Loading...
HomeMy WebLinkAbout2015-113 Planning - City of Durham, construction, operation of water and sewer facilities in the Eno EDD amendment � 1 _Please return this copy to the Clerk to the Board's office for permanent agenda file. /2-jW- dD�S- P 3 7-02- Attachment 2 FIRST AMENDMENT TO THE INTERLOCAL AGREEMENT BETWEEN ORANGE COUNTY AND THE CITY OF DURHAM FOR CONSTRUCTION AND OPERATION OF WATER AND SEWER FACILITIES IN THE ENO ECONOMIC DEVELOPMENT ZONE OF ORANGE COUNTY The City of Durham, a North Carolina municipal corporation("Durham") and Orange County,a North Carolina political subdivision("Orange")entered into an "Interlocal Agreement Between Orange County and the City of Durham for Construction and Operation of Water and Sewer Facilities in the Eno Economic Development Zone of Orange County" ("Original Agreement")on January 20, 2012. As a result of the November 2013 Draft Master Plan Report prepared by CDM Smith,Durham and Orange would like to amend the Original Agreement through this First Amendment to allow for additional time to study alternative design options. Through this First Amendment the Original Agreement is only modified as indicated below and the remaining portions of the Original Agreement shall remain in full force and effect. This First Amendment is dated, made, and entered into as of the_day of 12015. Paragraph 12 of the Original Agreement is modified as follows: 12. Duration. This agreement shall be perpetual,unless terminated earlier by mutual agreement. Nevertheless,this contract shall terminate if construction of the infrastructure has not begun by January 31, 2017. On such termination, all obligations that are still executory on both sides are discharged but any right based on prior breach or performance survives. The governing body of each party hereto has determined the duration provided in this paragraph to be reasonable. This amendment is made pursuant to Paragraph 14 of the Original Agreement. This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act. Durham Finance Director Orange Financial Services Director 9 CITY OF DURHAM ATTEST: By: City Clerk City Manager Type or print name person signing for the City: ACKNOWLEDGMENT BY CITY OF DURHAM Name of other party to the contract: Title of the contract: a notary public, certify: (Type or print name of Notary Public) (1) personally appeared before me (Type or print name of City Clerk or Deputy City Clerk who attested) in Durham County,N. C. on this day; (2)I have personal knowledge of her identity; and(3)she acknowledged that by authority duly given and as the act of the City of Durham, the foregoing document was signed in its corporate name by its City Manager, sealed with its corporate seal, and attested by its said City Clerk or Deputy City Clerk. This the day of ,20 My commission expires: Notary Public 10 ORANGE COUNTY 17 sz AT T• Donna Baker Bonnie B. Hammersley Orange County Clerk County Manager ACKNOWLEDGEMENT OF ORANGE COUNTY NORTH CAROLINA COUNTY OF oR*w,.E GurLftRD I, a Notary Public in and for the aforesaid County and State certify that Donna S. Baker personally appeared before me this day and acknowledged that she is the County Clerk of Orange County, a North Carolina political subdivision, and that by authority duly given and as the act of the County, the foregoing agreement with the City of Durham was signed in its corporate name by the Orange County Manager, sealed with its corporate seal and attested by its said County Clerk or Deputy County Clerk, this the&4 ay of 3' , 20)5. a otary Pu lic Donna S.Lloyd M commission expires: Notary Public My p Guilford County North Carolina M Commission Expires ■ _Please return this copy to the Clerk 3 Attachment 1 office for permanent agenda files d4ly otard,'cs� INTERLOCAL AGREEMENT BETWEEN ORANGE COUNTY AND THE CITY OF DURHAM FOR CONSTRUCTION AND OPERATION OF WATER AND SEWER FACILITIES IN THE ENO ECONOMIC DEVELOPMENT ZONE OF ORANGE COUNTY alt, This agreement is dated,made,and entered into as of the day of , 20 JA,by the City of Durham,a North Carolina municipal corporation('Durham)and Orange County, a North Carolina political subdivision("Orange"). Purposes. The purposes of this agreement are(1)to further the economic development potential of land identified by Orange County and the City of Durham in their respective.planning documents as particularly suitable for industrial development,as well as to promote the public health and safety of residents within the area,and(2)to accomplish the design,construction,and operation of water and sewer services within the Eno Economic Development District. 1. Definitions Year—July 1—June 30 Zone—The Eno Economic Development District located at the eastern boundary of Orange where U.S.Highway 70 and Interstate Highway 85 intersect,shown in greater detail by the map titled"Eno Economic Development Zone Utility Service Boundary" and attached as Exhibit A. The Zone does not include land in Durham County. 2. Desi . Durham will solicit and receive proposals for the design of water and sewer infrastructure to serve the Zone.Before awarding contracts for such design,Durham will provide Orange with the proposals and other responses to the request for proposals so that Orange may review and comment to Durham regarding the selection of the designer(s). Durham will then proceed to negotiate the professional fees with the designer(s). The fees must be satisfactory to Orange. Durham will not select any designer to which Orange obj ects based on the qualifications and/or professional fees. If Orange does not object within a reasonable time to a designer and its proposed fee structure,Durham may award a contract to the designer for such design in which the proposed fee structure applies. Orange will reimburse Durham for all payments that Durham is required to pay under the contracts. Therefore,Durham will invoice Orange as invoices are received from the selected designer(s)for payments made or required to be made under the design contracts. Orange will pay each invoice within thirty(30)days after it receives it. 3. Construction. Durham will solicit bids for the construction of the infrastructure. Durham will share the proposals with Orange. Orange may comment to Durham as to which contractor(s) the award should be made. If Durham concurs, and if Durham determines it appropriate to do so,Durham will award the contract(s)to those contractor(s)and execute contract(s)with them. If Durham does not concur,or if Durham otherwise finds it appropriate to rebid, Durham will rebid and continue the process described in this paragraph until Durham makes an award unless the Durham City Manager and the Orange County Manager jointly agree to suspend or abandon the process. By authorizing their respective managers to sign this agreement,the parties' governing bodies authorize them to agree to suspend or abandon the JNTERIOCdLAGREEMF,VTBETWEE,V ORANGE COUNTYAND THE CJTY0FD0RI1AMFOR CONSTRUCTIONAND OPERATION OF WATER AND SEWER FACILITIES IN THE ENO ECONOMIC DEVELOPMENT ZONE OF ORANGE COUNTY,page 2 process if they jointly determine it is prudent to do so, If the managers do not jointly agree it is prudent to suspend or abandon the process,it is agreed that suspension or abandonment will not be effective unless the parties' governing bodies jointly agree to suspend or abandon. 