Loading...
HomeMy WebLinkAboutOUTBoard agenda 051519 AGENDA Orange Unified Transportation Board May 15, 2019 6:30 p.m. You can bring your laptops/tablets if you would like to use them. Whitted Building, Room 230 300 West Tryon Street, Hillsborough *PLEASE NOTE CHANGE IN LOCATION* Page Item Title 1. Call to Order and Determination of Quorum 3 - 7 2. Approval of Minutes from February 20 and April 17, 2019 3. Consideration of Additions or Changes to the Agenda 4. Transit Advisory Services (TAS)/Orange County Public Transportation (OCPT) This section of the agenda is addressed jointly by the OUTBoard and supplemental staff from other County departments (Aging; DSS; Housing, Human Rights and Community Development; Health; and Child Support Enforcement) to address transit services. 9 — 10 4.a. OCPT/Orange County Commuter Options(OCCO) Update (Allyson Coltrane) — PowerPoint Presentation, and handouts to be provided at the meeting. OUTBoard/TAS Action: Receive and review information, provide comments. 4.b. OCPT Administrative Updates (Theo Letman, TeLeishia Holloway) OUTBoard/TAS Action: Receive and review information, provide comments. 4.c. TAS Comments/Questions (Theo Letman) - Opportunity for TAS members to offer transit related comments and ask questions regarding issues not on the agenda. 5.0 Regular OUTBoard Agenda (Action Items) 6.0 Staff Reports/Updates 6.a. Orange County's Portion of Triangle Freight Plan (Nish Trivedi) 9 - 46 6.b. Triangle Bike and Ped Workshop, March 29, 2019 (Abigaile Pittman) — PowerPoint Presentation 47-52 6.c. Small Transportation Projects Input (Abigaile Pittman) — Opportunity for OUTBoard members to submit suggestions for NCDOT small transportation projects. 6.d. MPO/RPO Updates (Nish Trivedi) 7.0 Information Items 53-54 7.a. Burlington-Graham Metropolitan Planning Organization (B-G MPO) 2045 Metropolitan Transportation Plan ( MTP) (Nish Trivedi) 55-58 7.b. NCDOT Projects Under Development (Nish Trivedi) 8.0 Adjournment — The next regularly scheduled meeting date is June 19, 2019. Charge of the OUTBoard(from Section 1, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. From time to time the OUT Board may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUT Board shall serve in an advisory capacity to the Planning Board. Meetings (from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings 3. Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Meetings are held on the third Wednesday of the month. The start time and location of the meeting shall be included on the agenda and shall typically be 6:30 p.m. at the Orange County West Campus Office Building located at 131 West Margaret Lane, Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any special circumstances, provided the information is included on the distributed agenda. DRAFT 3 1 MINUTES 2 ORANGE COUNTY OUTBOARD 3 FEBRUARY 20,2019 4 REGULAR MEETING 5 6 7 MEMBERS PRESENT: Art Menius (Chair), Little River Township Representative; Brantley Wells (Vice Chair), Hillsborough 8 Township Representative; David Laudicina, Cheeks Township Representative; Jenn Sykes, At-Large Representative; Alyson 9 West, At-Large Representative; Donna Musson, Eno Township Representative; Heidi Perry, At-Large Representative; 10 Johanna Birckmayer, At-Large Representative; Eric Broo, At-Large Representative; Amy Cole, At-Large Representative, Ram 11 Athavale, Chapel Hill Township Representative; Randy Marshall, Bingham Township Representative; Ed Vaughn, Cedar 12 Grove Township Representative;Todd Jones,At-Large Representative 13 14 TRANSIT ADVISORY SERVICES MEMBERS PRESENT: Theo Letman, Allyson Coltrane; Teleishia Holloway, Lisa Berkley; Angela 15 Hurdle, Janice Tyler; Corinthia Barber; Serena McPherson; Beverly Scurry;Anna Sienna; 16 17 STAFF PRESENT:Abigaile Pittman,Transportation/Land Use Planner; Tina Love,Administrative Assistant III; 18 19 OTHERS PRESENT: Matt Day,TARPO 20 21 AGENDA ITEM 1: CALL TO ORDER AND DETERMINATION OF QUORUM 22 23 AGENDA ITEM 2: INTRODUCTION OF NEW AT-LARGE MEMBER 24 25 AGENDA ITEM 3: APPROVAL OF MINUTES 26 27 Art Menius: Any changes to the minutes? 28 29 David Laudicina: I have some, line 519 should be changed from Old 86 to NC 86 and that line 550 should be changed to Old 30 86 from 86. 31 32 Heidi Perry: It's written in a weird way but line 576 it should say one of the reasons for not approving the US 70 project was to 33 find better ways to keep trucks on the interstate. Then 582 motion by Heidi Perry to not recommend. 34 35 MOTION by Randy Marshall to approve the January 16, 2019, OUTBoard Minutes with corrections. Seconded by Heidi Perry. 36 VOTE: UNANIMOUS 37 38 AGENDA ITEM 4: CONSIDERATION OF ADDITIONS TO AGENDA 39 There were none. 40 41 AGENDA ITEM 5A: OCPT ADMINISTRATIVE UPDATES 42 Theo Letman reported on the Orange County Public Transportation projects and updates to the transit program including 43 information on new software. 44 45 Heidi Perry: What is the platform for the user interface for the citizens? 46 47 Theo Letman: Ecolane is the company that provides the software the third party is still in negotiations. It is a different 48 platform from Chapel Hill Transit. 49 50 AGENDA ITEM 5B: OCPT/OCCO UPDATE 51 Allyson Coltrane gave a PowerPoint presentation on the Transportation Demand Program. 52 53 AGENDA ITEM 5C: TRANSIT ADVISORY SERVICES(TAS)COMMENTS/QUESTIONS 54 1 DRAFT 4 55 Beverly Scurry: I work with the Health Department and we're interested to see if the transit plan has any recommendations on 56 a department like ours, that recognizes the need for transportation and how that is connected to help outcome, can assist in 57 any way with getting the word out about your services or help get folks connected. Payment for rides, whatever if there are 58 any recommendations on how any agency or community can assist in anyway. 