Loading...
HomeMy WebLinkAboutAgenda - 12-14-2004-9aORANGE COUNTY BOARD OF COMMISSIONERS Action Agen a Item No. - Ct SUBJECT: Southern Orange Senior Center Project Budget DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N) No Services ATTACHMENT(S): Cost Estimate from Architect Letter from Architect Preliminary Floor Plan ACTION AGENDA ITEM ABSTRACT Meeting Date: December 14, 2004 INFORMATION CONTACT: Pam Jones, (919) 245-2652 TELEPHONE NUMBERS: Hillsborough Chapel Hill Durham Mebane 732-8181 968-4501 688-7331 336-227-2031 PURPOSE: To consider establishing a budget to support the facility program for the new Southern Orange Senior Center, being developed in collaboration with the Southern Orange Senior Center Planning Committee. BACKGROUND: Far the past several months, the Southern Orange Senior Center Planning Committee, appointed by the County Commissioners, has met to define the program that should be carried out in the new Southern Orange Senior Center. As reflected on the attached preliminary floor plan, the Center will include spaces that will be adaptable to carry out a wide variety of programs, activities and meals, The identified needs dictate that most of the space should be flexible in order to accommodate as many different activities as possible. The most notable exception is the area depicted as the auditorium on the attached plan. As currently proposed, this area would be designed with a sloped floor, auditorium style seating, complete with the appropriate acoustics and audio systems suitable for performances, recitals, lectures, etc. The auditorium at the current center is used extensively in this manner, and the planning committee felt that awell-designed specialized area for this type of activity should be an integral part of the facility. Further, the architect has met with Department on Aging Staff to ensure the design of adequate staff space to support the Center. The office spaces will accommodate visiting agencies that may be scheduled to provide services at the center, in addition to the space designed for the permanent staff assigned to the facility. The Board will note that the Center also includes a fairly small area that will be designated as clinic space from which visiting clinicians and physicians from UNG Hospitals, the Health Department or others, as may be identified in the future, may provide a variety of screening, assessment and referral services to seniors and their families.. Discussions with UNC Hospitals z provided the basis for the design of the space, which consists of small exam rooms with sinks that will provide an opportunity for a variety of service delivery options in the future, The project site plan has been reviewed by the Community Design Committee (CDC) (October 11) and the Chapel Hill Town Council (November 15). Bath groups were supportive of the site plan and offered no comments that would significantly alter the attached site plan. The project has many regulatory milestones to complete before its projected commencement in summer 2005. As noted in the attached letter from Richard Gurlitz, the project continues to stay on track for the June 30, 2006 opening date, In order to maintain the schedule, however, a fixed budget must be articulated to the designer, which will in turn better define their parameters and allow them to proceed with the design, FINANCIAL IMPACT: The project architect has produced an estimate of what a similar project to the Senior Center may reasonably be expected to cost in today's construction market, Pursuant to the estimate attached, the project will cast in the neighborhood of $4.9 million, A complete itemization of the elements is attached, but in general includes the building construction and all owner responsibilities including, but not limited to, design fees, OWASA capital casts, Town fees, furnishings, etc. Note that the costs cited as owner responsibilities are estimates and staff believes there is flexibility in some