HomeMy WebLinkAboutAgenda 05-21-19 6-b - Comments on the Draft FY20 Work Plan for Orange County Transit Services and Approval of Participation in a Commuter Rail Feasibility Study 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 21, 2019 Action Agenda Item No. 6-b SUBJECT: Comments on the Draft FY20 Work Plan for Orange County Transit Services and Approval of Participation in a Commuter Rail Feasibility Study DEPARTMENT: County Manager's Office ATTACHMENT(S): INFORMATION CONTACT: Attachment 1: Draft FY20 Work Plan for Travis Myren, 919-245-2300 Orange County Transit Theo Letman, 919-245-2007 Services - First 12 Pages UNDER SEPARATE COVER Attachment 2: Draft FY20 Work Plan for Orange County Transit Services with Appendix (ONLY AVAILABLE ELECTRONICALLY AT.- http://www.orange countyn c.gov/Document Cen ter/Vie w/7214/FY2020-Durham- Orange-Transit-Plans- PURPOSE: To provide comments on the Draft FY20 Work Plan for Orange County Transit Services and to consider participating in a feasibility study for commuter rail in the Triangle region at a cost of $75,000. All projects in the Draft Work Plan are funded using Dedicated Transit Revenues, and sufficient funding would be available to participate in the commuter rail feasibility study using those funds. BACKGROUND: Each year, the Staff Working Group for Orange County reviews projects included in the Orange County Transit Plan and recommends a specific, annual work plan to implement those projects. Like the Capital Investment Plan, the Transit Plan serves as the long range framework for transit investments while the annual work plan identifies the specific projects and amounts that will be budgeted for those projects in the coming fiscal year. The Staff Working Group includes representatives of the County, the Durham-Chapel Hill- Carrboro Metropolitan Transportation Organization (DCHC MPO), and GoTriangle as prescribed by the 2012 Interlocal Implementation Agreement for the Orange County Bus and Rail Investment Plan. The recommended FY20 Work Plan was released for a 21-day public comment period on May 9, 2019 by the DCHC MPO. The public comment period will end on May 30, 2019. 2 Upon completion of the public comment period and subsequent Work Plan adjustments, the Staff Working Group will make a recommendation to the GoTriangle Board of Trustees which administers the Transit Tax District Funds and adopts the Work Plan as part of the GoTriangle Annual Budget. The draft FY20 Draft Work Plan is the first to be recommended following the discontinuation of the Durham-Orange Light Rail Project. No funding is recommended in the FY20 Draft Work Plan for this project. The Draft Work Plan contains several highlights that are intended to revise the long term strategy for public transportation in Orange County and result in a revised Orange County Transit Plan. Specific highlights include: 1. Funding to Develop a New Orange County Transit Plan The Work Plan recommends an initial investment of $500,000 to facilitate the process of creating a new Transit Plan. Using this framework, the County would provide funding to a third party consultant to assist with the transportation planning elements of the plan and to coordinate a public information process according to direction provided by Orange County. The contracting process may flow through the DCHC MPO to provide regional context while a local oversight group will guide and define local priorities. If this initial investment is approved, a more detailed scope will be developed in cooperation with the County's regional and local transit stakeholders, and a more detailed cost estimate will be established. 2. Future Funding Flexibility The FY20 Draft Work Plan does not spend all of the available estimated revenue. The Draft Plan currently projects a surplus of $3.8 million for FY20. These funds will rollover to future years and would be invested in the new transit priorities identified through the new Transit Plan. 3. Mobility on Demand The recommendations for Orange County Public Transit include the initial investments to advance a mobility on demand model to better and more efficiently serve the less densely populated portions of the County. This model will also be leveraged to serve the commuting population through the use of van pools and other smaller, more flexible modes of transportation. Proposed Participation in the Triangle Commuter Rail Feasibility Study The Transit Plans adopted by Wake County and Durham County included initial investments in a Commuter Rail Transit (CRT) project. Commuter Rail Transit uses existing railroad tracks to provide passenger rail service focused on peak commuting times. The initial scope of this project is envisioned to run thirty-seven (37) miles from Garner to downtown Raleigh, N.C. State University, Cary, Morrisville and the Research Triangle Park continuing to Durham. The longer term vision for this system would extend commuter rail service through Orange County to Alamance County. After the Draft Work Plan was developed, the GoTriangle Board of Trustees discussed including Orange County in the initial feasibility study to extend commuter rail in the Triangle region. 