HomeMy WebLinkAboutAgenda - 6-a - EfIand-Buckhorn-Mebane Access Management Plan Adoption 1
ORANGE COUNTY
BOARD OFCOMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: April 2, 2019
Action Agenda
Item No. 6-a
SUBJECT: Efland-Buckhorn-Mebane Access Management Plan Adoption
DEPARTMENT: Planning and Inspections
ATTACHMENT(S): INFORMATION CONTACT:
1. Mebane Traffic Separation Study (TSS) Nishith Trivedi, Transportation Planner,
2. Church Letter (919) 245-2582
3. County Response — Before & After Craig Benedict, Planning Director, (919)
245-2585
UNDER SEPARATE COVER Tom Altieri, Comprehensive Planning
4. Draft Efland-Buckhorn-Mebane Access Supervisor, (919) 245-2579
Management Plan
ONLYAVAILABLE ELECTRONICALLYAT.-
http://www.co.orange.nc.us/DocumentCenter/View
PURPOSE: To consider adopting the 2019 Efland-Buckhorn-Mebane Access Management Plan
(E-B-M AMP).
BACKGROUND: On April 3, 2018 the BOCC authorized the Planning Department to update the
adopted 2011 E-B-M AMP in accordance with an approved public and advisory board review.
This update has been conducted through a comprehensive public involvement process which
included community input and recommendations from the Planning Board, Orange Unified
Transportation Board (OUTBoard) and Economic Development Advisory Board(EDAB).
Community Meeting - August 28, 2018
The Planning staff conducted a community meeting at Gravelly Hill Middle School in the planning
area. All public comments are contained in Appendix C of the E-B-M AMP.
Planning Board - October 3, 2018 & Orange Unified Transportation Board - October 17, 2018
The two Boards recommended the BOCC approve the Plan with additional context.
Economic Develoament Advisory Board - January 8, 2019
The EDAB recommended the BOCC approve the Plan with the reduced connective option.
February 5, 2019 BOCC Public Hearing - No members of the public spoke on the proposed
Plan. The BOCC directed staff to place the item on a subsequent meeting agenda for
consideration.
March 7. 2019 BOCC Meeting - Members of the Mt. Moriah Baptist Church attended and offered
comments on the portion of the plan that reflects a possible rail crossing relocation and grade
separation near Buckhorn Road. The BOCC directed staff to meet with members of the church to
review the plan, respond to questions, and place the item on a subsequent BOCC meeting for
future consideration.
2
March 12, 2019 Mt. Moriah Baptist Church Meeting - Staff met with members of the church
and approximately over 40 people attended. The Orange County Planning Director provided an
overview of the plan and some specifics about a possible rail crossing relocation and grade
separation in a 5-10 years horizon. The public notification process for the Buckhorn (and other
areas) Traffic Separation Study (TSS) began in 2016 and was initiated by the North Carolina
Department of Transportation (NCDOT) and the North Carolina Railroad (NCRR). The TSS
includes environmental and cultural impact survey. Residents were shown all three proposed
alignments as recommended in the TSS (Attachment 1) and asked to work with staff to find the
alternative with the least impact. They were also reminded of the two public meetings, public
hearing and public review processes NCDOT and Mebane conducted when drafting and adopting
the TSS. The City of Mebane notified the County of this project and we offered comments about
what alignment option has the least impact (i.e. No impact) to the church and cemetery and the
best alignment for a future intersection to US-70.
The Church has provided a letter to Orange County (Attachment 2) requesting:
• The Mebane TSS for Buckhorn Road be removed from plans and that closing the train
crossing at Buckhorn Road not to be an option.
• A resolution assuring that the E-B-M AMP will not be part of any long rang plans for the
Efland-Buckhorn community's residents and economic future.
Planning Director's Recommendation - The Planning Director recommends that the draft 2019
E-B-M AMP be revised to exclude the elements of the TSS between the Industrial Drive/Buckhorn
Road intersection and US-70 Frazier Road intersection (Attachment 3). The concerns of the
residents will be forwarded to NCDOT and NCRR. The Planning Director also recommends the
BOCC adopt the E-B-M AMP (Attachment 4). Adoption of the plan will lead to more orderly
growth which promotes the public health, safety, and general welfare and helps to achieve the
purposes of the adopted Comprehensive Plan.
