to submit hard copies you are asked to please print the full submittal double-sided and stapled on recyclable, normal stock, white, office paper without plastic binding or cover. Section 1—Introductory/Cover Letter a. Please provide a brief introduction letter stating your interest in the project and include the name and address/location of your firm, and provide the name, email and phone number of a designated contact person for this project. Section 2—Professional Qualifications and Key Project Personnel Experience a. Provide,for your firm and any subconsultants on you team,the following: 1. The full name and address of the firm or team, including any subconsultants you intend to include in your project team. 2. A brief description of the firm, history of firm and a description of capabilities and typical services provided offered. 3. Describe the firm's professional qualifications and experience, including those of any subconsultants, in order to clearly demonstrate your ability to successfully furnish the professional engineering services described in this Request for Qualifications. Include any relevant professional certifications held by the firm, team members and subconsultants. Firm must be licensed to practice in North Carolina.Submit License. b. For Key Project Personnel, provide the names and brief resumes of the assigned project manager and/or other key staff members who will comprise the core of your firm's project team. Also, provide brief resumes for any identified sub-consultants. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 c. Explain roles and availability of Key Project Personnel and expected commitment/assignment to the project. Describe how the project team will be organized, and provide formal reporting lines and informal lines of communication in proposed organization chart. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Section 3—Experience and Past Performance a. List of 5 projects undertaken in the last five years demonstrating experience performing engineering services. These reference projects must include: 1. Projects similar to the scope of services for this project. 2. Projects that have been performed by the prime consultant and sub- consultant team, where key personnel and core team are essentially the same team being proposed. 3. The summary for each reference project should include project title, location, brief description of the project, including services provided, size and cost of project, percentage of error and omissions, original and final schedule dates (including reason for any changes), fee and fee percentage, client (owner) contacts, design team contacts, construction contractor team contacts. For contacts include name, telephone number and email of key representative. b. Provide (3) Reference letters from ONE of the projects listed in your experience. One letter each from the following: Owner, Architect/Engineer, and General Contractor. c. Provide other pertinent information demonstrating the firm and key team members experience and past performance (Examples: unique challenges or problems, innovative solutions, project successes, etc.) Section 4—Other Requirements a. Statement that your firm's capability to cover insurance requirements set forth by the County. b. List of all lawsuits your firm has been involved in within the last 5 years related to Geotechnical, Construction Materials Testing and Special Inspections services. SELECTION PROCESS: The deadline for receipt of Qualifications Statements is 5:00 p.m. on August 29, 2019. Orange County will review all submitted qualifications packages that comply with the requirements contained within this document. The criteria by which the packages will be evaluated include: • Firm's stated understanding of services needs related to the project. • Firm's experience providing similar testing and inspections for projects of very similar size and type structure within the past five (5) years, project team performance and reference letters. • Qualifications of principal(s) and actual inspection staff to be assigned to perform desired work, the level of involvement in the project for each person and a listing of similar projects completed by each employee within the past five(5)years. • Firm's responsiveness and ability to provide desired services without disruption of construction schedule. Depending on the number of packages received, the County may choose a single firm from the information submitted; or, several firms may be selected to a "short list" and invited to make an oral presentation, at the County's sole discretion. Professional services fees are not to be submitted at this time and will be negotiated with the firm deemed most responsive and qualified. If an acceptable fee cannot be negotiated,the second ranked firm will be contacted. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 GENERAL REQUIREMENTS: a. Living Wage Orange County is committed to providing its employees with a living wage and encourages agencies it funds to pursue the same goal. A copy of Orange County's Living Wage Contractor Policy is included in Attachment C. b. E-Verify HB789 imposes E-Verify requirements on contractors who enter into certain contracts with state agencies and local governments. The legislation specifically prohibits governmental units from entering into certain contracts "unless the contractor and the contractor's subcontractors comply with the requirements of Article 2 of Chapter 65 of the General Statues." (Article 2 of Chapter 65 establishes North Carolina's E- Verify requirements for private employers.) It is important to note that the verification requirement applies to subcontractors as well as contractors. The new laws specifically prohibit governmental units from entering into contracts with contractors who have not (or their subcontractors have not) complied with E-Verify. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ORANGE COUNTY NORTH CAROLINA Orange County Asset Management Services Addendum #1 August 23, 2019 ORANGE COUNTY RFQ NO. 5268 CONSTRUCTION MATERIAL TESTING AND SPECIAL INSPECTIONS SERVICES FOR THE NEW ORANGE COUNTY DETENTION CENTER AND VARIOUS PROJECTS To All Interested Firms: Modifications to bid documents for the above named bid shall be made herein and shall be included in the bid amount. The due date for both electronic copy and hard copies is September 5, 2019 by 5:00 pm Submit your electronic submittal to All finance purchasing@orangecountync.gov and cc abarnes@orangecountync.gov Copies of e-verify form and living wage policy is attached By: Angel Barnes, AMS, CPM; abarnes@orangecountync.gov/919.245.2628 Acknowledgement of receipt of this addendum shall be included with your submittal: Company Name: By: Date Received: P.O. Box 8181 * 131 West Margaret Lane, 3rd Floor* Hillsborough, North Carolina 27278 Telephone: 919 245-2625 Fax: 919-644-3001 E-mail :AMService@orangecountync.gov Page 1 of 3 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Section I: General Cron eram t and Administration Policy 10.0: Living Wage Contractor Policy Reviewed by: County Attorney/County Manager Approved by: County Manager Original Effective Date: July 1, 2017 Revisions: Poliev Statement It is the policy of Orange County to ensure its employees,and all indi-viduals who provide services for @range County,are paid a living wage. Purpose To encourage all vendors and c ontractors to pay a living wage to all employees who perform work pursuant to a contract with Orange County. .ApRlicabllity Applies to all Orange County contracts and purchases. Policy 10.1 Living Wage 10.1.1 Orange County is conm3itted to providing its employees with a liking wage and encourages all contractors and�,endors doing business with Orange County to pursue the same goal. Orange C:ounty's living wage is $14.95 per hour. To the extent possible,Orange County reconmiands that contractors and vendors seelang to do business with Orange County pro--idea living wage to their employees_ 10.1.2 Prior to final execution of contract with Orange County all contractors and vendors seel*g to do business with Orange County shall submit to the County's representative a statement indicating whether those employees who will perfi=work on the Orange County contract are paid at least the living wage amount set out above_ If such employees do not snake at least the living wage amount set out above the contractor or vendor shall indicate in the statement the actual amount paid to such employees. For bid projects this statement should be submitted as part of the bid packet. TI is policy-may be reviewed annualh-and updated as needed by the Manager's Office P.O. Box 8181 * 131 West Margaret Lane,3`d Floor* Hillsborough, North Carolina 27278 Telephone:919 245-2625 Fax:919-644-3001 E-mail :AMService@orangecountync.gov Page 3 of 3 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 STATE OF NORTH CAROLINA AFFIDAVIT ORANGE COUNTY ssssssssssssssssssssssssss I, (the individual attesting below), being duly authorized by and on behalf of (the entity bidding on project hereinafter"Employer")after first being duly sworn herebyswears or affirms as follows- 1. Employer u n d e rstan ds that E-Veri is the federal E-Verify program operated by the United States Department of Homeland Security and other federaI agencies,or a ny s uccess o r or equiva I ent p rag ram used to verify the work authorization of newly hired employees pursuantto federal law in accordance with NCGS§64-25(5). 2. Employer understandsthat Emplovers Must Use E-Verify_ Each employer,after hiringan employee to work in the United States,shall verify the workauthorixation of the employeethrough E-Verify in acrordance with NCGS§64-26[a]. 3. Employer is a person,business entity, or other organization th at t ra nsa cts business in this State and that employs25 or more employees in this State. (mark Yes or No) a_ YES . or b_ NO 4. Employer's subcontractors comply with E-Verify,and if Employer Fs;the winning bidderon this project Employer will ensure compliance with E-Verify by any subcontractors subsequently hired by Employer. This day of 201_ Signature of AfFant Print or Type Name: State of North Carolina, County b Sign edand sworn to(or affirmed) before me,this the " a Zt C- day of .24= m" My Commission Expires: m M m Notary Public P.O. Box 8181 * 131 West Margaret Lane,3`d Floor* Hillsborough, North Carolina 27278 Telephone:919 245-2625 Fax:919-644-3001 E-mail :AMService@orangecountync.gov Page 3 of 3 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 USUMMIT 504 Meadowlands Drive, Hillsborough, NC 27278 DESIGN AND ENGINEERING SERVICES Phone // 919.732.3883 Web // www.summitde.net September 18, 2019 Ms. Angel Barnes Capital Projects Manager Orange County Asset Mgmt. Services 131 West Margaret Lane Hillsborough, NC 27278 Reference: Proposal for Construction Materials Testing(CMT) and Special Inspections(SI)Services Detention Center, EAC and POB (Northern Campus Expansion) Hillsborough, North Carolina Summit Proposal No.: T19-0043 Dear Ms. Barnes, Summit Design and Engineering Services,PLLC is pleased to present this proposal to perform Construction Material Testing(CMT) and Special Inspections(SI)services for the above reference project.As a provider of professional engineering services, Summit brings a proven successful inspections and testing team led by experienced engineers, engineering technicians and project managers. The purpose of our services is to provide construction observation and testing services, as required by code, to assess compliance with project documents.The following information forms the basis of this proposal and our scope of services: • Summit's review of the project Detention Center plans and specifications revised 7/10/2019; • Summit's review of the project EAC and POB plans and specifications revised 7/10/2019; • Summit's understanding of the required Special Inspections for the project; • General construction schedule provided by Resolute dated 7/29/2019; • Summit's past experience on projects of similar size and scope, and PROJECT UNDERSTANDING We understand that this project will consist constructing 3 new facilities at the Northern Campus, as described below. • Orange County Detention Center — New 55,000 SF detention facility to include administrative offices, common areas, kitchen and booking wing, visitation area and inmate cells. Construction to consist of: typical shallow foundations, reinforced concrete, load bearing masonry and structural steel framing. • Orange County Environmental and Agricultural Center (EAC) — New 17,247 SF environment and agricultural center, to include administrative offices and multipurpose program and meeting spaces for County, State and Federal departments serving the agricultural community. This building is a single-story, steel-framed structure, with brick veneer cladding, fully sprinklered. • Orange County Parks Operations Base — New 8,692 SF government services operations base, to include administrative offices, staff workroom, and equipment and maintenance storage space for the Parks Division of the Orange County Dept. of the Environment, Agriculture, Parks, and Recreation. This building is a single-story, pre-engineered metal structure with metal panel cladding,fully sprinklered. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Proposal for CMT and Special Inspections Services Proposal Number:T19-0043 Detention Center, EAC and POB (Northern Campus Expansion) September 18, 2019 Hillsborough, North Carolina Overall, we understand that construction will primarily consist of: utility installation and re-location, earthwork grading,temporary storm basins and SCM construction,typical shallow foundations, reinforced cast-in-place concrete, structural masonry, structural steel framing, site paving and site work and hardscapes. We understand the contractor has received/or will receive NTP in September 2019 and construction will continue through to substantial completion in March 2021. We anticipate being onsite on a continuous to periodic basis during construction, as dictated by the project plans and specifications and Statement of Special Inspections,to perform the required observation and testing services. If any of our scheduling assumptions need to be altered, we will adjust accordingly based on a Time and Materials basis. SCOPE OF SERVICES Our scope of services is described below and provides the basis of our fee estimate. It should be noted our services will exclude: (1) supervision, direction, or acceptance of the contractor's work; (2) interpretation or modification of the project plans or specifications; (3)submittal of test results or reports to any regulatory agency (unless specifically requested by client in writing); or (4) job site safety. The following tasks outline our proposed scope of services for this project. Pre-Construction Meeting and Review of Project Documents Summit's Project Manager and supporting team members will attend a pre-construction meeting alongside the owner's representative, general contractor, and design team members to review requirements for the project prior to beginning construction activities. We have reviewed the project plans from a geotechnical perspective for conformance with recommendations provided in the final geotechnical report for the project. Geotechnical &Soils Observation and Testing Services Summit will provide a Special Inspections Agent or senior engineering technician working under the supervision of a registered engineer to observe proofrolls,subgrade preparation,footing installation,and to perform compaction testing services during onsite grading activities. We anticipate that the following observations and testing will be required during earthwork and associated construction for the following: • Site work and grading; • Utility trench backfill in structural areas; • Proofrolling operations; • Foundation observations and testing; • Subgrade preparation and compaction for grade slabs; and • Compaction testing of backfill material. Compaction testing following grading will be performed in general accordance with the project's geotechnical report and project documents. We anticipate we will be required to perform field density testing using American Society for Testing and Materials (ASTM) procedures. Our personnel will sample on-site and imported materials used as fill and transport these samples to our laboratory for testing. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Proposal for CMT and Special Inspections Services Proposal Number:T19-0043 Detention Center, EAC and POB (Northern Campus Expansion) September 18, 2019 Hillsborough, North Carolina Cast-In-Place Concrete Construction and Reinforcement Placement Summit will provide a Special Inspections Agent or senior engineering technician working under the supervision of a registered engineer for full-time inspection, sampling, and field testing services during placement of structural concrete for foundations, grade slabs, elevated slabs and hardscapes. Prior to the placement of concrete,we will periodically observe the size,type, and placement(lap lengths, ties,and cover)of the reinforcing steel(rebar)and drilling&epoxied rebar priorto placement of structural cast-in-place concrete. We will also observe the placement, curing, and protection of cast-in-place concrete. We will perform slump, air content, unit weight, and temperature testing during cast-in-place concrete placement. Concrete batch tickets will be monitored during placement for mix design compliance. We will mold one set of five 48 inch concrete compression test cylinders at frequencies specified in the project specifications,for each type of concrete placed per day. Concrete specimens will be picked up and delivered to our laboratory after the initial on-site curing period. We will also provide floor flatness and floor levelness testing for grade slabs and elevated slabs. This will be performed with a FACE Dipstick 2272 Floor Profiler and will be executed in general accordance with ASTM E1155. Structural Masonry and Grout Placement(Level B-Quality Assurance) We will provide a Special Inspections Agent to observe the grout spaces,the size,type, and lap lengths of the reinforcing steel prior to grout placement and perform masonry grout testing. In addition, we will provide a senior engineering technician to assist with grout sampling for during grouting operations. In general the testing will consist of slump and mix temperature testing and molding of one set of four (4) grout samples according to the testing frequencies in the specifications for laboratory compressive strength testing. Grout samples will be retrieved from the site and transported to our laboratory and placed in the proper curing facilities within 48 hours.A site-curing box will be required to maintain proper curing temperatures during the initial 24 to 48 hours. Structural Steel Framing We will provide a Special Inspections Agent and/or a Certified Welding Inspector (AWS-CWI) for observation and inspection during field welding and review of welding materials, equipment, mill certifications and welder qualifications. We will perform visual inspection of structural bolting, field welding, shear wall connections and patterns in accordance with the project plans and specifications. Once fabrication drawings are produced,we will also better understand any non-destructive testing(NDT) required for moment connections. We will also observe seismic resistance components. Pavements and Bases Observation and Testing Summit will provide a Field Technician II working under the supervision of a registered engineer to observe proofrolls of the prepared soil subgrade prior to ABC stone, observe and test asphalt and concrete paving operations, and obtain cores samples for density requirements.ABC stone base compaction tests will also be performed by the nuclear gauge method or sand-cone method, as related to a standard proctor DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Proposal for CMT and Special Inspections Services Proposal Number:T19-0043 Detention Center, EAC and POB (Northern Campus Expansion) September 18, 2019 Hillsborough, North Carolina laboratory compaction test. We will provide a Senior Engineering Technician as needed to observe the placement of concrete and hot-mix asphalt pavements.Additionally,we will periodically monitor hot-mix asphalt delivery temperatures, rolled thickness,and perform asphalt density testing with a nuclear gauge. Laboratory Testing In an effort to maintain the highest quality control standards within our company, our laboratory, equipment, and personnel are inspected both by our internal Quality Control Group and a variety of external agencies. Our laboratory and personnel periodically go through inspections and have received accreditations through CCRL (Cement and Concrete Reference Laboratory) relating to ASTM C1077 Standards; and AMRL (AASHTO Materials Reference Laboratory) relating to AASHTO and ASTM D 3740 Standards. Each of these organizations is part of the National Institute of Standards and Technology. We have also been inspected and accredited by the Soil and Materials Laboratory of NCDOT. Laboratory testing will be performed in accordance with the project document requirements to evaluate that materials comply with project requirements. Results of laboratory testing will be provided to the construction manager and designated project team members as soon as practicably available. We anticipate that testing will be required for backfill material and concrete cylinders. Samples collected from the job site will be secured and returned to our laboratory for testing, as required. Our budget includes laboratory testing of soils, including maximum dry unit weight/optimum moisture curves, Atterberg limits, and No. 200 wash sieves for 6 samples and compressive strength testing for up to 400 concrete cylinders and 160 grout prisms. Proiect Management and Engineering Consultation Our project organization will include various field testing and inspections staff working under the supervision of Jeff Elliott, P.E. who will oversee the administrative functions for the project, including assignment of appropriate field personnel, review of field data, laboratory data, inspection reports, and communication the following with project team personnel and owner: • The results of our field testing and inspections for each day will be summarized in a daily field report,with all results communicated to appropriate on site personnel. • Unusual occurrences will be communicated in a timely manner. • Scheduling conflicts do to contractor error, work cancellations upon Summit's arrival, retesting and non-compliance testing, and contractor's convenience testing will be tracked throughout project and reported to owner for tracking purposes of appropriate back charges to contractor. • Non-conforming items that are not corrected on the same date that they are initially observed, will be communicated to the owner, building official, general contractor, and design team immediately. • The results of concrete, grout and mortar compressive strength testing will be available electronically to the project team within 48 hours, as the tests are performed.Test results will be available through e-mail, and summarized in our monthly summary report. • A typed final report of our services will be prepared by our Project Manager, reviewed and sealed by our Registered Engineer, and distributed to specified members of the project team on a monthly basis, as well as a Final Report at the end of project. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Proposal for CMT and Special Inspections Services Proposal Number:T19-0043 Detention Center, EAC and POB (Northern Campus Expansion) September 18, 2019 Hillsborough, North Carolina The project will be closely managed to identify potential budget and schedule impacts during the course of the project.Summit's project managerwill also monitorfield operations for possible out-of-scope items or retesting due to failed tests that develop during the course of the project that are not included in this proposal and preliminary fee estimate. Retesting will be tracked, quantified and provided to owner so that those costs can be back-charged to the contractor performing the work. We have included budget for construction kickoff meeting, technical consultation and for special site meetings due to unanticipated conditions or design changes during construction. Since this scope cannot be fully defined at this time, we allocated budget based on prior projects of similar nature. Final Testing and Inspections Letter Upon completion of the project, a final summary report will be prepared by Summit to document geotechnical observations, testing services and laboratory testing services during this phase of construction. In the event other project deliverables become required for reasons unknown at this time, including but not limited to failed test items requiring further analysis and/or reporting, additional fees may be incurred beyond those contained in the attached fee estimate. SCHEDULE For scheduling of our field-personnel, Summit must be contacted prior to 1:00 p.m. the day before our services are required and/or at least 24 hours in advance. Our visits will be coordinated with the contractor's project site superintendent and/or an owner's representative. Summit will be available for inspection services 7 days a week and 24 hours per day, as requested. FEE ESTIMATE Based on the scope of services outlined herein and our understanding of the available project construction information,we recommend an estimated allowance of$245,238 be included for the cost of our CMT/SI services as described herein. Please note that the budget allowance stated and illustrated herein does not constitute a "lump sum" fee for our services. CMT/SI services will be invoiced on an on- call,time and materials basis at the rates indicated on the attached unit fee schedule for those services we are requested to provide by the general contractor throughout the project construction duration. Our proposed budget allowance will not be exceeded without prior client notification, and would be increased only via contract amendment. Our recommend budget allowance is based on providing the scope of services outlined herein only. If the construction schedule, actual material quantities, or requirements for the project are different from what we have described herein, we reserve the right to review our scope and budget allowance with respect to the new information and propose necessary changes to you. Some factors that commonly affect our proposed budget allowance include re-testing and re-inspections, overtime work, adverse weather events that affect the construction materials on-site or our scheduling, additional laboratory testing, performance of additional services not explicitly listed herein, and poor scheduling (or late cancelling) of our field services by the general contractor's personnel. We will attempt to coordinate our services with the contractor to efficiently service the project. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Proposal for CMT and Special Inspections Services Proposal Number:T19-0043 Detention Center, EAC and POB (Northern Campus Expansion) September 18, 2019 Hillsborough, North Carolina ASSUMPTIONS During our proposal preparation certain assumptions were required based on our review of the project plans. Based on the available information (noted above), the following assumptions apply: • Rates associated with overtime work are at 1.5 times the listed hourly rates in the attached fee schedule and rates shown on the Fee Summary. Overtime for our services is defined as work on the project by a single person in excess of 8 hours per day and all time on weekends, Summit recognized holidays, and night shifts; • Weekend and/or night work is not anticipated for this project; • We assume a workday will consist of a normal 8-hour day; • Crews will be working at a pace and distance from one another such that 1 field personnel per day is sufficient to observe the work, with the exception of slab and grout pours which may require 2 field personnel; • We anticipate our services being needed 1 full-time inspector (8 hours/day) over a 12-month period. Assuming 22 work days in a month,this equals approximately 264 days (or 2,112 hours). Per Special Inspections requirements, we also anticipate needing an additional technician onsite for 5 months during this timeframe. This equals approximately 110 days (or 880 hours) for a second man onsite. • We assume 1.5 hours a week for 100 weeks for Project Management tasks during construction. • Laboratory testing and compaction testing will be performed in accordance with ASTM standards. LIMITATIONS Our work will be performed in a manner consistent with that level of care and skill ordinarily exercised by other members of Summit's profession practicing in the same locality, under similar conditions, and at the date the services are provided. Our conclusions, opinions, and recommendations will be based on a limited number of observations and data. It is possible that conditions could vary between or beyond the data evaluated. In all cases, the contractor is solely responsible for the direction and quality of the work, adherence to plans and specifications, and repair of defects regardless of when they are found. Summit makes no guarantee or warranty, express or implied, regarding the services, communication (oral or written), report, opinion, or instrument of service provided. Safety of our employees is of paramount concern to Summit. You will be notified if the location of the project represents a potential safety concern to our employees. Unsafe conditions for field work will require a modification of our estimated scope of work and associated fees. We will advise you of the additional costs necessary to mitigate these unanticipated conditions, if applicable. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Proposal for CMT and Special Inspections Services Proposal Number:T19-0043 Detention Center, EAC and POB (Northern Campus Expansion) September 18, 2019 Hillsborough, North Carolina CLOSURE We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If we have excluded any services that are required, please contact us so that we can modify this proposal, or provide an additional proposal, for these services. If you have any questions concerning this proposal, please contact us at your convenience at(919) 732-3883. Sincerely, SUMMIT DESIGN AND ENGINEERING SERVICES, PLLC Firm's NC License No. P-0339 q,fl &&--bL- Jeff Elliott, PE CMT&SI Department Manager Jeff.Elliott@summitde.net DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 USUMMIT DESIGN AND ENGINEERING SERVICES Schedule of Standard Rates Construction Materials Testing & Inspections FIELD TESTING AND OBSERVATION SERVICES Field Technician 1 $50.00 Per Hour Field Technician 11 $60.00 Per Hour Field Technician 111 $70.00 Per Hour Field Technician IV /Special Inspector $75.00 Per Hour Field Technician V $80.00 Per Hour AWS CWI Certified Welding Inspection $85.00 Per Hour Trip Charge $0.00 Per Trip Overtime:(Over 8 hr/day,40 hr/week,nights&Saturdays) Regular Time x 1.5 Per Hour Doubletime:(Sundays and Holidays) Regular Time x 2.0 Per Hour FIELD TESTING EQUIPMENT Nuclear Density Equipment $30.00 Per Day Ultrasonic Equipment $100.00 Per Day Dipstick(Floor Flatness Profiler) $100.00 Per Day Coring Equipment $250.00 Per Day Direct Expenses Cost+15% LABORATORY SERVICES Engineering Classification ASTM D2487 or D2488 $4.00 Per Test Natural Moisture Content ASTM D2216 $8.00 Per Test Wash#200 Sieve Analysis ASTM D1140 $40.00 Per Test Wash#200 Sieve w/Grain Size Analysis ASTM D422 $100.00 Per Test Atterberg Limits ASTM D4318 $70.00 Per Test Standard Proctor ASTM D698 $150.00 Per Test Modified Proctor ASTM D1557 $175.00 Per Test ABC Stone Proctor ASTM D698 or ASTM D1557 $175.00 Per Test Concrete Compressive Strength ASTM C39 $18.00 Per Test Lightweight Concrete Density ASTM C567 $30.00 Per Test Concrete Core Compressive Strength ASTM C42 $35.00 Per Test Mortar Compressive Strength ASTM C109 $15.00 Per Test Grout Compressive Strength ASTM C1019 $30.00 Per Test Specific Gravity/Density of Asphalt Core ASTM D2726 $35.00 Per Test California Bearing Ration(3 Point Test) $450.00 Per Test Soil-Cement Mix Design/Proctor $250.00 Per Test Soil-Cement Compressive Strength $35.00 Per Test Soil Permeability(Hydraulic Conductivity) $300.00 Per Test ENGINEERING&PROJECT MANAGAMENT SERVICES Admin/Clerical $50.00 Per Hour Staff Professonal 1 $75.00 Per Hour Staff Professonal II $85.00 Per Hour Project Technical Lead $110.00 Per Hour Project Engineer 1 $110.00 Per Hour Project Engineer II $120.00 Per Hour Associate Project Manager $120.00 Per Hour Project Manager $130.00 Per Hour Senior Project Engineer $140.00 Per Hour Senior Project Professional $165.00 Per Hour Notes Scheduling of field services requires no less than 24 hours advance notice. There is a 2-hour Cancellation charge and 4-hour minimum charge for all field services. Unit Prices are in effect for 30 days from the date of proposal. All Rates are billed on a portal to portal basis. Rates are subject to a 5%Annual Escalation 2019-06 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 SUMMARY OF COST ESTIMATE T19-0043 Detention Facility,EAC and POB_Cost Estimate Sr.Eng.Tech. Special Inspector PM 10- TASK 6-Technician lII 6-Technician III Project TOTAL TASK LABOR TASK LAB UNITS AND TASK SUB- TOTAL TASK LABOR CATEGORY Manager I HOURS FEE FEE EXPENSES CONSULTANTS FEE Billing rate($1hr) $60.00 $75.00 $145.00 10-000L Laboratory Testing 0 0 0 0 $0 $12,288 $0 $0 $12,288 10-1000 Lead Inspector for 396 days 0 2112 0 2112 $158,400 $0 $0 $0 $158,400 10-2000 Second Technician for 198 days 880 0 0 880 $52,800 $0 $0 $0 $52,800 10-3000 Project Management 0 0 150 150 $21,750 $0 $0 $0 $21,750 LABOR HOURS 8801 21121 1501 3142 LABOR FEE S52,8001 $158,400 $21,750 $232,9501 $12,288 $0 $0 $245,238 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Act Descrtption Orig Early Early Late Total ID Dur Start Finish FInlsh Float nua Project Milestones MILE 110 Start On-Site Work 0 16SEP19 15tl Start On-Site Work _____________________________________________ ___ ________ __ __ _______ _ N . MILE 225 NTP 0 16SEP19` 30d TP MILE 122 Com lets DET SOG 0 11MAY21 14MAY21 258d ---------------------------------------------- --- --- --- I ______________________________________________ ___ ___ __Complete DET SOG ___ ___ ______ __ ______ ______ ___ ______ ___ ___ ___ ___ __ ___ ______ ___ ___ ___ ______ ______ ___ _ MILE 121 Complete EAC SOG 0 12JUN20 14MAY21 238tl C SOG _ _________________________________________ mPlele SWMure in Detention Areas MILE 130 Can let'Stmclure in Detention Areas 0 04AUG20 MUG20 6tl _ __ Complete Structure--- ___ ---- ___ tiC _ __ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ __ _______ ___ ___ ___ ___ ___ ___ ------- MILE 142 Can lete POB BOG Det 0 05AUG20 14MAY21 200d - p -- Del ___ ___ ______________ «of __ ___ _ __ --- --_ --- ___ ___ ___ ___ ___ ___ ___ ________ ______ ______ ___ ___ --_ -_- --- - MILE Complete omelet G MILE 1� Complete Shuoture EAC 0 07AUG20 14MAV21 198d ___ _ __ i C zlerie POB SO ' E tale Sbuclure EAC - or Glass Close-In Thoro hoot MILE 160 Eztedor Glass Close-In ThaugMu[ 0 19AUG20 14MAY21 190d -i _ 9 __ - ___ i_ -Com le___ - - - - - MILE 140 Complete Shucture POB 0 090CT20 14MAY21 153d __________________ ______ ___ -- ate Simrou9hout�--- --- ___ ___ ___ ___ ___ ___ ___ ___ _____ ___ ______ ___ _-_ -_- _-- ___ More POB MILE 170 En ization 0 08DEC20 28DEC20 13d ____________________________________________ ____ ________ l� , EnergizabonJ__- --- ___ ___ ___ ___ ___ ___ ___ ___ ___ __ _______ ___ ___ ___ ___ ___ ___ ___ ___ ___ _ __________________ ___' ' --- --------- --- --- - _� --i___ __ ___ ___ ___ ______ ______ ___ ________ ______ ______ ___ ______ ___--- --- - MILE 180 Start Start-Up of HVAC 0 23DEC20 23tl Sfart Start-Up of HVAC ---------------------------------------------- --- -------------- --- - Sta- -UpVAC Com fete Throu out----- --- --- --- ----- --- ------ --------- ------ ------ --- - MILE 190 Start41 HVAC Com ale Throu hoot 0 30DEC20 19JAN21 13tl ________ P 9 ___ ___ ___ ___ ___ __ ___ ______ ______ ___ ______ ______ ___ _ MILE 200 Substantial Com tattoo 0 18MAR21" 16MAR21" 0 --_- _--_- --_-- _--_- -- _-__ _- --_ -- ;;; Substanhal Complehon� --- --- --- --- --- - ------- --- --- --- -- --- --- --- --- --- - MILE 210 Achieve Final Cam tattoo 22 1]MAR21 15APR21 15APR21 0 III _ Achieve Final Completion MILE 235 Final Completion 0 15APR21 14MAY21 21tl "' tool Completion ______________________________________________ ___ i ___ ______________ ___ ___ ___ __. --- --- --- --- -- -------___ ___ ___ ___ --- --- ___ ___ ___ MILE 215 Achieve DHSR Ins ctions 21 1fiAPR21 14MAY21 14MAV21 0 � � ���i� ,�� ;�; Achieve DHSR Inspections MILE 205 DHSR Complete,Final-Final 0 14MAV21" 14MAY21 0 -- DHSR Complete,Final-Final Preconstruction Submittal Generation&Submission to AE SUB 1000 Generate&Submit Prefabricated Cells 30 16SEP19 250CT19 0&IAN20 51d Generate&Submit Pretabdcatetl Cells Submittal Submittal Review&Approval REV 1000 Redew&Appprove Pefabdcated Cells 30 28OCT19 06DEC19 19FEB20 51d Rwiew&Appprove Pnefahncated Cells Submittal; Fabrication&Deliv.of Long-Lead Equip&Marla FAB 1000 Fab&Deliver Prefabricated Steel Cells 70 09DEC19 11MAR20 2]MAV20 51d Fab&Deliver Prefabricated Steel Cells Construction Mobilization.Early Sltework&Building Pad ES 1000 Mobilize to Site,Initial FJC 8 Clearing 15 168EP19 040CT19 040CT19 0 Mobll¢e to Site.Inaial EIC 8 Clearing 1 •_ ___ • __ ___ ___ ___ ___ ______ ___ ___ ___ ___ __ ___ ______ ___ ___ ___ ______ ______ ___ - ES 1008 Establish TempConstruction Access& 10 308EP19 110CT19 24JAN20 73d Establish Temp Go Access&Laydown ______________________________________________ ___ `�_— - Es1015 Canslmcl Tem Skimmer Basin8 15 07OCT19 250CT19 250CT19 0 C_onstmc[Tamp Skimmer Basin&Di version Ditches _ ___ ______ ___ ______ ___ _ _ _L, n for Builtlln P__.•, „ ___ ES 1015 Gredi for Buildi Pad Detention 63 280CT19 24JAN20 24JAN20 0 T Grath g g atl Detention ' ___ ------ --- ------ ------ --- ----- --- ---___ _________ ------ ------ --- - p ing Footprint Stomndminage; ' ;;; ' ES 1010 BuildingFootprint Stamtlreinage 5 27JAN20 31JAN20 14FE820 10tl _ ---------------------------------- - -F- 1-Build --- -_- - - _r r_ -__ __ _____ ___ ______ _________ ______ ______ ___ _ Es1018 Gratli for Builtli Pad POB 20 27JAN20 21FE820 13MAR20 15tl -_______- ___ ____ _____ Grading for,Building Pad POBi ni 'i iii _ _ _. iii- --_ ,1______ ___ ___ ___ ___ ___ ___ ___ ___ ______ ___ ___ ___ ______ ______ ___ _ ES 1016 Gredirg for Buildirg Pad EAC 25 24FEB20 27MAR20 17APR20 15d Gretling for Building Pad EAC, Foundations i FND 110 Foundati ors- ntion Zone 15 27JAN20 14FEB20 14FEB20 0 Foundations-Detention Zon FND 115 Foundation BlockDete-Detention Zone 5 12FEB20 18FEB20 18FEB20 0 nation Block-Detention Zone ;; ;; ,,; --- FIND 100 Foundations-Kitchen&Intake Zone 20 17FE620 13MAR20 13MAR20 0 .