3 GoTriangle has requested $75,000 in dedicated transit revenues to expand the scope of the feasibility study to include Orange County. As a feasibility study, the study elements are intended to provide policy makers with information to assess whether the project should proceed and, if so, at what size and scope. These elements would include establishing the purpose and need for the project, modelling ridership, analyzing capacity, developing initial capital and operating and maintenance cost estimates, developing a stakeholder and public outreach plan, assessing project delivery methods, and evaluating existing conditions. The study would evaluate a total of six (6) commuter rail scenarios. Three of these scenarios would include service extensions into Orange, Johnston and Alamance counties. If any of these counties elect to participate, each County would be asked to contribute to the cost of the study. The study is expected to be completed during the 2019 calendar year. FINANCIAL IMPACT: The Draft FY20 Work Plan recommends a total of $5.8 million in public transportation investments to be funded with Dedicated Transit Revenues. The Board is being asked to provide comments on these recommendations and to recommend the addition of $75,000 in Dedicated Transit Revenues to participate in a Commuter Rail Feasibility Study. Sufficient dedicated transit revenues are available to fund this addition. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. Public Transportation provides opportunity for access to jobs and services to many individuals. RECOMMENDATION(S): The Manager recommends the Board provide comments on the Draft FY20 Work Plan for transit services in Orange County and consider adding $75,000 in dedicated transit revenues to participate in a feasibility study for commuter rail in the Triangle region. 4 TRIANGLE 'SAX DISTRICT FY20 DRAFT WORK PLAN FOR DUR H[AM AND ORANGE COUNTIES 5 Executive Summary The Triangle Tax District manages the funds of the combined Durham and Orange Transit Plans. Each County is governed by a separate plan and oversight group, called the Staff Working Group (SWG), which reviews projects funded through each county's Transit Plan.The SWG recommends projects for funding and develops the annual work plan, which is presented here as the Draft Work Plan. The FY20 Durham and Orange Work Plan was released for a 21-day public comment period on May 9, 2019.The public comment period will end on May 30, 2019. All comments can be made to Aaron Cain of the Durham-Chapel Hill-Carrboro Metropolitan Transportation Organization (DCHC MPO) at aaron.cain@durhamnc.gov or(919) 560-4366 x36443. Upon completion of the public comment period, and adjustments made to the Work Plan based on the public comments, a Final Draft Work Plan will be brought before the Durham and Orange SWGs for a recommendation on June 5, 2019.The SWGs will make a recommendation to the GoTriangle Board, which adopts the Work Plan as part of the GoTriangle Budget, per the Interlocal Agreement adopted by GoTriangle, DCHC MPO, and Durham and Orange counties. GoTriangle administers the Tax District Funds. The FY20 Work Plans are an annual implementation of the Durham and Orange County Transit Plans, adopted in April 2017.These plans provide dedicated funding for transit in the two counties. This local funding supports seamless mobility within and between not only Durham and Orange Counties, but also to Wake, Alamance and Chatham Counties. Tax District Funds are generated from a %cent sales tax,two vehicle registration fees($7 and $3, respectively), and a vehicle rental tax. Through the annual Work Plans, funds are allocated from the Tax District fund. The Tax District has collected revenues since 2013, and has allocated funding since 2014. The services and capital investments funded by the Tax District Fund include: • Providing greater frequency and more