Loading...
HomeMy WebLinkAboutOUTBoard agenda 022019 AGENDA Orange Unified Transportation Board February 20, 2019 6:30 p.m. You can bring your laptops/tablets if you would like to use them. Whitted Building, Room 230 300 West Tryon Street, Hillsborough *PLEASE NOTE CHANGE IN LOCATION* Page Item Title 1. Call to Order and Determination of Quorum 2. Introduction of new at-large OUTBoard member 3-14 3. Approval of Minutes from January 16, 2019 4. Consideration of Additions to the Agenda 5.0 Transit Advisory Services/Orange County Public Transportation (OCPT) This section of the agenda is addressed jointly by the OUTBoard and supplemental staff from other County departments (Aging; DSS; Housing, Human Rights and Community Development; Health; and Child Support Enforcement) to address transit services. 5.a. OCPT Administrative Updates (Theo Letman) — Information to be provided at the meeting. OUTBoard/Transit Advisory Services Action: Receive and review information, provide comments 15-26 5.b. OCPT/OCCO Update (TeLeishia Holloway, Allyson Coltrane) OUTBoard/Transit Advisory Services Action: Receive and review information, provide comments. Transit Advisory Services (TAS) Comments/Questions (Theo Letman) - Opportunity 5.c. for TAS members to offer transit related comments and ask questions regarding issues not on the agenda. OUTBoard/Transit Services Action: Provide comments and questions, receive feedback. 6. Regular OUTBoard Agenda (Action Items) 27-28 6.a. Bicycle Safety Implementation Subcommittee Report (Abigaile Pittman) OUTBoard Action: Receive the information and provide any comments or direction that the Board might have. 29 7.0 Staff Updates 31 7.a. FY 2020-2029 Orange County Strategic Transportation Investment Program (STIP) Summary 33-38 7.b. Orange County & NCDOT Highway Luncheon Meeting Notes 39-40 7.c. MPO/RPO NCDOT Protect Updates OUTBoard Action: Receive the update information and provide any comments that the Board might have. 8.0 Adjournment — The next regularly scheduled meeting date is March 20, 2019. Charge of the OUTBoard (from Section 1, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. From time to time the OUT Board may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUT Board shall serve in an advisory capacity to the Planning Board. Meetings (from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Meetings are held on the third Wednesday of the month. The start time and location of the meeting shall be included on the agenda and shall typically be 6:30 p.m. at the Orange County West Campus Office Building located at 131 West Margaret Lane, Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any special circumstances, provided the information is included on the distributed agenda. Item 3.a DRAFT 3 1 MINUTES 2 ORANGE COUNTY OUTBOARD 3 JANUARY 16,2019 4 REGULAR MEETING 5 6 MEMBERS PRESENT: Art Menius, At-Large Representative (Chair); Jenn Sykes, At-Large Representative; Ed Vaughn, 7 Cedar Grove Township Representative; David Laudicina, Cheeks Township Representative; Heidi Perry, At-Large 8 Representative; Eric Broo, At-Large Representative; Amy Cole, At-Large Representative, Ram Athavale, Chapel Hill 9 Township Representative; Randy Marshall, Bingham Township Representative; 10 11 MEMBERS ABSENT: Brantley Wells (Vice Chair), Hillsborough Township Representative; Donna Musson, Eno Township 12 Representative; Johanna Birckmayer,At-Large Representative;Alyson West,At-Large Representative; 13 14 STAFF PRESENT: Abigaile Pittman, Transportation/Land Use Planner; Nish Trivedi, Transportation Planner; Tina Love, 15 Administrative Assistant III; 16 17 OTHERS PRESENT: Matthew Day, TARPO; Tina Moon, Town of Carrboro 18 19 AGENDA ITEM 1: CALL TO ORDER,DETERMINATION OF QUORUM AND INTRODUCTION OF NEW MEMBERS 20 Art Menius called the meeting to order. 21 22 AGENDA ITEM 2: APPROVAL OF MINUTES 23 Art Menius: Change line 151 change relative to favorable. 24 25 MOTION by Art Menius to approve the November 28, 2018 OUTBoard Minutes with correction. Seconded by Randy 26 Marshall. 27 VOTE: UNANIMOUS 28 29 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 30 There were none. 31 32 AGENDA ITEM 4: REGULAR OUTBOARD AGENDA 33 34 Art Menius: Nish isn't here so where do you want to start? Abigaile? 35 36 Abigaile Pittman: I can start with the Bicycle Safety report—page 23. 37 38 AGENDA ITEM 413: BICYCLE SAFETY IMPLEMENTATION SUBCOMMITTEE REPORT(ABIGAILE PITTMAN) 39 Abigaile presented the status of the Bicycle Safety Subcommittee activities and next steps. 40 41 Heidi Perry: For the signs being put up in the County, it would be really nice if along with those signs, if there were signs 42 the state would put up that say "4 feet or change lanes to pass". We've never asked them about this and since we are 43 trying to make people aware of the new law this would be a reinforcement of the new laws passed in 2016. 44 45 Amy Cole: I have a question regarding conversations we had at the last meeting about the signage for the reduced speed 46 on Orange Grove Road. You mentioned it would be discussed at the next NCDOT luncheon meeting, how did that work 47 out? 48 49 Abigaile Pittman: I put it on that agenda for the meeting that was held on January 91h and NC DOT is going out to look at 50 the intersection of Oakdale and Orange Grove Road for any additional potential SPOT safety improvements which could 51 include signage or speed limits or flashing lights, etc. In addition, we have a staff engineer, Chris, preparing an estimate 52 for preliminary engineering the purpose of entering discussions with Hillsborough about the sidewalks and maintenance. 53 The 15 bicycle safety road signs are planned to be up by the end of this week. The website has all the links, and you can 4 54 go to it either through the Orange County website or directly. We need to decide on the social media ads, radio ads, etc. 55 and finalize the rest of the budget by the end of February. 56 57 Heidi Perry: For the signs being put up in the County, it would be really nice if along with those signs, if there were signs 58 the state would let up put up that say'A feet or change lanes to pass". We've never asked them about this and since we 59 are trying to make people aware of the new law this would be a reinforcement of the new laws passed in 2016. 60 61 AGENDA ITEM 4A: ORANGE COUNTY TRANSPORTATION PRIORITY LIST FOR SPOT 6.0 I FY 2022-2031 STIP (NISH 62 TRIVEDI)- 63 Nish Trivedi gave a presentation on SPOT 6.0. He spoke on the process that MPOs and local jurisdictions go through to 64 submit projects to be included in the next Statewide Transportation Improvement Program(STIP). 65 66 Heidi Perry: Who determines the scoring criteria? 67 68 Nish Trivedi: The NCDOT Board of Transportation (DOT) determines the weights and criteria for the statewide, regional, 69 and division pots. A working group is meeting regularly and will make final recommendations to the Board of 70 Transportation? 71 72 Matt Day: DOT always defer to the working group. 73 74 Heidi Perry: Who comprises the working group? 75 76 Matt Day: The working group is 12 people from NCDOT and 12 non-NCDOT people.They have lots of meetings. 77 78 Ram Athavale: What do you mean by centerlines? 79 80 Nish: Centerline is the center of the road or center of right-of-way. NCDOT uses it to avoid double counting roads. It does 81 not take into account number of lanes. Centerline miles is simply length of road from one end to another. 82 83 Matt Day: DOT has two different ways of counting mileage;centerline and lane miles. 84 85 Nish Trivedi: Federal money is used for bike/ped projects and it is tied to STIP.The Federal money is the SDBGDA. 86 87 Matt Day: You can submit them for STI, there is federal money that is specifically for bike and projects. The federal money 88 is made part of the state's STIP. 89 90 Heidi Perry: And it requires a local match? 91 92 Nish Trivedi. Yes,these require local match and local administration. 93 94 Matt Day: Yes. But STBGDA is available to MPOs not RPOs, you can get federal TAP funds through RPO and anyone 95 can get them through STI. 96 97 Nish Trivedi: There are federal Transportation Alternative Program (TAP) funds TAP also requires local match and local 98 administration. Local match is just one major cost of the project and Local Administration is also another additional cost. 99 Local jurisdictions have to pay both. Orange County has not addressed this issue yet. 100 101 Heidi Perry: Two years ago, wasn't $4 million dollar rescinded back to the federal government because no one could 102 gather local matches for their projects? 103 104 Matt Day: This was based on the recession that happened a few years ago. There's a certain amount of that federal 105 money that has to be spent in towns less than 5,000 people, and they had a hard time getting towns that were that small to 106 contribute money. DOT is using some of those unused TAP funds on ADA curb-ramp improvements, for municipalities in 107 the state. 5 108 109 Heidi Perry: Where is Mebane? DCHC MPO, TARPO? 110 111 Nish Trivedi: Mebane is part in Orange County and majority in BG MPO Alamance County. It is in BG MPO in Orange 112 County, and Orange County is also in BG MPO. 113 114 Jenn Sykes:They are mutually exclusive,color coded in the maps. 115 116 Nish Trivedi continued his presentation referring to Attachments on priorities for TARPO, BG/MPO, &DCHC/MPO. 117 118 Nish Trivedi: Matt correct me if I'm wrong, but if you submit a highway project using a NCDOT standard street cross 119 section that has bike lane, NCDOT will put in that bike lane as part of the highway modernization project. 