59 60 Theo Letman: We welcome any type of publicity we can get. I will work with your boss, director on a number of initiatives 61 expanding our marketing capabilities. I work closely with Janice and the Department on Aging and Lisa Berley and also we 62 have Serena McPherson at DSS, we welcome any assistance you can provide in getting the word out. Plus, that new loop, 63 the Hillsborough Circular will try to have a stop here at the Health Department. 64 65 Heidi Perry: Is there any discussion of expanding the hours of the buses going to Chapel Hill and back? 66 67 Theo Letman: I have not talked with Brian Litchfield but in talking with GoTriangle,they are always looking at the performance 68 of all the routes and there are going to be some changes coming to the 420. 1 am not sure what yet. 69 70 Heidi Perry: What was the expectation of the Orange-Alamance bus that didn't succeed of where those people would be 71 going and to and from. 72 73 Theo Letman: That route is actually the GoTriangle ODX route and we just operated it in the mid-day and we routed it through 74 Hillsborough hoping to get some ridership in the mid-day. One problem we encountered with the outlet was that they would 75 not let us bring our bus in there. We requested many times and were flat out denied so there was no cooperation there. 1 76 think that was an impediment to the popularity of the route. 77 78 Lisa Berkley: When you are looking at new vehicles are you taking into account transportation for individual who needs a 79 wheel chair but has a frailty that involves having a lot of pain so going to doctor appointments on a bus is not good for this 80 individual, I am describing one person in particular but I have run across this with others. He has had to hire private 81 transportation which is very expensive. I am wondering if you are looking at any van transportation that is wheel chair 82 accessible that would be less bumpy and could possibly be more direct in the future. 83 84 Theo Letman: We haven't as of yet and what you're referring to is what we would call a stretcher service. We have had 85 clients in other locals that I've worked at where the person isn't in a wheel chair they are actually on a stretcher. They suffer 86 from paraplegia and so they can't move so we have to accommodate them with a large enough vehicle almost like an 87 ambulance to transport them. Those vehicles are expensive but if there is a need in our county, I can definitely look into that. 88 89 Art Menius: I was going to ask about more public transportation in the north part of the county especially the northeast. 90 91 Theo Letman: We are definitely going to focus on that. When we do our pilot program that will be one of the areas we start 92 with. 93 94 AGENDA ITEM 6: REGULAR OUTBOARD AGENDA 95 96 AGENDA ITEM 6A: BICYCLE SAFETY IMPLEMENTATION SUBCOMMITTEE REPORT 97 Abigaile Pittman reviewed the Bicycle Safety Implementation Subcommittee report and reviewed recent activities of the 98 subcommittee including Public Service Announcements, a Facebook Page and the Bicycle Rodeo. 99 100 Art Menius: How many signs have actually been installed? 101 102 Abigaile Pittman: 14,there is another one coming that they missed so there will be 15 in total. 103 104 Alyson West: Is there a list of where they are? 105 106 Abigaile Pittman: I do have it, I will email it. I was also asked to co-locate some with the signs for the rural buffer. 107 Additionally, Todd McGee may get additional rural buffer signs next year and if so he will install the taller poles so we can 108 hopefully add more of our bicycle safety signs to those in the future. 2 DRAFT 5 109 110 AGENDA ITEM 7: STAFF UPDATES 111 112 AGENDA ITEM 7A: FY 2020-2029 ORANGE COUNTY STRATEGIC TRANSPORTATION INVESTMENT PROGRAM(STIP)SUMMARY 113 Abigail Pittman gave the committee three quick updates. 114 115 Heidi Perry: Is there going to be bike lanes and sidewalks on the S. Churton Street project, is it the one that we looked at from 116 a public hearing somewhere recently. 117 118 Abigaile Pittman: No, that is for the next cycle the one that will come out in two years. 119 120 AGENDA ITEM 713: ORANGE COUNTY&NCDOT HIGHWAY LUNCHEON MEETING NOTES 121 122 Abigaile Pittman reviewed the luncheon meeting that was held on January 91h and referred the committee to the notes 123 124 Abigaile Pittman: In response to Amy's interest in the SPOT Safety report, it is still in the works and they will report back as 125 soon as it is completed. 126 127 AGENDA ITEM 7C: MPOIRPO NCDOT PROJECT UPDATES 128 129 Abigaile Pittman updated the Board members on the projects 130 131 Heidi Perry: I looked back and it is the project shown with bike lanes and sidewalks but part of the requirements for it is 132 Hillsborough and Orange County to have an agreement about sidewalk maintenance,where does that stand? 133 134 Abigaile Pittman: It is not forgotten but part of the problem with reaching any kind of agreement is nobody knows what the 135 cost would be to put it in, what are they all agreeing to, not just the maintenance but the shared costs, etc. They don't have 136 enough details to move forward in making an agreement. 137 138 Heidi Perry: I would like to see it done,we've been trying to get it done for three years. The agreement. 139 140 Abigaile Pittman presented a news release by NCDOT titled "Funds Breathe New Life Into Safe Routes To School Program" 141 She will be sending it out to the OUTBoard. 