ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: February 19, 2019
Action Agenda
Item No. 4-a
SUBJECT: OWASA Annual Update Presentation
DEPARTMENT: County Commissioners
ATTACHMENT(S): INFORMATION CONTACT:
Donna Baker, Clerk to the Board, 245-
January 29, 2019 Letter from OWASA 2130
Board Chair Yinka Ayankoya Bonnie Hammersley, County Manager,
Quarterly Meeting Summary - BOCC 245-2300
Representatives and County Ed Kerwin, OWASA Executive Director,
Appointees to OWASA Board 968-4421
PURPOSE: To receive a presentation and information from the Orange Water and Sewer
Authority (OWASA) on recent activities.
BACKGROUND: At the beginning of each calendar year over the last decade, OWASA
representatives have appeared before the Board of Commissioners to make a presentation on
recent OWASA activities.
Ray DuBose and Jody Eimers, Orange County appointees to the OWASA Board, will provide
an overview on several initiatives from OWASA's annual report (attached).
FINANCIAL IMPACT: There is no financial impact associated with receiving the presentation.
SOCIAL JUSTICE IMPACT: There is no Orange County Social Justice Goal impact associated
with this item.
RECOMMENDATION(S): The Manager recommends that the Board receive the presentation
as information and provide any feedback as necessary.
1 2
OWASA ORANGE WATER AND SEWER AUTHORITY
A public, non-profit agency providing water, sewer and reclaimed water services
to the Carrboro-Chapel Hill community.
January 29, 2019
Mayor Pam Hemminger Mayor Lydia Lavelle Chair Penny Rich
Town of Chapel Hill Town of Carrboro Orange County Board of
405 Martin Luther King Jr. Blvd Post Office Box 8181 Commissioners
Chapel Hill,NC 27514 Carrboro,NC 27510 301 West Main Street
Hillsborough,NC 27278
Dear Mayor Hemminger, Mayor Lavelle and Chair Rich:
We are pleased to submit this annual report on our services, projects and initiatives in calendar
year 2018. This report includes information on the following items:
1. System resiliency, emergency response
2. Water supply
3. Water quality
4. Agua Vista/Advanced Metering Infrastructure
5. New rates, system development fees
6. Affordability Outreach Program
7. Wastewater and biosolids quality
8. Sewers for the Historic Rogers Road Area
9. Equal employment opportunity annual report 2017-18
10. Diversity&Inclusion Program
11. Energy management
12. Annual fiscal report 2017-18
13. Infrastructure Investments
1. System resiliency, emergency response
In the latter part of 2018, OWASA responded to three emergencies, accelerating existing plans
and new initiatives to increase system resiliency. OWASA provided continuous water and
wastewater service throughout two hurricanes: Florence in September and Michael in October.
In November, a water main break on Jones Ferry Road in Carrboro resulted in system-wide
conservation and boil water advisory. The event prompted OWASA to take new actions to
further increase system resiliency.
400 Jones Ferry Road Equal Opportunity Employer Voice (919) 968-4421
Carrboro, NC 27510-2001 Printed on Recycled Paper www.owasa.org
OWASA Annual Report 3
January 29, 2019
Page 2
Hurricane Florence
In the lead-up to Hurricane Florence, OWASA reviewed its response, safety, and staffing plans;
secured back-up fuel and treatment chemicals; lined up contractors to assist with repairs as
needed; assigned Incident Command responsibilities; and coordinated with community partners.
On September 14, Florence made landfall in North Carolina as a Category 1 Storm. University
Lake peaked at 54.5 inches above the spillway triggering the first stage in OWASA's Dam
Emergency Action Plan(EAP). At this first stage, there is no real danger of the dam failing;
however as per EAP protocol, OWASA notified Orange County Emergency Management, the
dam's engineer, and the state. The State Department of Environmental Quality's Dam Safety
Division inspected the dam and noted no issues. Cane Creek Reservoir's water levels peaked at
27.5 inches above the spillway; this did not require OWASA to activate the Dam EAP. OWASA
responded to two water main breaks and restored service to affected community members (88
customers)within the day. Stormwater inadvertently entered the wastewater collection system
resulting in one wastewater overflow(estimated at 8,300 gallons).
