SUBJECT: Contract Approval: Lighting Consultant for Playing Fields at Smith Middle
School and Efland Cheeks Park
DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N) No
Services, Environment and
Resource Conservation
ATTACHMENT(S):
Cost Proposal from Reece Noland
McElrath
INFORMATION CONTACT:
Pam .)ones, (919) 245-2652
Dave Stancil, (919) 245-2598
Mara Beth Carr, (919) 960-3880
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To consider awarding a contract to Reece Noland McElrath for engineering
services associated with the design of field lighting at Smith Middle School and Efland Cheeks
Park.
BACKGROUND: The Board has previously authorized staff to develop lighting plans for Efland
Cheeks Park Phase II and the playing fields at Smith Middle School. A cost proposal was
solicited from Reece Noland McElrath (RNM) to design the electrical system to carry out this
work. As the Board may recall, Reece Noland McElrath was the electrical engineering firm that
was asub-consultant for Corley Redfoot Zack in the design of the Smith Middle School, thereby
giving them an existent working knowledge of the site and issues that surround the field lighting.
More recently, RNM provided the design services for the HVAC replacement at the Whitted
Building.
The cost proposal provides a design fee of $18,550 far the Smith Middle School Project and
$19,550 for Efland Cheeks Park -Phase II,
RNM estimates that construction documents will be completed within six to eight weeks after
contract approvah
FINANCIAL IMPACT: Bath projects are funded through the 2001 Parks and Open Space
Bond, with $250,000 currently allocated to each project.
RECOMMENDATION(S): The Manager recommends that the Board exempt this project from
the qualification-based selection process for architect services as allowed by GS 143-64.32 and
approve a contractwith Reece Noland McElrath in the amount of $18,550 for Smith Middle
School fields and $19,550 for design of lighting far Efland Cheeks Parks -Phase II; and
authorize the Purchasing Director to execute paperwork as may be required.
I Ot (1CC4L,IVVtr~nt~ u nv~._. _.. .._,~ ..
~I ~'~l ~
~i~~>~~~~~~~s
Yteece, Noland & iViclJlrath, knc.
ao!+ North Havw~od Strcct ~ PO rSt+x 540
Wavneeviilc. Not[n Cnrolina 2RTRti
R'ay uesvillct 828•a5o-9851 Asheville: 828-253.3280
Fax. R2R-,SSG-b2U5 fwiAtL(y1iNM-ENGINGHRS C.OM
September 1~4. ZO(14 -
i\is P;un .tones
f)irector- 1'utch:rsing aitd C:entrr.l sc:.n'ices
13'? G I:.in~ Stress
Hi1lsbUrnugli,.VC" 2?2i3
Ire Ball r;ela L.ighturg
Smith Middle Suhugl
L• fl:md - f'.heehs Llerrtenlarv Schotrl
Dear Pam:
~'~ REECE,
~~ M~,tC1TM
FAX ME$8AOE "-'"""'"
FAX LNE 17041456-8205
3
TD: ~ ~ R' ~K-t
DATE ~ 1
PROJECT:
\Ve nrc. plexserl to prop ide qou uui' rc- revised proposal un this 17rgjcci. u) furnish vo!.i de;i~in
engineerin¢ scavicestirr Electrical Systems Pnr these facilities;
\We understand this will involve design, of Sports rield L.iehtin~ Fnr pruoidin
lig!ttinq for 'Cwo Soccer 6clds at Smith I~liddlr. School in Chapel Hill. A C'. (' 1'ro~~isions i~or
udditinnai BasebailPield nntl Tennis Court atSmitll diddle School would be provided
in l:ttce' design) anti lishting for °Iwo 5uceet Fields, Baseball l:ield and ti~'aiking tracts ttt
tiflauci C'Ix:rlcs Elementary' School in rflancl, Tv C:. ti'1'e understand that the .~fland C'heel.s
rile .vill require specietized li~brinl,) placement and circuifin~ to provide for the
overlapping multi -use laVOllt S"~'e. understand yrnt will provide C:,~AD drawing of this
site.
\'Jc tivill provide professional scrvic,s P~ de.vt¢n svstenrs, prepare Workinre Drtv.'ing; and
Specifications sort bid doarmetrts necessary for above ~acililie.=. in st!llicient detail to obtain
proposals iur rrrn'I: ittvulvec! by sclccletl coIItraclors, aFler rrcciving approvals.
i)w proposal includes cootdin<uing the above wor6: 4vith :;xisting sits plcur drawings and
t~+;'Hor's rucirrirements xx ptovidt:d
Wc; bare int'huied 1)t'oviding nfFce n>,viec~' of C'nntractut's shop drawings. as well as one
con,uiidian t~h;rse, visit pa ~.vr5ek (Total !' per jni> 1 during aunslruction and assistance; with
nnstructipa coordination nr prnhlern resolution bvpFiane or nn-;ite as appropriate ;vheu requsted
b)~ Or;mer 1\Te will provide writtu~r -field rrp~,~rts oi.'such inspt:utiuus
G l¢tt Itt C4 t. IK Pa.. W L ~+ct11MlH. llt P r S IhPHt?' C. KAUi MAh 1' F.
l'!In111 P.5 W' ~AtCkE1'r ' K£~'IN W' ylt pCK, P ~ ~ 1Gi'rER 1' $ PLEh1MONn ~ hlAAk McUO~+7.L1. P t
DA+11D R NOIANU Y E :OOd.: ~?r
tii: n~c ~c~w..,~.,~ .... .. ....... _. _.
YtyGE
<.hu iump snnl professional fee for the above work: r:aated to Srntth. D~tiddle 5chor;l is
%iehteen Thousat[d Five LIundr'ed F'iAp f)oiiar;; (S 1K.55U 00), payable rnondil} "'' `%~~ at
C(nnplCClgn OI d6s1 ~*Il . 5°/n al reCGlpt OI 1J1tl5 Fffld ~Q ~'u 35 ^.onSlrtlCrinil U1U~~'BSS?5
Our lunlp sun, pmfcssiunai zee i'or the abuvt; work related to EIland (.lheel;s ~.iemantar)
School is JAincteen 'Ihous~lnd 1•ivc Hundred Fiftiy L)ollars (~ 19,50-00), payable monthly. ?~ ° ~~
at completion c? design , 5°~~, ai receipt of bids and 20 ss, as constn(ction orogress~s.
ylre have eliminated the fee for consulting services from ~'Til:e Hammersley of
Corley Redfoot Zack since ~4aralieth indicated th at most oi' process has bce:n done atnl
Count} Planning personnel w ii) handle notification: and public meeting; ,etc
We gill attend meetings ac regnestad for a per trip fee of Six Httndrer5
(S 600.(1(1) Dollars
R%e wi 11 iuvoi ce m onthl}'. with fee to be payable monthly by the 1 ~ th as project prod esses on
a net =U da;• hasis. if theta is a proicct sit~m and building plaque. Reece, ~~oland ~~ P:1cLlrattt
I-ngiucrrs will be: appropria[ely listed with other desicrter(sl grid contractors
t;Icctrical Systems wili be desi;*ned based ou bang supplied 'Horn utility Company
Pro•aided clec[rical setvics
~'4"e estimate we could he comple[e with contract documents within 6 u, R wccls
after approval of our contract
T.i you hate any questions or your needs differ fiom the scope of work I h;eve asswnc(! ;lllCl
quoted above, please let me lmo~+.
Yours her: truly.
TZEECE,?~IOLAIv1~ f: Mci;L,kA [H. L'~C
ti~illiam L. ititcEirath.lr P F
by%.Ls~%L .ir. ~ hs