Loading...
HomeMy WebLinkAboutOUTBoard agenda 082119 AGENDA Orange Unified Transportation Board August 21, 2019 6:30 p.m. You can bring your laptops/tablets if you would like to use them. Whitted Building, Room 230 300 West Tryon Street, Hillsborough *PLEASE NOTE CHANGE IN LOCATION* Page Item Title 1. Call to Order and Determination of Quorum 3-12 2. Approval of Minutes from May 15, 2019 3. Consideration of Additions or Changes to the Agenda 4. Transit Advisory Services (TAS)/Orange County Public Transportation (OCPT) This section of the agenda is addressed jointly by the OUTBoard and supplemental staff from other County departments (Aging; DSS; Housing, Human Rights and Community Development; Health; and Child Support Enforcement) to address transit services. 4.a. OCPT/Orange County Commuter Options (OCCO) Update (Allyson Coltrane) — PowerPoint Presentation and handouts to be provided at the meeting. OUTBoard/TAS Action: Receive and review information, provide comments. 4.b. OCPT Mobility on Demand Updates (Theo Letman) OUTBoard/TAS Action: Receive and review information, provide comments. 4.c. OCPT Administrative Updates (Theo Letman and TeLeishia Holloway) OUTBoard/TAS Action: Receive and review information, provide comments. 4.d. TAS Comments/Questions (Theo Letman) - Opportunity for TAS members to offer transit related comments and ask questions regarding issues not on the agenda. 5.0 Regular OUTBoard Agenda (Action Items) 13-14 5.a. Bicycle Safety Implementation Subcommittee (BSIS) Recommendation on Future Handling of Bicycle Safety Implementation (Nish Trivedi) OUTBoard Action: Staff recommends OUTBoard approve the BSIS recommendation. 15-20 5.b. Draft Carrboro Bike Plan (Zachary Hallock) OUTBoard Action: Staff recommends OUTBoard provide comments. 6.0 Staff Reports/Updates 7.0 Information Items 21-22 7.a. Chapel Hill Transit North-South Bus Rapid Transit Locally Preferred Alternative — Public Review (Nish Trivedi) 23-32 7.b. MPO/RPO and NCDOT Updates (Nish Trivedi) 8.0 Adjournment— The next regularly scheduled meeting date is September 18, 2019. Charge of the OUTBoard(from Section 1, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. From time to time the OUT Board may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUT Board shall serve in an advisory capacity to the Planning Board. Meetings (from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings 3. Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Meetings are held on the third Wednesday of the month. The start time and location of the meeting shall be included on the agenda and shall typically be 6:30 p.m. at the Orange County West Campus Office Building located at 131 West Margaret Lane, Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any special circumstances, provided the information is included on the distributed agenda. 3 DRAFT 1 MINUTES 2 ORANGE COUNTY OUTBOARD 3 MAY 15,2019 4 REGULAR MEETING 5 6 MEMBERS PRESENT: Brantley Wells (Vice Chair), Hillsborough Township Representative; Ram Athavale, Chapel Hill 7 Township Representative; Donna Musson, Eno Township Representative; Ed Vaughn, Cedar Grove Township 8 Representative; David Laudicina, Cheeks Township Representative; Heidi Perry, At-Large Representative; Erik Broo, At- 9 Large Representative;Amy Cole,At-Large Representative, Randy Marshall, Bingham Township Representative; 10 11 MEMBERS ABSENT: Art Menlus, Little River Township Representative (Chair); Johanna Birckmayer,At-Large Representative; 12 Alyson West,At-Large Representative; Jenn Sykes,At-Large Representative; Todd Jones,At-Large Representative; 13 14 TRANSIT ADVISORY SERVICES MEMBERS PRESENT: Theo Letman, Allyson Coltrane; Teleishia Holloway, Lisa Berkley; Erika 15 Bryant, Janice Tyler; Serena McPherson; Beverly Scurry;Anna Sienna; 16 17 STAFF PRESENT: Abigaile Pittman, Transportation/Land Use Planner; Nish Trivedi, Transportation Planner; Tina Love, 18 Administrative Assistant III; 19 20 AGENDA ITEM 1: CALL TO ORDER,DETERMINATION OF QUORUM AND INTRODUCTION OF NEW MEMBERS 21 Brantley Wells called the meeting to order. 22 23 AGENDA ITEM 2: APPROVAL OF MINUTES 24 MOTION by Heidi Perry to approve the February 20, and April 17, 2019 OUTBoard Minutes. Seconded by Erik Broo. 25 VOTE: UNANIMOUS 26 27 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 28 29 AGENDA ITEM 4A: OCPT/ORANGE COUNTY COMMUTER OPTIONS(OCCO)UPDATE(ALLYSON COLTRANE) 30 Allyson Coltrane gave updates on the County's commuter options 31 32 Beverly Scurry: Is there any way to make connections with people who live in our area? 33 34 Allyson Coltrane: We have a share ride NC program that matches you with just Orange County employees or we'll match 35 you with your similar ZIP code, so you can be grouped into the carpool or the vanpool. 36 37 Heidi Perry: I was wondering if there was any thought to having another enrichment event during non-working hours. 38 39 Allyson Coltrane:Yes,we're going to partner with the chamber to do one after business hours. 40 41 AGENDA ITEM 4B: OCPT ADMINISTRATIVE UPDATES(THEO LETMAN,TELEISHIA HOLLOWAY)— 42 Theo Letman and Teleishia Holloway gave updates on the departments transit projects 43 44 David Laudicina: Has there been any discussion about Alamance kicking in any money for this thing? Why are we spending 45 money to support Alamance coming in? 46 47 Theo Letman: These routes that we're moving forward were already in the Orange County transit plans and were already 48 approved. We're just bringing them forward to the next fiscal year. Alamance is part of a different MPO designated area. 49 We are currently coordinating with the Wake County transit plans as well as the Durham County transit plans. 50 51 David Laudicina: The whole idea was that everyone chips in. I have a problem with helping to support people who aren't 52 chipping in. 53 54 Amy Cole: It also does support the Orange County residents who may work out of those facilities. 1 4 DRAFT 55 56 Theo Letman: The transit boundaries as well as the MPO boundaries are not drawn by the County;you have some overlaps. 57 For the Burlington-Graham MPO area, for example, we get funds from them even though they're service area is 58 predominately Burlington and Mebane. 59 60 Randy Marshall: On the first map you have 6:30-9:30. Is that 9:30 a.m.? Does that mean you just run it three times? 61 62 Teleishia Holloway:Yes,just during peak hours. 63 64 Randy Marshall: How do people get home? 65 66 Teleishia Holloway: That's the research that we'll have to do. We were thinking of connecting to the ODX on the way back 67 home in the evening. 68 69 Theo Letman:There are other services that are currently run in the evening, and we're just trying to give a more direct route. 70 71 Randy Marshall:And people who are doing this would be fully aware of what options are available? 72 73 Theo Letman: The long-range transit planning process with Nelson Nygaard, they did. We gave out surveys as well and got 74 a prioritization list of all the top routes that people said they wanted to have. 75 76 Lisa Berkley:Will there be more than one stop in Cedar Grove? 77 78 Theo Letman: The community center is probably the best place for our buses because we have a parking lot and we have a 79 bus shelter there. 80 81 Randy Marshall:At some point you'll have ridership numbers? 82 83 Theo Letman:Yes. 84 85 Donna Musson: Into our park and ride lot here in Hillsborough coming from the country to Durham? 86 87 Theo Letman: It's already in the works to have a park and ride lot in Hillsborough. We already know that the Maxway 88 shopping area does not allow any of your transit connections to be there, so we looked on the Highway 70 corridor, at the 89 Credit Union parking lot or somewhere else in that corridor. 90 91 Nish Trivedi:That's something GoTriangle is doing. 