hours on many bus routes; • Creating new routes to serve growth; • Making improvements to transit infrastructure such as bus stops and park-and-ride lots; and • Planning for major transit infrastructure, such as Bus Rapid Transit (BRT) or Commuter Rail (CRT). Transit Plan funds also support the long-term health of the region's transit systems, providing money to replace an aging fleet.These investments make it easier for residents to move around Durham and Orange counties, support equitable access to jobs and services, and connect our universities, neighborhoods, and employment centers. The investments are modern—they incorporate standards for ADA access and Complete Streets, and with Wifi capacity, our buses bring information access to the systems riders. 6 This FY20 Work Plan provides detailed information about projected revenues of the Tax District, as well as expected accomplishments of regional transit providers. Specific project information can be found in the appendix. The Work Plans also provide information regarding the current and prior year financial commitments. The Work Plan is a product of the Transit Plans technical committee,the SWG. Administrative support for the development of the Work Plan is from the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO). Project Sponsors submitted Project Requests for projects for SWG review.The SWG considered how the allocations align to the Durham Transit Plan, Plan goals and current needs.The SWG process has included approval of previous years carryover balances for FY19 activity. Revenues The Triangle Tax District administers funds from four different sources: • % cent sales tax • $7 vehicle registration fee • $3 vehicle registration fee • Vehicle rental tax These revenues are used to support the transit activities shown in the following Durham and Orange County Work Plan.A summary of expected revenues is shown below in Table 1. Table 1: Expected Triangle Tax District Revenues in FY20 by Funding Source Triangle Tax Tax Revenues Durham Orange District 1/2 %Sales Tax $ $ $ 32,519,299 7,753,837 40,273,136 Vehicle Rental Tax 1,327,648 647,790 1,975,438 $7 Vehicle Registration 1,759,605 890,384 2,649,989 $3 Vehicle Registration 754,076 381,617 1,135,693 Total Tax Revenues $36,360,628 $9,673,628 $46,034,256 Tax Revenues are budgeted at the amounts projected in 2017 Transit Plan The FY20 Work Plan does not include funds that were budgeted in prior year, known as carryover balances.These amounts are the net of budget activity to actual expenditures, and are known after 7 year-end,when the GoTriangle Consolidated Audited Financial Report (CAFR) is completed,typically in November. Expenditures Development of this Work Plan included coordination with all jurisdictions and transit agencies that are subject to the Triangle Tax District. Project sheets (shown in the Appendix) were submitted and reviewed by the SWG prior to release for public comment. A summary of the planned expenditures is shown in Table 2. More detailed information is located in the following Work Plan. Table 2: Expected Program Expenditures by County in FY20 Program Expenditures Durham Orange Triangle Tax District Transit Service - Existing (ICES) $ 850,800 $ 758,405 $ 1,609,205 Transit Service - Expansion 3,571,348 2,825,326 6,396,674 Transit Service -Surveys 74,350 - 74,350 Admin-Staff Working Group (1 FTE) 55,364 55,364 110,728 Admin -Tax District(1.5 FTE) 77,714 77,714 155,428 Planning- New Transit Plans 750,000 500,000 1,250,000 Vehicle Purchases 72,850 170,045 242,895 Bus Stops, Park&Rides,TECs* 3,176,376 1,129,784 4,306,160 Chapel Hill - N-S BRT** - - Hillsborough Train Station 285,000 285,000 Durham-Wake Commuter Rail*** - - Budget $ 8,628,802 $ 5,801,638 $ 14,430,440 *Includes Bus Amenities at Hillsborough Train Station TEC= Transit Emphasis Corridor, only in Durham Transit Plan **N-S BRT will carryover approximately$2 million from FY 2019 Budget. This amount should be sufficient at current levels of spending. ***Commuter Rail will carryover approximately$8001(from FY2019 Budget. Comparing the revenues for each county, and the Triangle Tax District as a whole,to the proposed budget there is sufficient funding for the planned activities in FY20. 