1 . Open & Welcome Sassaman states that before getting to the agenda items there are
two pieces of housekeeping that need to be addressed . There are people here from
the public that have signed up to speak . The other issue is Board member comments .
That has typically been at the top of the agenda . In the past few months its use has
fallen off. It seems that to continue to have this item it may be more appropriate to
have it at the end of the agenda because there are some things that might come up
during the meeting that may generate comments .
2 . Adoption of Minutes from March 31 and April 2 SWAB meetings
Smith moves to accept the March 31 minutes . Norwood 2nd . Passes unanimously .
Norwood moves to accept the April 2 minutes . Bowerman 2nd . Passes unanimously
3 . Transfer Station Site Search Update Wilson states that at the April 21St BOCC
meeting there was a substantial discussion of the status of the environmental
evaluations, the report on contingency plan, and some discussion on the various
financial analysis on hauling that had been performed . The Board adopted the
manager' s recommendation to hire a law firm to be available in the event that a
lawsuit resulted from the transfer station site search process . The Board directed the
County manager to bring back to the BOCC the final ruling from the County Planning
Department once the Planning Department received all the information from the State
clearing house regarding the various environmental issues related to site 056 known
as the Howell property .
There will be a work session in which the Town Councils will be invited as well as the
SWAB, which will be on May 14th at 7pm at the Southern Human Services Center
where there will be a broader discussion of the transfer station siting process .
One of the options in the contingency report was a temporary transfer operation on
Eubanks Rd . They determined that there would not be a temporary transfer
operation on Eubanks Rd . An environmental impact statement or a rough equivalent
of an environmental impact statement would be performed on the Howell property .
Staff was requested to speak to the Orange Grove Fire Department about fire issues
related to a possible transfer station on Hwy 54 .
Sassaman states that at the request of the Commissioners I made a statement on behalf
of the SWAB . That is in the minutes of the BOCC meeting. It was a summary of the
memo we sent to them . [passes out some copies of the statement]
1
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
Regarding the issue of Al Vickers ' transfer station resolution I would like to distribute
the vote . Of seven members there were four " no " s, one abstention and two " yes " s .
Vickers states that if this is going to be distributed, distribute the request for vote also .
Aicdience Comments
Gary Carver of Blackwood Mountain Road states that it has been quite some time
since I 've attended some of your meetings . Most of you were not here the last time I
was here so you may not know me . I live off Millhouse Rd . What I ' d like to talk
about are some facts and some methods . I have limited facts . I acknowledge I don' t
know if they are accurate and I don' t know how true they are, however I find them
quite disturbing . I find them disturbing in the fact that it pertains to Millhouse Rd .
and as far as I know no one on Millhouse Rd . knows about this .
The facts as I know them are as follows : The proposed transfer station site is out on
[Hwy] 54 . I don' t know where that is . I really don' t care . All I know is what I read in
the paper . There has been a lot of push back . Now it seems that �there is a current that
says " Let' s just keep it in the neighborhood it has always been in and that s this
neighborhood . I don' t live on Rogers Rd . , but I am part of the neighborhood . We
stood with Rogers Rd . when no one else stood with them . The groups that are
standing with them now are newcomers .
I ' ve heard that there is a little secret get together that is now proposing the waste
transfer station site goes on Millhouse or somewhere thereabouts . Specifically I do
not know . I have two guesses - the Blackwood property and the property adjacent to
the [Town] operations center . I understand the heat that has been generated and why
you would want to consider that proposal . My position is we are not saying " not in
my back yard " we are saying " not in my back yard no longer " . We have put up with it
for 30 years . Whether it is on Millhouse or Eubanks it is still the same neighborhood .
We consider ourselves pretty close to Rogers Rd . and we consider ourselves closer to
Eubanks . I don' t know if the proposal is an official one and I don' t know where it
stands, I do know enough that it is spreading around and I take it at this point to be
true . If you want to deny those rumors now is the time to do it. I ' ve also heard that
the Mayor [of Chapel Hill] , which we can' t vote for or against, has held his meetings
with the group from Rogers Rd . and trying to divide and conquer . He wants the
Rogers Rd . group to say OK to put it on Millhouse, it' s not really Rogers Rd . so why
don' t you join us and come out and say this is a great idea . It is not a great idea . It is
no better on Millhouse than it is on Eubanks .