92 93 Amy Cole: What is the culture behind people not wanting transit to enter into their business area? 94 95 Theo Letman: Some jurisdictions favor transit and want the traffic, others don't. They feel like our buses going on to a 96 private parking area would tear up their pavement. They would have the reinforce their parking lot at a cost, or the 97 commuters are taking up their parking spots for their shoppers. 98 99 Lisa Berkley:There'll be some new stops? 100 101 Theo Letman: Sure, and if there's a preference to where we get interest when we present this, we can modify this. 102 103 David Laudicina: In regard to The Orange-Chapel Hill connector route that is already in existence, are you going to be 104 adding any stops on that? 105 106 Theo Letman: Some of the work we do at the MPO level is to support our services better. 107 108 Ram Athavale: Can you give me a sense of the construction and type of buses, how big? Are they state-of-the-art, hybrid? 2 5 DRAFT 109 110 Theo Letman: We are looking at state-of-the-art buses, and we're in the process of doing replacements. We're also looking 111 at changing up our fleet from going to a cut-away model to the Ford transit or a Sprinter type van; a newer, sleeker looking 112 vehicle. We are in talks with Ford now. We'll present more of that information as we get further in the process. 113 114 Erik Broo: Have you considered compressed natural gas. 115 116 Theo Letman: I ran a fleet of compressed natural gas buses in Atlanta and the fuel efficiency with diesel is relatively the 117 same. The ozone for diesel is better. 118 119 David Laudicina: Is propane efficient? 120 121 Theo Letman: For propane,we're just getting information. 122 123 Erik Broo: I have a question about the on-demand service. Will they be wheelchair equipped? 124 125 Theo Letman:They do not. I think it's appropriate to also have wheelchair accessible vehicles. 126 127 Erik Broo: I work out in Wake County, and I go to Cary a lot. They have fully electric vehicles and I haven't seen them in any 128 of the other municipalities. I didn't know if you guys had plans to have fully electric or hybrid vehicles. 129 130 Theo Letman: Or autonomous. Autonomous is coming; it's out there. 131 132 Erik Broo: For the routes that only have four to six passengers, is there any thought of making those hybridized or electric? 133 134 Theo Letman: Sure. We're in the beginning of that process, and every vendor that we've talked to we've asked them to 135 provide a quote that has that technology. 136 137 Amy Cole: Is there a demand for people to utilize those services to go to a bus stop so they can then go to rest of the way? 138 139 Theo Letman: I know that GoTriangle did that and that's they're concept. To have a shuttle van take them to a transit center 140 in a secular bus line. 141 142 Amy Cole: I was thinking about the rural areas where they don't have immediate access to where the bus would pick up. 143 144 Theo Letman:That's why we're going to do a pilot first to see where the demand is coming from. 145 146 Beverly Scurry: Do you see the service more for one on one or groups? 147 148 Theo Letman: I think because it's public transit, we would assume that it's a shared ride. There will be times when there will 149 be only one person in the vehicle or there might be three or four. 150 151 Heidi Perry: Do you know when you're going to mold this? 152 153 Theo Letman: It will be during the summertime. The project is out for public comment right now, and I think they intend for it 154 to be approved by the boards before the summer break. 155 156 Randy Marshall: Is there a comfortable way for some of your clients to use their phones to determine where the bus is and 157 know when the pick-up is going to be? 158 159 Theo Letman: That's an add on module that will be coming when we launch the Mobility OnDemand Service. 160 161 David Laudicina: Does Chapel Hill Transit already have that? 162 3 6 DRAFT 163 Lisa Berkley:They use Next Bus. 164 165 Heidi Perry: What is the software called? 166 167 Teleishia Holloway: It's called Eco Lane. 168 169 Brantley Wells: Is it automated or is it someone dialing? 170 171 Teleishia Holloway: It's actually someone dialing, but that is another module that can be added on. 172 173 Erik Broo: I can't get a bus from Chapel Hill or anywhere nearby to the airport. Is there a reason for that? Has there been 174 demand for people to get to the airport and not have to drive their car to parking? 175 176 Theo Letman: We have gone through years and years of transit planning and going to the airport was somehow left out of 177 the equation. 178 179 Heidi Perry: I've asked GoTriangle this question. They always say there's not enough demand and others say the airport 180 won't let them do it because they want all the people to pay for the parking decks they built. 181 182 Erik Broo: Has it been studied? Is there a demand for it? Even if you're paying the airport to be able to drop people off and 183 pick people up,that might be a valuable service. 184 185 Theo Letman: The transit plan is now going to have to be redone. This will be a wonderful question to be asked. You guys 186 are looking at transit services in the area but what about to the airport? 187 188 Lisa Berkley: Can you say anything about the decision-making process that takes place with the finalization of what projects 189 are going to go forward. What part is the County Commissioners,what part is GoTriangle regional planning? 190 191 Nish Trivedi: There are lots of different processes that are involved in the decision-making process and Orange County 192 plays a roll in each of them. This is the overall Orange County Transit Plan; it is for the overall county transit services. 193 Orange County has one, Durham County, and Wake County have their own separate transit plans. Previously Go Triangle 194 administered these plans, now each County is looking to take control of their own transit plan. There is another process 195 through the MPO that is more the state process which is the strategic prioritization of transportation (SPOT) and Orange 196 County identifies certain projects that are put forward for that process. There is GoTriangle which is a regional transit 197 provider and they have their own toolkit of processes for their brand. Orange County plays a role in each of these other 198 processes. I am not a transit planner but I know transit agencies have their own federal requirements for other processes 199 they are involved in. 200 201 Theo Letman: There are many plans and boards and committees and working groups that go into planning. Each county 202 going forward is going to be responsible for their own transit plan. 203 204 David Laudicina: There has to be collaboration between Durham and Wake. There was a ton of collaboration for the light 205 rail between Orange County and Durham County. 206 207 Nish Trivedi: And that collaboration happens at the MPO. The current adopted transit plans have gone before the MPO so 208 that they could be collaborated on together. Previously it was Go Triangle that did most of the work to collaborate these 209 transit plans together, now each County will have to collaborate on their own when doing these transit plans. 210 211 Lisa Berkley: Does Orange County have control over the pot of money that is accumulated through the Orange residents 212 paying and what is done with it? 213 214 Theo Letman: Yes, It is dispersed by an interlocal agreement with Chapel Hill, and all the city municipalities in Orange 215 County. That is done at the commissioner level and city council level. They have to render a decision. 