8 Summary Durham's transit providers connect residents to school and to work in Durham and the Triangle Region. These transit services create access to existing passenger rail service at Durham's Amtrak station, and to Raleigh-Durham International Airport. GoDurham,GoTriangle and Durham County Access provide complimentary service. GoDurham serves the City of Durham area, and is the second-largest transit Durham service provider in the state. GoTriangle's regional service connects Durham to neighboring Orange and Wake Counties, including service to Research Triangle DURHAM COUNTY Park(RTP). Durham County Access meets the needs of Durham County residents, including those in need of paratransit services, through a demand response �, • service. In FY20, GoTriangle is looking to expand service to Tnangle northern Durham County through a vanpool service. GoTriangle and GoDurham plan to improve the user experience at the Village in East Durham, Southpoint, and Patterson Place through capital improvements. GoTriangle and GoDurham will also construct improvements and amenities at 31 bus stops that were designed in FY19, as well as design up to an additional 50 stops in FY20,to be constructed in future years.The City of Durham will lead the design and construction of Transit Emphasis Corridors (TEC)for three high-use transit corridors in Durham: Holloway Street, Fayetteville Street, and Chapel Hill Street.TECs include not only bus stop improvements but also pedestrian and bicycle infrastructure that provides greater accessibility to the stops for area transit riders. Some projects will carry over from previous years and may not be reflected in this Work Plan. The FY20 Work Plan primarily addresses projects either receiving new funding for the first time or additional funding in FY20 in order to meet project needs. Efforts that are continuing using prior year funding, such as the Major Infrastructure Study for Durham-Wake Commuter Rail, are not outlined specifically in this report though work continues. Table 3 identifies the proposed expenditures for capital, service, and administrative projects in Durham.The Project Request Sheets,where more specific information on each project can be found, is located in the Appendix.These Project Request Sheets only reflect those submitted for FY20—project sheets for previous year funding can be found in that year's Work Plan. Carryover Balances The Durham County Transit Plan, and its predecessor,the Bus and Rail Investment Plan,developed a funding schedule to control expenditure amounts available per year by agency(or sponsor). These expenditure limits are to protect the Transit Plan balances over the life of the plan. In prior years, many sponsors were not able to use the available cash flow at the level planned. This has created"carryover balances" available in FY20 for transit needs. These balances will be utilized to provide additional service or make additional,one-time,capital investments in the FY20 Work Plan. 9 Adminstration The Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO), which hosts the administrative functions of the Staff Working Groups (SWG), requested that the previously half-time position of SWG Administrator be upgraded to full time to reflect the amount of time and effort actually required to perform the duties.The Durham County Transit Tax District would pay for half of this position, in accordance with previous custom to split the position evenly between Durham and Orange counties. In addition,two positions are identified that are housed at GoTriangle:the Triangle Tax District Administrator and a Tax District Administrative Assistant.These positions were previously embedded within the functions of the Durham-Orange Light Rail Transit(D-0 LRT) project, but since these are necessary administrative functions with our without D-O LRT,the FY20 Work Plan calls them out specifically for funding.The cost for the Triangle Tax District Administrator is split evenly between Durham and Orange counties (same as for the SWG Administrator).The Tax District Administrative Assistant is split between three counties: half of the cost is paid by Wake County, and one-quarter each by Durham and Orange counties. Service In Durham County,the primary new service will be a subsidized vanpool option for northern Durham County.The Durham County Transit Plan calls for park-and-ride and bus service to Rougemont. However, as part of its cost-benefit analysis, GoTriangle determined that regularly scheduled bus service to Rougemont was cost prohibitive. For a less-densely populated area like northern Durham County, a subsidized vanpool can be more cost effective.The FY20 cost is shown in Table 1. In addition to the vanpool service, GoTriangle will also perform a set of customer surveys. Capital Capital improvements are led not only by