142 143 Matt Day: My understanding is the concept for this is to essentially replace the active routes to routes to school funding that 144 had been in place for the last several years that came through Health and Human Services. Now this is DOT funding to 145 essentially replace that funding that has now gone away. That program had regional coordinators that worked with people in 146 each region and I think the intention is they are hoping something similar to that will continue on and folks will partner together 147 if there's some type of service like that. 148 149 Todd Jones: I am happy to serve as a liaison to the county schools. When we get to the point where we want to make some 150 proposals and get some partnership,just let me know. 151 152 Randy Marshall: I have noticed that the center line reflectors have disappeared and are not being replaced. Is there any 153 thought in getting those included in the County's resurfacing projects,they are a significant safety issues for minimal cost. 154 155 Abigaile Pittman: I can bring that up at the NCDOT Luncheon in April. 156 157 AGENDA ITEM:ADJOURNMENT 158 OUTBoard meeting was adjourned. 159 Art Menius, Chair 3 �� Q �� `� DRAFT 7 1 MINUTES 2 ORANGE COUNTY OUTBOARD 3 JANUARY 16,2019 4 REGULAR MEETING 5 6 7 MEMBERS PRESENT: Art Menius,At-Large Representative (Chair); Brantley Wells(Vice Chair), Hillsborough Township 8 Representative; Jenn Sykes, At-Large Representative; Ed Vaughn, Cedar Grove Township Representative; Heidi 9 Perry, At-Large Representative; Eric Broo, At-Large Representative; Amy Cole, At-Large Representative, Ram 10 Athavale, Chapel Hill Township Representative; Randy Marshall, Bingham Township Representative; Johanna 11 Birckmayer,At-Large Representative; 12 13 14 MEMBERS ABSENT: Donna Musson, Eno Township Representative; Alyson West, At-Large Representative; David 15 Laudicina, Cheeks Township Representative; 16 17 18 STAFF PRESENT: Craig Benedict, Planning & Inspections Director; Tom Altieri, Comprehensive Planning Supervisor; 19 Abigaile Pittman,Transportation/Land Use Planner; Nish Trivedi,Transportation Planner; 20 21 22 OTHERS PRESENT: Chuck Edwards, NCDOT District Engineer 23 24 25 AGENDA ITEM 1: CALL TO ORDER,DETERMINATION OF QUORUM AND INTRODUCTION OF NEW MEMBERS 26 Art Menius called the meeting to order. 27 28 29 AGENDA ITEM 2: APPROVAL OF MINUTES 30 MOTION by Heidi Perry to approve the January 16, OUTBoard Minutes with corrections. Seconded by Randy Marshall 31 VOTE: UNANIMOUS 32 33 34 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 35 There were none. 36 37 38 AGENDA ITEM 4: SPECIAL PRESENTATION 39 40 Chuck Edwards of NCDOT was introduced and gave an educational presentation to the OUTBoard and answered 41 questions. 42 43 There was discussion afterwards and Mr. Edwards was thanked for coming to the OUTBoard and providing valuable 44 information. 45 46 Craig Benedict introduced himself to the new members of the OUTBoard and discussed the Orientation to follow the 47 regularly scheduled OUTBoard meeting and invited the members to attend the upcoming Planning Board Orientation 48 as well to gain additional insight. 49 50 51 1 DRAFT 8 52 AGENDA ITEM 5: REGULAR OUTBOARD AGENDA 53 54 55 AGENDA ITEM 5A: BICYCLE SAFETY IMPLEMENTATION SUBCOMMITTEE REPORT AND ACTION ON A RECOMMENDED 56 NEXT STEPS(ABIGAILE PITTMAN) 57 58 Abigaile Pittman updated the OUTBoard on the latest Bicycle Safety Implementation Subcommittee (BSIS) activity 59 and recommendation on the direction and next steps for the subcommittee. 60 61 MOTION by Heidi Perry to recommend the BSIS evaluate the future work and determine if there is need to continue to 62 meet apart from the OUTBoard as a subcommittee or to continue as part of the OUTBoard meetings; and request 63 staff place the BSIS on the OUTBoard agenda in June or July to receive and consider a recommendation from the 64 BSIS and if applicable, discuss the documentation of goals, deliverables, and associated timeline. Seconded by Ram 65 Athavale 66 VOTE: UNANIMOUS 67 68 69 AGENDA ITEM 6: STAFF UPDATES 70 71 72 AGENDA ITEM 6A: MPO/RPO NCDOT PROJECT UPDATES(NISH TRIVEDI)- 73 Handouts: NCDOT Division 7 Project Spreadsheet, 74 NCDOT MOVES-Study Overview&Purpose Fact Sheet, 75 TARPO Letter regarding NCDOT Safe Routes to School program 76 77 Nish Trivedi gave updates and handed out information and updated the OUTBoard on current transportation projects 78 79 80 AGENDA ITEM 7:ADJOURNMENT 81 OUTBoard meeting was adjourned 82 83 Art Menius, Chair 2 9 Item 4 OrangeCounty PUR LIC TRAN SPORTATION Orange Unified Transportation Board OCPT Update Theo Letman TeLeishia Holloway Allyson Coltrane Commuter Options Program ■ TDM Program Grant Funded ■ Commuter Survey ➢Who were surveyed? • Orange County • Town of Hillsborough • UNC Hillsborough • Durham Tech Orange County Campus • Hillsborough/Orange County Chamber of Commerce ORANGE COUNTY NORTH CAROLINA 10 Commuter Options Program Contd. ➢ Results ■ 90%are still driving to work alone ■ Top 3 commute origins: ✓ Hillsborough ✓ Mebane ✓ Graham and Chapel Hill(tie) ■ Recent Campaigns ➢ Telework Challenge ➢ Enrichment Breakfast ➢ Cycle the Riverwalk 0 ORANGE COUNTY prey NORTH CAROLINA Transit Improvements ■ Short Range Transit Plan ➢ Data Points ➢Approved Projects ORANGE COUNTY o, �y NORTH CAROLINA ORANGE COUNTY NORTH CAROLINA TRIANGLE BIKE AND PED WORKSHOP MARCH 2912019 MAY 15, 2019 Item 6. b . 12 ANNUAL REVIEW OF REGIONAL BIKE-PED PROJECTS/ACCOMPLISHMENTS IN THE REGION • Wake Forest • Ca ry • Raleigh • Carrboro • Hillsborough • Apex • Durham • Vision Zero Task Force • Clayton • East Coast Greenway • Chapel Hill • NCDOT Complete Streets 2 .0 n �o . . ra ns ortatio ects r. . - Suzette Morales, ' . tia Transportation Planning Managers ALf ,71W. wF TOWN Of WAKE FOREST 14 y �V:f k:��n� 4a�•, tV _ I Brevofeld Golf links - f Has entree Club m �{,,•'.