Hurricane Michael
With preparations for Hurricane Florence still intact, OWASA was ready for Hurricane Michael.
On October 11, power outages started to occur in Carrboro and Chapel Hill. By 6:30 pm that
evening, OWASA had twelve facilities running smoothly on back-up power generation: the Cane
Creek Reservoir raw water pump station, the water and wastewater treatment plants, and 9
wastewater pumping stations. Throughout the storm, all water and wastewater systems remained
fully operational. On October 13, recreation was closed at Cane Creek Reservoir due to power
limitations. By October 14 at 1:15 pm,utility power was restored and we returned to normal
operations at all locations.
Jones Ferry Road Water Main Break
On November 5, 2018, a water main break on Jones Ferry Road in Carrboro affected water
storage levels and system pressure. Customers in OWASA's service area were asked to conserve
water for 24 hours and boil water(before consuming it) for 31 hours. Immediately following the
event, OWASA commissioned engineering firm Hazen and Sawyer to conduct an independent
review of what caused the break and why it took 7.5 hours to stop the leak. According to Hazen
and Sawyer, the root cause of the main break was a manufacturing defect in the pipe. The area
where the pipe cracked was significantly thinner than other areas of the pipe. This defect,
compounded with the age and material of the pipe,resulted in localized cracking. To stop the
leak, OWASA had to close a series of valves. Some valves were found to be inoperable requiring
OWASA to move further away from the break to close more valves. The report noted that the
complexity of turning 31 valves overall resulted in 7.5 hours passing before OWASA slowed the
leak to a point where the necessary repairs could be made.
OWASA is acting on recommendations from the report to increase system resiliency. For
example, we are establishing a dedicated valve maintenance crew,working with a consultant to
improve the organization's water pipe assessment and replacement prioritization model, and
developing plans to improve piping infrastructure leaving the Water Treatment Plant (WTP) on
OWASA Annual Report 4
January 29, 2019
Page 3
Jones Ferry Road. OWASA is also meeting with community partners to understand their unique
needs and collaborate on solutions.
2. Water supply
The North Carolina Drought Monitor currently does not have any drought advisories issued in
North Carolina. The OWASA Board and staff continuously monitor conditions and always
encourage wise use of water resources.
In 2018, OWASA recorded the highest year of local rainfall on record(as compared to 128 years
of rainfall data that OWASA has on file). Rainfall at the WTP in Carrboro measured at 74.74
inches. This is 27.57 inches above the 128-year average of 47.17 inches per year. OWASA has
also measured rainfall at Cane Creek Reservoir since 1992, which has averaged 44.64 inches
annually. 2018 was also the wettest year at Cane Creek where rainfall measured at 67.67 inches.
As of January 22nd, our reservoirs (Cane Creek Reservoir,University Lake and Quarry
Reservoir)were 100% full.
While experts believe the southeastern United States will receive in the future about the same
amount of rainfall as 2018, on average, the rainfall will likely be provided in more severe storms
and flooding events with more severe and prolonged droughts in between. OWASA has a Water
Shortage Response Plan and a Drought Response Operating Protocol which guides our decisions
to ensure we work proactively with the community in case of drought conditions.
In 2018, OWASA continued to work with utility neighbors through the Jordan Lake Partnership.
The JLP began work on regional drought and emergency response planning in 2018 and will
continue this work under the newly formed Triangle Water Supply Partnership. OWASA is also
updating its Long Range Water Supply Plan to ensure we have water to meet our needs through
2070.
3. Water quality
OWASA published its annual water qualityport card and was pleased to share that in 2017, we
met or surpassed all Federal and State standards for drinking water quality, including
requirements to test for over 150 substances. Throughout the reporting year, OWASA treated
about 2.5 billion gallons of water, an average of 6.8 million gallons per day.
