HomeMy WebLinkAboutSWAG quick report 061312Solid Waste Advisory Board
Regular Meeting
June 13, 2012
Meeting Summary
Draft
1
Attendance: Jan Sassaman, Remus Smith, Steve Yuhasz
Staff: Gayle Wilson, Blair Pollock, Cody Marshall, Wanda McCain and Wendy
Simmons
1. Opening & Welcome – Sassaman: No quorum, this will be an informational
meeting.
2. Adoption of Minutes from March 14, SWAB meeting – No quorum.
Sassaman: In the minutes there was a request of Mr. Yuhasz to give the SWAB some
form of charge formal or informal from the BOCC. SWAB is willing to serve them
and answer questions but we need bounds on the envelope of what they want us to
do. We don’t have staff resources or member resources; Chapel Hill is the only
party to the interlocal agreement that has a full complement on the SWAB.
Yuhasz: There isn’t anything different to tell from what has been the charge of the
SWAB since the time the Commissioners made the decision to send the MSW to
Durham.
Sassaman: We can’t function if we are kept in the dark. Those that attend the
meetings are beginning to feel like it’s a waste of time.
Yuhasz: From a political standpoint all action has been halted pending the decision
of Chapel Hill and what they are going to do with its waste and if they will continue
to be part of the partnership. Until that decision is made there will not be a lot to
discuss.
Simmons: The next update from SCS is tentatively scheduled for June 26th. The
final report will not be presented to Council until the fall. The meeting on June 26
will focus on short-term recommendations.
Wilson: We have a secondary interest in what the Town does with their collection
both commercial and residential. If they walk away and allow the private sector to
service garbage collection you will see an immediate impact on reaching our waste
reduction goal.
Yuhasz: The SWAB is the creature of the interlocal agreement and without the
parties to the interlocal agreement the SWAB doesn’t exist anymore. There may be
Solid Waste Advisory Board
Regular Meeting
June 13, 2012
Meeting Summary
Draft
2
some other advisory group we put together based on who participates. Until some
decisions are made there is no way for us to move forward.
Sassaman: Would it serve us if you, Steve as the BOCC representative and I talk to
the County manager?
All agree.
3. Public Comment Period – Sassaman: Blair sent out something before the meeting
from a neighbor for discussion. The SWAB needs an opportunity to look at it first.
4. Overview of Manager’s Solid Waste FY 2012/13 Budget Proposal Wilson: One of
the most important things in the budget is the $3.1 million to close the landfill. We
are presuming to implement single-stream. Funds have been budgeted for the
second convenience center modification which is proposed to be a neighborhood
center. One hundred thousand dollars has been budgeted for the neighborhood
cleanup. We are buying roll carts to do an initial first phase in the rural areas that
are most urban like and to also do a pilot in the more rural area for feedback. We
are proposing to buy two new recycling trucks and one front loader. The proposed
fee changes are for C&D landfill is to reduce it from $44 to $40/ton, mulch will
increase from $22 to $25 [per three cubic yard scoop] and the [annual]solid waste
convenience fee will increase for urban from $5 to $10 and rural from $10 to $20.
The $5 surcharge for MSW will remain.
5. Chapel Hill Solid Waste Study Update Simmons: There isn’t a specific date that
the report is due. The consultants stated that they believe the Town was getting a
good value from the County for the recycling program. There will be a section in
the report that will say what our final plans are in terms of recycling.
Pollock: Is it possible to segment out the decisions that create a critical path for us
such as recycling?
Simmons: I can take back to staff the things that you all think are critical and discuss
that with them. We are not purposely trying to withhold information. It is a
complex evaluation. We want to be thoughtful and not rush it which is the reason
the report isn’t being released at this point. There are ongoing analyses so there may
be items that are critical for you priority wise but we may not have completed that
evaluation yet.
6. Programs and Services Update
Solid Waste Advisory Board
Regular Meeting
June 13, 2012
Meeting Summary
Draft
3
a. Walnut Grove Road SWCC Construction Wilson: There were 4 bids which were
within budget. During the evaluation of the 2 low bids one of the vendors noticed
they made a $92,000 oversight in their bid for the base grade under the asphalt.
Taking that and some other factors into consideration we decided to rebid. There
will be no substantive changes to the bid.
b. Single Stream Recycling Implementation Marshall: It is going to happen.
Dumpsters are getting repaired; signs and labels have been ordered.
c. Landfill Neighborhood Clean Project Wilson: There is an RFP out to obtain a vendor
to do the work. Currently there are about 20 properties that have requested
cleanup and about 3 or 4 pending. With this small number it may not come close
to the amount budgeted and the cleanup may happen much quicker.
d. Historic Rogers Road Task Force
e. 56% Per Capita Waste Reduction in Latest State Report Pollock: Once again we’ve
achieved the highest waste reduction rate in North Carolina last fiscal year.
f. New Household Hazardous Waste Contractor
g. Future SWAB Meetings/Agenda Sassaman: Assume we will meet on August 8th
pending what we hear from the County manager.
h. Other
7. Board Member Comments - None
8. Other Business – None
Adjourn: 8:15pm