SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
Pursuant to Section 5 of the Memorandum of Understanding Supporting a Regional Water
Supply Partnership for Water Supply Planning and Potential Joint Use of B. Everett Jordan
Reservoir dated March 16, 2009 (MOU),this Supplemental Article No. 5 defines the terms
under which the Regional Interconnections Study,Phase 2 will be undertaken by the Jordan
Lake Partnership. The signatories to this Supplemental Article agree to reimburse the Lead
Contractual Agency for actual costs incurred, according to cost shares defined below,up to the
total cost shown.
Project Lead Agency: Town of Cary
Lead Contractual Agency: City of Durham
Project Scope: The project scope is described in the Jordan Lake Partnership Potable Water
Interconnection Study Phase 2: Hydraulic Modeling Proposal, from Hazen and Sawyer dated
March 12, 2013 (Attachment A). The project scope includes all tasks, except Task 2.3 (Analyze
flow between Cary and Chatham County).
Project Cost: The total project cost without Task 2.3 is $446,040. Attachment A. defines the
scope of the project in detail.
Chatham County: Should Chatham County choose to participate in the Regional
Interconnections Study,Phase 2 after this Supplemental Article No. 5 has been executed;
Chatham County would sign Supplemental Article No. 5 as an Optional Participant. Task 2.3
would then be added to the project scope and the total project cost with Task 2.3 would be
$481,320. Chatham County's cost share would be $24,560.
Project Management Team: The Project Management Team will be made up of one
representative, appointed by the Manager or Executive Director, from each of the signatories.
Signatory Cost Shares: 15 percent of the total cost will be shared equally among the
participating partners (base participation). The remaining 85 percent will be split according to the
relative interests participating partners have in each task(task participation). Base cost and task
costs differ depending on whether Chatham County participates(see Table 1). Participant
signatories agree to each pay up to the larger cost share that depends upon Chatham County's
participation, as defined in Table 2. The last column in Table 2 shows the largest cost share each
Signatory would pay.
Jordan Lake Partnership Supplemental Article 5 Page 1 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
Table 1. Project Scope and Task Costs
Task Description Cost w/Chatham Cost w/o Chatham
1.1 Analyze Cary-Durham Interconnections $57,280 $57,280
1.2 Analyze Durham-OWASA Interconnections $51,840 $51,840
1.3 Analyze Flow between Cary and OWASA through Durham $39,360 $39,360
1.4 Analyze Hillsborough-Durham Interconnection $37,840 $37,840
1.5 Analyze Flow from Hillsborough to Orange County $28,960 $28,960
2.1 Analyze Cary emergency interconnections $58,000 $58,000
2.2 Analyze Apex-Holly Springs interconnection $35,280 $35,280
2.3 Analyze flow between Cary and Chatham County $35,280 $0
2.4 Analyze flow from Raleigh through Cary to Holly Springs and Apex $34,160 $34,160
2.5 Analyze flow from Durham to Apex and Holly Springs $30,600 $30,600
2.6 Analyze Cary-Durham-Raleigh interconnections in 2060 $72,720 $72,720
Total 1 $481,320 1 $446,040
Table 2. Partner Cost Shares for Initial Execution of Supplemental Article No. 5
Cost Share Cost Share Cost Share for
Partner w/Chatham w/o Chatham Sup.Art.5
Cary $ 83,342 $ 77,982 $ 83,342
Apex $ 83,342 $ 77,982 $ 83,342
Durham $ 76,809 $ 76,809 $ 76,809
OWASA $ 66,087 $ 66,087 $ 66,087
Hillsborough $ 17,941 $ 17,941 $ 17,941
Chatham County $ 24,560 $ - $ -
Pittsboro $ 7,220 $ 7,220 $ 7,220
Holly Springs $ 20,476 $ 20,476 $ 20,476
Raleigh $ 51,641 $ 51,641 $ 51,641
Orange County $ 49,901 $ 49,901 $ 49,901
Total 1 $ 481,3201 $ 446,0401 $ 456,760
Jordan Lake Partnership Supplemental Article 5 Page 2 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study,Phase 2
Attachment A.
