Loading...
HomeMy WebLinkAboutAgenda - 06-12-2007-4ee revised SAPFO report 2007 Revised 6 - 1M7 . Changes to page numbers contained in table on page 2 are in bold italic font . These were the only changes made . 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date : June 12 , 2007 Action Agenda Item No . 4 - ee SUBJECT : Schools Adequate Public Facilities Ordinance ( SAPFO ) — Approval of Annual 2007 Report DEPARTMENT : Manager/ Budget/ Planning / PUBLIC HEARING : ( Y/ N ) No Attorney ATTACHMENT ( S ) : INFORMATION CONTACT : Draft SAPFOTAC Annual Report Craig Benedict , 245 - 2592 ( Under Separate Cover ) Donna Coffey , 245 - 2151 Geoff Gledhill , 732 - 2196 Perdita Holtz , 245 - 2611 PURPOSE : To approve the 2007 SAPFOTAC Report related to various aspects of Orange County Schools ( OCS ) and Chapel Hill - Carrboro City Schools ( CHCCS ) , as outlined in the draft Annual Report of the SAPFO Technical Advisory Committee ( SAPFOTAC ) and the incorporated forms . BACKGROUND : At the December 12 , 2006 Board of County Commissioners ' meeting , the Board approved the November 15 , 2006 actual membership and previously adopted capacity numbers for both Orange County Schools and Chapel Hill - Carrboro City Schools . Additional approvals / certifications , as outlined in the table below , are required by the SAPFO partners MOUs ( Memorandum of Understanding ) . At the April 10 , 2007 BOCC meeting , the Board received for review the draft 2007 SAPFOTAC report . The draft report was also posted on the Orange County Planning Department ' s web site . A letter and the Executive Summary of the report was sent to all SAPFO partners on April 169 2007 advising them of the availability of the draft report and inviting comment . Comments were requested for submission prior to May 16 , 2007 . No comments have been received ; however , the Town Council of Chapel Hill adopted a resolution endorsing the 2007 SAPFOTAC Report at its May 7 , 2007 Council meeting . In response to the informational item on the May 15 , 2007 BOCC agenda regarding Class Size Amendments , the relevant sections of the 2007 SAPFOTAC Report have been updated to reflect the OCS updated capacity numbers when the K- 3 class size reductions go into effect . The specific pages that were changed are as follows : ii , 4 , 407 47 , and 48 . The exact pages of the 2007 SAPFOTAC report that the BOCC will be acknowledging and certifying are listed below . The context ( i . e . : definitions and standards ) of the various SAPFO elements precedes the data to be certified and is within the full report . Revised 6 - 1 M7 . Changes to page numbers contained in table on page 2 are in bold italic font . 2 These were the only changes made . Element Page in Certification to be made by BOCC SAPFOTAC Report Building capacity 11 through 16 Building capacity and current year with CIP changes membership was approved at the December 12 , 2006 meeting . ( Change ) Student membership 19 Certification that the average of 5 models projection methodology will be used , as noted in # 3 on page 19 ( No Change ) Student membership 47 and 48 Orange County Elementary , Middle , projections and High Schools Student Projections ( row that notes average only) ( p . 4. 7) • Chapel Hill /Carrboro Elementary , Middle , and High Schools Student Projections ( row that notes average ( Change ) only) p . 48) Student Growth Rate 49 Orange County Elementary , Middle , and High Schools • Chapel Hill /Carrboro Elementary , ( Change ) Middle , and High Schools Student/ housing generation 54 Orange County Elementary , Middle , rate and High Schools • Chapel Hill / Carrboro Elementary , Middle , and High Schools ( No Change ) ( Change ) denotes a change from last year . FINANCIAL IMPACT : As was included in the April 10 , 2007 BOCC agenda abstract materials , CHCCS have projected capital facility construction needs as follows : Projected need for : New Elementary # 10 in 2008 - 2009 New Elementary # 11 in 2010 - 2011 New Middle School # 5 in 2013 - 2014 Expanded High School in 2016 - 2017 OCS is not expected to have new school construction needs in the 10 -year planning period , but approved development within the Orange County portion of the City of Mebane may impact future projections and needs . RECOMMENDATION ( S ) : The Manager recommends that the Board approve the 2007 SAPFOTAC Annual Report as specified in the report certification summary table herein . 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date : June 12 , 2007 Action Agenda Item No . E� SUBJECT : Schools Adequate Public Facilities Ordinance ( SAPFO ) — Approval of Annual 2007 Report DEPARTMENT : Manager/ Budget/ Planning / PUBLIC HEARING : (Y/ N ) No Attorney ATTACHMENT ( S ) . INFORMATION CONTACT . Draft SAPFOTAC Annual Report Craig Benedict , 245 - 2592 ( Under Separate Cover) Donna Coffey , 245 -2151 Geoff Gledhill , 732 -2196 Perdita Holtz , 245 -2611 PURPOSE : To approve the 2007 SAPFOTAC Report related to various aspects of Orange County Schools ( OCS ) and Chapel HilkCarrboro City Schools ( CHCCS ) , as outlined in the draft Annual Report of the SAPFO Technical Advisory Committee ( SAPFOTAC ) and the incorporated forms . BACKGROUND : At the December 12 , 2006 Board of County Commissioners ' meeting , the Board approved the November 15 , 2006 actual membership and previously adopted capacity numbers for both Orange County Schools and Chapel HilkCarrboro City Schools . Additional approvals/certifications , as outlined in the table below , are required by the SAPFO partners MOUs ( Memorandum of Understanding ) . At the April 10 , 2007 BOCC meeting , the Board received for review the draft 2007 SAPFOTAC report . The draft report was also posted on the Orange County Planning Department ' s web site . A letter and the Executive Summary of the report was sent to all SAPFO partners on April 16 , 2007 advising them of the availability of the draft report and inviting comment . Comments were requested for submission prior to May 16 , 2007 . No comments have been received ; however , the Town Council of Chapel Hill adopted a resolution endorsing the 2007 SAPFOTAC Report at its May 7 , 2007 Council meeting . In response to the - informational item on the May 15 , 2007 BOCC agenda regarding Class Size Amendments , the relevant sections of the 2007 SAPFOTAC Report have been updated to reflect the OCS updated capacity numbers when the K- 3 class size reductions go into effect . The specific pages that were changed are as follows : ii , 41 40 , 47 , and 48 . The exact pages of the 2007 SAPFOTAC report that the BOCC will be acknowledging and certifying are listed below . The context ( Le . : definitions and standards ) of the various SAPFO elements precedes the data to be certified and is within the full report . 2 Element Page in Certification to be made by BOCC SAPFOTAC Report Building capacity 21 through 26 Building capacity and current year with CIP changes membership was approved at the December 12 , 2006 meeting . ( Change ) Student membership 29 Certification that the average of 5 models projection methodology will be used , as noted in #3 on page 29 No Change ) Student membership 59 and 60 Orange County Elementary , Middle , and projections High Schools Student Projections ( row that notes average only ) ( p . 59 ) • Chapel Hill /Carrboro Elementary , Middle , and High Schools Student Projections ( row that notes average ( Change ) only ) . 60 Student Growth Rate 61 Orange County Elementary , Middle , and High Schools • Chapel Hill /Carrboro Elementary , ( Change ) Middle , and High Schools Student/housing generation 68 • Orange County Elementary , Middle , and rate High Schools • Chapel Hill/Carrboro Elementary , Middle , and High Schools No Change ) ( Change ) denotes a change from last year . FINANCIAL IMPACT : As was included in the April 10 , 2007 BOCC agenda abstract materials , CHCCS have projected capital facility construction needs as follows : Projected need for : New Elementary # 10 in 200 & 2009 New Elementary # 11 in 2010 -2011 New Middle School #5 in 2013 -2014 Expanded High School in 201 & 2017 OCS is not expected to have new school construction needs in the 10 - year planning period , but approved development within the Orange County portion of the City of Mebane may impact future projections and needs . RECOMMENDATION ( S ) : The Manager recommends that the Board approve the 2007 SAPFOTAC Annual Report as specified in the report certification summary table herein . Compiled by : Orange County Budget Office 01 /29/07 OCS Student Projections (1 ) (4) Capacity Figures Revised by Planning Dept. on 5/22/07 Elementary School Year 2000 -01 2001 -02 2002 =03 2003 =04 2004-05 2005=06 2006 -07 2007-08 2008-09 2009-10 2010 =11 2011 -12 2012 -13 2013 -14 2014-15 2015 =16 201647 Actual 31078 2 ,893 21901 21945 31016 3 , 006 iiF39144 Tischler 3 , 130 31189 31247 3 , 306 32364 31423 31481 3 , 540 3 , 598 31657 OC Planning 31119 31164 31240 31334 31431 3 , 531 31634 3 , 741 39851 31964 10 Year Growth 31120 31140 31181 31165 31203 31235 3 , 267 31300 3 , 333 31366 5 Year Growth 31186 39232 31216 39250 31282 31315 31348 31381 31415 3 Year Growth All 3 , 137 39172 3 , 214 31203 39237 3 , 269 3 , 302 39335 31368 31402 Average 33130 31170 31223 31245 31297 31348 39400 31453 39506 39561 Annual Change - Increase ( Decrease) in Actual & Projected Membership) ( 185) 8 44 71 ! '"1 '+ 66 58 40 53 22 52 51 52 53 53 55 Capacity - 100 % Level of Service 31820 39820 3 ,820 3 ,820 31820 31920 39920 3 , 920 39920 31694 39694 31694 39694 31694 30694 39694 31694 Number of Students , Actual and Projected , Over ( Under) 100 % LOS ( 742 ) (927) (919) (875) IL ? 