4. P4yment. For each construction contract,Orange will select payment option A or payment option B and will notify Durham of its selection within twenty days after Durham shall have executed the construction contract. Payment option A:Durham will invoice Orange from as invoices are received from the selected construction contractor for payments made or required to be made under the construction contracts. Orange will pay each invoice within thirty(30)days after it receives it.Payment option B:Orange will reimburse Durham for payments made or required to be made under the construction contracts over a 10-year period,beginning on substantial completion,at an annual interest rate of 5%.The remainder of this paragraph applies to both payment options. [Provided however Orange shall not be required to pay for services that were not appropriately authorized or ratified by Durham or which Durham did not find to be satisfactorily performed by the contractor,provided that Durham will not be liable to Orange for making a finding of satisfactory performance. Durham will insert in the construction contracts a provision stating,"Orange County,a N. C. political subdivision,is a third-party beneficiary of this contract." 5. Construction Standards. In all respects except to the extent otherwise stated in this contract, the construction will be done in accordance with(i)Durham standards,requirements,and procedures,including approvals of plans,conducting inspections,requiring tests and certifications,and requiring as-built drawings,and(ii)any applicable federal and state standards. 6. Ownership of and Responsibility for Infrastructure.Durham will be the owner of and responsible for the operation and maintenance of the infrastructure constructed under the construction contracts.All construction contracts shall provide for the indemnification and defense by the contractors of both Orange and Durham. 7. Fees and Charges. As long as a particular property is located outside Durham's corporate limits,Durham will impose,process,and collect all fees and charges with respect to that particular property,including acreage fees,connection charges,frontage charges,capacity cliarges,and utility rates,as Durham charges on other locations outside Durham's corporate limits, Except to the extent specified otherwise,Orange will have no right to any of those fees and charges,and nothing in this agreement will affect the use or disposition of those fees and charges. 8. Reduction in Payments from Orp-&e—. The acreage fees and frontage charges collected by Durham from the Zone will be used towards payment of the design and the construction of the infrastructure(collectively,the"Dedicated Receipts").. ("Acreage fees"means impact fees(as defined in Durham City Code sections 30-81 et seq.)that are based on area.) No other fees or charges collected by Durham,such as capacity and connection charges,will be used for that purpose. The amounts to be paid by Orange to Durham under paragraph 4 above in a particular Year will be reduced by the Dedicated Receipts received by Durham in that Year, if the Dedicated Receipts received by Durham in that Year-exceed the amounts to 5 r INTERLOCAL AGREEMENT BETWEEN ORANGE COUNTYAND THE CITY OFDURHAMFOR CONSTRUCTIONAND OPERATION OF WATER AND SEWER FACILITIES IN THE ENO ECONOMICDEVELOPMENT ZONE OF ORANGE COUNTY,page 3 be paid by Orange under paragraph 4 in that Year,the excess Dedicated Receipts will be carried forward and used similarly to reduce the amounts to be paid by Orange under paragraph 4 in the following Years. The Dedicated Receipts received only during the ten Years beginning on the first July 1 after substantial completion of the relevant infrastructure will be applied in this manner. Nevertheless,the ten Year period shall end on or before the expiration of fifteen Years beginning on the first July 1 after the date of this contract. Nothing herein means that Durham will make any payment to Orange on the ground that the Dedicated Receipts exceed,in any Year or Years,the amounts to be paid by Orange under paragraph 4. If Durham is required by a court of competent jurisdiction to refund any acreage fees or frontage charges that were used towards payment of the design and the construction of the infrastructure by means of the Dedicated Receipts process described above in this paragraph, Orange shall reimburse Durham(i)to the extent the amounts paid by Orange to Durham under paragraph 4 above in a particular Year were reduced by the Dedicated Receipts attributable to the amounts refunded, and(ii)for interest associated with the refunds of the acreage fees or frontage charges that Durham is required to pay by a court of competent jurisdiction. 9. NondiscriminatoKy Policies. Durham will not establish policies that impose a level of water and sewer service in the Zone that is inferior to that provided to similarly situated users of Durham water and sewer services. 10. Annexation. Durham may enter into agreements with developers and property owners that they will comply with requirements that Durham desires related to annexation,including that they will not seek annexation by any municipality other than Durham;that they will petition for annexation when requested by Durham;and that they will be subject to remedies for violating the annexation-related provisions. 11. Re ug_lations. Durham shall have the authority to protect and regulate the water and sewer systems and its users in the Zone,including water use restrictions and regulations respecting introduction of pollutants into the wastewater system. 12.Duration. This agreement shall be perpetual,unless terminated earlier by mutual agreement. Nevertheless,this contract shall terminate if construction of the infrastructure has not begun within three(3)years of the date of this agreement. On such termination,all obligations that are still executory on both sides are discharged but any right based on prior breach or performance survives.The governing body of each party hereto has determined the duration provided in this paragraph to be reasonable. 