Loading...
HomeMy WebLinkAboutAgenda 04-02-2019 8-i - Approval of Budget Amendment #7-D for Initiation of the Repairs-Reconstruction of the John Link Jr. Government Services Building 1 ORD-2019-014 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 2, 2019 Action Agenda Item No. 8-i SUBJECT: Approval of Budget Amendment #7-D for Initiation of the Repairs/Reconstruction of the John Link Jr. Government Services Building DEPARTMENT: Asset Management Services ATTACHMENT(S): INFORMATION CONTACT: Budget Summary Angel Barnes, Capital Projects Manager, 919-245-2628 Travis Myren, Deputy County Manager, 919-245-2308 PURPOSE: To approve an initial project budget for the initiation of the repair and reconstruction of the John Link Jr. Government Services Building and to approve Budget Amendment #7-D to finance design services and ancillary costs related to the containment of affected areas. An additional budget amendment will be required to finance the remediation, repair, and construction work. BACKGROUND: The John Link Jr. Government Services building has been experiencing water intrusion around the stone band that surrounds the exterior of the facility. Heavy rains and storms throughout 2018 caused repeated water intrusion around the stone band into the facility. The persistent presence of moisture caused organic growth within the ceiling cavity of the facility. The growth present is currently contained above the drop ceiling, and preventive measures have been taken to prevent further contamination. The initial project budget created by this abstract is for design services. The design services will culminate in a set of construction drawings that will be competitively bid. Once the results of those bids are received, another budget amendment will need to be processed to proceed with the remediation, repair, and reconstruction work specified in the construction documents. Since this project was not anticipated as part of the FY2018-19 Capital Budget, a budget amendment is necessary to finance this project. This budget amendment #7-D amends the following Capital Project Ordinances: Link Center Remediation Capital Project ($178,000) - Project#10069 Revenues for this project: Current FY 2018-19 FY 2018-19 FY 2018-19 Amendment Revised Alternative Financing $0 $178,000 $178,000 Total Project Funding $0 $178,000 $178,000 2 Appropriated for this project: Current FY FY 2018-19 FY 2018-19 2018-19 Amendment Revised Professional Services $0 $117,000 $117,000 Construction $0 $61.000 $61,000 Total Costs $0 $178,000 $178,000 FINANCIAL IMPACT: The initial project budget for containment measures and project design for the John Link Jr. Government Services Building is $178,000. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: CREATE A SAFE COMMUNITY The reduction of risks from vehicle/traffic accidents, childhood and senior injuries, gang activity, substance abuse and domestic violence. • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation. Repair and reconstruction the Link Government Services building will create a safe working environment for staff. RECOMMENDATION(S): The Manager recommends that the Board: 1. Approve the initial project budget to start the initial steps for the design and curative measures for the John Link, Jr. Government Services Building; and 2. Approve Budget Amendment #7-D, described above, to finance this unexpected design work. 3 PROJECT NAME John Link Jr.Government Services Center Remediation Updated 3/22/2019 project code 10069 MUNIS Update SF $/SF Summary Revenues Prior Years Funding FY18-19 Total Funds Recognized $0 Service Detailed Description Budget Cost SubTotal Professional Services: Designer Not to Exceed-includes MEP, FA&Structural $90,000 Industrial Hygenist Air Quality&Surface Sampling(initial testing) $2,000 Industrial Hygenist Additional Air Quality Testing-Up to construction start $25,000 Reimbursables $117,000 Construction Services: Mold Remediation Temporary Barrier of Mold Contaminated sheetrock $28,000 Air Scrubber rental&maintenance $25,000 Test Cuts for investigation to complete design $8,000 Contents Cleaning Demolition Repairs Roof Replacement Electrical Mechanical Flooring Cabinets/Millwork Furniture Roof Access Ladder Permitting HVAC Rework/Replacement Estimated(Required due to hepa filters) $45,000 $61,000 Owner Costs Furniture,Materials Audio-Visual,Low Voltage Signage Owner Contingency 0.00 $178,000.00