� Foundations-Kitchen 8lnfake Zones; n 'i FND 145 Fountlation.-POB 10 16MAR20 27MAR20 27MAR20 0 ____________________________________________ ___ _ _ ___ ________ __ __ _ Foundations-P081;�.;�i-�C�---,1;„___ _ -- --- ______ ___ ______ ___ ___ ___ ___ __ __________ ___ ___ ___ ______ ______ ___ _ i FND 105 Foundation Block-Kitchen S Intake 5 16MAR20 20MAR20 31MAR20 7d Fountlation Block-Kitchen&Intake Zone;. - - - - - --- --- - FND135 Foundations-EAC 15 30MAR20 17APR20 17APR20 0 Foundations-EAC' "i "' "' FN0130 Fountlation Block-EAC 5 20APR20 24APR20 24APR20 0 Foundation Block-FAC; low-Slab Rlls and BOG Prefabncated Cans&Datention Area Strunnre SOG 200 Below-Slab Plumbing-Del 30 19FEB20 31MAR20�31MAF20 0 Below-Slab Plumbing-Det-- --- - - - --- -- --- --- --- --- --- --- --- --- --- --- -- ------- --- --- --- --- --- --- --- --- --- - _________ _____________________________ ___ _ ________ ____ __ ___ ___ - r r SOG 20fi Below-Slab Secudt -Det 25 2fiFEB20 31MAR20 15APR20 11d Below-Slab Becuny-Del � i i, i�i tint i BOG 205 BelowSlab Electrical-Del 25 04MAR20 07APR20 07APR20 0 Below-Slab Electrical-Del SOG 210 Fine retle,Form,Mesh&Plat BOG- 20 25MAR20 21APR20 29APR20 6tl fineff.de,Form Mesh B Place SO - el "--u--- --- --- --- --- --- --- --- --- --- -- ------- --- --- --- --- --- --- --- --- ---G-Del ;,,; Kitchen&Intake -4 SOG 100 20BelowSlab Plumbs -K81 18 01APR20 24APR20 24APR20 020Below-Slab Plumbin K&I ;i ii ---------------------------------------------- tint B. 105 BelowSlab ElecMcal-K&I 18 08APR20 01MAY2D 01MAY20 0 Below-Blab EleMrical-K&I Start date 16SEP19 Eery bar Finish date 14MAY21 �Progress be Data tlate 16SEP19 Bordeaux Critical bar Pa a number 1A Orange County Northern Campus-Bid Basis Schedule Summary bar ®Pdmmere S stems Inc. ♦ Stan milestone point ♦ Finish milestone point DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ' Description ong Early Early Late Total ID our SWn Plnlsh Plnlsh Ploat AUD eaP oeT xov cee uAx Paa eAa APR MAY tux Jug AuD a OCT xov DEC 2023 BOG 106 Below-Slab Security-K&I 10 20APR20 01MAY20 03JUWO 23tl --IBelow-Slab Lecuriq-,K&I --- --- --- --- --- --- --- --- --- --- -- --- ------ --- --- --- --- --- --- --- --- - ---------------------------------------------- --- - - --- -------- -------� SOG 110 Fine retle,Form,Mesh&Place BOG- 10 04MAV20 15MAV20 1]JUN20 23tl I Finegratle,Fonn,Mesh 8 Place SOG-K81 I III I FAG BOG 505 Below-Slab ElecMcal-EAC 25 27APR20 1 29MAV20 129MAY20 0 ______________________________________________ _ _ ___ ________ Belo SIabE ctric C w I al-EA ,,,- -EAC 25 04MAV20 05JUN20 OSJUN20 0 - - ------- ----- Below-Slab P robin EAC" - - "--'-- ------ --- ------ --- --- --- --- - BOG 500 Below-Slab Plumbi _ _. - !u ..a-_...'.._BOG 510 Finegrede,Form BOG-EAC 10 01JUN20 12JUN20 12JUN20 0 Fine retle,Form SOG-EAC n Park Offi a li BOG 600 Belau-Slab Plumbiig-POB 25 15JUN20 1]JUL20 25SEP20 50d ---------------------------------------------- --- - ----- -------- ----- -, -- Below-Blab Plumbiny-POB -- --- --- --- --- --- --- --- --- --- --- -- ------- --- --- --- --- ------ --- --- --- - BOG 605 Belav-Slab Else deal-POB 5 20JUL20 24JUL20 020CT20 50d Below-Slab Electrical-POB ____________________________ Fine de.Form,SOG BOG 810 Fine retle,Form,SOG-POB 15 20JUL20 07AUG20 16OCT20 50d 9ra POB HIT IN Structural Work Prefabricated Cells&Detention Area Structure ______________________________________________ ____ _ ar.A STR 205 Stmcturel Masonry Walls-De1.Areas 35 22APR20 09JUN20 17JUN20 6tl ___ _ __ ___ __ Stroctural Mason Walls D Areas �',„i- i 0 ___ - __ ___ __ g..._.._x, - _ ___ ___ ___ __ _______ ___ ___ __ ______ ___ ___ ___ - STR 2 Shorn Fonn Rein(&Place Co{ntrol Rm Floom STR 200 Set Prefabricated d Cells Place Control 15 20MAY20 09JUN20 17JUN20 16d .............................................. _________ __ _________ __ __________ ___ __ ________ ` �Betigrefabrirat. ells_ J-l��.--- - ---- --- --- --- --- _ ___ _____ ilia � ill___ ___ et Raof Joists-De ,,,__ ___ �„--i___ ___ ___ ___ ___ on Areas STR 220 Set RoofJdsts-Detention Areas 20 10JUN20 07JUL20 15JUL20 Bd tenti-W-L--- -- --- --- --- - STR210 Erect 2ntl Fir Cell Access Walkwas 25 10JUN20 14JUL20 175EP20 47tl �rec[ n r e Walkways _____________________________________________ ___ _____ ______ _ i_ Roof Metal Decking Detention STR 225 Roof Metal Decking-Detention Areas 20 09IUL20 04AUG20 12AUG20 fid - ntion Areas When&Intake STR 100 Stmeturel Masonry Walls-Kit&Intake 30 27MAV20 0]JUL20 29JUL20 16d ' Structure)Masonry Walls-IKit B Intake STR 110 Set Roof Jdsts-Ki[8Intake ifi 0&IUL20 29JUL20 20AUG20 ifid _ _ _ _ Set Roof Joists-Kit 8lntake___L --- -- --- --- --- --- --- -- ------- --- --- - --- --- --- --- - LTR105 Roof Metal Decking-Kit&Intake 5 30JUL20 OSAUG20 27AUG20 i8d --- --- - --- --- -- -• Raof M�tal Del�kilgKilB Intake',;; J--- --- --- --- ------ --- --- --- --- -- ------- --- --- --- --- ------ --- --- --- - LEGJaiI Admin SirucWre _ _ 1 h I I_Y___F'II STIR 610 Set Prec ine,el metal building fame 20 10AUG20 04SEP20 13NOV20 Sod Set Preengineertl metal building frame STR 610 Preergineeredlnaulallon 15 07SEP20 25SEP20 04DEC20 SOd _ _ __ Precngineeretl insulation' Ineeretl girls entl sheathing 10 28LEP20 090CT20 i8DEC20 SOtl Preen` - hin STR 605 Pree eered girts and sheathing EAC ' u St I-EAC III Ili tr ct I STR 205 AN Structural Steel-EAC 25 i5JUN20 17JUL20 17JUL20 0 r u re ee STR 220 AN Be...Roof Joist.8 tleck-EAC 15 20JUL20 07AUG20 07AUG20 0 Set Roof Joists 8 deck-EAC ___ --- --- ------------------- - - - --- Lheathin __"--- --- --- --- ------ ------ --- -----___ ______ --- --- __ STR 230 AN Metal Studs&Bhealhin 30 10AUG20 186EP20 18SEP20 0 -____ _ Metal Stud � � STR240AN SPrey foam 30 24AUG20 020CT20 02OCT20 0 Sp foam;; Roofing&Roof-Top Work Prefabricated Cells&Detention Area Structure RF 200 Blocking&Equipment Curbs- 10 05AUG20 i8AUG20 26AUG20 fid Blocking B EquQmenl Curbs-Dletenion Areas-- --- --- --- --- --- --- --- --- -- --- ------ ------ --- ------ ------ --- - s ______________________________________________ Cm-Det'rdkr Areas_S _...._` `______ __ ___ ___ ___ ___ ___ ___ ___ ___ ___ __ - _____________________ nAreas ___ _ ___ ________ _____ ___ _ Roofi RF 205 Roofln L tem-Detention Areas 25 12AUG20 i55EP20 23SEP20 Bd ng Yse Set Roof urbs-Detenko RF 215 Set Roof Curbs-Detention Areas 10 i66EP20 295EP20 WOCT20 6tl 21 SoldI _Ji 1 25 16SEP20 RF2RIF 0 Copn9s.sLatltlers,HatchesB Walk 15 140CT20 00OCT20 02 EN21 63d _ _ III "" Co_Pnet �s.Latltlers,It{___J___ Kitchen&Intake _____________________________________________ ____ _ ___ _ ,t { r _r,Il�.hea 1&Walk Parts Detenl'n RF 100 Blackin &E ui ment Curbs-Kit& 10 O6AUG20 1MUG20 09OCT20 37d lockin &Equi ment Curbs-Kit&Intake ---------------------------------------------- --- - ----- -------- ----- --- --- -- - uiprp...-----� - --- --- --- -- ------ --- --- --- --- -- ------- --- --- --- --- --- --- --- --- --- - RF105 Roofing Byetem-Kit&Intake 15 i6SEP20 060CT20 230CT20 13dRoofin Sstem-Kit&Intake _g`-Y.-_----` _______ ___ RF 110 Set Roof to a uI 15 070CT20 270CT20 26JAN21 83d ______________________________________________ ___ ___ ________ _____ ___ ___ __ _• ,,, oof top equip_ RF 115 Copings,Ladders,Hatches&Walk 10 210CUO 03NOV20 02FEB21 63tl opin s,Ladders,Hatches&Walk Pars-Detent'n FAG 20 "LRoofin System-EAC Exterior Cladding South Elevation CLS 105 Mason Veneer-Ground to Low-Roof- 15 10JUN20 30JUN20 11SEP20 53d MasonryVeneer-Gr Ito Low-Roof-South: CL S 100 Masonry Veneer-Low Roof to High 15 09JUL20 29JUL20 16OCTZO 57d ______________________________________________ ___ _ _ ___ -------_ ________ ______ _ till Masonry Veneer-Low Roof to Mgh Roof-South_-- _--_-- _--_-- _--_-- _-- _-- -- _-- _--_-- _--_--_-- _--_-- _--_-- _-- _ CLS 110 Wind—&Storefront-South Eleu 10 30JUL20 12AUG20 27NOV20 77d iwindows&Storefront-Louth11 Elev. CL5125 Entrance CarwPles-South Eleu 5 30JUL20 OSAUG20 04DEC20 87d _ Entrance Canopies-South Elev.� s CL S 120 Ezlerior Doors&HarcNrare-Louth 10 OBAUG20 19AUG20 18DEC20 87d Exterior Doors gaffe Gate 8 Controls v.Sall port CL L 135 Fencln &Moleable Gate&Controls 15 30JUL20 19AUG20 12JAN21 102d ennn ove - 1 -••_•• ._are-South Elev. �.h EI Downs uts-Bout CL5130 Ezlerior lJ9MIn9T mEILOWh EIeu 0 20AUG20 025EP20 12JAN21 92d _ ______________________________ ___ Ezlerior ______________ - - - _1•�_..S tTrim-South -- _____ ________ ________ ___ ___ _ --"CL L 140 SecurityCameras&Controls-South 15 03LEP20 23LEP20 02FEB21 92d Securi Cameras 8 Controls-South Elev. East Elevstio I CL E 105 Mason Veneer-Ground to Low-East 15 011UL20 21JUL20 020CT20 53d M, ry YV ->C'.,�-.'.. l ason Veneer- round to Low ry ...._ ___ ___ ___ ___ ___ ___ __LLA ___ I CL E 100 Masonry Veneer-Low Roof to High 10 30JUL20 12AUG20 300CT20 57d 'Masonry Veneer-Low Rocf to High Roaf-East Start date 16SEP19 Early bar Finish date 14MAV21 �Progress be Dal.date 16SEP19 Bordeaux IIIi Critical bar Pa a number 2A Orange County Northern Campus-Bid Basis Schedule Summary bar 0 Pnm S stems,Inc. ♦ Stan milestone point ♦ Finish milestone point DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ' Description On Early Early Late 1,2d our Start Flnlsh Flnlsh AuoDogs&Hardware-East Elev 5 1AUG20 19AUG20 i8DEC20 oeT cee rea xov oa nxDowvDsc oAx a NAa AFa unv Juu uuL Auc sav oci xov oac unx Fae uta AFa NAv uux uuL AuCLE 115 Wintlows-East Elev 5 1AUG20 19AUG20 2]NOV20 --- --- ----------- --- Windows-Earl e----`�_______ ___ ________ ___ _____ ___ _ _____ ________ _____ ___ ___ ___ __ ngl ast-El --- --- --- --- --- -__ --_CLE 130 Exterior Lighting Trim-East Elev 10 20AUG20 02SEP20 19JAN21 Exterior Li Ming TrimEast Elev.CLE 1358 20AUG20 31AUG20 19JAN21 East Elev__CL E 125IIi", Elev 10 038EP20 168EP20 D2FE821 Securit Cameras-East Eley. anCLW 105 Mas my Veneer-Grountl to Low-Roof- 20 22JUL20 1AUG20 300CT20 Mso ryVe�ee� Ground toL Roof-West o ---------------------------------------------- --- - - --- -------- -------- ------ -- - - '___,___,___ ___ ___ ______ ______ ___ _____ ___ ______ ______ ___ ______ ______ ___ - CLW100 Mason Veneer-Grountl to Hih Roof 15 19AUG20 08SEP20 20NOV20 53tl ____ ____ ____ ___ _ ____ _ ___ ___ Masonry Veneer-Groundb High Roof-Wes_t C 110 Enhance Canopy-West El- 10 09SEP20 22SEP20 04DEC20 53d %EnceCanopy West Elev. 1_ ----_ ----_ ----_ _ ___ _ _____ __ ___ _ ___ ___ u� _ ___ ___ ______ ___ ___ ___ ------ LW CL W 120 Exterior Doors&Hardware-West Eleu 10 23SEP20 06OCT20 1BDEC20 53tl rior Doors&Hardware-West EIev. CLW 115 Exterior Lighting Trim-West Eleu 10 070CT20 200CT20 19JAN21 83tl [erLightingTrim-WestEIev. __________________________________________ ______ ______ __ Camer- ___ - CL W 125 SecurityCameras-West El- 10 210CT20 03NOV20 02FE821 63tl ecuriry Cameaa-West Elev. North Elevation Veneer CLN 1110 Ezlerio�Doors&HarcNrareo NlorthEe 6 24SEP20 30SEP20 18DEC 0 57tl -------- -- -- -- -- ------------------------ --- - ----- -------- -------- --- -- , Eax[erio Doote Hardwam High Roof_NM EIev-- _ - - - _ ___ I" are-NOM_Elev. __ _ CL N 105 D—Pouts-North EIev 5 24SEP20 30SEP20 19JAN21 77d ______________________________________________ ___ _ _ ___ ________ _____ ___ ___ {Downspouts.Noah EIev;J--,J_ -�__-� _� _______ ___ ___ ___ ___ ______ ______ ___ _ ------------ CLN 120 FencingMamt.Vehicle Slo - 5 010CT20 070CT20 19JAN21 72tl F y�r M [Veh cle S[orege Nodh Elev. """ Exterior Li htin Trim-North EIev. CLN115 Exterior Lighting Trim Eleu 5 080CT20 140CT20 28JAN21 72tl ,,,,, � 4_`9 ' -'___ _ ______ ______ ___ _ CLN125 SecurityCameras-Nodh El- 5 150CT20 210C120 02FE821 72tl Securi Cameras-NOM Elev. EAC anon Veneer EAC CL 105 ANI Mason Veneer-EAC 25 OSOCT20 06NOV20 06NOV20 0 _____________________________________________ __ ____ ________ _____ ___ ___ ___ __ ry �_ --- --- --- --- --_ ___ ___ „„ M e ,, Entrance ___ ___ __ ___ ___ ___ ___ _ CL 125 ANI Ent...Canopies-F1C 5 09NOV20 13NOV20 13NOV20 0 ',r,r, 'E --L pies_EAC --------------- CL 110ANI Wind -EAC 10 09NOV20 20NOV20 21DEC20 211 ",',,,�,� Wind &SturelroM-EAC _`___'__�___'___•___ ___ ___ ______ ___ ___ ___ ___ __ _______ ___ ___ ___ ___ ______ __ CL120ANI Exterior Doors&Hardware-EAC 10 i8NOV20 27NOV20 27NOV20 0 '��""' """" Exterior Doors&Hardware-EAC Park Office CLS 120 POB exterior doors&HW 10 120CT20 230CT20 OSJAN21 50d __ _ f�''�i��� PO 111erior doo & f B # HW' Interior Work Detention Areas A/B Drr M earA/B 1 wl - 15Grid HaH Elechlca RA/B 105 OH Electrical R/I-Al System.A-All 20 0AUG20 OSEP20 17SEP20 12tl g ct& R/I-All Stems CEq.-A/B 00 g a 9. _ ___ ________ ________ ______ __ _ Above-Ceiling HVA __ ____ _ - 11 P --`Systems 1 Chase h R MEN Rlls-rA/B rrr NB - RA/13 115 RA/B 110 Spn1'keR/In A/B Is-A/B 15 0 AUG20 2AUG20 28000 46d __________ ___________________________ ______ ___ _ __--- ___ _ __ __ _ _ Cell tilers ll-I. ---------------------------------------------- --- - - VAC Pipe,Rlla&Connectsb HVAC Eq.