Loading...
HomeMy WebLinkAboutOUTBoard agenda 011619 AGENDA Orange Unified Transportation Board January 16, 2019 6:30 p.m. You can bring your laptops/tablets if you would like to use them. Conference Room 204, Orange County West Campus 131 West Margaret Lane, Hillsborough *PLEASE NOTE CHANGE IN LOCATION* Page Item Title 1. Call to Order, Determination of Quorum, and Introductions of New Members 3. 2. Approval of Minutes from November 28, 2018 3. Consideration of Additions to the Agenda 4. Regular OUTBoard Agenda (Action Items) 9. 4.a. Orange County Transportation Priority List for SPOT 6.0 / FY 2021-2030 STIP (Nish Trivedi) — To provide a recommendation to the Board of County Commissioners (BOCC) on a list of transportation priorities for consideration in Strategic Prioritization of Transportation (SPOT) / Statewide Transportation Improvement Program (STIP). OUTBoard Action: Consider the list of transportation projects/priorities and provide a recommendation to the BOCC. 23. 4.b. Bicycle Safety Implementation Subcommittee Report (Abigaile Pittman) OUTBoard Action: Receive the information and provide any comments or direction that the Board might have. 25. 5.0 Staff Updates 27. 5.a. Efland-Buckhorn-Mebane Access Management Plan (Nish Trivedi) 33. 5.b. MPO/RPO NCDOT Project Updates (Nish Trivedi) 6.0 Adjournment — The next regularly scheduled meeting date is February 20, 2019. Charge of the OUTBoard (from Section 1, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. From time to time the OUT Board may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUT Board shall serve in an advisory capacity to the Planning Board. Meetings (from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Meetings are held on the third Wednesday of the month. The start time and location of the meeting shall be included on the agenda and shall typically be 6:30 p.m. at the Orange County West Campus Office Building located at 131 West Margaret Lane, Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any special circumstances, provided the information is included on the distributed agenda. DRAFT 3 1 MINUTES 2 ORANGE COUNTY OUTBOARD 3 NOVEMBER 28,2018 4 REGULAR MEETING 5 6 MEMBERS PRESENT: Art Menius, At-Large Representative (Chair); Brantley Wells (Vice Chair), Hillsborough Township 7 Representative; David Laudicina, Cheeks Township Representative; Jenn Sykes,At-Large Representative; Alyson West, 8 At-Large Representative; Donna Musson, Eno Township Representative; Heidi Perry, At-Large Representative; Johanna 9 Birckmayer, At-Large Representative; Eric Broo, At-Large Representative; Amy Cole, At-Large Representative, Ram 10 Athavale, Chapel Hill Township Representative; Randy Marshall, Bingham Township Representative. 11 12 MEMBERS ABSENT: Ed Vaughn, Cedar Grove Township Representative. 13 14 TRANSIT ADVISORY SERVICES MEMBERS PRESENT: Theo Letman, Allyson Coltrane, Teleishia Holloway, Lisa Berkley, 15 Meredith McMonigle. 16 17 STAFF PRESENT: Abigaile Pittman, Transportation/Land Use Planner; Nish Trivedi, Transportation Planner; Tina Love, 18 Administrative Assistant III; 19 20 OTHERS PRESENT: Nikki Catalano, Minutes Preparer. 21 22 AGENDA ITEM 1: CALL TO ORDER,DETERMINATION OF QUORUM AND INTRODUCTION OF NEW MEMBERS 23 Heidi Perry called the meeting to order and introductions went around the room for the new members. 24 25 AGENDA ITEM 2: ELECTION OF CHAIR/VICE-CHAIR 26 MOTION by Brantley Wells to nominate Art Menius as Chair of the OUTBoard. Seconded by Jenn Sykes. 27 VOTE: UNANIMOUS 28 29 MOTION by Art Menius to nominate Brantley Wells as Vice-Chair of the OUTBoard. Seconded by Heidi Perry. 30 VOTE: UNANIMOUS 31 32 AGENDA ITEM 3: APPROVAL OF MINUTES 33 MOTION by Heidi Perry to approve the September 19,2018, OUTBoard Minutes. Seconded by Donna Musson. 34 VOTE: UNANIMOUS 35 MOTION by Heidi Perry to approve the October 17, 2018, OUTBoard Minutes with correction to line 97. Seconded by Erik 36 Broo. 37 VOTE: UNANIMOUS 38 39 AGENDA ITEM 4: CONSIDERATION OF ADDITIONS TO AGENDA-There were none. 40 41 AGENDA ITEM 5A: OCPT ADMINISTRATIVE UPDATES(THEO LETMAN)- 42 Theo Letman reported on the Orange County Public Transportation projects and updates 43 44 AGENDA ITEM 513: OCPTIOCCO UPDATE(ALLYSON COLTRANE)- 45 Allyson Coltrane gave a PowerPoint presentation 46 47 Allyson Coltrane: We have a 10% discount at bicycle shops in Chapel Hill and Carrboro, starting in January I will be 48 handing out those coupons. The coupons currently show ending in December however they will be updated once that 49 cycle has ended. New Year New Commute will start mid-January, I will also give out those coupons at that time. Chapel 50 Hill and Carrboro are giving some out now. Chapel Hill does this campaign year-round, so you will be able to have 51 discounts all year round. 52 53 Lisa Berkley: What about Earn Cash for commuting;what does that mean? 1 DRAFT 4 54 55 Allyson Coltrane: It's not technically cash in hand, but you can get GoPerks. To get GoPerks you must log your 56 commute through our ShareTheRideNC page; it's there you can get free Joe VanGo coffee,free Dunkin Donuts, etc. 57 58 Allyson Coltrane: Below is the operating costs annually and the revenue hours need to all of this. 59 60 Johanna Birckmayer: What are revenue hours? 61 62 Allyson Coltrane: DOT allots us certain hours that we can dedicate to certain routes and services, so those are hours 63 you would need to make the Hillsborough circulator run every 30 minutes, or to expand the service to 8:00 P.M. 64 65 Art Menius: How far short is our capacity, people, and money compared to the excellent goals laid out in the 66 PowerPoint? 67 68 Theo Letman: We are very far apart. There was a discussion a year ago regarding the light rail in the transit plan. A lot 69 of the money is going toward the light rail and not a lot towards bus. Part of the transit plan is to push what the needs 70 are in the area and what the folks want. Myself; Travis Myren,the Deputy County Manager; as well as Craig Benedict go 71 to the staff working group meetings with GoTriangle and the other transportation providers, and we push for this and as 72 much dollars as we can to get out the transit plan for these projects, but there is a huge gap between what is proposed 73 and allocated. Negotiations are still going on between the entities to finalize what our cut should be. 74 75 Heidi Perry: So the circulator is out, was that one of the ones they took off the plan in order to only have the light rail go 76 forward for funding? 77 78 Theo Letman: There was a proposal that I put out to have a reverse circulator and that is what they took off, but I am not 79 letting it die. I do have another plan. The idea is to divide the circulator into two intersecting routes. We currently have 80 one loop and it is a very long ride for everyone. So my thought is to break it into two different routes. 81 82 Heidi Perry: Like a figure 8? 83 84 Theo Letman: Exactly. Bisecting in the middle of the town and they can make their connections. It would provide more 85 frequent service and will require more hours. I am working on getting it done. 86 87 AGENDA ITEM 5C: TRANSIT ADVISORY SERVICES(TAS)COMM ENTSIQUESTIONS(THEO LETMAN)- 88 89 Theo Letman: To follow Allyson on the status of the transit plan, it is in final draft mode and is currently being reviewed. 90 Once reviewed by staff, it will be brought to the OUTBoard for review. Our concern has always been that we provide 91 more on-demand services than fixed routes. Both GoTriangle and Chapel Hill Transit provide fixed route services. In 92 our rural county, we do a lot of on demand; a lot of Medicaid transportation and a lot of paratransit services that provide 93 for the elderly and the disabled. My focus is to meet the needs of those populations and provide as much service as 94 possible. To organize services that are both cost effective and meet those needs is not always possible because of 95 ridership. Part of the transit planning is to bring those ideas and efforts forward in a comprehensive plan that articulates 96 the needs of this community. We are going through the review process with GoTriangle. We will bring that report 97 forward for the OUTBoard to review. Staffing is almost back up to full staff since the last meeting. We are currently 98 hiring for part time and full-time drivers and a full-time,operations assistant. It has been grant season with NCDOT since 99 our last meeting, and for the first time,we applied for a 5307 grant which is an urbanized area grant. The grant provides 100 dollars for more positions, and it provides for the transit amenities that we are planning for. We have a semi-seat project 101 that we are working with the Department on Aging on, and as of a year ago, the project is still on going so the grant 102 provides money to make sure the labor is still there. It will purchase bike racks and vehicles that were purchased without 103 bike racks. Mobile pay will be a way for people to use an app on their cell phones to pay the fare as they board the bus. 104 We are just about finished with our procurement for upgrading our software that will help us manage the internal the day- 105 to-day services and scheduling and provide external means for passengers to look up when their ride will arrive. They 2 DRAFT 5 106 will be able to track the vehicles themselves utilizing the app. Hopefully by the end of December we'll start going through 107 the process of transitioning our services to the new software. 108 109 Randy Marshall: Allyson seemed to be saying that with the additional needs for funding for Orange County Public 110 Transportation, some of those funding sources were being pulled off for the light rail project. What's the relationship 111 between the funding of each of those, and is it true that there's competition and public transportation is losing funding to 112 the light rail? Is the light rail just banking the funds that they are getting, or do they actively have things that they are 113 spending it on? How does that work? 114 115 Theo Letman: A concise answer would be that in the original Transit Plan called the (BRIP) Bus, Rail Investment Plan; 116 there was a negotiation done way before my time here. Each entity within the counties was designated or allotted 117 certain amount of funds. 118 119 Heidi Perry: From the Transit tax? 120 121 Theo Letman: From the Transit tax. As well as funding going toward the light rail which takes the lion's share of those 122 funds. At the time there was very little leadership at Orange County Public Transit and so was got a paltry amount of 123 funds. Now as we see the demand growing and increasing over the years, we are going back and renegotiate this 124 arrangement so that we get more funding. I think the Commissioner as well made it very clear that there needs to be 125 more investment in bus transportation because a huge part of the county will probably never utilize the light rail. It's in 126 the rural areas, some of the urban areas that don't connect with the light rail, so the Commissioners pushed that there 127 should be more investment in bus. 128 129 David Laudicina: Isn't it true though that the plan has provided quite a bit of service already for Orange County? 130 131 Theo Letman: Yes. The Transit tax is doing what it is supposed to do. 132 133 Heidi Perry: There were also a couple of projects that were in the running for state funding and they were all pulled so 134 that the light rail would be the only project that was in contention for the funding. They didn't get any funding, so that 135 means it can't be implemented. 136 137 Dave Laudicina: Was it just pulled or postponed? 138 139 Theo Letman: It was part of the SPOT process that things have to go before the state and the state Board of 140 Transportation for approval. The reverse circulator scored better than both the light rail and the BRT and it got pulled 141 because it was taking votes away from the light rail. 142 143 Heidi Perry: How is a Transit Uber superior to a regular Uber? Is it more efficient? It is because you're piling up rides 144 and doing more than one at a time? 145 146 Theo Letman: Uber is not even in this area from what I understand, so I am trying to capitalize on that and provide some 147 type of service. 