To give you some background, a long, long time ago there were no landfills on
Eubanks Rd . It was shoved down their throat because it was the neighborhood that
had no say . People want to deny that but that is the truth . Not too long ago when the
first part of the landfill started to fill up there was a proposal for a new landfill so they
2
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
did a county wide search just like for the transfer station and looked at many sites and
came up with 16 sites . They went through a long process of many months and about
one month before they decided to vote on it all of a sudden site 17 was added to the
list. Site 17 was on the Blackwood property . Everyone thought that was a great idea .
It didn' t quite work out that way . That was dropped and we went to the waste
transfer sties . The promise was always made not on Eubanks Rd . Now we come back
to the full circle .
Let me talk about the method . I find it extremely underhanded that I only learned
about this tonight. I find it extremely underhanded that they have said nothing, as far
as I know, to anybody on Millhouse Rd . This divide and conquer is not the way to go .
That is poor . I don' t know the facts . Does anybody care to tell me the facts ? I also
find it strange going to meetings for 20 years it is always a one -way discussion.
Whoever is on these boards don' t like to talk to the public . We get to stand up here
and say our little speall but the people on the board don' t like to answer questions .
Can you tell me if this is fact or fiction? Am I invited to the meeting tomorrow?
Sassaman states that you know more than I do . The issue of Millhouse Rd . is not on
our table .
Carver asks, " Do you know about it? " .
Bowerman states that I know of one group that has mentioned putting it on
Millhouse . I know that when it was brought up with me I said they are the same
people they have it next to us . I consider myself part of the same neighborhood and
I ' ve always had an issue with the fact that we are divided into three with a third of
being in Carrboro, a third being in Chapel Hill or to be annexed by Chapel Hill and a
third being County, never to be annexed by anyone, so that we never act as an entire
group . Besides that I can' t tell you what will happen. I ' ve just heard people mention
it and they are not people in power .
Carver states that Mr . Foy is in power . Is this a process that is going to go forward ?
Sassaman states that whatever might happen, the issue of the siting of a waste transfer
station is not our agenda . It is the responsibility of the BOCC . They have not
delegated that to us . We have made some recommendations of where we think our
good sites and bad sites are in the past. The whole issue of siting is not our
responsibility .
Carver states that I accept that and I understand that. At the same time I would say
you certainly had inputs to the BOCC and I take it that Chapel Hill and Carrboro and
in that perspective you ' ve had more say than I do . In fact if you live in Chapel Hill or
3
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
Carrboro you have a lot more say than I do . I cannot vote for him . We are in no-mans
land .
My summary is we consider this one in the same as Eubanks Rd . If the position is
not on Eubanks Rd . ' then the position should also be ' not on Millhouse Rd . ' One
more point that I find a little extremely disturbing, Site 17 was the Blackwood
property . That property was in that family since 1750 . It was a land grant from the
King of England to the Blackwood family . Mrs . Blackwood owned that property and
she considered it a legacy worth fighting for . It wound up that her only choice with
that property was to sell it to the County . No one else was interested because of the
history and background of the landfill being in that area . I also find it quite unusual
that this now surfaces with a few weeks after Mrs . Blackwood dies . They made
promises to her about the use of that property and it wasn' t for a waste transfer
station and it wasn' t for a landfill . Once again we come to a point where promises
were made .
Smith asks where is the Blackwood property .
Carver states that it is across the railroad tracks around the curve and it' s the red brick
house that sets on the corner . The property extends to the back of the landfill . It is a
tempting and wonderful site . The County owns it, they don' t have to buy it, it' s there,
it' s next to the existing landfill; the temptation is tremendous . That does not make it
right.
Sassaman suggests to Mr . Carver to communicate at the appropriate time to the
BOCC . They are the body that makes the decision .
Bonnie Hauser states speaking on behalf of Orange County Voice I would like to first
thank Al Vickers and BJ Tipton for having the courage to stand behind their principles
and speak out against the waste transfer station in Bingham [Township] . That is what
the citizens of Orange County expect from this Board - principled stands .
I also wanted to clarify I know that Commissioner Yuhasz is new to the board, but I
think that it is really important that he clarify when he is speaking for himself and
when he is speaking for the Board . When he spoke about vendors as alternatives at
the meeting on the 31St, he was not speaking for the Board, at least that is what I ' ve
heard from other Board members .
We were surprised that after two long work sessions with this board and after your
deliberation and your vote that the resolutions that were discussed by this board were
not presented to the BOCC . There was no notification to the public about a change .