14 ) ( 3A £ ) ( 790 ) ( 471 ) (449) ( 397) (346) 105% Level of Service 41011 49011 41011 45011 41011 4, 0i 16 116 4, 116 49116 31879 3 ,879 31879 3 ,879 39879 3 , 879 39879 3 , 879 Number of Students , Actual and Projected , Over ( Under) 105 % LOS ( 933) ( 19118 ) ( 17110 ) ( 19066) (995) ( 13110 ) ( 1 , 0 ( 986) ( 946) ( 656) ( 634) ( 582 ) ( 531 ) (4 `i (426) (373 ) ( 31 :` ' Actual - % Level of Service 1 80 . 6 % 75 * 7 % 1 75 . 9 % 7741 % 1 79 . 0 % 1 76 . 7 % 78 . 4% Average - % Level of Service 79 . 8 % 80 , 9% 1 87 . 2 % 87 . 8 % 89 . 3 % 90 . 6% 92 . 0 % 93 . 5% 94 . 9 % 96 . 4 % Annual Student ro Rate -6.01 % 1 0 . 28 % 1 .52% 2 .41 % -0 . 33% 2 . 20 % 11 . % 1 .28% 1 .66% On68% 1 1 .61 % 1 .55% 1 .55% 1 . 56% 1 . 55% 1 .56% additional 100 new seats @ Hillsborough Elementary OCS Student Projections(l ) Middle School Year 2000 -01 2001 -02 2002 =03 2003=04 2004=05 2005=06 2006=07 2007=08 2008 -09 2009 -10 2010 -11 2011 -12 2012-13 2013 =14 2014=15 2015 -16 2016- 17 Actual 1 , 504 11527 11631 12671 19593 1 , 590 19580 Tischler 11606 1 , 636 11666 1 , 696 12726 1 , 756 11786 11816 11846 11876 OC Planning 11612 1 , 653 11697 11727 11757 11789 11821 11854 19888 1 , 923 10 Year Growth 19585 19553 19551 11631 1 , 631 10656 11623 19646 11662 1 , 679 5 Year Growth 1 , 605 1 , 592 1 , 620 11728 1 , 755 11787 11753 19773 11790 1 , 808 3 Year Growth 11597 11585 1 , 609 19705 11723 11750 11722 11742 11759 11777 Average 1 , 601 11604 11629 1 , 697 19718 1 , 748 15741 13766 19789 11813 Annual Change - Increase ( Decrease) in Actual & Projected Membership) 23 104 40 (78) (3) ( 10 ) 21 3 25 69 21 29 25 23 24 Capacity - 100 % Level of Service 1 ,466 11466 11466 1 ,466 1 ,466 11466 21166 2 , 166 21166 25166 23166 2 , 166 29166 2 , 166 25166 2 , 166 21166 Number of Students , Actual and Projected , Over ( Under) 100 % LOS 38 61 165 205 127 124 ( 586) ( 565) ( 562 ) ( 537 ) (469) (448) (418) 1 1 ='_ >; ( �' U ? qJ ` ' ) 107 % Level of Service 11569 11569 19569 1 , 569 1 , 569 11569 21318 318 29318 29318 2 , 318 21318 2 ,318 29318 21318 2 , 318 29318 Number of Students , Actual and Projected , Over (Under) 107% LOS 1 ( 65) (42 ) 1 62 1 102 1 24 1 21 1 ( 738 ) ( 7 7 } ( r �! %;� � ( 689 ) ( 620 ) ( 599 ) ( 570 ) ( 577) �; > 'u ) ( � a29 ) Actual - % Level of Service 1 102 . 6% 1 104 . 2 % 1 111 . 3 % 1 114 . 0 % 1 108 . 7 % 1 108 . 5% 72 . 9 % Average - % Level of Service 73 . 9 % 74 . 0 % 75 . 2 % 78 .4 % 7903 % 1 80 , 7% 1 80 , 4 % 1 81 , 5 % 1 82 , 6 % 1 83 . 7 % Annual Student ro Rate 1 . 53% 6*81 % 1 2o45% 1 -4 . 67% -0 . 19 % -0 . 63 % 1 . 33 % 1 17% 1 1 . 55% 4.22 % 1 .24% 1670 % 1 -0.38% 1 .45% 1 .29 % 1 .32 % middle school # 3 opens in fall 2006 with 700 additional seats 771 OCS Student Projections High School Year 2000 =01 2001 =02 2002 =03 2003 =04 2004-05 2005 =06 2006-07 2007=08 2008 -09 2009 -10 2010 -11 2011 -12 2012 -13 2013 =14 2014-15 2015=16 2015=16 Actual 11672 11753 11828 11887 2 , 057 21124 21180 Tischler 2 , 226 21267 2 , 309 21351 2 , 392 2 ,434 21475 21517 2 , 559 27600 OC Planning 21247 21309 21345 2 ,381 21419 21458 21497 21537 21578 21620 10 Year Growth 29138 29100 21005 19970 21003 11968 21041 29056 21063 29088 5 Year Growth 21167 21191 21139 21137 21192 21194 21309 21359 21387 2 ,414 3 Year Growth 21146 21150 21089 2 , 074 21123 21121 21219 21259 21281 21303 Average 21185 29203 29177 29183 2 ,226 2 ,235 29308 21346 22374 23405 Annual Change - Increase ( Decrease) in Actual & Projected Membership) 81 75 59 170 67 56 5 19 (26) 5 43 9 73 37 28 31 Capacity - 100 % Level of Service 1 , 518 1 , 518 29518 21518 23518 21518 21518 2 , 518 21518 21518 21518 29518 29518 2 , 518 2 $ 18 21518 21518 n Number of Students , Actual and Projected , Over ( Under) 100 % LOS 154 235 (690 ) (631 ) (461 ) ( 394) (338) (333) ( 315) (341 ) (335) (292 ) (283 ) (210 ) ( 172 ) ( 144) ( 113 ) '� 110 % Level of Service 11670 1 , 670 21770 2 ,770 22770 29770 21770 29770 2 , 770 29770 29770 29770 29770 21770 29770 2 ,770 29770 Number of Students , Actual and Projected , Over ( Under) 110 % LOS 2 83 (942 ) ( 883 ) ( 713 ) ( 646) ( 590) ( 585) ( 566) ( 592 ) ( 587 ) ( 544 ) ( 535) (462 ) (424 ) ( 396) (365) (0 Actual - % Level of Service 1 110 . 1 % 1 115 . 5 % 1 72 . 6 % 1 74 . 9 % 81 . 7% 84 . 4 % 86 . 6% Z Average - % Level of Service 608 % 1 87 . 5 % 8605% 1 86 . 70/6 8844 % 1 88 , 8 % 1 91 , 7 % 1 93 . 2 % 94 . 3 % 95 . 5 % Annual Student ro Rate 4.84% 4.28% .23% 9.01 % 126% 1 2 .64% 0 .22% Oo85% 1 4 .18% 0 .24% 1 .98% 0 .41 % 3 . 28 % 1 .62 % 1019% 1 1 .320f cedar ridge high opens with 1,000 seats in fall 2002 indicates first year that district surpasses Schools APFO recommended Level of Service It is important to note that this reflects the November 15, 2006 date of membership as outlined in by the Schools Adequate Public Facilities Ordinance . It does not include CHCCS students attending the Hospital School . "V (2 ) The Tischler Model provides for the " Linear Method " of projections for both CHCCS and OCS . Original projections used in prior years projection models included the " Linear Extrapolation Method " for CHCCS . (3) Annual growth rate calculated using actual membership for years 2000-01 through 2006-07 and average membership for years 2006-07 through 2016- 17 . (4) Class sizes for grades K-3 = 1 : 23 for school years 2006-07 and 2007-08 . In accordance with 2005 School Collaboration Work Group direction , with planned opening of CHCCS Elementary # 10 in school year 2008-09 , K-3 class sizes for school years 2008-09 through 2015- 16 reflect 1 : 21 as directed by past State legislative action . This results in OCS elementary capacity reduction (district wide) of 297 seats (decreasing from 4 , 116 [ 105% LOS @ 1 : 23 class size] to 3 , 819 [ 105 % LOS @ 1 : 21 class size] ) . Compiled by : Orange County Budget Office 01 /29/07 CHCCS Student Projections (' ) (4) Capacity Figures revised by Planning Dept . on 5/22/07 Elementary School Year 2000 =01 2001 -02 2002-03 2003=04 2004=05 12005=06 12006=07 2007 -08 2008 -09 2009-10 2010 -11 2011 =12 2012A3 201344 2014=15 2015 =16 201647 Actual 41444 41474 41551 1 4 ,692 1 4 ,695 1 41879 1 4 , 980 Tischler 5 , 103 51227 5 ,350 5 ,473 51596 51719 5 ,842 53965 61088 61211 OC Planning 51079 51170 51253 51359 51465 51597 51729 51863 50997 6 , 132 10 Year Growth 5 , 233 51429 51597 51810 52945 61005 61065 61126 61187 69249 5 Year Growth 51157 51290 51405 5 ,569 51673 51729 51787 51845 50903 51962 3 Year Growth 5 , 138 1 5250 51342 51494 57590 51646 51702 51759 51817 51875 Average 57142 51273 5$ 89 5$ 41 51654 52739 51825 59912 51998 69086 Annual Change - Increase ( Decrease) in Actual & Projected Membership) 30 77 141 3 184 101 162 131 116 152 113 85 86 87 87 87 Capacity - 100 % Level of Service ( LOS) 4 , 302 41302 4 , 302 4,921 4 , 921 43921 4, 921 5 , 506 5 , 244 53244 5 , 244 53244 51244 51244 51244 5 , 244 Number of Students , Actual and Projected , Over ( Under) 100 % LOS 142 172 24 (229 ) (226) (42 ) 59 221 (233) 5 297 410 495 581 668 754 842 Capacity - 105% Level of Service ( LOS) 49517 4, 517 43517 59167 51167 51167 5, 167 5 , 167 1 50781 51506 5,506 51506 5 , 506 5 , 506 51506 5,506 5 , 506 Number of Students, Actual and Projected , Over (Under) 105% LOS 1 ( 73 ) 3 ) 1 34 1 (475 ) (472 ) ( 288 ) ( 187 ) (25 ) ( 508 ) ( 117 ) 5 148 233 319 405 492 580 Actual - % Level of Service 10 ° 104 . 0 % 105 . 8 % 95 . 3% 95 .4% 99 . 1 % 101 . 2% Average - % Level of Service 104 .5% 95 * 8 % 1 102 , 8 % 1 105 . 7 % #% J 109 .4% 111 . 1 % 112 . 7% 114 . 4% 116. 1 AnnualStudent row Rate 0 . 