FINANCIAL IMPACT: There is no immediate financial impact associated with this item. The
2017 Transportation Study was funded through the FY 17-18 budget at a cost of $35,000.
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to
this item:
• GOAL: CREATE ASAFE COMMUNITY
The reduction of risks from vehicle/traffic accidents, childhood and senior injuries, gang
activity, substance abuse and domestic violence.
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary
for residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
RECOMMENDATION(S): The Manager recommends the Board adopt the 2019 Efland-
Buckhorn-Mebane Access Management Plan (Attachment 4)
c�i'(eO NC
BY TRAIN
Figure 29: SR 1114— Buckhorn Road (Crossing # 735 141 R) Recommendation Option 1
BUCKHORN OPTION 1 MEBANE GRADE CROSSING STUDY BS1CK-01
.71
• 1. C g
U
.F
$n/
c Off: O a o o 0 o a a
r IV / R + + + + + + + + + + + k �� \ •f
It s-.1 O N N N N N N co
N \l 1yF
7so 200 FT 7sa
80-FT ..,,, - --
740 r'i'I 150 FT.. 100 FT_ ;`.., ::,. r .., _,..�
I FT80 FT --, :` 740
730 _ 100 FT — - 7so
_ I
10+00 11+00 12+00 13+00 14+00 15M0 16M0 17+00 16+00 18+00 20+00 21+00 22+0 23+00 24+00 25+00 26+00 27+00 20+00 29+00 30+00 31+00 32+00
61
e�axe
NC
9Y TRAIN
Figure 30: SR 1114— Buckhorn Road (Crossing # 735 141 R) Recommendation Option 2
BUCKHORN ROUNDABOUT 1 MEBANEGRROSSINGSTUDY "01"°MIN
ADEC
tn
IMP
41 CPO
w a
.. + 4-
x
k _ -
. : . .
-759 I _l� 1 �. - 500 F7
200 FT
740 BEGIN ALIGNMENT I .,.,. I.-H -'H i i 740
730 STA.1D+00.00 ge 300 FT
ENQALIGNMENT 73C
720 150 _ ——— - ———— PRGP.9Rf�GE y —— — STA.36+38.69 720
710 50 FT —— y6 710
700 .. 700
670 870
10+00 11+00 12+00 13+00 14+00 15+00 16+90 17+00 13+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 28+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00
62
c-Ae6axe NC
BY TRAIN cc
Figure 31: SR 1114— Buckhorn Road (Crossing # 735 141 R) Recommendation Option 3
BUCKHORN ROUNDABOUT 2 MEBANE GRACE CROSSING STUDY Ig D2�
c + `A ® 9
x
CD
o N !� z, 4
CP
INDUSTRIAL JDRIvE
G�� x
maw, 6cP o n 2
o
..
FRAZ4ER ROADs� G —�•°
r' �.
_ -
soo FT
750 .. _:� I -i.` 750
- ._.. -
740 BEGIN ALIGNMENT I CSC� .i5B FT ENPALI6NME-
740
730
57A.1D+0000 { 57A 33*53.07
730
720 .. ----... � �� r
1 pDFT ----�"---- �z r�
50 FT 720
7101
710
700580
%
870
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 %,GG 19+00 20+00 21+00 22+00 23+00 24+00 25+00 28+DO 27+00 28+90 28W0 30+00 31+00 32+00 33+00 34+00 35W0 38+00 37+00
P.
63
6
People for Progress Committee
Post Office Box 754
Mebane,North Carolina 27302
To: Craig Benedict, Orange County Planning Dir.
Subject: Efland- Buckhorn Access Management Plan
Date: March 25, 2019
The citizens/property owners of Orange County's Efland-Buckhorn community,members
of the People for Progress Committee,and officers and members of Hunter's Chapel African
Methodist Episcopal Church and Mount Moriah Missionary Baptist Church go on record in
opposition to the proposed Traffic Separation Study (dated September 11, 2017)
recommendations for Buckhorn Road and its vicinity.