120 121 Matt Day: DOT is in the process of updating their bike/ped policy. My expectation is that once that update is done, the 122 answer would be, yes. Right now, I can't tell you that the answer is,yes. 123 124 Nish Trivedi: Staff recommends carrying forward and updating the County Priorities used in 5.0. Instead of asking for a 125 paved shoulder we are asking for a highway project with a bike lane. We would use the NCDOT standards street cross 126 section that has bike lane and sidewalk. The sidewalk is included should NCDOT ever change their policy 127 128 Matt Day: If you're going to submit these as highway projects, the DOT thinks you are saying the primary purpose of the 129 project is to modernize the highway with the bicycle lanes as a secondary benefit. 130 131 Nish Trivedi: These are modernization where the focus is improving safety, bring roads to current standards as the 132 primary purpose and the bike lane, pedestrian facility, multimodal component is a secondary benefit. 133 134 Matt Day: If the primary purpose of the project is to provide bike lanes then submit it as a bike project. If the primary 135 purpose is to improve and modernize the road with the bike lanes as a secondary benefit, then submit as a highway 136 project. 137 138 Nish Trivedi: If the bike is primary then you're required to provide local match and local administration. The County has 139 never addressed local match or local administration. I do not believe we have time to address it prior to submission. I'm 140 recommending these as highway modernization projects with the bike lane as a secondary benefit. These are all 141 modernization projects with two exceptions: NC 86 and NC 54 which the staff is recommending as widening projects. The 142 NC-86 is identified because it is in the current adopted TARPO CTP. 143 144 Matt Day:Yes it is in the CTP but just because it is in the CTP does not mean you may want to submit it. 145 146 Nish Trivedi: Yes, the reason these projects are identified is because it is for the County Priorities for SPOT 6 and later for 147 SPOT 7, 8, etc. Staff is identifying a full list that we will bring to you every SPOT cycle rather than reinventing the wheel 148 each time. 149 150 Heidi Perry: In order to make it a highway project with a modernization of bike lanes, does it have to have a curb and 151 gutter? 152 153 Matt Day: No. If you look at the DOT standard cross-sections and desire a bike lane, you will see curb and gutter. 154 Anything that doesn't have a curb and gutter, DOT will typically do a 4-foot paved shoulder, not a full 5-foot. 155 156 Nish Trivedi: No, I used that NCDOT standard street cross section as it is the closest one that reflects the existing 60' 157 right-of-way with a bike lane. I can update the recommendation of having a four-foot paved shoulder instead of a curb and 158 gutter, but it will not be a bike lane. 159 160 Heidi Perry: What makes it a modernization? 161 6 162 Nish Trivedi: Modernization projects are what NCDOT uses to bring the roads to current"modern"standards. 163 164 Matt Day: It's generally projects to make the existing travel lanes to current safe standards, or to straighten out some 165 curves and to add shoulders if necessary. 166 167 Heidi Perry: What I did like was the 11-foot travel lane.Would 11-foot travel lanes be allowed? 168 169 Nish Trivedi: Yes. The majority of the cross section are 11-foot travel lane. 170 171 Heidi Perry: Where do separated multi-use paths stand? 172 173 Nish Trivedi: I can cover that at the very end of this presentation. Multi-use paths or shared use paths or side paths are all 174 considered independent bike/ped projects and funded through federal STBGDA. State funds cannot be used for them. 175 176 Heidi Perry. Does that count as part of a modernization? 177 178 Nish Trivedi and Matt Day: No. 179 180 Matt Day: There is a project in TARPO that has a multi-use path as part of a highway project but such projects falls under 181 the NCDOT Cost Share Policy which local jurisdictions have to pay. 182 183 Heidi Perry: Is this the 20% local match? 184 185 Nish Trivedi: No, cost share policy is based on the local jurisdiction population. Larger populated local jurisdictions pay 186 more for such projects. Durham County pays 50% 187 188 Eric Broo:What about sidewalks? 189 190 Nish Trivedi:This applies to sidewalks and I will show how this policy works at end of presentation. 191 192 Randy Marshall: Looking at Old Greensboro, we can modernize but not include the curb and gutter and sidewalk; is that 193 right? I thought DOT didn't do sidewalks. 194 195 Nish Trivedi: Yes, They administer and build sidewalks, through their pedestrian policy that requires local jurisdiction to 196 pay a percentage of the cost. They do not maintain them. 197 198 Randy Marshall. Why would you put curb, gutters, and sidewalks on Old Greensboro Highway when nobody is there to 199 maintain them? Why not just put the improvements of 11-foot travel lanes and 4-foot paved shoulders. Put something in 200 there that's likely to score higher and be more cost effective. 201 202 Heidi Perry:These projects were in there last year. 203 204 Nish Trivedi: Yes, these were in there as paved shoulder projects. The paved shoulder projects were not carried forward 205 at the MPO. Paved shoulder projects were not submitted by MPO to NCDOT because they could not be carried forward. 206 Old Greensboro road was carried forward as a modernization project, not just paved shoulder. 207 208 Heidi Perry: It wasn't submitted last time, and I'm not sure why? 209 210 Nish Trivedi: We did submit it and it is part of SPOT 5.0. It was given a regional and divisional score but it was too low to 211 give it points. Neither OUTBoard nor BOCC recommended it as a priority when it came to local input points so it did not get 212 any points. 213 214 Matt Day: It was submitted and scored, but it didn't score high enough for us to put points on. 215 7 216 Nish Trivedi: As part of your recommendation, would you be asking for removing curb and gutter on all these projects? 217 The focus for these staff recommendations is to modernize the roads, get 11-foot travel lanes and bike lanes. 218 219 Randy Marshall. I think so. Curb and gutter and sidewalk can't happen. We don't have a municipality to maintain, and we 220 should never put it in there. 221 222 Eric Broo: Would that be deemed by the DOT as too costly, nixing the project when we could otherwise get 80% of what 223 we really want? 224 225 Jenn Sykes: Does changing it up the probability of a higher score? 226 227 Nish Trivedi: Cost is a scoring criteria, reducing the cost may improve its score. 228 229 Matt Day: Curbs and gutters will be more expensive. 230 231 Nish Trivedi: Without curb and gutter, there will be no bike lane,just a 4-foot paved shoulder. 232 233 Matt Day: That will be cheaper and improve the score. We are working on ways to improve the modernization aspect so 234 they do not compete with capacity aspects. Perhaps scale differently. 235 236 Heidi Perry: What about bike counts as a provision like along Dairyland Road?There are more cyclists there on weekends 237 then cars. 238 239 Randy Marshall: If you're proposing to do a four-foot bike lane, that would wipe out the ditch, and you would have to do 240 the ditch beyond that and buy the right of way which would run the score down. 241 242 Nish Trivedi: And the length of the road. In SPOT 5.0 the length of Old Greensboro Road was from Alamance County into 243 DCHC MPO. It was not broken into segments. Matt, If we have a projects list and they cover a whole road, can we in the 244 MPO/RPO technical committees and submit only a portion of it? 245 246 Matt Day: As long as there's a logical reason for why we're breaking it at a certain point. 247 248 Nish Trivedi: This list is to get the whole corridor. In the MPO/RPO meetings, they will be divided into separate sections 249 for better scoring. That is why as part of staff recommendations we are providing you the two bases for breaking the 250 segments, Traffic Count(AADT) and Crashes (number and severity) both are variables used in calculating the quantitative 251 scores. 252 253 Heidi Perry: I would like to keep all these on here for discussion. I agree with Randy regarding removing the curb and 254 gutters and keeping them on here as paved shoulders. I would like for there to be some way of saying that the shoulder 255 should be able to withstand the same amount of traffic as the roads. 256 257 Nish Trivedi: That's why staff is recommending these as highway modernization projects, to bring that whole road to a 258 current standard, not just a road with a 2-foot paved shoulder but to ensure sufficient shoulder for safety purpose and/or 259 bike lane. 260 261 Heidi Perry: At some point, we might be able to add another foot to each of these and make them true bike lane projects. 262 I think we need to keep them on here as they are just so they don't go away without some reason for removing them. 263 264 Nish Trivedi: When MPO/RPOs submit highway projects to NCDOT, they must provide a standard street cross section 265 they want the road to be for scoring purpose. 266 267 Matt Day: When we submit these to DOT we have to pick one of their standard cross sections that we submitted it as. 268 We can write in the description what we'd like if one of those standard cross section doesn't exactly match up with what we 269 want. 8 270 271 Nish Trivedi: We can pick a NCDOT standard street cross section and modify it for what we want, like no curb and gutter 272 and/or 5-foot paved shoulder. 273 274 Eric Broo: So Old Greensboro Road should be sliced into two projects? 275 276 Nish Trivedi: One of the criteria is the cost benefit of the project. If it's a shorter portion, the cost is reduced and it's 277 benefit may be higher, thereby scoring better. Segments have a better chance of scoring better than the entire corridor. 278 279 Heidi Perry: If we put in the curb and the gutter, it automatically becomes a bike project. Because it's going to have a bike 280 lane. It's not a shoulder any more it's a lane for bikes 281 282 Nish Trivedi: The curb and gutter does not make it a bike project. When a project's sole purpose is to improve the bike 283 mode of travel that is what makes it a bike project. Simply asking for a bike lane makes it a bike project. Same with asking 284 for a sidewalk makes it a pedestrian project. 