68 % 1 .72 % 3o10 % J 0.06% 1 3.920/6 2.07% 3.25% 2.55% 2.20% 2 .81 % 2.040/6 1 .51 % 1 .49% 1 .49% 1 .47% 1 .46% Elementary # 9 opens in fall 2003 with additional 619 seats Per November 15, 2005 Certified Capacity Calculations, CHCCS projects Elementary # 10 opening for school year 2008-09 . In accordance with BOCC adopted School Construction Standards, elementary school capacity totals 600 students. Important Note : Per 2005 agreement of School Collaboration Work Group, Grades K-3 class size reduced from 1@23 to 1 : 21 the year after Elementary # 10 opens (to allow for prior Legislative Action re : reduced class size) and School Construction Standards for the Elementary level will have a capacity of 585 students. (The new capacity of 585 students is reflected in the capacity numbers shown ) . CHCCS Student Projections Middle School Year 2000 =01 2001 -02 2002 =03 2003=04 2004-05 2005 =06 2006-07 2007 -08 2008 =09 2009-10 12011 =12 2012A3 201344 12014=15 12015 =16 201647 Actual 21326 21540 2 ,608 21612 21560 2 ,572 1 21592 Tischler 21656 21720 21784 23848 21913 21977 31041 31105 31169 3 , 233 OC Planning rg21670 21742 21810 21855 21899 21943 21986 3 , 029 3 ,072 31114 10 Year Growth 21605 29683 21806 23905 31018 31177 31382 3 , 502 30537 31572 5 Year Growth 21588 2 , 636 2 , 720 21775 21843 2 ,939 31087 3 , 170 3 ,201 31233 3 Year Growth 21593 21649 21740 21784 21837 2 ,909 31045 31120 31151 31182 Average 2 ,622 21686 21772 21833 27902 21989 33108 31185 33226 3 , 267 Annual Change - Increase ( Decrease) in Actual & Projected Membership) 214 68 4 (52) 12 20 30 64 86 61 69 87 119 77 41 41 Capacity 100 % Level of Service 23108 21840 2,840 21840 21840 21840 2 , 840 21840 2 , 840 21840 2 , 840 2 , 840 2 , 840 2 , 840 21840 23840 2 , 840 Number of Students , Actual and Projected , Over ( Under) 100% LOS 218 (232 ) (228 ) (280 ) IL 1 62 149 268 345 386 427 107 % Level of Service 23256 33039 31039 31039 31039 31039 3 ,039 31039 3 , 039 35039 3 , 039 3 , 039 39039 3,039 31039 3 ,039 33039 Number of Students, Actual and Projected , Over ( Under) 107 % LOS 70 (479) (467 ) (447 ) (416 ) 69 146 187 228 Actual - % Level of Service 1 110 . 3% 1 89 , 4 % 1 91 . 8 % 1 92 . 0 % 9061 % 1 90 . 6 % 91 . 3% Average - % Level of Service 92 , 3% 1 94 , 6 % 1 97 . 6 % 1 99 , 8 % 1 102 , 2 % 1 105 . 2 % 1 109 ,4 % 1 112 . 2 % 1 113 . 6% 115 . 0 % JAnnual Studentrow a e 9.20% 2 .68% 0015% 1 =11 699% 1 0 .47% 0.78% 1 . 17% 2 .43% 3 .20 % 2 .22% 2 .42 % 3 .00 % 3.99% 2 .48% la28 % 1 1 .26% CHCCS Student Projections High School Year 2000-01 2001 =02 2002 -03 2003-04 2004=05 2005 =06 2006-07 2007-08 2008-09 2009-10 2010-11 2011 -12 2012 -13 2013-14 2014-15 t4lt37O t555 iY389 Actual 2 ,815 2 ,963 31162 39330 3 ,422 31514 3 ,520 Tischler 3 ,606 31693 31780 31867 31954 41041 41128 41215 OC Planning 3 ,613 3 , 706 3 , 794 3 ,883 3 ,973 4 ,037 4 , 101 4 , 165 10 Year Growth 3 ,589 31621 3 , 587 3 , 605 31708 31848 3 , 942 41143 l 5 Year Growth 3 ,616 3 , 653 3 , 616 3 , 628 3 ,692 3 , 784 3 , 827 3 ,963 4 , 106 4 ,224 N 3 Year Growth 3 ,570 31569 31517 31538 31607 3 , 708 3 , 740 31855 31974 41065 O Average 3 , 599 3 ,648 31659 39704 35787 35884 31948 49068 4, 196 49305 d �. Annual Change - Increase ( Decrease) in Actual & Projected Membership) 148 199 168 92 92 6 79 50 10 45 83 97 64 121 128 109 Capacity - 100 % Level of Service 30035 33035 31035 3 , 035 31035 39035 31035 33835 3 , 835 31835 39835 39835 31835 3 , 835 3 ,835 3 , 835 31835 Number of Students , Actual and Projected , Over ( Under) 100 % LOS (220 ) 6 :° ; 127 295 387 479 485 (236) t . 7 ` ( 131 ) 49 113 233 361 470 J 110 % Level of Service 3,339 31339 31339 31339 39339 3 , 339 39339 49219 219 1 43219 1 4,219 1 41219 41219 4 , 219 4,219 1 4,219 41219 Number of Students , Actual and Projected , Over ( Under) 110% LOS (524) (376 ) l 83 176 182 ( 620 ) ( 0 ) ( 560 ) ( 514) ( 432 ) ( 335) (271 ) ( 150 ) ( 23) 86 L - % Level of Service 92 .8 % 97 . 6% 104 . 2 % 109 . 7 % 112 . 8 % 115 . 8 % 116 . 0 % e - % Level of Service 93 . 8 % 95 . 1 % 95 . 4 % 96 . 6% 98 . 7% 101 . 3% 102 .9% 106. 1 % 109 . 4% 112.3% u ent Growth Rate 5.26% 6 .72% 5 .31 % 2 .76% 2 .69% 0.17% 2 .24% 1 . 36 % 0 .29% 1 .24% 2 .23% 2 .56% 1 .65% 3.06% 3 . 14% .39°7a J Carrboro High School opens in fall 2007 with 800 additional seats indicates first year that district surpasses Schools APFO recommended Level of Service (1 ) It is important to note that this reflects the November 15, 2006 date of membership as outlined in by the Schools Adequate Public Facilities Ordinance . It does not include CHCCS students attending the Hospital School . (2) The Tischler Model provides for the " Linear Method " of projections for both CHCCS and OCS . Original projections used in prior years projection models included the "Linear Extrapolation Method " for CHCCS . (3) Annual growth rate calculated using actual membership for years 2000-01 through 2006-07 and average membership for years 2006-07 through 2016-17. (4) Class sizes for grades K-3 = 1 : 23 for school years 2006-07 and 2007-08 . In accordance with 2005 School Collaboration Work Group direction , with planned opening of CHCCS Elementary #10 in school year 2008-09 , K-3 class sizes for school years 2008-09 through 2015- 16 reflect 1 : 21 as directed by past State legislative action . This results in CHCCS elementary capacity reduction (district wide) of 275 seats (decreasing from 5 , 797 [105% LOS @ 1 : 23 class size] to 5 ,522 [105% LOS @ 1 : 21 class size] ) . Class size reduction results in need for CHCCS Elementary # 11 to come online in school year 2011 -12 ( 1 : 21 ratio) compared to 2014- 15 ( 1 : 21 ratio) . ORANGE COUNTY , NC SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PREPARED BY A STAFF COMMITTEE : PLANNING DIRECTORS , SCHOOL REPRESENTATIVES , TECHNICAL ADVISORY COMMITTEE ( SAPFOTAC ) (PURSUANT TO PROVISIONS OF A MEMORANDUM OF UNDERSTANDING ADOPTED IN 2002 & 2003 ) ( OIt711iiANCES ADOPTED IN3ULY , 2003 ) Annual Report 2007 (BASED ON NOVEMBER 2006 DATA CERTIFIED BY THE BOCC ON XXX , 2007 Table of Contents Page Executive Summary . . . . . . . . . . . a some goes esomeese gee oesess 9 * 60000600 moses6sees a boessb $ o 09sovol Introduction . . . . . Goes beemootesee a & * & sea peat * * @ 040 5 8 8 a a a AV Schools Adequate Public Facilities Ordinance Partners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v Planning Directors , School Representatives , Technical Advisory Committee ( SAPFOTAC) members . . . . . . . Ban a 8 too @Boost * $ * sees WasseemossomVi I . Base Memorandum of Understanding A . Level of Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Be Building Capacity . . . . . . . . . . . . . . . . . . Sees too agog as boa message@ & @ fee as 0 8 @a woo 0008 @ * ago Boom * * @ & * a * * seems 8 Samoa 2 Attachments* I. B. 1 . - Orange County School Capacity (Elementary, Middle & High School) (2005 ) . . . . . . . . . . . . . . 5 Attachments* I. B. 2 . - Chapel Hill/Carrboro School Capacity (Elementary, Middle & High School) (2005 ) . . . . . . 8 Attachment.• I. B. 3 . . Orange County School Capacity (Elementary, Middle & High School) (2006) . . . . . . . . . . . . . 011 Attachment: I. B. 4. - Chapel Hill/Carrboro School Capacity (Elementary, Middle & High School) (2006) . . . . . . 14 C . Membership Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 II . Annual Update to Schools Adequate Public Facilities Ordinance System A . Capital Investment Plan (CIP) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Be Student Membership Projection Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Attachment: H. B. I . — Student Membership Projection Descriptions . . . . . . as * Sea 009 Sea * 90 * 09 * me few Sea see Sea few 000 so@ Attachments* H. B. 2. — Student Membership Projection Models Performance Analysis for 2005- 06 . . . . . . . . . . . . . . . . . 31 Attachment: H. B. 3 . — Student Membership Projection Models Performance Analysis for 2006- 07 . . . . . . . . . . . . . . . . . 35 C . Student Membership Projections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Attachment: II. C. 1 . — Orange County Student Projections (Elementary, Middle & High Sch000 (2005 ) . . . . . . 45 Attachment: II. C. 2 . — Chapel Hill/Carrboro Student Projections (Elementary, Middle & High School) (2005 ) . .46 Attachment: II. C. 3 . — Orange County Student Projections (Elementary, Middle & High School) (2006) . . . . . . 47 Attachment: II. C. 4. — Chapel Hill/Carrboro Student Projections (Elementary, Middle & High School) (2006 ) . . 48 D . Student Membership Growth Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 Attachment: II. D. 1 . — Orange County & Chapel Hill/Carrboro Student Growth Rates Chart dates from 2006 — 2016 based on 11115105 membership numbers (2005 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 Attachment: II. D. 2. — Orange County & Chapel Hill/Carrboro Student Growth Rates Chart dates from 2007 — 2017 based on 11115106 membership numbers (2006 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 E . Student / Housing Generation Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 Attachment: II. E. 1 . -Student Generation Rates (2002) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 III . Flowchart of Schools Adequate Public Facilities Ordinance Process A . Process 1 - Capital Investment Plan . . . . . . . . . . . . . . . . . . . . . . . . goo . . . . . . . . . . . . son Sea . . . . . . woe too . . . . . . . . : . . 