Loading...
HomeMy WebLinkAboutAgenda - 8-f - Approval of Budget Amendment #9-A for Piedmont Food Processing Center Freezer Installation 1 ORD-2019-020 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 21, 2019 Action Agenda Item No. 8-f SUBJECT: Approval of Budget Amendment #9-A for Piedmont Food Processing Center Freezer Installation DEPARTMENT: Asset Management Services ATTACHMENT(S): INFORMATION CONTACT: Budget Summary Angel Barnes, Capital Projects Manager, 919-245-2628 Travis Myren, Deputy County Manager, 919-245-2308 PURPOSE: To approve Budget Amendment #9-A for the Piedmont Food Processing Center Freezer Installation. BACKGROUND: The Piedmont Food Processing Center located at 500 Valley Forge Road, Hillsborough, NC, was awarded a Golden Leaf Grant of $128,000 in May 2018, with a required local match of $32,000 from Article 46 Sales Tax proceeds for a total project budget of $160,000 for the installation of two exterior freezers for the storage of processed food. Throughout the summer and fall of 2018, the freezer slab, roof system, and freezer installation was designed by Summit Engineering. The freezer design and purchase was also completed and delivered to the jobsite. Over winter 2018, the project was sent out to multiple construction bidders for the construction activities and installation of the freezers. The original bid numbers returned were more than double the budgeted amount for the installation of the freezer slab and connections to the existing facility. In January 2019, the roof portion of the project was updated to become an alternate to the project scope of work, and the project was then re-bid. The revised construction bids remain higher than the original estimated amounts, and an additional $26,093 is needed to fund the project, for a total revised project budget of $186,093. Staff recommends that the additional funds needed for this project come from available Article 46 Sales Tax proceeds, bringing the total County match to $58,093. FINANCIAL IMPACT: Proceeds from Article 46 Sales Tax revenue would fund the additional amount of $26,093 needed for this project. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this item: • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY 2 The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. RECOMMENDATION(S): The Manager recommends that the Board approve Budget Amendment #9-A, described above, to fund this capital investment. 3 Budget Cost SubTotal Comments Professional Services: Designer $8,150.00 $10,750 $8750[Fi)ed)$2000 Reim. Construction Materials Testing $2,806 Asbestos Testinq 2000 $f 3,556 Construction: $88,000 Electrical 8000 Retaininq Wall 25000 Roof Structure 20000 Freezer Purchase 55000 $64,524 Mechanical(Spec&Install Freezer Units) 19887.5 $19,887.50 Misc Materials 5000 SprinWer 10000 Buildinq Permit 2000 Fire Marshal Plans Review!Permit 95.94 Racks.Bumpers,etc... 8000 $f 72,412 Owner Costs Zoninq Compliance Permit(TOH) $ 125.00 Owner Continqency 101 of Construction Estimate $15,298 Cost Escalation 51 of Construction Estimate $7,649 $ f 25.U0 Total Estimated Budqet $186,080.96 Total Encumbered Project Cost $f 86,093