Elsewhere in North Carolina, some utilities reported in their water high levels of GenX, a
compound belonging to a group of man-made chemicals called per- and polyfluoroalkyl
substances (PFASs). In January 2018, OWASA proactively tested local water samples for PFASs
levels in our treated drinking water, as well as our raw water sources (reservoirs). Results
showed that GenX was not present in any sample.
For treated drinking water, the Environmental Protection Agency(EPA)has established a
lifetime health advisor 1�for two PFASs (PFOS and PFOA) at a combined level of 70 parts
per trillion(ppt). Low levels of PFOS and PFOA, below the EPA's advisory level, were detected
in OWASA's treated water samples.
OWASA Annual Report 5
January 29, 2019
Page 4
For raw water(at point of source and not yet treated), the EPA does not have a health advisory
level, nor any other guidance in place. OWASA's raw water sample from Cane Creek Reservoir
measured 120 ppt(PFOS and PFOA combined). The upstream sources of PFOS and PFOA at
this site are not certain at this time. There are no facilities typically associated with elevated
levels of PFASs in the watershed(although we do not have historical information on past land
use). We do know that other utilities have applied biosolids in the watershed; OWASA does not.
PFASs can be found in everyday products such as carpet, clothing, and cookware because they
increase resistance to water, grease, and stains. As these products are treated, washed, or
degrade, PFASs can enter wastewater systems and then travel onward to lakes and rivers. They
are used in manufacturing processes for a variety of reasons including repelling moisture and
reducing mechanical wear. Through these uses, PFASs can also enter water through industrial
releases or discharges from wastewater treatment plants. Studies indicate that the use of powder
activated carbon(PAC) is successful in the removal of some PFASs but not all. Consistent with
these studies, OWASA's use of PAC has also resulted in the removal of some PFASs but not all.
The EPA does not provide formal guidance on PFASs mitigation, though the agency has
announced its intention to publish a PFASs management plan in the future. In the absence of
formal guidance, we are in the process of implementing a PFASs monitoring plan—consisting of
quarterly sampling of Cane Creek Reservoir and our treated drinking water—to ensure we have
localized data. We will continue to share results and action plans with the community.
4. Agua Vista/Advanced Metering Infrastructure
OWASA has upgraded more than 21,000 meters across Chapel Hill and Carrboro with remote
read capability, representing more than 95% of our installation target. The Agua Vista project
remains on time and on budget. Leveraging the nearly real-time data the meters provide,
OWASA is communicating with customers when we observe increased water use beyond normal
consumption patterns that suggest a water leak. As a result of these proactive notifications and
customer service outreach, the number of customers making requests for OWASA to come and
do on-site checks for leaks have greatly decreased. For example, service requests were 50%
lower in September 2018 than in September 2017.
To enable customers to track their own water use, we are in the process of implementing a web
portal where customers will be able to track their water use data and learn conservation tips. The
Agua Vista customer portal is scheduled to launch in March 2019.
5. New rates, system development fees
OWASA's Board of Directors adopted the budget for July 2018 through June 2019, which
included a 2% increase in monthly water and sewer(wastewater,)rates as of October 1, 2018. As
a result, a monthly water and wastewater bill for a single-family residence (using 4,000 gallons
each month) increased $1.41 per month. This was the first increase in OWASA's monthly water
and sewer rates in six years. The fiscal year budget included a $21 million Capital Improvements
Plan, representing critical investments in the community's water and wastewater infrastructure.
OWASA Annual Report 6
January 29, 2019
Page 5
Effective July 1, 2018, system development fees (one-time fees charged for new connections to
OWASA's system) were reduced between 10% and 40%, depending on meter size and property
type. A new tier for single family homes less than 800 square feet in size was also added.
