HomeMy WebLinkAboutAgenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 19, 2019 Action Agenda Item No. 8-i SUBJECT: Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building DEPARTMENT: Asset Management Services ATTACHMENT(S): INFORMATION CONTACT: Contract with Sasser Companies Angel Barnes, Capital Projects Manager, 919-245-2628 Travis Myren, Deputy County Manager, 919-245-2308 PURPOSE: To approve a construction contract with Sasser Companies for the remediation, repair, and reconstruction of the Phillip Nick Waters Emergency Services Building. BACKGROUND: The Phillip Nick Waters Emergency Services building experienced water intrusions that were exacerbated by heavy rains and flooding associated with Hurricanes Florence and Michael. As these intrusions were investigated, staff found mold growth behind walls under the windows, and in the building's heating and ventilating system. Based on this finding, the County retained a forensic engineer to determine the cause of the water intrusions. The engineer found that the intrusions were linked to the roof, windows, and split face concrete blocks. Due to the extensive work that will need to be completed for the repairs, the Emergency Services building has been removed from service and will not be utilized for operations until the cleaning, remediation, roof repairs, block sealing, and other repairs are complete. Boomerang Design was retained to provide a complete design for the remediation, repairs and construction. The prevalence and extent of mold growth requires the entire facility to be cleaned and remediated including the removal of all drywall inside the facility along the external walls. This will include removing all drywall, existing Styrofoam insulation and hat channels down to the concrete blocks. All contents inside the facility are to be professionally cleaned in addition to the remediation and restoration of the drywall, insulation, block sealing, and roof repairs. FINANCIAL IMPACT: There is no financial impact for this contract change as the BOCC approved the project budget at the February 5, 2019 regular meeting. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this item: 2 • GOAL: CREATE A SAFE COMMUNITY The reduction of risks from vehicle/traffic accidents, childhood and senior injuries, gang activity, substance abuse and domestic violence. • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation. Remediating and repairing the Philip Nick Waters Emergency Services building will create a safe working environment for staff. RECOMMENDATION(S): The Manager recommends that the Board approve and authorize the Chair to execute a construction contract with Sasser Companies, pending final review by the County Attorney, in the amount of $1,499,409 to remediate, repair, and reconstruct the Phillip Nick Waters Emergency Services building. 3 [Departmental Use Only] TITLE ES Remediation FY 2018-19 NORTH CAROLINA CONSTRUCTION AGREEMENT OVER $250,000.00 ORANGE COUNTY THIS CONSTRUCTION AGREEMENT (hereinafter called"Agreement"), made as of the 20th day of March, 2019, by and between Sasser Companies, (hereinafter called the "Contractor"), and Orange County, a political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange County," or "Owner"). WITNESSETH: That the Contractor and the Owner, for the consideration herein named, agree as follows: 1. CONTRACT DOCUMENTS; PRIORITY The Contract Documents consist of this Agreement, the General Conditions which are fully incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract Documents form the Contract. In the event of any inconsistency between or among the Contract Documents the Contract Documents shall be interpreted in the following order of priority: a. This Agreement and incorporated General Conditions attached as Exhibit 1. b. Designer approved and stamped construction documents and drawings and written specifications. c. Designer approved communications and/or field orders. d. Request for Proposals and addenda thereto. e. Proposal. 2. SCOPE OF WORK The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and Owner and in accordance with the following enumerated documents, which are made a part hereof as if fully contained herein: a. Construction Drawings prepared by Boomerang Design (Sheet G101, G102, G103, A001, A002, A101, A102, A301, R1, M000, M001, M002, M101, M102, M501, M601, M701, E000, E001, E101 dated 12/7/2018) b. Written specifications prepared by the Designer. c. Sasser Companies. proposal dated January 18, 2019 which fully describes the work to be Revised 12/18 1 4 performed, such work(hereinafter called the"Work"). d. Related documents listed under Section 2 above. 3. TERM AND SCHEDULING a. The Contractor agrees to commence work pursuant to the written Notice-to Proceed. b. The Contractor agrees to complete substantially all Work included by TBD, 2019. c. Time is of the essence with respect to all dates specified in the Contract Documents as Completion Dates. d. The Contractor shall perform the Work in the time, manner and form required by the Contract Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and Owner. 