285 286 Matt Day: You could have a modernization project that has curbs and gutters and it would be a highway project as long 287 has your stated purpose of the projects is to improve that road. 288 289 Eric Broo: So select stretches that might get a different treatment might be obvious that they were for cyclists and be 290 discarded because there's no other logical reason for doing it? 291 292 Matt Day: I think if you had different designs for different sections then yes that would become obvious. 293 294 Nish Trivedi:That is why I am recommending congestion and safety be the factors used in breaking up segments and both 295 of them are standard criteria for SPOT scoring and geared toward highway projects rather than bike/ped. 296 297 Eric Broo: When do you intend to submit these? 298 299 Nish Trivedi: I am looking for your recommendation right now because both or our recommendations goes to the BOCC for 300 their final decision. We need to get these projects identified by March so we can submit them to MPO/RPO. 301 302 Eric Broo: The bicycle subcommittee could meet and talk about other specific segments? 303 304 Heidi Perry: I think we can't do that without the OUTBoard's recommendation. 305 306 Art Menius: Nish posed the question of whether we wanted to pull curb and gutter and sidewalk out of these projects do 307 we have a consensus on that or need further discussion? 308 309 Nish Trivedi: If that is your recommendation, I will update these entire lists by removing the curb and gutter and sidewalks, 310 and recommend County Priorities as Highway Modernization projects with a 5 foot paved shoulder, rather than 4-foot 311 which matching the NCDOT standard street cross section is 2B. 312 313 Randy Marshall: Will this paved shoulder be built to the same standards as the road? 314 315 Nish Trivedi: Yes, that's why it would be modernized to current standards. 316 317 Nish Trivedi: Do you get the updates for scoping? 318 319 Matt Day: With any kind of sizable project of the MPO/RPO,you should receive notices. 320 321 Art Menius: Where did the discussion about segmenting Old Greensboro project end up? 322 9 323 Nish Trivedi: As Matt said, it's better to segment these sections out. Right now, I'm listing it as the entire corridor as a 324 County concern/priority. Staff recommends using traffic count and crashes as the criteria for separating those segments. 325 It's listed as the entire corridor because we are recommending the entire corridor be a priority for the County for now and 326 future SPOT cycles. By breaking the corroder down into segments, each segment has a better chance of receiving a 327 higher score. 328 329 Matt Day: The reason for segmentation is to cut down the cost to improve its score. 330 331 Nish Trivedi: I will keep the board updated as to what segment will be. Prior to MPO/RPO submitting it to NCDOT, they 332 will go through a 30-day public review period before their policy boards adopts the final project submission list. 333 334 Eric Broo: Does the DOT look at pedestrians and bicyclists when it comes to accidents? 335 336 Nish Trivedi: Yes. Safety was a criteria in SPOT 5.0 and it was based on 20% crash density, 20% crash severity, 20% 337 critical crash rate, and 40% safety benefits. In SPOT 5, it accounted for 10% of the total score in Statewide, Region, and 338 Division.This criteria is expected to be carried forward with SPOT 6.0 339 340 Eric Broo: That includes vehicle and bicycle interactions? 341 342 Nish Trivedi: NCDOT keeps record of all reported crashes, the crash data includes whether it involved pedestrian, cyclist, 343 or animal, as well as hitting a pole, object or rear ending someone. 344 345 Nish Trivedi: Your current recommendation is to remove curb and gutter, have 11-foot travel lanes, and a four-foot paved 346 shoulder increased to five,and I will find the standard cross section NCDOT uses. Should I remove sidewalks as well? 347 348 Heidi Perry: I think so. 349 350 Eric Broo: If there is a school or community center in the future where there should be a sidewalk, I think it would be 351 reasonable to include that portion as a sidewalk. 352 353 Nish Trivedi: Before we complete with TARPO, I want to mention the two projects that were mentioned for widening. As 354 Matt mentioned earlier, NC-86 is part of the adopted Comprehensive Transportation Plan (CTP). I haven't been given 355 direction on whether we're updating the CTP or not. The CTP calls for NC-54 and NC 86 to be widened. 356 357 Matt Day: To provide a little background, NCDOT used to have a policy that was considered NC-86 as a strategic highway 358 corridor. Under the policy, NCDOT required that all plans had to show NC 86 as a four-lane expressway from Hillsborough 359 up to Virginia. That policy was removed a few years ago and we no longer have to show it as a four-lane express way. It 360 was never justified based on the volume of traffic. Recently, when the MPO did their CTP, it did not show a widening of 361 their section of it, so the RPO portion picks somewhere probably a couple miles north of Hillsborough. 362 363 Heidi Perry: We should look at what the population growth is for that part of the county. 364 365 Matt Day: If there's some question about whether that project is necessary, you have on opportunity to request that DOT 366 do an update to the plan to decide if that project is something that is based on updated forecasts, is necessary from the 367 traffic prospective, or something that can be removed from the plan. 368 369 Nish Trivedi: What do I need to do to request that from NCDOT? 370 371 Matt Day: Have the Board of Commissioners make a request to the RPO and then the RPO can make a request to DOT. 372 1 think Nish was also going to talk about the widening of 54. The current CTP shows widening only being necessary out to 373 Orange Grove Road, but a recent corridor study suggested it needed to be widened all the way to Graham so that's 374 another thing you would want to go back and revisit in the plan. 375 10 376 Nish Trivedi: As Matt Day said those two sections are two separate projects that are being recommended as part of this 377 and are broken by traffic count as well. 378 379 Abigaile Pittman: I recall from 2013 that the commissioners actually it was either a letter or a resolution they sent with it? 380 381 Matt Day: Yes. Specific language inserted into the plan document itself was the only reason NC-86 widening was being 382 put in the plan, because of the strategic highway corridor. 383 384 Nish Trivedi: Would I need to get our board's recommendation to have that removed in updating the CTP? 385 386 Abigaile Pittman: Two of these projects are beyond the TARPO boundary, so I would suggest that you be thoughtful of 387 the language and not include something that is in these other jurisdictions. 388 389 Nish Trivedi: I believe that is referring to Dairyland Road and NC-54. Your attachments document which corridors 390 continue into DCHC MPO so we will be coordinating these with them. 391 392 Abigaile Pittman: And NC-86 going down to Eubanks. 393 394 Art Menius: I think the ones we are specifically talking about are NC-86 north of Hillsborough and NC-54 west of Carrboro. 395 396 Nish Trivedi: Staff is recommending that these be considered as new project and priorities for Orange County. I ask that 397 the OUTBoard recommend the BOCC to request TARPO to request NCDOT investigate NC-86 and update the CTP 398 accordingly. 399 400 Matt Day: You could request NCDOT do an update to look at NC-86, and if their analysis says that the traffic forecast 401 does not justify widening,then remove it. 402 403 MOTION by Eric Broo to have the BOCC request that the RPO request a reevaluation of NC 86 from NCDOT. Seconded 404 by Ram Athavale. 405 VOTE: UNANIMOUS 406 407 Nish Trivedi: What about NC 54? It is in TARPO CTP,this is a portion that goes Orange Grove Rd. 408 409 Matt Day: That stops at Dodson's crossroads because that is the boundary between the MPO and RPO. 410 411 Nish Trivedi: So the update should be the removal of Fayetteville Rd. and leave it to Dodson crossroads? 412 413 Heidi Perry: I thought the project was in flux after the corridor study? 414 415 Nish Trivedi: The Corridor Study is technically complete; it has been presented to all member jurisdictions and agencies. 416 Carrboro is currently working with DCHC MPO for additional work on it. NCDOT is satisfied with it. DCHC MPO is the only 417 agency responsible for adopting it. Graham has approved the study. 418 419 Tina Moon: There's two different issues here. There's two different jurisdictions in terms of the MPO vs. RPO. We should 420 be thoughtful with staff about knowingly having our elected officials at odds with one another. 421 422 Eric Broo: Since the study is still with the town and MPO to review the data; is it reasonable to wait? 423 424 Matt Day: The MPOs and RPOs get to submit projects, but so does the NCDOT division. If we choose not to submit, 425 then the division is going to submit this as a project. 426 427 Heidi Perry: Is it possible to ask the BOCC to postpone a decision on whether to add this project until the initial analysis is 428 done? 429 11 430 Nish Trivedi: You could recommend this project be tabled till MPO acts on the study. 431 432 Heidi Perry: I can't support the project until I get the rest of the requested answers. 433 434 MOTION by Heidi Perry to ask the BOCC table this project until the MPO work on it is complete: Seconded by Eric Broo. 435 VOTE: 8-1; Opposed by Jenn Sykes. 436 437 Jenn Sykes: There are people who can't afford to live and they must use a car to get to work. And we are an economic 438 hub and we need to be very cognizant of that because the consequences of not making it easier to work. 439 440 Matt Day: I would suggest that you also hold off and do the NC-86 and NC-54 updates to the CPT at the same time. If 441 we're going to hold off making any decisions about what to do with NC-54, then I would also recommend that you hold off 442 on making any requests about 86. 