148 149 Randy Marshall: Has the OUTBoard as a group had discussions about light rail? 150 151 Art Menius: We have and it's generally relative toward the concept of light rail with the issues towards where this 152 particular light rail services. 153 154 Randy Marshall: Especially regarding funding? 155 156 Art Menius: And how that impacts the rest of the county. 157 158 AGENDA ITEM 6: REGULAR OUTBOARD AGENDA 3 DRAFT 6 159 160 AGENDA ITEM 6A: ANNUAL REPORT(2018)AND WORK PLAN(2019)(ABIGAILE PITTMAN) 161 Abigaile Pittman reviewed the OUTBoard Annual Report 2018 and Work Plan 2019. Responding about activity#1, High 162 Impact-Low Cost projects,Abigaile Pittman stated that these projects do not go through a SPOT scoring process, but are 163 prioritized by criteria and the OUTBoard comments but does not vote on candidate projects. 164 165 Heidi Perry: Could High Impact-Low Cost projects put shoulders on roads? 166 167 Abigaile Pittman: That is possible, and some of the county's candidate projects are shoulder road widening. These 168 projects are a separate item on the agenda tonight. 169 170 Heidi Perry: Referring to #8 on the list, I see we are going to go back and look at the Efland-Mebane Access 171 Management Plan. I don't see Hwy 54, but we are going see Hwy 54 again too, right? Nish said he was going to come 172 back to us with that. We just approved the Minutes that said he was going to do that. I want Hwy 54 included on the list 173 in case it comes before us again. There was consensus among the Board to add Hwy 54 plan review to the list. 174 175 Abigaile Pittman: I'll review this with Nish. 176 177 Heidi Perry: Aren't they putting a park and ride at White Cross? 178 179 Abigaile Pittman: Park and rides have been discussed as part of the Hwy 54 plan 180 181 Abigaile Pittman: The OUTBoard continues to press for improvements of the safe process goal. The safety fencing on 182 the bridge on Orange Grove Road came from this group and a group in Hillsborough. How high is the railing? 183 184 Amy Cole: It is 32 inches,which was to code when it was built but is no longer. 185 186 Randy Marshall: Referring to#9 on the list, my recollection is that we were going to try to get the Town of Hillsborough 187 to put in the sidewalks as part of the Save Routes to School plan implementation efforts. 188 189 Amy Cole: We met with the Town of Hillsborough and the dilemma was who funds sidewalks, who puts them in, and 190 who maintains them. 191 192 Abigaile Pittman: And who owns the road. 193 194 Randy Marshall: Do the Hillsborough town limits extend to that bridge? 195 196 Amy Cole: The Hillsborough town limits extend to the bridge. The county cannot maintain a sidewalk, so we need an 197 agreement where the Town of Hillsborough will maintain the sidewalk for the County. We have asked for them to come 198 to an agreement. 199 200 Randy Marshall: What about getting the school district to ask for voluntary annexation? It should be dense enough. 201 Could the school board ask for annexation? 202 203 Amy Cole: The high school is the property abutting up to the highway. And there is a lot of foot traffic every day that 204 goes over that bridge. I consider the fence a stepping stone but would also like to see the speed limit reduced there and 205 to put a stop light. I would love to see something that slows the traffic down during the morning and afternoon when 206 students are walking to and from school,and at the Oakdale intersection. Has NCDOT reviewed safety measures for the 207 Oakdale Drive intersection? 208 209 Abigaile Pittman: This is not something that needs to go in the OUTBoard's work plan though. Spot safety 210 improvements at the Oakdale intersection could be discussed at an upcoming NCDOT luncheon agenda. 211 4 DRAFT 7 212 Heidi Perry: Can we not include this in the High Impact Low Cost project submissions? 213 214 Abigaile Pittman: There are specific criteria for High Impact Low Cost program projects, and it may best be discussed 215 with NCDOT and evaluated for spot safety program improvements first. 216 217 Abigaile Pittman reviewed the Emerging Issues section of the Work Plan. 218 219 Randy Marshall: Are the state bridge improvements that are projected to be done pretty much completed? 220 221 Abigaile Pittman: There are remaining bridges scheduled on the NCDOT project list through 2020, and probably more to 222 come after that. 223 224 Jenn Sykes: I'd like to add to#5 regarding promoting alternative transportation modes that we work to ensure there is a 225 focus on helping to promote anything via the bus or bike in areas that are struggling economically in town. 226 227 Johanna Birckmayer: I was wondering if you could join with the Health Department and Social Services to do more and 228 educate about bus routes. 229 230 Jenn Sykes: I know from another board that I am on that they are trying to become more consolidated to provide more 231 outreach to these areas. 232 233 Abigaile Pittman: What we come up with has to fit within the context of the OUTBoard's charge, and not overlap with 234 OPT's work projects. 235 236 Randy Marshall: Are some of these areas on fixed routes? What about requesting a bus stop? There could be a fixed 237 advertisement with a schedule on the inside of it. I don't know what the shelters cost, but even just a bench to start with. 238 Maybe pull funds from Parks and Recreation. Maybe the Health Department could buy half a bench. If you get multiple 239 sources of funding for those things which have fairly finite costs, you may be able to do something. 240 241 Jenn Sykes: Yes, some of these areas are on fixed routes and some of them are as simple as saying this stop is here 242 and improving the sign on it. 243 244 Abigaile Pittman reviewed the OUTBoard's charge and initiatives. 245 246 Heidi Perry: Maybe literature posted at the Fairview Park, or churches in the area or stores in the area. 247 248 Jenn Sykes: Or at the Efland Ruritan Rodeo once a year. 249 250 Abigaile Pittman: I think the concept for the OUTBoard would be to collaborate or support Orange Public Transportation 251 (OPT)efforts. 252 253 Art Menius: We want to work with OPT to reach underserved populations with transportation resources that are 254 available to them as citizens. 255 256 Abigaile Pittman: I suggest we leave the`as citizens' off. 257 258 Eric Broo: Is the 1-40 widening project something we should be discussing and adding to this list of emerging issues 259 since it is going to be one of the larger projects for this year that will be on the minds of the Board of County 260 Commissioners and the NCDOT? 261 262 Abigaile Pittman: I don't believe the OUTBoard has any additional role now; it's really the NCDOT and the County 263 Commissioners at this stage. 264 5 DRAFT $ 265 Heidi Perry: My understanding is that the new 1-40 project route was requested by the developer that had just put in the 266 apartment complex. They asked to have it rerouted and now it's been rerouted through the subdivision. 267 268 Randy Marshall: There was an issue several years ago about getting an AMTRAK stop and a train station in 269 Hillsborough. Is that still something? 270 271 Abigaile Pittman: The Hillsborough train depot has its funding approved and it is on the TIP. 272 273 MOTION by Heidi Perry to approve the Annual Report and Work Plans as amended. Seconded by Jenn Sykes. 274 VOTE: UNANIMOUS 275 276 AGENDA ITEM 613: BICYCLE SAFETY IMPLEMENTATION SUBCOMMITTEE REPORT(ABIGAILE PITTMAN) 277 Abigaile Pittman reviewed the Bicycle Safety Subcommittee progress. 278 279 Amy Cole: Is the website for the bicycle safety currently maintained by Orange County staff? 280 281 Art Menius: It is maintained by the subcommittee. 282 283 Amy Cole: Can I ask the subcommittee to make the videos accessible so that there's actually transcription with closed 284 captioning? 285 286 There was a general discussion among Board members about the posters. 287 288 AGENDA ITEM 7: STAFF UPDATES 289 290 AGENDA ITEM 7A: MPO/RPO NCDOT PROJECT UPDATES(ABIGAILE PITTMAN) 291 292 Abigaile Pittman: We have monthly updates from NCDOT. We don't normally go through all these projects unless 293 someone has a question. The abstract starts on page 35 of the agenda packet. 294 295 AGENDA ITEM 7B: OUTBOARD ORIENTATION MATERIALS(ABIGAILE PITTMAN) 296 Staff reviewed and revised OUTBoard Orientation materials with the Board. The proposal was to bring all information up 297 to date, add new topics that have arisen over the past several years, and provide materials for the Board members. The 298 orientation materials are available online through the Planning Department's web 299 page: http://www.orangecountVnc.gov/2005/OUTBoard-Orientation-Materials. Links are also provided within the 300 orientation sections to information provided elsewhere and/or regularly updated by other agencies. 301 302 AGENDA ITEM 7C: CALL FOR HIGH IMPACT—Low COST PROJECTS(ABIGAILE PITTMAN) 303 Abigaile Pittman provided handouts and discussed. There was a list of staff generated projects. 304 305 Alyson West: Can we add something that is already in the STIP that's been failing? Widening the shoulders on Old 306 86/Fayetteville Road from Farm House to Calvander intersection with Dairy Land. 307 308 Heidi Perry: The existing shoulders are less than two feet wide. 309 310 AGENDA ITEM 8:ADJOURNMENT 311 No meeting for December 2018. Next meeting January 16, 2018. 312 313 OUTBoard meeting was adjourned. 314 Art Menius, Chair 6 9 ORANGE COUNTY Orange Unified Transportation Board ACTION AGENDA ITEM ABSTRACT Meeting Date: January 16, 2019 Action Agenda Item No. 4.a. SUBJECT: Orange County Transportation Priority List for SPOT 6.0 / FY 2021-2030 STIP DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Projects in TARPO Nishith Trivedi, Transportation Planner, 2. Projects in DCHC MPO 919-245-2582 3. Projects in BG MPO Tom Altieri, Comprehensive Planning Supervisor, 919-245-2579 Craig Benedict, Planning Director, 919-245-2592 PURPOSE: To provide a recommendation to the Board of County Commissioners (BOCC) on a list of transportation priorities for consideration in Strategic Prioritization of Transportation (SPOT) / Statewide Transportation Improvement Program (STIP). BACKGROUND: Biennially, the North Carolina Board of Transportation (BOT) adopts a ten year Statewide Transportation Improvement Program (STIP) that funds and schedules transportation projects throughout the state for all modes. The STIP implements Metropolitan and Rural Planning Organizations (MPO/RPO) adopted Comprehensive Transportation Plan (CTP) and Metropolitan Transportation Plan (MTP). The CTP and MTP are used by MPO/RPO to determine which projects are submitted for considered in the STIP using the Strategic Prioritization of Transportation (SPOT) process. SPOT 5.0/STIP FY 2020-2029 Orange County has thirty-nine (39) projects in SPOT 5.0. This includes its member jurisdictions, Hillsborough, Mebane, Chapel Hill, and Carrboro. Eight of them have been funded, these projects are: • TIP - 1-3306A: 1-40 Widening from 1-85 to US 15/501 • TIP - 1-5984: 1-85 at NC-86 Interchange upgrade • TIP - 1-0305: 1-85 Widening from Orange Grove Road to Durham County • TIP - U-5304A, B, D, E, F: US 15/501 improvements from NC-86 to 1-40 (Chapel Hill) SPOT P6.0 Schedule and Process Between July 1, 2019 — September 30, 2019 MPO/RPOs across the state will submit their limited number of projects — based on their population and total centerline miles — to North Carolina Department of Transportation (NCDOT) for inclusion in SPOT 6.0. These projects must be approved by their respective Boards prior to submission. Orange County process requires the Board of County Commissioners (BPCC) approve the list of County transportation priorities 10 prior to submission to respective MPO/RPO. Each MPO/RPO has their own unique process for determining which limited number of projects they submit to NCDOT. • DCHC MPO will only submit projects listed in the adopted MTP • TARPO will establish a subcommittee to determine which projects to submit • BG MPO uses a multi-criteria process to determine which projects to submit Before MPO/RPO Boards approve the projects for submission, they will conduct a 30 day public comment period and public hearing. SPOT P6.0 Project List Based on changes to MPO/RPO SPOT project selection processes, staff is recommended Orange County transportation priorities also change so that projects may compete better. Staff has also meet with member jurisdictions in Orange County to identify specific corridors they would like addressed through SPOT/STIP or other funding opportunities. These changes and potential corridors are provided as staff recommendations for Orange County Transportation Priorities (Attachments 1 - 3). Many Orange County 2017 trans ortation priorities are carried forward, these are in Green. New priorities are recommended in Oran e. • Staff recommending removal of independent bike/ped projects based on STI Law § 136- 189.11 (d).