Loading...
HomeMy WebLinkAboutAgenda 06-18-19 Item 6-d - Amendment to the Orange County Transit Plan to Increase Funding for the Chapel Hill Transit North South Bus Rapid Transit (NSBRT) Project ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 18, 2019 Action Agenda Item No. 6-d SUBJECT: Amendment to the Orange County Transit Plan to Increase Funding for the Chapel Hill Transit North South Bus Rapid Transit (NSBRT) Project DEPARTMENT: County Manager’s Office ATTACHMENT(S): Attachment 1: Proposed Amendment to the Orange County Transit Plan Attachment 2: NSBRT Funding Request Letter from the Town of Chapel Hill Attachment 3: Chapel Hill NSBRT Presentation - Joint Board Meeting INFORMATION CONTACT: Travis Myren, 919-245-2300 Brian Litchfield, 919-969-4908 PURPOSE: To consider an amendment to the Orange County Transit Plan to increase funding for the Chapel Hill Transit North South Bus Rapid Transit (BRT) project from $6.1M to $14.1M. The funding would be provided using Dedicated Transit Revenues. BACKGROUND: The Town of Chapel Hill/Chapel Hill Transit initiated the North South BRT project in 2014. The project was accepted into the Federal Transit Administration’s (FTA) Project Development in November 2016. The project expands on previous planning work to identify a locally-preferred transit investment in the corridor that facilitates safe, efficient and expanded levels of mobility and improves connectivity between the corridor and the region. This includes connections to regional routes serving Hillsborough, Durham, Raleigh and Greensboro. The project is guided by a Technical and Policy Committee that includes representatives from Orange County. The project is currently embarking on 30% design and environmental work. The Town is also planning to request a project ranking from Federal Transit Administration (FTA) by September 1, 2019 as it moves forward with pursuing a full-funding grant agreement. It is critical for the project rating process for the Town to be able to demonstrate at least 50-percent of the non- federal match ($14M) is allocated to the project in an adopted financial plan. The current cost estimate for the North South BRT project is $140M, which requires $28M in non-federal match. Only $6.1M is currently allocated in the Orange County Transit Plan. To assist in this effort, the Town submitted a request to Durham-Orange Joint Staff Working Group (SWG) to increase the Orange County Transit Plan funding level from $6.1M to $14.1M (Attachment 2 – Request from Town of Chapel Hill). During the June 10, 2019 SWG meeting, 1 the SWG approved recommending to the governing bodies of the Interlocal Agreement for the Orange County Transit Plan (Orange County, GoTriangle Board and DCHC MPO Board) approval of the request to dedicate $1 million in FY20, $1.5 million in FY21, $1.5 million in FY22, and $4 million in FY23. The Town of Chapel Hill will also be seeking offsetting project funds through the North Carolina Department of Transportation’s Strategic Prioritization Process (SPOT 6.0). The proposed Transit Plan amendment stipulates that any outside funds received for the project will be applied to reduce the financial obligations contained in the Amended Orange County Transit Plan, up to $8 million. SPOT 6.0 awards are expected to be announced in November 2019. The funding request is considered a material change to the Transit Plan which requires approval by the governing bodies. The SWG recommendation and funding request will be considered by the governing boards on the following schedule: • Orange County Board of County Commissioners – June 18, 2019 • GoTriangle Board – June 26, 2019 • DCHC MPO Board – August 14, 2019 If approved by the governing bodies, this amendment would allow the Town to submit a rating request to FTA by September 1, 2019. A delay in the schedule would mean that 2020 would be the earliest a rating request for the project would be considered by FTA. The project website is www.nsbrt.org. FINANCIAL IMPACT: The adopted Orange County Transit Plan currently allocates $6.1M to the North South BRT project. The proposed amendment (Attachment 1) would dedicate an additional $8M to the project in fiscal years FY2020 through FY2023. Sufficient dedicated transit revenues are available to fund this addition. The lowest Transit Plan fund balance during this scheduled draw down of dedicated transit revenues would occur in FY2022 when the balance is estimated to be $929,500 under current assumptions. If outside funding is secured by the Town of Chapel Hill for this project, the financial obligations of the Transit Plan will be relieved, up to $8 million. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. Public Transportation provides opportunity for access to jobs and services to many individuals. 2 RECOMMENDATION(S): The Manager recommends the Board consider approving an amendment to the Orange County Transit Plan (Attachment 1) which increases Transit Plan funding for the North South BRT project by $8 million in fiscal years FY2020 through FY2022 to a total of $14.1 million. 3 Attachment 1 Amendment to the Orange County Transit Plan Regarding Funding for the Chapel Hill North-South Bus Rapid Transit Project The Parties to the Orange County Transit Plan agree to amend the Plan as follows: The Orange County Transit Plan shall be amended to provide up to $8 million in additional dedicated transit revenue to the Chapel Hill North-South Bus Rapid Transit (NSBRT) Project. The additional $8 million shall be allocated over four years to meet project funding requirements. The Plan shall be amended to dedicate $1 million in FY20, $1.5 million in FY21, $1.5 million in FY22, and $4 million in FY23. This funding is in addition to $6.1 million allocated in the 2017 Orange County Transit Plan and increases the total amount dedicated to the North South Bus Rapid Transit Project to $14.1 million. This amendment is intended to provide the Town of Chapel Hill with evidence that fifty percent (50%) of the non-federal match is dedicated to the project through the Transit Plan. The total project cost is $140 million. The Town of Chapel Hill shall seek offsetting project funding through the North Carolina Department of Transportation’s Strategic Prioritization Process (SPOT 6.0). To the extent that State funds or other public, non-profit, or private funds are awarded to the North South Bus Rapid Transit Project, these outside funds shall be applied to reduce the financial obligations contained in the Amended Orange County Transit Plan, up to $8 million. Outside funding may not be used to finance changes in the project scope, unanticipated cost overruns, or other changes until the Transit Plan’s obligation of $8 million is completely relieved, unless otherwise approved by the parties to the Transit Plan. To the extent that any portion of this amendment conflicts with elements of the 2017 Orange County Transit Plan, the terms of this amendment shall supersede those elements. ______________________ Penny Rich, Chair Board of Orange County Commissioners ______________________ Damon Seils, Chair Durham-Chapel Hill-Carrboro Metropolitan Planning Organization ______________________ Jeff Mann, President and Chief Executive Officer Research Triangle Regional Public Transportation Authority 4 TOWN OF CHAPEL HILL Office of the Manager 405 Martin Luther King Jr. Blvd. Chapel Hill, NC 27514-5705 phone (919) 968-2743 fax (919) 969-2063 www.townofchapelhill.org May 23, 2019 Mr. Jeff Mann President and CEO GoTriangle PO Box 13787 Research Triangle Park, NC 27709 Re: Request for Funding for North South Bus Rapid Transit Project through Orange County Transit Plan Dear Mr. Mann: I am writing on behalf of the Town of Chapel Hill and our Chapel Hill Transit Funding Partners (Town of Carrboro and University of North Carolina at Chapel Hill) to request additional funding for the North South Bus Rapid Transit (BRT) Project in support of the project moving forward in the Federal Transit Administration (FTA) Small Starts Process. This critical transit project was approved to enter FTA’s Project Development phase in November of 2016 and we anticipate requesting a project ranking from FTA in September 2019 as we move forward with pursuing a full-funding grant agreement. As you are aware local funding commitments play a key role in the project rating process and being able to demonstrate that around 50-percent of the non-federal match is allocated to the project could help the North South BRT project significantly in the rating process. The current cost estimate for the North South BRT project is $140M, which requires $28M in non-federal match. The current Orange County Transit Plan allocates $6.1M of the non-federal match for the project and we are pursuing the difference through the State’s SPOT 6.0 process. However, SPOT funding will not be awarded in time for us to submit a rating request to FTA in September 2019. To assist us with this effort, we are asking that the Orange County Transit Plan allocate an additional $8M to the North South BRT project by August of 2019 and we would agree to revisit the project’s fiscal needs after SPOT 6.0 awards are announced in November 2019. The additional funds for the North South BRT project could be reallocated from capital revenues in the plan previously dedicated to the D-O LRT project. We believe this request