-NB RA/B 120 HVAC Pi R/IsBConnects to HVAC 15 2AUG20 i5SEP20 070CT20 i6d --- -------- -------- H,,, ---------------------------------------------- - __ _ ____ ______ R/I( t C Ilcha es) AJB ------ -- - 'OH Plumbin ------ --- - RA/B 165 OH Plumbin R/I not in Cell chases- 15 2AUG20 i55EP20 280CT20 31tl _ __ Y ____-------- - -- --- --- „� /�,.,11Wire a Lights&efPower-AB --- ------ --------- -- g c � I 135 Pull Wire tars stems-A/B 15 16SEP20 060CT20 19NOV20 32d _ - ___ __ _____ ___ _ 1-1- RA/B _____ ___ ---- ull Wirorfor- -- - --- --- --- --- --- --- --- --- --- -- ------- --- --- --- --- ------ --- --- --- - RA/B 125 PUII Wire for Li hts&Power-A/B 15 028EP20 228EP20 OSNOV20 32tl _________________________________ _ P II, --- -NB RA/B130 HVAC Insulation-A/B 15 30SEP20 20OCT20 28OCT20 fid _ _ ___ ___ __ ___ _____ u�y Clneulation --- --- --- --- --- -- --- --- -- ------- -- ------ --- - u - Bys s ____________________________________________ - _ u ___ --- --- --- --- --- --- s NB" RA/B140 Frame for Hard Ceilings BBuilkeatls- 10 140CT20 270CT20 04NOV20 6tl „„� f me for Hard Ceilings88uilkeads-A/B - - __ - ___ ___ ',ii�i� ',�ii�i�i�,FME ns W Frame ___ ___ ______ ___ ______________________________________________ ___ _ _ ________ ____ ___ ____ bove-Ce ectio ed C19s/Blkhds-AIB ___ ___ ___ ___ __ _______ ___ ___ ___ ___ ______ ___ ___ __ _ RA/8145 MEP Connections to Framed 10 210CT20 03NOV20 11NOV20 6tl PCon� _ tlln Ins coon-AB RA/B 150 Above-Ceiling Inspection-A/B 1 04NOV20 04NOV20 12NOV20 fid _ i1"i;_yu,,,,, Y.^�& 9�_I�? , 1 RA/B 155 Han &Finish Ceilin/Blkhd GWB A/B 10 05NOV20 18NOV20 26NOV20 6tl « "" HaW Finish Ceilin Blkhd GWB AB RA/8160 Prime Paint 8 Hang Ceiling Grid-A/B 10 12NOV20 25NOV20 11 DEC20 12tl Prime Paint&Hang Ceiling Grid-A/B Fhwrea&Flniahea F AIB 100 Install Grid Fixtures-A/B 15 26NOV20 16DEC20 OSJAN21 12d Install Gritl FizNres-A/B FA/B105 Hard Tile-A/B 10 26NOV20 09DEC20 02FEB21 37d ___ _ _ ___ ________ ________ ______ __ __ Hartl Tile-AB --- --- --- --- ------ --- --- --- --- -- --- ------ --- --- --- ------ ------ --- - _ - FA/B 110 Paintin -A/B 10 10DEC20 23DEC20 12JAN21 12tl Painting-AIB_��- �- Fizlures-A/B F AIB 115 Shower/Bath Fixtures-AIB 5 10DEC20 16DEC20 09FE621 37d ------------------------------------------- --- --- - -_- _- ShowerlBath - --- --- --- --- --- --- -- ------- --- --- --- --- _ ______________________________________________ _ _ _ _ bove-Ceiling Inspection_AB __ ___ ______ ______ ___ - ----- --- ------ - 'iii�'i� i. i' __ ___ ___ ___ ----- --- ------ ---- F A/B 120 Final Abo�eCeilin Ins action-AIB 1 17DEC20 17DEC20 19JAN21 21d __ ________ FinalA F Ale 130 Detention Area Div lO Finishes-A/B 10 17DEC20 31DEC20 23FEB21 37tl Detention Area Div 10 Finishes-AB FA/B 140 Doors&Hardwam-A/B 10 24DEC20 08JAN21 26JAN21 12tl ------------------------------------------- --- - ----- -------- ----- --- --- '�,:'I 'u Doors&,Hardware;-1 __ ___ ___ _ --- ___ __ _______ ___ ___ ___ ___ ______ ___ ___ ___ _ FA/B 135 Mechanical&Electrical Trimout-A/B 10 24DEC20 08JAN21 23FEB21 32d VICchanical&Electrical Trimout=A/B - - _ ,:� - - ___ ___ __ ___ F A/B 125 C®tin Tiles-A/B 5 31 DEC20 07JAN21 26JAN21 13d _ _ 'Ceiling Tiles-,A/6 1 __ ______ ___ _____ ___ ______ Security 21 21 F Ale 145 Fire Alannimout-A/B&Telecom,Detices-A/B 15 OBJAN21 04FFEB21 23FEB21 18tl --- ----- ---- Security Trimout-A/B --- 'iii�'�I _,___,___ ___ ___ 8 Telesom Devices-A/B .Fire ___ ___ ___ ___ ___ ___ ___ ___ _ F A/B ifiO adsion lO Finishes-A/B 10 08JAN21 21JAN21 23FEB21 23d Sp tiler Tn'Flnishes-AB arm I- Ivision 10 kler Trimout-A/B 5 08JAN21 14JAN21 23FEB21 28d �; LL rin mout-AlB1 FA/B 165 Mn.Concrole Floss-A/B 5 05FE621 11FE621 D2MAR21 13tl 'Sealed Concrete Floors-A/B Detentlon Areas CID 11, R C/D 100 Han&Duct B Above-Ceilin HVAC E.- 15 26AUG20 15SEP20 23SEP21 Id _',Hang Ducl&Above-Ceiling�HVAC Eq.-CID ______________________________________________ ___ _ _ ___ ________ ________ ______ M"__` '_ -, --- - Cell Chase ___ ___ ___ ___ ___ ___ ___ ___ __ RC/D115 Cell Chase MEP R/Is-C/D 15 2AUG20 i55EP20 210CT20 28tl _ _ _ q_ ________ _________ __ _ _____ __ uLL IuC/ " R CID 105 OH Electrical Wl-AllSstem.-C/o 20 02SEP20 29SEP20 15OCT20 12d _ --- - PO� C C�„� _____ .__ ___ ___ __ -_------- Fi P Is-C/Dstems,C/D R CID 110 Sprinkler R/I-C/D y 15 2AUG20 158EP20 11NOV20 41tl _ _ ______ ____ ___ ' S klElectriwl R/I-AIIS R CID 120 HVAC Pi R/Is&Connects to HVAC 15 16SEP20 060CT20 210CT20 11d ",u� „„HVAC Pi a R/Is&Connects to HVAC Eq._C/D ---------------------------------------------- --- - - --- -------- ----- --- --- --- -- -- Q --- --- --- --- --- R CIn 165 OH Plumbing R/I(not in Cell chases)- 15 1A.RF-U nsoC120 11NOV20 26tl OH Plumbing R/I(not in Cell chases)-CID Start date 16SEP 19 Eery bar Finish data 14MAV21 Progress bar Dal,kA, 1ISEP19 Bordeaux Critical bar Pae umber 3A Orange County Northern Campus-Bid Basis Schedule —Summary bar ®Prima�ere S stems,Inc. ♦ Start milestone point ♦ Finish milestone point DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ' Description on Early Early Late Tofal ID our Sbd Finish Finish Float AUD aeP tux .Iu� wDP OCT Nov DECAx APR MAY JUN JUL AUG SEP OCr MOV DEC JAN FEE MAR APR M.SUN JUL AUG SEP OCT NOV(DEC dw FEB MAR APa WJIIAUG R GD 125 PUII Wire for Li hts&Power-GD 15 305EP20 200CT20 19NOV20 22tl _ _ ',;;;;; „ ;Pull Wirefor Lights&Power-C/D ,, ,r, ___ ___- DR GD 130 HVAC Insulali--GD 15 07OCT20 270CT20 11NOV20 11d - Clnsulahon C/" ___ ___II li iot PUII Wire fors•CID 135 Pull Wl' for re efor ngs 8 Builkeatls-C/DR GD 140 Frame for Hartl Ceilings 8 Builkeatls- 10 210CT20 03NOV20 i8NOV20 11tl _ ',',„" ,,,, F,_,�-m, yCeili - ,� , _,___ --_ ___ ___ ___R GD 145 MEP Connections to Framed 10 280CT20 10NOV20 25NOV20 lld __ _ _ _ iMEP Connections to Framed ClgslBlkhds-C/D Hire-�M hlCe lmtllBlkhd GWB GD 110 19NOV20 02DEC20 10DEC20 16d - ----- - - --- -- - III Ab Haneil gl p ton CID ---1--- --- --- --- --- --- --- - ------- - - --- --- --- --- --- - 11NOV20 11NOV20 26NOV20 e-Cq&F hCe Lng/Blkhd GWBC/0 ___ ___ ___ ___ ___ ___ _ R GD 160 PH PC Paint&Hang Ceiling Gritl-GD 10 26NOV20 09DEC20 i8DEC20 ]tl Pdme PainlB Han CeilingGrid-C/D Fnwre.a Flm.h.. �I F CID 100 Install Grid Fiztures-GD 15 10DEC20 31DEC20 12JAN21 7d Install Grid Fixtures-CID -C/o 10 10DEC20 F GD 105 Pant nle-GD 10 24DEC20 208JAN211 19JAI421 7tl ___ __ _ ___ _ Hard TI C/D;] F GD 115 Shower/Bath Fixtures-GD 5 24DEC20 31 DEC20 09FEB21 27d er/e Show ath Fixtures-CID _ _ Final Above-Ceilin Ins ection-C/0 IEP F GD 145 Final Abo�eCeilin Inspection-GD 1 04JAN21 04JAN21 19JAN21 11d ;;;', 9-_p _ __ ___ ___ ___ ___ ___ __ ___ ______ _________ ______ ______ ___ _ F GD 140 Ceilin Tiles-GO 5 11JAN21 15JAN21 26JAN21 ]tl ------- -- ---------------------------------- --- - - --- -------- -------- ----- -D tention Area Div lO Finishes-C/D F CID 140 Dears 8 Hardware-GD 5 11JAN21 15JAN21 09FE621 12d e- _�_{___ F GO 135 MechanicalBElecMcal Trimout-GD 10 11JAN21 22JAN21 23FEB21 22tl _ - ------- -------- ----- """' ���,' C Tilesrtlware-C/D F GD 120 Detention Area Div 10 Finishes-GD 10 04JAN21 15JAN21 23FEB21 27tl _ n a nial&Electrical Trimout-GD .��i __ ..---•- •___ ______ ___ _____ F GD 150 Fire Ala-&Telecom Dow.-Go 15 18JAN21 05FEl 23FEB21 12d ___ __ ,������ „ Fire __ ---- ------- Trirtwut-C/D I---I--- -- --- - -- -- ----------------- --- Uri --- --- -- FGD155 Didsion lO Finishes-GD 10 18JAN21 29JAN21 23FEB21 i7d ________ __ __-_ ;',',;;,',', - ty ---- ---- " " Division l-STelecom DE F GD 130 Security Trimout-GD 20 18JAN21 12FE621 23FEB21 7tl _ _ _ ; f; ' Ala FGD125 S nkler Trimout-GD 5 18JAN21 22JAN21 23FEB21 22tl ',',� Sprinkler TO Finishes-C/0 �; " rimou[-CID F GD 165 Sealetl C-crete Floss-GD 5 15FE621 19FE621 02MAR21 ]tl �" " �' " 'Sealed Concrete Floors-CID Detention Areas OF PedmenP,col,w M Han Duct&Above-Ceilin HVACE!-E/F R E/F 100 Han Duct 8 Abore-Ceilin HVAC Eq.. 15 ifiSEP20 O60CT20 140CT20 fitl __ __ 9 q __________________________________________ ._.$he......�______' ___'_` ______ __ __ "rig:; J - ___ ___ ______ ___ ___ ___ ___ __ ___ ______ _________ ______ ______ ___ - RE/F 115 Cell Chase MEP R/Is-E/F 15 185EP20 06OCT20 04NOV20 21tl _ 11: Cell Chase MEP R/I ,,.I- nkierR/I-E/F 15 i65EP20 NMI) 21NOV21 led ___ ______ ___ ________ ______ __ __ ___ SPrink,r -EIF_r ,I R E/F 105 OH Electrical WI-All Systems-E/F 20 30SEP20 270CT20 12NOV20 12d ____ __________________________________ ___ _ ____ _ _____ ___ ___ ___ __. "I';; H.�IoIi col,AI I-_lems- ------------- �,,,,, ����,._.al S EIF EI ct R E/F 120 HVAC Pi Rile&Connects to HVAC 15 07OCT20 27OCT20 04NOV20 fitl __________ _ __ _ HVAC Pipe R/Is&Conneds to HVAC Eq.-FJF RE/F 165 OH PlumbingR/I tin Cell chases 15 07OCT20 270CT20 25NOV20 21tl -------- ",iui_i HPlurnbin ��-- --- --- --- ------ --- --- --- ----_-_ _--_-_ -_-_-_-_-_-_ -_-_-_-_-_-_ --_-_ -_-_-_-_-_-_ -_-_-_-_-- --- - (no )- PFumbin9 R/I(not in CIll chases)-E/F ____________________________________ RE/F 125 Pull Wire for Light.B Power-E/F 15 28OCT20 17NOV20 03DEC20 12d ___ -- - --- ---- _-_ ull yyi nsula8on-E/F g ______ ___ _ - - - ....._ _ � I_'._ ___ ___ ___ R E/F 140 Frame for Hadd Ceilings&Builkeatls- 10 11NOV20 24NOV20 02DEG20 fitl 1111 ", ;t F AC re for Lights&Power-ilk. R E/F 130 HVAC Insulali--E/F 15 280CT20 1]NOV20 25NOV20 6tl _ ___ _ ___ ___ __ _ 11'; PvV V_,__L_ V-- . ,_._ me for Hartl Ceilin s&Builkeatls-FJF ___ a Q---'-�- ------ ______ ___ ___ __ RE/F 135 Pull Wire for Systems-E/F 15 11 NOV20 01DEC20 17DEC20 12tl '�" ����� - WLWire for Systems-E/Fi I--- - -- -------- ---- --- --- -- -- ',,,,,, ',, - --- __--- - _ ConneIXionsb Framed Cl s/Blkhtls-E/F ___ ___ ___ RE/F 150 Above-Ceiling lrePection-EIF 1 02DEC20 02DEC20 10DEC20 fitl -- -yr i- Lve-Ceiling Inspection-FJF R E/F 145 MEP Connections to Framed 10 18NOV20 01 DEC20 09DEC20 fitl R E/F 155 He &Finish Ceilin/Blkhd GWB E/F 10 03DEC20 11DEC20 24DEC20 Bd ",i;i;-�;-;' ang 8 Finish Ceiling/Blkhd GWB OF R E/F 160 Prime Paint&Hang Ceiling Gritl-E/F 10 03DEC20 16DEC20 24DEC20 6tl Prime Paint&Hang Ceiling Grid-OF Fawn.a Firm— F E/F 100 Install Grid Fiztures-E/F 15 17DEC20 08JAN21 18JAN21 fitl _ Install Gritl Fi--s-'FJF ____________________________________________ ___ _ ___ - __ ,,,, L FE/F 105 Hard Tile-E/F 10 17DEC20 31 DEC20 01FEB21 21tl _ _ _ i ._ ,,,, Hard Tile-E/F F E/F 110 Paintin -E/F 10 04JAN21 15JAN21 25JAN21 6tl ",:� n F 'I.;. ' i " �Paintinq-EI _ ._____. ___ ___ __ ._ ',',f'll 'liiii 'f.............................................. FE/F 115 Shower/Bath Fixtures-E/F 5 00.1AN21 08JAN21 OBFEB21 21d Bath Fixues-EIF FE/F 120 Final AbrneCeilin Ins ection-E/F 1 11JAN21 11JAN21 25JAN21 10d ---------------------------------------------- --- - ----- -------- ----- --- --- --- -- -- --- -,Final Above-Ceilin Inspection-FJF --- --- --- --- --- -- ---------- --- --- --- --- --- --- --- --- -,,,, „ FE/F 130 DetentionArea Div lO Finishes-E/F' 10 11JAN21 22JAN21 MFEB21 21tl --- - --- -------- -------- ------ -- -- -.. - �- -- --- - - --- --- --- --- --- --- -- --- ------ --------- ------ ------ --- - "" """ oleo[on Area Dry lO Fina F E/F 125 Ceilin Tiles-E/F 5 18JAN21 22JAN21 01FEB21 8tl -- ------ -- - - - - --Ceiling Tiles-FlF --�---a-- --- --- --- --- --- --- -- ---------- --- --- --- ------ ------ --- -;;i;;; ;; FE/F 145 Security Trimout-E/F 20 18JAN21 12FEB21 22FEB21 fitl "" ""� ', " ecurity Trimout-EIF F E/F 150 Fire Alarm&Telecom Devices-E/F 15 18JAN21 05FEB21 22FEB21 11d """ a Ala-&Telecom Devices-E/F,,,, I -------------------------- :;:; Door--- -- I FE/F 140 Doors&Hartlware-E/F 10 18JAN21 29JAN21 16FEB21 I „rsBHardware-E/F F E/F 135 Mechanical&Electrical himout-E/F 10 18JAN21 29JAN21 22FEB21 Mechanical 8 Electrical Trimout-E/FFE/F 155 DlNalon lO Finishes-E/F 10 25JAN21 OSFE821 22FEB21 Drvisionjo Finishes-FJF'- 'FE/F 180 S 'nkler Tlimoul-E/F 5 25FEB21 29JAN21 22FEB21 ',',;;;; ;;;;;; ;, Sprinkler Trimout-E/F F E/F 165 Sealetl Concrete Floss-E/F 5 15FE621 19FE621 D1MAR21 Sealed Concrete Floors-E/F When Area . al IM R 2001 a pyw Non-SVuctural Mason Paditions-Kit 15 06AUG20 26AUG20 17SEP20 ifitl .I.'Non--Stmctural Masonry Paditions-Kit -------------------- g -- uct Rll 8 Set Above-Ceilin8 HVAC Equip-Kit IMR205 Oucl R/I&Set Abo�aCeilin HVAC 15 27AUG20 i65EP20 OBOCT20 ifitl _ _ rhead ectdcal R/I-AII Systems-Kit IMR210 O.erheatl Electrical WI-A115 stems- 20 27AUG20 23SEP20 160CT20 17tl �O __ ________ '., ,__•• col �Eq-Kit IMR225 HVA kIer R/ly-Kh Connect to Abo�eClg ;0 27AUG20 095EP20 17NOV 0 49d _ SP'k„Yi eRll&Con1nerrct to Abov11eCl IM R 215 S ---------------------------------------------- --- - - --- -------- - ---- -- --- - -- r m Be Pg�� J- -';;--�1-- '�_ - IxIT R 216 Roof Dreinage Piping-Kit 5 27AUG20 025EP20 17NOV20 54tl Roof D a _`_ ___ ___ ______ ___ ___ ___ ___ __ ___ ______ ___ ___ ___ ______ ______ ___ _ IM R 280 Install Kitchen Hoods 5 17SEP20 23SEP20 01DEC20 49d re for P r&Lights J Kit -f IxITR230 PUII Wire fur Power&U his-Kit 20 10SEP20 07OCT20 18NOV20 30tl II Wire L, i- --- --- ------ --- --- --- - IMR220 OH Plumbin fLI,T tin 8lnsulation- 15 23SEP20 130CT20 17NOV20 25d __ on-Kit _- _ in sl es in IxITR235 HVAC Insulalian DuclB