6. Affordability Outreach Program
2018 marked the third full year of OWASA's Affordability Outreach Program. Through this
program,we engage with over 20 social service agencies to empower low-income customers and
local agencies that serve them with information and tools to better manage their water consumption,
and reduce bills.
In addition, OWASA continued to invite customers to contribute to Care to Share, the customer
assistance program administered in partnership with the Interfaith Council for Social Services (IFC).
In 2018, on-bill contributions totaled over$7,650,representing a 44% increase over the year before
(about$2,350 more). Individuals and businesses also donated$790 directly to IFC to support Care to
Share. These combined customer, individual, and business contributions provided funding for
approximately 64%of utility bill assistance needs that IFC administered to families in 2018.
7. Wastewater and biosolids quality
OWASA published its annual Wastewater Quality Report Card and was pleased to report that
from July 2017 to June 2018,we surpassed all Federal and State standards for treated wastewater
quality. The phosphorus level in our treated wastewater was 45%below the regulatory limit, and
nitrogen was 67%below the limit. Throughout the reporting year, OWASA's wastewater system
treated about 2.8 billion gallons of wastewater, an average of 7.8 million gallons per day.
Following OWASA's extensive wastewater treatment process, the treated water output is
returned to Morgan Creek or reclaimed as non-drinking water for use in commercial cooling
units and other systems to support sustainable water use. In 2017-18, the University and UNC
Healthcare used about 265 million gallons of reclaimed water(about one-third of the
University's overall water use).
Solids that remain after the treatment process are anaerobically digested. These organic
materials, called biosolids, are beneficially recycled via composting or through land application
in partnership with local farms in Orange, Chatham and Alamance Counties. OWASA biosolids
are designated exceptional quality per EPA standards. Some biosolids are also recycled at a
private composting facility in Chatham County.
8. Sewers for the Historic Rogers Road Area
The Historic Rogers Road Area Sewer Extension Project was approved and funded jointly by
three local governments: Orange County, Town of Carrboro, and Town of Chapel Hill. OWASA
is providing project management services to oversee the construction of 18,000 feet of sewer
pipes; 70% of the pipes for this project have been installed.
Along the path of the piping in the Rogers Road area, the contractor encountered underground
rock which is requiring low intensity blasting to the south and north of Tallyho Trail in Carrboro.
OWASA Annual Report 7
January 29, 2019
Page 6
A public meeting was coordinated by the project partners before blasting commenced. Low
intensity underground blasting is currently underway. The project is now anticipated to be
complete in the Spring of 2019.
9. Equal employment opportunity annual report 2017-18
At the end of the fiscal year, OWASA's workforce was comprised of 23.2%Women and 76.8%
Men, representing an increase in gender diversity from last year(when OWASA's workforce
was comprised of 21.9% Women and 78.1%Men).
In terms of racial representation, at the end of the fiscal year, OWASA's workforce was 74.4%
White, 12.8%Black, 6.4% Two or More Races, 3.2%Hispanic, 2.4%Asian, and 0.8%American
Indian or Alaska Native. Overall, minority representation at OWASA at fiscal end was 25.6%,
remaining generally the same as the year before when minority representation was 25.8%.
OWASA has the opportunity to improve diversity at all levels of the organization and will
continue to strive to do so.
10. Diversity& Inclusion Program
OWASA's Diversity and Inclusion (D&I)program has two goals: 1) to foster diversity in our
workforce reflecting the communities we serve, and 2) enable an inclusive environment that
encourages and supports each team member to contribute to their full ability towards OWASA's
mission. OWASA's Diversity Resource Group, Diversity Recruitment Group, Diversity
Leadership Group, and supervisors have received 16 hours of training. Voluntary employee
trainings have also occurred.
OWASA has also completed a review of its recruitment processes, career development
programs, mentoring program and promotional opportunities. With learnings from this review
and input from the D&I groups, D&I activities now include: the development of recruitment
plans for each recruitment incorporating local census data (to develop applicant targets for
under-represented groups), training on new standard processes for interview panels, and training
for supervisors. The Board of Directors has also had four training sessions.