` .. JB Flaherty' Parko • • rt f G y 1 Paschol 0: l: u 46 -- _ Golf .Club ? Y4 ike h-'- Ne5t P 0. / 0\6 NC 98 Pra+4 'WaTP atkefgeld 98 j�r.9 'N �.. pyQ�i .1aok 5o Plantation 1 S� X 98 ----_, Heritage Golf Club ,p I • / / , / - Roy r 408 m ^ x 435m vxJon4"illsRd 15 TOWN OF WAKE FOREST PROJECTS • Design and ROW acquisition • Pedestrian signal • Utility relocation • Sidewalks • Bike lanes and multi - use paths • Greenway and greenway underpass • Re-striping TRANSPORTATION BE MMGH City of Raleigh _ BikeRaleigh Plan Local Update Triangle Bike & Ped Workshop 312912019 OF do Ll Raleigh 17 RALEIGH PROJECTS • Complete streets implementation • Bike lanes • Design manual update • Bike -share program • Bike signals • Greenway and trail construction • Sidewalks • Resurfacing project upgrades ,: .. Triangle18 WORW � a Bicycle . Pedestrian . Update 201 i HILLSBOROUGH PROJECTS 19 • Riverwalk connections to neighborhoods • Sidewalk construction • Churton St . medians and bike lanes, reducing traffic conflicts and tripping hazards, and installing stamped crosswa l ks • New ADA ramps • Amenities, improving pedestrian environment and safety 20 I ion f Du rho m Bigile & Nesf6ui 4dv«or�(ommission CITY OF DURHAM Durham Ud ate March 29, 2019 CITY OF DURHAM PROJECTS 2' • BikeWalk Implementation Plan with 17 miles of new bike lanes • Bike and Hike Map, • Greenways • SIRTS training • Neighborhood bike routes • Vision Zero policy • Protected bike lanes a r� } 5,' `='W 3- _ •y CLAYTON PROJECTS 2' • Sams Branch Greenway • Connecting two parks • Constructing a tunnel this summer • Advocating for an Amtrak stop L � +y .4 _ k� M1 � a kR:e.r'y `t- .:t �K •.k .. ��C'• ve � �►t � il- �• :�� ,; - of 1y F'{-' F- A 1 Zvi �{ ~YSI,�yy _ {�, •' 3+' ' — J t x 'I AIM. 4 ^ _ moom •lam � a � •} -OF �� �� 71f' I i ;'F'S •. JF I r . + � � •5 C{• •.J� 1+ J F ff 1 �J r y L { ' 4 Y,• F ., y •, i r � � 1 i +" 1 F J''• Chip • k•.. 5 .�•X'f.r5 „ t�• 4'Q LO 11 ''h5u y •:5 n �• J a x Tz. ar c'N•.t JAI Ir 5c '5 { � Yu �•l t �I i � J L J �5r,' S� S �';• JI' y •�• r I 5 1 1 1 ' r F •'..' S 1L�5 i� • �� • h.+l .a'S i I � l.'. '+.-0: Mom-��F;.4 ,i CHAPEL HILL PROJECTS 26 • Rosemary Street bike lanes • New traffic lights at MLK Boulevard • Tanyard Branch Trail • NC 54 Corridor Study • Road to Zero Program • Estes Drive Bike/ Ped project • Old Durham / Chapel Hill Road Bike/ Ped project • W . Franklin/ Merritt Mill Rd . Ped Project 27 Rosemary Street Additions � low Town of Cary A � w Bicycle & _ 1 Pedestrian Infrastructure dates yl - ■� 'r jI Triangie Bicycle & Pedesuiarr Workshop March 29, 2019 79 1 TOWN OF CARY PROJECTS 29 • Multiple greenway trails • Trail head project with parking • Trail connections in parks • Public art on greenways • HAWK beacon signals • Bike repair stations • Annual sidewalk improvements • ADA transition plan • Bike Month Activities 1 Aff LAKE CRABTREE C�ra��let�d la#�e zaf� 1 Y 1 ■■ . 1 u . I >' 1 jr y 1 w. L Town of Carrboro Fs•.G� •r TOWN OF CARRBORO PROJECTS 32 • Bike to School Day • Homestead CHHS Master Use Path • Bicycle Plan Update • Construction on two greenways • ADA Transition Plan • NCDOT resurfacing work on E . Main Street may result in a bike lane • Bike/ped data collection is Contra -flow bike lanes on 1 -way street I � ' AVI woo Te Projoet Status In Local Plans Llr r ( +1 1• ,y�t� 11 •1 L i5 x 1 i-4'I v rrc- f• r _ 34 Town of Apex Updates TriCf o'q Le P", c L cle R oA T>eciestr'�' cio, worl2sl� op Friday, March 29, 2019 ApexoM Carolina A' 35 TOWN OF APEX PROJECTS • Bike Apex Plan 2018 ( integrating bike projects with state and city road projects ) • Safe Routes to School Plan • Context sensitive design 36 Bike Apex X I:'YS.IF yCl 11� 'VI�Fh k y.a 1�V�M••r.Mr•T•�V�^�lYJ•I I Y•�RI�N���:I^�vJY'R�T Ltl!•F S IL]w •i�.k .�L�Ite�.ltr�lw.a.n..�l�}�M1.s 4'.acY.m 411�Jrr�i. � - .e.l.MJJ.�y QL V Zia ED �t-- ry-'i+�..- a am �-, J-"J-.kw- • y _.��� r Y'J�Sr Z� J �.-� ��v� Y•�h•aY .v�l w� 1 -�l� • 1 �Y 4 ti�'' fJ � rr} • J�. r pi e2ms. _,r�_� �! `� u a6v:,.ru L:xti'.._.. �.1.�.v,.•a..� K'4 i�l�wa~ •,` • Y ,Y y �4 I' #� + q ~ �..d .�.ti-n r.�� S.v J4�un.�a_- Jn.!�tea,� 1 f • ' f'' V' � �J• Y v W4�^'-lam I� 11...'y' �!\L-a.M 4i`�• �J•a.i]I�r M1� + `,- �- _ J -- R • -- r/4���,ry I�.W�V m.11vyaR,� a/iq.^'r � 4dL�] ,� -. raa..�. Y�f'• _ 1 r hµ I' �.]a}{{��''} r'Y 4 r:.- a�i.i.MY.rY uaa�..nvMyh J5v�" !.'� /� �� _ r' • 1� Vr I . ; _ �Ja✓a.W' .tiYY �yava a,.,. .r#R-�� �id001CS! .5rr 1 Yi!q f 5 1 �• �5 I 1 I �.�a.�FJaa YJ ak�•4�r ���'� Et I1�1:hN Y'iuYAlY Y�L s.Na.,L metre �I�aYRL� �W �iir5 ffA�S r , I! a :1�Y5L'�JLb A]l�.a'�n YJ�.•,y; ' 4 I eta ? L � L. � '�F � 1V •A 1 j ` ZZ dk C t _ n y I I - 'r~` NU STATE 1 NI%/LliSl I Y 38 Old paradigm(s) Vision Zero Paradigm 1 . Speed 1 . Safety 2. Convenience 2. Multimodal 3. Affordability of alternatives motor vehicle 3. Accessibility travel 4. Equitable results 39 Task Force -rr► -- K4RTH C.UL9LIHA American DEPAJt7MENT OP PVOLN IMI57RV-MQN Hear Ass -oc iation; VISION Z E R GREEN B RO Kimley>) Horn NCDQT 44 f o z RESPECT THE CROSSING. IFY RESPECT THE TRACK. yr �p1 Nbw1h 6e.ALa Duke University e Hospital DEFAU rraf PUBUESAFM � MP nrnn rnrui �u+�r Oil NORTH CAROLINA. VISION ZERV, 1 hb SAFER STREETS FOR CHARLOTTE IMF I , 1 1 a3 S IT Ya Investing. tp,,.t-he Future . Buildingthe East Coast , Greenway 41 Connecting people to pl c , Maine to Florida. t 3,000 miles, the East Coast Greenway onneots our nation's most populated corridor, from Maine to Florida. East Coast G reenway Alliance - Connecting people to place, Maine to Florida - greenway_org 42 NCDOT COMPLETE STREETS 2 . 0 ........................................................... -- - .i }i v NCDOTis corm tied to a cornplete .Streets policy ;r•:':i ` that enhances safety and provddes an efficient 5•w f.• k network for all transportation modes. yyQ r R"Jp ■� y x L Ensure travelers get where they reed to ,� w--_.�..•, * go easier s:••% . y Encourage the use of all modes of transportation • Increasing oonnectivity between PF communities and transit systems Improving safety for pedestrians, cyclists, and motorist.....scooter riders, roller x skaters, hover board rider and whatever - else is invented by this summer that will be on our roads! 