HomeMy WebLinkAbout2019-173 Planning - Moffat Pipe change order 8 , FILE COPY CHANGE ORDER NO.: 8 Page 1 of 2 CHANGE ORDER CHANGE ORDER NO.: 8 DATE:March 18,2019 Project: Historic Rogers Road Sewer Expansion Project Contractor: Moffat Pipe, Inc. Engineer/Architect: URS Corporation—North Carolina CONTRACTOR is directed to make the following changes in the Contract Documents. Description: Moffat Pipe,Inc. is requesting the following revisions to the substantial completion and final completion dates of the contract to account for delays in the project considered to be no fault of their own and beyond their control. Specifically, they have been delayed with excessive weather delays and delays associated with the septic system emergency pump and haul set-up and operation for the property at 7619 Rogers Road, as well as numerous utility locates due to unmarked cable lines along Tallyho Trail. An itemized list of the number of days associated with specific issues can be found in Attachment A--HRRA Coordination Issues/Delays. This Change Order is for weather delays experienced between January 22, 20I9 and March 18, 2019, as well as non-weather delays experienced between November 2018 and March 18,2019 and does not account for potential future delays from rock blasting,or any other item. CHANGE IN CONTRACT SLIM OR PRICE: CHANGE IN CONTRACT TIME OR TIMES: Original Contract Price Original Contract Times $4,782,436.00 Final Completion: July 15,2018 Net change from previous Change Orders No. 1 to Net change from previous Change Orders No. I to No.7: $180,683.44 No.7: 250 days Contract Sum or Price prior to this Change Order Contract Times prior to this Change Order $4,963,119.44 Final Completion: March 22,2019 Net Increase of this Change Order Net Increase of this Change Order $0.00 Forty-two(42)calendar days Contract Sum or Price with all approved Change Contract Times with all approved Change Orders Orders $4,963,119.44 Final Completion: May 3,2019 RECOMMENDED: REVIE D: - ACCE ED: By, B By: Cu- Engineer ange Con ractor Krista Paredes-Toledo, PE Craig Benedict,AICP Jes DuCla Date: 3/18/19 Date: � Date: CHANGE ORDER NO.: 8 Page 2 of 2 The adjustment in Contract Sum or Price and/or Contract Time or Times stated in this Change Order shall comprise the total price and/or time adjustment due or owed the CONTRACTOR for the work or changes defined in this Change Order. By executing the Change Order, the CONTRACTOR acknowledges and agrees that the stipulated price and/or time adjustments include the costs and delays for all work contained in the Change Order, including costs and delays associated with the interruption of schedules, extended overheads, delay, and cumulative impacts or ripple effect on all other non-affected work under this Contract. Signing of the Change Order constitutes full and mutual accord and satisfaction for the adjustment in Contract Sum or Price or Contract Time or Times as a result of increases or decreases in costs and time of performance caused directly and indirectly from the change, subject to the current scope of the entire work as set forth in the Contract Documents. Acceptance of the waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Contract, and that CONTRACTOR waives all rights to file a claim on this Change Order after it is properly executed. IN WITNESS WHEREOF,the undersigned have caused the execution hereof: CONTRACTOR: MOFFAT ME INC ATTEST: By: Name: Jesse DuClau Title: Contractor Secretary Address: 4901 Unicon Drive Date; ore aI s#,NC 27587 [Corporate Seal] OWNER: Orange Co�oty By;/, . Name: Bonnie Hammers/ Title: Ora ge Cou ty Manager Date: c� Change Order 8 Request Attachment A Weather Delays Anticipated/ Month Description Contract Actual/Impact Requested Notes Jan 22- Rain/Snow/Sleet Delays and Impact 10 10 0 24,25,29 Feb Rain/Snow/Sleet Delays and Impact 10 14 4 11,12,13,16,17,19,20,21,22,23,24,25,26,28 18-Mar Rain/Snow/Sleet Delays and Impact 10 9 0 1,2,3,4,8,9,10,15,16 Subtotal 4 Work Delays Month Description Days Notes Feb-Mar Utility locating impacts along Tally H❑ 10 Nov-Mar Septic Repair/Bypasing 16 Subtotal 26 Total Work Days 30 Total Calendar Days 42 Total this request 42