443 444 Heidi Perry: So don't ask the RPO to update the CTP on NC-86? 445 446 Matt Day: We can't ask DOT to do an update on one thing now and then come back six months from now for another 447 update. If we're going to have multiple requests,we need to make it all as one request. 448 449 Heidi Perry. So, what's the timing in terms of these two projects, because we're waiting for more information on NC-54. 450 So,we don't want to ask them to do the CTP on that,yet? 451 452 Matt Day: I would say even if we ask them to do a CTP update now on NC-86, you're not going to get that back for 453 another year, year and a half. 454 455 Heidi Perry: So,what should our request be? 456 457 Nish Trivedi: You can recommend both NC-86 and NC-54 be tabled till MPO/RPO CTPs are updated. 458 459 MOTION by Eric Broo, Seconded by Heidi Perry. 460 VOTE: 9-0;Abstention by Jenn Sykes 461 462 Jenn Sykes. The development issues aren't worth waiting on. The traffic congestion is already there and it's going to get 463 worse. It's going to get worse before it gets better, and I'd rather just try to get something started. This area is the 464 economic hub of the rural area. 465 466 Heidi Perry: We want to get cars off of roads. 467 468 Jenny Sykes: That may be ideal but it is not practical especially in rural Orange County. There people will always need to 469 drive to get to work. 470 471 Nish Trivedi: The corridor study provides specific intersection improvements along NC-54 as short term solutions. 472 473 Matt Day: When we submit these things, we try to keep them as vague as possible. We don't get into the specifics of turn 474 lanes, how long it is, or which direction or any of that. 475 476 Eric Broo: Would the details be worked through a public process? 477 478 Nish Trivedi: When STIP projects are committed and implemented, NCDOT host local officials and public meetings during 479 preliminary design. They take public comments so they can better finalize the design of these projects. Regarding the 480 other County Priorities that cross into Carrboro, they will be updated to remove curb and gutter but we will continue to 481 coordinate with Carrboro. Just because they may be part of Orange County's priority list, they may not be submitted by us, 482 Carrboro may choose to submit them. 483 12 484 Heidi Perry: Old NC-86 is a road that I think need a separated mixed-use path between Hillsborough and Carrboro. 485 Maybe along with modernization. I just feel that a bike lane or a shoulder on that road is not going to take care of the 486 problems. 487 488 Nish Trivedi: A mixed-use path, shared-use path, side path, or any independent bike/ped facility like is part of two different 489 funding and administration requirements. Federal STBGDA which requires 20% local match and local administration or a 490 sidewalk that is part of NCDOT's Pedestrian Policy and requires 50% cost share for first 5-feet width and 100% local cost 491 for any additional width. 492 493 Matt Day: Yes, I think in theory you could do that. DOT will administer it through the sidewalk cost share policy. If you 494 were to submit as a stand-alone project, it would be only a 20 percent match. 495 496 Abigaile Pittman: I think they would need right of way as well, does that influence? 497 498 Nish Trivedi: Old NC-86 right-of-way is 60'; a mixed-use path will require right-of-way acquisition. County would still have 499 to address the local match and local administration issue or pay share of the cost of the bike/ped facility. 500 501 Amy Cole: Is it possible to have a collaboration with the power company so that we could actually use their right of way as 502 the area where the side path would actually be built? 503 504 Matt Day: It's possible, but usually they don't have right of way; they just have an easement. 505 506 Ed Vaughn: I'm with Heidi on this one. We need separate bike/ped path to utilize the Mountain-to-Sea Trail. 507 508 Nish Trivedi. Staff recommends the bike lane along Old NC-86 because as part of DCHC MPO 2045 Metropolitan 509 Transportation Plan (MTP) recently adopted, this board recommended Old NC-86 as a Bike/Ped corridor, Board of County 510 Commissioners approved and we succeeded in getting it added to the MTP. 511 512 Matt Day: You have two options; one option is to do a modernization requesting a side path with the possibility of cost 513 share, or the second option is to submit it as a stand-alone bike/ped project knowing that it requires a letter of commitment 514 from the county to agree to administer and maintain. 515 516 Nish Trivedi: Another option is just like the other modernization projects, you could recommend removing curb and gutter, 517 and sidewalk and extending the paved shoulder to 5-feet. 518 519 David Laudicina: Why wouldn't you put the multi-use thing on Old NC-86? 520 521 Nish Trivedi: Because the multi-use path is considered an independent bike/ped facility, subject to either federal 522 requirement of 20% local match and local administration or state sidewalk cost share. 523 524 Jenn Sykes: I think some properties probably had some trouble getting the right of ways granted. 525 526 Nish Trivedi: For clarification, you want to turn Old 86 into a modernization with a multi-use path? 527 528 Heidi Perry: Separated side path. 529 530 Art Menius: Multi-use side path. 531 532 Matt Day: Just understanding that there will be a local match and local administration or cost share required. While that 533 project is slightly in TARPO it is mostly in the MPO and you will be competing with all the other MPO projects. 534 535 Amy Cole: Is it possible to do a countywide survey to see whether or not people would support it and make it more likely 536 to score well? 537 13 538 Nish Trivedi: Surveys do not go into SPOT scoring. 539 540 Matt Day: In more rural areas, it's harder to get rural bike/ped projects. You're better off scoring it as a highway project 541 because the criteria used for bike/ped projects are based on your proximity to points of interest and density of population, 542 things working against rural projects. 543 544 Nish Trivedi: Bike/Ped scoring variables are destinations, densities, connectivity,cost effectiveness and safety. 545 546 MOTION by Heidi Perry that the Old NC-86 improvement be submitted as a road modernization project with a separated 547 side-path, seconded by Ed Vaughn. 548 VOTE: 8-1. Opposed, David Laudicina. 549 550 David Laudicina: I live close along there and close enough to 86 that I don't want any more encroachment on my property. 551 552 Amy Cole:You will have problem getting right-of-way along Old NC-86. 553 554 Nish Trivedi: I don't know how Carrboro feels about Old NC-86 improvements. 555 556 Tina Moon: I think this will make for a good corridor study for bike/ped connection between Hillsborough and Carrboro. 557 Carrboro is about to embark on a bike plan and this area may come up. 558 559 Nish Trivedi continued the presentation and directed the OUTBoard to Attachment 2 regarding DCHC and attachment 3, 560 BG MPO Project List. 561 562 Nish Trivedi: Now DCHC MPO. DCHC's SPOT process is tentatively using the adopted MTP. If it is not in the MTP it may 563 not get submitted. I have identified possible projects that my require updating the MTP in order for them to be submitted 564 into SPOT. Right now these are just potential projects identified in DCHC MPO area. Some of these projects are covered 565 in TARPO but cross into DCHC. Because they cross between MPO/RPO they may be easier to submit in one than the 566 other. They are simply presented in both because they cross jurisdiction boundaries. Nish Trivedi: I have added US-70 to 567 the list because it crosses both DCHC MPO and BG MPO connecting Mebane, Hillsborough, and Durham. It is a Strategic 568 Freight Corridor in DCHC MPO. There is increasing traffic and crashes along it. Lebanon Road is also added as a potential 569 project because it too crosses both MPOs. Mebane is against widening Lebanon Road but they support intersection 570 improvements along it due to serious crashes and increasing traffic. Nish Trivedi: As you can see in the table for US-70, 571 there are over 14,000 vehicles going east from Mebane through Hillsborough and into Durham, many of them avoiding the 572 1-85 traffic and trucks avoiding the weight station. There have also been over 1,100 accidents over the past ten years and 573 10 of them being fatal, that's over 100/year and 1 fatality per year while traffic along it continues increasing. US-70 will be 574 the detour when NCDOT later widens 1-85. 575 576 Heidi Perry: One of the reasons was to find better ways to keep the trucks on the interstate. The trucks are exiting onto 70 577 to avoid a weigh station. Adding capacity to 70 would exasperate that problem, would allow trucks to bypass an important 578 safety measure that we have in place for the public good. Another expressed by a majority of the OUTBoard, was the 579 understanding that adding lanes to roads brings more cars and Vehicle Miles Traveled (VMTs), not fewer, and that the 580 state's focus should be on finding ways to decrease VMTs. 581 582 MOTION by Heidi Perry not recommend US-70 as possible project, seconded by Eric Broo. 583 VOTE: 8-1. Opposed by Jenn Sykes. 584 585 Nish Trivedi: Each jurisdiction in the BGMPO is allowed to submit 10 projects, and I don't want us to lose our chance of 586 getting a project in, so I'm asking for all five to be considered as potential projects. 587 588 Art Menius: Any opposition to moving forward with all five? 589 590 Abigaile Pittman: Didn't the U.S. 70 map get removed? 591 14 592 Nish Trivedi: The OUTBoard does not want it removed because remove gives negative connotation. They are just "not 593 recommending" it as a potential project. 