216 4 7 DRAFT 217 Lisa Berkley: I wanted to bring up a couple of things that the Master Aging Plan and the groups that were thought to be 218 important in the transit plan. One has to do with the elderly and disabled transportation assistance program which is the 219 funding source for a lot of the demand services for older adults and people who are disabled. Could this program get 220 funding under the reallocation of transit from the light rail? 221 222 Theo Letman: The tax district dollars go to the increased cost of existing services and for expansion services. It's a small pot 223 of money for rural operating assistance that we do get from the state. There are other funding streams that we get as well. 224 All programs are tied really to population, so the Census play as huge part in the level of funding that we get, and will play a 225 huge part in the coming Census. As areas go from rural to urban, those moneys will shrink even further. If you're asking to 226 utilize those funds to help offsetting the expenditures in rural areas that has to be put in the form of a project as an 227 expansion of services which we can look at doing or it can be utilized for capital expenses as in buying buses or for 228 purchasing more equipment. 229 230 Lisa Berkley: How do we get that added to the plan? 231 232 Theo Letman: Every month we have meetings, and we talk about the different types of services and the projects that we 233 want to provide to the rural areas. 234 235 Janice Tyler:Who holds that pot of money that's been collected and makes that decision? 236 237 Theo Letman: Orange County. 238 239 Heidi Perry: Remember that$130 million already went to the light rail and not all of is from Orange County. 240 $158 million is what they're planning to have go to it before it finishes. 241 242 Theo Letman:They are still doing the calculations on what is going to be spent on the remainder of the light rail project. 243 244 Lisa Berkley: This is for a certain small part of our population for individuals who temporarily or full time are in a wheelchair 245 but are too frail to go on the buses that Orange County Public Transportation has. Is there a role that our public government 246 can play in offsetting the high price of transportation or having a vehicle that we can also help people with? 247 248 Janice Tyler: Like a Sprinter vehicle? 249 250 Theo Letman: They are called ambulatory services. Transit is a public service, so we can't be just exclusive to one person. 251 That's not to say we can't look at other types of services or concepts if we have need in our community. 252 253 Erik Broo: Like a minivan that might cost a bit more than it normally would? 254 255 Heidi Perry:Are there no private medical services? 256 257 Lisa Berkley:There are plenty of private ones, but they are very expensive. 258 259 Heidi Perry: I'm wondering if there's a way to partner with them, so we don't have to buy the van or the driver, but we can 260 maybe subsidize. 261 262 Theo Letman. We will definitely look into that. 263 264 Theo Letman. Seats on the Staff Working Group (SWG); that is part of the Technical Committee to the MPO are appointed 265 by the County Manager.You can attend the meetings, all meetings are public. 266 267 Heidi: You can sign up to speak at these meetings and get a copy of the agenda prior to the meeting. 268 5 8 DRAFT 269 Nish: DCHC MPO is public, Staff Working Group is not, it is more within the agencies and officials. The MPO meetings are 270 public and you are welcomed to attend them and speak. One thing DCHC MPO is known for in the state is that it considers 271 Transit is an important component at every meeting, in both the TC and Board. 272 273 AGENDA ITEM 4C: TRANSIT ADVISORY SERVICES(TAS)COMMENTS/QUESTIONS(THEO LETMAN)- 274 Theo Letman asked if any TAS members had any additional questions or comments 275 276 AGENDA ITEM 5: REGULAR OUTBOARD AGENDA(ACTION ITEMS) 277 278 AGENDA ITEM 6: STAFF REPORTS/UPDATES 279 280 AGENDA ITEM 6A: ORANGE COUNTY'S PORTION OF TRIANGLE FREIGHT PLAN(NISH TRIVEDI) 281 Nish presented the Triangle Regional Freight Plan 282 283 Heidi Perry: What does that refer to,the 2 million square feet of manufacturing industry? 284 285 Nish Trivedi:Any distribution centers or anything that relates that freight is coming to or distributing along the state roads. 286 287 Heidi Perry: Can you send those slides? 288 289 Nish Trivedi: I can send you the slides and send you the link to the actual plan. 290 291 AGENDA ITEM 613: TRIANGLE BIKE AND PED WORKSHOP,MARCH 29,2019(ABIGAILE PITTMAN) 292 293 David Laudicina: What are protected bike lanes? 294 295 Heidi Perry: More often it has some sort of physical barrier between the car and the bikes. 296 297 David Laudicina: I didn't know if that meant security. Durham needs to be talking about security on their bike lanes. 298 299 Heidi Perry: That's very different because the protected bike lanes usually run alongside a real lane. 300 301 Randy Marshall: Would electric scooters fit into bike or ped since they're not mentioned. 302 303 Heidi Perry: They're discussing that right now at the Legislature, but I think they will probably go on the road. It's probably 304 going to come down to municipalities being able to make decisions, but I think if they're allowed on sidewalks there will be 305 speed limits. 306 307 Randy Marshall: They're becoming prolific and there's no mention of them anywhere in the either bike or ped presentation 308 that you're making, and it seems like somebody needs to take up the responsibility. 309 310 Heidi Perry: I think there a lot of things besides just scooters coming out. In Chapel Hill, there are these electric 311 skateboards with only one wheel, and those are on the roads, but I didn't think everybody is waiting to see what restrictions 312 to state puts on them before the municipalities develop a plan. 313 314 Ed Vaughn: Are you going to start putting bike lanes back in with the road projects? 315 316 Nish Trivedi: The NDDOT Complete Street Policy Update is a process through a committee. The goal is to eventually have 317 design and road projects that include bike and ped. How that is going to be implemented is unknown yet. The 2.0 version is 318 a change to their policy. It is yet to be determined how they will include bike/ped into road projects. Complete Street is a 319 multimodal policy, not just bike/ped. Multimodal is freight,transit, bike/ped, and others. 320 321 Heidi Perry: NCDOT has a thing called NCDOT Moves 2050 online and they're taking a survey on what you want to see in 322 the future. You will have the write in things like bus and bike because they don't seem to include those as options but there 6 9 DRAFT 323 is a place for comments. The other thing is that in 2013 the state passed a law that said no stand-alone bike and pedestrian 324 projects could be funded with state funding from DOT. That means that if Hillsborough or somebody else wanted to put in a 325 sidewalk or a separated multi-use path and they got the federal funding that community would have the come up with the 20 326 percent match. 327 328 Nish Trivedi: TARPO is one of the RPO's that has signed a resolution in support of such legislation directed towards 329 reducing or eliminating the local match requirement for bike/ped. 330 331 Heidi Perry: I think it's up to 11 RPO's and MPOs have signed on to that. 332 333 AGENDA ITEM 6C: SMALL TRANSPORTATION PROJECTS INPUT(ABIGAILE PITTMAN) 334 335 Janice Tyler: Is there a place you can report to for fixing potholes? 336 337 Abigaile Pittman: You can tell us, and we can tell the maintenance section of NCDOT. Does anybody have anything they'd 338 like to offer up as a possible project? 339 340 Randy Marshall: I mentioned getting a rumble strips when Chuck Edwards was here. 341 342 Erik Broo: For the 1-40 widening and the MILK interchange at 266, initially the plans did not include signal synchronization. 343 Can we add that? 344 345 Nish Trivedi: That interchange portion of the project has been delayed. We will follow up with you and keep you informed as 346 the 1-40 widening project progresses. 