4 r NCDOT COMPLETE STREETS 2 .0 43 WHAT IT MEANS FOR RURAL ORANGE COUNTY • Complete Streets is North Carolina's approach to interdependent, multi-modal transportation networks that safely accommodate access and travel for all users. • Under the new 2 .0 policy, NCDOT will collaborate with cities, towns, and communities during the planning and design phases of new street or improvement projects. The policy generally applies to facilities that exist in urban or suburban areas; however, it does not necessarily exclude rural settings ; and is viewed as a network that functions in an interdependent manner. NCDOT COMPLETE STREETS 2 .0 44 WHAT IT MEANS FOR RURAL ORANGE COUNTY • The policy statement recognizes that transportation , quality of life , and economic development are all connected through well- planned , well-designed , and context-sensitive transportation solutions . • The policy requires that NCDOT's planners and designers consider and incorporate multi-modal alternatives in the design and improvement of all appropriate transportation projects within a growth area of a community unless exceptional circumstances exist. 45 ANNUAL REVIEW OF REGIONAL BIKE- PED PROJECTS/ACCOMPLISHMENTS IN THE REGION Full presentations are available at: http://www.campo-nc.us/programs-studies/bicycle-and- pedestrian/triangle-bicycle-pedestrian-workshop Q 47 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: May 15, 2019 Action Agenda Item No. 6.c. SUBJECT: Small Transportation Projects Input DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACTS 1. Summary of NCDOT Non-STIP Abigaile Pittman, Transportation/Land Funding Sources for Transportation Use Planner, 919-245-2567 Improvements 2. Draft Running List of Small Tom Altieri, Comprehensive Planning Transportation Projects Supervisor, 919-245-2579 PURPOSE: Biannual opportunity for OUTBoard members to submit suggestions for identification of North Carolina Department of Transportation (NCDOT) to begin generating a list of projects for future small transportation projects. BACKGROUND: At the April 17 OUTBoard meeting the members received a presentation by Chuck Edwards, NCDOT Division 7 Engineer regarding potential non-STIP funding sources for small transportation projects (Attachment 1). Programs outlined in Attachment 1 include: • High Impact-Low Cost Program - A state funded program subject to quantitative criteria to deliver localized roadway improvements deemed to have substantial benefit while minimizing cost and project delivery time. Examples of potential project types include: intersection improvements; signalization; widening of lanes and resurfacing; and pavement strengthening. • Spot Safety Program - A state funded program to deliver smaller localized improvements to address identified safety and operational issues. Examples of potential project types include: horizontal and vertical alignment improvements; sight line improvements; signalization improvements; paved shoulders; rumble strips; enhanced signing, markings, markers; intersection flashers; all-way stops; and guardrails. • Hazard Elimination Program - A federally funded program essentially the same as Spot Safety Program but typically used for projects with higher costs and longer delivery timeline. Examples of potential project types are the same as for the Spot Safety Program but generally higher cost and longer duration. • Spot Mobility Program - A state funded program to deliver smaller localized improvements to address identified congestion and operational issues. Examples of potential projects types include: turn lanes; signalization to improve side street operation; modification of signal phasing/timing to improve efficiency; lane widening; and off-site improvements at public and private schools subject to NCGS 136-18(29a). 48 • Annual Maintenance Resurfacing, a state funded program for the repair and resurfacing of existing pavements to provide for acceptable operation and maintenance condition. Widening of existing travel lanes and/or installation of paved shoulders possible where warranted but limited to no more than 10% of program. Projects selected are based on relative ranking of biennial pavement condition survey, engineering judgement and local jurisdiction input. Common characteristics of projects outlined in Attachment 1 include: • Projects that require right-of-way acquisition or utility relocations are not good candidates; • Projects are expected to be performed or under contract within 12-24 months of funding approval; • Projects over $250 K typically require resolution of support from local elected body; • Most project program funding can be paired with other funding sources; and • Most projects subject to Board of Transportation (BOT) approval. Throughout each fiscal year, opportunities may arise for Orange County to submit small transportation projects to NCDOT. The turn-around time between NCDOT notification of requested projects or project review and the deadline for submission is typically very short and rarely allows sufficient time for full OUTBoard review and discussion. Developing the small transportation project lists as an ongoing process will allow Orange County to have greater input in addressing the County's small transportation issues. The Planning staff is requesting OUTBoard members assist staff in developing such a potential project list by providing input at this time regarding needed small transportation improvements, using the examples provided in Attachment 1 as a reference. OUTBoard members represent and reside in all areas of the county, and typically are more familiar with the roads they travel than staff. Staff has developed its Draft Running List of Small Transportation Projects (Attachment 2), also provided for your reference. No project is too small to identify. NCDOT has a maintenance yard and staff in Orange County that can: • Fix pot holes; • Maintain ditches and culverts; • Fill cracks in roadway surfaces; and • Maintain line of sight in critical areas like intersections. While formal small project requests will be discussed by the OUTBoard on a biannual basis, feel free to send possible projects to staff at any time to be added to our running list. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends that the OUTBoard provide input at this time regarding needed small transportation project improvements. Item Attachment 1 Summary of "Non-STIP" Funding Sources for Transportation Improvements High Impact-Low Cost Program: • Purpose- Deliver localized roadway improvements deemed to have substantial benefit while minimizing cost and project delivery time • State funded program • Introduced in 2017 legislative session • Funded in 2017-2019 biennium and 2020-2021 biennium • Program recurrence undetermined • Approx. $3.5 million per Division per biennium • Project cap $1.5 Million • Projects over $250 K require resolution of support from local elected body • Selection Criteria 0 30% Traffic Volume 0 15% Accident Data 0 15% Existing Lane Width 0 10% Existing Shoulder Width 0 5% Pavement Condition 0 5% Mufti-Modal Benefit 0 10% Other Funding Availability to Offset Project Costs 0 10% County Economic Prosperity Ranking • Local input solicited • Current/Recent Orange County Projects o Extend northbound right turn lane on Churton Street at US 70 (Summer 2019) o Efland Cedar Grove Road- Widen lanes 2' and resurface (2020-2021 biennium) • Examples of Potential Project Types o Intersection improvements (turn lanes, radius improvements, realignments) o Signalization or modification of existing signals o Widening lanes and resurfacing o Pavement strengthening o Other projects that do not require R/W acquisition or utility relocation Spot Safety Program: • Purpose- Deliver smaller localized improvements to address identified safety and operational issues • State funded program currently at $9M/ year statewide • Historically recurring funding • Project cap $400K but can be combined with other funding sources • Can be paired with other funding sources 50 Attachment 1 • Projects assessed on a quarterly basis for relative cost/benefit scoring based on anticipated reduction in frequency and/or severity of crashes • R/w acquisition and utility relocation costs are eligible but should be minimized • Project delivery in 18-24 months following funding approval • Current/Recent Projects in Orange County o Buckhorn Road at West Ten Road- Install all-way stop (complete) o NC 86 at Sawmill Road- Install flasher, channelization and sight distance improvements(complete) o Old NC 10 at Lawrence Road- Horizontal Curve and superfetation improvements (Spring 2020) • Examples of Potential Projects o Horizontal and vertical alignment improvements o Sight line improvements o Signalization and/or modification to existing signal o Paved shoulders o Rumble strips o Enhanced signing, markings, markers o Intersection flashers o All-Way stops o Guardrail Hazard Elimination Program: • Purpose- Essentially the same as Spot Safety Program but typically used for projects with higher costs and longer delivery timeline • Federal funded program subject to federal regulations • Historically recurring funding • Projects assessed on a quarterly basis for relative cost/benefit scoring based on anticipated reduction in frequency and/or severity of crashes • Projects programmed in STIP but not subject to SPOT process • ROW acquisition and utility relocation costs are eligible but should be minimized • Examples of potential projects o Same as Spot Safety but generally higher cost and longer duration • Current/Recent Projects in Orange County o Efland Cedar Grove Road south of Highland Farm Road- Realign horizontal curve (complete) o W. Franklin Street at Merrit Mill Road/Brewer Lane, Chapel Hill- Pedestrian improvements (Summer 2019) Spot Mobility Program: • Purpose- Deliver smaller localized improvements to address identified congestion and operational issues. • State funded program 51 Attachment 1 • Historically recurring funding • Project cap $750K but can be combined with other funding sources • Projects assessed on a quarterly basis relative to cost/benefit on anticipated reduction in travel time during peak periods • R/w acquisition and utility relocation costs are eligible but should be minimized • Project delivery in 18-24 months following funding approval • Examples of potential projects: o Turn lanes o Signalization to improve side street operation o Modification of signal phasing/timing to improve efficiency o Lane widening o Off-site improvements at public and private schools subject to NCGS 136- 18(29a) • Current/Recent Projects in Orange County o Reimbursement to CHCSS for turn lanes at Chapel Hill High School Expansion- (Reimbursement upon satisfactory completion by school system) Annual Maintenance Resurfacing: • Program Purpose- Repair and Resurface existing pavements to provide for acceptable operation and maintenance condition • State funded program • Recurring annual allocation per county/division as stipulated by enacted State budget • 5-year program developed for implementation and updated annually • Projects selected based on relative ranking of biennial pavement condition survey, engineering judgement and local jurisdiction input • Close coordination with local stakeholders is critical in project selection and scheduling • Widening of existing travel lanes and/or installation of paved shoulders possible where warranted but limited to no more than 10% of program • Other improvements not eligible 52 Attachment 2 Draft Running List of Small Transportation Projects 5/7/2019 4:41 PM 1. Segment improvement along Orange Grove Road from Patriots Point