Pie-Kit 15 070CT20 2]OCT20 1]NOV20 15tl _ _ HV Clnsulatiems-Kit; y _______ !.N u Kit ItJT R 245 Pull Wire for S stems-Kit 15 010CT20 210CT20 02DEC20 30tl u on( IM R 240 Above-Clg HVAC Eq Elec/Comrs 10 14OCT20 270CT20 17NOV20 15d -Tn boVe-._`-,-_ .. -Ki ------ --- --- --_ ___ __ ___ ___ ve-CI$HVAC Eq EIeGConids Connects-Kit INT R 250 Frame for Hard Ceilings B Connect PAS 10 280CT20 10NOV20 01DEC20 15tl for Hard Ceilings&Connect R/Is-Kit IM R 255 Above-C 9 pe eilin Insction-Kit 1 11NOV20 11NOV20 02DEC20 15tl --- ----- --- - - --- -------- -------- --- --- -- -- 'i'i i;i .i;i'ii, 'Above-Ceiling Inspection-Kit --- --- --- --- --- --- --- --- -- ---------- --- --- --- --- --- --- --- --- - Start date 16SEP19 Early bar Finish data 14MAY21 Progress be Data tlate i6SEP19 Bordeaux Critical bar Pae umber 4A Orange County Northern Campus-Bid Basis Schedule Summary bar ®Prima�ere S stems,Inc. ♦ Stan milestone point ♦ Finish milestone point DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ' Description Orig Early Early Late Total ID our Start Finish Finish Float AUG SEP oe7 aAN 4uc AND OCTDEC JAx FEa M DEC FEB MAR APR MAY SUN JUL AUG SEP OCT Nov DEC JAN FEB MAR APa MAY Jux JUL INT R 260 Han &Finish GWB Ceilin s-Kit 10 12NOV20 25NOV20 16DEC20 15tl ',',i; ;; Hang&Finiah GWB Ceilinge_Kit IM R 265 Prime Paint 8 Blackfill-Kit 5 26NOV20 02DEC20 23DEC20 15d Prime Paint&BI ekfill-Kit IMR270 Install Cooler/Freezer Compartments 10 30NOV20 11DEC20 05JAI421 15d _ _ I^stall C_oole_r/Fr_eezer Compartments IMR275 Instal Ceiling Gritl-Kit 5 14DEC20 18DEC20 19JAN21 20d �'�i;; ��,,,� ;Instal Ceilin Grid-Kit' --- --- ------ ------ --- ----- PINT F 205nifm6Hard Tie-Kit 15 14DEC20 05JAN21 26JAN21 15d Hartl Tile-Kit ,,,-Willi - �Ki[chen Equipment IM F 220 Kitchen Equipment&Connections-Kit 20 14DEC20 1ZJAN21 23FEB21 30d 8 Connections-Kh _- --- --- --- --- --- ----- --- ------ ------ --- ------ ------ --- - INT F 200 Install Grid Fixtures&Nor id Li his- 10 29DEC20 1ZJAN21 02FEB21 15tl "' ;; stall Grid Fixture 8 N - d Lights-on Gri KM IMF210 Interior Painting-Kit 10 13JAN21 26JAN21 16FE621 15d Interior Ptin K 11 i IMF 215 Final AboveCeilin Inspection-Kit 1 13JAN21 13JAN21 23FE621 29d Final Above-Ceiling Inspection-Ki IM F 225 Set Plumbing Fixtures-Kit 5 ZWAN21 26JAN21 02MAR21 25d x S t PIrnbmg F xN -Kit INT F 245 Doors&Hardware Kit 10 27JAN21 09FEB21 02MAR21 15tl -- _ f D g&Hard are Kt IMF 230 Calling Tiles Kt 5 27JAN21 02FE821 02MAR21 20d C In Tiles KC _ _ _ _ IMF 235 Electrical&Mechanical Trimout-Kit 10 27JAN21 09FEB21 09MAR21 20d Electrical&Mechanical Tnmoul-Kit -- -- --- - - ___ ___ ___ ___ -- - --- --- --- _ IMF 255 Fire Alan Desires Kit 10 27JAN21 09FEB21 09MAR21 20tl F' AI TDevices KtI IM F 265 Secun &Telecom Deuces-Kit 10 27JAN21 09FEB21 09MAR21 20tl S urTy&Telecom Devices K t "', _n_ii ii_ _ ___ __ ___ ____ _ _ ___ _ ___ __ _ ___ _ 5 27JAN21 02FEB21 09MAR21 25d Partitions/Accessories-Kit IMF 250 All tOthe'r Division lO Work-Kit -Kit 5 27JAN21 02FEB21 09MAR21 25d Ba Other room All Division 10 Work-Kit IMF280 VCT Flooring-Kit 5 10FEB21 16FEB21 09MAR21 15d _____________________________________ ___ _ _ ___ ________________ ___ ���-.. . - __ iVCT Flooring____ ___ ___ ___ ___ Intake -- --" wmaen.,cal,,aywan 4ada 'f IMR1105 Sasnkler wlrtitlMake Intake Cells- 5 iC3AUG20 025EP20 26NOV20 81tl ---------------------------------------------- - - -_- - -- - - �Ma SP'nkler iR/^ -y s Intake_ �- --- --- -rl Pa s&Intake Cell- _______________________________________ __ Intek __ ___ .. Intake_ ___ ___ ______ ______ ___ _____ ___ - - !Chase Plumbin Rlls Cells&Toilets-In e IM R 120 Chase Plumbin R/Is Cells&Toilets 10 13AUG20 26AUG20 2]NOV20 6]tl � IM R121 Raof Dreina a PiPin Intake 5 13AUG20 19AUG20 18DEC20 8]d _____________ ________________ -- - _____ _ ------ --- --- --- - 'R a e Pi Ilak J J -- --- --- --- --- --- --- --- --- -- ------- --- --- --- --- ------ --- --- --- - 9 9- of Drain '"'in -n e ,,, --------------------------------------------- - -------- -------- ---- - - '�hh� -- _--- -lr ke- --- --- --- --- --- --- -- ---------- --- --- --- ------ ------ --- - I&Set Above-Ceiling HVAC Equip=Intake ____ ___ ______ ________ ______ ______ ___ _ IM R 105 Duct R/I&Sal Above-Ceiling HVAC 15 17SEP20 070CT20 290CT20 ifitl _ -- - - � ��„�Duct W W IM R 130 OH Plumbing R/I,Testing 8 Insulation- 15 235EP20 130CT20 18DEC20 48tl ',', OH Fla.bin P/I Testing&Insulation-Intake IM R125 HVAC Pi R/I&Connect to Above-CI 20 245EP20 210CT20 12NOV20 ifitl __ _ _ "; ;' HVAC-�_� _� , , .___ ______ ___ ___ ___ Pi R/I 8 Conner[to Above-CI E-Intake INTR 110 Overhead Electrical Rll_AIIS stems- 20 24SEP20 21OCT20 13NOV20 17d ______________________________________________ ___ _____ ________ __ ___ ___ __ __ __ "" Over - riwl R/ All System-In 4_.--- --- --- --- --- --- --- -- ------- --- -- --- - --- - ,i, s-Intake ___ ___ ___ ___ ___ ___ _ INTR135 Pull Wire for Power&Li Ma-Intake 20 O8OCT20 04NOV20 27NOV20 17d ".,.,_ Wl Wire for 9 .-.__ _________________ ��,,,, P _ take IMR140 Complete Chase Mason Intake 5 140CT20 200CT20 28DEC20 48tl - _ _ --- ----- -------- - 'CO p atl Elect owerB Li hts-In- - --- ------ --- --- --- -- ------ --- - y ___ ___ - - Ion(Duct& I-A P __________________________________ ---------------------------- lete Cha ry-,make,-`- --- - - IM R 145 HVAC Insulation Duct&Pie-Intake 10 220CUO 04NOV20 MNOV20 ifitl AC Insulation��,,,, i" ,HV.�.... Pi -Intake ---- -- - - ___ rq VA iris Connects-Intake IM R155 Above-C19 HVAC Eq Elec/ConMs 10 220CT20 04NOV20 26NOV20 ifitl _____________________________________________ ___ _ _ ___ _ __ __ __ ",�;�; �„ Ab W_L C Eq EleclCon IMR 150 Pull Wire fors stems-Intake 20 22OCT20 18NOV20 11DEC20 17d _ _ _ ',',,,,, ;_;;; L PUII Wire fors stems-Intake' me roc _____ ________ ____ _-- ------ --- - IMR160 Freme for HaN Ceilings&Connect R/Is 10 OSNOV20 i6NOV20 10DEC20 ifitl _ __ Fra Hartl Ceilin s&Connect R/Is-Intake ___ __- - __ __ - ion_ ___ ______ ___ - IMR170 Han&Filneh GWB Ce�Ii Intake 10 20NOV20 03DEC20 28DEC20 ifitl ---------------------- ---- ---- -- -- 'i'i a Hang Bing In � -g�ke�---` --- --- --_ --- -- ------- --- --- coon-Intake 1 19NOV20 19NOV20 110EC20 ifitl __ _ v Cei glnsGWB Inta g rigs _ __ ___ __ _ _ Ceilin s-Intake --- --- --- --- --- ---- ------ ___ ___ __ __ _,.,--. a Prime PaintB Block811 --- --- - IM R 175 Prime Paint&Blockfill-Intake 5 04DEC20 10DEC20 05JAN21 led ",i�i;--;-' "' -Intake IMR180 Instal Ceiling Gntl-Intake 5 04DEC20 10DEC20 O5JAN21 ifitl Instal Ceiling Gnd-Intake; Fawns 4FlMehes Im i i'i Interior - iii "" Insak IMF110 Interior PalMin -Intake 10 11DEC20 24DEC20 19JAN21 ifitl _ _ _ _ _ _ _ _ _ _ ___ _ _ ___ _________ ______ ______ __ " Painting,- o' ---------------------------------------------- --- - - --- -------- - ------ ------ -- -- ".... -_�i;;i i'i Install Grid -__ ___ -_____ ______ ___ _____ ___ ______ ___ ___ ___ ______ ______ ___ _ IMF105 Hartl Tile-Inake 10 11DEC20 24DEC20 i6FEB21 36tl ��"" ""���_ Hard Tile-Intake � Non-Grid Light--Intake IMF 100 Install Grid Fixtures&NonGnd U Ms- 10 11DEC20 24DEC20 25JAN21 20tl ores 8 ixl 9 11 { .............................................. _._ . ._____- _ ___ ___ __ __ ___i . _ _ ___ o D IMF135 DDorsBHardware-Inake 10 28DEC20 11JAN21 02FEB21 ifitl ors&Hardware-Intake --- --- --- --- --- --- -- --- ------ --- --- --- --- --- --- --- --- - IMF 115 Final AboveCeilin Inspection-Intake 1 28DEC20 28DEC20 26JAN21 20d - IMF125 Set Plumbing Fixtures-Intake 5 28DEC20 04JAN21 23FEB21 36tlat Plumbing Fixt� --- --- ------ --- --- -- --- - ures-Intake IM F 140 Electrical&Mechanical lM1mou[- 10 28DEC20 11JAN21 02MAR21 36tl ___ ___ ___ ___ __ _ ___ ___ _ __ _ Electrical 8 Mechanical Trimoute Intake IM F 155 All Other Division 10 Work-Intake 5 28DEC20 04dAN21 02MAR21 41d All Olh D on 10 W k Intake IMF 120 no ..a-Intake 5 31DEC20 07JAN21 02FEB21 18d _ k-C g T'I -ImDk I -_} -- -- --- - ____________ _______ __ __- ',:,;;_ ework __a IMF160 Casework&Casework Connections- 10 31 DEC20 14JAN21 23FEB21 28tlwork Connections-Intake INTF 130 Balhmom Partitions/Accessories- 5 05JAN21 11JAN21 02MAR21 36tl ____ ______________ 1_� _ m Partiti�"-�-,---,---,-- --- --- --- --- --- -- --- ------ ------ons/Acoes"a-s-Intake r e _______ ___ __ __ '_"'F _iroo, --ecem Devices-Intake ___ ___ ___ ___ ___ ___ ___ _ IMF 165 Security&Telecom Devices-Intake 15 O8JAN21 28JAN21 02MAR21 23tl curity&Tel-kL- - - --- --- --- --- --- --- --IMF145 Fire Alann Devices-Intake 10 08JAN21 21JAN21 02MAR21 28tle Alarm Device--Intake IMF150 VCT Flooring-IMake 10 22JAN21 04FE62109MAR21 23tl VCT Flooring-Intake Main Mechanical&Electrical Room MER 100 Conalmet E ul merit Pada-MER 5 06AUG20 12AUG20 23OCT20 52d Construct Equipment Patls-1MER;', ----- -------------- ------------------------ --- - --- -------- ---- - s Main Roo ______ ______ ___ ___ _____ ___ - MIER105 Set S-t -,&Manl Room Panels- 10 070CT20 20OCT20 O6NOV20 13tl ___ ________ -_-- ------ ___ __ _ $eSelS &eta H-V_-J--gym_���-�- --- --- ------ --- --- ----- --- --- - i;i; --- --- --- -- ---------- --- --- --- ------ --- --- --- - Ps MER 115 Set Switch wkch &Main Roo Panels-MER ___ chops in MER " �_ ___ ______ ___ ___ ___ ___ __ _______ „ MER 110 Piping Connections in MER 15 070CT20 270CT20 27NOV20 23tl Conne -L- --- --- ------ --- - MER120 Feeder Wirin &Swlchear Buildout- 30 21OCT20 01DEC20 i8DEC20 13d _ _ ;Feeder Wiring Swichgear Buildout-MER -------------------------------------- --- - - --- -------- -------- --- - --- Connectrons in MER': r- --- --- ------ --- --- --- --- -- --- --- -- ------ --- - DEC20 23d MIER130 HVAC Insulation in MERR 15 111NO 20 01 EC20 06.1AN 1 23tl _ _ _ DucHV_AC Insulation inJMER'�',-�_� � �--- --- ___ ___ ___ ___ __ ___ ------ --- --- --- ______ ______ ___ _ MER 135 Else&Controls Connections to Mach 10 25NOV20 08DEC20 MAN21 23tl lec 8 C.rhols Connections to Mach Equip-MER MER 140 En -- -------- --- - -------- ___ rgize; _'_ ___ ___ __ - Ize 5 02DEC20 OBDEC20 28DEC20 13d _________________________ _ _ _ ',',;;' E^e ;; MER145 Start Up HVAC Equipment in MER 5 23EC20 30DEC20 19JAN21 13d StartU HVACE �- --- --- --- --- ---p quipmenl in MER FAC ,;; T FMmres s Fimnxe R EAC 100 Hang Duct&Above-Ceiling-EAC 15 24AUG20 115EP L20 10NOV20 42tl an Duct L R EAC 105 OH Electrical Wl-All Systems-EAC 15 24AUG20 115EP20 19NOV20 49tl OH Electrical R/I-AllS stems-EAC���� Start date 16SEP19 Early bar Finish data 14MAV21 �Progress be Dal.rime 16SEP19 Bordeaux Critical bar Pa a number 5A Orange County Northern Campus-Bid Basis Schedule Summary bar 0 PH me S stems,Inc. ♦ Stan milestone point ♦ Finish milestone point DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 ' Dascripton Orig Early Early Late Tofal ID our start Finish Finish Float Aua oar xov DEC 1 JAx Pea MAa,va Jux JUL Auo I EIP OCT NOW DEC JAx P ocr xD Dec JAx FEE MAR C E MAY Jux JUL AUG SEv OCT xov DEC JAN FEB MAR APR MAY Jux Juc Aux eEP oCT xov oEc J Pe q.-EAC R EAC 120 HVAC Pi R/Is&Connects to HVAC 5 145EP20 185EP20 1]NOV20 42tl --_ __ _ --- --- -- ---- -- III __PulAWirel for Fill, onmeect"EACA'�E �- --- --- ------ --- --- --- ----- --- ----- -- - REAC125 PUII Wire for Li hts&Power-EAC 5 14SEP20 185EP20 04DEC20 55tl _ _ _ _ _ U-L- ___ ___ ___ ___ __- --_ -_- _-- -_ __ ___ _ R EAC 130 HVAC Insulation-EAC 2 21SEP20 22SEP20 19NOV20 42tl I.. HVAC Insulado ------ --- --- --- --- --- --- --- ------------------------------- 4.. -- - -- -- - --- --- --- --- -- - -- n-EAcI�II�--- - ame for coon-EAC 1 30SEP20 30SEP20 27NOV20 42tl _ Ab el action EACH ii REAC140 Fame for Hard Ceilings-EAC 5 235EP20 29SEP20 26NOV20 42tl Fr Hartl Ceilin s- R EAC 150 Alrove-Cellln Ire -------- _ _- A - --- --- ------ ------ --- ----- --- - ------ --- ng GWB-EAC g Finis ell R EAC 160 Prime Paint&CeilingGrid-EAC 10 07DEC20 18DEC20 1BDEC20 0 _ me Paint&Cei Iing Grid-EAC F EAC 100 Install Grid Fizlures-EAC 5 21DEC20 28DEC20 28DEC20 0 - -- -------- -- - --- --- -- ",:I, - all Grid - --- --- --- --- --- --- --- -- ------- --- --- --- --- --- --- --- --- --- - ______________________________________________ _ _ _____ st Fixtures-EAC F EAC 110 Painting-EAC 5 29DEC20 OSJAN21 OSJAN21 0 --------------------------------- ---------- --- _ ___ - __ __ _ -- i�M Pain[in EAC g________________ ________ ____- ___ __ M.M. rin I eilin�Inspection ___ ______ ______ ___ ________ ______ ___ ___ ___ ______ _____F EAC 120 Final AboveCeilin Ins lion-EAC 1 29DEC20 29DEC20 12JAN21 9tl � a Abov -EAC 9 Pec ______ _________________________ __ _ _ _____ ..s& Do Hardware-EAC F EAC 140 Doors&Hartlware-EAC 5 O6JAN21 12JAN21 12JAN21 0 __ _ ___ ___ __ ail __! ._ ___ ___ ___ ___ ___ ___ __ _______ ___ ___ ___ ___ ______ ___ ___ ___ _ F ___ F EAC 125 Ceiling Tiles-EAC 5 O6JAN21 12JAN21 19JAN21 Sd ------------- ------ _------- ----- --- --- --- - 9Tiles_EAC�-�--�- - --- --- --- --- --- -_- _-- -- -__-__-����� � Coiling F EAC 135 Mechanical&Electrical Trim-EAC 5 06JAN21 12JAN21 26JAN21 10dIS M echical Trim-EAC echanical 8 El ______ ___ __ - F EAC 145 securi Trimoul-EAC 5 13JAN21 19JAN21 26JAN21 5tl _____ ________ - JFU -s-EAC F EAC 130 Div 10 Finishes-EAC 10 13JAN21 26JAN21 26JAN21 0 --- -- - - -- - - Dw 10F she-, ounl T Imoul EAC ____ ___ ___ ___ ___ _ _-_ ___ ___ ___ ___ ___ ___ __ _______ ___ ___ ___ ___ ___ ___ ______ ___ _ F EAC 150 Fire Alaml 8 Telecom D.C.