transit agencies such as GoTriangle and GoDurham, but also other related organizations such as the City of Durham's Transportation Department and Durham County Cooperative Extension,which manages Durham County Access. FY20 work will enhance the transit experience by improving 31 existing stops with shelters and seating, and creating Transit Emphasis Corridors(TECs).These TECs will focus not only on improving bus stops along the high-use corridors of Holloway Street, Fayetteville Street, and Chapel Hill Street, but also better pedestrian and bike facilities in order to connect riders to the stops.A new transit center will create a better experience at The Village in East Durham, GoDurham's second-most used bus stop. Capital improvements will also be made at the park-and-ride facilities at Southpoint and Patterson Place. 10 Capital Highlight: Bus Stops in Durham During FY19,GoTriangle's Figure 1:Capital Improvements in Durham Better Bus Stop Program designed improvements to 31 high-use bus stops in 30� Durham.These stops will receive improved shelters Capital Improvements and amenities.The map at Transit Centers • Transit Emphasis Corridor right shows the location of • Better Bus Stops these stops.All are planned to be constructed in FY20. Additionally,$500,000 has been programmed in FY20 so that GoTriangle can design 1b up to 50 more bus stops for • • improvements. For more 15 °ur • information about this work, .y • visit ] https://gotriangle.org/stops. 147 The map at right also displays • the locations of the three • TECs and two park-and-rides • 55 that will be improved using funds from the Transit Tax Fund in FY20. • 0 � • 1 in=1 milesi Esri,HERE,G—in,(c)OpenStreetMap contributors,and the GIS user Community Table 3: Durham County Expenditures in the FY20 Work Plan 11 Transit Service Provider Project ID Services ar 2019 2020 Carryover DRAFTT Work Plan Durham County Access 19DC0_TS1 Durham County ACCESS POS TBD 187,329 GoDurham 18DCI_TS1 Route 5-Frequent Service Corridor TBD 563,465 GoDurham 18DCI_TS2 Route 10-Frequent Service Corridor TBD 384,965 GoDurham 18DCI_TS3 Route 3-Tripper for Crowding Relief TBD 65,280 GoDurham 18DCI_TS4 Route 12&14-Frequency Improvements TBD 267,495 GoDurham 18DCI_TS5 Route 15-Span Improvements TBD 324,445 GoDurham 18DCI_TS6 Route 20-New Commuter Service TBD 299,285 GoDurham 18DCI_TS7 System-Wide-Later Sunday Service TBD 170,510 GoDurham 18DCI_TS8 System-Wide-New Year's Eve Service TBD 7,480 GoDurham 18DCI_TS9 Increasing Cost of Existing Services TBD 850,800 GoTriangle 18GOT_TS1 Route 700-Off-Peak Span and Frequency TBD 288,417 GoTriangle 18GOT_TS2 Route 800-Off-Peak Span and Frequency TBD 217,313 GoTriangle 18GOT_TS3 Route 400-Off-Peak Span and Frequency TBD 275,130 GoTriangle 18GOT_TS4 Route 800-Additional Peak Trips TBD 118,563 GoTriangle 18GOT_TS5 Route ODX-New Express Service TBD 130,493 GoTriangle 18GOT_TS7 Route DRX-Additional Peak Trips TBD 51,088 GoTriangle 19GOT_TS1 Extended Sunday Service for Routes 400,700,and 800 TBD 37,567 GoTriangle 19GOT_TS2 Durham-Raleigh Express,Additional Frequency TBD 57,414 GoTriangle 19GOT_TS3 Additional Holiday Service TBD 26,345 GoTriangle 19GOT_TS8 Paratransit costs associated with span increases TBD 31,805 GoTriangle 20GOT_TS1 Northern Durham Vanpool Services TBD 66,960 Transit Services Total Transit Services 4,422,148 GoTriangle 19GOT 002 Customer Surveys TBD 74,350 Other Operating Total Other Operating 74,350 GoTriangle 19GOT_AD1 .25 FTE for Tax District Admin n/a 22,350 DCHC MPO 20MPO_AD2 Planning for new Transit Plan n/a 750,000 DCHC MPO 19MP0_AD1 .5 FTE for SWG Admin TBD 55,364 DCHC MPO for GoTriangle 20GOT AD1 .5 FTE for Tax District Admin-Finance n/a 55,364 Admin Total Admin 883,078 FY 2019 Sponsor Project ID Project Budgeted FY 2020 Total Funding for (Available if not DRAFT Work Plan FY 2020 Activity spent) GoDurham 20DCI VP1 GoDurham Vehicle Purchases 72,850 72,850 Vehicles Total Vehicles 72,850 72,850 City of Durham/GoDurham 18DCI_CD5 Village Transit Center - 470,000 470,000 City of Durham 20DCI_CD1 Chapel Hill TEC 86,450 800,000 886,450 City of Durham 18DCI_CD2 Holloway St Transit Emphasis Corridor - 700,000 700,000 City of Durham 18DCI_CD1 Fayetteville St Transit Emphasis Corridor - 280,000 280,000 GoDurham 18DCI_CD4 GoD(Better)Bus Stop Improvements 783,570 500,000 1,283,570 GoTriangle 18GOT_CD2 Southpoint Transit Center-1 - 426,376 426,376 GoTriangle 18GOT_CD4 Patterson Place Improvements-1 183,000 - 183,000 GoTriangle 18GOT_CD5 Patterson Place Park&Ride - - GoTriangle 18GOT_CD7 