Jordan Lake Partnership Supplemental Article 5 Page 3 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
lam\MD SOM
casnshhaerarar
Environmental Engineers &Scientists GEMWAMk NC2�
Mind 12,2013
I&-Sydney Pad Icier,P_E
Waker Resotraes F giheer
Deimbset of Pablo tlWaks and lJliies
Ton of Cary
400 James Jackson/ore_
Cary,NC 27513
Re: Jo Wen Labe Parbrerstip
Pdable Wow Malroomrecon Sddy
Phase 2:Hytimullie llodebg Ptopoaal
Dear w leer:
Haan and%=V L- in pleased to subrd the updslod pn*oarl for hydrdc modetrg of polahie
hwier irhYscorareciors among she Jardm Lake Partner:This version at the proposal responds to
atr dsaaachrs air Oww Courdy and the Ton of Holy Springs_
Tire propose d tls z"s to develop a regKmO appaaeih far Alarm- ihtercom eciars that
ihoease the hetidrgy and a aftkubiy of drihlring wader by haivg mwLl rtes cooperaliveiy.
Orr December 1,2011,ledmicol memorwrdrm unnumized Phase 1 at the project.This umw wy
tab ukled each pariaer'i molar iaciies,docL nreried a"' k*m=neeiors and evrwied
apporkaalies for inpored k0arconruclions.The key deavecble was a map slhoaig mill lire
prime wmiler I 1 1.pie zone boundaries and are irkrrcormreckm locaiiors
Our December 2Q 2011,teclahicai rmenwwxbm sunned the Head steps titer evoa> "
iieoa<mre
AM a br pmvdrr9 a rrh1 al overview.,an explarrion of serves bwdmd water
�bita9 and upddi g ehoI and for moving iorhhhstt
Tha hpdred proposr it are p ged'a second shwa ir�igghres i*waxmeeion mot1@bq hegr=b
by are parches and fiber feedback on the scope and coat wins I imh p mvio m proposals,
khleroonrhFr-n a rat be evd lied fors 11 dn' P ad I arhales trig rrai.dq esdendetl period
asmddionz Each ehalloisb n wi irmirde how if both dreciorhs,where 1 1 e_Prediuied bydrsu r
perbrrterae will be compeed wih desip tsileria tar velocaiies,presaraes and tact watr kairJs
Caiea6on tds wi locus an existing ihleroamezhorha bander ea-ralion teat be reoonwherhded i
a palms nndel s an ble b ndch Ticld me mmaner&&
The I aa- 9 pages arsine the requesied rrrodeI g pajeds.Part 2 builds an Part 1 in ad tdus
are not reI I- I Pajeds ant ihvdve wthe* wnk:r f mfg h an irsrnhediie system mry invd-
ahe saaae irr' rsrrheefoths as died rwnfer projeebh,bra areas are sepsate nmdeirg acehar-ml
amt producedflere I fears and pmos es_The rmi bars mdsded M each p pd dwoipiaf refer
b the bilercom cfon IDs on are map tram our December 1,2011,is 1 ical neenharandush_E3clh
Roied ihdudes irir nreeirgs milh are parches bwoked,to review and update mhodd aoerwias,
Jordan Lake Partnership Supplemental Article 5 Page 4 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
In 1- L*e PahYSsiip
?lase 2 Hyetaio Ya Pfcpasal
March 12.ffi13
Pape 2