347 348 Erik Broo: The signal operations will be a big benefit for The Weaver Dairy/MLK intersection. The distance between Weaver 349 Dairy by the Food Lion and the Fire Station between that and the highway is a relatively short distance with a couple 350 intersections and there are a lot of LI turns at the Weaver Dairy/MLK light for people turning north heading back to the 351 highway. It's already getting jammed up as it is and so when they widen the highway for the population growth people are 352 worried about getting out of the neighborhood at the light there. 353 354 Nish Trivedi: How far are you looking for synchronization? Signal synchronization is not just an individual intersection. It 355 involves the timing of multiple signals along a corridor. 356 357 Erik Broo: Anywhere from Weaver Dairy Road north on MILK past 1-40 on right and side that goes down into the country 358 towards Durham 15-501. 359 360 Nish Trivedi: Duke Forest area. 361 362 Erik Broo: Yes, Whitfield, there to MLK should be synchronized just so people can make it through that very congested 363 segment. 364 365 Nish Trivedi: Synchronization is part of SPOT safety. We'll call NCDOT and ask about synchronizing two of those lights as 366 part of the 1-40 widening.. 367 368 Janice Tyler: So, as part of that 140 widening are they also paying close attention to pedestrian and bicycle accidents. 369 Cause there's a huge development that's going in basically within less than a quarter mile from all the shopping that they 370 need. 371 372 Nish Trivedi: Carraway Village. Yes, there was a very big push for sidewalks, crosswalks, BRT and other improvements 373 associated with the project. 374 375 Janice Tyler: Carraway Village and right across from that Chapel Hill North shopping area. 376 7 10 DRAFT 377 Randy Marshall: The section of Rocky Ridge Road that runs about a mile from Dairyland to Arthur Minnis in front of the 378 Maple View Farms ice cream. If they could resurface that one-mile section and put some paved shoulders or bike lanes that 379 would make a big difference. They started to gravel it a couple of times, but they have not done anything about the other 380 lane because it's a very bumpy road and it's also heavily used by commuters to get up to I-40. It's used by cyclists who 381 often gather at the Maple View Ice Cream store to begin and end their ride. Resurface that one mile section with bike lanes. 382 383 Nish Trivedi:Are you talking about Rocky Ridge Road or Arthur Minnis? 384 385 Randy Marshall. I'm talking about making improvements on Rocky Ridge between Dairyland and Arthur Minnis. 386 The other is the half mile section between the end of Fayetteville Rd. up to Calvander and Carrboro where the bike lanes 387 disappear. 388 389 Nish Trivedi: Carrboro doesn't want a bike lane up to Calvander I believe going north and east in Carrboro's jurisdiction. 390 391 Randy Marshall: The Carrboro town limits end with the end of the bike lanes. It would be an Orange County project to go 392 from there. It could be a Carrboro/Orange County project in the next half mile. 393 394 Nish Trivedi: We're trying to push for that in modernizing those roads with paved shoulders. We'll go to NCDOT and ask if 395 we can get a little piece of that improved. 396 397 Ram Athavale: In Carrboro, Jones Ferry and Old Fayetteville Road, the middle of that intersection has a pretty strong dip 398 and rise that can be damaging to vehicles. I wondered if that can be looked at and possibly repaired under one of these 399 programs. 400 401 Nish Trivedi:Jones Ferry in south Carrboro? 402 403 Ram Athavale: Yes, south of Carrboro. 404 405 Nish Trivedi: Carrboro has an ETJ, so I'll have to look and review their ETJ. I'll check on it. There are a lot of issues in that 406 area,just depends on the ETJ whether we can pursue it or Carrboro must. 407 408 Abigaile Pittman. We are still waiting for NCDOT on the Orange Grove Road assessment. 409 410 Randy Marshall: Is that the Orange Grove Road Extension? 411 412 Abigaile Pittman: No, it is the section down by the Cedar Ridge High School, from the pedestrian bridge up to the High 413 School. We asked NCDOT to see if there were additional safety measures that could be taken. 414 415 Brantley Wells: I saw plans, and I don't remember seeing sidewalks on the plan. 416 417 Amy Cole: It never appeared on any plans. We wanted it to appear on the plans, and then the discussion was that no, it was 418 never going to be on a plan. 419 420 Amy Cole: Can you speak to what segment improvement actually means? 421 422 Nish Trivedi: A segment improvement is any section of a road from one point to another point along the road, not involving 423 the intersection. 424 425 Amy Cole: Right, but what is the improvement? 426 427 Nish Trivedi: It could be a paved shoulder or improving the condition like repaving, aligning, improving curve radius within a 428 limited budget. 429 430 8 11 DRAFT 431 Amy Cole: A segment improvement for me and others along that area would include sidewalks rather than just a paved 432 shoulder. 433 434 Nish Trivedi: We provide recommendations on what that segment involves. 435 436 Amy Cole: In that case,when it comes to this portion of Orange Grove Road,we would like to see sidewalks. 437 438 Nish Trivedi: Sidewalks is a separate issue. There is a sidewalk that I think the department is working on, on Orange Grove 439 Road, I believe some preliminary engineering is one part but I'm not sure what the status of it is. 440 441 Nish Trivedi: Just so you know NCDOT does not build sidewalks. 442 443 Heidi Perry: Neither does Orange County. 444 445 Nish Trivedi: Someone has to build it and someone has to maintain it. 446 447 Amy Cole: When I see segment improvement and it doesn't mean sidewalk, what I don't want to happen is we spend 448 money on something that's pointless. 449 450 Brantley Wells: You could get your segment improvement and put your curb and gutter. 451 452 Nish Trivedi: It's a project the staff felt was too expensive. If it turns out it cannot be done through small source funding like 453 Spot safety, we will have to pursue it through the SPOT process. When that occurs, we will come to you for a specific 454 recommendation for that segment. Should NCDOT polices like complete streets change in the meantime, we will let you 455 know. 456 457 Heidi Perry: Can I ask a question about Efland Cedar Grove Road on page 49? Is there a reason we would want to widen 458 the lane rather than put shoulders?Widening lanes increases speed and make roads more dangerous. 459 460 Nish Trivedi: Right now, Efland-Cedar Grove Road is being considered to fix the alignment, improve curve radius, and paved 461 shoulders. Widening is not being considered right now.This is for High Impact Low Cost. 462 463 Heidi Perry: Can we change the way it's worded here because it says widen lanes by 2 feet? 464 465 Nish Trivedi: I'll go back and update them. 466 467 AGENDA ITEM 61): MPO/RPO NCDOT UPDATES(NISH TRIVEDI) 468 469 Heidi Perry:What was the thing you said that we're taking input on? 470 471 Nish Trivedi: The Human Services Coordinated Transportation Project. OCPT may still have its own. DCHC MPO has one. 472 473 Heidi Perry: Is it online? 474 475 Nish Trivedi: Yes, I'll get you a link. 476 477 AGENDA ITEM 7: INFORMATION ITEMS 478 479 AGENDA ITEM 7A: BURLINGTON-GRAHAM METROPOLITAN PLANNING ORGANIZATION (B-G MPO) 2045 METROPOLITAN 480 TRANSPORTATION PLAN (NISH TRIVEDI) 481 482 Ram Athavale: Is that what that memorandum is about? 483 9 12 DRAFT 484 Nish Trivedi: The memorandum is about the Metropolitan transition planning B-G MPO. It is describing the MTP update 485 process a 14 month process.TARPO is meeting next month and I will provide you updates at the next meeting. 486 487 AGENDA ITEM 713: NCDOT PROJECTS UNDER DEVELOPMENT(NISH TRIVEDI) 488 489 Randy Marshall: Intersection improvements as in NC 54 on page 52, are these some which have already been done or 490 some of these are yet to be done? 491 492 Nish Trivedi. Yet to be done. These are improvements that are needed along that corridor. 