The citizens of Orange County expect this board to represent their interest in an open
and transparent manner . We were very displeased at the resolutions presented . One
4
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
of the things that this board discussed was not to endorse the report from Olver,
which in fact you ended up doing .
I am curious if anyone has read the report from Olver . Could anyone answer why
there are two different volume projections in that report? Did anyone know that
UNC ' s waste volume was used as part of the vendor cost estimates ? That would
overstate the cost by at least $4 million . Did anyone confirm the assumptions given
by the Towns were assumptions used by Olver ? We have confirmed that they were
not. Did anyone look at Olver ' s use of fuel [cost] estimates of $2 / gallon? Does
anyone think that $2/ gallon for diesel is reasonable estimate for 2011 fuel prices ?
This is all in addition to some good work that was in this meeting and it wasn' t an
issue until this board changed its mind and decided to endorse the report that I can' t
image that the professionals on this board looked at and reviewed . I know that the
report was reissued after your resolution was written. Collectively from what we
could tell, it' s hard to tell because the reports are pretty confusing, the errors under
estimate the cost for Bingham by a lot, they overestimate the cost for vendors by at
least $10 million, probably more like $12 to $15 million, and the report fails to
reasonably depict how much more it will cost to build and operate a facility in
it will to build and operate a facility that is kept closer to
Bingham Township than
town .
Now this board has been invited to an important work session . The reason the work
session has been requested was because the Board was given a pile of reports from
Olver and the reports had contradictory points in it and they didn' t understand what
was going on . They really want to know the facts . This board has been invited so
how can you help the Board?
We would say what are the real options for a waste transfer station for this county
and one is, and I think there is some agreement, that the best option would be a
smaller site that is closer to town and Eubanks Rd . is not that site .
I think that everybody agrees that a Bingham site commits every taxpayer in this
county to 20 years of excess costs, bad service and environmental risks . I think that
we all agree that if we are stuck that vendors are a reasonable interim option . It has
not been discussed, but I wonder if there isn' t another good option to end the
interlocal agreement. That was a great idea for managing the landfill but maybe it is
time to let the Towns go on their own . Clearly Hillsborough is well on its path to
using vendors for three -quarters of its waste . Even with all the distortions in the
report it was cheaper for Hillsborough to use vendors . Maybe Hillsborough should
go out on its own . Maybe this county doesn' t need a waste transfer station to serve
the whole county .
5
Minutes mmom Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
Another thing that hasn ' t been discussed is when you put all the costs together do the
Towns know how much more a waste transfer station in Bingham or anywhere will
cost over the cost of using the current landfill . That is assuming all the recycling
subsidies are taken out. What are the real costs to tip garbage into this landfill versus
a waste transfer station? I ' m guessing it is roughly double . You the Solid Waste
Advisory Board your job is to represent the citizens we are not sure that we were
properly served in this last board meeting . You are being asked to serve the board as
experts to the Board we would ask please let the Board and the Town leaders know
the truth in what their real options are for solid waste management.
Robert Campbell states I found out about a meeting that was to take place last Friday .
I found out about it Wednesday evening . Thursday morning I called the Town of
Chapel Hill to see what the meeting was about. The mayor of the Town of Chapel
Hill had called some of the members that was on the [Rogers Road] Small Area Task
Force and invited them to come to a meeting Friday morning . The proposed site on
Millhouse Rd . was the subject of discussion about placing a transfer station on
Millhouse Rd . Millhouse Rd . is a part of the Rogers-Eubanks neighborhood
community . We have always said " no " to a transfer station and " no " to expanding the
landfill operation.
Whether you know about this meeting or whether you know this to be true or not,
today I get a phone call there is going to be another meeting tomorrow at 3pm down
by the Chapel Hill Operations Center to walk over the land that is the proposed site .
If you have any true interest in not being a part of this you should be there tomorrow
at 3pm to walk with Mayor Foy of the Town of Chapel Hill and those that will gather
together to walk over this property . You have an opportunity to voice your opinion
for or against but don' t be kept in the dark or don' t pretend to be kept in the dark
about what is happening on Eubanks Rd .