Scope of SelYnxa
Pot fayso%*Oww4dwa f4na ftw
1 rilwsi/rfd}ai0•i�►��MI�R4iiw��it
L 1 Ad1lrCwrawMwwwawdlaawMf►l!i i� 3 stm
1Glow, I adbdw%YwftftwS me
2 Upham Cwv me"YaiarwwAa�c
3 apaww Duhwo war Y
4 CawiWw Orddm aw/Oaryawddo iadlYdeaawawAYew diar+illa
S Cwt wwif alAbodko worYaY�wwAw w
6 p�wwwiwa arda•aYeflwarfww�YSopao OwAw rIYM wdw� iEM
7 Y�rY�e�Ir�wdllor�F�wrYfw�b►toO�Mw��
0 OuwwYr amYerirffaw5aw Oufiw woYirlrM��0��'a 1®sl
!t Ywafa Ygpwrwwwdi fora m"b"fhower 7we"Mw whm=d env igM
>e fYwaoatpmOnindp awi�
YYPawpawwpwadxqwwilaRY xw# aMAewww=wwb
12 fC
L 2 A*- k-wwmwdbmw R ags1l in f sYt ny
1 saw
2 GawiYae OMMIC5Y41�iwwaM wilaiOtOwiYaa►�woad awaaAA Mwagwrrllwn aawllt
3ClacknuM wwrYnlna•sdrrww
•fYMwwlaa aidalwaUofAo.rfwsn Owfas aoOrMf64 a a!wwaar ao f
S 1Soanwr affaraiwwlfwYwmaoOYAAAaA1�lAl�4a�lpdwloda.cirh.wOd�1
iYwdffYwwwawwwRfor 7agffn 806aw1o0d1AM+4aw1bechadw fa[4q
7AfawW.... wwwaw1r!wWf4 Owlaaww0WA 1w2=Wv&M a +4ws/aafMa�rn
0Dlewmiradioriaflwrfaam kaoDMIUMwft=%wrtotirM.n
r�we pwrnrw.�wrrw
10P-P-00pddo*wr wtYw♦*wadaaiallwr
n qt
L 3 �1ae13awYara�a��aat4fI1M01►dwa�Ori�ir�7�7s,3L271 M S win
1/iolwarfafaaaWOaw awi Ydw�faar Ndowa'atrf
211 aw-Wj" p frw=*wiSg14as6q*ww#DiA maoOlYAI►SRaApm*
3 O 1aewYw aduYOYofldrfwow OraldA 0ww�OrMlwots CaT
4 haaewtpwOmMiw f woulw
SP ewpandopas7Yd ias*dsaswaYaraowawawa
i D1:
1"1-4ss Pabbb war>gar.mortem StNdw l hZENAUVV SAMER
Jordan Lake Partnership Supplemental Article 5 Page 5 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
bte.t L*e PM*w5wP
PL®e 2 fi1-bauie Modeirg Pmposel
ri.dt fz 29"3
Pmue3
fbtfvdm te.t�oa.airr.a Mrs �..
L4 as NAM
140dow,doiw=low and,ao.,f..vabo sufF
2T*adw eprepsaddrdcrro/alc9f ndwat=wwd&mplat
1IdawtrpMspr, Nor 2wgdiww0m&=eoM1Niaw 0
♦WMh 10r4wqdi!awn0rdiww2DM1ww10 aYc2vW1w0 WCPg6asM"
511 NotapMw 1or1w@d1wVmh=
L Poae=prdlyd—wgdea
7 Pop=s alpat dater Mat k=gw=ees FM wr�wne
sac
Ls Aad�Owfawiriaraa*maar�p4aMp�MR.1A 7U tM
1 is/aarMfamatlow and Mt=daa Mieo=s'sum
2UpAamOraWAWa won"andad/mwaadlwfadrwia[
Cho*wig"
q ar�Yrwvawetlws
•t1aw11fp IwpaeaaMm fartl7S wM taw t�Ybrwa�Maws*daw�e Jtlw�s m Mudiaw�D
S t4*fiae floaas ti tka�Afwwiwa sysn arlMlaMYrrw fm sypMad fww MpMiwaq/a
rYawlrl trNtprwrawwrnsf=0}SwrttanaIrYiOsswa�iwfio Madl4wwm
7 h a padlwioap wuidts
0 Pop—a=p=t dapwtat Iwm4aasss aldwa a��
0ac
PM1v9tda lAN S2ti1r
IM-4"ri.taliswaswbAwc mmCbmSfody 114MNJLNDSAW1KR
Jordan Lake Partnership Supplemental Article 5 Page 6 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study,Phase 2
In I take Part% ship
Ph-e 2 Hyd-UNC Mode ft P-PUBW
Mntah 1Z 2013
Pqp 4
Mfna 7Mfk aeelfflee Ifwe rM
2 *wftft M4Mw&Nw1F"sarr.rotJrrl■r.ewwwst
it IIdPdM��Ir��i1�L�iZ4i3R.4Ma4i.ilL>r�Li.�>} w f 1R3w