55 Attachment: III A . 1 . — Process 1 Capital Investment Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 Be Process 2 - Schools Adequate Public Facilities Ordinance ; Certificate of Adequate Public Schools (CAPS) System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 Attachment: III B. 1 . — Process 2 Certificate ofAdequate Public Schools (CAPS) Allocation . . . * 08 we * Sea gas 60859 2007 SAPFOTAC Executive Summary I . Base Memorandum of Understanding A. Level of Service . . . . 00000 00 0 * 0 0 0000 * 0 * * * got 000046 Change) . . . . . . . . .Pg. I Chapel Hill/Carrboro Orange County School District School District Elementary 105 % 105 % Middle 107 % 107 % High 110% * 110% * Temporarily suspended. Note: The opening of Gravelly Hill Middle School in October 2006 reinstated the CAPS test in OCS. B . Building Capacity and Membership . . . . . . . . . . . . . . . . . . . . . . . . . (Change) . . . . . . . . . . Pg. 2 Chapel HillICarrboro Orange County School District School District Capacity Membership Increase Capacity Membership Increase from Prior from Prior Year Year Elementary 4921 4980 101 3920 3072 66 Middle 2840 2592 20 2166 1576 ( 13 ) High 3035 3520 6 2533 2184 63 C . Membership Date — November 15 . . . . . . . . . . . (No Change) . . . . . . . Pg. 17 II . Annual Update to SAPFO System A. Capital Investment Plan (CIP) . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Change) . . . . . . . . . . Pg. 18 B . Student Membership Projection Methodology . . . . . . (No Change) . . . . . . .Pg. 19 The average of 3, 5, and 10 year history/cohort survival and 2 linear projection models. NOTE: A change proposed for implementation next year is noted and discussed. C . Student Membership Projections , . 0 0 0 0 0 0 0 & 0 & 0 9 0 0 a 0 . . . . . (Change) . . eeeoe e e 99Pg. 39 5 Year out Snapshot Comparison (arrow indicates whether there was an overestimate (up arrow) or underestimate (down arrow) in projection total between projection estimate for that future year and the actual year) Chapel HilUCarrboro School District Orange County School District Year Projection Made 2002 1 2003 1 2004 1 2005 2006 112002 2003 1 2004 1 2005 1 2006 Projection made for Year. 2007 -2008 Elementary 5405 5366 1 50401 1 5177 t 51421 3067 3126 t 3201 t 31344 31301 Middle 2954 2883 1 26771 1 26761 26221 1587 1656 t 16184 15954 1601 t 3719 3737 t 36511 1 36281 35994 1952 2070 t 2135 t 2148 t 2185 t 1 Executive Summary D . Student Growth Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Change) . . . . . . . . . .Pg. 49 Average Annual Growth Rate over 10 Years Chapel Hill/Carrboro Orange County School District School District 2003 2004 2005 2006 2003 2004 2005 2006 Elementary 2 . 34% 1 . 79% 1 . 95 % 2 . 03 % 1 . 54 % 1 . 68 % 1 . 60% 1 . 49 % Middle 2 . 63 % 1 . 91 % 2 . 41 % 2 . 35 % 0 . 79 % 1 . 50 % 1 . 18 % 1 . 39 % High 2 . 81 % 2 . 04 % 1 . 95 % 2 . 04 % 1 . 28 % 1 . 2l % 0 . 92 % 0 . 99 % E . Student / Housing Generation Rate . . . . . . . . . . . . . . . . . . . . (No Change) . . . . . . .Pg. 52 Note : Orange County expects to enter into a contract with Tischler & Associates in mid 2007 which will include analyzing student generation rates and proposing updates if warranted. SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE STATUS (based on future year Student Membership Projections) A ` Joint Action Committee ' (language used in original MOU) met in November 2005 to discuss Elementary level K- 3 class size reductions related to legislation from the North Carolina Department of Public Instruction . The Committee has recommended that capacity changes be implemented equally in both school districts the year after the next elementary school opens which is anticipated to be CHCCS Elementary School # 10 in 2008 - 09 . When the reduced class size capacities go into effect, the result is 262 fewer seats available in CHCCS and 228 fewer seats available in OCS . The effect of this reduction is that the need for new elementary schools is accelerated because the loss of seats represents approximately 2 to 5 years of student growth . CHAPEL HILL/CARRBORO SCHOOL DISTRICT Elementary School District A . Does not currently exceed 105 % LOS standards (current LOS is 101 . 2 %) . B . Decrease in the increase of the growth rate at this level over the next 10 years . Co Chapel Hill/Carrboro Elementary School # 10 is scheduled for a 2008 - 09 opening . However, a 2009 - 10 may be a more realistic opening date due to approvals that need to occur and construction time . If Elementary School # 10 does not open until 200940 , the result could be an overcapacity situation at this level during the 2008 - 09 school year. In accordance with the MOU and implementing regulations , CAPS (Certificate of Adequate Public Schools) would not be issued during a period of overcapacity. This generally means that development approvals for new residential developments could not be made for projects expected to generate students during periods of overcapacity. D . Due partially to reduced class size capacities going into effect in 2008 - 09 , the projections are showing a need for Elementary School # 11 in 2010 . 11 . Middle School District A . Does not currently exceed 107 % LOS standards (current LOS is 91 . 3 %) . B . Decrease in the increase of the growth rate at this level over the next 10 years . 11 Executive Summary C . Chapel Hill/Carrboro Middle School 95 would likely be needed in 201344 versus the prior year projection of 201243 . High School District A. Currently exceeds the 110 % LOS standard (current LOS is 116 . 0 %) , but Memorandum of Understanding (MOU) suspended the Certificate Adequate Public Schools ( CAPS ) adequacy test at this level so CAPS may still be issued . Be Increase in the increase of the growth rate at this level over the next 10 years . C . Chapel Hill/Carrboro High School #3 (Carrboro High School) is still needed as soon as possible with current construction schedule estimates at 2007 -2008 . After the high school opens , all school levels would be tested for CAPS , in accordance with the Schools APFO MOU. Expansion of Carrboro High School from the initial capacity of 800 students to the ultimate capacity of 1 , 200 students is projected to be needed in 2016 - 17 versus prior year proj ection of 2014 - 15 . ORANGE COUNTY SCHOOL DISTRICT Elementary School District A . Does not currently exceed 105 % LOS standard (current LOS is 78 . 4%) . Be Steady increase of the growth rate at this level over the next 10 years . C . Does not affect or prompt CIP activity in 10 - year timeframe . However, staff is monitoring new development activity in the Orange County portion of Mebane, which is not a party to the Schools APFO MOU . Middle School District A . With the opening of Gravelly Hill Middle School in October 2006 , the present LOS is 72 . 9 % . The Certificate of Adequate Public Schools (CAPS ) adequacy test at this level has been reinstated at this level . Be Small decrease in the increase of the growth rate at this level over the next 10 years . C . Does not affect or prompt CIP activity in 10 -year time frame . High School District A . Does not currently exceed 110 % LOS (current LOS is 86 . 6 %) . Be Slight increase in the increase of the growth rate at this level over the next 10 years . C . Does not affect or prompt CIP activity in 10 -year time frame . NOTE : In August 2006 , the Orange County Board of Education redistricted all school districts at all levels concurrent with the opening of Gravelly Hill Middle School to re-balance individual school capacities . LOS is linked to the totals of all schools within a level ; therefore, the Schools APFO does not have a LOS for a specific school so redistricting by the Board of Education can independently ameliorate the unique school condition . An understanding of locational growth from the local governments assists in this rebalancing . 