The operation of this landfill has gone on for 30 + years . I know that there are voices
that say we have to put it somewhere but there was a site that was proposed by UNC
and the people that are developing Carolina North, they put that piece of property out
there when they thought they were going to put an airport on 54 . You probably
haven' t heard this being discussed but it has been . Why put it on Eubanks Rd . when
you can put it on Carolina North. They have acres they are not going to develop in 50
years . It is not an appropriate thing to put out here . You are already dealing with the
UPS trucks, school buses, the Town Operations Center and their trucks and vehicles,
Solid Waste and Recycling, and the Transit buses how are you going to control the
eighteen wheelers that will coming down Eubanks and Millhouse Rd . There is
enough congestion out here already . The people in this community have endured the
operations of municipal facilities too long . I know that the County is talking about
hiring a lawyer in case there may be some litigation but there will be some more
litigation . It is time to start looking at the humanity side of things and not the
6
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
economic part of it. Too long has the community suffered . It is time to be
responsible . We need to learn how to handle our trash more . We need to have the
human side of what all this is doing to the ecosystem out here and the lives that
depend on it. Where is the future for the community out here if we are going to keep
id waste facilities . It is time for us to begin
being impacted by the operations of the sol
to do the right thing .
I know of the many times that I have spoken to the different boards and spoken here .
1 know you hear me but are you hearing what I ' m saying . Enough is enough . There
are other ways of dealing with our waste and there are other ways of dealing with the
situation we have here . We can either find something we can all work together with
or we can work in our own way to come up with a solution to the pollution this
operation has caused this community .
Guild states that this is the first I ' ve heard any of the information and it is a little
surprising . Steve if I may ask has there been any communication from the Board to
the Town of Chapel Hill about assisting with the selection of a site .
Yuhasz states that there hasn ' t been any communication that he is aware of from
Chapel Hill to the BOCC on a site . Rev . Campbell has said that there is a meeting .
That is a meeting that I was not aware of.
Norwood asks Steve if this board went to the BOCC and said " Don' t you dare" , what
impact would it really have ? The paper I have here says the ultimate site selection is
the responsibility of the Commissioners . What I ' m really asking is how much power
do we really have . I think there is an assumption that we have more and if we have
more I ' d like to play with it. But I' m not aware we have any .
Yuhasz states that at the risk of speaking for the Board, I believe the BOCC listens to
all the comments and all the groups that speak to it. I think the BOCC looks at SWAB
as a technical advisory board . To the extent that recommendations are technical in
nature, I think the BOCC gives great weight to those recommendations . I think that
those that are not technical, but rather political I think the Commissioners are likely to
give less weight to that recommendation .
Norwood clarifies if we are going with our guts and following the public and the
residents here, that is not going to carry any weight. We would have to come up with
a technical reason why as a board [we would oppose the site] .
Yuhasz states that as a board that is probably true . As an individual [or] a non-
technical recommendation yours would be given as much weight as every other
citizen.
7
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
Bowerman asks Steve is the Rogers Rd . community viewed as a small community by
the Commissioners or is it larger out Millhouse way . I know the people that live in
the area have one way they look at things but I ' m not sure it is shared by those in the
county .
Yuhasz states that a lot of this that we are talking about predates my participation and
knowledge so I can only speak by hearsay . It is my understanding that at some point
nition of the historic Rogers Rd . community created to
in the past there was a defi
which all parties agreed . Whether Millhouse is or is not a part of that I don' t know .
Vickers states that there was a report that talked about that issue not too long ago . It
ity as those landowners that had been there from the
defined the Rogers Rd . commun
60 ' s or something like that. It was a period . of people that had continued residents on
the property not newcomers to the area . It surprised me that it was somewhat split.
This was in a Carrboro report and how they were dealing with the sewer assistance .
Norwood states that if it is allowed, Rev . Campbell can tell you what areas were
included .
Campbell states that when the discussions began in the 90s about all the different 16
sites and during the land [fill] owners group and neighborhood association group
work groups we identified what the Rogers - Eubanks community was to be and
what it is . All the way from Billabong to New Jericho Rd . and part of the Blackwood
Mountain area up to the Emerson Waldorf School was put into that section . When
they began to talk about the water and sewer and the cost it was all the way over to
Allen' s Barbecue . That was part of the area that was considered as being the historic
ity . It has never changed . The only thing that changed is
Rogers -Eubanks commun
when they came back and [former] Commissioner Carey headed up the Enhancement
Taskforce they redefined an area for enhancing the Rogers Rd . neighborhood . Even at
that time we said " You cannot leave out the other area . We are one community and
have always been a community even when it was farmland and they were using it to
cut down timber to use the wood to make houses in this area . "
Sassaman states I've got one question for staff or whomever, that Rev . Campbell
mentioned something about the University offering a site, which is new to me . The
only person that I ' ve heard suggest that the UNC North property might be a good
place for a waste transfer station is myself. Despite the fact that I live less than a mile
from that property that has a lot of appeal to me because it meets all of what I think
are the key criteria of being close to the waste centroid, transportation routes and
where the garbage is but that is the first time I ' ve heard anybody other than myself
say that. Do any of you know anything about it?