1 ember MIIwtlm1i1d11�1Mre relwel�'fMl'
1 f*d ftAps WA"IRIMMU M
3 Add MWd*eadAF=10 nn 11�/�rePl l and� �fl�lwmw'dMMi
4OrdlnaoilcomYnllml,tMdmwemeMl M
fANON=C vewpsrpnmmwMlmn0wh4rrnaddwon
i Amdrs C11Ysnra�lq Mdwswrdlew mldl CIMIIFaet elFwrts
1 pwet �wmis
3 FMwww leraoat dtar mrtllsfnsarmnwceeMrn awwrss
tar
st A�ISA/wff> irdl�efarlw�rMff.fi111L� M f WbM
S GMdw forlufdlelladMdm"wrfafarrt ON
2 Add arm mwk%vb— rit adrdlifdfst Nwasametlws
7 Wtl ao
jMgaw tiN
nMfrr2aW Wrlprgl�3r�te1yw+7rM11 Ory wnMYwrlt
4 Oefea11d11e m11YMdife fiwflseArywts IMaWI/SN1�
SWaGrM1�aw.ar salerAadweplRawrMsMwwMihlMMWrSicRrlwC TSW*A.w
i rYweft pMNn111wr M fis
7 Fftp-1Mpmf dmpremtssa'srisnslels
sac
2.3 AwftwfenYelweeCNr ili4 f �
1idlwrM11ne11rtlaosdNlludwrwamen swN
2.Adf NwdltlleMwll�lsgalydiMemdwddl eededriYl�fsweseNl�/4w
3 OMee1111ee llwlYes Gq''fhaalVjAPw 1b0adNwtYeeq
40wkwmk=#kwf 0w*wmCmn1r9 nme^vml*Cmw
3 runt"WWW *awds
i pftpm 1e0atdNPVAW*t—WN&osaenlnmarmum
ICK
MI-4"Robins Wa1Q h4uVwmeribim Sh* 11AUNNSI)SAwAF
Jordan Lake Partnership supplemental Article 5 Page 7 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
Phi z .ire I P=pwW
eWffch 1Z 2013
POWs
ho Paden et e..r.r. wry rr.
2U s aay.
:fJMi1r erid aresNspe.p..t o HAr now.
s oorrreae►a;rreerawa-wo COY bmorwav
Sr rwinerr e`eeetle.e
e rrreat�eeierwry eerrlr
7P-p—mop- 1 4 r' b=pWmae.s..ra.mn..n�s
M SAM
1 ie/�rYe�teweelee ad rarnlrr r+.en.:•�
2 CbrvtiApaaditft Yqp
s YeeerrMe�rewele ri reerw arerrAees
a rae:etpmamb rr rarlr
%P-P—w—1, 1- - lesipreee owlet mnr
6cr
t i awrem w P&W40A ir2mK47,4F,4LJIL4lL4t4NL4&2km,D1 4K S W=
1 ieuw6e6eeelre mid r aww1ow Pauree erlr
2 A�etaee welter rmti/anN bm 1Aayr egbei llrrr sgq*rrn
�llrafrlepewes irrma�I rrr or�rn bCgyApn/Ileer3plef
•�r�ir�airmertlrn a1.yNOCap'A�r�Aloil,lp�
S irerE/Il�eewe�6rerme�l4�ar a.r..ad e,i.iwdir�
i�r r..v.rlrar ore..re.MAV•dlMr
7 wrarrl.ip.rr.�r.vaerlh..eelel�bc7e�rApeflloerlpr,s
eIdr v.olrar Or6�ad Rr�MmN �s
sew.rr.er.f rr Mr..neo..iq►tlrr�r1�rsM.Reo�spl�
moeereeYrwlerfart ��el► *NaMrwwwwCt.#+rlp mp,r,M
11 Oe.resrellarferr MrrelQow4Uro���r Srl�ad Cepllttpen m oueMrn
12owner.tlrrwrwlrneneCorrr 0 1k*r3PdrC60NN==idftw%=W0WWA
1t'1 MwR�dYeYerr�selr
m Pws•we�+re .ee.es seder aeenrKs
is 4[
rree3>irer� L�IIt sa""
deMrmaOfN� Se06M
M1-dr6 re water h mumnr ee Study 1�4ZLN.t D 5�1WY11t
Jordan Lake Partnership supplemental Article 5 Page 8 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
.eor�r,r�Par,esh:P
Ph @-2 Hp*a ft Modero PkW05W
March 12,2D13
Papie 6
Deffiverables
The deiveabte for this pro jed mil be a safe report Baia daaplem descrfrg Fs Wk for each
iraterCOrrredo I pr*&The report mi be provided in eb*cr&T X11
Project Tema
The Hasa and Sayer teen for its j 4—mi bKkN .