111 Orange County, NC School Adequate Public Facilities Ordinance INTRODUCTION The Schools Adequate Public Facilities Ordinance and its Memorandum of Understanding are ordinances and agreements , respectively. Supporting documents are anticipated to be dynamic to incorporate the annual changing conditions of membership , capacity and student projections that may affect School Capital Investment Plan (CIP) timing . This formal annual report will be forthcoming to all of the Schools Adequate Public Facilities Ordinance partners each year as new information is available . This updated information is used in the schools capital needs process of the Capital Investment Plan (Process 1 ) and within elements of the Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS ) spreadsheet system (Process 2) . This report and any comments from the Schools Adequate Public Facilities Ordinance partners will be considered in the first half of each year by the Board of County Commissioners at a regular or special meeting . The various elements of the report are then "certified" and formally considered in the process of the upcoming Capital Investment Plan . The Certificate of Adequate Public Schools system is updated after November 15 when data is received from the school districts with actual membership and pre- certified capacity (i . e . CIP capacity or prior "joint action" capacity changes) . The Schools Adequate Public Facilities Ordinance and Memorandum of Understanding have dynamic aspects . The derivation of the baseline and update to the variables will continue in the future as a variety of school related issues are fine-tuned by technical and policy groups . The primary facet of this report includes the creation of mathematical projections for student memberships by school levels (Elementary, Middle and High) and by School Districts (Chapel Hill/Carrboro and Orange County) . This information is found in Section II, Subsections B , C , D , and E . In summary, this report serves as an update to the dynamic conditions of student membership and school capacity which effect future projected needs considered in Capital Investment Planning . Interested parties may make their comments known to the Board of County Commissioners prior to their review of the report and school CIP completion or ask questions of the SAPFOTAC members . iv ANNUAL REPORT AS OUTLINED IN Schools Adequate Public Facilities Ordinance Memorandum of Understanding ( Schools APFO MOU) SECTION 1 d RESPECTFULLY SUBMITTED TO SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PARTNERS Chapel Hill/Carrboro School District Orange County School District School APFO School APFO Board of County Commissioners Board of County Commissioners Carrboro Board of Aldermen Hillsborough Town Council Chapel Hill Town Council Chapel Hill/Carrboro School Board Orange County School Board v Planning Directors/ School Representatives Technical Advisory Committee (aka SAPFOTAQ Orange County Planning Department Craig Benedict, Planning Director and Perdita Holtz, Special Projects Planner 3064 Revere Road P . O . Box 8181 Hillsborough , NC 27278 Town of Chapel Hill J.B . Culpepper, Planning Director 405 Martin Luther King, Jr . Blvd . Chapel Hill, North Carolina 27514 Town of Hillsborough Margaret Hauth , Planning Director P . O . Box 429 Hillsborough , NC 27278 Orange County School District Shirley Carraway, Superintendent 200 E . King Street Hillsborough, NC 27278 Carrboro Planning Department Roy Williford , Planning Director P . O . Box 829 Carrboro , NC 27510 Chapel Hill- Carrboro School District Steve Scroggs , Support Services 750 Merritt Mill Road Chapel Hill, NC 25716 Includes : SAPFOTAC/O. C . Budget Liaison Donna Dean 208 South Cameron Street P . O . Box 8181 Hillsborough, NC 27278 vi I . BASE MEMORANDUM OF UNDERSTANDING A . Level of Service 1 . Responsible Entity for Suggesting Change — Change can only be effectuated by amendment to Memorandum of Understanding (MOU) by all School APFO partners . IDefinition — Level of Service (LOS ) means the amount (level) of students that can be accommodated (serviced) at a certain school system grade group [ i . e . , Elementary level (K- 5 ) , Middle Level (6 - 8 ) , High School Level (942) ] . 3 . Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District Elementary Middle High School Elementary Middle High School 105 % 107 % N/A 105 % 107 % 110 % 110 % N/A — This means the School APFO CAPS Test has been " suspended" in accordance with addendums to the Memorandum of Understanding until proposed capacity is added in the specific school level area . 4 . Analysis of Existing Conditions Analysis of Existing Conditions Chapel Hill Carrboro School District Orange County School District These standards are acceptable at this time . These standards are acceptable at this time . Please note that the High School CAPS test has Orange County ' s newest Middle School, been suspended (i . e . , does not apply) until the Gravelly Hill, opened in October 2006 . The new High School opens which is scheduled for opening of this Middle School brings capacity Fall , 2007 at which time the test for the High at this level under the adopted LOS and the School will be automatically reinstated . The CAPS test has been reinstated . Therefore , Elementary and Middle school levels are CAPS processing is now in effect for all subject to the CAPS test . school levels . S . Recommendation - Recommendation- No Change from above standard No Change from above standard 1 Section I B . Building Capacity 1 . Responsible Entity for Suggesting Change ing- The Plann Directors , School Representatives , Technical Advisory Committee ( SAPFOTAC) will receive requested changes that are CIP related and adopted in the prior year . CIP capacity changes will be updated along with actual membership received in November of each year . Other changes will be sent to a ` Joint Action Committee ' of the BOCC and Board of Education, as noted in the MOU, who will make recommendations and forward changes (on the specific forms with justification) to the full Board of County Commissioners for review and action . These non- CEP changes would be updated in the upcoming November CAPS system recalibration and included in the SAPFOTAC report . 2 . Definition - "For purposes of this Memorandum, "building capacity" will be determined by reference to State guidelines and the School District guidelines (consistent with CIP School Construction Guidelines/policies developed by the School District and the Board of County Commissioners) and will be determined by a joint action of the School Board and the Orange County Board of Commissioners . As used herein the term " building capacity" refers to permanent buildings . Mobile classrooms and other temporary student accommodating classroom spaces are not permanent buildings and may not be counted in determining the school districts building capacity. " 3 . Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District The original certified capacity for each of the The original certified capacity for each of the schools was certified by the respective schools was certified by the respective superintendent and incorporated in the superintendent and incorporated in the initialization of the CAPS system (Chapel Hill initialization of the CAPS system (Orange Carrboro School District Apri129 , 2002 - County School District April 30 , 2002 - Base) Base) Capacity changes were made each year as Capacity changes were made each year as follows : follows : 2 Section I 2003 : Increase of 619 at Rashkis Elementary. 2003 : No net increase in capacity at 2004 : No changes at Elementary, Middle , or Elementary level . No changes at Middle High School levels . School level . Increase of 1 , 000 at Cedar Ridge 2005 : No changes at Elementary, Middle, or High School . High School levels . 2004 : No net increase in capacity at 2006 : No changes at Elementary, Middle , or Elementary level . No changes at Middle or High School levels . High School levels . 2005 : An increase in capacity of 100 at Hillsborough Elementary with the completion of renovations . 2006 : An increase in capacity of 700 at the Middle School level with the completion of Gravelly Hill Middle School and and increase of 15 at the High School level with the temporary location of Partnership Academy Alternative School . 4 . Analysis of Existing Conditions Analysis of Existing Conditions Chapel Hill Carrboro School District d Orange County School District The Schools Facilities Task Force developed The Schools Facilities Task Force developed a a system to calculate capacity. Any changes system to calculate capacity. Any changes year to year will be monitored, reviewed, and year to year will be itored, reviewed, and recorded by the SAPFOTAC on approved recorded by the SAPFOTAC on approved forms distributed to SAPFO partners and forms distributed to SAPFO partners and certified upon approval by the Board of certified upon approval by the Board of County Commissioners each year. County Commissioners each year . The requested 2006 - 7 capacity is noted on The requested 2006 . 7 capacity is noted on Attachment I . B . 3 Attachment I . B . 