13.Anuointment of Personnel. The City Manager shall designate persons to carry out Durham's obligations under this agreement. The County Manager shall designate persons to carry out Orange's obligations under this agreement. 14.Amendment and Termination. This agreement may be amended or terminated by agreement of the parties. An amendment is not valid unless signed by both parties and otherwise in accordance with requirements of law. An amendment is not enforceable against Durham unless it is signed by its City Manager,or a deputy or assistant City Manager. An 6 B TERLOCALA GREEMENTBETWEENORANGECOUNTYAND THE CITY OFDURMAMFORCONSTRUCTIONAND OPERATION OF WATER AND SEWER FACILITIESINTHE ENO ECONOMICDEVELOPMENT ZONE OF ORANGE COUNTY,page 4 amendment is not enforceable against Orange unless signed by the County Manager or Chair of the Board of County Commissioners. 15.Notice. (a)All notices and other communications required or permitted by this agreement shall be in writing and shall be given either by personal delivery,UPS,Federal Express,or certified United States mail,return receipt requested,addressed as follows. The parties are requested to send a copy by email. To Durham: Mr. Thomas J.Bonfield City Manager City of Durham 101 City Hall Plaza Durham,NC 27701-3329 Email: tom.bonfield @durhamnc.gov To Orange: Frank Clifton Orange County Manager 200 S.Cameron Street P.O. Box 8181 Hillsborough,NC 27278 Email: fclifton @co.orange.nc.us (b)Change of Address. Date Notice Deemed Given. A change of address,fax number,or person to receive notice may be made by either party by notice given to the other party. Any notice or other communication under this agreement shall be deemed given and sent at the time of actual delivery,if it is personally delivered. If the notice or other communication is sent by United States mail,it shall be deemed received upon the third calendar day following the day on which such notice or other communication is deposited with the United States Postal Service or upon actual delivery,whichever first occurs. 16. No Third Party Rights Created. This agreement is intended for the benefit of the two parties and not any other person and no rights or benefits are created for or granted to any third party by this agreement. This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act. Durham ac Director Orange Financial Services Director 7 I INTERLOCAL AGREEMENT BETWEENORANGE COUNTYAND THE CITY OFDURHAMFOR CONSTRUCTIONAND OPERATION OF WATER AND SEWER FACILITIESIN THE ENO ECONOMIC DEVELOPMENT ZONE OF ORANGE COUNTY,page S Of D. CITY OF DURHAM TTEST: i ►ICI r'fS�:1':::• 'Q �� • °j .' omas J.Bonfield Clerk �rVrr �Lf �I'+� City Manager r� COUNTY OF ORANGE ATTEST: 17 5g y: /">7,1 / �� Frank - r' l(Juu Clerk � � County Manager NORTH CARINA ACKNOWLEDGMENT OF CITY OF DURHAM COUNTY of a U-r ncA rr-1 I,aalloary Ppblic m and fo o aforesaid County and State certify that _ (1 f-eA, personally appeared before me this day,and acknowledged that he or she is the City Clerk of the City of Durham,a municipal corporation,and that by authority duly given and as the act of the City,the foregoing agreement with the County of Orange was signed in its corporate name by its City Manager,sealed with its corporate seal,and attested by its said City Clerk or Deputy City Clerk. Thi e_ day of �GrYI t'Q Y 201-2— i Notary Public ,..'Jc;�T T,, , My commission expires; OT, —� 2-461-7 ,c N Q z NORTH CAROLINA ACKNOWLEDGMENT OF COUNTY OF ORANGE =G A COUNTY of O an 2 •�•i�••.•..i.i.tJ.1II�11~a I,a Notary Public in and for the aforesaid County and State certify that D anna S' gnikef personally appeared beforp,�e t�ii's day,and acknowledged that be or she is the County Clerk of�OrangOAA o Carolina political subdivision,and that by authority duly given d as the act of the County,the foregoing a;reement with the City of Durham was signed in its corporate name by its ()rmya 2 County 9anager,sealed w'th its corporate seal,and attested by its said County Clerk or Deputy County Clerk.Jrh—is the�L_day of 20 It OFFICIAL SEAL Nolary Public,NOM WMI[na Notary Public ORANGE COUNTY My commission expires: S "7 Z 0 t� P DAVID HUNT 1 My soommill fan ffx Tres Approved as to form and legal sufficiency. QWntf Attorney i 11 i Attachment 3 ' Section 1 Introduction 5% 1.1 Project Background and Objectives In recent years,Orange County(County)has taken a proactive role in the recruitment of business and industry and has established three strategic economic development districts as part of its strategy. One of those districts is the Eno Economic Development District(Eno EDD),previously known as the Interstate 85/US Highway 70(1-85/US Hwy 70)Economic Development District,and is strategically located near the intersection of 1-85 and US Hwy 70.This economic development area will be able to capitalize on its location within the City of Durham's(City)Urban Growth Area to provide water and sewer service to future customers,which are zoned to include a mixture of industrial,commercial,and high density residential development. With this project,the City and County are collaborating to construct the backbone of a water and i sewer system within the Eno EDD that will promote an effective growth pattern in the County with respect to location and phasing.The major objectives of this master plan are as follows. ■ Develop water demand and sewer flow projections Determine the appropriate size and location for a sewer lift station ■ Determine the appropriate size and route of a force main to carry wastewater flow from the proposed sewer lift zytation to a discharge point within the City's sewer collection system ■ Determine the appropriate size and location of a gravity sewer collection system and water transmission$ystem backbone ■ Develop conceptual bpinions of probable cost for the recommended improvements i 1.2 Project Area The Eno EDD 10 apps oximately 796 acres and is located in eastern Orange County,bordered to the north by 1-85 4nd U9 Hwy 90,to the east by the Durham and Orange County border,to the south by the Norfolk S611thero railroad,and to the weft by Stony Creek,as shown on Figure 1-1.The area is primarily undl8veloped with some rural residential and light business scattered south of 1-85. The Eno EDD is located within the Eno River Watershed,which eventually discharges into the Neuse } River.In general,tho area flows in a northerly direction into tributaries to the Eno River.There is significant toppgraphic change within the area,ranging in elevation from 414 feet to 538 feet,a difference of 124 feet. i i i i Smith 1-1 Section 1 • Introduction 1.3 Scope of Study The scope of work for this master plan was developed by CDM Smith,City,and County staff and 17 consists of the following primary tasks: ■ Flow and Demand