HomeMy WebLinkAboutAgenda - 03-06-2001-9cORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 6, 2000 Action Age a Item No. a SUBJECT: Review Architectural/Schematic Design and Approve Planning Phase for CHCCS Elementary School #9 DEPARTMENT: Budget PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Donna Dean 245-2151 Attachment 1. CHCCS Elementary - School #9 Revised Project Budget _ TELEPHONE NUMBERS: Attachment 2. CHCCS Elementary #9 Hillsborough 732-8181 Project Schedule Chapel Hill 968-4501 Attachment 3. CHCCS Elementary #9 Durham 688-7331 Construction Capital Project Ordinance Mebane 336-227-2031 and Budget as Amended PURPOSE: To review the architectural/schematic design for Chapel Hill-Carrboro City School (CHCCS) Elementary School #9 and appropriate funding forthe Planning Phase of the project. BACKGROUND: In November 2000, the Board of Commissioners approved a Policy on Planning and Funding School Capital Projects. That policy identifies two levels of school construction projects -Level 1 and Level 2. Level 1 projects are those projects that have a relatively small scope of work and can be accomplished using a single prime contractor, in-house staff or entail purchasing equipment and vehicles. Level 2 projects are major projects that require several phases to complete. For these projects, the Commissioners approve project funding in four phases: • Concept/Pre-Planning Phase -includes preliminary programming and design work that would result in conceptual drawings and preliminary cost estimates. • Planning Phase -includes siting the facility, construction of infrastructure, and preparation of construction documents in preparation for bidding process. • Design and Construction Phase -includes final design, facility canstruction and purchase of equipment, furnishings, technology, and one-time startup items. • Final Accounting Phase - provides a reconciliation of actual project expenditures with approved budget. Last fiall, the CHCCS Board identified the need for a new elementary school. The estimated cost for the school, to be built on the Meadowmont site, totals $13,555,026 (details provided in Attachment 1) with funding from a combination of pay-as-you-go monies and the proposed November 2001 bond. As defined in the above mentioned policy, this project is a Level 2 2 project and therefore requires that the Board of Commissioners approve the project at the various phases outlined above. Concept/Pre-Planning Phase In December 2000, the Commissioners appropriated $132,184 in funding far the initial phase, Concept/Pre-Planning, for this project. The appropriation provided funding far conceptual drawings (schematics) and preliminary permit fees (for the Town of Chapel Hill) for the school. Over the last few months, the School system and the architect have worked together to complete the preliminary design, and the School Board recently approved the plans. In addition, the Town of Chapel Hill has reviewed and approved the planned project. Planning Phase The Commissioner approved policy also indicates that the Board of County Commissioners should appoint a representative to work directly with the Board of Education as it plans and constructs a new facility. At its February 7, 2001 meeting, the Board appointed Chair Halkiotis as its Commissioner representative. At this time, CHCCS is ready to present the plans to the Board of Commissioners for review. In accordance with the approved policy, the District also requests that the Commissioners appropriate funding totaling $440,462 .for the Planning Phase of the project. Funding approval of this phase will enable the project to proceed according to the timeline (Attachment 2) allowing the new school to open in fall 2003. Specifically, this phase entails: • Refining the schematic plans; _ • Developing construction and site work details; • Producing project drawings that fix the building size and characteristics (including building elevations, exterior finishes, and mechanical, electrical and plumbing systems). All of the items outlined above enable the District to finalize the building plans and specifications and produce the construction documents required in the bidding process. At that point, the Department of Public Instruction's School Planning Division provides its certification of compliance and the State Department of Insurance attests to the project's compliance to building codes. The finished plans and specifications provide the level of specificity required by contractors to develop construction bid estimates. The plans and specifications became part of the construction contract documents that contractors use to build a facility. The chart below outlines details regarding the first two phases of the project: CHCCS Funding Phase Request Concept/Pre-Planning Phase (Approved 12/06/00) Schematic Design $107,184 Town Approval Process $25,000 Total Concept/Pre-Planning Phase $932,184 Planning Phase (Requested 03/06/01) Design Development $142,911 Town Approval Process $72,000 Construction Documents $225,367 Total Planning Phase $440, 278 Total CHCCS Funding Request $572,462 Design and Construction Phase 3 Upon completion of the Planning Phase and prior to soliciting construction bids for this project, the School District will present the final design and construction details to the Commissioners for review. At that point, and fallowing Commissioner review, the District would begin the bidding phase of the project. After bids are received and analysis is complete, CHCCS staff would present a recommendation to the Board of Education and the Board of County Commissioners for approval. It is important to note that CHCCS anticipates funding for this phase, Design and Construction, to come from the proposed November 2001 bond referendum. Final Accounting Phase At the close of the project, this phase will reconcile actual project expenditures with the approved budget and provide the Board with a "final accounting" of the project. FINANCIAL IMPACT: The District anticipates project savings at Smith Middle School to be approximately $380,000. Funding for the Concept/Pre-Planning Phase of the project, ($132,184) came from those identified savings, leaving a balance of $247,816. The District anticipates the second phase of the project, Planning, to cost $440,278. To fund the Planning Phase, the District requests that the Board of County Commissioners transfer the remaining savings at Smith Middle School ($247,816) to Elementary School #9 and appropriate $192,462 from the School Capital Project Fund Balance. RECOMMENDATION (S): The Manager recommends that the Board of County Commissioners review .plans for Elementary School #9 and adopt the attached Elementary School #9 Construction Capital Project Ordinance. CHAPEL HILL - CARRBORO CITY SCHOOLS ELEMENTARY SCHOOL #9 REVISED PROJECT BUDGET Revised Feb. 20D1 Budget Category (1) Project Budget Site Acquisition - Donated Meadowmont site Construction: 9,552,900 90,980 square foot (2) at $105 per square foot (3) Site Development: 955,290 10% of construction cast Con. + Dev. Sub-total 10,508,190 Professional Fees: 1,050,819 10% of construction and site development cost Furniture and Equipment: 477,645 5% of construction cost Technology: 750,585 8.25 per sf for infrastructure and equipment Non-personnel Start Up Costs 400,000 Contingency: 367,787 3.5% of construction and site development costs PROJECT COST $ 13,555,026 (1) Budget format conforms to the model established in the Orange County School Facility Construction Standards and includes the specified categories with unit measurements. (2) Elementary #9 size is based on Scroggs Elementary School's 90,980 square feet. (3) Construction cost estimate is based on Smith Middle School's 1999 construction bid of $98.54 inflated 3% a year for two years. ~- e+> N o° J N 0 H _ ~ U ~ N a 0 V o O Q, ~ ~ ~ ~. o 0 _ ~ a~~ U N J_ ~ W = F U aWW = J ~ U W a ~ ,: - i'. (~ f~ ~ __ __ _ O N 1L ~;;, ~ ~ F ^ z ~d n O Q N a ~i F o ~ ~ m ~ x ~ }' ., ` ~:ar. ~ +~P i O N ~ 0 ~ ,~ o ~ r N r y C _ C N m Q W O m v A e m E O a o ~ w o . O a m m o e O m C m m p C ~ m ~ N • 'O ~ ~ C o m N ~ C m r.. ~ U G 0 c+ - m m a i y o 3 ~ ~ ~ a a ~ ~ ~ o ¢ 7 ~ v R ~ 4 w e e C m v O m 0 0 0 ~ 9 v O O ~ O tsi ~ ro ,O O V w v o r v v m oo m v v a i m a co m U w a: a ~ c a ~ ~ Q ~ N v ~ V ~ h r i 7 i a n ti •V ~' O N ~ 6f l1 lf) a0 M N to ~LJ H d N 4 ~ ~ 11~ 0. r ~ ~c_y~vr~a~i ` ~- Elementary School #9 Construction Chapel Hill-Carrboro City Schools Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds to construct Elementary School #9 for the Chapel Hill Carrboro City Schools. Funding for the project comes from savings from the Smith Middle School Construction Project and an appropriation from the School Capital Project Fund Balance. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. 'the :following revenue is anticipated to complete this project: roug 1999-00 FY 2000-01 roug 2000-O1 Sales Tax $0 $0 $0 Im act Fees $0 $0 $0 FSBF $0 $0 $0 Sond Funds $0 $0 $0 raps er om nut Middle School Ca ital $0 $380,000 $380,000 ppropna a un a ante (School Capital Project Fund $0 $192 462 $192,462 Total Pro'ect Fuudin $0 $572 462 $572 462 Section 4. The following is appropriated for this project: roug 1999-00 FY 2000-01 roug 2000-01 Conte t/Pre-Plannin $0 $132,184 $132184 Plannin $0 $440,278 $440,278 Desi nand Construction $0 $0 $0 E ui ment/Furnishin s $0 $0 $0 Technolo $0 $0 $0 Coritin enc $0 $0 $0 Total $0 $S72 462 $S72 462 Section 5. This Ordinance, originally adopted December 9, 2000, shall remain in effect until rune 30, 2002. Adopted this sixth day of March 2001. 6