(3).c.— The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. o Independent bike/ped projects can be pursued through Federal Surface Transportation Block Grant Direct Allocation (SDBGDA) which is part of STIP o They require 20% local match and local administration • Staff recommends converting paved shoulder projects and independent bike/ped projects to highway modernization projects with bike lanes. o 1 st 5' width of sidewalk is subject to NCDOT Sidewalk Cost Share Policy — 40% for Orange County — and any additional is 100% locally funded. • Staff recommends adding Old NC-86, NC-86, US-70 and NC-54 as County Priorities for SPOT and other funding opportunities FINANCIAL IMPACT: There is no immediate financial impact associated with this item. However, should County seek any bicycle or pedestrian projects, it will be required to provide 20 percent local match for the project's overall cost. It will also be obligated to provide local administration in addition to the local match. All bike and pedestrian projects will require a resolution or letter of commitment from Orange County indicating the County will provide the local match and administration if any such projects are selected for funding. This will be choreographed with the County's budget process. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this agenda item: • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. RECOMMENDATION(S): Staff recommends OUTBoard consider the list of Orange County transportation projects/priorities for consideration in the 2021-2030 STIP and provide a recommendation on the list to the BOCC. 11 _ Current County priority as highway project Attachment 1: Draft Triangle Area Rural Planning Organization(TARPO)Project List New Project MPO/ AADT 2010- Crashes 2006- 2018 Results Recommendations # RPO Project Description/Need 2016 2016 (SPOT 5.0) Staff OUTBoard Description:Modernize Old Greensboro Road(SR-1005)from Jones Ferry Road(SR-1942)to Alamance County with NCDOT standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g and sidewalk), Total 339 add turn lanes and safety improvements at Jones Ferry Road(SR-1942),Hatch Road(SR-1944),Neville Road pest 2800-3000 5 fatal County priority Old Greensboro(SR- (SR-1945),Carl Durham Road(SR-1950),White Cross Road(SR-1951),Wildcat Creek Road(SR-1953),and 6 serious injury County Priority redefined as Orange Chapel Clover Garden Road(SR-1956). 45 minor injury highway project 1 TARPO 1005)Road /DCHC Improvement** 36 Division.51 possible injury 22 Need:This project would provide a continuous paved bikeway segment from Carrboro through the Meets RPO southwestern portion of Orange County to connect with other bikeway segments that comprise the state's 232 property SPOT process Mountain to Sea bicycle route.The project is not likely to score very high using either the State's highway or east 4600-4800 damage bike/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. Description:Widen Efland-Cedar Grove Road(SR 1004)from Highland Farm Road(SR 1332)to Carr Store Road(SR 1352)with NCDOT standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g and Total 56 14.63 Division County priority sidewalk),add turn lanes and safety improvements at Carr Street(SR-1357)and highland Farm Road(SR- north 1400-1800 1 serious injury redefined as Efland-Cedar Grove 1332). 2 TARPO Road(SR 1004) 6 minor injury No local points highway project Improvements Need:The project improves travel time by increased design speed and improve safety with travel lane 11 possible injury recommended 38 property Meets straightening and increased pavement width.This segment of Efland-Cedar Grove Road is a travel alternative to NC 86 for traffic from northwestern Orange County to access 1-40/85,and as such,traffic is projected to south 2100-2200 damage Not funded SPOT process continue to increase in future years. Description:Provide two(2)buses to cover two(2)deviated fixed route expansion routes in the northwestern Deviated Fixed Route and northeastern areas of Orange County. 3 TARPO Service Implementation N/A 24.81 Division OCPT Vehicles Need:This project would provide Flexible fixed route or enhanced demand response service from the rural, underserved areas of Orange County to major points of interest such as medical,employment,retail,municipal and social services. Description:Modernize Orange Grove Road(SR-1106)from 1-85 to Dodson Crossroad(SR-1007)with NCDOT County Priority standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g and sidewalk),add turn lanes and Total 102 safety improvements at Ode Turner Road(SR-1130),Dimmocks Mill Road(SR-1134),Crossroad Church north 4700-4600 1 fatal Not carried County priority Cemetery Road(SR-1131),Davis Drive(SR-1129),Kimbro Road(SR-1128)and Dodson Crossroads(SR- redefined as TARPO Orange Grove Road(SR- 1102) 1 serious injury forward by highway project 4 /DCHC 1006)Improvement** 7 minor injury MPO Need:This project would provide one segment of a bikeway connection through western Orange County from 13 possible injury Meets RPO Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both 80 property No 20%local south 2400-3100 damage match or local SPOT process bicyclists and motorized vehicular travel.The project is not likely to score very high using the State's administration bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description:Modernize Dairyland Road(SR-1177)from Orange Grove Road(SR-1006)to Old NC-86(SR- County Priority 1009)with NCDOT standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g and sidewalk), Total 121 add turn lanes and safety improvements at Orange Grove Road(SR-1006),Dodson Crossroads(SR-1102), County priority Rocky Ridge Road(SR-1113), Bethel Hickory Grove Church Road(SR-1104)and convert intersectino at Old west 940-970 2 fatal Not carried redefined as 5 TARPO Dairyland Road(SR- NC-86(SR-1009)to Roundabout. 2 serious injury forward by 15 minor injury MPO highway project /DCHC 1177)Improvement** possible injury Need:This project would provide one segment of a bikeway connection through western Orange County from 16 p 86 property No 20/o o local Meets RPO Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for SPOT process motorized vehicular travel.The project is not likely to score very high using the State's bile/pedestrian scoring east 5400-5200 damage match or local factors because of its rural context and is only eligible for funding at the division tier. administration Description:Modernize Dodson Crossroad(SR-1102)from Orange Grove Road(SR-1006)to NC-54 with County Priority NCDOT standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g,and sidewalk),add turn lanes and safety improvements at Orange Grove Road(SR-1106),Borland Road(SR-1126),Arthur Minnis north 830-1000 Total 62 Not carried County priority Road(SR-1115),and Dairyland Road(SR-1177) 2 serious injury redefined as forward by 6 TARPO Dodson Crossroad(SR- 8 minor injury MPO highway project /DCHC 1102)Improvement Need:This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge 10 possible injury High School from the area south of the schools and connect to a proposed bikeway facility on Orange Grove 42 property No 20%local Meets RPO Road northward into Hillsborough.The project would also improve safety for motorized vehicular travel on this south 1800-1800 damage SPOT process segment of Orange Grove Road.The project is not likely to score very high using the State's bike/pedestrian match local scoringfactors because of its rural context and is onlyeligible for fundingin the division tier. administration 12 Attachment 1:Draft Triangle Area Rural Planning Organization(TARPO)Project List Recommendations MPO/ AADT 2010- Crashes 2006- Map RPO Project Description/Need 2016 2016 2018 Results Staff OUTBoard Description:Modernize Mebane Oaks Road(SR 1007)from NC 54 to 1-85 with NCDOT standard street cross- section 2E(60'row,1 T travel lane,5'bike lane,c&g,and sidewalk),add turn lanes and safety improvements at Old Hillsborough Road Road(SR-2126),Hebron Church Road(SR-1139),Yarborough Road(SR-1138),Oak north 4400-3400 Total 161 Grove Church Road(SR-1117),Jones Road(SR-1123),S Jim Minor Road(SR-2135),Nicks Road(SR-1119), 2 fatal New Project Mebane Oaks Road(SR- Bradshaw Quarry Road(SR-1100),and NC-54 4 serious injury 7 TARPO 1007)Improvement 19 minor injury N/A Meets RPO Need:This project would provide multimodal and safety improvements along a north-south corridor that 31 possible injury SPOT process connects Orange and Alamance County.This corridor is growing more unsafe with increasing accidents,two of 105 property south 2400-2400 damage them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Description:Modernize Old NC-86(SR-1009)from 1-40 to Eubanks Road(SR-1727)with NCDOT standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g,and sidewalk),add turn lanes at Davis Road north 5500-6300 Total 208 (SR-1129),and New Hope Church Road(SR-1723) 3 fatal 01 TARPO Old NC-86(SR-1009) Need:This project would provide multimodal and safety improvements along a north-south corridor for 3 serious injury New Project 8 /DCHC Improvement** commuters travel between Hillsborough and Carrboro.This corridor is growing more unsafe with increasing 15 minor injury N/A Meets RPO accidents,three of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce 24 possible injury sou4500-5000 163 property SPOT process crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will damage continue increasing making the area more hazardous and will eventually exceed the capacity of the existing road. Description:NC-57 to Caswell County north 4700-5700 Total 609 9 fatal Need:This project would provide multimodal and safety improvements along a north-south corridor for 6 serious injury New Project 9 TARPO NC-86 Improvement** commuters travel between Orange and Caswell County.This corridor is growing more unsafe with increasing 46 minor injury N/A accidents,nine of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce south 11000- 111 possible Meets RPO crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will 11000 injury SPOT process continue increasing making the area more hazardous and will eventually exceed the capacity of the existing 437 property road. damage Description:Widen NC-54 from Orange Grove Rd(SR 1006)to Butler Rd(SR 1951)/Dodsons Cross Rd(SR East 12000- Total 340 New Project 1102)and from Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)to Old Fayetteville Road(SR-1107)/ 15000 3 fatal Inside DCHC Meets RPO 8 serious injury 61.80 Region TARPO SPOT process 1 /DCHC NC-54 Improvement** Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will 35 minor injury substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 9300- 61 possible injury 26.58 Division Fundable widening.NC-54 West Corridor Stud provides such recommendations necessary to address increasingtraffic 10000 233 property y p ry damage through and crashes along corridor. g Regional Impact Description:Widen from Mebane Oaks Road(SR-1007)to Orange Grove Rd(SR 1006). East 93000- New Project 10000 Total163 1 fatal Meets RPO 4 serious injury Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will SPOT process 11 TARPO NC-54 Improvement** 19 minor injury N/A substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 5800-6000 20 possible injury widening.NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic 119 property Fundable and crashes along corridor damage through Regional Impact Notes: *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County Attachment 1: Draft Triangle Area Rural Planning Organization(TARPO)Project List 13 TARPO SPOT 6 - Projects Caswell Co. eo Ems`R. Persnn c., ��P FSRo AL�Qt, �' tlRAV Rp q CoReFTT- y p4 q si ICON R9 N F9a y 0 ,gN9e'O�JS A S70RE Ra 49 hC�rTU 2 S C �. q hPNMINS Rp F£ftP n OJT iLE RIVpN RCH RO iD R IL R9 . e� �R0 A5ro4e,, Q 0 86 PEM1AT„ 2 H P 1♦ R& 0 KIGER R0 w° r fps ENio"'RD AdaS r�RRr RD RD N�.r LEBhfVp�y ❑ Q.0.