4. STANDARD OF CARE AND DUTIES OF CONTRACTOR a. The Contractor shall exercise reasonable care and diligence in performing the Work in accordance with the generally accepted standards of this type of Contractor practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the performance of these services. Contractor is solely responsible for the professional quality, accuracy and timely completion and/or submission of all work. b. The Contractor shall not load or permit any part of the Work to be loaded with a weight that will endanger its safety, intended performance or configuration. c. Contractor shall be responsible for all Contractor, Subcontractor, and Sub-subcontractor errors or omissions, in the performance of the Agreement together with the errors and omissions of any agent or employee of the Contractor or any Subcontractor or Sub-subcontractor. Contractor shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to the Owner. d. Contractor is an independent contractor of Owner. Any and all employees of the Contractor engaged by the Contractor in the performance of any work or services required of the Contractor under this Agreement, shall be considered employees or agents of the Contractor only and not of the Owner, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Contractor. e. Contractor shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal -discrimination laws, policies, rules, and regulations and the Orange County Non-Discrimination Policy and Orange County Living Wage Policy (each policy is incorporated herein by reference and may be viewed at http://www.oran-e�tync. og v/departments/purchasing division/contracts.php). Any violation of the Orange County Non-Discrimination Policy is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County. This paragraph is not intended to limit and does not limit the definition of breach to discrimination. Revised 12/18 2 5 f. If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Contractor represents that it and/or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. g. The Contractor shall supervise and direct the Work efficiently and with the Contractor's best skill and attention. Except as specifically set forth in the Contract Documents the Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction, and for safety precautions and programs in connection with the Work. The Contractor shall be responsible to see that the finished Work complies accurately with the Contract Documents. h. The Contractor shall appoint a competent Project Manager with general authority to manage the Project for the Contractor. The Contractor shall also keep on the Project at all times during the Work of the Contractor a competent Resident Superintendent and necessary assistants who shall not be replaced without prior written approval by the Designer or by the Owner if a Designer is not retained for the Project. i. If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the Contract Price if and when directed by the Designer. j. The Contractor shall attend all progress conferences and all other meetings or conferences. The Contractor shall be represented at these progress conferences by a representative having the authority of the Project Manager and by such other representatives as the Designer may direct. k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the Contractor. Any Work in which untested materials are used without approval or written permission of the Owner and/or Designer shall be removed and replaced at Contractor's expense. 1. The Contractor shall obtain all necessary permits including all permits required to complete the Work in compliance with local, state, and/or federal law. 5. PAYMENT & TAXES a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- exceed One Million, Four Hundred Ninety-Nine Thousand, Four Hundred Nine Dollars ($1,499,409.00). Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the Owner's Representative, generally the Designer if a Designer is retained on the Work, a Request for Payment for work done during the previous calendar month. (i) The Request for Payment shall be in form of a standardized invoice or AIA Document G702-703 appropriately addressed to Owner's Representative at Boomerang Design 6131 Falls of Neuse Road, Ste 204, Raleigh, NC 27609 and shall show substantially the value of work done during the previous calendar month. Revised 12/18 3 6 (ii) The amount due for payment shall be ninety-five percent (95%) of the value of work completed since the last Request for Payment and this amount shall be paid by the Owner on or before the last business day of the month. Owner shall retain five percent (5%) (the "Retainage"). (1) Upon Owner's Representative's certification that fifty percent (50%) of the Work has been satisfactorily completed Retainage shall be reduced to two and one half percent(2%2%). (2) Upon Owner's Representative's certification that ninety percent (90%) of the Work has been satisfactorily completed Retainage may be discontinued. Retainage may be discontinued, at Owner's Discretion, so long as work continues to be completed satisfactorily and on schedule. (iii) Final payment shall not be due to the Contractor until thirty (30) days after Final Completion of the Work, including punch list work, has been satisfactorily completed and an appropriate Affidavit, Indemnification, and Release as required in Section 8(d) below has been received by Owner. b. Should Owner reasonably determine that Contractor has failed to perform the Work related to a Request for Payment, Owner, at its discretion may provide the Contractor ten (10) days to cure the breach. Owner may withhold the accompanying payment without penalty until such time as Contractor cures the breach. (i) Should Contractor or its representatives fail to cure the