Raged Diedor-LWmd Wag,PhD,PE
Rojed Lbwmmj --id%ey R CnAdoilvo ,PE
Moddow
Cr1pM Broadkwit,PF
Todd DavW P.E-
tiicsdo EsQiraesa,RE.
tllegan Rob eals,P-E
Wayne ZraraL PhD,.P-E.
field Coardinaior_
KeWn Widderid Et.
Cnnrpermdn 1 for serAces m dared abd be bowed an a bred Labor LWIviler of 115 applied to
labor carts of to Curaildee lrous r-m gad to fire prajer I by each employee prwkkq services_
Table 1 depicts cu wd died sa"races for vsors sbrti pcssTions expected b be k olread vsih
the pnijact Adbal talesmil be based upon Iba•uwb far fire im*Aduals uarrlong an!ae pmjeo-at
the time services are reached,and mry difes Isar there ataoam is the tile.
Tale i–D'inut Salary Rates
Posibisa Direct Sammy Rates
vice President $75
Ser*w Aasodle $67
Aasodre "a
$44
Coordml or $40
The tired Labor Odkder mi be appied to adrr hbor coalo mud mil loclude al omhead,praik
travel,rrro I I seNhaare mad Corr ular eartrw mad processg,sec"AW ,leleplaC ''1 faces,air.
k alai be uaderaiood the ag repf cart COMM 1 10 1 laed far this pr nip xt shed net be exceeded
Nap Dip P"takes feces hoes than en9vaeled,the fee mi be has than tbd aharn-NOW Cods for
araobaer pra*d ovemaa that Pm*cft cod oeTiag,rariasrg tees km afher projects tray be used.
IW-4%Pebbb W26W h*WU= wfi=SINdY l hZLNAwD SQMER
Jordan Lake Partnership Supplemental Article 5 Page 9 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
.to',take Pmkm!d,;p
Fk� 2 Hw Aa,ie Modek*Proposal
Yawh 1Z 2M3
P¢7
Schad
wN6 12 monf of aufwrtm§m b prceed1 mkig wi not begs
befa�'
Pla cal are at(336)292-7490 z61720 9 you haw=V Quest cm mqm*9 ois piapanal,or
e d m at" "Corn.
HAZEN AM SAWYER,Pit:.
.Idrey R Duidn rk PE
5er*w Aaaodmb
GC. Kdmd Wang,P.E.
Gaisflopher Bdk P-E-
ltil-/SS r r,Lie Wahr LOvcwaertir 51ady It ativ w�'i It
Jordan Lake Partnership Supplemental Article 5 Page 10 of 20 May 20,2013
JORDAN LAKE PARTNERSHIP
SUPPLEMENTAL ARTICLE No. 5
Regional Interconnections Study, Phase 2
Participant: ORANGE COUNTY
U
(Signature)
Cou ty Manager
ATTEST:
This instrument has been pre-audited in the
manner required by the Local Government
C B„ udget and f� cal ntrol Act
Clarence G. Grier,Assistant Co. Manager&
CFO
Jordan Lake Partnership supplemental Article 5 Page 16 of 20 May 20,2013