° N r W j 1 F,I 2 RO ��VC ❑ � t- Mebane;?L E00 —A~ 70 +Esr E.TyRvoe�.ssa� o r�tiREi Rp� �� � sr7 HiI.IsbArvu0i s �oE� r� J RFD ��a O c� Ro pp RD_ Y O:I,Yn0 V,➢ pT`�H (j,`,'y. �p�{pr�1LL56rJR �,S, gORL gifP RQ 4 Qq r90 µT sINA,Rp I x Durham Co. ❑ �r R O RATyDR f.1[y rr.`.RO l } ^Da+ tl4igy;A•JP F+p w r1SCFIELD Rp 1. 7 ¢ 0 �❑� TEEP R� ? x Gp� J J� [9}RC p. 1 o Li Chape'Pliill pftP BE x�� �yRp "'URRo'x [y� Y•P 3� y '''�55'''A ��t � a W o RALEIQyA,n_ 00)GRY 5801iO R,O =1it�'_'H ROr�LFICyi.Yr. L ¢ h F Project Locations Municipal Boundaries Chatham Co. v 1 in=3 miles DCHC MPO Boundary ORANGE A MMMIE=Mlles TARPO Boundary 0 2 Orange County Planning and Inspection B-G MPO Boundary BC 1M2019 Q� 15 _ Current County priority as highway project Attachment 2: Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List New Project Removal—funded/now highway/local match MPO/ AADT 2010- 2018 Results Recommendations # RPO Project Description/Need 2016 Crashes 2006-2016 (SPOT 5.0) Staff OUTBoard Description:Widen US-70 and improve intersections from Buckhorn Road(SR-1114)to Durham County with NCDOT standard street cross-section 4G(110'row,17.5'median,11'travel lanes,5'bike lane,c&g,and sidewalk),add turn lanes and safety improvements at NC-86,St.Mary's Road(SR-1002),Efland Cedar Grove Road(SR-1004),Frazier Road(SR- West 6400-6200 Total 1148 1310),Richmond Road(SR-1312),Brookhollow Road(SR-1324),Faucette Mill Road(SR-1328),Miller Road(SR-1555), 10 fatal Lawrence Road(SR-1561),Palmers Grove Church Road(SR-1562),Pleasant Green Road(SR-1567),Orange High School 12 serious injury 1 DCHC US-70 Road(SR-1588),and N Scotswood Boulevard(SR-2300). 100 minor injury N/A New Project /BG Improvements 220 possible injury Need: This is a major east-west corridor linking Mebane,Hillsborough and Durham through Orange County.Traffic continues 706 property increasing with more commuters traveling from Mebane and Hillsborough into Durham.Many use this corridor to avoid 1-85.It East 12000- damage is also designated at a Strategic Freight Corridor in the DCHC MPO adopted Freight Plan. 14000 Description:Reconstruct interchange at 1-85 and NC 86 1-85/NC 86 Funded Need:This project would relieve existing and/or future expected congestion on the under-capacity existing interchange to 2 DCHC Interchange N/A Statewide Removal Improvements accommodate future capacity improvements to I-85 and increase operational efficiency at the on-ramp/off-ramp intersections TIP I-5984 with NC 86.The new interchange would also be an opportunity to provide pedestrian and biking facilities across 1-85;these facilities do not currently exist along the corridor. Description:Widen NC 86 from U.S.70 Bypass to north of NC 57 to four(4)lanes with intersection improvements at U.S.70 Bypass and NC 57 Total 114 NC 86 Need:The segment of NC 86 between NC 57 and U.S.70 is highly congested.Traffic counts indicate that this segment of NC County Priority 3 Improvements 86 is over capacity for average annual daily counts.Capacity improvements would ease congestion and improve travel time 1 serious injury DCHC 17000-18 North of along this primary north-south corridor connecting the Town of Hillsborough to NC 57 and northern Orange County. , ,000 5 minor injury 26 possible inju 51.02 Regional County priority Hillsborough Additionally,this area is identified in the Orange County Safe Routes to School Plan and the Town of Hillsborough ry27.42 Division Connectivity Plan as an area in need of improvements for pedestrians,particularly for school age residents of the Fairview 82 property damage neighborhood that walk to Orange High School and Stanford Middle School.The Town of Hillsborough Connectivity Plan also calls for bike lanes in this area as well. Eno Mountain Description:Realign the intersection of Eno Mountain Road(SR 1148)and Mayo Street(SR 1192)with Orange Grove Road Eno 3800-4500 Total 38 County Priority Road/Mayo Street (SR 1006)and make safety improvements. 4 minor 4 DCHC injury County priority at Orange Grove Need:The project would improve safety,reduce travel time,and improve traffic flow between residential and commercial Mayo 5300- 4 possible injury 14.36 Division Rd. areas in the Town of Hillsborough. 5200 30 ro ert dams e Description:Modify the 1-85/1-40 Connector(SR 1239)interchange at U.S.70 to provide access from all directions. Total 54 County Priority U.S.70 EasUl-85/1- Need:The project would enable traffic from northwestern Orange County to access 1-85 more easily without risking the many 1 fatal 5 DCHC 40 Connector points of traffic conflict through Efland. Traffic has increased on Efland-Cedar Grove Road as an alternative to NC 86.Much 4100-4900 5 minor injury 18.43 Regional County priority of that traffic currently"dog-legs"through Efland via Forrest Avenue to Mt.Willing Road to access 1-85/1-40.Traffic counts 4 possible injury 13.03 Division reveal that traffic has increased approximately 40%over the past 10 years on Mt.Willing Road just south of Forrest Avenue, 44 property damage while traffic on U.S.70 east of Efland-Cedar Grove Road has increased only 2%.The project would dramatically improve travel time for traffic from northwestern Orange County to 1-85/1-40 and would dramatically ease congestion during peak periods in Efland. Description:Modernize Old Greensboro Road(SR-1005)from Jones Ferry Road(SR-1942)to Alamance County with NCDOT standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g and sidewalk),add turn lanes and safety Total 339 County priority improvements at Jones Ferry Road(SR-1942),Hatch Road(SR-1944),Neville Road(SR-1945),Carl Durham Road(SR- west 2800-3000 5 fatal County Priority redefined as DCHC Old Greensboro 1950),White Cross Road(SR-1951),Wildcat Creek Road(SR-1953),and Orange Chapel Clover Garden Road(SR-1956). 6 serious injury highway 6 /TARP (SR-1005)Road 45 minor injury No 20%local project O Improvement— Need:This project would provide a continuous paved bikeway segment from Carrboro through the southwestern portion of 51 possible injury match or local Orange County to connect with other bikeway segments that comprise the state's Mountain to Sea bicycle route.The project east 4600-4800 232 property administration Meets RPO is not likely to score very high using either the State's highway or bike/pedestrian scoring factors because of its rural context damage SPOT process and is only eligible for funding at the division tier. 16 Attachment 2:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List Recommendations Map MPO/ Project Description/Need AADT 2010- Crashes 2006-2016 2018 Results RPO 2016 Staff OUTBoard Description:Modernize Dairyland Road(SR-1177)from Orange Grove Road(SR-1006)to Old NC-86(SR-1009)with NCDOT standard street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g and sidewalk),add turn lanes and safety Total 121 improvements at Orange Grove Road(SR-1006),Dodson Crossroads(SR-1102),Rocky Ridge Road(SR-1113), Bethel west 940-970 County Priority DCHC Dairyland Road Hickory Grove Church Road(SR-1104)and convert intersectino at Old NC-86(SR-1009)to Roundabout. 2 fatal County priority 7 /TARP (SR-1177) 2 serious injury No 20%local redefined as O Improvement— Need:This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the 15 minor injury match or local highway Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized south 2400- 16 possible injury administration Project vehicular travel.The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its 3100 86 property damage rural context and is only eligible for funding in the division tier. Description:Modernize Dodson Crossroad(SR-1102)from Orange Grove Road(SR-1006)to NC-54 with NCDOT standard street cross-section 2E(60'row,1 T travel lane,5'bike lane,c&g,and sidewalk),add turn lanes and safety improvements at north 830-1000 Orange Grove Road(SR-1106),Borland Road(SR-1126),Arthur Minnis Road(SR-1115),and Dairyland Road(SR-1177) Total 62 County Priority County priority DCHC Dodson Crossroad 2 serious injury redefined as 8 /TARP (SR-1102) Need:This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from 8 minor injury No 20%local highway O Improvement the area south of the schools and connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. south 1800- 10 possible injury match or local project The project would also improve safety for motorized vehicular travel on this segment of Orange Grove Road.The project is 1800 42 property damage administration not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description:Modernize Orange Grove Road(SR-1106)from 1-85 to Dodson Crossroad(SR-1007)with NCDOT standard street cross-section 2E(60'row,1 T travel lane,5'bike lane,c&g and sidewalk),add turn lanes and safety improvements at north 4700- Ode Turner Road(SR-1130),Dimmocks Mill Road(SR-1134),Crossroad Church Cemetery Road(SR-1131),Davis Drive Total 102 4600 County Priority DCHC Orange Grove (SR-1129),Kimbro Road(SR-1128)and Dodson Crossroads(SR-1102) 1 fatal County priority 1 serious injury redefined as 9 TARP Road Improvement— No match o local Need:This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the 7 minor injury highway O Improvement" matchst local Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized south 2400- 13 possible injury administration project vehicular travel.The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its 3124 80 Property damage rural context and is only eligible for funding in the division tier. 00 Description:Widen NC-54 from Orange Grove Rd(SR 1006)to Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)and from East 12000- Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)to Old Fayetteville Road(SR-1107)/Inside DCHC 15000 340 New Project Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will substantially Total al exceed the existing roadway capacity by 2035,warranting an increase in capacity through widening.NCDOT traffic figures 3 fatal Meets RPO DCHC 8 serious injury 61.80 Region SPOT process NC-54 already indicate that traffic along the segment of NC 54 from Butler Road/Dodsons Cross Road to Neville Road is at capacity 10 /TARP y g g P y 35 minor injury O Improvement" and will only continue to substantially exceed capacity in future years.It is likely that traffic along the segment of NC 54 from 61 possible injury 26.58 Division Fundable Neville Road to Old Fayetteville Road is also at or over capacity.Specific user input on the subject corridor reveals the lack of West 9300- 233 property through usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signalization. 10000 damage Regional User input also reveals the presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate Impact storage for left and right turns at some intersecting streets and entrances to businesses along the corridor. Description:Intersection and safety improvements along Lebanon Road(SR-1306)from Mill Creek Road(SR-1345)to East 2600—3000 Total 100 Efland-Cedar Grove Road(SR-1004) DCHC 2 serious injury 11 /BG Lebanon Road 12 minor injury N/A New Project 11 possible injury Need:Road continues experiencing increasing traffic and crashes,intersection and safety improvements along the corridor West 2100-2300 75 property damage will help provide safe travel for all users. Map MPO/ Project Description/Need AADT 2010- Crashes 2006-2016 2018 Results Recommendations RPO 2016 17 Attachment 2: Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List Staff OUTBoard Description:Modernize Old NC-86(SR-1009)from 1-40 to Eubanks Road(SR-1727)with NCDOT standard street cross- section 2E(60'row,11'travel lane,5'bike lane,c&g,and sidewalk),add turn lanes at Davis Road(SR-1129),and New Hope north 5500- Total 208 Church Road(SR-1723) 6300 3 fatal DCHC Old NC-86(SR- 3 serious injury New Project Need:This project would provide multimodal and safety improvements along a north-south corridor for commuters travel O Improovemvement 12 /TARP between Hillsborough and Carrboro.This corridor is growing more unsafe with increasing accidents,three of them being fatal. 