breach within ten (10) days, or fail to reasonably agree to such modified schedule, Owner may immediately terminate this Agreement in writing, without penalty or incurring further obligation to Contractor. (ii) This section shall not be interpreted to limit the definition of breach to the failure to perform the Work related to a Request for Payment. c. The Contractor has included in the Contract Price and shall pay all taxes assessed by any authority on the Work or the labor and materials used therein. It shall be the Contractor's responsibility to furnish the Owner documentary evidence showing the materials used and sales and use tax paid by the Contractor and each of its subcontractors. d. Should the Owner receive notice that the Contractor has failed to pay a Subcontractor for the Work performed related to a Request for Payment, Owner shall have the authority to withhold payment of the disputed amount until parties resolve their dispute. Failure to pay the Contractor pursuant to this section of the Agreement shall not be deemed to be a breach of the Agreement. 6. NON—APPROPRIATION a. Contractor acknowledges that Owner is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. Revised 12/18 4 7 b. In the event that public funds are unavailable and not appropriated for the performance of Owner's obligations under this Agreement, then this Agreement shall automatically expire without penalty to Owner immediately upon written notice to Contractor of the unavailability and non-appropriation of public funds. It is expressly agreed that Owner shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement,but only as an emergency fiscal measure during a substantial fiscal crisis. c. In the event of a change in the Owner's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects Owner's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to Owner upon written notice to Contractor of such limitation or change in Owner's legal authority. 7. NOTICES Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Owner: Contractor: Orange County Sasser Companies Attn: Angel Barnes PO Box 10 P.O. Box 8181 Whittset,NC Hillsborough,NC 27278 27377 8. MISCELLANEOUS a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties and Obligations imposed by state, federal or local law,rules, regulations and ordinances. b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or duty granted them under the Contract Documents, nor shall any act or failure to act constitute any approval except as specifically agreed in writing. c. The Work shall be tested and inspected as required by the Contract Documents and as required by law. Unless prohibited by law the costs of all such tests and inspections related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building Codes shall be borne by the Contractor. The costs for material and structural testing shall be conducted by an independent third parry at the expense of the Owner. Delays related to any of the aforementioned tests and inspections shall not be grounds for delaying the completion of the work. If any such tests and inspections reveal deficiencies in the Work such that the Work does not comply with terms or requirements of the Contract Documents and/or the requirements of any code or law the Contractor is solely responsible for the cost of bringing such deficiencies into compliance with the terms of the Contract Documents and/or any code or law. d. Should the Designer, if a Designer is retained for the project involving the Work, or Owner reject any portion of the Work for failing to comply with the Contract Documents Contractor shall immediately, at Contractor's expense, correct the Work. Any such rejection may be made before or after substantial completion. If applicable, any additional expense borne by the Designer under this section shall be paid at Contractor's expense. Revised 12/18 5 8 e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its entirety without the prior written consent of the Owner. 9. CONSEQUENTIAL DAMAGES a. Owner and Contractor mutually waive any claim against each other for consequential damages. Consequential Damages include: (i) Damages incurred by Owner for loss of use, income, financing, or business. (ii) Damages incurred by Contractor for office expenses, including personnel, loss of financing, profit, income, business, damage to reputation, or any other non-direct damages. 10. ENTIRE AGREEMENT All of the documents listed, referenced or described in this Agreement, the written Notice-to-Proceed, together with Modifications made or issued in accordance herewith are the Contract Documents, and the work, labor, materials, and completed construction required by the Contract Documents and all parts thereof is the Work. The Contract Documents constitute the entire agreement between Owner and Contractor. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. If any provision of the Agreement or General Conditions shall be declared invalid or unenforceable,the remainder of the Agreement shall continue in full force and effect. [SIGNATURE PAGE TO FOLLOW] Revised 12/18 6 9 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day and date first above written in a number of counterparts, each of which shall, without proof or accounting for other counterparts,be deemed an original contract. ORANGE COUNTY: CONTRACTOR: By: By: Penny Rich, Chair Kevin Sasser, President Orange County Board of County Printed Name and Title Commissioners Revised 12/18 7