11. Energy management
In April 2017, the Board adopted an Energy Management Plan. Goals included reducing
OWASA's use of purchased natural gas by 5%by 2020 (compared to a 2010 baseline), reducing
use of purchased electricity by 35%by 2020 (compared to a 2010 baseline), and beneficially
using all Wastewater Treatment Plant biogas by 2022 (provided the preferred strategy is
projected to have a positive payback within the expected life of the required equipment).
For the first time since these goals were set, OWASA reached its natural gas use reduction goal
of 5%. From December 2017 to November 2018, we used 7.3% less natural gas than we did in
2010, in large part due to our use of the methane generated by anaerobic digestion at the
Wastewater Treatment Plant(rather than pipeline natural gas). This repurposed energy was used
OWASA Annual Report 8
January 29, 2019
Page 7
to heat the boilers that heat our anaerobic digesters. In addition, the new HVAC system in the
Administration Building has eliminated OWASA's use of natural gas for building heating, also
supporting our decreased use of natural gas.
12. Annual fiscal report 2017-18
In September, OWASA presented its Comprehensive Annual Financial Report(CAFR) for
Fiscal Year 2018 (beginning July 1, 2017 and ending June 30, 2018). OWASA's financial
position improved during the fiscal year with net income less debt service being about$10.7
million. The financial reserves will be used for planned capital improvements needs.
About 69% of OWASA's $19.2 million capital expenditures for fiscal year 2018 were invested
in replacing and rehabilitating existing infrastructure. The remaining 31% of capital expenditures
were invested in expanding or enhancing the community's water and wastewater systems, for
example, to increase the size of some pipes and install new meters.
OWASA is a special purpose local government entity organized under state law. We are a
public, non-profit agency and are required by law to use cost-of-service rates, meaning we set
our rates, fees, and charges to cover the cost for each of our services. We do not levy or collect
taxes, nor do we receive funding from taxing authorities. OWASA's credit ratings from Fitch of
AA+ and Aal from Moody's remain unchanged. Standard&Poor's increased OWASA's rating
to AAA during the year.
13. Infrastructure investment
OWASA maintains 750 miles of water and wastewater pipes, a water treatment plant, a
wastewater treatment plant,pump stations, and other infrastructure. Meeting the community's
needs and increasing system resiliency requires ongoing rehabilitation of the water, wastewater,
and reclaimed water systems. Capital investments, including debt payments for capital projects,
account for about half of our costs. In the last fiscal year, we invested about $19.2 million to renew,
replace and improve infrastructure. Our five-year Capital Improvements Program can be viewed
here.
Key accomplishments in 2018:
1. Construction of a chemical facility at Cane Creek Reservoir to improve the taste and odor
of our treated water;
2. Completion of a risk and reliability study for the water treatment and wastewater
treatment plants to identify risks that would prevent OWASA from meeting or exceeding
federal, state, and local quality requirements;
3. Installation of upgraded security equipment at the water treatment plant, water supply
reservoirs, and other critical water facilities;
4. Replacement of filter media and improvements to the filtering process at the water
treatment plant;
5. Completion of water and wastewater pipe replacements along Hillsborough Street in
advance of planned resurfacing by the Town of Chapel Hill;
OWASA Annual Report 9
January 29, 2019
Page 8
6. Completion of water main replacement along part of Brandywine Road, and concurrent
rehabilitation of sewer pipes and manholes throughout the Heritage Hills neighborhood;
7. Replacement and upsizing of a wastewater interceptor pipe in the easement behind
Emory Drive;