493 494 Randy Marshall: Well, at Dodson's Crossroads in the last several years, they've added turn lanes and traffic signals; what 495 else can they add there? 496 497 Nish Trivedi: Traffic is still increasing in that intersection. 498 499 Randy Marshall. What else can you do to improve that intersection? 500 501 Nish Trivedi: Some recommend roundabouts. 502 503 Heidi Perry. I thought they were showing super street things here? 504 505 Nish Trivedi:These are the improvements that can be done at various pieces of the intersections. 506 507 Randy Marshall: A massive realignment or reworking of the Orange Grove/54 intersection and that's on here for 508 improvements. 509 510 Nish Trivedi. I'm sorry,which one? 511 512 Randy Marshall: Orange Grove Road and 54. They just completely re-did that intersection and it's down here for additional 513 improvements. 514 515 Nish Trivedi: Orange Grove Road and NC 54 is going through operational improvements as far as the current STIR I think 516 there's operational improvements in there. The traffic signal is already there at the intersection. I'll look back and see 517 what's going on. 518 519 AGENDA ITEM 8:ADJOURNMENT 520 521 Art Menius, Chair 10 13 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: August 21, 2019 Action Agenda Item No. 5.a. SUBJECT: Bicycle Safety Implementation Subcommittee (BSIS) Recommendation on Future Handling of Bicycle Safety Implementation DEPARTMENT: Planning and Inspections ATTACHMENTS: INFORMATION CONTACT: 1. None. Nish Trivedi, Transportation Planner, 919-245-2582 Tom Altieri, Comprehensive Planning Supervisor, 919-245-2579 Craig Benedict, Planning Director, 919-245-2585 PURPOSE: Receive a recommendation from the BSIS that it pursue its future bicycle safety implementation as part of regular OUTBoard meetings and agendas. BACKGROUND: At its April Meeting, the OUTBoard requested: 1. The BSIS evaluate its anticipated future work and determine if there is immediate need to continue meeting separate from the OUTBoard as a sub-committee, or continue as part of regular OUTBoard meetings; and 2. That staff place Bicycle Safety Implementation on a subsequent OUTBoard agenda to receive and consider a recommendation from the BSIS and if applicable, discuss the documentation of goals, deliverables, and associated timeline. Subsequently, the BSIS met on May 24 and unanimously recommended to the OUTBoard that the subcommittee format be dissolved and that future bicycle safety implementation be included and discussed at regular OUTBoard meetings. In reaching this recommendation, the BSIS evaluated its work and determined that there was no immediate need to continue meeting separate from the OUTBoard as a subcommittee. Subcommittees as a matter of Orange County Advisory Board Policy established by the BOCC are to have documented goals, deliverables, and a timeline and cease to meet when these are satisfied. Also consistent with Policy, the need to reinstate a subcommittee or create others can be considered by the OUTBoard at any time. The BSIS has done an excellent job in accomplishing several of the activities identified in the Bicycle Safety Task Force (BSTF) Report such as: • Campaign logo and marketing survey; • Creation of a campaign website with safety information; • Creation of four campaign video PSAs in partnership with Cedar Ridge Videography Club; • Creation of four campaign bike safety posters, and a Rules of the Road brochure; 14 • Purchase of swag for tabling at events; • Signage design and placement of fifteen signs at multiple entry points in the County; and • Very successful Bike Rodeo held on July 24 at the Cedar Grove Community Center. The BSIS and OUTBoard have been very appreciative of the support and funding received from the BOCC and it shares an appreciation for the work that has been done. As a reminder, BSIS was formed by the OUTBoard in 2017 for the purpose of implementing identified initial activities of the BSTF Report with a budget of $15,000 ($10,000 from the Non-Departmental General Fund, and $5,000 from the Visitors Bureau). Some additional funding was provided in FY 2018- 19 and has since been expended. Activities that have been discussed for the future include: • Creation of Bike Safety Facebook page and Instagram account; and • Release of multiple bicycle safety radio PSAs. With additional funding, the following items could also be pursued: • School outreach apps/programs; • Crash reporting enhancements; and • Real-time EMT incident reporting. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends OUTBoard approve the BSIS recommendation. 15 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: August 21, 2019 Action Agenda Item No. 5.b. SUBJECT: Draft Carrboro Bike Plan DEPARTMENT: Planning and Inspections ATTACHMENTS: INFORMATION CONTACT: 1. Draft Carrboro Bike Plan Map Series Zachary Hallock, Town of Carrboro PURPOSE: Receive an update on the Carrboro Bike Plan; and review and provide comments on the Draft Carrboro Bike Plan Map Series regional Orange County connections. BACKGROUND: In 2018, the Town of Carrboro was awarded a planning grant from the North Carolina Department of Transportation (NCDOT) to update its comprehensive bicycle transportation plan. The overall goal of the Project is to provide a framework for NCDOT and the Town to enhance bicycling as a mode of transportation for residents and visitors alike, improving access, connectivity, and safety. Additional goals include promoting healthy active lifestyles, diversifying the local economy, and reducing transportation-related greenhouse gas emissions. The planning process was initiated in late 2018 and includes identified key routes, connections, opportunities, obstacles, and prioritized areas for future implementation. The draft plan review and revisions are to be completed in September or October, and final plan and presentations are scheduled for this winter. Planning staff has participated on the steering committee for the plan update, with a particular focus on regional connectivity. Attachment A provides four separate network maps: 1) Existing Network 2) Existing & In Development 3) Existing, In Development, & Strategic Priorities 4) Long-term Network The OUTBoard is being requested to review the regional Orange County connections depicted on the maps. The OUTBoard's review comments will be provided to Carrboro planners for consideration in finalizing the bike plan update. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends OUTBoard provide comments. r :k y - v i 17 Z Existing Network a �oF° cHAPeL - EXISTING BIKE NETWORK 0 — Bike Lanes Bike Lane One Side Only HOI, Sharrow Wide Shoulder co z Shared Use Path o v�, o ° HOGAN HILLS RD oa u+ ID a zQ O "- Y J i f � � iOMESTEq O p 3� 6 1 - l cc �OR r r o of go —; w O u S°o,�oG G o cy � , STROWD LN pATHby4Y D� �- 54 CAROL ST �y J °�� Q e0 S IC � N'�NSTHILL Ul CIF A r W P010,PR !/F o FIDELITY sT o Ln E MAIN ST NES FER o DESTINATIONS ,O — m Key Destinations A W Parks/Public Open Space mm o "- 54 - � - m Schools � 0 UNC Lakes ' �z '1 Town of Carrboro / eP`II CLUB RD ti Surrounding Communities 501 ROC/r, y 9VEN RD MILES 0 0.25 0.5 3 MIN BIKE RIDE � fff/ 18 Existing and Z o In Development CHAPEL Network EXISTING BIKE NETWORK YH0 — Bike Lanes w — Bike Lane One Side Only U F� oSharrow HOGAN HILLS RD f eRgCE�, o Wide Shoulder Od Shared Use Path u+ F p LONG-TERM BIKE NETWORK 2Q --- Separated Bike Lanes v _ / --- Bike Lanes Q Neighborway J --- Shared Use Path HOMESTEgOR O Crossing Improvement O 7 a DEVELOPMENT STATUS O m K 0 o In Development �LL N F. Z 5 O /� EL O opoG GP �Q7 op t UO ■ v cy 0. n c) po • STROWD LN m PATywAY Dp 1 m 54 0 CAROL ST f D �� � �0 nLn y�r 03 70 ,` wMA/N ST 0 NSeOROi�n�HILL ST DO W POPSPgL 0- + FIDESST•.. v O �o RUl A RD 1 E MAIN ST gR���EI O ��R o� �oNEs DESTINATIONS .