Projgctions • Proposed Water and Wastewater Infrastructure within Eno EDD • Force Main Discharge Alternatives ■ Permit Agency Coordination ■ Cost Estimates i • Master Plan Report A brief description of each task follows. Flow and Demand Projiections The purpose of this task was to utilize available zoning and planned-development data to develop water demand and wastewater flow projections within the Eno EDD,which in turn would be used to layout the proposed water and wastewater infrastructure backbone. Proposed Water and Wastewater Infrastructure within Eno EDD The purpose of this task was ti)develop a conceptual layout of the recommended water distribution, wastewater collection,and wastewater pump station and force main infrastructure within the Eno EDD.A combination of wastewater flow/water demand projections and physical site characteristics, *� such as topography,streams,and roads,were used to layout the proposed infrastructure that would serve as the backbone of the system. Force Main Discharge Alternatives The purpose of this task was tb identify and evaluate various alternatives for Where the wastewater flow generated within the Eno EDD could be discharged into the City's wastewater collection and conveyance system.The location of the Eno EDD basin is such that the wastewater flow could i potentially be discharged into either one of the City's two water reclamation facility(WRF)basins,the North Durham WRF or the South Durham WRF.There are three potential outfalls the Eno EDD flow could be discharged to: ■ North Durham WRF Basin i The Eno Outfall,which is located in the Eno Basin -The Ellerbe Creek Outfall,which is located in the North Durham Basin ■ South Durham WRF Baain -The Mud Creek Outfall,which is located in the Farrington Basin For the purposes of this report,the three potential discharge locations will be referred to as the Eno Outfall,Ellerbe Creek Outfall,and Mud Creek'Outfall. 1-2 Vfflb1 13 Section 1• Introduction Permit Agency Coordination The purpose of this task was to identify the potential permitting needs and coordinate with the associated regulatory agencies,if needed,on what the permit requirements would be.The types of permitting needs related to work such as stream channel crossings,wetland crossings,and North Carolina Department of Transportation(NCDOT)encroachment. Cost Estimates The purpose of this task was to develop conceptual opinions of probable cost for the proposed water and wastewater infrastructure within the Eno EDD. Master Plan Report The purpose of this section was to document the evaluations and findings from the previous tasks into a comprehensive master plan report that would guide the City and County moving forward. 1.4 Report Format The remainder of this report is organized-into the following sections,with a brief description of each sections purpose following the name: ■ Section 2-Water Demand and Wastewater Flow Projections: This section provides a description of the methodology and assumptions by which the demand and flow projections { were developed. ■ Section 3-Evaluation of Existing Water Infrastructure within the Eno EDD: This section provides a description of the existing water infrastructure within the Eno EDD followed by the evaluation that was performed to determine the additional infrastructure required to provide the backbone for the system. ■ Section 4-Proposed Wastewater Collection System within Eno EDD: This section describes the process by which the recommended wastewater collection system infrastructure within the Eno EDD was developed. ■ Section 5-Conveyance to the City of Durham's Wastewater Collection System: This section describes the alternatives analysis that was performed to determine where in the City's wastewater system the wastewater flows generated in the Eno EDD should be discharged. ■ Section(-Engineer's Opinion of Probable Cost: This section provides a description of how the costs we're developed as well as a breakdown of the cost by each of the major infrastructure componEnts. ■ Section -Permit Requirements: This section provides a description of the environmental impacts that are anticipated if the proposed infrastructure were constructed as well as a list of #11 permits that would be anticipated to be required prier to initiating construction. 1 ` Section$-Conclusions and Recommendations: This section provides a brief summary of the recommended infrastructure and associated cost followed by the options for how the City and County can advance the project forward. Wul 1-3 P 14 Section 8 Conclusions and Recommendations The purpose of this section is to present a summary of the conclusions presented in Sections I through 7 of this report and discuss options for project implementation, 8.1 Conclusions The primary objective of this project is for the City and County to collaborate to construct the backbone of a water and sewer system Within the Eno EDD that Will promote an effective growth pattern in Orange County with respect to location and phasing.in order to develop the backbone system,CDM Smith has performed an evaluation of the Eno EDD to develop projected water and wastewater.flows,determine what infrastructure will be needed to create the backbone,determine where the generated wastewater will be discharged in the City's sewer system,identify potential permitting needs,and develop conceptual opinions on probable cost. The water demands and wastewater flows developed for the Eno EDD are summarized in Table 8-1.It can be seen from the table that the projected average water demands vary from 76,000 gpd in year 2020 under the Low scenario to 895,000 gpd by build-out under the High scenario.The projected average wastewater flows vary from 60,000 gpd in year 2020 under the Low scenario to 715,000 gpd by build-out under the High scenario. if Table 8-1.Summary of Average Day Water Demand and Wastewater Flow.Projections by Planning Period Planning Period god) Projectlons[1,2] 2020 2030: 2,040 2050 2060 Build-out - Low Water 76,000 176,000 277,000 378,000 479,000 504,000 Mid Water 105,000 245,000 384,000 524,000 664,000 699,000 High Water 134,000 313,000 492,000 671,000 850,000 895,000 Low Wastewater 60,000 141,000 221,000 302,000 382,000 402,000 Mid Wastewater 84,000 195,000 307,000 419,000 530,000 558,000 High Wastewater 107,000 250,000 393,000 536,000 679,000 715,000 Notes: 1) The Low,Mid,and High projections differ based on the assumed unit water demand factor for industrial development. The Low projection assumed 1,000 gpd/acre,the Mid projection 1,500 gpd/acre,and the High projection 2,000 gpd/acre. 2) The wastewater projections are based on an assumed water return rate of 80 percent. 