15 minor injury N/A Meets RPO process " Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key south 4500- 24 possible injury SPOT process locations along the corridor.Traffic along this corridor will continue increasing making the area more hazardous and will 5000 163 property eventually exceed the capacity of the existing road. damage Description:Improve current Dimmocks Mill Rd(#735154S)grade separation and close Bellvue St(#735152D)rail crossing County Priority Dimmocks Mill Need:The NCRR trestle on Dimmock's Mill currently does not allow trucks or pedestrians to safely cross underneath the 13 DCHC Trestle N/A 52.84 Statewide County priority railroad.By restructuring this trestle and reconfiguring the intersection,this area will provide a safe crossing between Improvements Hillsborough and destinations south for all users.Additionally,improving this trestle will allow large trucks to avoid using 33.08 Regional Churton Street and will help create a back entrance to West Hillsborough. 22.86 Division Description:Improve the current trestle at Exchange Park Lane to accommodate Pedestrian traffic to support a pedestrian link from the proposed train station to downtown Hillsborough. County Priority Exchange Park Need:Currently,the NCRR trestle on Exchange Park Lane only accommodates one vehicle at a time and provides no safe 14 DCHC Lane Rail Trestle accommodations for pedestrians.Once the Hillsborough Train Station is constructed,Exchange Park Lane will be the only N/A 2 16.56 Statewide County priority Improvements safe pedestrian route from the Train Station to Downtown Hillsborough.With substantial pedestrian demand forecast between Regional the Train Station and Downtown Hillsborough,creating a safe pedestrian environment is a crucial need in this area. 12.4.46 Division Description:Construct one additional lane between Patriot's Pointe Drive and New Grady Brown School Road(SR 1221)to Orange Grove Rd include both pedestrian and bicycle improvements along the roadway.The 1-40 bridge would be widened to accommodate Total 43 Not carried Widening with both pedestrian and bicycle amenities and one additional travel lane. 1 serious injury forward by MPO 15 DCHC Bicycle and 4700-4600 5 minor injury o Removal' Pedestrian Need:There are significant safety issues along this stretch of roadway for motorists,but also for pedestrians and bicyclists. 6 possible injury No 20/o local (See#9) Improvements Increased traffic along Orange Grove Road has led to a significant safety risks for all users of the roadway. 31 property match or local damage administration Description:Construct a roundabout at the intersection of Old NC 86,Dairyland Road(SR 1004/1113/1177),and Homestead 19.99 Division Calvander Road(SR 1777)in Calvander outside of Carrboro Part of Old NC- 1 DCHC Roundabout N/A 86 modernization Removal Need:Included at the request of the Orange Unified Transportation Board,this project would enhance safety at this (SPOT ID intersection and improve traffic flow,while also facilitating a safe left turns for bicyclists. H170399) Description:Provide one(1)bus to serve a new route for Orange Public Transportation providing service to major trip Orange County generators in Hillsborough Public Removed from 17 DCHC Transportation Need:This project would provide a fixed route for underserved areas of Orange County(not being covered by the N/A SPOT in favor of Removal Circulator 11 Hillsborough Circulator)to major points of interest such as medical,employment,retail,municipal and social services.The DO LRT Vehicles project is currently in the unfunded category of the Orange County Bus and Rail Investment plan,yet remains a priority for our County Board of commissioners.It is only eligible for funding at the Division Needs tier. Description:Construct bicycle facilities on Old NC 86 from Farm House Road in Carrboro to Homestead Road(SR 1777). Not carried forward by MPO 18 DCHC Old NC 86 Bike Need:Cyclists routinely use Old NC 86 as a key conduit for major rides in rural Orange County.Recent bicycle counts N/A Removal' Lanes conducted by NCDOT and NC State's ITRE indicate that 160 cyclists use the stretch of Old NC 86 between Hillsborough No 20%local (See#11) Road(SR 1009)and Homestead Road(SR 1777)each day with more on the weekends.This section is also particularly match or local narrow and includes a narrow gravel shoulder,which can present a hazard for cyclists.Widening this section to include administration bicycle lanes will provide a safes ace for bicyclists in this heavily trafficked bicycle corridor. Map MPO/ Project Description/Need AADT 2010- Crashes 2006-2016 2018 Results Recommendations RPO 2016 18 Attachment 2: Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List Staff OUTBoard Description:Improve Homestead Road(SR 1777)from Old NC 86(SR 1009)to NC 86 to include bicycle lanes and sidewalks in sections of the corridor where they do not exist. Not carried Homestead Road forward by MPO Need:There are three(3)schools in the vicinity of Homestead Road:Chapel Hill High School,Smith Middle School,and 19 DCHC Bike Lanes and Seawell Elementary School.Many students live within walking and biking distance of Chapel Hill High School and must walk N/A No 20%local Removal* Sidewalks or cycle along or across Homestead Road on a daily basis.Provision of bikeway and pedestrian facilities is necessary to give match or local students a comfortable and safe place to travel separate from that of motorized vehicular traffic.Homestead Road is also a administration commuting route for adult utilitarian bicyclists connecting residential areas to other arteries serving employment centers Not carried Description:Construct bicycle lanes on Eubanks Road(SR 1727)from Old NC 86(SR 1009)to NC 86. forward by MPO 20 DCHC Eubanks Road Bike N/A Removal* Lanes Need:This project would provide a separate facility for both recreational and commuter bicyclists to reduce/eliminate the No 20%local bike/automobile modal conflict along this corridor.The project would also provide access to the Morris Grove Elementary match or local School on Eubanks Road. administration Description:Construct bike lanes and sidewalks from US 15-501 to Bennett Road and bike lanes from Bennett Road to the Chatham County line. Not carried Mt.Carmel Church forward by MPO 22 DCHC Road Need:This project would provide a continuous paved bikeway facility from Chapel Hill through southeastern Orange County N/A Removal* Bike/Pedestrian into Chatham County.The project connects to another project submitted by Chatham County to construct bike lanes along No 20%local Improvements Mt.Carmel Church Road from the Orange County line to Old Farrington Point Road.This segment is listed as a Statewide match or local bicycle facility in the DCHC MPO MTP and is a continuation of the state's Mountain to Sea bicycle route through Orange administration. County. Description:Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S.70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road,install high Orange High visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road,and construct a sidewalk Not carried School along entrance roads to CW Stanford Middle School. forward by MPO 2 DCHC Road/Harold Latta N/A Removal* Need:Orange High School Road serves two schools north of U.S.70,Orange High School and CW Stanford Middle School. No 20%local (See#9) Road Sidewalk There are currently no dedicated pedestrian facilities along Orange High School Road to accommodate students accessing match or local Improvements the schools from residential areas to the north and east.The project would provide safe and comfortable pedestrian administration. connections from these areas to the schools.The Orange County Safe Routes to School Action Plan identifies these sidewalk and crosswalk improvements as central elements in the plan for both Orange High School and CW Stanford Middle School. Description:Construct a pedestrian bridge over 1-40 alongside Orange Grove Road(SR 1006),construct a sidewalk along the north side of Orange Grove Road(SR 1006)from the pedestrian bridge to Timbers Drive,construct sidewalks along both sides of New Grady Brown School Road with a midblock crossing,and construct a sidewalk along one side of Oakdale Drive carried from Cheshire Drive to Orange Grove Road. forward Not carr rr ed Orange Grove MPO 24 DCHC Road/1-40 Need:1-40 separates two schools,Grady Brown Elementary and Cedar Ridge High School,from residential areas north of I- N/A No 20%local Removal* Pedestrian Bridge 40.The schools are within walking distance of residential areas,but bicyclists and pedestrians must share the roadway with match or local motor vehicles crossing the existing narrow two(2)-lane bridge that carries Orange Grove Road over 1-40.The bridge is too administration narrow to accommodate a pedestrian walkway.Lack of an adequate pedestrian crossing presents an unsafe environment for students to walk to the schools.The Orange County Safe Routes to School Action Plan identifies the pedestrian bridge and supporting sidewalk improvements as central elements in the plan for Grady Brown Elementary School. Description:Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, Daniel Boone Village,and Downtown Hillsborough. Not carried forward by MPO 25 DCHC 1-85 Pedestrian Need:Neighborhoods to the south of 1-85,such as those along Cates Creek Parkway and Beckett's Ridge Drive,lack N/A Removal* Bridge pedestrian and bicycle connections to commercial amenities and neighborhoods north of the highway.Constructing a bridge No 20%local across 1-85 would create a safe access point for pedestrians and bicyclists and link areas of Hillsborough south of 1-85 to match or local Downtown Hillsborough and commercial amenities along Churton Street.Receiving sidewalks will be present on both sides of administration the proposed pedestrian bridge. Dairyland Road Description:Widen Dairyland Road(SR 1004/1113/1177)from Union Grove Church Road(SR 1111)to Orange Grove Road Not carried Removal* 26 DCHC Paved Shoulders (SR 1006)to include four(4)-foot paved shoulders. N/A forward by MPO (See val 19 Attachment 2:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List Need:This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the No 20%local Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized match or local vehicular travel.The project is not likely to score very high using the State's congestion and benefit-cost scoring factors and is administration only eligible for funding at the division tier. Description:Construct a multi-use path connecting English Hill Lane to Buttonwood Drive. Not carried Trail Connection Need:Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan.An existing forward by MPO 27 DCHC from English Hill barrier to pedestrians toward Orange High School and CW Stanford Middle School exists between residential areas along N/A Removal` Lane to and east of Buttonwood Drive and residential areas along and west of English Hill Lane.The improvement would provide a No 20%local Buttonwood Dr. direct pedestrian connection from highly populated residential areas further west from the schools and make walking match or local distances safer and more manageable. administration. Description:Construct a multi-use path connecting the southwest corner of Patriots Pointe to Timbers Drive to shorten walking distances for pedestrians. Not carried Trail Connection forward by MPO 28 DCHC from Patriot's Need:Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan.An existing N/A