►— m Key Destinations W LU - Parks/Public Open Space vm 0K09' S4 y - Schools ti, ro0 U N C OR 11 Lakes `` z Town of Carrboro CLUB RD hti Surrounding Communities Rock 501 ~'9VEN RD MILES 0 0.25 0.5 3 MIN BIKE RIDE /'' i 19 X z X Existing, a ° In Development, & QDFD CHAPEL HILL , Strategic Priorities EXISTING BIKE NETWORK Ho�� Shared Use Path CO F� On-Road Bike Facility z 2 9�o PROPOSED BIKE NETWORK HOGAN HILLS RD @RgCE\,��'O p0 Shared Use Path 0 Separated Bike Lanes Neighborway tiQ O Crossing Improvement _W DEVELOPMENT STATUS 1 JIn Development HOMESTE PRIORITY STATUS � goRo n Strategic Priority A o •a O m 3 O 0 JLL cc �DR N y w z E z y, o `1 LL W 4{ O 0 C, co y RO PATHW m AY DR STRpWD LN i r m � /f ! < Q � m 54 O CAROL ST �y- D �� O O >, Wv It Mq'A, 0ROy HILL,ST D W POPS-PRA�F O -{ FIDELITV•ST N 7o y R� E MAIN ST� \. o � IC N i �![. 30N s 00 DESTINATIONS m N Ci Key Destinations W W Parks/Public Open Space o0, oKDQ 54 y - Schools ti 0T UNC - cp Lakes J �- Z Town of Carrboro a,04 CLUB RD Surrounding Communities Roc 501 ky 7VEN RD MILES 0 0.25 0.5 3 MIN BIKE RIDE 1 r r 20 i r z Long-Term o Network CHAPEL HILL ° EXISTING BIKE NETWORK 1 ti Bike Lanes 1 �vHo� — Bike Lane One Side Only (01 00 1 Sharrow Zr r — Wide Shoulder °r HOGAN HILLS RD _ eR14_1E Shared Use Path t zi LONG-TERM BIKE NETWORK °' 'vim pow.--? --- Separated Bike Lanes F � • 1 1 a • 1 --- Bike Lanes Neighborway 1 0 1. �► � —� 1 1 = 1 ■.—k --- Private Connection l•, 1 P , ! ! --- Shared Use Path 1 .C7� r O Crossing Improvement �~�HOMESTEP'ORD .ftI►• tit j a �� il ► DEVELOPMENT STATUS o o ` In Development %% a 'a i cc OR r � o Of r" {� o n s r' i LL o STRO A PATHbvAY Dy 1 Xx ° 54 CAROL ST Gy il Q`�� c�F��•� �' Bike lanes are currently v� _0 eORo N HILL ST oD in development but the � % ► N. 0� % D , C� v long-term vision is for <<• o separated bike lanes. 1 { k POPLAR AVEN O FIDELITY ST 1 + m y R� E AIN 6R�� QA ►4 o F�f' 10 DESTINATIONS i:�— ��. °N �► i o O 4i Key Destinations .--��� �� , 1 LLUUF IL Parks/Public Open Space m� o jy - Schools �< Lakes tir r Town of Carrboro BQ.N C4013 RD Surrounding Communities ROC/t- 501 ti 7VEN RD MILES °! 0 0.25 0.5 3 MIN r' BIKE RIDE �21 w� , 21 ITEM 7.a PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Comprehensive Planning 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 MEMORANDUM TO: Orange Unified Transportation Board FROM: Nishith Trivedi, Orange County Transportation Planner DATE: August 21, 2019 SUBJECT: Chapel Hill Transit North-South Bus Rapid Transit (CHT NS BRT) Attachment: Locally Preferred Alternative This memorandum is to provide the Orange Unified Transportation Board (OUTBoard) an update on the CHT NS BRT Transit Locally Preferred Alternative (LPA). July 12, 2019 Chapel Hill hosted a public meeting on the NS BRT LPA (Attachment 1). The BRT will go along the Martin Luther King Jr. Boulevard and South Columbus Street corridor, from Southern Village park-and-ride lot to Eubanks Road park-and-ride lot. It is currently completing its 30% design and full National Environmental Policy Act (NEPA) documentation. Upon completion of NEPA, it will be submitted to Federal Transit Administration (FTA) for Small Starts funding. Next steps of the project are as follows: • Fall 2019: Request FTA Small Starts Rating to determine eligibility for capital funding. • 2019 — 2020: Prepare final plans, specifications, and bid packages for BRT construction. • 2020 — 2021: Chapel Hill Transit will work with the FTA to develop a Grant Agreement, which is the means by which the FTA provides Small Starts capital funds. Signing the Grant Agreement marks the end of Project Development. • 2021 — 2022: Construction is anticipated to begin in early spring 2021 and last approximately 18 months. • 2022: Following construction, the NS BRT would open for revenue service in 2022. For additional information: https://nsbrt.org Transportation planning staff will continue to keep the OUTBoard apprised of this project. Feel free to contact staff with any questions. Revised Locally Preferred Alternative 22 (LPA) Mixed Traffic with TSP Dedicated Curb Lane -Construct Eubanks P+R Dedicated Curb Lane -Convert Dedicated Curb Lane- ■ Convert or Construct.TBD Weaver Dairy Road New Parkside ......................................... .................................................... Homestead Northfield Piney Mountain ............................... . >`stes............................................. Estes 1 rJ Hillsborough .......................................... ..................................................... North Franklin Cameron Pittsboro/Credit Union Carrington Hall ....................................... Manning/ East ........................... Manning Jackson Circle/ Mason Farm For bike and pedestrian facilities, the LPA NC 5q......................................I...... NC 54 includes a multi-use path Culbreth adjacent to the roadway along the corridor. Southern Village P+R frId el Hill nSIt NORrHBUSNPIa rNsIf NO Tr. 23 Burlington-Graham MPO Getting There 2045 MTP Update Vision, Goals and Objectives Updated June 26, 2019 Vision Getting There 2045 Plan will support the investment in a multimodal transportation network for a vibrant and prosperous Burlington-Graham region where residents of all ages have access to opportunities and a good quality of life, businesses can grow and thrive, and the natural and cultural resources of the region are protected. Goals and Objectives Development Goals and Objectives Metrics Provide a safe,secure,comprehensive,and effective transportation system to move people and goods within and through the area Objective 1A Enhance mobility and accessibility and manage congestion Travel Time Reliability utilizing TTI(Travel Time Index from across the transportation system and across modes of INRIX/HERE data)for interstates and US routes transportation . Bicycle,pedestrian and transit access to passenger rail stations (metric to be refined) . Ridership on passenger rail and transit Objective 16 Support projects,programs,and policies that advance safe . Reduce non-motorized fatalities and serious injuries rate(5-year and secure travel for all transportation system users average)(utilizing NCDOT data) . Reduce serious injury and fatality crash rates(utilizing NCDOT data) Objective 1D Plan and support a freight transportation system that allows . The number of at-grade rail crossings for the efficient movement of goods Objective 1E Improve resiliency and reliability of the transportation system . The number of deficient bridges/roads through increasing roadway network connectivity and supporting multiple route options \\vhb\gbl\pro'\Raleigh\38912.00 BGMPO 2045MTP Burlington\tech\Goals and Objectives\Goals and Objectives Updated 1une26 2019.doc CID CY 24 GOAL 2 Provide a transportation system that enables mobility choices Objective 2A Integrate walking and bicycling with vehicular travel and . Miles of existing sidewalks,bike facilities and greenways encourage the use of walking and bicycling • Percentage of CBDs and Designated TOD areas with a walk score of 50 or higher • Number of communities within the region recognized as Walk- Friendly or Bicycle-Friendly Communities • Funding for a follow-up study to identify bicycle and pedestrian network gaps Objective 2B Develop an integrated public transportation system that • Percentage of the region's population located within 1/4-mile buffer supports multimodal transportation options of fixed route transit • Percentage of the population served with 30-minute frequency (within%mile buffer) Objective 2C Maximize rail and air transportation opportunities(no • Percentage of identified future economic development sites that can changes) be potentially served by rail Objective 2D Support transportation demand management strategies • Number of