8
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
Yuhasz states that in the five months serving as a Commissioner I have not heard any
iversity that that would be a place to site a transfer station or
suggestion from the Un
any other facility .
Hauser states that in some transient comment Caroline Efland had mentioned the
notion of Carolina North being used for a plasma gasification facility in the long term .
So it would seem to me if they would be open to a waste -to - energy facility they might
be interested in a waste transfer station as a phase one . Just a comment.
Yuhasz states that as part of the parallel tract effort made there were overtures made
to the University for cooperation on waste-to - energy and I ' m sure there would have
been discussions about potential for siting a waste transfer station at that property . I
think if that was a viable suggestion we would have heard about it by now .
4 . Solid Waste Department Budget Update Wilson states that it has been a tough year
for all departments . We have all had to submit a budget with 10 % reduction from the
budget that was approved for this year . (Hands out draft budget to be presented to the
itation Division some possible budget reductions could be .
manager) In the San
• Miscellaneous cuts in the amount of $92, 000 .
• Free dump permits be eliminated .
• Mattresses no longer accepted at the SWCCs . We are suggesting that when people
buy new mattress they have the old ones hauled away by the company they
purchased the new one from or find a way to get them to the landfill themselves .
• Closing one of the SWCCs- Bradshaw Quarry Rd . It is the least used and doesn' t
have the full array of our services . It is a very small site with no opportunity to
expand .
• Closing all the SWCCs on Thursday, Wednesday (as is currently done) , and
Sunday and close an hour early all other times . That would be a savings of
$120, 000 . Users may not like it and the Board may not like it, you can' t save
without cutting costs . The BOCC will determine what will ' give' .
For the non-Sanitation budget of the enterprise fund possible budget cuts of $400, 000
are :
• Eliminate interns including one we' ve had since 1990 .
• Reduced materials like stone for maintenance .
• Cut back on training, but no specific programs were eliminated .
Norwood states that regarding cutting the hours for the SWCC is the last hour of the
day the least used time or is it from 7 - 8 in the morning .
Wilson states that usually the last hour of the day is the slowest.
9
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
Vickers states that item 2 says to delay work on the solid waste management plan, is
that feasible ?
Wilson states that it is feasible . The State will just have to understand .
Vickers states that rural recycling is twice a month, is there any consideration of doing
that in the Towns .
Wilson states that it has been discussed : It has not been pursued or recommended for
a number of reasons . The urban residents have had recycling a lot longer than the
rural residents . On a household basis it is a lot cheaper . Going to every other week in
the urban areas the result would be not people holding their stuff for two weeks but
taking it to the drop - off sites and we would be over burdened at the drop- off sites .
We would be shifting the expense and materials from curbside to the drop - off sites .
Norwood states that there are some people that receive [handicapped] special service
where a separate truck goes to the house to get the materials, do you all still do that
and would it be more cost-effective if the driver of the regular truck just picked it up .
Wilson states that the Town used to have a special truck get the garbage depending
on the situation . Regarding the recycling in the urban area it is serviced by a
contractor and they are doing it the most efficient way . I don' t think there is any
money to be saved there .
Pollock states that they don' t charge any extra for that service . It is a flat fee per
household .
Yuhasz asks on the elimination of the permit distribution and the mattress acceptance
do you have any guess of how much that would increase illegal dumping? And how
much illegal dumping there is now .
Wilson states that I have a notion that there is less illegal dumping than there has ever
been. A combination of expanded enforcement, general awareness and little
reluctance from the public if it is seen and due to expansion of the towns there are
fewer good places to dump . We scout those more frequently . Regarding the
mattresses and elimination of permits, [it] could result in illegal dumping . I suspect
that at first there could be a brief period of illegal dumping because they cant get a
permit or they' re protesting . But illegal dumping is a hard way to get rid of waste on a
regular basis, so eventually they' re going to do whatever they have to do .