-EAC 5 13JAN21 19JAN21 26JAN21 Sd Alann 8 Teleom Devices-EAC F EAC 166 Sealed Concrete Floors-EAC 5 13JAN21 19JAN21 26JAN21 Sd __ ___ _ _ ___ ___ ___ letl Concrete.Flaors-EAC__ ___ ___ ___ ___ ___ ___ __ __________ ___ ___ ___ ___ ___ ______ ___ _____ ______ ___ __ --- _FEAC165 Floor finishes-EAC 5 27JAN21 02FEB21 02FEB21 0 loor Bin as MERA III MERA 115 Set Switch QearpB enicelstlSEAC C 0 10]AUG20 28AUG20 t05MAR21 . _ __ _ _ ___ _ ____ _____--- ------ ___ __� ; net Swdoq�Ipa&tangs EAC � �'��'�' -__ --- --- --- --- --- --- ___ MERA 105 Set Pumps&Air Handlers-EAC 10 17AUG20 28AUG20 __ _ _ see ---- ------- - ----- -- -- ------ -- 1. EAC___ ___ ___ _ __ _ _ ______ --- U.MERA 120 Feeder Wirin & ear-EAC 30 31AUG20 090CT20 F etl W g&g EAC---------------------------------------------- --- - - --- -------- -----MERA 140 En EAC 5 30NOV20 04DEC20 "" ' � Ene rze-EACi�� �'� Start •MERA145 StartU HVACE ui ment-EAC 50]DEC20EC20HVAC Equipment-EAC Park lNflce F—Iw wal R POB 605 OHElecbical P/I-AIISystems-POB 20 26OC720 20NOV20 02FE621 50tl OH Electrical R/I-AIISystems-POB Post-Building Pad Sitework Post-Building Pad Grading&Drainage GR 100 I General Grading 20 27JAN20 21FE620 185EP20 150tl General Gmding utilities I I ii UT 100 Water&Sewer Connections 30 1OFEB20 20MAR20 160CT20 150d -Wa[erB Sewer Connections ���� � �� ______________________________________________ ___ _ _ ___ ______________ _ ____'---'--CCrre _.. _L __ ___ ___ ___ ___ ___ ___ ___ __ _______ ___ ___ ___ ___ ______ ______ ___ _ UT 105 She Electrical underground R/I 15 23MAR20 10APR20 06NOV20 150d Sile Electrical Underground Rill o ii tlardseapes --------------------------------------------- -- --- ------- -- ^i HS 000 Early-Hardscape Finegrade 10 13APR20 24APR20 20NOV20 150d _ Eariy-Hardscape Finegatle HS 005 Eart -Site Curbs&Stone 15 27APR20 15MAY20 11DEC20 150d Eariy-Sde Curbs&Stone _____ ______________ ___ ___________ ___ __ _ _ ___ ___ - - - --" --- ------ --- --- --- --- -- --- ___--- ------ --- ------ ------ --- - HS 010 Eady-Sitlewalks,&Any 10 11MAY20 22MAY20 18DEC20 150tl __ _ " '____-_ ____-_ ____-__ _ __ ________ ___ ___ •Eiarl-Sidewalks If An _ _ HS 015 Earl -Fine de Stone B Pave 10 25MAY20 05JUN20 OSJAN21 150d _________________ ___ ____" _____________ _ EarIY_Finegade Stone&P "^ J' _'r_ ___ ___ ___ ___ ___ ___ ___ ___ __ ---__------ ___ ___ ___ ______ ______ ___ _ Y � Y ______________________ -------------- HS - C.rd& tlewal a ---------------------------------------------- - - - --- Gravel Rd Fire Tafic100 Curbs&Sidewalks(post-Lull/Heavy 15 105EP20 305EP20 18DEC20 57d '.Fir Lane. -1' HS 105 Gavel Drives/Fire Lan s 15 10SEP20 30SEP20 19JAN21 77d _ 1 l) .I HS 115 Asphalt Pati 10 15OCT20 28OCT20 19JAN21 57d _ _ 'ii - -'--'As Landscapes&Site Finishes ----- Pltell Pavin HS 110 Concrete Pavements 20 1]SEP20 140CT20 OSJAN21 57tl Con ents" 9 Prl9 --------------------------------------------- - - - --- - i_ __ _ _ '9 Tops, 9 -_ ___ ______ ___ ___ ___ ___ __ -__ --- LS 105 Seeding&Landsca 15 19NOV20 09DEC20 02MAR21 57d -- --- --- --- --- IniSeetlin / - f p --- --- --- --- --- --- --- --- --- LS 100 Finish Gatlin /To din a Top. 15 290CT20 16NOV20 WFE621 57tl _ ntlsce Project Testing,Punchlist&Closeout CLO 165 1 16SEP19 16SEP19 14MAY21 430d _ CLO 120 TAB-POB 5 31 DEC20 07JAN21 23FEB21 33tl --------------------------------------- - �:T��'-P- '- --- ----- --- --- --- -------------- - --- ------ --- --- --- --- -- ---------- --- --- --- CL0100 TAB-A/B 5 11JAN21 15JAN21 02FEB21 12d -- - 'STAB-AIB i i'i i CLO 105 TAB-Intake/Kitchen 5 18JAN21 22JAN21 09FEB21 12dTAB-Intake/Ki[chen_ CLO 110 TAB-C/o 5 25JAN21 29JAN21 16FEB21 12tl TAB-CID; __ ___ _ ___ _________________ ___ __ __ 'TAB CLO 130 TAB-E/F 5 01FE621 05FE621 23FEB21 12tl - CLO 131 TAB-EAC 5 01FEB21 05FEB21 23FEB21 12d _______ _ _ TAB_EAC 'ice ___ J _ CLO 115 GC Interior Punchlist 8 Corrections 30 03FEB21 18MAR21 16MAR21 0 C Interior Punchlist 8 Comecfions CLO 135 Canple[e All TAB Reports S 08FE621 12FEB21 02MAR21 12tl to All TAB Reports CLO 140 Fire Marshal Ins actions 8 F/AT tin 10 08FEB21 19FEB21 16MAR21 17d Fire Marshal Inspections&F/A Testing CLO 150 RaN &Approve All TAB Reports 10 15FEB21 26FEB21 16MAR21 12d ,Review 8 Approve All TAB Reports ___ ______________ __ CLO 125 Healih Da rtment Ins lions 5 17FEB21 23FEB21 16MAR21 15tl Health Department Inspections CL0155 Final Inspections-Local AHJ 5 22FEB21 26FEB21 1610M 12tl - -"- --- --- --- --- --- --- --�gESPunhlist&GCIConecSons Throughout CLO 145 AE Punchlist&GC Conections 20 24FEB21 23MAR21 14MAV21 38d Start date 16SEP19 Eariy bar Finish date 14MAV21 �Progress bar Dal.date 16SEP19 Bordeaux �Critical bar Pa enumber 6A Orange County Northern Campus-Bid Basis Schedule —Summary bar O Primavea S stems Inc. ♦ Start milestone point ♦ Finish milestone point DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 A ��0 CERTIFICATE OF LIABILITY INSURANCE DATE(M 01/06//2020 Y) 020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Crystal Perry NAME: Business Insurers of Carolinas aCONN. Ext: (919)968-4611 ac,No): (919)968-8991 501 Eastowne Drive,Suite 250 E-MAIL c er business-insurers.com ADDRESS: p ry@ PO Box 2536 INSURER(S)AFFORDING COVERAGE NAIC# Chapel Hill NC 27515 INSURERA: Travelers Indeminity 25658 INSURED INSURER B: Travelers Property Cas Cc of America 36161 Summit Design and Engineering Services PLLC INSURER C: Accident Fund Insurance Cc of America 10166 320 Executive Court INSURER D: INSURER E: Hillsborough NC 27278 INSURER F: COVERAGES CERTIFICATE NUMBER: CL19121927785 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TR INSD WVD POLICY NUMBER POLICY EFF POLICY EXP LIMITS TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE To_7CLAIMS-MADE � OCCUR PREM SES Ea occurrence)l $ 100,000 MED EXP(Any one person) $ 5,000 A Y 6304KO89149 01/01/2020 01/01/2021 PERSONAL&ADV INJURY $ 1,000,000 GEN'LAGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY Fx_1 PRO ❑ LOC PRODUCTS-COMP/OP AGG $ 2,000,000 JECT OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) X ANYAUTO BODILY INJURY(Per person) $ A OWNED SCHEDULED Y 810-2J958216 04/02/2019 04/02/2020 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED I NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) Experience Mod Factor 2 $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 6,000,000 B EXCESS LIAB CLAIMS-MADE CUP41<264429 01/01/2020 01/01/2021 AGGREGATE $ 6,000,000 DED I X1 RETENTION $ 10,000 $ WORKERS COMPENSATION X1 STER ATUTE X ORTH- AND EMPLOYERS'LIABILITY Y/N 1,000,000 ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ C OFFICER/MEMBEREXCLUDED? NIA WCV6179537 01/01/2020 01/01/2021 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Excess/Umbrella over GL,AU,WC DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Re:Capital Projects Certificate holder is included as additional insured in reference to the General Liability&Auto Liability policies per written contract. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Orange County Asset Management Services ACCORDANCE WITH THE POLICY PROVISIONS. Capital Projects AUTHORIZED REPRESENTATIVE 131 West Margaret Lane Hillsborough NC 27278 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Policy 810-2J958216 COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GENERAL DESCRIPTION OF COVERAGE—This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights,duties, and what is and is not covered. A. BROAD FORM NAMED INSURED H. HIRED AUTO PHYSICAL DAMAGE— LOSS OF B. BLANKET ADDITIONAL INSURED USE—INCREASED LIMIT C. EMPLOYEE HIRED AUTO I. PHYSICAL DAMAGE — TRANSPORTATION EXPENSES— INCREASED LIMIT D. EMPLOYEES AS INSURED J. PERSONAL PROPERTY E. SUPPLEMENTARY PAYMENTS -- INCREASED K. AIRBAGS LIMITS L. NOTICE AND KNOWLEDGE OF ACCIDENT OR F. HIRED AUTO — LIMITED WORLDWIDE COV- LOSS ERAGE—INDEMNITY BASIS M. BLANKET WAIVER OF SUBROGATION G. WAIVER OF DEDUCTIBLE—GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS PROVISIONS A. BROAD FORM NAMED INSURED this insurance applies and only to the extent that The following is added to Paragraph A.1., Who Is person or organization qualifies as an "insured" An Insured, of SECTION II—COVERED AUTOS under the Who is An Insured provision contained LIABILITY COVERAGE: in Section II. Any organization you newly acquire or form dur- C. EMPLOYEE HIRED AUTO ing the policy period over which you maintain 1. The following is added to Paragraph A.1., 50% or more ownership interest and that is not Who is An Insured, of SECTION II — COV- separately insured for Business Auto Coverage. ERE❑ AUTOS LIABILITY COVERAGE: Coverage under this provision is afforded only un- An "employee" of yours is an "insured" while til the 180th day after you acquire or form the or- operating an "auto" hired or rented under a ganization or the end of the policy period, which- contract or agreement in an "employee's" ever is earlier. name, with your permission, while performing duties related to the conduct of your busi- B. BLANKET ADDITIONAL INSURED ness. The following is added to Paragraph c. in A.1., 2. The following replaces Paragraph b. in B.5., Who Is An Insured, of SECTION 11 —COVERED Other Insurance, of SECTION IV — BUSI- AUTOS LIABILITY COVERAGE: NESS AUTO CONDITIONS: Any person or organization who is required under b. For Hired Auto Physical Damage Cover- a written contract or agreement between you and age, the following are deemed to be cov- that person or organization, that is signed and ered "autos" you own: executed by you before the "bodily injury" or (1) Any covered "auto" you lease, hire, "property damage" occurs and that is in effect rent or borrow; and during the policy period, to be named as an addi- (2) Any covered "auto" hired or rented by tional insured is an "insures!" for Covered Autos your "employee" under a contract in Liability Coverage, but only for damages to which an "employee's" name, with your CA T3 53 02 15 (D 2015 The Travelers Indemnity Company.All rights reserved. Page 1 of 4 Includes copyrighted material of Insurance Services Office,Inc.with its permission. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 COMMERCIAL AUTO permission, while performing duties (a) With respect to any claim made or "suit" related to the conduct of your busi- brought outside the United States of ness. America, the territories and possessions However, any "auto"that is leased, hired, of the United States of America, Puerto rented or Borrowed with a driver is not a Rico and Canada: covered "auto". (i) You must arrange to defend the "in- D. EMPLOYEES AS INSURED sured" against, and investigate or set- tle any such claim or "suit" and keep The following is added to Paragraph A.1., Who Is advised dvised of all proceedings and ac- An Insured, of SECTION II —COVERED AUTOS us a LIABILITY COVERAGE: s. Any "employee" of yours is an "insured"while u5- (ii) Neither you nor any other involved "insured" will make any settlement ing a covered "auto" you don't own, hire or borrow without our consent. in your business or your personal affairs. E. SUPPLEMENTARY PAYMENTS — INCREASED (iii)We may, at our discretion, participate in defending the "insured" against, or LIMITS in the settlement of, any claim or 1. The following replaces Paragraph A.2.a.(2), "suit". of SECTION 11 —COVERED AUTOS LIABIL- ITY COVERAGE: (iv)We will reimburse the "insured" for sums that the "insured" legally must (2) Up to $3,000 for cost of bail bonds (in- pay as damages because of "bodily cluding bonds for related traffic law viola- injury" or"property damage" to which tions) required Because of an "accident" this insurance applies, that the "in- we cover. We do not have to furnish sured" pays with our consent, but these bonds. only up to the limit described in Para- 2. The following replaces Paragraph A.2.a.(4), graph C., Limits Of Insurance, of of SECTION II —COVERED AUTOS LIABIL- SECTION II — COVERED AUTOS ITY COVERAGE: LIABILITY COVERAGE. (4) All reasonable expenses incurred by the (v) We will reimburse the "insured" for "insured" at our request, including actual the reasonable expenses incurred loss of earnings up to $500 a day be- with our consent for your investiga- cause of time off from work. tion of such claims and your defense of the "insured" against any such F. HIRED AUTO — LIMITED WORLDWIDE COV- "suit", but only up to and included ERAGE—INDEMNITY BASIS within the limit described in Para- The following replaces Subparagraph (5) in Para- graph C., Limits Of Insurance, of graph B.7., Policy Period, Coverage Territory, SECTION 11 — COVERED AUTOS of SECTION IV — BUSINESS AUTO CONDI- LIABILITY COVERAGE, and not in TIONS: addition to such limit. Our duty to (5) Anywhere in the world, except any country or make such payments ends when we jurisdiction while any trade sanction, em- have used up the applicable limit of bargo, or similar regulation imposed by the insurance in payments for damages, United States of America applies to and pro- settlements or defense expenses. hibits the transaction of business with or (b) This insurance is excess over any valid within such country or jurisdiction, for Cov- and collectible other insurance available ered Autos Liability Coverage for any covered to the "insured" whether primary, excess, "auto" that you lease, hire, rent or borrow contingent or on any other basis. without a driver for a period of 30 days or less (c) This insurance is not a substitute for re- and that is not an "auto" you lease, hire, rent quired or compulsory insurance in any or borrow from any of your "employees", country outside the United States, its ter- partners (if you are a partnership), members (if you are a Limited liability company) or ritories and possessions, Puerto Rico and Canada. members of their households. Page 2 of 4 02015 The Travelers Indemnity company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office,Inc.with its permission. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 COMMERCIAL AUTO You agree to maintain all required or (2) In or on your covered "auto compulsory insurance in any such coun- This coverage applies only in the event of a total try up to the minimum limits required by theft of your covered "auto". local law. Your failure to comply with No deductibles apply to this Personal Property compulsory insurance requirements will coverage. not invalidate the coverage afforded by this policy, but we will only be liable to the K. AIRBAGS same extent we would have been liable The following is added to Paragraph B.3., Exclu- had you complied with the compulsory in- sions, of SECTION III — PHYSICAL DAMAGE surance requirements. COVERAGE: (d) it is understood that we are not an admit- Exclusion 3.a. does not apply to "loss" to one or ted or authorized insurer outside the more airbags in a covered "auto" you own that in- United States of America, its territories flate due to a cause other than a cause of "loss" and possessions, Puerto Rico and Can- set forth in Paragraphs A.i.b. and A.1.c., but ada. We assume no responsibility for the only: furnishing of certificates of insurance, or a. If that "auto" is a covered "auto" for Compre- for compliance in any way with the laws hensive Coverage under this policy; of other countries relating to insurance. b. The airbags are not covered under any war- G. WAIVER OF DEDUCTIBLE—GLASS ranty; and The following is added to Paragraph D., Deducti- c. The airbags were not intentionally inflated. ble, of SECTION III — PHYSICAL DAMAGE We will pay up to a maximum of $1,000 for any COVERAGE: one "loss No deductible for a covered "auto" will apply to L. NOTICE AND KNOWLEDGE OF ACCIDENT OR glass damage if the glass is repaired rather than LOSS replaced, The following is added to Paragraph A.2.a., of H. HIRED AUTO PHYSICAL DAMAGE— LOSS OF SECTION IV—BUSINESS AUTO CONDITIONS: USE—INCREASED LIMIT Your duty to give us or our authorized representa- The following replaces the last sentence of Para- tive prompt notice of the "accident" or "loss" ap- graph A.4.b., Loss Of Use Expenses, of SEC- plies only when the "accident" or "loss" is known TION III—PHYSICAL DAMAGE COVERAGE: to: However, the most we will pay for any expenses (a) You (if you are an individual); for loss of use is $65 per day, to a maximum of $750 for any one "accident". (b) A partner(if you are a partnership); I. PHYSICAL DAMAGE — TRANSPORTATION (c) A member (if you are a limited liability com- pany); EXPENSES—INCREASED LIMIT (d) An executive officer, director or insurance The following replaces the first sentence in Para- manager (if you are a corporation or other or- graph A.4.a., Transportation Expenses, of ganization); or SECTION III — PHYSICAL DAMAGE COVER- (e) Any "employee" authorized by y you to give no- tice of the"accident" or"loss". We will pay up to $50 per day to a maximum of M. BLANKET WAIVER OF SUBROGATION $1,500 for temporary transportation expense in- The following replaces Paragraph A.5., Transfer curred by you because of the total theft of a cov- Of Rights Of Recovery Against Others To Us, ered "auto" of the private passenger type. of SECTION IV — BUSINESS AUTO CONDI- J. PERSONAL PROPERTY TIONS: The following is added to Paragraph A.4., Cover- S. Transfer Of Rights Of Recovery Against age Extensions, of SECTION III — PHYSICAL. Others To Us DAMAGE COVERAGE: We waive any right of recovery we may have Personal Property against any person or organization to the ex- tent required of you by a written contract We will pay up to $404 for "loss" to wearing ap- signed and executed prior to any "accident" pares and other personal property which is: or"loss", provided that the "accident" or"loss" (1) Owned by an "insured"; and arises out of operations contemplated by CA T3 53 02 15 m 2015 The Travelers Indemnity Company.AN rights reserved. Page 3 of 4 Includes copyrighted material of Insurance services Office,inc.with its permission. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 COMMERCIAL AUTO such contract. The waiver applies only to the The unintentional Omission of, or unintentional person or organization designated in such error in, any information givers by you shall not contract. prejudice your rights under this insurance. How- N. UNINTENTIONAL ERRORS ❑R ❑MISSIONS ever this provision [foes not affect our fight to col- The following is added to Paragraph B.2., Con- lect additional premium or exercise ❑ur right ❑f cealment, Misrepresentation, Or Fraud, ❑f cancellation ❑r non-renewal. SECTION IV— BUSINESS AUTO CONDITIONS: Page 4 of 4 iD tot 5 The"travelers Indemn'sty Company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office,Inc.with its permission. DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 Policy 6304KO89149 COMMERCIAL GENERAL LIABILITY THIS ENDORSMENT CHANGES THE POLCY. PLEASE READ IT CAREFULLY BLANKET ADDITIONAL INSURED (CONTRACTORS) This endorsement mod€fees insurance provided under the following: COMMERCIAL GENERAL LIABILITY OVERAGE PART COMMERCIAL GENERAL LIABILITY-CONTRACTORS COVERAGE PART 1) WHO IS AN INSURED — (Section 11) is drawings, opinions, reports, surveys, amended to include any person or field orders, change orders, or drawings organization you are required to include as an and specifications;and additional insured on this policy by a written contract or written agreement In effect during ii] Supervisory or inspection activities this policy period and signed and executed by performed as part of any related you prior to the loss for which coverage is architectural or engineering activities. sought. The person or organization does not qualify as an additional insured with respect to c) This insurance does not apply to "bodily the independent acts or omissions of such injury" or "property damage" caused by person or organization. The person or 'your work' included in the "products- organization Is only an additional insured with completed operations hazard" unless you respect to liability caused by 'your work" for are required to provide such coverage for that additional Insured. the additional Insured by a written contract or written agreement in effect during this 2) The insurance provided to the additional policy period and signed and executed by insured is limited as follows: you prior to the loss for which coverage is sought and then only for the period of time a) In the event that the limits of liability stated required by such contract or agreement and in the policy exceed the limits of liability in no event beyond the expiration date of the required by a written contract or written policy. agreement in effect during this policy period and signed and executed by you 3) Subpart (1)(a) of the Pollution exclusion under prior to the loss for which coverage is Paragraph 2., Exclusions of Bodily Injury and sought, the insurance provided by this Property Damage Liability Coverage(Section I— endorsement shall be limited to the limits Coverages) does not apply to you If the "bodily of liability required by such contract or injury or 'property damage" arises out of'your agreement. This endorsement shall not work' performed on premises which are owned increase the limits stated in Section Ill- or rented by the additional insured at the time LIMITS OF INSURANCE. "your work"is performed. b] The insurance provided to the additional 4) Any coverage provided by this endorsement to insured does not apply to"bodily injury"or an additional insured shall be excess over any °advertising Injury arising out of an other valid and collectible insurance available to architect's, engineer's or surveyor's the additional insured whether primary, excess, rendering of or failure to render any contingent or on any other basis unless a written professional services including: contract or written agreement in effect during this policy period and signed and executed by i) The preparing, approving or failing to you prior to the loss For which coverage is prepare or approve maps, shop sought specifically requires that this insurance Copyright,The Travelers indemnity Company, 2002 CG 02 46 10 02 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 apply on a primary or non-contributory basis. c) Tender the defense and indemnity of any When this insurance is primary and there is claim or "suit' to any other insurer which other insurance available to the additional insured also Insures against a loss we cover under from any source, we will share with that other this endorsement, This includes, but is not insurance by the method described in the policy, limited to, any insurer which has issued a policy of insurance in which the additional 5) As a condition of coverage, each additional insured qualifies as an insured. For insured must: purposes of this requirement, the term 'Insures against"refers to any self-insurance and to any Insurer which issued a policy of a) Give us prompt written notice of an insurance that may provide coverage for the .occurrence' or offences which may result loss, regardless of whether the additional In a claim and prompt written notice of insured has actually requested that the "suit". insurer provide the additional insured with a defense and/or indemnity under that policy b) Immediately forward all legal papers to us, of insurance. cooperate in the investigation or settlement of the claim or defense against d) Agree to make available any other insurance the "suit," and otherwise comply with that the additional insured has for a loss we policy conditions. cover under this endorsement. Copyright,The Travelers indemnity Company, 2002 CG D2 46 10 02 DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 � N DATE ID LMMDIYYYY) AC"RL> CERTIFICATE OF LIABILITY INSURANCE ��. 05/17/2019 THIS CERTIFICATE 15 ISSUED AS A NIATTER OF INFORNIA71ON ONLY AND CONFERS NO RIGHTS UPON THE CERTEFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND. EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S). AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTANAME' Carla Moore Colonial Insurance Agency Hillsborough AHIC'N (919)732 2191 AID No): (919)732 2192 103 Millstone Dr.Suite A EMAIL ADDRESS, colonial-a enc ADDRESS: .com C� � Y Po Box 490 INSURERS AFFORDING COVERAGE NAIL# Hillsborough NC 27278 INSURER ; Starr Surplus Lines Ins.Co. 13604 INSURED INSURER B Summit Design And Engineering Services, PLLC INSURER C 504 Meadowlands Drive INSURER D INSURER E Hillsborough NC 27278 INSURER IF COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ACOLSUBR POLICY E LTR TYPE OF INSURANCE INSD WVQ POLICY NUMBER (MWDDrYYYY1 iMPkDDffYYYILIMITS COMMERCIAL GENE PALLIABILJTY EACH OCCURRENCE $ CLAIMS-MADE OCCUR PREMISES a occurrence $ MED EXP(Any orre person) $ PERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERALAGGREGATE $ JECT PO-ICY1:1 PRO LOC PRODUCTS GOMP+OP AGG $ OTHFR $ AUTOMOBILE LIABILITY (Co ME,,ccNEDSINGLE LIMIT $ Ea accident ANYAUTO BODILYINJURY(Per person) $ OWNED SCHEDULED BODILYINJURY(Per accidenl) $ AUTOS ONLY AUTOS HIRED NON-OWNED ROPERTY D AGE $ AUTOS ONLY AUTOS ONLY PeracU $ c!deni UMBRELLA LIAR OCCUR EACH OCCURRENCE $ EXCESS LIAR CLAIMS-MADE AGGREGATE $ DIED I RETENTION$ $ WORKERS COMPENSATION AND EMPLOYERS'LIABILITY Y r N STATUTE I I ERH ANY PROPRIETOR:PARTNER+EXECUTIVE E.L.EACH ACCIDENT $ 0FPICER:MEMSER EXCLUDED? MIA (Mandatoryin NH) E.L.DISEASE-EA EMPLOYE $ Iryes,describe under DESCRIPTION OF OPERATIONS beiaw E., DISEASE-POLICY LIMIT $ Professional, E&O Contractors Occurence 5,000,000 A Pollution Liability N N SLSL-PRO-262380-19 04/02/2019 0410M020 Aggregate 5,000,D00 ❑ESCR3PTION Of OPERATIONS+LOCATIONS I VEHICLES (ACORD 101.Addltlonal Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Orange County Asset Management Services ACCORDANCE WITH THE POLICY PROVISIONS. 131 W Margaret Lane AUTHORIZED REPRESENTATIVE _Py Hillsborough NC 27278 Fax: F-mallabarnes@orangecountync.gov ©1988-2015 ACORD CORPORATION. Al rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACOR❑