of the elements, For example, there is latitude in the $300,000 estimated to furnish the facility. It is important to note that these numbers are preliminary, but do, in the opinion of the architect, reflect today's market costs considering the impact of higher fuel costs and the rising costs of construction materials, including steel and concrete. Further, it is important to note that this budget snapshot is based on current conditions, Although the market has shown small signs of stabilization in the past few months, the conditions present at the time the project is put to bid next year will determine the final bid outcome, The Board has endorsed a debt issuance schedule that includes 2001 voter approved bonds totaling $4 million, along with an additional $2,150 million in private placement funds to fund two senior centers: one 25,000 square foot facility in southern Orange and one 15,000 square foot facility in Central Orange, The Southern Orange Senior Center planning committee has been adamant in their support of a building no less than the 25,000 square feet called for in the Master Aging Plan. Understanding that the $4..9 million that is currently the project estimate is significantly beyond what the County's allocation far this project, the architect has suggested that the 25,000 square foot structure could be built within a budget range from $4,1 to $4.5 million by leaving some portions of the building unfinished as shell space, pending additional funding from either public or private sources, RECOMMENDATION(S): The Manager recommends that the Board: • Authorize a $4.1 million budget for the completion of a 25,000 square foot senior center at the Southern Orange Human Services Center campus; and • Direct staff to bring forward funding options that addresses the construction of both senior centers in .January 2005. _.~ U fC LL W O O O N a-. C N U ~ Q T C R ~ Q N N ~ ~ ~ m O i N N F S +~' ._ 7 ~ O ~ cq a N IO M fR N In M Ni N N ~- EA N N r fA O (O (O N1 I~ N (O EA n OD N M ~- (O V (A O ~ O (A (D V O EA M N ~ to M M O !A m N ~ kH 0 ~- V' fPr '7 O fR 7 N N tfi 07 (D V' d1 tp m O to N N I~ (fl M 1+1 O lH tG N N !A u1 01 N fA 11'1 !T N Vf t11 ~--~ 7 fA m O N ER M V +- fA O M •- fR O O N tli O O N N 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 0 O O O 0 0 0 0 O O O ~ ~ 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 0 O O O O O O O O O O N t V O O O 0 0 0 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 O 0 0 (O t0 O 41 t(1 O O O N LL1 t0 O l0 O O O O t0 O t0 111 111 10 10 l0 O O O V' <j O 1~ ~ N O N ti N N O N O O t0 t0 N In I` n r N t` N N CO W O O UJ (p r 41 V' ~- O CO f~ N O O ~ O M tD c'1 Ci M N 10 d' tG N CO M M O ^ ~ A M d' O .- O N O .- N t` n O 0 M M E V 1 . - N 1 er en v1 e» e1 rri e» er /n rr1 rn e1 eR » ua u1 va cfl v1 va rn en en » va ~ e» e» 0 0 0 0 0 0 0 e a a a .n a a t t N N to N N o o (p ~ ` ` C N C > > N ~ ~ ~ E U O +~ .. 3 N ~ .y ~c ~ ~ O N c ~ „ ~ V c U y T a O = N N ~ ~ N rn v a c c ~ S o c c m ~ v loi ° °- ° a xs 'c o o c O N p O y W O L O tll ~~ ~ N ~ C ? > ~ ~ C ~ N C N N O ~ N ~ G C C G .~ L .~ C O U C p (0 U (j 0 0 (0 (J O tL N O N ~ O ~ ~ ~ 1 N ~ ~ O X rt «~ UI O ~ N N 4- ~ (n (n I.L m W W (q m ~amUU_'S f!)U.. l1J a 2t!_tn 0 0 0 0 0 0 0 N N M M O .- N N N N M N •- N M M N M M V' V' fO M cD tD cO cD c0 cO (O .- h W O O N O 0 0 0 0 00 0 0000000.- o o oo.- C y o E m ? :.' N N j N ~ ~ N N ~ o O C v ~ 2 U U c ~ ~ N O p O N C t~ N .`O. C U LL (n ~ W c U N T2 0 0 0 0 0 0 0 O 0 O vi N X W d U a .~ C 0 Y U N d 0 N r U R LL L{. O O O N ~I nl~ u°Di, inl ri lh Qi O r tr'1 tm0 N N r M r s tND N O O N ~ .N- r N °o ~ °o ~ °o ~ °o °o 0 0 0 0 0 O O O O t0 O O ~O Yi i~ V c~ N of N pp N m ~ r le» ~ I ~I wI ~c~~h M fR rn IO V w W ~ ~ ~ ~ C cll U N m 'y o O ~, .~ l6 N c cn a d ~ 7~ ~ ~ t6 ~ Q m U ~ = w ~ w ~ ~ ~' •- o ~ rn cn a m 0 E Y a U~y ~ m w in ~I a x `m It»Iw r~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . .- . 