Spire states that 25 % was counted for large loads being redistributed back into the
convenience centers through the process of education that the public would know you
couldn' t bring an over flowing pickup but only a regular load and still dispose of it at
10
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
the convenience centers . Some would reduce the size of their load and go once a week
instead of every other week .
Wilson adds there has been some abuse of the permit system . They say they need
three loads when they need one and let someone else use their permit.
5 . Programs/Services Update
Joint Landfill Gas Recovery Project Spire states that the project is moving forward on a
fairly fast track . We have received the first preliminary draft of the installation and
made our comments back to UNC . There is another meeting next Monday with UNC
staff, architects, and engineers to go over the second draft that shows the proposed
installation on the landfill . Once the proposed piping is agreed upon we will move
on to the permitting and construction. This will hook the gas wells on the north and
south sides together and getting them to a flare station on the south side of the road .
Once we agree on the piping route, we will proceed on the permitting on that. There
have been some good discussions between us and the Town to get the pipeline down
to Homestead Road and Martin Luther King Jr . Blvd . and the duct bank down to
Carolina North from there .
Smith clarifies that it will transport gas to Carolina North . What will they do with it
once it gets there ?
Spire states that from the gen [erator] set there will be a substation and UNC is in the
process of getting permission to put what they call a duct bank of high voltage power
transmission line down to Carolina North where it is currently located . It is 1 , 000
kilowatts to be be generated .
Smith asks if we are furnishing gas that they will use to make steam to generate
electricity .
Spire states that they are not looking to generate the steam yet. They are looking
specifically at the generation of electricity . There has been talk about capturing the
exhaust heat and doing some work with that in the local facilities that may be built
around that area . It is a reciprocating engine, not a gas turbine . The generator will be
at the old Duke Power facility at Homestead Road and Martin Luther King Jr . Blvd .
Norwood states that with the way the world has changed recently there is a concern
for security . What security measures will be on site to prevent tampering? Fences,
cameras ?
Spire states that this site will be heavily fenced where no one could get into it. It has
multiple backup systems where it will be on an auto- dialer . If it ' hiccups; and shuts
11
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
down someone will have to come and restart it. This is not a new approach, it will
serve us well as a community . UNC and we feel comfortable with it.
Norwood states that it should be in writing how long it would take for this person to
show up and how many backups are to that person if something happens .
Spire states that if something happens the system shuts down and stops . It will have
a control panel that can be read on site and off site . If the flare for the gas now shuts
down, the blower automatically shuts down .
Sassaman states that the system in the transportation of the gas will be similar to the
residential gas system throughout Chapel Hill with the possible exception that it is
going to be lower pressure and the gas coming out of the landfill will have a lower
thermal energy .
Yuhasz asks won' t all those questions be asked during the permitting process .
Spire concurs .
Sassaman states that there are certain safety standards that are required .
Norwood states that previously living next door to the largest natural gas pumping
station on the east coast it went boom . ' No matter what the checks and balances are,
my reason for going through all this is because I do live here, a lot of the people are
afraid of the gas, they don' t understand it and we all have stories of things going
wrong . What I ' m asking ( especially since the Town of Chapel Hill is involved) they
tell us nothing and do what they please I was hoping that we might have some
control or with our commissioner here, so that neighbors know what' s going on and
someone in the neighborhood to be notified if something happens - something to
reassure us that we are not just going to go boom .
Spire states that as the plans develop we will share them with you . As staff I don' t
have anything to do with what UNC does with the Town of Chapel Hill . I take faith
that UNC and the Town of Chapel Hill will do whatever is required to make sure it is
safe on that end . We can make sure through our engineer that whatever is put in on
our end is the highest quality and the safest system out there . I don' t think they can
go forward without that.
Landfill Construction Activity Spire states that we have started refilling the last outer
slopes of the landfill . We are on the southeast corner of the landfill . This will gain
approximately six to seven months of life for the landfill . We have built back out to
the permitted grade . We have had the landfill [topography] flown again to verify the
expansion that the consultants say we have gained .
12
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
Norwood points out that the smell is obvious when this is being done .
Spire states that we' re putting garbage on top of garbage and then we recover it with
daily cover to reduce odor but we are trying to make the landfill last as long as we
can.
Yuhasz asks Paul what has the extended life done to increase the probability that we
will actually get a transfer station built in time .