Removal* Pointe to Timbers barrier to pedestrians exists between Patriots Point Apartments and Timbers Drive such that long walking distances are No 20%local Dr. required for pedestrians from Patriots Pointe to access the New Grady Brown Elementary School and Cedar Ridge High match or local School along Orange Grove Road with no designated pedestrian facilities.The improvement would provide a direct administration. pedestrian connection from Patriots Point to Timbers Drive and Orange Grove Road in the direction of the schools that make walking distances more manageable. Notes: *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County Attachment 2: Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List 20 DCHC SPOT 6 - Projects Caswell CO- Person CO. ypv N 1 R9C��'� ❑ o ,7$JvSLEY R9 .fit.] a 8pRC1ts RP AL11 GRAY RD COAeET7-RU C'p dFrrD a C Q - p¢ a x g ,eve R &LLON RO 'Y �Pd d ,MI]P ti IhW^,STORE Rp 149 p N'V%Ns P❑BPS''' N 7 NEE p d66 O[ay r O �y In M Ui LERiVERRV CH RJ RD¢ R° n C� �Rp A570REk0 ry O PEARS RD r v KJGER RG Gay g O 96 `+P ' tip �QO Aiamance Co. Po U RE iIgy AD PS •� J -•H �o o RO O A Tk } � Lt oCgRv HALLS MILL Rp 9y Fqp o l BR /hgRY5 Rd 3 LEeANOM Ro O �L w r1 tom+ J P A r� 7 ;V = P& ul Va.'Pyyy -��Mebane �,1 70 1 RW_m Hillsborough YcPv � r.:�• 70+1 9a �RD oLD NIL_ R� Q; 'y �' Durhaam Co. 2 � °CF "v dgv�SQ o Gel w GINA;RA 2 t Z ART14LM u��� p Yt' Z ^L'is PO qY rc r/ z LL ��S FIELD RD w° g■ aUp iEER ,E=,•E,D,, J -C hapel,•HikIRHRMR0 yR° Car haro � t L�PO n L4� � 4,� �, ao � "sew o Lnrrrrra F -D Project Locations E55 4 I Municipal Boundaries �s�stl 1 in=3 miles B-G MPO Boundary CE A MEMr-=MiI., DCHC MPO Boundary a 2 TARPO Boundary Chatham Co. Oran geCou gCPI,�Zn079aniflnspec+ion 21 _ Current County priority as highway project Attachment 3:Draft Burlington-Graham Metropolitan Planning Organization(BGMPO)Project List New Project MPO/ Recommendation # RPO Project Description/Need AADT 2010-2016 Crashes 2006-2016 2018 Results (SPOT 5.0) Staff OUTBoard Description:Widen US-70 and improve intersections from Buckhorn Road(SR-1114)to Durham Total 1148 County with NCDOT standard street cross-section 4G(110'row,17.5'median,11'travel lanes,5' West 6400-6200 10 fatal US-70 bike lane,c&g,and sidewalk),add turn lanes and safety improvements at NC-86,St.Mary's Road 12 serious injury 1 DCHC/BG Improvements** (SR-1002),Efland Cedar Grove Road(SR-1004),Frazier Road(SR-1310),Richmond Road(SR- 100 minor injury N/A New Project 1312),Brookhollow Road(SR-1324),Faucette Mill Road(SR-1328),Miller Road(SR-1555), East 12000-14000 220 possible injury Lawrence Road(SR-1561),Palmers Grove Church Road(SR-1562),Pleasant Green Road(SR- 722 property damage 1567),Orange High School Road SR-1588,and N Scotswood Boulevard SR-2300. County Priority 2 BG Mattress Factory Description:Construct a new interchange at the existing grade-separated crossing of Mattress N/A County priority Road Interchange Factory Road and 1-85/1-40 Not carried forward by MPO Description:Extend Mattress Factory Road northward across East Washington Street and the North 2200-2000 Total 18 County Priority Mattress Factory NCRR/Norfolk Southern railroad right-of-way to intersect U.S.70 and close the existing railroad 1 serious injury 3 BG Road Extension to crossover road connecting East Washington Street and U.S.70 approximately 240 feet to the east 3 minor injury Not carried County priority U.S.70 1 possible injury forward by MPO of the intersection of Mattress Factory Road and East Washington Street. South 1300-1800 13 property damage Total124 Count Priority North 6800-6600 Y Y Buckhorn Road 2 serious in 4 BG (SR 1114) Description:Widen Buckhorn Road from U.S.70 to West Ten Road(SR1144)to multiple lanes with 14 minor injury County priority Widening bicycle and pedestrian facilities. 18 possible injury Not carried South 2500-3000 90 property damage forward by MPO Total 100 Lebanon Road East 2600—3000 2 serious injury 5 DCHC/BG (SR-1306) Description:Intersection and safety improvements along Lebanon Road(SR-1306)from Mill Creek 12 minor injury N/A New Project Improvements** Road(SR-1345)to Efland-Cedar Grove Road(SR-1004) 11 possible injury West 2100-2300 75 property damage Notes: *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County Attachment 3:Draft Burlington-Graham Metropolitan Planning Organization(BGMPO)Project List 22 BGMPO SPOT 6 - Projects -,a ❑ R � �Q O eNURQN RU �y. M1 IRA RE) 1 l fir" "� rl 1 ' � I I t y I f' d ❑ iI Z r+ 0 I I I y a 70 {fl 1 WEST TEtY Rp i1 , gG i 1 S 5 x 1 � ! a �G �J �G gR� Project Locations Municipal Boundary �V, B-G MPO Boundary �y�y ti 1 in=3.0001e 1 �� A �.Fi ❑CHC MPO Boundary 0 2.1900 TARPO Boundary Orange County 111 81 2 0 7 9n dlnspeclion BC 23 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: January 16, 2019 Action Agenda Item No. 4.b. SUBJECT: Bicycle Safety Implementation Subcommittee (BSIS) Report DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: Abigaile Pittman, Transportation/Land Use Planner, 919-245-2567 PURPOSE: Receive a report on the recent activities of the BSIS. BACKGROUND: Since the November 28, 2018 OUTBoard meeting, four posters and a brochure focused on `Rules of the Road' have been printed by Vista Print. The installation of fifteen bicycle safety road signs at entry points to the county and along frequently used bicycle routes began January 7th. Additionally, the bicycle safety website has been completed and linked to the Orange County Transportation web site: http://www.orangecountVnc.gov/2047/Bicycle-Safety . Next Steps Staff and the BSIS will continue to work on: • Social media ads and posts, and radio ads will be underway late fall of this year. Budgeted funds will be utilized for social media ads on Facebook, Instagram and Twitter, print and/or radio ads (WCHL Radio, News of Orange, etc.). Audio PSAs will be produced by WCOM Radio next spring. • The scheduling of events, including a Bike Rodeo, and other community events where bicycle safety brochures and branded swag can be shared. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. Budgeted funds from are being utilized. RECOMMENDATION(S): Staff recommends that the OUTBoard: 1. Receive information; and 2. Provide any comments or direction that the Board might have. Q 25 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: January 16, 2019 Action Agenda Item No. 5. SUBJECT: Staff Updates DEPARTMENT: Planning and Inspections INFORMATION CONTACT: ATTACHMENT(S): Nish Trivedi, Transportation Planner, 5.a. Efland-Buckhorn-Mebane Access 919-245-2582 Management Plan Abigaile Pittman, Transportation/Land 5.b. MPO/RPO NCDOT Projects Use Planner, 919-245-2567 PURPOSE: Receive staff updates and provide any comments that the Board might have. Item 5.a. — Efland-Buckhorn-Mebane Access Management Plan — This item is an update from staff on the Efland-Buckhorn-Mebane Access Management Plan public hearing process and next steps. On September 19, 2018, Orange Unified Transportation Board (OUTBoard) began reviewing the Draft Efland-Buckhorn-Mebane Access Management Plan (E-B-M AMP) and at its October 17, 2018 meeting in the absence of a quorum, recommended the Board of County Commissioners (BOCC) approve the Plan with inclusion of some clarifying text additions. The E-B-M AMP is being revised to reflect the OUTBoard's recommendations. Item 5.b. — MPO/RPO NCDOT Project Updates - NCDOT regularly releases lists of transportation projects underway in the DCHC MPO and BG MPO. Item 5.c. — OUTBoard Orientation Materials — At the November 28, 2018 meeting, staff previewed the revised orientation materials with the Board. The materials are available online through the Boards and Committees section of the Planning Department's web page: http://www.orangecountVnc.gov/2005/OUTBoard-Orientation-Materials . Links are also provided within the orientation sections to information that is already provided elsewhere and/or regularly updated by other agencies, such as NCDOT and the MPOs/RPO. In this way, information is uniformly and accurately updated by the responsible agency. Staff will scheduled an orientation session with new OUTBoard members and any other members that wish to attend. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. Budgeted funds from are being utilized. RECOMMENDATION(S): Staff recommends that the OUTBoard: 1. Receive information; and 2. Provide any comments that the Board might have. Q 27 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: January 16, 2019 Action Agenda Item No. 5.a. SUBJECT: Efland-Buckhorn-Mebane Access Management Plan DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1) Excerpt of OUTBoard Minutes Nishith Trivedi, Transportation Planner, From 10/17/2018 Meeting (919) 245-2582 Tom Altieri, Planner III, (919) 245-2579 Craig Benedict, Planning Director, (919) 245-2592 PURPOSE: To receive an update from staff on the Efland-Buckhorn-Mebane Access Management Plan public hearing process and next steps. BACKGROUND: On September 19, 2018, Orange Unified Transportation Board (OUTBoard) began reviewing the Draft Efland-Buckhorn-Mebane Access Management Plan (E-B-M AMP) and at its October 17, 2018 meeting (Attachment 1), in the absence of a quorum, recommended the Board of County Commissioners (BOCC) approve the Plan with inclusion of some clarifying text additions. The E-B-M AMP is being revised to reflect the OUTBoard's recommendations. The public hearing draft will be formatted to track the changes from the first draft and will be released no later than January 31, 2019, consistent with the County's agenda preparation schedule. In addition to the regular posting that occurs on the County's BOCC meeting area of its website, the draft will be posted on the Planning Department's website where additional materials and information on the AMP has been made available to the public, following is the link: https://www.orangecountync.gov/1404/Efland-Buckhorn-Mebane-Access-Management On November 1, 2018, the BOCC opened the Public Hearing for the E-B-M AMP but continued it to February 5, 2019, in order to meet with Economic Development staff and the Economic Development Commission to fully understand its questions and provide responses. The primary concern raised by Economic Development is the future marketability of relatively large properties (e.g. where new connector roads bisect the area) that have been targeted for economic development purposes. County Planning and Economic Development staffs have met for initial discussion to see if there's opportunity to allow some flexibility in Plan implementation and a meeting has been scheduled with the Economic Development Commission to take place January 8, 2019. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends that the OUTBoard receive the update. 28 Approved 11/7/2018 Attachment 1 1 MINUTES EXCERPT 2 ORANGE COUNTY OUTBOARD 3 OCTOBER 17,2018 4 REGULAR MEETING 5 6 7 MEMBERS PRESENT: Heidi Perry (Chair), At-Large Representative; David Laudicina, Cheeks Township 8 Representative; Ed Vaughn, Cedar Grove Township Representative; Brantley Wells, Hillsborough Township 9 Representative;Art Menius,At-Large Representative; Erik Broo,At-Large Representative 10 11 MEMBERS ABSENT: Jenn Sykes, At-Large; Alyson West, At-Large Representative; Donna Musson, Eno Township 12 Representative; 13 14 STAFF PRESENT: Abigaile Pittman, Land Use/Transportation Planner; Nishith Trivedi, Transportation Planner; Tina 15 Love,Administrative Assistant III; 16 17 OTHERS PRESENT: Cy Stober, City of Mebane; Betty Rogers; Brian & Bonnie Myers; Jennifer Terrell; Anthony 18 Corbett; Mai & Huong Hguyen; Octavio Hernandez Lesso; Dana Richardson; Jolanda Williams; Annie Whitted; 19 Kristen Marbais; Richard &Brenda Bright; Robert Jones; Knox Efland 20 21 AGENDA ITEM 1: CALL TO ORDER AND DETERMINATION OF QUORUM 22 There was not a quorum for the meeting 23 24 AGENDA ITEM 413: EFLAND-BUCKHORN-MEBANE ACCESS MANAGEMENT PLAN UPDATE(NISH TRIVEDI)— 25 Make a recommendation on the Efland-Mebane Access Management Plan 26 27 Nish Trivedi reviewed a PowerPoint presentation on the draft plan. 28 29 Resident: Does this include Highway 70? 