8. Repairs to a large pressurized wastewater pipe along Prestwick Road;
9. Rehabilitation of over two miles of wastewater pipes; and
10. Improvements to a wastewater pump station near Providence Road.
Key projects planned in 2019:
1. Completion of the replacement of water pipes along Pritchard Avenue and Noble Street;
2. Replacement of water pipes within Manning Drive (from Ridge Road to Fordham
Boulevard), Country Club Road, and Kensington Drive;
3. Replacement and upsizing of a water pipe along the Fordham Boulevard service road
between Hardees and Eastowne Drive;
4. Updates to and expansion of a prioritization model and other decision support tools used
to guide capital investments and operational management of the water distribution
system;
5. Completion of a$3.1 million project to rehabilitate and improve the wastewater pump
station behind Cleland Drive;
6. Rehabilitation of over 6 miles of wastewater pipes;
7. Completion of a master planning study for the wastewater collection system, including
consideration for any expected future growth within the service area;
8. Rehabilitation of a large pump station within the wastewater treatment plant; and
9. Rehabilitation of two large settling tanks ("clarifiers") at the wastewater treatment plant.
We would be happy to provide you more detailed information on the items above or other topics
of interest as desired. Please feel free to contact Ed Kerwin, Executive Director
(ekerwin@owasa.org or 919-537-4211), or me.
Sincerely,
n t . ()X-f9jAx
Yinka Ayankoya, Chair
OWASA Board of Directors
cc: Mr. David Andrews, Carrboro Town Manager
Ms. Bonnie Hammersley, Orange County Manager
Mr. Maurice Jones, Chapel Hill Town Manager
OWASA Board of Directors
Ed Kerwin, OWASA Executive Director
10
Quarterly Meeting of Members from the Orange County Board of County Commissioners
(BOCC) and the Orange County Appointees to the OWASA Board of Directors
Meeting Summary
January 30, 2019, 8:00 to 9:30 a.m.
OWASA Boardroom, Carrboro
Attendees: Oranze County: Penny Rich(Chair) and Mark Marcoplos
OWASA Board Members: Ray DuBose and Yinka Ayankoya(Chair)
OWASA Staff Ed Kerwin
Public: None
Water System Resiliency
Ray DuBose provided an overview of action taken and planned to further improve water system
resiliency to include:
• Plan to invest—$33 million to replace —16 miles of water pipe over the next five years.
• Created a new capital project to improve piping leaving the Jones Ferry Road Water
Treatment Plant into the water distribution system. Design, bidding and construction is
expected to take 24-30 months.
• The addition of a fourth Utilities Engineer position to support effective execution of the
Capital Improvements Program.
• Development of a new water main assessment and replacement prioritization model, to
include recommendations to further improve system resiliency. This work is expected to be
completed with the next 12-18 months.
• Establishment of a dedicated valve maintenance crew with additional equipment.
• OWASA staff will continue to meet with UNC,UNC Hospitals and other key stakeholders
and community partners to apprise,plan and collaborate on resiliency solutions.
Agua Vista (Advanced Metering Infrastructure)
Ray DuBose said OWASA has upgraded more than 21,000 meters across Chapel Hill and
Carrboro with remote read capability, representing more than 95% of our installation target.
Leveraging the nearly real-time data the meters provide, OWASA is communicating with
customers when we observe increased water use beyond normal consumption patterns that
suggest a water leak. As a result of these proactive notifications and customer service outreach,
the number of customers making requests for OWASA to come and do on-site checks for leaks
have greatly decreased. For example, service requests were 50% lower in September 2018 than
in September 2017.
As we have upgraded the meters, we have begun to analyze the data to detect leaks and provide
early notification of water use trends that could result in a high bill and even home damage. In
11
Meeting Summary
January 30, 2019
Page 2
2018, our customer service team provided approximately 1,600 leak notifications to OWASA
customers. We are averaging about 220 notifications per month.
To enable customers to track their own water use, we are in the process of implementing a web
portal where customers will be able to track their water use data and learn conservation tips. The
Agua Vista customer portal is scheduled to launch in March 2019.
Penny Rich and Mark Marcoplos noted the value of Agua Vista to assist the community to save
water and money. They suggested that when informing customers of a rate increase, the message
should include conservation tips to help customers lower their water usage, thereby offsetting the
impact of a rate increase. The public may also find useful how OWASA's rates compare with
others in the region.
