Solid Waste Plan Development process . This memo provides an outline of the key
decisions regarding the waste reduction and recycling element of the plan as well as other
elements including waste collection and disposal/transfer which are also highly important
to plan success and demand key decisions as well . The outline is a condensed version of
the decision points memo that was distributed to the Solid Waste Plan Work Group prior
to the meeting with RRSI in June . We plan to also present this decision points outline to
the Work Group along with the report due from RRSI next week .
We further expect to introduce some of these points to the group when we receive the
Rural Solid Waste collection study, projected in December 2006 .
Many of the points contained in the earlier, more detailed decision points memo are not
included below as they are relatively minor and will not directly affect the major
decisions . Some however are tied to bigger decisions , for example : if you select
automated single - stream curbside recycling as the collection method, you must use a roll
cart , not bins . As an alternative approach, single - stream , non- automated collection can be
done with the pending two -bin system that Orange County will use in its curbside
program for the next several years . That will not be as efficient but may be cheaper in the
short run equipment- wise .
The major areas for decision making include :
Processing The key decision is to build a facility or ship out the recyclables . This
decision can be subjected to a series of economic tests based on soliciting specific
proposals from current out of county MRF operators to take our materials , proposals from
hauling companies to get them there and proposals from equipment providers to process
the materials . The costs generated from those proposals could then be used to evaluate
more precisely the economics of transport v . processing and marketing .
Development of a commercial recycling program is another key plan element that
demands some decisions . RRSI plans to present some case studies of other communities '
approaches to commercial recycling and offer cost estimates of capitalizing and operating
a commercial recycling program at two different levels of participation and diversion that
should help with the economics of establishing a commercial sector recycling program .
Some minor but not insignificant decisions include :
Expanding the food waste program to cover all the potential points of generation . This is
straightforward at about $ 80 per ton using the current contractor . We believe that there
are another 1000 to 1500 tons of food waste readily collectable from the commercial
sector .
Timing of when to take the multifamily program from its current source separated
program to two stream as the curbside programs are now . Staff is prepared to do this next
fiscal year, 2007 - 08 .
When and how to expand rural curbside recycling to the 40 % of homes in the
unincorporated part of the County that do not now have that service , is another element of
the program .
Other major areas for decision making include
Rural waste collection for residential and non -residential sectors for which a background
cost and environmental study is being prepared for December distribution ,
The future of drop off and convenience centers ,
Siting a waste transfer station ,
Overall program integration and planning that includes financing and integrating all the
above considerations .
2
Outline of Key Decisions
The Waste Reduction Goal :
Reaffirm 61 % goal or consider an alternative goal ?
Timeline for reaching the adopted goal
Prol4rams and Services
Residential
Continue the dual stream (that started this fall) v . a single
stream/commingled program
Materials
County collected or franchised/contracted
Frequency — all once a week, all biweekly or mixed as now .
Non -residential ( commercial)
Commingled v . dual stream
Standardized service or custom- tailored
Materials
County- collected or franchised/contracted
Multifamily
When/if to go dual or single stream
Processing
■ Transfer
■ Sort it all at on site facility
■ Sort paper OR cans/bottles
■ Include evaluation of alternatives
■ Siting decision
■ Will there be an ability to receive source separated materials from
other
• generators/haulers
■ Including other materials we don ' t now collect
■ Accepting out- of- county materials
■ Organics Management — build processing facility? Continue to
contract
• collections and processing
Emergency storm debris , stumps and inert debris processing
(not landfilling)
Regulations
Mandatory/ Transfer or landfill bans
3
Convenience Centers ( SWCCs ) and Drop off sites (the convenience center
issues also dovetail with solid waste management issues as much
as recycling
■ Keep all sites OR
■ Eliminate all unstaffed ( or some)
■ Consolidate SWCCs OR keep all
■ Charge fees at SWCCs
■ Allow commercial use of SWCCs
■ Add more materials
■ Keep source separated , go dual or single stream (regardless of
what is done at the curb
■ Other functional changes : hours of operation , go to paved sites
with compactors and other modernizations
Non - recycling related plan makinLy decisions
Emergency Storm Debris Management
Site and build a facility
Operate it for recycling and waste diversion primarily or exclusively
Rural Waste Collection
Residential and Non- residential
• Universal , ` mandatory ' ( i . e . you must pay for service)
• Un regulated collection
• Franchised (universal or exclusive)
• County provides service
Siting and building a waste transfer station
4