GoT Bus Stop Improvements(Durham County) 257,000 257,000 GoTriangle 19GOT_CO2 Durham-Wake Commuter Rail 810,000 - 810,000 Capital Improvements Total Capital Improvements 2,120,020 3,176,376 5,296,396 Total Durham County Draft Work Plan 8,628,802 12 Summary: Orange County's three transit providers move a region that is both rural and urban to North Carolina's major -= employment centers and schools. Orange Public OMNCE COUNTY Transportation (OPT) connects the county seat of NORTH CAROLIN Hillsborough to other regional towns, and provides service for the rural areas of the county and into Chapel Hill,as I Hill well as regional connections to Durham and Mebane in Alamance County. Chapel Hill Transit moves UNC students, employees and visitors, as well as serving the mobility Triangle needs of the residents of Chapel Hill and Carrboro. flonsl GoTriangle's regional service connects Orange to neighboring Durham and Wake Counties, including express service to Duke and Durham, NC State and Raleigh, and frequent service to the Research Triangle Park(RTP). In FY20, capital projects include Americans with Disabilities Act (ADA) compliant improvements at bus stops for Chapel Hill Transit, construction of the Hillsborough train station, a park-and-ride lot in north Hillsborough, and bus stop improvements throughout Orange County, as well as in Mebane. Project sponsors will also use Orange County's Tax District Funding to support new service. OPT will add new service on two routes: Hillsborough-Mebane on the Alamance Health Connector and a new Cedar Grove-Durham Express.The Hillsborough Circulator will be expanded and counter-circular service provided as well. OPT will also increase service for mobility on-demand. Some projects will carry over from previous years and may not be reflected in this Work Plan.The FY20 Work Plan primarily addresses projects either receiving new funding for the first time or additional funding in FY20 in order to meet project needs. Efforts that are continuing using prior year funding, such as North-South Bus Rapid Transit (N-S BRT), are not outlined specifically in this report though work continues. Table 4 identifies the proposed expenditures for capital, service, and administrative projects in Orange County.The Project Request Sheets,where more specific information on each project can be found, is located in the Appendix.These Project Request Sheets only reflect those submitted for FY20—project sheets for previous year funding can be found in that year's Work Plan. Carryover Balances The Orange County Transit Plan, and its predecessor,the Bus and Rail Investment Plan, include a fund schedule, which limits the expenditure amount available per year by agency(or sponsor). These expenditure limits are to protect the Transit Plan balances over the life of the plan. During the years 2014 to 2017, many sponsors were not able to use the available cash flow at the level planned. This has created "carryover balances," or additional funds available in FY 2020 for transit needs. Carryover has been authorized for one-time capital purchases. 13 Adminstration The Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO), which hosts the administrative functions of the Staff Working Groups (SWG), requested that the previously half-time position of SWG Administrator be upgraded to full time to reflect the amount of time and effort actually required to perform the duties.The Orange County Transit Tax District would pay for half of this position, in accordance with previous custom to split the position evenly between Durham and Orange counties. In addition,two positions are identified that are housed at GoTriangle:the Triangle Tax District Administrator and a Tax District Administrative Assistant.These positions were previously embedded within the functions of the Durham-Orange Light Rail Transit(D-0 LRT) project, but since these are necessary administrative functions with our without D-O LRT,the FY20 Work Plan calls them out specifically for funding.The cost for the Triangle Tax District Administrator is split evenly between Durham and Orange counties(same as for the SWG Administrator).The Tax District Administrative Assistant is split between three counties: half of the cost is paid by Wake County, and one-quarter each by Durham and Orange counties. Services Orange Public Transit (OPT) will provide increased or new service on four routes in FY20: • The Alamance Health Connector Service to Mebane • A new Cedar Grove-Durham Express • Expansion of service hours for the