Drive to 1-40 2. Segment improvement along Efland-Cedar Grove Road from Highland Farm Road to Carr Store Road 3. Segment improvement along Bowman Road between Ben Wilson Road and W.Ten Road 4. Intersection improvement at NC-54 and: a. Morrow Mill Road b. Neville Road c. Dodson Crossroads d. Mebane Oaks Road e. Orange Grove Road f. White Cross Road g. Guess Road 5. Intersection improvement at West Ten Road and Buckhorn Road 6. Intersection improvement at Lawrence Road and 1-85 7. Segment improvement along Eno Mountain Road/Mayo Street 8. Intersection improvement at S. Churton Street and US-70-Bus 9. Intersection improvement at US-70 and a. Efland-Cedar Grove Road b. St. Mary's Road c. Pleasant Green Road 10. Intersection improvement at NC-86 and a. US-70A b. Old NC-10 c. NC-57 d. New Hope Church Road e. Philips Road f. Sawmill Road g. Walnut Grove Church Road 11. Intersection improvement at Old NC-86 at Arthur Minnis Road 12. Intersection improvement at Orange Grove Road and Davis Road 13. Intersection improvements at Lebanon Road and a. High Rock Road b. Efland-Cedar Grove Road c. N. Frazier Road d. Daniels Farm Road e. Mill Creek Road 53 Item Ta. PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 _ oukl�v MEMORANDUM TO: Orange Unified Transportation Board FROM: Nishith Trivedi, Transportation Planner DATE: April 29, 2019 SUBJECT: Information Item — BG MPO 2045 Metropolitan Transportation Plan This memorandum provides a brief summary of the Burlington-Graham Metropolitan Planning Organizations (BG MPO) Metropolitan Transportation Plan (MTP) update process. Background VHB has been selected by BG MPO staff to update the MPO's MTP. They conducted their kickoff meeting Wednesday, April 17, 2019. The plan will list specific projects geared toward realizing the MPO's vision over the next 25 years. It is an update from the previous 2040 MTP which was adopted August 2015. Schedule: VHB will conduct a 16 month planning process and the MPO is schedule to adopted it fall 2020, following Federal Highway Administration review and approval. The schedule is as follow: • Phase 1: Assess Existing Conditions - March - June 2019 • Phase 2: Assess Future Conditions & Potential Improvements - May - October 2019 • Phase 3: Develop Recommended Plan - October 2019 - May 2020 • Final Plan Approval by FHWA - June - August 2020 • Key Public Involvement Points - June 2019, December 2019, February 2020 First public workshop is planned for Mid-June in Graham, detail information will be provided when venue is secured. Q Item 7.b. bb NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPM�T'°a' TIPNNBS# Description Let/Start Completion Cost Status Project Lead Date Date SS-4907BS Installation of traffic signal at the intersection of US70 and 5/31/2017 Apr. 2019 $40,500 R/W Utility relocations complete, Right of Dawn McPherson 44894.2.1 SR 1114 (Buckhorn Road)East of Mebane. $43,200 CON entry rescinded, R/W acquisition 44894.3.1 pending W-5707C Revise pavement markings and overhead lane use signs for 11/1/2018 Aug. 2019 $395,000 Planning and design activities Chad Reimakoski 44853.1.3 removal of inside lane drop configuration on 1-40 underway, re-let due to bids 44853.3.3 Westbound in vicinity of US 15-501 interchange. exceeded engineers estimate, new 47490 Resurfacing 1-40 WB by use of contingency funds let date 11/1/18 and received no bids, possible delivery by design- build let 47798 Increase length of existing turn lane/slip ramp and 1/17/2019 Jul. 2019 $189,000 Planning and design activities Derek Dixon improve existing radius in the SE quadrant of US 70 complete, R/W certified 9/18/18, Business/NC 86 at US 70 Bypass in Hillsborough signal work complete,widening scheduled by end of Mar. 2019 U-5846 Construct a roundabout at SR 1772 (Greensboro Street) Mar. 2019 FY2021 $775,000 1st bid opening received no bids, Chad Reimakoski 50236.1.1 and SR 1780(Estes Drive)in Carrboro. Re-let 9/6/18 bids exceeded 50236.2.1 engineers estimate, project cost 50236.3.1 evaluation being performed, Utility relocation underway, Re-let pending B-4962 Replace Bridge#46 over Eno river on US 70 Bypass 4/16/2019 FY 2021 $5,826,000 Planning and Design activities Kevin Fischer 40174.1.1 underway, ROW acquisition 40174.2.1 complete, ROW certified 1/22/19 40174.3.1 W-5707K Remove and replace existing curb&gutter and sidewalk, 5/31/2019 Sept. 2019 $350,000 Construction May 2019 Chris Smitherman 48283 add pedestrian signals, concrete island, and signal Derek Dixon modifications on SR 1010(E. Main St/W. Franklin St)from Brewer Ln to Graham St. in Chapel Hill and Carrboro U-5847 Intersection improvements at SR 1010 (West Franklin St.) 5/31/2019 Sept. 2019 $775,000 Planning and design activities Chris Smitherman 50238.1.1 and SR 1771 (Merritt Mill Rd)/SR1927 (Brewer Lane)in underway, bike/ped improvements 50238.2.1 Chapel Hill/Carrboro. to be completed under project 50238.3.1 48283 Page 1 DCHCMPO Feb.2019.xlsx Page 13 of 17 NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPM�T'°a' TIPNNBS# Description Let/Start Completion Cost Status Project Lead Date Date SS-4907CD Horizontal curve improvements on SR 1710 (Old NC 10) 12/5/2019 Spring 2020 $261,000 Planning and design activities Chad Reimakoski 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of underway 47936.2.1 Hillsborough. Improvements consist of wedging pavement 47936.3.1 and grading shoulders. 