00000 u~cooooo0000000 07 O O O O O N i~ 0 0 0 0 0 0 0 0 0 0 0 Vl O O O c+7 V1 O (O c7 0 0 0 0 0 0 0 0 0 0 [{ O O O 1~ r O l0 r to O ifJ O~ O N d' N O OI r o7 r N N N O .- ~- r o .- O W th M r r to H3 ffl fA (H fR N} d3 fH (Pr (H N3 EPr fR (fl (fl fR fA 0 y d F fn G N 41 w d .a a rn c 3 0 ~ ~ ~ N .~. ~ m ~ v ~ ~~~ a o W ~ O iV U o. co ~ c E E m w ~° w E m m- o~ N m E a N aoW=~ E.°~~~ N ~~ ~ .U S1 N N d ~~ O lL Q ~~ C y` W N W Ul O U N~~ Q N d N O. = 0~ O G (n c ?~ E m y W m a s o v o c m O N 1U 10 O cn ¢ cn F`- s c~ ~ E ~ ti I~ ~7 Q Y 10, ~ m y ~. A ~ } y o 0 N n 5 Architectural Group, PA. November 17, 2004 Ms, Pam Jones Purchasing Director County of Orange Hillsborough, North Carolina Re: Southern Orange County Senior Center -Budget and Schedule Dear Ms, Jones As per your request, I am attaching the preliminary cost estimate for the Southern Orange Senior Center as well as the design and construction schedule. I am also attaching letters for your review from many of the area material suppliers documenting their rising costs. These documents are for your use in discussing these issues with the Orange County Board of Commissioners and in reaching a determination of an appropriate budget for the building The cost estimate for the project is based on similar buildings under construction today. There has been considerable movement in the construction sector this year, starting in late February 2004 with the sharp rise in steel costs followed by rises in concrete and fuel. The steel costs have since filtered down to product supply so that not just the structural billet steel is affected, but other steel components - HVAC duct, conduit, fixturing, etc. -are also affected. Steel costs rose approximately 45% in the first three months of the year.. Concrete rises have also affected building costs, particularly institutional construction that utilizes more elements of fire resistive construction for building slabs and footings, Finally, the rise in fuel costs has been passed along by suppliers in the form of transportation surcharges added on to almost every item delivered to the site. The net affect of these cost increases is that municipal and institutional projects that were costing in the range of $120-$140 per square foot as recently as last January are now coming in with low bids in the $150 to $170 range for the same materials and scope. The second item of import for this project is the schedule. During the initial weeks of the design process, we developed a design and construction schedule. The major components of the schedule that provided fixed dates were the Chapel Hill Special Use Permit process, the Orange County bidding process, the schedule for construction of the project, and the move out date for the existing Senior Center in the Galleria shopping center. We coordinated our design process around accommodating those fixed requirements to enable the Senior Center to continue operation making a smooth transition from the existing facility to a completed construction project. We are currently adhering to that schedule with the understanding that the budget issue will be defined within the timeframe that will allow us to continue working on the project. We cannot do forward with the design of the building without a clear understanding of the project budget, If the budget is not defined within the month of December, 2004, the schedule will necessarily slip. 5310 South Alston Avenue, Suite 220 Durham, North Carolina 27713 919A89 9000 tcl 919A938937 fax ~^nvv/. yurlitza rch itects,com Pam Jones Orange County Purchasing I hope this letter is informative as we work to define the scope, budget and schedule issues for the Southern Orange Senior Center. If you require further information, we are at your disposal. Sincerely, THE GURLITZ ARCHITECTURAL GROUP, PA Richard A Gurlitz 5310 South Alston Avenue, Suite 220 Durham, North Carolina 27713 9Y9 489.9000 tel 919 493 8937 fax ~J ~mw~m.yuriitza rchitccts.cnm m a 0 0 u. 4 0 0 a c 0 v c a `o o~ u_ ~ LL a ~ c a` o ~ro ~ ~ a of