30 31 Nish Trivedi: There are no recommendations on Hwy 70; it was not recommended for any right-of-way changes. 32 If the state decides to pursue some of these projects, these are along state roads and NCDOT has their own 33 process to acquire any additional right-of way. 34 35 Resident: I live in the Cheeks Crossing community and I noticed the intersections around where I live are 36 congested; I see congestion isn't mentioned. Were there any studies done at the intersections of South Frazier 37 and Buckhorn Rd, East Washington Street Extension and Buckhorn Road? Those are highly congested areas. 38 We have had several accidents there. It really needs improvements. Also,what are the specific plans in terms of 39 extending of those roads on Buckhorn beginning on Exit 157 off 1-85/40 going along Buckhorn Road toward US 40 70? That's the community I live in; what were the specific plans; what were the studies and what were the 41 results in those areas? 42 43 Nish Trivedi: We have Cy Stober from Mebane. 44 45 Cy Stober: My name is Cy Stober and I'm the Development Director with the City of Mebane. To answer your 46 questions, in May of this year the NC Railroad conducted a study recommending improvements in the exact area 47 you are talking about for what they call grade separation, a bridge over the railroad tracks. I have sketches there 48 is not a public process; no designs have been done. The project is not funded. It was the only project in this 49 plan that was not funded. There are a number of safety improvements that are being done from Gibson Road in 50 Mebane all the way through town. The Buckhorn Road project is estimated to be around 8.5 million dollars and 51 so it would have to be funded and done by the state. There are 3 sketches in here, Mr. Jones came by the office 29 Approved 11/7/2018 52 this morning and got a copy of the plan. We have more copies of the plan and it's available on our website. 1 53 would be happy to talk with you after the meeting and show you some of the safety improvements suggested for 54 that very area. In addition, the City adopted its own transportation plan. The limit of our jurisdiction is Buckhorn 55 Road. Widening of Buckhorn for safety improvements including intersection improvements is identified in this 56 plan as a priority project. The City cannot afford to do that project, it is well beyond our means. We would have 57 to rely on state funding and again this is an unfunded project that we would like to pursue that would be entirely 58 separate process from what Nish is doing here this evening or that Orange County is considering. These are 59 unfunded projects that would have to have a totally separate public participation and design process that would 60 come in the future should the project be funded. 61 62 Resident: So what is long range goal here in terms of the future? 63 64 Cy Stober: We actually had a meeting yesterday about how to acquire state funds to do these two projects. 65 Best case scenario would be that the projects would be nominated for state funding in spring 2019. That will be 66 a one year process of consideration by the state so we won't even know for over a year. After that point, should 67 they be funded, there would be a design and public participation process that last another year to 2 years and 68 then construction would begin. The first year of construction, the public doesn't see anything, nothing happens. 69 The fastest track that we could see anything would be 4 years from now roughly. The soonest you would hear 70 something is 18 months from now about whether the state has funded anything and if it is this project, how you 71 can participate to make sure your concerns are heard. We know there are concerns about impacts to the 72 churches on Buckhorn and of the 3 sketches that have been done so far, avoid the churches there. 73 74 Resident: What about the homes? 75 76 Cy Stober: There is one sketch that avoids all homes and then two others that do not. We need your input to 77 help us decide the best sketch. We don't have a favorite, Orange County has two sketches that they don't like 78 and the one they do like is the one that does not impact any homes. They sent us a letter to that effect. 79 80 Resident: It still would be an impact, noise, getting out of their homes with a bridge. How close would it be near 81 the homes. There would be some impact. So as a homeowner there I would like to know now what would be 82 the foreseen impacts if I remain there. 83 84 Nish Trivedi: Right now it is not in the plan, if it is funded by the state it is in a ten year window. If within the first 85 five years it is guaranteed to be built. 86 87 Resident: I'm not asking about the process about when it will be built, I am asking about the study. If you did a 88 study and it was a holistic study then you should know the impact it would cause. You have 194 people in the 89 Cheeks Crossing Township that you are going to impact. What were the results in terms of if you did this, what 90 would be the impact on the people who remain living in that community? 91 92 Cy Stober: We simply cannot answer that question at this time because a design has not been determined. 93 94 Resident: So you did a transportation study and you don't know the impact it is going to have on the community 95 in which you are going to put the road through? You did a transportation study, you had transportation 96 engineers you had environmental engineers and there is no results on how that would impact the 194 people 97 that live there. There were no results? 98 99 Nish Trivedi: In the 2017 study, that area was not studied. That is why we are saying additional study is 100 required. 101 30 Approved 11/7/2018 102 Resident: So when will it be done? The letter I received said you would connect Industrial to South Frasier, add 103 two lanes on Buckhorn starting from 1-85/40 to Highway 70 so that is the Cheeks Crossing Township. That 104 township has 194 people so that is not the study? You didn't do any transportation study in that area? 105 106 Nish Trivedi: Not when the 2017 study was done,when the project is being done by the state the state would do 107 a separate, more detailed, on the ground public involvement study for that road. There is no design for that road 108 at this point. 109 110 Resident: You sent me a letter as a property owner telling me that you are going to impact my road and there 111 still was no study done. 112 113 Nish Trivedi: We're not having any impact on your road, if you are not developing your property then there is no 114 impact at this stage. If the state doesn't fund the project there is no impact. 115 116 Resident: Then why did I get a letter? 117 118 Nish Trivedi: To get your input and comments so we can include it in this plan when it is updated. If the state 119 does fund it we would come back to you again for more detailed, direct community meeting for that project - 120 because there is going to be increased traffic along Buckhorn Road, because of the development goal for this 121 area and because if any development does occur it is going to create more traffic. In the event that is not done it 122 will create more safety problems and more issues if not addressed. We feel that area needs to be studied and 123 addressed. It is on the plan as a blue dot indicating additional study needs to be done to address the increase of 124 traffic that is going to be 10-20 years down the line for that road. 125 126 Resident: I would like to add there is already increased traffic. 127 128 David Laudicina: You mentioned the cross-section potential for bridges over the railroad, did they take into 129 consideration the fact that they may double that track in the future? 130 131 Cy Stober: That has been discussed with DOT and would be addressed by the design. Independent of all of 132 this, Orange County and Mebane have successfully lobbied DOT to put a traffic light at the intersection of 133 Buckhorn Road and US 70. It will be there by Christmas of this year. It's been delayed already but we are 134 working hard to get that installed. 135 136 Nish Trivedi: One of the considerations the Planning Director made was to remove a road near the Mattress 137 Factory Road area because of a stream crossing and all the issues involved so we have removed some of that 138 road network to avoid touching the streams and the crossing and provide the same east/west connection. We 139 have added text to include bicycle safety based on the recommendations from the OUTBoard and to include that 140 this network should be for all users whether transit, auto or bike/ped. Another recommendation was how it 141 addresses the Economic Development objectives in the plan and how does it encourage mixed use projects to 142 support walkable communities and how does the plan address public transportation and alternative modes such 143 as carpooling and park/ride facilities. I will include more narrative about the cross section and try to meet these 144 objectives. Now we are seeking OUTBoard comments and recommendations. 145 146 Heidi Perov: You've had a lot of public comment, did any of it change any of the plans? 147 148 Nish Trivedi: The only real change was the removal of the roads in the Rock Quarry Road area we discussed. 149 150 Heidi Perov: The questionnaire you used was odd because you are working in an area where there isn't any 151 public transit, bike or pedestrian facilities so it seems like the better way to ask this in the future is would you use 152 transit if it were available; would you ride bikes or walk in your community if there were facilities available; what 31 Approved 11/7/2018 153 is the one part of your commute that is the most frustrating. Other comments I have is that I would like to see 154 included in there in the intersection improvements that roundabouts be considered along with turn lanes. I would 155 say if you have a road with sidewalks included in the cross-section that it would be good not to have a speed 156 limit over 45 mph. I would also say when you have a road with 12 foot lanes and 5 foot shoulders; I would 157 consider changing that design to 11 foot lanes and putting in an extra buffer between the lane and the shoulder 158 with the other foot. Also, I didn't hear anything in the report about air quality. Is there anything that requires an 159 air quality report would be part of that road improvement process? 160 161 Nish Trivedi: No, I don't think that is part of our UDO for development. 162 163 Heidi Perov: My last comment is that I think as part of this report there should be something that says that new 164 technologies should be taken into account and studied which may offer new ways to address intersection 165 improvements, traffic flow and safety without road widenings. I think there is going to be smart signalizations 166 that are going to improve in 10 years'time and promoting transit to get people to not be in their cars which would 167 actually improve the roads to the point that we may not have to widen them. So I think new technologies and 168 public transit should be addressed. 