1-3306A Widening 1-40 from 1-85 in Orange Co.to Durham Co. line TBD TBD $98,800,000 Planning and design activities Laura Sutton 34178.1.3 (US 15/501 Interchange) underway, Public meeting 1/24/19, 34718.2.2 No schedule at this time other than 34178.3.3 CE document scheduled for 3/29/19, Combined w/1-3306AC P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020, Matthew Simmons 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough Coordinate with U-5848 46395.3.1 R-5821A Construct operational improvements including 6/21/2022 FY2024 $3,924,000 Planning and design activities Jennifer Evans 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR underway, coordinating with NC54 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old West Corridor Study 47093.3.2 Fayetteville Road). U-5848 Extend SR 1006 (Orange Grove Road)on new location with 3/21/2023 FY 2025 $5,326,000 Planning and Design activities Laura Sutton 50237.1.1 Sidewalks and bike lanes from existing SR 1006(Orange underway, Coordinate with P-5701 50237.2.1 Grove Road)to US 70 Business in Hillsborough. and U-5845 50237.3.1 1-3306AC Interchange improvements at 1-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities Laura Sutton 34178.1.6 underway, Combined w/1-3306A 34178.2.5 434178.3.9 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17, Chris Smitherman 45911.1.1 (Orange Grove Road)to Durham County line Coordinate with 1-5967, 1-5984, 1- 45911.3.1 5983 and 1-0305 1-5967 Interchange improvements at 1-85 and SR 1009(South 1/16/2024 FY 2027 $20,700,000 Planning and Design activities Laura Sutton 45917.1.1 Churton Street) in Hillsborough underway, Coordinate with 1-0305 45917.2.1 and U-5845 45917.3.1 Page 2 DCHCMPO Feb.2019.xlsx Page 14 of 17 NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPMENT Technical TIPNNBS# Description Let/Start Completion Cost Status Project Lead Date Date U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1- 1/16/2024 FY 2027 $49,751,000 Planning and Design activities Laura Sutton 50235.1.1 40 to Eno River in Hillsborough underway, Coordinate with U-5848 50235.2.1 and 1-5967 50235.3.1 1-5984 Interchange improvements at 1-85 and NC 86 in 11/18/2025 FY 2027 $16,488,000 Funding approved 10/10/17, Laura Sutton 47530.1.1 Hillsborough Coordinate with 1-0305 and 1-5959 47530.2.1 47530.3.1 U-6071 Intersection improvements at NC 54 and SR 1007 (Old 1/15/2026 FY 2027 $1,216,000 Planning and design activities Jennifer Evans 47496.1.1 Fayetteville Rd)in Carrboro underway, Project on hold per Draft 47496.2.1 2020-2029 STIP (unfunded project) 47496.3.1 1-5983 Widen 1-85 in Orange Co.from west of SR1713 (Mt. 10/20/2026 FY2029 $53,460,000 Planning and Design activities Laura Sutton 47529.1.1 Hermon Church Rd)to Durham Co. line underway, Coordinate with U-5848, 47529.2.1 1-0305 and 1-5984 47529.3.1 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove 1/1/2027 FY2029 $133,400,000 Planning and design activities Laura Sutton 34142.1.2 Road)in Orange Co.to west of SR 1400 (Sparger Road) in underway, Project reinstated per 34142.2.2 Orange Co. Draft 2020-2029 STIP (funded 34142.3.2 1 1 1 project) 'NORTH�. Technical Page 1 of 158 North Carolina Department of Transportation 02/06/2019 Active Projects Under Construction - Orange Co. 9 ��NTOF TRPN`?QO,' Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, Lorenz,PE, Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 03/15/2019 100.00 92.24 GUILFORD COUNTY AND 3 INC. BRIDGES IN ORANGE COUNTY. C203946 B-5348 REPLACE BRIDGE#85 OVER PHILS DANE CONSTRUCTION Kirkman,PE, $984,596.98 02/01/2018 12/27/2018 02/01/2018 01/30/2019 99.00 92.33 CRK ON SR-1005(OLD G'BORO RD) INC Christopher D C204025 1-5954 PAVEMENT REHAB ON 1-40/1-85 APAC-ATLANTIC INC Kirkman,PE, $9,699,053.68 FROM EAST OF NC-54 IN GRAHAM THOMPSON ARTHUR Christopher D IN ALAM.CO.TO WEST OF SR-1114 DIVISION (BUCKHORN RD)IN ORANGE CO. DG00321 W-5143 SR 1004(EFLAND-CEDAR GROVE CAROLINA SUNROCK Kirkman,PE, $1,711,133.05 04/02/2018 04/02/2019 04/02/2018 04/02/2019 100.00 98.20 RD)ROADWAY IMPROVEMENTS. LLC Christopher D DG00393 RESURFACE SR 1101,SR 1118,SR RILEY PAVING INC Kirkman,PE, $1,084,520.40 04/02/2018 10/12/2018 06/18/2018 12/07/2018 100.00 99.97 1119,SR 1124,SR 1125,SR 1127,SR Christopher D 1128 SR 1130,SR 1134,SR 1135,SR 1137,SR 1141,SR 1143, ETC. DG00395 REPLACE BRIDGE#189 ON SR 1114 S T WOOTEN Kirkman,PE, $723,924.13 04/01/2018 01/01/2019 05/07/2018 02/07/2019 97.00 99.75 (BUCKHORN ROAD)OVER CANE CORPORATION Christopher D CREEK DG00413 RESURFACE US 70 BUS,SR 1009, CAROLINA SUNROCK Kirkman,PE, $3,562,232.66 05/28/2018 11/01/2019 05/29/2018 11/01/2019 38.00 53.71 SR 1102,SR 1129,SR 1239,SR LLC Christopher D 1352,SR 1716 AND SR 1841 DG00419 RESURFACE NC 86 AND 17 CAROLINA SUNROCK Kirkman,PE, $3,764,001.64 05/14/2018 11/01/2019 05/14/2018 11/01/2019 40.00 23.45 SECONDARY ROADS LLC Christopher D DG00427 REPLACE BRIDGE#51 ON SR 1534 NATIONAL BRIDGE Kirkman,PE, $521,443.82 05/07/2018 03/04/2019 07/30/2018 04/29/2019 100.00 98.48 (MCKEE ROAD)OVER BUFFALO CK. BUILDERS LLC Christopher D DG00435 AST RETREATMENT ON 22 WHITEHURST PAVING Kirkman,PE, $846,340.66 04/01/2019 10/11/2019 SECONDARY ROADS CO INC Christopher D DG00444 R-5821B INTERSECTION IMPORVEMENTS AT FSC II LLC DBA FRED Kirkman,PE, $1,039,900.00 07/16/2018 05/16/2019 08/13/2018 05/16/2019 100.00 90.11 THE INTERSECTION OF NC 54 AND SMITH COMPANY Christopher D SR 1006(ORANGE GROVE ROAD) DG00445 R-5787BB INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 70.00 61.61 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAWBA COUNTY INC W-5707A INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 70.00 61.61 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAWBA COUNTY INC DG00451 U-5854 SR 1008(MT.CARMEL CHURCH CAROLINA SUNROCK Kirkman,PE, $1,833,468.84 08/15/2018 04/30/2020 ROAD)AND SR 1913(BENNETT LLC Christopher D ROAD)ROUNDABOUT AND RELATED SAFETY IMPROVEMENTS DG00461 BRIDGE REHAB.FOR BRIDGE#031 M&J CONSTRUCTION Robinson, $2,456,272.12 11/12/2018 07/15/2019 ON SR 1010(E. FRANKLIN ST.)OVER CO OF PINELLAS Stephen J BOLIN CREEK&BOLIN CREEK TRAIL COUNTY INC DG00462 REHAB BRIDGES 264,288,260,543 IN ELITE INDUSTRIAL Snell,PE, $967,383.15 08/01/2019 01/01/2020 GUILFORD COUNTY AND BRIDGE 031 PAINTING INC William H IN ORANGE COUNTY