3) The percentage of growth between planning periods was provided by Orange County. The Eno EDD currently has a 16-inch diameter waterline installed in the project area.Based on a hydraulic model analysis,the existing water main has sufficient capacity to meet the near-term and build-out demands for the Low and Mid scenarios.There are some minor flow and headloss deficiencies for the High flow scenario under build-out conditions,however it would be anticipated "M -1 8 15 Section 8 • Conclusions and Recommendations that improvements implemented in the City's system by the time build-out were to occur may address the minor deficiencies.Therefore,no additional water distribution infrastructure is recommended. The only municipal wastewater infrastructure within the Eno EDD is a small pump station near the eastern most boundary of the project area that conveys a small amount of flow to the City. Therefore, a wastewater collection and conveyance system backbone is required within the Eno EDD. Recommended collection system infrastructure and associated conceptual opinions of probable cost were developed for the Low and High wastewater flow scenarios.Tables 8-2 and 8-3 present the recommended infrastructure and associated cast for the Low and High flow scenarios,respectively. In order to construct the recommended infrastructure,a number of regulatory permits will be required.In an effort to minimize environmental impacts and associated permitting efforts,trenchless construction methodologies were assumed for stream and roadway crossings.The potential need for an EA/EIS could be required as a result of the amount of infrastructure included in the project,but is not a certainty.If the gravity sewer and force main proposed to parallel US Hwy 70 cannot be installed within the NCDOT road ROW,the need for an alternative alignment and/or easement acquisition could be required,which would lengthen the project schedule and impact project cost.This would need to be addressed early in the design phase to minimize impacts. 8.2 Cast Reduction Options It is recognized that the costs presented in either Table 8-2 or Table¢-3 would be a significant investment for the County and that immediately funding the project in its entirety will be a challenge. Therefore,the following options to potentially reduce project cost aqd/or phase the improvements were identified and are presented below. Construct only the pump station and force main.Collection system infrastructure could be ; constructed by developers on an as-needed basis,or by the Cofmty if additional funding becomes available, ® Construct the pump station,force main,and only the most critical collection system infrastructure.The collection system piping recommended for this option includes gravity pipes 2,4,and 6,as identified on Figure 6-1.Constructing these gravity pipes would prevent developers from having to impact Rhodes Creek and US Hwy 70,both of which will have. q permitting challenges. ' Construct the force main from the proposed pump station to a manhole in the City's wastewater 1 collection system near the Eno EDD boundary,as opposed to qll Xhe way to the r(.§commended location in the South Durham Basin,d6scribed in Section 5.This Option would teinporarily ' reduce the amount of force main and gravity sewer pipe by approximately 11,000 feet.It is expected that this alternative discharge point will onlyha-�e sufficient capacity td receive wastewater flows in the near-term,and that the additional for�e main would be needed in the future.The force main and pump station would still be degigndd to handle future flows so that when the discharge point into the City's wastewater system noeds to be relocated tt)the recommended location in the South Dtirhatn Basin,the existing force mAin would only have to be extended(i.e.not upgraded).Additional modeling and dingioeoring eyaluation will be required to determine where and how much wastewater flow ca-ti be discharged to the alternative location in the City's system. 8-2 I M"Ith 16 Section 8• Conclusions and Recommendations Table 8-2.Opinion of Probable Construction Cost—Low Wastewater Flow Scenario Associated System Description Unit Quantity Cost Gravity Sewer-8-inch DIP Lf 12,123 $620,8001 Jack&Bore Lf 1202 $60,000 Eno EDD Gravity System 1 i Gravity Sewer-12-inch DIP Lf 368 $25,000 Gravity Sewer Manhole3 Ea 45 $270,000 Pump Station4 MGD 0.7 $486,000 8-inch f=orce Main Lf 7,000 $315,000 8-inch Jack&Bore Lf 1605 $80,000 Eno EDD Conveyance System to 12-inch Gravity Sewer Lf 11,300 $757,1006 Durham Sewer System 12-inch Jack&Bore Lf 100 $65,000 Gravity Sewer Manhole Ea 38 $228,000 Traffic Control? Lf 8,000 $180,000 Pavejnent Replacement Sy 1,000 $42,000 Subtotal $3,129,000 x 5%Mobilization $160,000 Subtotal $3,29Q,000 I • I 10%Contractor OH&P $329,Q00 Subtotal $3,62Q,000 25%Contingency $910,Q00 Subtotal $4,53Q,000 i 20%Engineering,Permitting,and Administration $910,000 f TOTAL $5,44Q,000 Notes: 1) Cost reflects various depths of cover. Not shown in table for clarity. 2) Jack&Bore costs reflect two(2)60-ft bores. See Note 10. 3) Gravity sewer manhole spacing of 300 feet. 4) Pump station and associated force main sized for Year 2045. 1 5) Jack&Bore costs reflect one(1)100-ft bore and one(1)60 ft bore. See Note 10. 6) Cost assumes 10-feet of cover. j 7) Traffic control required during installation of force main along Hwy 70. f 8) Eno EDD gravity sewer system was sized based on High flow scenario with a peaking factor of 2.5 9) Cost does not reflect pump replacement by 2035. 10) Jack&Bores were assumed for: r 60-ft bore under Hwy 70(Eno EDD Gravity System) • 60-ft bore understream crossing near pump station(Eno EDD Gravity System•&Conveyance System) 100-ft bore under SR 751 along force main route(Eno EDD Conveyance System) • 100-ft bore under railroad along force main rpute(Eno EDD Conveyance System) miitit 8-3 I, 17 r �endauons aii►le Const ixs#ion Cost—High-Wastewater flow Scenario Cost Esiimat6 Associated r m u t Gravity Sewer-8-inch DIP Lf 6,669 $358,000, ! ; / Jack&Bore Lf 120z $78,000 Gtavity;Sp tern 1 Gravity Sewer-12-inch DIP Lf 5,822 $420,040 Gravity Sewer Manholes Ea 45 $270,000 Nmp Station -MGD 1.2 $540,000 12-inch Force Main Lf 7,000 $378,000 12-inch Jack&Bore Lf 1605 $104,000 h Se L 1130fl 1,220,00e Eno EDD Conveyance System to 18 me Gravity wBr f $ Durham Sewer System 18-inch Jack&Bore Lf 100 $125,000 '! Gravity Sewer Manholes Ea 38 $228,000 Traffic Control Lf 8,000 $180,000 Pavement Replacement Sy 1,000 $42,000 Subtotal $3,943,000 5%Mopilization/Demobilization $200,000 Subtotal $4,140,000 10%Contractor OH&P $414,000 Subtotal $4,550,000 259 Contingency $1,140,000 Subtotal $5,690,000 201 Engineering,Permifting,and Administration $1,140,000 TOTAL $6,830,000 Notes: 1) Cost reflects various depths of cover. Not shown in table for clarity. 