4 3 Section I A ` Joint Action Committee ' met in November 2005 to discuss Elementary level K 3 class size reductions related to legislation from the North Carolina Department of Public Instruction . The Committee has recommended that capacity changes be implemented equally in both school districts when the next elementary school opens which is anticipated to be CHCCS Elementary School # 10 in 20M09 . When the reduced class size capacities go into effect, the result is 262 fewer seats available in CHCCS and 228 fewer seats available in OCS . The effect of this reduction is that the need for new elementary schools is accelerated because the loss of seats represents approximately 2 to 5 years of student growth . 5 . Recommendation — Change Recommendation — Change Elementary Level capacities the year Elementary Level capacities the year after after the next elementary school opens the next elementary school opens within within either school district either school district As discussed above, a ` Joint Action As discussed above, a ` Joint Action Committee ' has recommended that capacity Committee ' has recommended that capacity changes at the Elementary level be changes at the Elementary level be implemented equally in both school districts implemented equally in both school districts the year after the next elementary school opens the year after the next elementary school which is anticipated to be CHCCS Elementary opens which is anticipated to be CHCCS School # 10 in 200 & 09 . Elementary School # 10 in 200 & 09 . 4 Section I Attachment I . B . 1 (page 1 of 3 ) it Change Request Form a 041*e School District: Orange County Schools SAPFO CAPS Years November 15 , 2005 - November 14 , 2006 Capacity and Membership Submittal Dates November 15 , 2005 OF Fit II 004 2004mi 2005111111 II ! I Fii.; Elenientar� Square ( l 11 RequestedRequested Requested r r rrFill Footnote Capac ty ce 44 5 8 ty I 598 3 0 2 = �'59 8 98 � -5 Cameron=P ark ` 7 81 9 Central 52,492 �t83 483 483 483 ; 288 Efland Cheels 64 ,316 52� 529 529 529 424 Grady Brown 74 ,015 575 575 575 575O F . Z . 492 Hillsborough 51 , 106 414 414 . : . 414 514 : : . . I . 377OFF New Hope 100,164 621 621 621. G21 F. 472 7 . PathOF ways 85,282 600 G00 600 600 :519 OF d. Total 498 , 188 ; 3;820 : ; 3820 SZO . .. . . . OFF0 3 0006 Special Note: For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as purl of the School Facilities 'Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report These capacities will remain effective until changed by ( 1 ) the School CIP or (2 ) an amended version of this form that is certified by the BOCC Justification: An increase in Hillsborough Elementary capacity of 100 was completed prior to the start of the 2003-04 school year in accordance with the CIP . However, due to continuing renovations within the school , the full capacity of 514 student seats was not achieved until the 2005-2006 school year . The above numbers reflect school capacity without consideration of State- directed class size reductions in grades li Representatives of County and both school governing boards have recommended that the lower State -directed class size reductions at the elementary level be implemented with the opening of the next new elementary school in Orange County, anticipated now to be CHCCS Elementary # 10 in 2008011 Capacity Certifications xm=� Superin ndent Date BOC hai Date I Membership Certifications S Date BOC al Date upe intendant 5 . Section I Attachment I . B . I (page 2 of 3 ) School APF0 Capacity Change Request Form and Current Membership School District: Orange County Schools SAPFO CAPS Year: November 15 , 2005 - November 14, 2006 Capacity and Membership Submittal Date: November 15 , 2005 L 5t nhack ` IF 1369000 " :140, 740 " 740 740 708 I IF GPw. Stanford' 1079620 Io 2G' 726 ' 726. 726 881 IF - IF I IF c. 243,620 1466 1466 " 1 ,466 , 1 ,466 0 1 ,589 IF I Special Note: For the November 15 , 2Q02 base year the board accepted the superintendent -certified capacities as pan of the School Facilities Task Justification: No change in capacity. C pacify Certification : FIFIFFS Sup intendent Date O CC air Date Membership Certification: r l -tp - oS k 2 - D � Supe ' endent Date BO , Ch it Date 6 Section I Attachment I . B . 1 (page 3 of 3 ) School APFO Capacity Change Request Form and Current � Members 1p -. School District: Orange County Schools SAPFO CAPS Year: November 15 , 2005 - November 14 , 2006 Capacity and Membership Submittal Date: November 15 , 2005 Capacity . Capacity Cap, cIky - Capacity Orange 2139509 1 ,518 1 , 518 '' 1 , 518 11518 - 999 Cedar Ridge 206,900 : 1 ,000' 11000 . 1 ,000 1 ,000 1 , 122 Total ; 4209409 2,518 ', 2,518 : 2, 518 2,5 > 8 F 0 ' 2, 121 Special Note: For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as part of the School facilities Task Justification ; No change in capacity. Ca acity Certification : _ 24 - O(o Superifbtendent Date BO r Date Membership Certification : 1 ,144 (0 -. to - as Sup ' tendent Date BOCC -h r Date 7 Section I Attachment I .B . 2 (page I of 3 ) F chool District: Chapel Hill-Carrboro City Schools chool Year; November 15, 2004 - November 14, 2005 11 It II 11 II I I 11 . Im t .:;. 582 ;`56 " 563 5 3 60 8. 2 ; 563 63 = - 3 Caiiboro :- ,.: : - ...::�: � - Ephesus 66,95Z 472 47Z 472 472 : 43 Estes Hills _ ` 569299 ":::.`':549 549 5%19 549 502 Glenwood• 5o,7G4 ': 945 445 tp A45 445 458 PP 'Grahizin 63,541 57.0 570 570 570 : ' :587 iylcbou_g 98,o0 59G 596 596 59G : :'S57 Rasiilus 942234 A 619 619 619 tT 538 Scrods 90,980 609 609 609 Go9 G70 Se � tiyell ' :•';' ° 52,896 498 498 498 498 551 Tcital 6341498 ; `: ,°4 :302 ; ; ' : 4 ;921 :: :'..' . . ° `s4921 5 : 9 ,921 .: :. :.� : '4 ;879 Special Note : For the November 15, 2002 base year the board accepted the superintendent-certified capacities as part or the School facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report These capacities %%IIt remain efrective until changed by ( 1 ) the School CIP or (2) an amended version of this form that is certired by the BOCC Justification . An increase in capacity of 619 at Rashkis Elementary was completed prior to the start of the 2003 04 school year in accordance with the CIP . The above numbers reflect school capacity without consideration of State-directed class size reductions in grades K-3 . Representatives of County and both school governing boards have recommended that the lower State-directed class size reductions at the elementary level be implemented with the opening of the next new elementary school In Orange County, anticipated now to be CHCCS Elementary # 10 in 2008 =09 _ Capacity Certif ation : Cf Superintendent Date OCC a Date Membership Certification: l 40 Superintendent Date BOCC C it Date 8 Section I Attachment I . B . 2 (page 2 of 3 ) E l District: Chapel Hill-Carrboro City Schools l Year: November 15 , 2004 - November 14, 2005 Middle Capacity Capacity Capacity Capacity school Cul�ireth . 104,798 `670 670 670 670 587 McDougle 136,221 732 732 732 732 638 Phillips 109,498 ` 706 706 746 706 648 Smith . 128,764 . _. 732 732 732 732 699 Total 479,281 2, 840 2;840 . 2,840 2;840 : 0 25:72 Special Note : For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by ( I ) the School CIP or ( 2) an amended version of this form that is certified by the BOCC. Justification : No change in capacity requested Capacity Certification : Superintendent Date B air Date Membership Certification : 4u&perintendent Date B C it Date 9 Section I Attachment I . B . 2 (page 3 of 3 ) E hool District : Chapel Hill-Carrboro City Schools hool Year: November 15 , 2004 " November 14 , 2005 ISquare I 1005 II 1 � 2006m Membership RequestedHigh School Requested Requested Feet Capacity Capacity Capacity Capacity Capacity Footnote # school ChapeI , Hill " ` 241I IF , 111 1IF ,520 1F . 11 ,520 1,520 1 ,520 19810 East Chapel Hill 2587985 1 ,515 1 ,515 . 1,515 1 ,515 1_,704 Ttitail " 500,096 3;035 3;035 i ' ` . 3,035 ; 3;035 0 3;514 Special Note: For the November I5 .. 2002 base year the board accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by ( 1 ) the School CIP or (2 ) an amended version of this form that is certified by the BOCC. Justification : No change in capacity requested Capacity Certification : Superintendent Date BPeC Ch Date Membership Certification : 01 Superinteildent Date BO air Date 10 Attachment I . B . 3 (page 1 of 3 ) ILI School District: Orange County Schools SAPFO CAPS Year: November 15 , 2006 - November 14. 2007 Capacity and Membership Submittal Date: November 15 , 2006 I 11607 y es Re es L1 r Aole Ica i0a Cameron Park 70,812 598 598 598 598 598 498 Central 52,492 483 483 483 483 483 297 Efland Cheeks 64,316 529 529 529 529 529 440 Grady Brown 74 ,016 575 575 575 575 575 503 Hillsborough 519106 414 414 414 514 514 385 New Hope 100, 164 621 621 621 621 621 527 Pathways 855282 600 600 600 600 600 422 Total 1 49891881 31820 3,8201 , 39820 35920 3,9201 1 39072 Special Note: For the November Ii . 