Park-and-ride lots including Park-and-Ride lots,carpooling and vanpooling . Number of people registered for carpooling and vanpooling(data throughout the region from PART) Objective 2E Support better coordination and integration of existing transit . Fund and program a Regional Transit Feasibility Study services in Alamance County GOAL 373APrioritize ek to optimize the existing transportation system Objective maintaining existing assets before exploring systemNumber ofdeficient/posted bridges pansion options Objective 3B Utilize existing transportation capacity through targeted economic redevelopment in areas with sufficient infrastructure \\vhb\gbl\pro'\Raleigh\38912.00 BGMPO 2045MTP Burlington\tech\Goals and Objectives\Goals and Objectives Updated 1une26 2019.doc 25 GOAL 4 Promote equity and accessibility in transportation options for transportation-disadvantaged populations Objective 4A Improve opportunities to serve transportation-disadvantaged . Percentage of the region's block groups with a high EJ concern score populations with convenient transportation to needed located within%mile of fixed route transit services and desired travel destinations Percentage of the region's key community resources including town halls,parks,libraries,post offices,K-12 schools,colleges,universities, health and social services offices and grocery stores within''/.mile of fixed route transit Objective 4B Provide meaningful opportunities for public involvement in the transportation planning process(No change) Objective 4C Use inclusive design to make the system work for all users • Number of ADA Transition plans for local communities completed or updated in the last 10 years GOAL 5 Integrate land use and transportation planning Objective SA Support land use planning strategies that facilitate efficient . Number of activity centers(nodes)across the region designated as transportation system use and development accessible(via walk and transit) • Number of locally-adopted comprehensive plans Objective 56 Align the transportation infrastructure investment with . Percentage of major transportation capacity projects that align with community vision of future growth locally-adopted plans for growth areas Objective SC Encourage density and destination clustering which will . Residential and employment density in activity centers increase accessibility and multimodal transportation options Objective SD Support areas designated for additional economic . Percentage of major transportation capacity projects that overlap development potential under programs such as Opportunity with and/or provide access to designated Opportunity Zones,N.C. Zones and North Carolina Industrial Commission Certified Industrial Commission Certified sites or other locations designated Sites through transportation infrastructure investments for targeted economic development \\vhb\gbl\pro'\Raleigh\38912.00 BGMPO 2045MTP Burlington\tech\Goals and Objectives\Goals and Objectives Updated 1une26 2019.doc 26 MTP 2045 Goals and Objectives and Transportation Planning Factors A Metropolitan Transportation Plan is required to address the transportation planning factors established by the Federal transportation legislation.The FAST Act,signed into law in 2015,included the addition of two planning factors(focused on resiliency and reliability and tourism),for a total of ten transportation planning factors.Eight of those factors were initially defined in the Safe,Accountable, Flexible, Efficient Transportation Equity Act:A Legacy for Users(SAFETEA-LU),enacted in 2005,and carried forward by MAP-21 in 2012.' The projects and strategies recommended in the MTP must support these planning factors.The federal planning factors are as follows: • Support the economic vitality of the metropolitan area • Increase the safety of the transportation system for motorized and non-motorized users • Increase the security of the transportation system for motorized and non-motorized users • Increase the accessibility and mobility of people and for freight • Protect and enhance the environment,promote energy conservation,and improve the quality of life • Enhance the integration and connectivity of the transportation system,across and between modes,for people and freight • Promote efficient system management and operations • Emphasize the preservation of the existing transportation system • Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation • Enhance travel and tourism As can be seen in the table below,the MTP goals align with the federal planning factors to ensure that the federal guidelines are addressed throughout the MTP 2045 plan development. I Code of Federal Regulations:Title 23,Part 450.306 \\vhb\gbl\pro'\Raleigh\38912.00 BGMPO 2045MTP Burlington\tech\Goals and Objectives\Goals and Objectives Updated 1une26 2019.doc 27 Goal 1:Provide a safe, Goal 2:Provide a Goal 3:Seek to optimize the Goal 4:Promote equity and Goal 5:Integrate land use secure,comprehensive and transportation system that existing transportation amessiblllty in Ire nsportat Ion and transportation planning effective transpor[atl on ena tiles mohility choice s systems opt Ions for t ra nspurtatiun- system to move people and disadvantaged populations goods within and through the Support the economic vitality of the matropol itan area ❑ ■ ■ ❑ • Increase the safety of the transportation system for motorized and non-motorized users Increase the security of the transportation system for motorized and non-motorized users ❑ ❑ Increase the arcs ssi bil ity and mohi lity of people and freight ■ ■ ■ ■ ■ Protect and enhance the environment,promote en orgy conservation,and improve the quality of life ❑ ■ ❑ ❑ • Enhance tha integration and connectivity of the transportation system,across and between modes,For people and freight Promote efficient system management and operations ❑ ■ ■ ■ ❑ Emphasize the preservation of the existing transportation system ❑ ❑ ■ r • Improve She resiliency and reliability of the transportation system and reduce or mitigate St-m—iter impacts of surface transportation a ❑ ❑ Enhance travel and tourism • • • ❑ 0 ■ Full ❑ Partial \\vhb\gbl\pro'\Raleigh\38912.00 BGMPO 2045MTP Burlington\tech\Goals and Objectives\Goals and Objectives Updated 1une26 2019.doc Technical Committee 7/24/2019 Item 11 98 NCDOT DIV 7 PROJECTS LOCATED/N DCHCMPO-UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date SS-4907BS Installation of traffic signal at the intersection of US70 and 5/31/2017 Jul.2019 $40,500 R/W Construction underway,Tentatively Dawn McPherson 44894.2.1 SR 1114(Buckhorn Road)East of Mebane. $43,200 CON schedule to flash signal 6/14/19 44894.3.1 W-5707C Revise pavement markings and overhead lane use signs for 11/1/2018 Aug.2019 $395,000 No bids on most recent letting, Chad Reimakoski 44853.1.3 removal of inside lane drop configuration on 1-40 Project on hold until further notice 44853.3.3 Westbound in vicinity of US 15-501 interchange. 