We met on March 12, 2019 at Mount Moriah Baptist Church.We were joined by Mr. Craig
Benedict of the Orange County Planning Dept.and some of his staff members.They shared
with us the proposed changes to the traffic patterns along Buckhorn Road,and how it could
impact the community going forward.There was a lengthy discussion concerning the
cemeteries,new traffic patterns,noise pollution, safety,property values,and displaced
family homes.
It is our opinion that the proposed Traffic Separation Study and the Extraterritorial
jurisdiction (ETJ) of the city of Mebane is overreach and will only serve to erode and erase
our community, culture, history and institutions.
The property owners along the proposed traffic route (Buckhorn Road) are 95%black. The
two churches have been in existence for over 279 years collectively and are a staple in the
community. The proposed flyover will drastically impact our community in a negative way.
We are asking that the proposed Traffic Separation Study for Buckhorn Road be removed
from the plans and that closing the train crossing at Buckhorn Road is no longer an option.
Further,we ask the Orange County Board of Commissioners for a Resolution honoring the
wishes of our community, and that we can be assured that the Efland-Buckhorn-Mebane
Access Management Plan will not surface in the long range plans for the Efland-Buckhorn
community's residential and economic future.
Respectfully submitted,
Mrs. Na la Fearrington, Secretary
Rev.Vernon P. Burns, Pastor, Hunter's Chapel AME Church
Rev. Norman T.Umstead,Jr., Pastor, Mt. Mo'riah Baptist Church
Chair, People for Progress Committee
Efland-Buckhorn-Mebane Access Management Plan Reduced Connectivity 7
1 j ,
i _w I /' •-
�
-- - - - - - -
Ir.as — I-�
� I S
I �
z.
i ----------- -------J-- �" 1 i
G
I --
,
— I
--------- ---
-r - EW, - - - -
NG o NC, p
-N ST EX_7- .�;�.. T-Railroad
Church j 1P te7--- — ,
urch
1t —1 h �— T _
ivatej jCemet}ry J '7� --
��J 6ivatI4 j �_ T---
Priv e -
I Private i
Mebane ETJ I T �� =�0R.
v0 �_E—RV_ICE
eo �"
Roads Intersections
City of Mebane _--�"
Analyzed Routes Analyzed Improvements ---- -_
— 1
Mebane ETJ
— I
Mebane 2040 CTP Mebane 20,40 CTP —
---
CountyBoundary -45167
L•—r —2018 Orange County Planning 2018 Orange County Planning
(Further Analysis Required) (Further Analysis Required)
v 2017 Transportation Study 2017 Transportation Study \ - .� ,., - 0-9e G—ty Pbn-9 end m,ped—,
N'sh th Tr'—d'(312 612 01 9)
Efland-Buckhorn-Mebane Access Management Plan Reduced Connectivity $
r-----
'03
1 j i ► j j i i ',1y II � �� jig' /-�, i,;l � � 1
rn
1
j _ -L L` j L
7041
I �
1 I } I
- - - � - �
f
— i
1 — -- T.- — E
NGTO
WgHI --
— —
aiaChurch
hu Pnvate?rch
}
j
—
y at P�riva
._._
_ T
�Pt[iv ej � �__ jCemet�ry
I
�rivat�
11 i T i.
P�-iv�'te
� i Private i_ l , j � i � � ,' •�
Mebane ETJ ��� r._ \ Z ;� j
L._
f
\ �OQi S, RVIC
1
eo
4
Roads Intersections City of Mebane - ---.-\_ 1
Analyzed Routes Analyzed Improvements
- Mebane ETJ
Mebane 2040 CTP � Mebane 2040 CTP _ --- '
�--- .. " .
County Boundary
�•••—r —2018 Orange County Planning 2018 Orange County Planning k`
(Further Analysis Required) (Further Analysis Required) °�10Fee�
2017 Transportation Study 2017 Transportation Study
, \--, .•,.- p � 'i_ 1 • P - ., Nsh'th Tr'vad'(3/26/2019)