Sewers for Historic Rogers Road Area
Ray DuBose said OWASA is providing project management services to oversee the construction
of 18,000 feet (almost 3.5 miles) of sewer pipes and about 70% of the pipes for the project have
been installed.
The contractor encountered underground rock along the path of the piping in the Rogers Road
area, which is requiring low intensity blasting to the south and north of Tallyho Trail in
Carrboro. A public meeting was coordinated by the project partners before blasting commenced.
Low intensity underground blasting is currently underway.
The project is now anticipated to be complete in the Spring of 2019.
Affordability Outreach Program
Ray DuBose said 2018 marked the third full year of OWASA's Affordability Outreach Program.
Through this program, OWASA engages with over 20 social service agencies to empower low-
income customers and local agencies that serve them with information and tools to better manage
their water consumption and reduce bills.
Last year, we worked with our partners, as well as directly with customers, to share water
conservation information and low-flow devices (showerheads, aerators, and leak detection
tablets).
o For example, we worked with Orange County Housing and Community Development
to promote water conservation and provide low-flow devices at the Section 8 Tenant
Engagement Session on Money Management, Budgeting, and Housekeeping.
We distribute an infographic and motion graphic developed in Year 1 of the Program to engage
all customers in water wise behavior. The infographic was developed in English and Spanish; the
motion graphic was narrated in English, Spanish, Burmese, and Karen and can be found on
OWASA's YouTube Channel.
12
Meeting Summary
January 30, 2019
Page 3
o For example, we have shared this material with Navigators for Orange County Family
Success Alliance.
In addition, OWASA continued to invite customers to contribute to Care to Share, the customer
assistance program administered in partnership with the Interfaith Council for Social Services
(IFC). In 2018, on-bill contributions totaled over$7,650, representing a 44% increase over the
year before (about $2,350 more). Individuals and businesses also donated $790 directly to IFC to
support Care to Share. These combined customer, individual, and business contributions
provided funding for approximately 64% of utility bill assistance needs that IFC administered to
families in 2018. We will continue to promote the Care to Share program and encourage
increased donations to the program.
The OWASA Board of Directors approved a Plan for Year 4,which includes the promotion of
the Agua Vista web portal as valuable affordability tool and integration into existing efforts, such
as the Orange County Home Preservation Coalition.
They noted that Orange County Housing has an Urgent Repair program that would benefit from
knowing of homes needing repairs to address water use.
Diversity and Inclusion
Ray DuBose said for the past two plus years, OWASA has developed and implemented a
Diversity and Inclusion (D&I) Program which has two goals:
1) to foster diversity in our workforce reflecting the communities we serve, and
2) enable an inclusive environment that encourages and supports each team member to
contribute to their full ability towards OWASA's mission.
With the assistance of a consultant, employee teams have been formed to guide and support the
D&I work to include:
• mandatory supervisory training
• voluntary employee training
• improving procedures for recruitment and selection of new employees
• promoting an inclusive work culture
The Board of Directors have also had training sessions with the consultant and continues to
monitor and support staff s D&I work.
Penny Rich and Mark Marcoplos expressed their support for this important work.
OWASA's Annual Update for the BOCC on February 19, 2019
Penny Rich and Mark Marcoplos suggested that Ray DuBose and/or Jody Eimers provide a 10
minute or less presentation about the following topics at the February 19, 2019 BOCC meeting:
13
Meeting Summary
January 30, 2019
Page 4
• Water System Resiliency
• Sewers for Historic Rogers Road
• Affordability Outreach Program
• Diversity and Inclusion
Next Meeting/Future Topics
The group agreed to meet quarterly and scheduled their next meeting for Thursday, April 25,
2019 at 8:00 a.m. in the OWASA Boardroom.
Prepared by:
Ed Kerwin
Executive Director