47490 Resurfacing I-40 WB by use of contingency funds 47798 Increase length of existing turn lane/slip ramp and 1/17/2019 Jul.2019 $189,000 Construction underway-90% Derek Dixon improve existing radius in the SE quadrant of US 70 complete,final pavment markings Business/NC 86 at US 70 Bypass in Hillsborough pending U-5846 Construct a roundabout at SR 1772(Greensboro Street) 5/2/2019 3/1/2022 $3,375,611 Project let and contract awarded to Chad Reimakoski 50236.1.1 and SR 1780(Estes Drive)in Carrboro. Fred Smith Company 50236.2.1 50236.3.1 B-4962 Replace Bridge#46 over Eno river on US 70 Bypass 4/16/2019 12/28/2021 $4,863,757 Project let and contract awarded to Kevin Fischer 40174.1.1 Conti Enterprises,Inc. 40174.2.1 40174.3.1 W-5707K Remove and replace existing curb&gutter and sidewalk, 5/31/2019 Sept.2019 $350,000 ROW acquisition underway, Chris Smitherman 48283 add pedestrian signals,concrete island,and signal construction underway in areas of Derek Dixon modifications on SR 1010(E.Main St/W.Franklin St)from existing ROW Brewer Ln to Graham St.in Chapel Hill and Carrboro Page 1 DCHCMPO Jun.2019 Page 14 of 19 Technical Committee 7/24/2019 Item 11 99 NCDOT DIV 7 PROJECTS LOCATED/N DCHCMPO-UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date U-5847 Intersection improvements at SR 1010(West Franklin St.) 5/31/2019 Sept.2019 $775,000 Planning and design activities Chris Smitherman 50238.1.1 and SR 1771(Merritt Mill Rd)/SR1927(Brewer Lane)in underway,bike/ped improvements 50238.2.1 Chapel Hill/Carrboro. to be completed under project 50238.3.1 48283 SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) 12/5/2019 Spring 2020 $261,000 Planning and design activities Chad Reimakoski 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of underway,ROW activities June/July 47936.2.1 Hillsborough. Improvements consist of wedging pavement 2019 47936.3.1 and grading shoulders. 1-3306A Widening 1-40 from 1-85 in Orange Co.to Durham Co.line TBD TBD $98,800,000 Planning and design activities Laura Sutton 34178.1.3 (US 15/501 Interchange) underway,Public meeting 1/24/19, 34718.2.2 No schedule at this time other than 34178.3.3 CE document scheduled for 3/29/19,Combined w/1-3306AC P-5701 Construct Platform,Passenger Rail Station Building at 6/30/2021 FY2022 $7,200,000 PE funding scheduled 711/2020, Matthew Simmons 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough Coordinate with U-5848 46395.3.1 R-5821A Construct operational improvements including 6/21/2022 FY2024 $3,924,000 Planning and design activities Chris Smitherman 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR underway,coordinating with NC54 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old West Corridor Study 47093.3.2 Fayetteville Road). U-5848 Extend SR 1006(Orange Grove Road)on new location with 3/21/2023 FY 2025 $5,326,000 Planning and Design activities Laura Sutton 50237.1.1 Sidewalks and bike lanes from existing SR 1006(Orange underway,Coordinate with P-5701 50237.2.1 Grove Road)to US 70 Business in Hillsborough. and U-5845 50237.3.1 1-3306AC Interchange improvements at 1-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities Laura Sutton 34178.1.6 underway,Combined w/1-3306A 34178.2.5 434178.3.9 Page 2 DCHCMPO Jun.2019 Page 15 of 19 Technical Committee 7/24/2019 Item 11 30 NCDOT DIV 7 PROJECTS LOCATED/N DCHCMPO-UNDER DEVELOPMENT TIPMBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17, Chris Smitherman 45911.1.1 (Orange Grove Road)to Durham County line Coordinate with 1-5967,1-5984,1- 45911.3.1 5983 and 1-0305 1-5967 Interchange improvements at 1-85 and SR 1009(South 1/16/2024 FY 2027 $20,700,000 Planning and Design activities Laura Sutton 45917.1.1 Churton Street)in Hillsborough underway,Coordinate with 1-0305 45917.2.1 and U-5845 45917.3.1 U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1-1/16/2024 FY 2027 $49,751,000 Planning and Design activities Laura Sutton 50235.1.1 40 to Eno River in Hillsborough underway,Coordinate with U-5848 50235.2.1 and 1-5967 50235.3.1 1-5984 Interchange improvements at 1-85 and NC 86 in 11/18/2025 FY 2027 $16,488,000 Funding approved 10/10/17, Laura Sutton 47530.1.1 Hillsborough Coordinate with 1-0305 and 1-5959 47530.2.1 47530.3.1 U-6071 Intersection improvements at NC 54 and SR 1007(Old 1/15/2026 FY 2027 $1,216,000 Planning and design activities Chris Smitherman 47496.1.1 Fayetteville Rd)in Carrboro underway,Project on hold per Draft 47496.2.1 2020-2029 STIP(unfunded project) 47496.3.1 1-5983 Widen 1-85 in Orange Co.from west of SR1713(Mt. 10/20/2026 FY2029 $53,460,000 Planning and Design activities Laura Sutton 47529.1.1 Hermon Church Rd)to Durham Co.line underway,Coordinate with U-5848, 47529.2.1 1-0305 and 1-5984 47529.3.1 1-0305 Widening of 1-85 from west of SR1006(Orange Grove 1/1/2027 FY2029 $133,400,000 Planning and design activities Laura Sutton 34142.1.2 Road)in Orange Co.to west of SR 1400(Sparger Road)in underway,Project reinstated per 34142.2.2 Orange Co. Draft 2020-2029 STIP(funded 34142.3.2 project) Page 3 DCHCMPO Jun.2019 Page 16 of 19 Technical Committee 7/24/2019 Item 11 �OF NOpTry Cq o� Page 1 of 2 31 North Carolina Department of Transportation 06/04/2019 op, Active Projects Under Construction -Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent C202581 EB-4707A SR-1838/SR-2220 FROM US-15/501 IN S T WOOTEN Nordan,PE, $4,614,460.00 05/28/2019 02/15/2021 05/28/2019 ORANGE COUNTY TO SR-1113 IN CORPORATION James M DURHAM COUNTY. DIV 5 C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, Lorenz,PE,Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 05/15/2019 100.00 98.27 GUILFORD COUNTY AND 3 BRIDGES INC. IN ORANGE COUNTY. C203946 B-5348 REPLACE BRIDGE#85 OVER PHILS DANE CONSTRUCTION Howell,Bobby J $984,596.98 02/01/2018 12/27/2018 02/01/2018 01/30/2019 99.00 92.33 CRK ON SR-1005(OLD G'BORO RD) INC C204025 1-5954 PAVEMENT REHAB ON 1-40/1-85 FROM APAC-ATLANTIC INC Howell,BobbyJ $9,699,053.68 04/01/2018 06/29/2019 04/29/2019 06/29/2019 9.00 15.74 EAST OF NC-54 IN GRAHAM IN ALAM. THOMPSON ARTHUR CO.TO WEST OF SR-1114 DIVISION (BUCKHORN RD)IN ORANGE CO. DG00321 W-5143 SR 1004(EFLAND-CEDAR GROVE RD)CAROLINA SUNROCK Howell,BobbyJ $1,711,133.05 04/02/2018 04/02/2019 04/02/2018 04/02/2019 100.00 99.10 ROADWAY IMROVEMENTS LLC DG00393 RESUFACE SR 1101,SR 1118,SR 1119 RILEY PAVING INC Howell,Bobby J $1,084,520.40 04/02/2018 10/12/2018 06/18/2018 12/07/2018 100.00 99.97 SR 1124,SR 1125,SR 1127,SR 1128 SR 1130,SR 1134,SR 1135,SR 1137, SR 1141,SR 1143,ETC. DG00395 REPLACE BRIDGE#189 ON SR 1114 S T W OOTEN Howell,Bobby J $723,924.13 04/01/2018 01/01/2019 05/07/2018 02/07/2019 97.00 99.75 (BUCKHORN ROAD)OVER CANE CORPORATION CREEK DG00413 RESURFACE US 70 BUS,SR 1009,SR CAROLINA SUNROCK Howell,Bobby $3,562,232.66 05/28/2018 11/01/2019 05/29/2018 11/01/2019 47.00 82.91 1102,SR 1129,SR 1239,SR 1352,SR LLC 1716 AND SR 1841 DG00419 RESURFACE NC 86,17 SECONDARY CAROLINA SUNROCK Howell,Bobby $3,764,001.64 05/14/2018 11/01/2019 05/14/2018 11/01/2019 40.00 23.45 ROADS LLC DG00427 REPLACE BRIDGE#51 ON SR 1534 NATIONAL BRIDGE Howell,Bobby J $521,443.82 05/07/2018 03/04/2019 07/30/2018 05/21/2019 100.00 99.49 (MCKEE ROAD)OVER BUFFALO CK. BUILDERS LLC DG00435 AST RETREATMENT ON 22 WHITEHURST PAVING Howell,Bobby J $846,340.66 04/01/2019 10/11/2019 SECONDARY ROADS CO INC DG00444 R-5821B INTERSECTION IMPORVEMENTS AT FSC 11 LLC DBA FRED Howell,Bobby J $1,039,900.00 07/16/2018 05/16/2019 08/13/2018 05/16/2019 100.00 99.94 THE INTERSECTION OF NC 54 AND SMITH COMPANY SR 1006(ORANGE GROVE ROAD) DG00445 R-5787BB INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Howell,Bobby J $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 80.00 80.14 CURB RAMPS AT VARIOUS BUILDERS OF INTERSECTIONS CATAW BA COUNTY INC W-5707A INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Howell,Bobby J $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 80.00 80.14 CURB RAMPS AT VARIOUS BUILDERS OF INTERSECTIONS CATAW BA COUNTY INC DG00451 U-5854 SR 1008(MT.CARMEL CHURCH CAROLINA SUNROCK Howell,Bobby $1,833,468.84 08/15/2018 04/30/2020 02/13/2019 11/30/2020 7.00 17.73 ROAD)AND SR 1913(BENNETT LLC ROAD)ROUNDABOUT AND RELATED SAFETY IMPROVEMENTS DG00461 REHAB.BRIDGE#031 ON SR 1010(E. M&J CONSTRUCTION Howell,Bobby J $2,456,272.12 11/12/2018 07/15/2019 03/15/2019 07/15/2019 7.00 6.78 FRANKLIN ST.)OVER BOLIN CREEK&CO OF PINELLAS BOLIN CREEK TRAIL COUNTY INC Page 17 of 19 Technical Committee 7/24/2019 Item 11 of"ORiN Q. Page 2 of 2 32 North Carolina Department of Transportation 06/04/2019 a Active Projects Under Construction-Orange Co. 9��e�10F TAAN`'e�Qh 0 Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent DG00462 REHAB.BRIDGES 264,288,260,543 ELITE INDUSTRIAL Snell,PE,William$967,383.15 08/01/2019 01/01/2020 IN GUILFORD COUNTY AND BRIDGE PAINTING INC H 031 IN ORANGE COUNTY Page 18 of 19