2) Jack&Bore costs reflect two(2)60-ft bores. See Note 10. 3) Gravity sewer manhole spacing of 300 feet, 4) Pump station sized for 30 year flows. 5) Jack&Bore costs reflect one(1)100-ft bore and one(1)60-ft bore. See Note 10. 6) Cost assumes 15-feet of cover. 7) Traff ic control required during installation of force main along Hwy 70, 8) Eno EDD gravity sewer system was sized based on High flow scenario with a peaking factor of 2.5 9) Cost does not reflect pump replacement by 2035. t 10) Jack&Bores were assumed for: 1 • 60-ft bore under Hwy 70(Eno EDD Gravity System) ■ 60-ft bore under stream crossing near pump station(Eno EDD Gravity System&Conveyance System) 100-ft bore under Sit 751 alongforce main route(Eno EDD Conveyance System) 1 ■ 100-ft bore under railroad along force main route(Eno EDD Col vegance System) / 8-4 t' F" 18 Section 8■ Conclusions and Recommendations ■ Construct the pump station and force main to convey only near-term wastewater flows,with the understanding that both will need to be upgraded in the future.This option will cost significantly more money for the County over the lifetime of the project,but have a lower initial capital cost.Additional modeling and engineering evaluation will be required to determine where and how much wastewater flow can be discharged in the City's system and what the required infrastructure will be. �G 8.3 Recommendations The County has included approximately$1,500,000 in their Capital Improvement Program to fund 1 design and construction of water and wastewater improvements in the Eno EDD.Based on the cost estimates presented in Tables 8-2 and 8-3,there is not currently enough funding available to construct the recommended wastewater infrastructure for either wastewater flow scenario. Therefore,the County will have to consider alternatives in order for this project to continue to move forward, C possibly in addition to the cost reduction options presented in Section 8.2.Based on discussions with County and.City staff,the following alternatives may be considered. 8.3.1 Alternatives Alternative 1—Design and Construction of Improvements This alternative includes continuous design,permitting,bidding,and construction of the recommended improvements.In order for this alternative to move forward,Orange County will be r required to reallocate funds to increase their available budget from$1,500,000 to the desired scenario estimate,presented in Tables 8-2 and 8-3.If design of the improvements were to begin in early 2014, construction would be estimated to start in early 2015. Alternative 2—Full Design of Improvements This alternative includes development of a complete design package.Acquisition of any necessary permanent easements should also be included in this alternative.Permitting,bidding,and construction will be put on hold until additional funding can be secured.The permitting is put on hold because permit approvals have limited durations and could expire before construction funding is secured.This alternative will allow the County to make use of most of their currently available funds to keep the project moving forward so that once the additional funding is made available,the project can more quickly advance into permitting,bidding,and construction.Based on the cost presented in Table 8-2,the full design is expected to cost less than$1,130,000. The cost will be less since permitting would not be included in this phase. Alternative 3—Preliminary Design of Improvements This alternative includes development of preliminary design documents,which are assumed to be around the 50 percent design stage.Final design,permitting,bidding,and construction will be put on hold until additional funding can be secured.This alternative will allow the County to make use of some of their available funding to keep the project moving forward so that once the additional funding is made available,the project can more quickly advance. The preliminary design is expected to include an additional data collection effort;which would include survey and geotechnical investigation,followed by development of preliminary design drawings and key technical specifications.Additional work could also be included such as preliminary coordination with regulatory agencies anal public outreach.Land acquisition for the proposed pump station could Writ" 8-5 19 Section 8 o Conclusions and Recommendations be performed.However,it may not be appropriate to acquire permanent easements,if any are required,based on the preliminary status of the design. The cost to perform the preliminary design can be provided upon request,but can be assumed to be less than the$1,130,000 identified in Table 8-2 for full design and permitting. Alternative 4—Hold Project Indefinitely This alternative puts the entire project on hold until additional funding can be secured by the County. This alternative will result in the longest schedule,as no upfront design work will have been completed.This alternative can also put the project at greater risk for significant changes as development and roadway modifications could impact the proposed alignments,which could in turn increase the cost of the project. 8.3.2 Recommendation Based on the alternatives presented above,it is CDM Smith's recommendation that the County move forward with Alternative 2,which includes full design of the recommended improvements,but holding on the construction until additional funding can be secured.This alternative provides the following benefits: ■ Avoids the need for an immediate reallocation of funds compared to Alternative 1. ■ Allows the County to make use of the funds that are currently available for the project, compared to Alternative 4 and partially for Alternative 3. ■ Allows the County to acquire the necessary easements,if any are required,compared to Alternatives 3 and 4. Al ■ Allows the County to continue moving the project forward,compared to Alternative 4. Reduces the overall schedule compared to Alternatives 3 and 4. ■ Allows the County to move immediately into permitting,bidding,and construction once the available funds are secured,compared to Alternatives 3 and 4.Being able to quickly implement the infrastructure will be much more attractive to potential developers. 