is reasonable considering that the D-O LRT project has been discontinued and the North South BRT project remains as one of the key transit investments identified in the Orange County Transit Plan. Additionally, the North South BRT project, despite 5 its anticipated high SPOT 5.0 score, was removed from the SPOT 5.0 process following a vote by the DCHHC MPO due to its potential risk to D-O LRT funding, eliminating our ability to attract State funding at that time to assist with the non-federal match requirement. We also believe this request is consistent with requirements of the Interlocal Implementation Agreement that governs that Orange County Transit Plan and its associated funding and should be considered a non-material change consistent with paragraphs 16 and 17 of the interlocal agreement. The Town of Chapel Hill and our Transit Funding Partners are committed to the success of the North South BRT project and believe that this funding request will help us best position the project as we seek federal funding. We appreciate consideration for additional funding for the North South BRT project and look forward to our continued work together to create a dependable, affordable, time-competitive and accessible transportation network that will meet the needs of those who live, work, play, learn and heal throughout Orange County and the Triangle region. Please do not hesitate to contact me with any questions. Sincerely, Maurice Jones Town Manager Town of Chapel Hill CC: Pam Hemminger, Mayor, Town of Chapel Hill Lydia Lavelle, Mayor, Town of Carrboro Bonnie Hamersley, Orange County Manager Travis Myren, Orange County Deputy Manager David Andrews, Town Manager, Town of Carrboro Damon Seils, Chair, Durham-Chapel Hill-Carrboro MPO Board A. Bradley Ives, Associate Vice Chancellor for Campus Enterprises & Chief Sustainability Officer, The University of North Carolina at Chapel Hill Felix Nwoko, Ph.D., MPO Executive Director, Durham-Chapel Hill-Carrboro MPO Aaron Cain, Chair, Orange County Staff Working Group Brian Litchfield, Director, Chapel Hill Transit 6 Chapel Hill North-South BRT DCHC MPO Update May 29, 2019 Joint Executive Boards 5/29/2019 Item 4ii Page 1 of 8 7 Context and Vision Prepares the Town to meet mobility demand as the region continues to grow: •Current system operates close to maximum capacity •Proposed system provides a long-term, scalable solution available to residents and visitors of the community •Connects to regional transit options •Supports current and planned development in the corridor with a multi-modal system that serves cyclists, pedestrians and other users 5 Joint Executive Boards 5/29/2019 Item 4ii Page 2 of 8 8 Technical and Policy Committees 3 Joint Executive Boards 5/29/2019 Item 4ii Page 3 of 8 9 4 •NSBRT is currently in FTA Project Development •Includes 30% Design & Environmental •30% Design •Further defining alignment and specific station locations from the initial Locally Preferred Alternative (LPA) •Traffic analysis •Integration of bicycle and pedestrian facilities •Station area analysis Current Status Joint Executive Boards 5/29/2019 Item 4ii Page 4 of 8 10 Project Schedule •Spring 2019: evaluate BRT Transit Oriented Development Opportunities •Late Summer 2019: draft 30% Design Plans are handed over to the NEPA team •Late Summer/Fall 2019: finalize non-Small Starts funding •Late Summer/Fall 2019: 30% Design Plans are finalized, based on FTA feedback •September 2019: Apply for rating with FTA •Fall/Winter 2019: NEPA document is published for review •Spring 2020: Finding of No Significant Impact (FONSI) issued, completing the NEPA review process. •Planned 2023: The North-South Corridor BRT would open for revenue service. 5 Joint Executive Boards 5/29/2019 Item 4ii Page 5 of 8 11 Next Steps •Finalize Traffic Analysis •Complete Market and TOD Study •Determine construct vs convert for the northern portion of the corridor •Complete 30% design •Complete Environmental Analysis 6 Joint Executive Boards 5/29/2019 Item 4ii Page 6 of 8 12 NSBRT Funding 7 •Current financial plan assumes 80% ($112M) of project funding to come through Federal Sources, 20% ($28M) from non-federal sources •Project needs to demonstrate commitment of at least half the non-federal share ($14M) by September 2019 to stay in Project Development and be considered for moving into Project Design •Currently we have $6.1M of non-federal funds committed through the Orange County Transit Plan, we have requested an additional $8M •We have also submitted a request for $25M as part of the SPOT 6.0 process. Joint Executive Boards 5/29/2019 Item 4ii Page 7 of 8 13 Questions? 8 Joint Executive Boards 5/29/2019 Item 4ii Page 8 of 8 14