Hillsborough Circulator, including new counter-circulator service • Increased service for mobility on demand Capital Capital expenditures in FY20 will be primarily directed towards bus stop improvements. Chapel Hill Transit will upgrade stops to be ADA compliant, part of an effort to eventually upgrade 602 bus stops throughout their service area. GoTriangle will upgrade two stops in Carrboro along Rogers Road and one in Mebane. Several other bus stops throughout Orange County will also be improved. In addition to these bus stop improvements, construction of the Hillsborough Train Station is expected to progress in FY20, and funds are available through the Orange County Work Plan to complete that project. Work on the N-S BRT in Chapel Hill will continue into FY20. Prior year funds will be used to bring the project to project development. Figure 21 maps the location of these forthcoming service and capital investments (except the Chapel Hill Transit bus stops). 1 Map was incomplete at the time of publication for public comment. It will be updated as soon as all location information is available. 14 Figure 2:Capital and Service Investments in Orange County Capital and Service Improvements • CarrborolRogers Road Stops • Mebane Bus Stop —OPT Orange-Alamance • 95 Chapel Hill C—b— 1 in=2 miles Esri,HERE,Garmin,(c)OpenSlreetMap contributors,and the GIS user community Table 4:Orange County Expenditures in the FY20 Work Plan 15 Transit Service FY 2019 FY 2020 Project ID Services Provider Carryover DRAFT Work Plan CHT 19CHT_TS1 Service Expansion FY19 TBD 350,300 CHT 19CHT_TS3 Existing Service Expansion FY13-FY18 TBD 1,001,191 CHT 19CHT_TS2 Increasing Cost of Existing Services TBD 632,416 OPT 190PT_TS1 Continuation of Transit Services TBD 275,061 OPT 20OPT_TS2 Alamance Health Connector TBD 120,640 OPT 20OPT_TS3 Cedar Grove-Durham Express TBD 60,320 OPT 20OPT_TS4 Hillsborough Circular Expansion TBD 30,160 OPT 20OPT_TS5 Hillsborough Circular II TBD 94,656 OPT 20OPT_TS6 Mobility on Demand TBD 36,192 OPT 190PT_TS2 Increasing Cost of Existing Services TBD 125,989 GoTriangle 18GOT_TS2 Route 800-Off-Peak Span and Frequency TBD 217,313 GoTriangle 18GOT_TS3 Route 400-Off-Peak Span and Frequency TBD 275,130 GoTriangle 18GOT_TS4 Route 800-Additional Peak Trips TBD 118,563 GoTriangle 18GOT_TS5 Route ODX-New Express Service TBD 130,493 GoTriangle 18GOT_TS6 RouteCRX-AdditionalPeakTrips TBD 46,028 GoTriangle 19GOT_TS1 Extended Sunday Service for Routes 400,700,and 800 TBD 25,044 GoTriangle 19GOT_TS3 Additional Holiday Service TBD 26,345 GoTriangle 19GOT_TS8 Paratransit TBD 17,890 Transit Services Total Transit Services 3,583,731 GoTriangle 19GOT_AD1 .25 FTE for Tax District Admin n/a 22,350 DCHC MPO 20MPO_AD2 Planning for new Transit Plan n/a 500,000 DCHC MPO 19MPO AD1 .5 FTE for SWG Admin TBD 55,364 DCHC MPO for GoTriangle 20GOT AD1 .5 FTE for Tax District Admin-Finance n/a 55,364 Admin Total Admin 633,078 FY 2019 Sponsor Project ID Project Budgeted FY 2020 Total Funding for (Available if not DRAFT Work Plan FY 2020 Activity spent) CHT 20CHT_VP1 CHT-Vehicle Purchases 1,500,105 41,087 1,541,192 OPT 20OPT_VP1 OPT-VP 35,731 128,958 164,689 Vehicles Total Vehicle Purchases 1,535,836 170,045 1,705,881 Carrboro 18TOC_CD1 Estes Drive Bike-Ped Improvements 37,204 10,169 47,373 Carrboro 18TOC_CD2 Estes Drive Transit Access/Corridor Study 106,296 - 106,296 Carrboro 18TOC_CD3 Bus Stop improvements(Rogers Road) 31,889 31,889 Carrboro 18TOC_CD4 Morgan Creek Greenway 199,837 199,837 Carrboro 19TOC_CD1 South Greensboro St.Sidewalk 552,340 - 552,340 CHT 20CHT_CD1 Lighting in bus shelters - 53,148 53,148 CHT 19CHT_CD2 ADA Bus Stop Upgrades 140,000 308,815 448,815 CHT 20CHT_CD2 Bus Stop Sign Design and Replacement - 84,741 84,741 CHT 19CHT_CD1 CHT-NSBRT 2,000,000 - 2,000,000 GoTriangle 18GOT_CD8 Hillsborough Park-and-Ride-3 362,500 583,223 945,723 GoTriangle 20GOT_CD1 Hillsborough Transfer Center - GoTriangle 18GOT_CD10 GoT Bus Stop Improvement in Carrboro 17,000 9,574 26,574 GoTriangle 18GOT_CD11 Mebane Bus Stop Improvement 10,630 10,630 GoTriangle 18GOT_CD12 GoT Bus Stop Improvements in Orange 310,000 21,100 331,100 Town of Hillborough 18TOH_CD1 Hillsborough Train Station 116,000 285,000 401,000 Town of Hillborough 20TOH_CD1 Hillsborough Train Station Bus Stop Improvements - 33,897 33,897 OPT 20OPT_CD1 OPT 15 OPT Bus Stop Signs - 1,594 1,594 Orange Planning 190PT CD1 OPT Bus stop improvement(5 OPT stops) 124,972 12,892 137,864 Capital Improvements Total Capital Improvements 4,028,037 1,414,784 5,412,821