594 595 Eric Broo: So,we're talking about four; numbers 2, 3,4, and 5? 596 597 Heidi Perry: I'm confused about three because you said that NCDOT was doing a study on how to handle the railroad 598 there so why would you do the road extension project? 599 600 Nish Trivedi: NCDOT is doing an express Feasibility Study of Buckhorn Road that will address both the widening and a 601 grade separation to US-70 using Mebane's recently adopted Traffic Separation Study. 602 603 Heidi Perry: You said something about the railroad. 604 605 Nish Trivedi: The Mattress Factory Road Extension to US-70 involves an at-grade crossing and Mebane is coordinating 606 with NCDOT to determine what is the best way to do that. NCDOT railroad division is all in favor for removing at grade 607 crossings to better connect Raleigh to Charlotte. The Feasibility Study is geared towards identifying the best way to widen 608 Buckhorn Road, create a grade separation and connect to US-70 for SPOT purpose. 609 610 Matt Day: Their ultimate goal for that line between Raleigh and Charlotte is to get rid of all the at-grade crossings. 611 612 Heidi Perry: So, assuming the project scored highly and were to get funded, they would have to make that part of the 613 extension? 614 615 Nish Trivedi: Yes 616 617 Matt Day: Yes. If project 3 were to get submitted and got funded, the railroad wouldn't let them build a new at grade 618 crossing. 619 620 Nish Trivedi: As part of the Feasibility Study NCDOT is also evaluating an at grade separation for Buckhorn Road and the 621 grade separation is also part of the staff recommendation. 622 623 MOTION by Heidi Perry to keep the four projects on the list for the BGMPO. Eric Broo seconded. 624 VOTE: UNANIMOUS. 625 626 AGENDA ITEM 5: STAFF UPDATES 627 628 AGENDA ITEM 5A: EFLAND-BUCKHORN-MEBANE ACCESS MANAGEMENT PLAN(NISH TRIVEDI)- 629 Nish Trivedi gave a quick update on the progress and updates since the last time it came before the OUTBoard. We will 630 be posting this draft plan on January 31 to the website. 631 632 AGENDA ITEM 5B: MPO/RPO NCDOT PROJECT UPDATES(NISH TRIVEDI) 633 634 Nish Trivedi: Included in your packet is the NCDOT update for all projects in Orange County. Let me know if you have any 635 questions on them. Thank you. 636 637 Nish Trivedi: 1-40 Widening, there is a public meeting scheduled for January 24 in Hillsborough at the Passmore Center. 638 Chapel Hill is working with NCDOT to get another public meeting in Chapel Hill. 639 640 AGENDA ITEM:ADJOURNMENT 641 OUTBoard meeting was adjourned. 642 Art Menius, Chair Item 5.b. 15 00rarveCounty PUBLIC TRANSPORTATION Orange Unified Transportation Board OCPT Update Theo Letman TeLeishia Holloway Allyson Coltrane Background • Orange County Public Transportation is the County's transit system, providing both urban and rural transportation, in partnership with Go Triangle and Chapel Hill Transit systems. • OCPT operates within Orange County and also enters into neighboring counties. OCPT currently delivers 3 fixed routes and multiple demand response services such as Medicaid transportation, ADA (Americans with Disabilities Act), Rural Operating Assistance and Senior transportation. ORANGE COUNTY prrcy NORTH CAROLINA 16 Background Cont'd • OCPT currently has 23 employees, and operates a fleet of 17 LTV (light transit vehicles), which are maintained by AMS (Asset Management Service) mechanics. • With grant funding from TJCOG (Triangle J Council of Governments), Orange County was able to establish a TDM (Transportation Demand Management) program, purposed in reducing traffic and air pollution by promoting commute alternatives such as transit, telework, carpooling, vanpooling, biking and walking. ORANGE COUNTY NORTH CAROLINA Commuter Options Program • Share The Ride NC Campaign ➢ Orange County Pilot ➢ Testing outreach strategies https://www.sharetheridenc.org/Public/Home.aspx?CustomSubSite=oc ➢ Results/Next Steps ➢ Planning for local businesses • TDM Grant Funding ➢ Pilot Vanpool Program ➢ Administered by Orange County Human Resources Department ➢ Employer Outreach ➢ Expanding partnerships with local businesses ORANGE COUNTY � �, NORTH CAROLINA 17 Funding Streams In 2017 Orange County Public Transportation became aware of various"Urbanized Area"grant funds that have been apportioned to Orange County by the FTA(Federal Transit Administration),through the two MPO's(Metropolitan Planning Organizations)-DCHC(Durham Chapel Hill Carrboro)and Burlington Graham;and"Air Quality"grant funds through TARPO(Triangle Area rural Planning Organization).Listed below are the multiple funding sources available to OCPT for Operations, Administrative and Capital assistance for both the rural and urbanized areas. Federal 5307 Urbanized area grants-DCHCMPO,BGMPO apportionments 5310 Senior programs transportation-through Orange County Department on Aging 5311 CTP(Community Transportation Program)-Rural area administrative grant 5339 Bus and Bus Facilities-Capital purchases of replacement vehicles and equipment State Article 43 Tax district-includes transit sales tax proceeds and vehicle registration fees Medicaid transportation—through Orange County Department of Social Services ROAP-Rural Operating Assistance Program(EDTAP,RGP,EMPL) CMAQ-Congestion Mitigation and Air Quality grant-through TARPO �10 ORANGE COUNTY o, ,,,nty NORTH CAROLINA Budget OCPT has increased its budget annually over the last few fiscal years. Total in operating grant revenue since FY16: FY16 -$414,742 FY17 -$572,881 FY18 -$855,798 FY19 -$1,619,044 -FY16 first fiscal year OCPT was a stand alone department -FY17,first year of OCPT with new Transit Director 'Source:Munis reports �� -� l\ // ORANGE COUNTY orangecovnt, NORTH CAROLINA 18 Unmet Needs - Existing Programs In 2018 Orange County partnered with Go Triangle and Nelson Nygaard consultant group to produce a Short Range Transit Plan, which included public participation and is fiscally constrained. The Plan identifies recommendations to serve unmet transit needs: providing transit service coverage to the rural areas ("Mobility on Demand"aka- micro transit), increased trip frequency and service hours for the fixed routes, and adding various transit amenities such as bus shelters, and park and ride locations. OCPT is upgrading its dispatching and scheduling system to take advantage of the latest technology in the industry to manage the various services we provide and provide an external platform for patrons to access real time ride information and schedule trips. ORANGE COUNTY NORTH CAROLINA Orange County Transit Plan • The Orange County Transit Plan final draft was prepared by Go Triangle, and the consultant firm Nelson Nygaard in the fall 2018. • Nelson Nygaard was also contracted to do the short range transit planning for Wake County, Go Triangle and Chapel Hill Transit. ORANGE COUNTY prrcy NORTH CAROLINA 19 Orange County Transit Plan Cont'd • The report covers existing conditions public outreach and involvement, future service strategies and service prioritizations based on existing funding and projections. • The plan provides mobility options for the residents of Orange County which will provide connectivity with our transit partners throughout the region. ORANGE COUNTY NORTH CAROLINA OCPT Expansion Activities In 2012 under the Orange County Bus and Rail Investment Plan (OCBRIP), OCPT was allocated 12 %of the available funds from the Article 43 Tax District funds for Orange County; with 64%going to Chapel Hill Transit and 24%going to Go Triangle.This mix equated to OCPT receiving funding for about 8560 hours of service at the$58/hour revenue rate. Under the current Cost Sharing Agreement outlined in the Orange County Transit Plan of 2017,this arrangement was continued with the understanding that it will be negotiated periodically to provide equitable distribution of tax district funds based on the areas transit system needs. • OCPT currently operates the following routes utilizing tax district funds: • Hillsborough Circulator • Hillsborough-Chapel Hill Midday Connector(Chapel Hill Transit 420 route) • Orange Alamance Midday Connector(Go Triangle ODX route-modified) ORANGE COUNTY o,�y NORTH CAROLINA 20 OCPT Expansion Activities Cont'd OCPT has remaining routes funded through the tax district to deploy. These route's implementation were delayed due to Go Triangle requesting further evaluation and short range transit planning completion,to evaluate current conditions and entertain emerging ideas and technology not available when the original OCBRIP was adopted back in 2012. • The original proposed service expansions funded but not implemented include: • Fixed zonal routes(to operate on specific days) • Efland Commuter Loop(to operate during peak hours-weekdays) • Additional expansion services were planned but not funded under the current distribution calculation: • Expanded hours of service on the Hillsborough circulator(to include week end service) • Route 420 expansion (to include OCPT operating this route all day) ORANGE COUNTY tr. ,�k,:n,t•:,- NORTH CAROLINA Rural Service is Not One-Size-Fits-AI! Example Strategies in Orange County a Fixed-route service in appropriate areas(Hillsborough Chapel Hill and Mebane) - ■ Commuter routes from urban areas and park-and-rides to major destinations(Durham and Chapel Hill) ■ Flexible services in rural areas _ (Dial-a-Ride,deviated fixed-route, ` 1 zone service) o e ■ Van and transportation voucher programs to assist with mobility needs Existing level ofresources are a challenge for providing robust rural service ORANGE COUNTY �y NORTH CAROLINA 21 Potential Transit Vision Improvements ■ Mobility On Demand:Fixed-Rural Service(Three zones) — Each zone:7am-6pm on _ weekdays served with one vehicle(van,hybrid car)per zone ■ Hillsborough Circulator II — 7am-Spm(Mon-Sat);30 minutes — 2 intersecting loops _ ■ Hillsborough-Durham Connector — 9am-4pm;60 minutes _ ■ Cedar Grove Peak Connector 6am-9am and 3.30pm-7pm; 30 minutes �1 �V ORANGE COUNTY NORTH CAROLINA Transportation Needs Extend Throughout County t . CF*EL FILL L�maegp 4J rtq[�4p� ORANGE COUNTY orangeCo�e t) NORTH CAROLINA 22 Summary of OCPT Data Aggregate Totals FY16 PY17 FY18 Yearly Averages Rides 55,109 60,991 53,729 56,609.67 Passenger miles 419,035 334,878 347,298 367,070.33 Passenger hours 18,007.90 15,415.44 19,208.86 17,544.07 Invoice Revenue $ 196,820.89 $ 228,177.70 $ 204,167.08 $ 209,721.82 Revenue per ride $ 3.57 $ 3.74 $ 3.80 $ 3.70 Miles per ride 7.60 5.49 6.46 6.52 Hours per ride 0.33 0.25 0.36 0.31 Fare collected $ 92,276.64 $ 92,681.06 $ 87,252.83 $ 90,736.84 Total revenue $ 289,097.33 $ 320,858.76 $ 291,419.91 $ 300,458.67 Revenue per ride $ 5.25 $ 5.26 $ 5.42 $ 5.31 Ridership Totals FY16 FY17 FY18 Yearly Averages. Fixed routes: 18,593 24,227 21,429 21,416 Hillsborough,Circulator 15,134 18,372 16,535 16,347 Hillsborough-Chapel Hill Connector 3,459 5,856 5,828 5.047 Orange-Alamance Connector - - 66 66 Demand Response: 36,516 36,764 32,300 35,193 ADA 12 54 19 28 ❑SS Medicaid transportation 4,295 5,256 4,566 4,706 Dept on Aging-Nutrition transportation 7,839 7,019 7,192 7,350 Dept on Aging-Senior trips 958 958 1.246 1,054 ROAP-EDTAP 5,376 5,617 5,572 5,522 ROAP-RGP 165 153 179 166 Orange Enterprise(discontinued FY19,now EDTAP) 13,062 12,293 10,467 11,941 Sportsplex(discontinued per FTA audit) 3.706 3,601 1,999 3,169 Salty Adult Day(to be discontinued per FTA audit) 1,103 1,613 1,060 1,259 23 TrnP"SfJ FYaa Oak r't Nl�,asanr Gnee++Estates k, gtooarh Fxnt HI�rsst ""� F 83uFfs of Enc FAeadow EsW:vn + _ Grey-ryes.: fl tm Rivpr 51aSc Park WJlow Ridgo- Haverauli �—krll -IS Oak Rdgc mQq-uod e �� Piney G�o-rc 'I Elrigarfvan YJ�awi ocov_N'Run 5;raplwrn lidlx Seven!WEs Farms � _ _ 3iucklcLe+ry5pnnq uni,Krvq. ' Gurmarr Gree+rbnar Vucsx Htlly=ar: -- .� •.. •'.:.I EtephrLu RBI�-h Glcr Unrvcrmry Czt:;••_s L'nlwn:ty Acrex !¢-kp KnNI WOInte Cum Fallsof New Hop* puke Forestt Durham OHlifpn I vehicle—Bus Puke ll n[versiry Puke Forest Durham KomUan Pirisian J W'-d _c�l�n'ara Mangy hlUl 5loncndge fl 1 population1,3845 nmb� Ha:rCs Nonhwl,od Carol Woods 7 mt 617 jobs Cedar 4kI Fnx hseoeows fr 7 P 24 Pro?o5eo( FYao QF-n, Griytnaif gh SLw Park VWIv 11 Ridgo 144—h- wmqwood Jipadwn Mill.Gr-q 97m, sv*wrr.Hill, H"Idd—Ty spring 11,wrsiry Gre Amar Won Hill.Ea Oulk.Forest Duke JnF—lty Dukc Forest Durham 0 Korman Division Mvn-Pill 11,n-ri.Ir., Far I AcLjc,o— :? 25 Pr,p Sul o Pieasare Green Esraras ii li�r•3: 81ufl�yf Err Aieaoow Esucoa En.Rover Gr•rmrass Aare Perk W Iknv RrJyn Fa-AAA rph p,,kiadge Marywood ��GrQ�Q .. . P.r;iadoan �gC.Dec"�'•' Svayl,Qrn Hills Hu klQb"Zon9 Vruvnsity H[4a Emr CrccnUr��r - Vnlversky EwS'es GFr Vniversiry peres -- R�r-y 5.�r N'nlnrn Gww Falis of nicw Hcpn Dye Fast Durham D7 W— _ Duke VM,"ty ❑uku Fp r'-'.f'rhdm Ludt o e SaneridgQ � •a� • Lm6ercren NQ.yrrycd Larvl Woods * (1 fnx Mecdouy i C<dar Hiif S 11 26 ��r-j..F Regional System Map LW�� a ao.wrwa..,i,O Nm- r o ADD LEGEND Tumm CONNECTIONTP 4 w a r ^: _ dew••• cernaR LOCAL TRAHSWAG0ICT MEMCM Imam NAlDR R01fIE STOPS - S.rvt..ii ppy.�Wyse w.< p �he�N .. .- cJ Oa ""�' ROUTE x P .�'..a *.. PARK-ANO-RIDE REGIWtAL ROniR - ek �,�. Q - _ LOCATIONS °w 40-Fnea I//`' �..i-w+ ..,� HOSPITALS O ®��� *a SCKOoL/vwwERSRy rl REGKWAL EXP'AIMSS ROUTES SHOPPvIBCENTEAS ffSe<+e.WmE aak hwks o^b' MaKgry FEW, m3c'®® 27 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: February 20, 2019 Action Agenda Item No. 6.a. SUBJECT: Bicycle Safety Implementation Subcommittee (BSIS) Report DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: Abigaile Pittman, Transportation/Land Use Planner, 919-245-2567 PURPOSE: Receive a report on the recent activities of the BSIS. BACKGROUND: Since the January 16, 2019 OUTBoard meeting, the Bicycle Safety Implementation Subcommittee (BSIS) met to discuss implementation of social media ads and posts, and radio ads. Radio Media PSA - The Bicycle Safety group is going to produce a short radio PSA. We have a mix of people that can do this. Group member Art Menius mentioned that the Orange County Community Relations Department may have some available spots with WCOM through the end of July. In response, the County's Community Relations Department has offered to donate monthly spots on WHUP and WCOM for a month or two. They have asked if there is a best time, such as a national bicycle safety week/month, and would like to target that time of year. The spots on those stations tend to be about 10-15 seconds. They could do a longer PSA on WCHL (30 seconds) that could be run sporadically throughout the year. Social Media - The BSIS has decided to do a Facebook page and prevent comments because we intend for the page to just be an information page. The group does not want to have argumentative comments on the page. We spoke about have safety tips of the week, `did you know' excerpts of the law, news about bicycle events, photos of bicycle riders and vehicles safely interacting, a link to the County bicycle safety website, and perhaps other websites with useful information. The Community Relations Director has advised that we just start with Facebook. He wants us to concentrate on building up an audience through Facebook before we think about branching out to the Twitter and Instagram if your audience reaches a certain point. He said that he can send posts for us on Twitter through the County account. He advised that it is not possible to stop people from responding on Twitter or Instagram; however, at least on Twitter, no one would necessarily see any kind of comment unless they specifically clicked on the tweet, which most people don't do. The County's IT Department will archive our social media accounts, per County policy. Bicycle Rodeo — Planning staff has contacted the Orange County Sheriff's office and requested to coordinate with them on a hosting a bicycle rodeo for kids this spring or summer. We are awaiting a reply. 28 Next Steps Staff and the BSIS will continue to work on: • Facebook social media ads and posts, and radio psa's for this spring and summer. • The scheduling of events, including a Bike Rodeo, and other community events where bicycle safety brochures and branded swag bicycle can be shared. • The distribution of printed posters and brochures. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. Budgeted funds from are being utilized. RECOMMENDATION(S): Staff recommends that the OUTBoard: 1. Receive information; and 2. Provide any comments or direction that the Board might have. 29 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: February 20, 2019 Action Agenda Item No. 7.0 SUBJECT: Staff Updates DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 7.a. FY 2020-2029 Orange County STIP Nish Trivedi, Transportation Planner, 7.b. Orange County & NCDOT Highway 919-245-2582 Luncheon Meeting Notes Abigaile Pittman, Transportation/Land 7.c. MPO/RPO NCDOT Projects Use Planner, 919-245-2567 PURPOSE: Receive staff updates and provide any comments that the Board might have. Item 7.a. — FY 2020-2029 Orange County Strategic Transportation Investment Program STIP — North Carolina Department of Transportation (NCDOT) has released the draft fiscal year 2020-2029 STIP for public comments. It is scheduled for adoption by the Board of Transportation on June 2019. This state capital improvement program identifies which transportation projects are committed and developed for ten years. Attachment 7.a. provides a summary of all committed and developed projects in Orange County. Item 7.b. — Orange County and NCDOT Highway Division Luncheon Meeting Notes — On January 9, 2019 Orange County and the NCDOT Highway Division had a luncheon meeting to discuss various right-of-way topics; policies, programs and new projects; NCDOT updates on pending or active projects; and Orange County staff updates on various local issues and projects. Notes on the meeting are provided in Attachment 7.b. Item 7.c. — MPO/RPO NCDOT Project Updates - NCDOT regularly releases lists of transportation projects underway. Attachment 7.c. provides current projects in the Triangle Area Rural Planning Organization (TARPO). FINANCIAL IMPACT: There is no immediate financial impact associated with this item. Budgeted funds from are being utilized. RECOMMENDATION(S): Staff recommends that the OUTBoard: 1. Receive information; and 2. Provide any comments that the Board might have. Q Item 7.a. 31 Orange County FY 2020-2029 STIP Project STIP ID Location--A Mac—onstruction 1-40 1-3306 Widen from 1-85 to NC-147 2020 2021 Operation improvement from Orange Grove Road to Old Fayetteville Road and Orange Grove Road NC-54 R-5821 intersection improvement 2020 2022 Orange Grove Road U-5848 Extend to US-70 Business w/sidewalk and bike lanes 2021 2023 1-85 1-5967 Interchange Improvements at S. Churton Street 2022 2025 NC-54 U-5774 Upgrade road corridor from US15/501 to NC-55 2022 2025 S. Churton Street U-5845 1-40 to Eno River, widen to multilane 2022 2025 1-85 1-5984 Upgrade interchange at NC-86 2024 2026 DO LRT TE-5205 LRT from UNC in Chapel Hill to Alston Ave Durham 2024 OPT TA-6721 Purchase 2 light transit busses 2021 . . Ioil 1-85 1-0305 Widen from Orange Grove Road to Sparger Road 2025 2028 US 15/501 U-5304 Upgrade corridor from NC-86 to 1-40 2026 2028 Q Item 7.b. Orange County & NCDOT Highway Luncheon 33 Division 7 and District 1 January 9, 2019 12:00 p.m. John M. Link, Jr. Government Services Center Upstairs Large Conference Room 200 South Cameron Street, Hillsborough MEETING NOTES I. INTRODUCTIONS Present: Penny Rich, Chair, Board of County Commissioners; Commissioner Penny Rich, Orange County Commissioner; Bonnie Hammersley, Orange County Manager; Travis Myren, Orange County Deputy Manager; John Roberts, Orange County Attorney; Todd McGee, Orange County Community Relations Director; Chuck Edwards, NCDOT District Engineer; Pat Wilson, NCDOT Project Delivery Engineer; Craig Benedict, Orange County Planning Director; Tom Altieri, Orange County Comprehensive