Loading...
HomeMy WebLinkAboutAgenda - 06-23-2005-5eORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 23, 2005 SUBJECT: Contract Award: DEPARTMENT: Purchasing and Central Services ATTACHMENT(S): RFP Respondents List Fee Schedule for Olver, Inc. Action Agenda Item No. 5-e,. Services for Landfill PUBLIC HEARING: (Y/N) No INFORMATION CONTACT: Pam Jones, (919) 245-2652 Gayle Wilson, (919) 968-2885 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To consider awarding athree-year contract to Olver, Incorporated, of Charlotte, NC, for engineering services associated with landfill operations. BACKGROUND: The Orange Ccunty Landfill has on-going needs for a variety of services that are outside the scope of work for the staff engineer. A contract with a firm that can provide comprehensive landfill engineering services has historically allowed those needs to be addressed in a timely and budget conscious manner. In recent years, under previous contracts of a similar nature, the County has obtained the following types of general engineering consulting services: o Review Technical Proposals o Media Support for Meetings o Groundwater Monitoring and Reporting o Capacity Calculations o Financial Assurance o Post Closure Reporting o Closure Plans/Certifications o Permit Modifications o Calculations of NMOC Emissions o Feasibility Evaluations o Drainage/Erosion Control Plans o Landfill Permitting o Waste Characterizations o General Technical Advising, Drafting, o Master Plan Preparation/Drawings and Regulation Interpretations The County recently solicited Requests for Proposals for these services and received ten responses. A list of respondents is attached with interviewed firms denoted with an asterisk, Following evaluation of the responses by the Solid Waste staff, four firms were short-listed for interviews. Solid Waste and Purchasing office staff conducted the interviews on June 2, 2005 and are recommending that the County contract with Olver Incorporated, Charlotte, NC, While all of the interviewed firms are capable of providing engineering services, the specific expertise of Olver, Inc. in areas such as transfer station design, compost feasibility/permitting, drop-off site design/operations, landfill gas management, and landfill design/permitting/ operations most closely met the projects that the County anticipates within the proposed three- yearcontract period. Z Upon approval by the Board, a contract will be drafted that incorporates the terms of the proposal and accompanying fee schedule. Highlights of the contract include: • Term: Three-years, commencing upon July 1, 2005, with one three-year renewal upon mutual consent of the parties; • Fees to be charged pursuant to the attached fee schedule, as included in the June 2, 2005 RFP response; • A scope of work will be prepared by Solid Waste Management staff for any work to be done by Olver, then Olver will submit to the County a cost proposal for that specific body of work. FINANCIAL IMPACT: The annual Solid Waste Management Department budget contains funding for all necessary and required engineering services in order to maintain and improve solid waste operations and meet environmental management obligations. Typically, the annual engineering expenditures are approximately $190,000-$210,000, depending on a number of factors, primarily regulatory. RECOMMENDATION(S): The Manager recommends that the Board authorize a contract with Olver, Incorporated for landfill engineering services through June 30, 2008; and authorize the Chair to sign a contract, contingent upon Attorney and staff review. Landfill Engineering Services RFQ#5114 3 March 31, 2005 Name of Firm Location EarthTech Ed Aguirre and Associates Raleigh, North Carolina __ ___ Raleigh, North Carolina _.____-______~ ~ _____._...._. _ _ .. Hazen & Sawer** - _ w___. __~ _ Raleigh, North Carolina _ _ ~ ______..._. __ .. _ HDR Joyce ___ _ ___ Raleigh, North Carolina ______ Greensboro, North Carolina __ ___-_-_____ _____ .~._~_-_..--____. _ _________ Municipal Engineering Services_ ~Garner, North Carolina I _ _ __ _ Oliver Inc** ____~ f Charlotte, North Carolina _ ___ _____ ( .__ __I ___ S&ME** __ (Raleigh, North Carolina j j __ SCS Engineers** ~~ ___~_ Charlotte, North Carolina ~ ~ _ j _ ____ ~ ____ __ Withers & Ravenel (Cary, North Carolina ~ i **interviewed firms .____ _________.___ __ ___ __ ~.._.w___--~-_____-_____-_-____--_--__.- I __w---_-___ ~ I _ ____ _ _ _.~ I _.__--_____ _ - . __ w _ __ _____ ____ I i I ---.--- ._- -- - ______________.__.._ ___ _ __ ___ __ _ .I-__.______-___-_ ~ _________--__-_--_._-- I ----------1 I _-__.___-__-_ _.______ . _ ___ --.---._____ ~_____-____. I_ ~-______ _~I .-__ __ _ I___--__-__--_--__._----___-_-______-- J __--.--__.__-- __ I I ~ __. ___ I _.~ ______.___.__._----_.- I ~_---.--------_-_ _ _____ __ _____ __ _ _ __ I ~-- I -- ! ____ ___ _ __ - _- - __~ _ _ I - - - -- ---. _ _ ~ ._ __.._.___._-____-__~ _.-- _ ~ _. _ -------_---.------------------ _ ___--__--_I I ________.I I ____-- -- -_ _ I ( i __ ---- ----_.---~____._____-----_-__ I _-_-- ----.i _____._ . _ _____ _.~_____ _._. _ _ ____ _w____ __.____i __ . ___. ~____ ____I . __ -- _. _ ____ I ----_______________.__ -- _- _ _ I . _ _______ - ~ I ~ I I I i ___ ~ ____l _. L~ _ _-__------ _ I _ __ ________._____________ _ - -_ _ ____________I - ________.-.___i I _________! ._________- -- _ ---____________._.__ _ _._ _ ___..___._______i ______-.__ ________I.I _____ _ ____i - _ _ __-__ ___________ ~__.___ i _._____-- ----~ ~_____~ _______ ~ - PER DIEM AND RATE SCHEDULES The following tables summarize Olver's tabor and direct expense rates. The hourly per diem rates include all direct labor, overhead, and profit costs. I _ _~ LaborClassifiealion - RatelSlhour) Principal -- -------- S 120 Project Manager ~ $ 110 Senior Engineer/Planner _'- $ 95 Environmental Engineer - $ 90 Project Engineer - ------ - $ 65 CADD/Technidan -~ -~--- $ 55 Clerical -- -- --- _ _,_. S 45 Direct expenses would be billed on a direct reimbursement bazis fn accordance with the following schedule Category - t3i(ling Rate Reproduction and Mailing -~ - ---~- Printing At Cost --- -- --- Travel At Cost --- Mileage "- At Cost -- -__ - ~._~,._ ~ 50.39 per mite t`~~`~+ [Y Vt=a Z5 ue~iu. ~ n~npr-u v omc