Spire states that the only thing I can say is that we are putting as much trash in that
hole as we possibly can . We are maximizing our compaction with our new [heavier]
compactor . We' re making more space through, for example recycling 2, 000
mattresses from UNC . Without standing the slopes up we would not have made it.
Making it on time will depend on acquiring the land and getting the design and
permitting done .
Best Paper Recycling Community Award - American Forest & Paper Association Pollock
states that we won the national best community paper recycling award from the
American Forest & Paper Association. There is a short film that highlights the
program - www . afandpa . org . There were 126 submittals so it was very competitive .
One of the things we tried to point out was the ubiquitous nature of recycling in our
county and that it is an expectation that everywhere you go it is going to be available .
We are particularly proud that we have had 22 years of good support from the public .
Compost Bins Sales Pollock states that we have been selling compost bins at cost for
the last eight years . We have an opportunity to consider selling the bins for $10 over
cost and recovering some of our other costs and still provide them at about half the
standard retail cost. I don' t know how much the demand will change if we went from
$40 to $50 .
Norwood states that not knowing what you intend to add to what we recycle but if
the public were told it would cost $5 or $10 more for the compost bins and the money
would go towards a specific project might make people happy .
Sassaman asks would it make sense to try it for six months or a year to see .
Pollock replies a pilot might make sense .
Solid Waste Plan Work Group Pollock states that the work group has not been that
active since the last meeting since December, the transfer station issue and the budget
have taken all the solid waste [staff] attention . We do feel it will be time to get back to
the business of solid waste management plan. What we are doing right now is
finishing up phone conversations with our consultant RRSI to bring us a
13
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
comprehensive financial model . The model would encompass the landfill/ transfer
station to the recycling programs, sanitation budget and administration, which are
our four divisions . The financial model would give us a chance to look at a lot of
' what if' scenarios . What happens if MSW tons decline to 40, 000 or rise to 60, 000 .
What happens if we introduce a commercial recycling program with the attendant 3 -R
fee, shifting waste from the garbage can to the recycling bin?
Our timetable is to have staff review the model in June and be able to bring that as a
item to the work group in August or September . We are hoping to use
live working
this final piece as a tool to advise the commissioners and the public what are some of
the options going forward . As a couple of concrete examples, should the Sanitation
budget continue to be part of the general fund or what are the other opportunities to
use availability fees, pay as you throw, are they feasible, should they be phased in?
The commercial recycling is another key issue; that' s where the last semi low-hanging
fruit is . That is limited now and the model would help us define the implications of
expanding it before we do the detailed planning . We hope to bring you that as a
working tool, familiarize the SWAB and work group with the tool, and use the tool to
give you some scenarios to give you options to bring back to the BOCC - Commercial
recycling, transfer station, Sanitation Division.
Vickers asks will it also include the franchising piece ?
Pollock states that the notion of franchising to either simply rural residents or
including rural non-residential solid waste collection or it could possibly include
commercial solid waste collection, that set of sub- options dealing with solid waste
[franchising] , not recycling, definitely will be part of the decision making package .
Other -- None
6 . Board Member Comments
Norwood asks if the needle guards for diabetics are recyclable ?
Guild states that when I was talking about the plasma [arc] units I said I would bring
in a tile . I have that. It is made of the waste slag that comes out of the bottom . The
two byproducts [of plasma arc waste reduction] are syn [thetic] gas and the slag . The
slag is totally inert and very dense . The company is Integrated Environmental
Technologies . Inentech if you want to look it up .
Sassaman states that while visiting family in England, they have a very interesting
disposal arrangement. Everything that comes out of their house goes into one of two
bins [roll carts] . Wet waste-- any food product, paper towels, meat scraps — goes into
bin A . Everything else goes into the other bin - bottles, cans, pieces of plastic etc .
14
Minutes - Regular Meeting
Solid Waste Advisory Board
May 7, 2009
Approved June 3, 2009
My understanding was that everything in A gets composted and everything in bin B
goes through a recycling operation . That is throughout London . Both are picked up
once a week . It' s not quite as hot there . They do use a small bucket with a little pad of
newspaper under it to absorb the odors . It works well .
7 . Other Business - None
Vickers moves to adjourn . Guild 2nd .
Adjourn: 9 : 10 pm
Next meeting : June 4, 2009
Solid Waste Administration Bldg .
15