1 , s-s h ; / 20 i f Table of Contents Section 1 Introduction 1.1 Project Background and Objectives...............................................................................................................1-1 1.2 Project Area..............................................................................................................................................................1-1 1.3 Scope of Stud ..............................................1-2 1.4 Report Format........................................................................................................................................................1-3 Section 2 Water Demand and Wastewater Flow Projections ' 2.1 Land Use Assumption...:.......................................................................................................................................2-1 2.2 Water Demand Projections...... ....................................................................................................................2-3 2.3 Wastewater Flow Projections..... 2.4 Phasing and Summary.........................................................................................................................................2-5 Section 3 Evaluation of Existing Water Infrastructure within Eno EDD 3.1 Existing Infrastructure........................................................................................................................................3-1 3.2 Water Distribution System Evaluation.........................................................................................................3-1 3.2.1 Model Verification.....................................................................................................................................3-1 3.2.2 Model Set-Up and Evaluation Criteria...........................................................................................3-1 3.2.3�Hydraulic Capacity Analysis. .3-3 3.2.4 Summary.......................................................................................................................................................3-4 Section 4 Proposed Wastewater Collection System within the Eno EDD 4.1 Existing Wastewater Collection System....................................................................................................4-1 4.2 Eno EDD Physical Features. ....................................................4-1 4.2.1 Roadways......................................................................................................................................................4-1 4.2.2 Hydrography...............................................................................................................................................4-2 4.2.3 Topography........................................................... ....................................................................................................4-4 4.3 Design Criteria........................... ..................... 4-4 4.3.1 Priority Service Areas.......................................................................................................................... .....4-4 4.4 Proposed Wastewater System..........................................................................................................................4-5 4.4.1 Peaking Factor.............................................................................................................................................4-5 4.4.2 Gravity Sewer..............................................................................................................................................4-5 4.4.2.1 Pipe Depth Analysis................................................................................. . .............................4-5 4.4.2.2 Pipe Capacity.............................................................................................................................4-10 4.4.3 Eno EDD Pump Station............................................ .......................................................................4-12 4.4.3.1 Pump Station Location..........................................................................................................4-12 4.4.3.2 Pump Station Capacity...........................................................................................................4-13 4.4_.4 Force Main.................................................................................................................................................4-13 th i � ' 21 � Table of Contents Eno Economic Development District Water and SewerSystem Project—Draft Master Plan Report � ° � � |.Section 5 Conveyance tm City nK Durham's Wastewater Collection System � 5.1 Eno 8DD Force Main Discharge Alternatives............................................................................................S'1 � 5.1.1 Alternative Discharge Locatiouu--.__------------_-----------S'1 5.12lotmrbuanTransfer Considerations................................................................................................S'3 � 5.2 Hydraulic Model Set-Up......................................................................................................................................5'3 � 5.3.1 Estimated Peak Hour Design Flows from Eno EDD...................................................................5'3 � 52.2 Eno and EUocbo Creek UutfaD-Mode Set-Up................................................................................5'4 � 5.2.3 Mud Creek OutbaD Model Set-Up........................................................................................................5~& � �6 � 5.3 Capacity Analysis.................................................................................................................................. � 5.3.1 Eno 8ntbd ...................................................................................................................................................S'6 � 5.8'2 8Derbe Creek Umdtall...............................................................................................................................G-6 � 5.33 Mud Creek OntbaD...................................................................................................................................S'6 5,4 Additional Hydraulic Considerations.......................................................................................................S'7 � Section 6 Engineers Opinion wf Probable Construction Cost 6.1 Construction Cost Assumptions......................................................................................................................f-1 - 62 Projections Unit Cuutoto future Values......................................................................................................6~2 � 63 Opinion uf Probable Construction Cost......................................................................................................6-2 � � � Section 7 Permit Requirements � ! 7'1 Construction Cost Aonuzupto�s-------------~.----_-_~.---_--_-------.7�. � 7� /�tbor�a�mutn Construct—_~..._--.----------.