Planning Supervisor; Nish Trivedi, Orange County Transportation Planner; Abigaile Pittman, Orange County Land Use/ Transportation Planner; Margaret Hauth, Town of Hillsborough Planning Director/Assistant Town Manager; and Tom Stevens, Town of Hillsborough Mayor. Commissioner Penny Rich, Chair welcomed all and introductions were made. II. RIGHT-OF-WAY TOPICS A. Arthur Minnis Road Update (NCDOT/Nish Trivedi) In order for NCDOT to pave the unpaved section of Arthur Minnis Road, additional Right-of-Way must be obtained from property owners. NCDOT has sent letters to property owners and met with the Orange Grove Road Fire Department for it to follow up. (Exhibit II.A) Status: Chuck Edwards, NCDOT reviewed the history on an unpaved section of Arthur Minnis Road between Rocky Ridge Road and Dodson's Crossroads, which has been on NCDOT's hold list because additional right-of-way is needed for paving. Since this matter was last discussed with this group, NCDOT has been working with the Orange Grove Fire Department and County staff. There have been some personal visits with four outstanding property owners, and letters sent. One additional property owner agreed to dedicate the needed right-of-way. NCDOT will try again with the remaining property owners. Fire Department has expressed its concerns pertaining to response times, safety, etc. Chuck Edwards stated that NCDOT has the legal ability to condemn properties to acquire the necessary right-of-way consistent with State law and that Arthur Minnis road meets criteria for condemnation. In order to proceed, a request from property owners and a commitment by the property owners to post funds to go towards partial funding of the condemnation process is needed. The anticipated cost for Orange County & NCDOT Highway Luncheon 34 Division 7 and District 1 January 9, 2019 12:00 p.m. condemnation would be $2,500 per parcel plus any damages identified through appraisal. NCDOT could proceed with a project to pave the road if the right-of-way were made available, subject to available funding. Tom Altieri mentioned that the Fire Department informally offered to help with any funding that may be necessary to help acquire right-of-way and that a property owner is needed to request condemnation to initiate the process per State Statute. Chuck Edwards confirmed. Craig Benedict noted that he ran into one of the property owners and will attempt to schedule a meeting to discuss. B. Perry Hills Neighborhood Roadway Improvements (Abigaile Pittman) Paylor Street, Perry Road, Shambley Road, the northern portion of Alpha Drive, and Lancaster Road were paved during 2018. The Division of Highways has also assumed the maintenance of Paylor Street. (Exhibit II.B) Status: Chuck Edwards stated that here has been no change in status since the work done in 2018 to improve and add Paylor Street to the state system, and pave the other state roads in the subdivision using NCDOT discretionary funds. Scarlett Street and the southern portion of Alpha Drive do not meet the density or condition criteria for being accepted into the state system. Renee Price stated that EMS vehicles and the school bus cannot turn around at the end of Alpha Drive. Habitat for Humanity did not build the road extension to current. Chuck Edwards confirmed that it was built as a single lane road, like a driveway which does not meet NCDOT minimum subdivision road requirements. General discussion about how long ago properties were developed in the neighborhood. Margaret Hauth mentioned how exempt subdivisions may have influenced. Others agreed as a likely possibility. Renee Price asked that NCDOT review if it is possible to create a turnaround area for EMS vehicles and school buses. Chuck Edwards stated that his staff will reach out to OCEM and School staff to get additional information on their needs and investigate feasibility of making modifications; however, right-of-way may be a limiting factor. Discussing how the unopened roads might eventually become a part of the system, Chuck Edwards stated that it would require bringing any roads up to NCDOT standards, and cautioned the County about entering road development like a developer. Also, there are housing density requirements that have not been met. Craig Benedict noted that there is no public sewer available to the subdivision, and making it available is problematic because of topography and direction of flow away from Mebane. Orange County & NCDOT Highway Luncheon 35 Division 7 and District 1 January 9, 2019 12:00 p.m. Abigaile Pittman offered there were discussions with Mebane staff about making bus stops and bus stop improvements on US 70 to serve the residents of Perry Hills. Bonnie Hammersley noted that this type of discussion should be referred to Theo Letman, OCPT. C. Jefferson Davis National Highway Plaque (NCDOT) In October 2018, the BOCC passed a resolution repealing a 1959 designation of U.S.15 as the Jefferson Davis National Highway and will petition the NCDOT to have the pedestal and plaque removed. (Exhibit II.C.) Status: Chuck Edwards noted that NCDOT has had staff-level discussions regarding this matter and through examination have found no evidence of any authorization from DOT or indication of the owner of the plaque. It may have been placed originally by the Daughters of the Confederacy. What is confirmed is that the plaque isn't in NCDOT right-of-way, which ends at the back of the curb. It thinks that the land behind the curb may be owned by UNC and likely combined with Town of Chapel Hill rights-of-way/easements for areas of sidewalk and other amenities. This would have to be researched. The Town of Chapel Hill directed its staff to ask NCDOT to remove it, but NCDOT doesn't own it. It was noted that the General Assembly is not in a position to take action either. John Roberts requested a letter from NCDOT saying the plaque is not in its right-of- way. Chuck Edwards stated that with a formal request from the County Commissioners or County Manager, such a letter would be sent. Bonnie Hammersley agreed that a formal letter would be sent by the Manager's Office. D. Sanders Road and Efland Avenue Neighborhood — Possibility of Adding Roads to the State Maintained System (NCDOT/Renee Price). Sanders Road and Efland Avenue are generally bounded by US 70 W to the north, Greenestead Lane to the west, Gaines Chapel Road to the east, and the railroad to the south. The original subdivision was recorded in 1919. It has since been re-subdivided with numerous smaller subdivisions. The roads are mostly graveled with significant maintenance problems. (Exhibit II.D.) Status: Renee Price summarized the road maintenance and construction in the subdivision, noting that it is similar to the situation facing the Perry Hills subdivision. Chuck Edwards stated that NCDOT will investigate and send a report to Abigaile Pittman who can distribute the findings. Craig Benedict noted that Gaines Chapel Road is partially encroaching in the rail right- of-way and may cause problems such as the removal of the crossing to the south if the railroad revises the curves in the track through this area. III. POLICIES, PROGRAMS, NEW PROJECTS Orange County & NCDOT Highway Luncheon 36 Division 7 and District 1 January 9, 2019 12:00 p.m. A. 1-40 Widening and Interchange Improvements (NCDOT/Tom Altieri) NCDOT's current design would have impact on 1 mobile home in OC planning jurisdiction (north side of 140). The south side of 140 is in Chapel Hill's jurisdiction (Town Limits and ETJ), where community impacts are greatest. The interchange improvement includes the realignment of Eubanks Rd, which would impact the Northwood subdivision. Status: Local Officials Meeting on January 14, 2019, 2:00-4:00 pm at Southern Human Services Center. Public Open House (drop-in style) Meeting to be held January 24, 4:00-7:00 pm, at the Passmore Center-Great Hall, 103 Meadowlands Drive, Hillsborough. Chuck Edwards stated that based on the feedback received to date, NCDOT is considering a couple of alternative designs. There are concerns about the impacts to the Northwood subdivision. He mentioned the upcoming meetings listed above where these alternatives will be presented and discussed. The project is lengthy and there are other pieces of the greater 1-40 project that will be reviewed. Tom Altieri stated that the County was looking for NCDOT's assistance with getting the word out to the public about the upcoming meetings. Chuck Edwards stated that DOT will send out public notifications for the meetings, and press releases and mailers. Orange County can put out the word through their networks also. He said that if there is a need for multiple meetings with different groups that can be done also. Bonnie Hammersley stated that the Orange County Orange County Community Relations Director is Todd McGee and should be the contact person for NCDOT notices, they should go through him, and he needs to be on their distribution lists. B. South Churton Street Widening and Orange Grove Rd. Extension in Hillsborough (NCDOT/Nish Trivedi) NCDOT is proposing to widen S. Churton Street from 1-40 to Orange Grove Road in Hillsborough. The project and is being coordinated with the proposed extension of Orange Grove Rd. Status: Local Officials Meeting on January 8, 2019, 2:30-3:30 pm at the Hillsborough Town Hall Annex, Board Meeting Room,105 East Corbin Street, Hillsborough. Public Open House (drop-in style) meeting to be held immediately following from 4:00-7:00 pm at the same location. (Exhibit 111. B.) Margaret Hauth stated that last night (January 8) was the first public meeting on the S. Churton Street widening. Over 75 people attended the drop-in meeting. There was a lot of good discussion and she is expecting a lot of useful comments. The Town also has some basic comments for NCDOT, which are forthcoming. Penny Rich requested that Margaret Hauth keep Orange County staff updated. Orange County & NCDOT Highway Luncheon 37 Division 7 and District 1 