169 170 Q Item 5.b. NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT 3-1 TIP/WBS# Description Let/Start CompletionDate Date Cost Status Project Lead SS-4907BS Installation of traffic signal at the intersection of US70 and 5/31/2017 Dec. 2018 $40,500 R/W Utility relocations complete, Right of Dawn McPherson 44894.2.1 SR 1114 (Buckhorn Road) East of Mebane. $43,200 CON entry complete, R/W acquisition 44894.3.1 pending U-5846 Construct a roundabout at SR 1772 (Greensboro Street)and 9/6/2018 FY2021 $775,000 1 st bid opening received no bids, Chad Reimakoski 50236.1.1 SR 1780 (Estes Drive) in Carrboro. Re-let 9/6/18 bids exceeded 50236.2.1 engineers estimate, project cost 50236.3.1 evalution being performed W-5707C Revise pavement markings and overhead lane use signs for 11/1/2018 Aug. 2019 $395,000 Planning and design activities Chad Reimakoski 44853.1.3 removal of inside lane drop configuration on 1-40 Westbound underway, re-let due to bids 44853.3.3 in vicinity of US 15-501 interchange. Resurfacing 1-40 WB exceeded engineers estimate, new 47490 by use of contingency funds let date 11/1/18 47798 Increase length of existing turn lane/slip ramp and improve 1/17/2019 Jun. 2019 $189,000 Planning and design activities Chad Reimakoski existing radius in the SE quadrant of US 70 Business/NC 86 complete, R/W certified 9/18/18 at US 70 Bypass in Hillsborough U-5847 Intersection improvements at SR 1010(West Franklin St.) 1/17/2019 FY 2020 $775,000 Planning and design activities Chris Smitherman 50238.1.1 and SR 1771 (Merritt Mill Rd)/SR1927(Brewer Lane)in underway, bike/ped improvements 50238.2.1 Chapel Hill/Carrboro. to be completed under project 48283 50238.3.1 48283 Remove and replace existing curb&gutter and sidewalk, 5/31/2019 Sept. 2019 $250,000 Funds approved 9/6/18, Chris Smitherman add pedestrian signals, concrete island, and signal Construction May 2019 modifications on SR 1010(E. Main St/W. Franklin St)from Brewer Ln to Graham St. in Chapel Hill and Carrboro B-4962 Replace Bridge#46 over Eno river on US 70 Bypass 4/16/2019 FY 2021 $5,826,000 Planning and Design activities Kevin Fischer 40174.1.1 underway, ROW acquisition- 15% 40174.2.1 complete 40174.3.1 NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT 34 TIP/WBS# Description Let/Start CompletionDate Date Cost Status Project Lead SS-4907CD Horizontal curve improvements on SR 1710 (Old NC 10) 12/5/2019 Spring 2020 $261,000 Planning and design activities Chad Reimakoski 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of underway 47936.2.1 Hillsborough. Improvements consist of wedging pavement 47936.3.1 and grading shoulders. 1-3306A Wideing 1-40 from 1-85 in Orange Co.to Durham Co. line(US TBD TBD $98,800,000 Planning and design activities Laura Sutton 34178.1.3 15/501 Interchange) underway, No schedule at this time 34718.2.2 other than CE doucment scheduled 34178.3.3 for 12/28/2018 P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020, Matthew Simmons 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough Coordinate with U-5848 46395.3.1 R-5821A Construct operational improvements including 6/21/2022 FY2024 $3,924,000 Planning and design activities Jennifer Evans 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 underway, coordinating with NC54 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville West Corridor Study 47093.3.2 Road). U-5848 Extend SR 1006(Orange Grove Road)on new location with 3/21/2023 FY 2025 $5,326,000 Planning and Design activities Laura Sutton 50237.1.1 Sidewalks and bike lanes from existing SR 1006 (Orange underway, Coordinate with P-5701 50237.2.1 Grove Road)to US 70 Business in Hillsborough. and U-5845 50237.3.1 1-3306AC Interchange improvements at 1-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities Laura Sutton 34178.1.6 underway 34178.2.5 434178.3.9 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17 Chris Smitherman 45911.1.1 (Orange Grove Road)to Durham County line 45911.3.1 1-5967 Interchange improvements at 1-85 and SR 1009(South 1/16/2024 FY 2027 $20,700,000 Planning and Design activities Laura Sutton 45917.1.1 Churton Street)in Hillsborough underway 45917.2.1 45917.3.1 NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT 30 TIP/WBS# Description Let/Start CompletionDate Date Cost Status Project Lead U-5845 Widen SR 1009 (South Chu rton Street)to multi-lanes from 1- 1/16/2024 FY 2027 $49,751,000 Planning and Design activities Laura Sutton 50235.1.1 40 to Eno River in Hillsborough underway, Coordinate with U-5848 50235.2.1 and 1-5984 50235.3.1 1-5984 Interchange improvements at 1-85 and NC 86 in 11/18/2025 FY 2027 $16,488,000 Funding approved 10/10/17, Laura Sutton 47530.1.1 Hillsborough Coordinate with U-5845 and 1-5959 47530.2.1 47530.3.1 U-6071 Intersection improvements at NC 54 and SR 1007 (Old 1/15/2026 FY 2027 $1,216,000 Planning and design activities Jennifer Evans 47496.1.1 Fayetteville Rd)in Carrboro underway 47496.2.1 47496.3.1 �OF"NORTq Cg90 36 North Carolina Department of Transportation P Active Projects Under Construction - Orange Co. •,\��T�F TFiANjJ Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, Lorenz,PE,Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 12/01/2018 100.00 87.93 GUILFORD COUNTY AND 3 BRIDGES INC. IN ORANGE COUNTY. C203946 B-5348 REPLACE BRIDGE#85 OVER PHILS DANE CONSTRUCTION Kirkman,PE, $984,596.98 02/01/2018 12/27/2018 02/01/2018 01/30/2019 99.00 92.33 CRK ON SR-1005(OLD G'BORO RD) INC Christopher D C204025 1-5954 PAVEMENT REHABI-40/1-85 FROM APAC-ATLANTIC INC Kirkman,PE, $9,699,053.68 EAST OF NC-54 IN GRAHAM IN THOMPSON ARTHUR Christopher D ALAMANCE CO.TO WEST OF SR-1114 DIVISION (BUCKHORN RD)IN ORANGE CO. DG00302 P-4405K EXTEND BRYDSVILLE ROAD TO NC TRIANGLE GRADING& Kirkman,PE, $1,683,900.00 07/01/2016 12/30/2017 09/29/2016 10/31/2018 100.00 89.87 86 AND REMOVE RAIL CROSSING PAVING INC Christopher D DG00321 W-5143 IMPROVEMENTS ONSR 1004(EFLAND-CAROLINA Kirkman,PE, $1,711,133.05 04/02/2018 04/02/2019 04/02/2018 04/02/2019 85.20 69.86 CEDAR GROVE RD) SUNROCK,LLC Christopher D DG00332 W-5601 IF 1-85 GUARDRAIL END TERMINAL NICKELSTON Kirkman,PE, $494,243.00 12/05/2016 09/05/2017 05/01/2017 08/22/2018 100.00 100.00 UPGRADES INDUSTRIES INC Christopher D DG00371 RESURFACE 9 SECONDARY ROADS CAROLINA SUNROCK Kirkman,PE, $1,688,750.33 07/05/2017 11/01/2018 08/30/2017 11/01/2018 62.00 96.08 LLC Christopher D DG00372 R-5787B ADA CURB RAMPS IN BURLINGTON, ATLANTIC Kirkman,PE, $128,910.00 07/24/2017 03/28/2019 02/26/2018 08/31/2018 89.81 98.29 GIBSONVILLE,GRAHAM,MEBANE IN CONTRACTING Christopher D ALAMANCE CO.,CARRBORO& COMPANY, INC. CHAPEL HILL IN ORANGE COUNTY DG00391 REPLACE BRIDGE#104 OVER R.E.BURNS&SONS Kirkman,PE, $561,562.02 01/30/2018 10/26/2018 03/01/2018 05/02/2019 99.00 63.09 STONEY CREEK ON SR 1712 CO., INC. Christopher D (UNIVERSITY STATION RD) DG00393 RESURFACE SR 1101,SR 1118,SR RILEY PAVING INC Kirkman,PE, $1,084,520.40 04/02/2018 10/12/2018 06/18/2018 10/12/2018 60.00 63.83 1119,SR 1124,SR 1125,SR 1127,SR Christopher D 1128 SR 1130,SR 1134,SR 1135,SR 1137,SR 1141,SR 1143,ETC. DG00395 REPLACE BRIDGE#189 ON SR S T WOOTEN Kirkman,PE, $723,924.13 04/01/2018 01/01/2019 05/07/2018 02/07/2019 97.00 99.75 1114(BUCKHORN ROAD)OVER CORPORATION Christopher D CANE CREEK DG00413 RESURFACE US 70 BUS,SR 1009,SR CAROLINA SUNROCK Kirkman,PE, $3,562,232.66 05/28/2018 11/01/2019 05/29/2018 11/01/2019 32.00 38.14 1102,SR 1129,SR 1239,SR 1352,SR LLC Christopher D 1716 AND SR 1841 DG00419 RESURFACE NC 86 AND 17 CAROLINA SUNROCK Kirkman,PE, $3,764,001.64 05/14/2018 11/01/2019 05/14/2018 11/01/2019 40.00 23.23 SECONDARY ROADS LLC Christopher D DG00427 REPLACE BRIDGE#51 ON SR 1534 NATIONAL BRIDGE Kirkman,PE, $521,443.82 05/07/2018 03/04/2019 07/30/2018 04/29/2019 23.00 24.84 (MCKEE ROAD)OVER BUFFALO CRK BUILDERS LLC Christopher D DG00435 RESURFACE 22 SECONDARY WHITEHURST PAVING Kirkman,PE, $846,340.66 04/01/2019 10/11/2019 ROADS CO INC Christopher D DG00444 R-5821B INTERSECTION IMPORVEMENTS AT FSC 11 LLC DBA FRED Kirkman,PE, $1,039,900.00 07/16/2018 05/16/2019 08/13/2018 05/16/2019 14.21 4.85 THE INTERSECTION OF NC 54 AND SMITH COMPANY Christopher D SR 1006(ORANGE GROVE ROAD) DG00445 R-5787BB INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 10.00 22.75 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAW BA COUNTY INC Page 16 of 20 �OF"NORTq Cg90 37 North Carolina Department of Transportation P Active Projects Under Construction - Orange Co. •,\��T�F TFiANjJ Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent DG00445 W-5707A INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 10.00 22.75 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAW BA COUNTY INC DG00451 U-5854 SR 1008(MT.CARMEL CHURCH CAROLINA SUNROCK Kirkman,PE, $1,833,468.84 08/15/2018 04/30/2020 ROAD)AND SR 1913(BENNETT LLC Christopher D ROAD)ROUNDABOUT AND RELATED SAFETY IMPROVEMENTS Page 17 of 20 �OF"NORTq Cg90 3Q V North Carolina Department of Transportation P Active Projects Under Construction - Orange Co. •,\��T�F TFiANjJ Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, Lorenz,PE,Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 11/01/2017 93.20 86.93 GUILFORD COUNTY AND 3 BRIDGES INC. IN ORANGE COUNTY. C203641 REPLACEMENT OF 5 BRIDGES IN R.E.BURNS&SONS Kirkman,PE, $5,940,323.00 06/01/2015 11/01/2018 06/01/2015 08/31/2018 100.00 99.40 GUILFORD COUNTY AND 5 BRIDGES CO.,INC. Christopher D IN ORANGE COUNTY. C203946 B-5348 REPLACE BRIDGE#85 OVER PHILS DANE CONSTRUCTION Kirkman,PE, $984,596.98 02/01/2018 12/27/2018 02/01/2018 01/30/2019 99.00 85.05 CRK ON SR-1005(OLD G'BORO RD) INC Christopher D C204025 1-5954 PAVEMENT REHAB ON 1-40/1-85 APAC-ATLANTIC INC Kirkman,PE, $9,699,053.68 FROM EAST OF NC-54 IN GRAHAM THOMPSON ARTHUR Christopher D TO WEST OF SR-1114(BUCKHORN DIVISION RD)IN ORANGE COUNTY. DG00302 P-4405K EXTEND BRYDSVILLE ROAD TO NC TRIANGLE GRADING& Kirkman,PE, $1,683,900.00 07/01/2016 12/30/2017 09/29/2016 10/31/2018 100.00 89.87 86 AND REMOVE RAIL CROSSING PAVING INC Christopher D DG00321 W-5143 SR 1004(EFLAND-CEDAR GROVE RD)CAROLINA SUNROCK Kirkman,PE, $1,711,133.05 04/02/2018 04/02/2019 04/02/2018 04/02/2019 25.00 49.86 LLC Christopher D DG00332 W-5601 IF 1-85 GUARDRAIL END TERMINAL NICKELSTON Kirkman,PE, $494,243.00 12/05/2016 09/05/2017 05/01/2017 09/05/2018 100.00 100.00 UPGRADES INDUSTRIES INC Christopher D DG00371 RESURFACE 9 SECONDARY ROADS CAROLINA SUNROCK Kirkman,PE, $1,688,750.33 07/05/2017 11/01/2018 08/30/2017 11/01/2018 42.40 92.43 LLC Christopher D DG00372 R-5787B ADA CURB RAMPS IN BURLINGTON, ATLANTIC Kirkman,PE, $128,910.00 07/24/2017 03/28/2019 02/26/2018 03/28/2019 40.95 54.52 GIBSONVILLE,GRAHAM,MEBANE IN CONTRACTING Christopher D ALAMANCE CO.,CARRBORO& COMPANY, INC. CHAPEL HILL IN ORANGE COUNTY DG00391 REPLACE BRIDGE#104 OVER R.E.BURNS&SONS Kirkman,PE, $561,562.02 01/30/2018 10/26/2018 03/01/2018 05/02/2019 60.07 72.05 STONEY CREEK ON SR 1712 CO., INC. Christopher D (UNIVERSITY STATION RD) D000393 RESURFACE SR 1101,SR 1118,SR RILEY PAVING INC Kirkman,PE, $1,084,520.40 04/02/2018 10/12/2018 06/18/2018 10/12/2018 24.00 25.98 1119,SR 1124,SR 1125,SR 1127,SR Christopher D 1128 SR 1130,SR 1134,SR 1135,SR 1137,SR 1141,SR 1143,ETC. DG00395 REPLACE BRIDGE#189 ON SR S T WOOTEN Kirkman,PE, $723,924.13 04/01/2018 01/01/2019 05/07/2018 02/07/2019 95.25 69.47 1114(BUCKHORN ROAD)OVER CORPORATION Christopher D CANE CREEK D000413 RESURFACE US 70 BUS,SR 1009,SR CAROLINA SUNROCK Kirkman,PE, $3,562,232.66 05/28/2018 11/01/2019 05/29/2018 11/01/2019 23.00 24.53 1102,SR 1129,SR 1239,SR 1352,SR LLC Christopher D 1716 AND SR 1841 DG00419 RESURFACE NC 86 AND 17 CAROLINA SUNROCK Kirkman,PE, $3,764,001.64 05/14/2018 11/01/2019 05/14/2018 11/01/2019 26.00 7.32 SECONDARY ROADS LLC Christopher D DG00427 REPLACE BRIDGE#51 ON SR 1534 NATIONAL BRIDGE Kirkman,PE, $521,443.82 05/07/2018 03/04/2019 07/30/2018 (MCKEE ROAD)OVER BUFFALO CRK BUILDERS LLC Christopher D DG00435 AST RETREATMENT ON 22 WHITEHURST PAVING Kirkman,PE, $846,340.66 04/01/2019 10/11/2019 SECONDARY ROADS CO INC Christopher D DG00444 R-5821B INTERSECTION IMPORVEMENTS AT FSC 11 LLC DBA FRED Kirkman,PE, $1,039,900.00 07/16/2018 05/16/2019 THE INTERSECTION OF NC 54 AND SMITH COMPANY Christopher D SR 1006(ORANGE GROVE ROAD) �OF"NORTq Cg90 39 North Carolina Department of Transportation P Active Projects Under Construction - Orange Co. •,\��T�F TFiANjJ Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent DG00445 R-5787BB INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAW BA COUNTY INC W-5707A INSTALLATION OF ADA COMPLIANT LITTLE MOUNTAIN Kirkman,PE, $319,319.80 06/25/2018 02/15/2020 CURB RAMPS AT VARIOUS BUILDERS OF Christopher D INTERSECTIONS CATAW BA COUNTY INC DG00451 U-5854 SR 1008(MT.CARMEL CHURCH CAROLINA SUNROCK Kirkman,PE, $1,833,468.84 08/15/2018 04/30/2020 ROAD)AND SR 1913(BENNETT LLC Christopher D ROAD)ROUNDABOUT AND RELATED SAFETY IMPROVEMENTS 40 unty-DCHC MPO-Upcoming Projects- Division 8--December 2018 Contract#or Route Description Let Date Completion Contractor Project Admin. Project Cost Notes WBS#or TIP# Date R-5825 NC 751 at SR 1731 Upgrade and Realign Intersection 4/9/2019 TBD TBD Greg Davis TBD Right of Way in progress (O'Kelly Chapel Road) (910)773-8022