---_--- .............................7-1 � 7.3 Nationwide Permit/Water Quality Certification...................................................................................7-1 � 1.4 Sediment and Erosion Control Plan..............................................................................................................7-2 7'2 � 1.5 F��Lake y0�riant��uoagenzeutStrategy.---------------_--------_-----. 73 �N 1.6 8oddioQStandards Poruz�---_---_--'__—__-_--_--__--_---' ' 7�3 � 1.7 A�OoolbyDeQatru�mu'__—_---------------------------'' � 7'3 �.8 NCDO�—__—_—'_--_------~~~-''^~—~~---'--'-^------~---'-----' � . � � 7-� 1.9 RaDroud..-..._..~.-...~..--~...~''~~'^~-~^--''--^^'---'----^-------'' 7'� � 7.18 MicoDu00000Cuno�outkxn---.-.-...-~---_-----------'_-----~----. . � Section 8 Conclusions and Recommendations O'1 - 9.1 Conclusions.............................................................................................................................................................. x� �� � 8.2 Cost Bedumdouo0y�oun-----._--_---------'~--------'-------~------ 8-5 � 8.3 Recommendations................................................................................................................................................ � A.3'1 Alternatives..............................................................................................................................................................8'5 4N B-6 � 9.3'2 Recommendation.................................................................................................................................................. mN � ~ ~» | Appendices ces � r`��3����| rr � � � Appendix'&-Capacity Analysis Figures � uN | ~ i uN With � � 22 Table of Contents• Eno Economic Development District Water and Sewer System Project—Draft Master Plan Report List of Tables Table2-1 Eno EDD Acreage by Future Land Use..............................................................................................2-1 Table 2-2 Water Demand Factors................., Table 2-3 Demand and Flow Factors based on Parcel Area(Low Scenario)........................................2-4 Table 2-4 Demand and Flow Factors based on Parcel Area(Mid Scenario).........................................2-4 Table 2-5 Demand and Flow Factors based on Parcel Area(High Scenario).......................................2-4 Table2-6 Water Demand Factors...........................................................................................................................2-5 i Table 2-7 Summary of Avg.Day Water Demand&Wastewater Flow Projections.............................2-6 Table 3-1 Summary of Demand along US 70 Transmission Main in Orange County........................3-2 Table 3-2 Minimum Pressure along Existing Water Transmission Main in Eno EDD......................3-3 Table 3-3 Velocity,Headloss,and Fire Flow along Existing Water Transmission Maino Eno$DD......................................................................................................................................3-4 Table 4-1 Depth of Cav�r. .4-10 Table4-=2 Pipe Diameters........................................................................................................................................4-12 r Table 5-1 Summary of peak Flows for Hydraulic Modelling.......................................................................5-3 Table 6-1 Opinion of Probable Construction Cost-Low Scenario.......................... 6-4 Table 6-2 Opinion of Probable Construction Cost-High Scenario............................................................6-5 Table 6-3 Individual Component Casts-Low Scenario................... ... 6-6 Table 6-4 Individual Component Costs-High Scenario...............................:.................................................6-7 Table 8-1 Summary of Avg.Day Water and Demand and Wastewater Flow Projections...............8-1 ' Table 8-2 Opinion of Probable Construction Cost-Low Wastewater Flow Scenario.......................8-3 Table 8-3 Opinion of Probable Construction Cost-High Wastewater Flow Scenario......................8-4 r . r List of Figures rFigure 2-1 Eno EDD Proposed Future Landuse..................................................................................................2-2 Figure 2-2 Future Average Day Water Demand Projection Scenarios......................................................2-7 rFigure 4-1 Eno EDD Physical Features...........................................................................................................,.......4-3 rFigure 4-2 Old Autumnwood Drive at Rhodes Creek.....:.................................................................................4-2 r Figure 4-4 Eno EDD Priori Service Areas.........................................................................................................4-7 ................................................................4-6 Fig ure 4-3 Eno EDD Elevation Profile........................................... Figure 4-5 Eno EDD Gravity Sewer System Pipe Alignments....... r Figure 4-6 Eno EDD Gravity Sewer System Contributing Areas...............................................................4-11 r Figure 4-7 Eno EDD Proposed Wastewater System.......................................................................................4-14 Figure 5-1 Eno EDD Force Main Discharge Alternatives................................................................................5-2 Figure 5-2 Eno EDD Modeled Pipes in the Eno,Ellerbe Creek and Mud Creek Outfalis....................5-5 rFigure 6-1 Eno EDD Allocated Component Costs-Low Scenario................................................................6-8 rFigure 6-2 Eno EDD Allocated Component Costs=High Scenario...............................................................6-9 r r , r r r r mith r . i 23 �,,. ' ..i. i : \ avow •4 ` 1 t ATTACM�ENT �,r._._.�` y ..►- �\ t a, r �''�`�` Aga ~'' OP. rAfaiK i _000. fi / 1 r nw ;kV.-•� E ! ; ' Nett Rd pure 1 I 1 1Nl /•�'�s i ! ∎ .`i •.,, ; •ti. r► q `• .. L. / _ n i i �'•l •�. •r• •/ 1 �` �,in ! -� J <; t (..' Graff Sewer li ., �, ��i .....-- \� lea " " `� ■ Streams nog.0°'6oundorY `�.�._..- E3L ng. `� 1, 1 •1 parcel SoundorY �-rt i �` �f i 1 dig •'`+.r' i 1 ; ,Feet i % ••. 1 1 �,,,,� " t �� .1,00 �` - ' .... , ,...,-- 500 -44, 0 1 . t,fri,..„,,,,,......._.---/ i i WWI p : r t ION° _.... .., • •.01. Illi■ ---- : 1:1111.111111.1 11101 _moil i ., 7 ,-"-,-cii sa.,7‘,--, 11 i • - : 01%111M...0,4 NI wr : i AV i .411— , ollit co, Air 1 a\\10410prittlittf„Arit---iionikl■ / , It,.40.-----,„ - sp_ivaia, ---6. --itirriow re 1 ____-_,....,A —...;,--—•7,. mosciaos b.- gshritil iows =%sit 111 s► �, w rrr �►11 or pub s ', s lel Aga Sit 0 \ / " te CO G rj 4 Re Ct.i IQ_ ,r`r,�l r;;,..,'-,,/ '•, e�. & ,tswi x ,' a, 1.1 ��++iir �7 .- Eno �D t l SII "11-