January 9, 2019 12:00 p.m. Renee Price asked about the impact on Tuscarora, which is a part of the Orange Grove Road Extension project area. Margaret Hauth replied that different alignment options are still being considered, but that there will be some changes. Some options have been discounted also. The Town didn't like the three options it reviewed previously. Craig Benedict initiated a discussion on the coordination of the Orange Grove Road and S. Churton Street projects under one NCDOT manager, and the coordination of the 1-85 and 1-40 projects that is necessary. Margaret Hauth stated that the 1-85/Churton Road interchange has to go first. Nish Trivedi said that the 1-85 interchange is part of the larger 1-85 widening and all of the projects are being scheduled around the same time. Margaret Hauth said that we need to get the project schedules correctly coordinated, timed out to be in the right order. NCDOT needs to involve the local staff in this coordination effort. Also, she wanted local staff to be able to see project information 7-10 days prior to public meetings so that they can properly prepare. Chuck Edwards said that NCDOT is definitely interested in staying connected with the Town and County on its projects. Penny Rich stated that the Town and County could see what NCDOT is doing first, and then put the information on local websites, perhaps utilizing links. Margaret said that those web sites will need to be built in the very near future. Penny Rich stated that it was most important to have NCDOT or Orange County telling the story. Pat Wilson stated that the new STIP is being released and a drop-in public session will be scheduled in Greensboro to collect comments. It will also be reviewed through the MPOs. He said that there is typically a two-week time period for information to be provided to local officials prior to public meetings. IV. NCDOT UPDATES ON PENDING OR ACTIVE PROJECTS A. TIP projects (NCDOT) Chuck Edwards reviewed the list of projects. (Exhibit IV.A.) B. Resurfacing and/or Bridge Replacements (NCDOT) (In addition to the typical update on projects, a brief overview of the various types of materials used for resurfacing and how that determination is made based on roadway type or function is requested. Also, County staff received an inquiry about wet- weather surface glare and the visibility of striping on Old NC 86 since its repaving.) Chuck Edwards reviewed the large number of completed bridge projects in the County and said that there will be no new bridge replacement projects in the next year. (Also in Exhibit IV.A.) Orange County & NCDOT Highway Luncheon 38 Division 7 and District 1 January 9, 2019 12:00 p.m. NCDOT offered to investigate the surface glare on Old NC 86 for any safety improvements, such as reflective striping and raised pavement markers. V. ORANGE COUNTY STAFF UPDATES A. Orange Grove Road Pedestrian/Sidewalk Follow-up (Abigaile Pittman/ Tom Altieri) Drafting Orange County Budget Request for Sidewalk Preliminary Engineering on Orange Grove Road. Abigaile Pittman stated that she has been asked to develop a budget request for a preliminary engineering estimate for sidewalks along a half-mile section of Orange Grove Road from Patriot Point to New Grady Brown Road. A staff engineer will be using online tools to develop an estimate and it may be necessary to follow up with a comparative estimate from a private engineer. Tom Altieri stated that the estimate needs to take some specific site conditions like right-of-way, topography, drainage swales, utilities, and whether curb and gutter is needed to meet NCDOT guidelines. As a Planner, he anticipates that curb and gutter will be needed and some areas of retention wall. There was a general discussion regarding the status of County discussions about sidewalk construction and maintenance. Bonnie Hammersley mentioned that there has been a petition for school safety improvements in this area and there will be some upcoming meetings between County and OC Schools management regarding these issues. The joint meeting in February with the Town of Hillsborough was also mentioned and these meetings would need to inform any future budget request. B. Pedestrian Safety/Spot Safety Evaluation Request (Abigaile Pittman) At its November meeting, the OUTBoard requested that staff inquire with NCDOT regarding any possible Spot Safety funded pedestrian improvements at the Orange Grove Road/Oakdale Drive intersection. Abigaile Pittman reviewed the safety issues along this section of Orange Grove Road, the recent history of safety fencing on the 1-40 bridge, and the request of the OUTBoard for a SPOT safety review at the intersection of Orange Grove Road and Oakdale Drive. Chuck Edwards stated that NCDOT would perform the requested SPOT safety review and report back. VI. FUTURE MEETINGS Penny Rich brought up the topic of how many times a year these meetings should be held. Bonnie Hammersley recommended future meetings be scheduled on a quarterly basis in January, April, July, and October. The need for each meeting can be evaluated based on the sufficiency of Commissioner agenda topics. Item 7.c. NCDOT DIV 7 PROJECTS LOCATED IN TARPO-UNDER DEVELOPMENT 39 TIP/WBS# Description Let/Start Date Completion Cost Status Project Lead Date SS4907BV Intersection improvements on NC 86 at SR 1545(Sawmill 4/9/18 Fall 2018 $104,000 Construction completed 11/8/2018, Dawn McPherson 47121.1.1 Road)/SR 1352(Carr Store Road).Improvements include Pending RTE Final Inspection 47121.2.1 flasher and"Vehicle Entering When Flashing"sign installation, 47121.3.1 channelization,and sight distance improvements. SS4907CD Horizontal curve improvements on SR 1710(Old NC 10)west 12/5/19 Spring 2020 $261,000 Planning and design activities Chad Reimakoski 47936.1.1 of SR 1561/SR 1709(Lawrence Road)east of Hillsborough. underway 47936.2.1 Improvements consist of wedging pavement and grading 47936.3.1 shoulders. R-5821A Construct operational improvements including 6/21/22 FY2024 $3,924,000 Planning and design activities Jennifer Evans 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 underway,coordinating with NC54 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville West Corridor Study 47093.3.2 Road). 1-5958 Pavement rehabilitation on 1-40/1-85 from west of SR 1114 11/15/22 FY2024 $7,455,000 Planning activities pending Chris Smitherman 45910.1.1 (Buckhorn Road)to west of SR 1006(Orange Grove Road). 45910.3.1 1-5959 Pavement rehabilitation on 1-85 from west of SR 1006(Orange 11/21/23 FY2025 $11,155,000 Planning activities pending Chris Smitherman 45911.1.1 Grove Road)to Durham County line. 45911.3.1 U-6071 Intersection improvements at NC 54 and SR 1007(Old 1/15/2026 FY 2027 $1,216,000 Planning and design activities Jennifer Evans 47496.1.1 Fayetteville Rd)in Carrboro underway,Project on hold due to Draft 47496.2.1 2020-2029 STIP 47496.3.1 4.0HORTM Cq9� 40 g � North Carolina Department of Transportation o�=) Active Projects Under Construction - Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, Lorenz,PE,Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 03/15/2019 100.00 92.24 GUILFORD COUNTY AND 3 INC. BRIDGES IN ORANGE COUNTY. C203946 B-5348 REPLACE BRIDGE#85 OVER PHILS DANE CONSTRUCTION Kirkman,PE, $984,596.98 02/01/2018 12/27/2018 02/01/2018 01/30/2019 99.00 92.33 CRK ON SR-1005(OLD G-BORO RD) INC Christopher D C204025 1-5954 PAVEMENT REHAB ON I-40/1-85 APAC-ATLANTIC INC Kirkman,PE, $9,699,053.68 FROM EAST OF NC-54 IN GRAHAM THOMPSON ARTHUR Christopher D IN ALAM.CO.TO WEST OF SR-1114 DIVISION (BUCKHORN RD)IN ORANGE CO. DG00321 W-5143 SR 1004(EFLAND-CEDAR GROVE CAROLINA SUNROCK Kirkman,PE, $1,711,133.05 04/02/2018 04/02/2019 04/02/2018 04/02/2019 100.00 98.20 RD)ROADWAY IMPROVEMENTS. LLC Christopher D DG00393 RESURFACE SR 1101,SR 1118,SR RILEY PAVING INC Kirkman,PE, $1,084,520.40 04/02/2018 10/12/2018 06/18/2018 12/07/2018 100.00 99.97 1119,SR 1124,SR 1125,SR 1127,SR Christopher D 1128 SR 1130,SR 1134,SR 1135,SR 1137,SR 1141,SR 1143,ETC. DG00395 REPLACE BRIDGE#189 ON SR 1114 S T WOOTEN Kirkman,PE, $723,924.13 04/01/2018 01/01/2019 05/07/2018 02/07/2019 97.00 99.75 (BUCKHORN ROAD)OVER CANE CORPORATION Christopher D CREEK DG00413 RESURFACE US 70 BUS,SR 1009, CAROLINA SUNROCK Kirkman,PE, $3,562,232.66 05/28/2018 11/01/2019 05/29/2018 11/01/2019 38.00 53.71 SR 1102,SR 1129,SR 1239,SR LLC Christopher D 1352,SR 1716 AND SR 1841 DG00419 RESURFACE NC 86 AND 17 CAROLINA SUNROCK Kirkman,PE, $3,764,001.64 05/14/2018 11/01/2019 05/14/2018 11/01/2019 40.00 23.45 SECONDARY ROADS LLC Christopher D DG00427 REPLACE BRIDGE#51 ON SR 1534 NATIONAL BRIDGE Kirkman,PE, $521,443.82 05/07/2018 03/04/2019 07/30/2018 04/29/2019 100.00 98.48 (MCKEE ROAD)OVER BUFFALO CK. BUILDERS LLC Christopher D DG00435 AST RETREATMENT ON 22 WHITEHURST PAVING Kirkman,PE, $846,340.66 04/01/2019 10/11/2019 SECONDARY ROADS CO INC Christopher D DG00444 R-5821B INTERSECTION IMPRRVEMENTS AT FSC II LLC DBA FRED Kirkman,PE, $1,039,900.00 07/16/2018 05/16/2019 08/13/2018 05/16/2019 100.00 90.11 THE INTERSECTION OF NC 54 AND SMITH COMPANY Christopher D SR 1006(ORANGE GROVE ROAD) DG00445 R-5787BB INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 70.00 61.61 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAWBA COUNTY INC W-5707A INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 70.00 61.61 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAWBA COUNTY INC DG00451 U-5854 SR 1008(MT.CARMEL CHURCH CAROLINA SUNROCK Kirkman,PE, $1,833,468.84 08/15/2018 04/30/2020 ROAD)AND SR 1913(BENNETT LLC Christopher D ROAD)ROUNDABOUT AND RELATED SAFETY IMPROVEMENTS DG00461 BRIDGE REHAB.FOR BRIDGE#031 M&J CONSTRUCTION Robinson, $2,456,272.12 11/12/2018 07/15/2019 ON SR 1010(E.FRANKLIN ST.)OVER CO OF PINELLAS Stephen J BOLIN CREEK&BOLIN CREEK TRAIL COUNTY INC DG00462 REHAB BRIDGES 264,288,260,543 IN ELITE INDUSTRIAL Snell,PE, $967,383.15 08/01/2019 01/01/2020 GUILFORD COUNTY AND BRIDGE 031 PAINTING INC William H IN ORANGE COUNTY