2002 base year the hoard accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee; Report. These capacities will remain effective until changed by ( 1 ) the School CTP or (2 ) an amended version of this form that is certified by the BOCC. Justification : No change in capacity. The above numbers reflect school capacity without consideration of state class size reductions in grades K- 3 . Capacity Certification : ILL61 Supe intendent (j Date BOCC Chair Date Membership Certification: Supe tendent Date BOCC Cha ' Date / 1 lee�V0 it Attachment I . R . 3 (page 2of 3 ) School APFO Capacity Change Request Form and Current Membership School District : Orange County Schools SAPFO CAPS Year: November 15 , 2006 - .November 14, 2007 Capacity and Membership Submittal Date: November 15 , 2006 1 11 1 1 RequestedMiddle Square juslification Requested Requested Requested Membership Footnote # sellool Feet Capacity - (.'apacity A4. L . Stanback 1361000 740 740 740 740 Capacity 740 633 C.W . Stanford 107 ,620 726 726 726 726 726 679 Gravelly Hill 123 ,000 0 0 0 0 700 264 Ti) Ud _ 366,620 ^1;466 I ,466 1;466 I,46 21661 - - - 1 ,576 Special Note: For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as part o.f the School Pacilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by ( 1 ) the School C11? or (2) an amended version of this form that is certified by the BOCC. Justification : An incease in capacity has been generated as a result of the completion of Gravelly Hill Middle School . This school has added an additional 700 middle school student seats . j1 Ca city Certification : zz/ L/I Su rintendent Date BOCC hair ate Membership Certification: { , / dddd Sup intendent Date BOCC Chair, Date I � Attachment I . B . 3 (page 3of 3 ) Schools est Form and , Current - School District : Orange County Schools SAPFO CAPS Year: November 15 , 2006 - November 14, 2007 Capacity and Membership Submittal Date: November 15 , 2006 i 1 CCU CAPacit) Footnote # 1 Orange 213,509 1,518 1 ,518 11518 15518 1518 1 , 147 Cedar. Ridge 2063900 11000 11000 11000 1 ,000 11000 1 ,022 Partnership 29249 0 0 0 0 1 15 15 Total 1 422,6581 215181 2,5181 2,5181 , 2,5181 2,5331 2, 184 Special Note: For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee: Report. These capacities will remain effective until changed by ( 1 ) the School CIP or (2 ) an amended version of this form that is certified by the BOCC. Justification : Partnership Academy Alternative School ( P . A . A . S . ) is temporarily located at Fairview Baptist Church which allows limited capacity for alternative school students . Upon completion of the permanent site for P . A . A . S . we anticipate approximately 40 student seats added to the high school capacity. Ca acity Certification : 121 I)Zlei 4, Su rintendent Date BOCC Chair Date Membership Certification : Supe in ndent Date OCC hai Date i3 Attachment I . B . 4 (page 1 of 3 ) School APFO Capacity Calculation and Change Request Form School District: Chapel Hill- Carrboro City Schools School Year: November 15 , 2006 - November 14, 2007 Carrboro 60,832 , " `�� =563 563 563 x; Y�'f 533 Ephesus . , 66,952 47 472 - 472 472 437 Fstes.l. s 56,299 $4 549 '5 1 . 49 549 549 512 Glenwood 50,764 4A5 445 445 445 445 454 >~`P Grraham 4 Nil . 63, 541 570 570 Z57 570 570 562 McDougle 989000 d 596 596 596 596 596 581 Rashkis 94,234 0 619 . .619 619 619 636 Scro99S 90, 980 1609 609 609 609 609 706 Seawell 52,896 498 498 498 498 498 ` 4 5 9 ' l Total 634,498 , . 74 . , >�130 f . 4,921 4921 4,921 4,921 4' 80 Special Note: For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by ( 1 ) the School CIP or (2) an amended version of this form that is certified by the BOCC. Justification : An increase in capacity of 619 at Rashkis Elementary was completed prior to the start of the 2003- 04 school year in accordance with the CIP . The above numbers reflect school capacity without consideration of state class size reductions in ' grades K- 3 . Capacity Certification :8;900 � J§00�&4 , Superintendent Date BOCC Chair D t Membership ertification : Superintendent Date BOCC Chair pate E � Attachment LBA (page 2 of 3 ) School APF0 Capacity Calculation and Change Request Form : mmi School District: Chapel Hill-Carrboro City Schools UNION School Year: November 15 , 2006 - November 14, 2007 2007 Membership Middle School 9 Requested Requested Requested Reque.*ited ( referenced Culbrett> 104,798 IriFm- mA %` 6�74 670 67Q 670 670 628 �� � a EOrM McDougle 136,221 732 732 732 732 645 Phillips 109,498 ��s f � 706 706 706 706 646 Smith ': 128,764 ;:IF, �7Z 732 . 73 732 732 673 i ! _ I OHr l IF/5 / , 4 IF Vim I OF Or TaIt � 479 ,2811 2 840 = `; 2,840 2,$r��l : 2,840 2 840 2;592 Special Note: For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report . These capacities will remain effective until changed by ( 1 ) the School CIP or (2) an amended version of this form that is certified by the BOCC . Justification : No change in capacity requested Capacity Certification : Superintendent Date BOCC Chair �v�' Date Membership Certification : Leo Ize,,f'' &Z9 2' G SEEK Superintendent Date BOCC hair 'Da e Attachment I RA (page 3of 3 ) School APFO Capacity Calculation and Change Re q* uest Form School District : Chapel Hill-Carrboro City Schools School Year: November 15 , 2006 - November 14, 2007 Far Chapel Hill 2419111 151 IF r 52 11520 L 1 ,520 1 ,520 1,778 East Chapel Hill 258,985 1,515 1 , 515 ' `r,515 19515 1 ,515 1,742 I IF ; I � ; !rt . t IF to xt� E ' OF c ', l i t ..; s pp r �(.!f Y Z FlI Fe § dd IF s IF J � % 4Uni IF I IF - , Ad r rIF Total 5009096 3,035 <:3,0�5 } �jiffl i`F ea _ 3,035 ' ._._ . .;`3,035 ,3,520 Special Note: For the November 15 , 2002 base year the board accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by ( 1 ) the School CIP or (2) an amended version of this form that is certified by the BOCC. Justification : No change in capacity requested Capacity Certification : 0000 uperintendent Date BOCC Chair Date y. , Membership Certification : IAL /4 Superintendent Date BOCC Chair at �f V 1 P„ Section I C . Membership Date 1 . Responsible Entity for Suggesting Change — Change can be effectuated only by amendment to Memorandum of Understanding (MOU) by all School APFO partners . The Planning Directors, School Representatives , Technical Advisory Committee (SAPFOTAC) may advise if a change in date would improve the reporting or timeliness of the report . 2 . Definition - The date at which student membership is calculated . This date is updated each year and also serves as the basis for projections along with the history from previous years . "For purposes of this Memorandum, the term " school membership " means the actual number of students attending school as of November 15 of each year. The figure is determined by considering the number of students enrolled (i . e . registered, regardless of whether a student is no longer attending school) and making adjustments for withdrawals , dropouts , deaths , retentions and promotions . Students who are merely absent from class on the date membership is determined as a result of sickness or some other temporary reason are included in school membership figures . Each year the School District shall transmit its school membership to the parties to this agreement no later than five (5 ) school days after November 15 . 3 . Standard for : Standard for: Chapel Hill Carrboro School District Orange County School District November 15 November 15 of each year of each year 4 . Analysis of Existing Conditions This will be analyzed in the future years to determine if it is an exemplary date . This date may sometimes occur on a weekend (as it did in 2003) and is not a typical date for membership census and recordation . An earlier date such as the "40th day " membership may be suggested in future years so data can be analyzed earlier to assist in school CIP needs assessment. S. Recommendation - No change at this Recommendation - No change at this time time 17 Section II II . ANNUAL UPDATE TO SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE SYSTEM A. Capital Investment Plan ( CIP) .1 . Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Board of County Commissioners (BOCC) after review of the CIP requests from the School Districts . Action regarding CIP programs usually occurs during the BOCC budget Public Hearing process in the spring of each year . The development of the CIP considers the conditions noted in the SAPFOTAC report released in the same CIP development year including LOS (level of service) , capacity, and membership proj ections . 2 . Definition — The process and resultant program to determine school needs and provide funding for new school facilities through a variety of funding mechanisms . 3 . Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District Not Applicable Not Applicable 4 . Analysis of Existing Conditions The MOU outlines a system of implementing the SAPFO , including issuing Certificates of Adequate Public Schools (CAPS ) to new development if capacity is available . The Requests for CAPS will be evaluated using the most recently adopted Capital Investment Plan. The plan includes funding for Carrboro High School (2007) and CHCCS Elementary School # 10 (2008) . Anew Capital Investment Plan is currently under development for approval prior to June 30 , 2007 . 5 . Recommendation Not subject to staff review 18 Section II Be Student Projection Methodology 1 . Responsible Entity for Suggesting Change — This section is reviewed and recommended by the Planning Directors , School Representatives , Technical Advisory Committee ( SAPFOTAC) to the BOCC for change , if necessary. 2 . Definition - The method(s) by which student memberships are calculated for future years to determine total membership at each combined school level (Elementary, Middle and High School) which take into consideration historical membership totals at a specific time (November 15 ) in the school year . These methods are also known as ` models ' . 3 . Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District Presently, the average of five models are being used : namely 3 , 5 , and 10 year history/cohort survival methods , Orange County Planning Department Linear Wave and Tischler Linear methods . Attachment II . B . 1 includes a description of each model . 4 . Analysis of Existing Conditions Performance of the models is monitored each year . The value of a projection model is in its prediction of school level capacities at least three years in advance of capacity shortfalls so the annual Capital Investment Plan (CIP ) updates can respond proactively with siting, design, and construction. Attachment II . B . 3 shows the performance of the models for the 2006 . 7 school year from the prior year projection . After which, a summary of each model is provided . 5 . Recommendation - Five (5 ) years of projection results are now available . Analysis on the accuracy of the results is showing the some models have better results in one district while others have better results in the other district . The historic growth rate is easily captured by the models but projected future growth is more difficult to accurately quantify. This is especially true in the Orange County School District which serves students living within the Orange County portion of the City of Mebane . Because the City of Mebane is not a signatory party to the SAPFO , the. models have not adequately taken into account the significant residential growth occurring within Mebane ' s jurisdiction . The SAPFOTAC proposes to meet during 2007 to analyze the data and formulate 19 Section II a recommendation on future projection methodology since it appears that using the same projection methodology for both school districts may not result in the optimal projection accuracy. The BOCC would need to approve any changes in projection methodology prior to any change in the methodology. 20 Section II Attachment 11 . B . 1 (page 1 of I C STUDENT MEMBERSHIP PROJECTION School District : Orange County Year/Date Issued : 12/07/2005 Year/Date Based : November 15 , 2005 ~2006 Years Projected : 2007 -2016 A. Projection Type : Tischler Linear 1 . Projection Mathematical formula Description/ Straight line projection Characteristics : 2 . Projection Formula : y = ((c *b ) * x)+b (y = Projected Population; c = Ifistorical Annual Change; b = Base Yeai; x = Projection Years) 3 . Projection Historical growth is reflected in projected growth Assumptions : % Elementary, Middle, and High taken from SYE 2006 and held constant throughout projection . 4 . Annual Growth Rate • 1 . 77 % Note : this is an average annual growth rate over ten years 5 . Attachments : a) Projections (includes : Total, Elementary, Middle , and High) 6. Projection Performed : By : Brian Carson Date : 12/07/2005 7. Projection Reviewed : By : Date . 8 . Projection Certified : 9 . Comments : 21 Section II Attachment H. li . 1 (page 4 of 10) STUDENT MEMBERSHIP PROJECTION School District: Orange County Year/Date Issued : 12/07/05 Year/Date Based : November 15 , 2005 - 2006 Years Projected : 2007-2016 A. Projection Type : 5 Year Cohort 1 . Projection Mathematical formula that computes the average advancement rate over the previous 5 years for each grade level and then uses each rate to calculate Bosoms Description/ Characteristics : projected membership by school level . An assumed kindergarten membership is based on birth records and/or historical growth rates . n=l 2 . Projection Formula : �/ p J Kn = K,�-1 + �K,t-► * 0 . 01) a G= ( � n / b n - � ) / 5 b = gn-t (a ) n=5 K=Kindergarten membership, n = Given school year, G= Given grade 's ►membership (other than Kindergarten) g=Previous grade 's membership, a =Average advancement rate, b =Projected membership 3 . Projection Assumes a M annual growth rate for the kindergarten grade level . Assumptions : Assumes the same percentage of students in each grade level graduate to the next level each year. 4 . Average Annual 0 . 76 % Note: This is an average annual rate over all school levels over ten years. Growth Rate : 5. Attachments : 6 . Projection Performed : By : Scroggs, Benedict , Dean Date : 12/07/2005 7 . Projection Reviewed : By : Date : 8 . Projection Certified : 9 . Comments : 24 Section II Attachment ILB . I (page 5 of 10) STUDENT MEMBERSHIP PROJECTION School District : Orange County Year/Date Issued : 12/07/05 Year/Date Based : November 15 , 2005 -2006 Years Projected : 2007-2016 A. Projection Type : 10 Year Cohort 1 . Projection Mathematical formula that computes the average advancement rate over Description/ the previous 10 years for each grade level and then uses each rate to calculate Characteristics : projected membership by school level . An assumed kindergarten membership is based on birth records and/or historical growth rates . 2 . Projection Formula : J K„ = K„-, + (K,I -, * 0 . 01) a = ( J G„ l g„-, ) / 10 b = g„ -, (a ) =10 K=Kindergarten membership, n = Given school year, G= Given grade 's membership (other than Kindergarten) g=Previous grade 's membership, a =Average advancement rate, b =Projected membership 3 . Projection Assumes a 1 % annual growth rate for the kindergarten grade level. Assumptions : Assumes the same percentage of students in each grade level graduate to the next level each year. 4 . Average Annual 0 . 68 % Note: This is an average annual rate over all school levels over ten years. Growth Rate . 5 . Attachments : 6 . Projection Performed : By : Scroggs , Benedict, Dean Date : 12/07/05 7 . Projection Reviewed : By : Date : 8 . Projection Certified : 9 . Comments : 25 Section II =of STUDENT MEMBERSHIP PROJECTION School District : Chapel Hill — Carrboro Year/Date Issued : WOM 12/07/2005 Year/Date Based : November . 15 , 2005 - 2006 Years Projected : 2007 -2016 A. Projection Type : Tischler Linear 1 . Projection Mathematical formula Description/ Straight line projection Characteristics : 2 . Projection Formula : y _ ((c *b ) * x)+b (y = Projected Population ; c = Historical Annual Change; b = Base Year; x = Projection Years) 3 . Projection Historical growth is reflected in projected growth Assumptions : % Elementary, Middle, and High taken from SYE 2006 and held constant throughout projection . 4 . Annual Growth Rate : 2 .45 % Note: this is an average annual growth rate over tell years 5 . Attachments : a) Projections (includes : Total , Elementary, Middle , and High) 6 . Projection Performed : By : Brian Carson Date : 12/07/2005 7 . Projection Reviewed : By : Date : 8 . Projection Certified : 9 . Comments : 26 Section II Attachment II . B . I (page 7 of 10) STUDENT MEMBERSHIP PROJECTION School District : Chapel Hill - Carrboro Year/Date Issued : 12/07/2005 Year/Date Based : November 15 , 2005 -2006 Years Projected : 2007 -2016 A. Projection Type : OCP Linear Wave 1 . Projection Mathematical linear with percent variation among school levels . Description/ Reflecting progressing waves of membership . Characteristics : 2 . Projection Formula : BYM + (BYI — 5 (n)) = EYM EYM x % SL = EYM/SL (BYM = Base year 2"d month membership; BY1 = year student membership increment base (285) ; EYM =Ensuing year membership • n = Projection Year; % SL = % of total membership per school level (i. e. , elementary, middle, high) ; EYM/SL = Ensuing yew member by school level 3 . Projection Base year growth reflects 10-year average . Assumptions : Decrease in BYI of 15 until school year 2009 - 2010 reflects decreases in housing growth. Reflects buildout constraints . 4 . Average Annual 2 . 0 7 % Growth Rate : ASGR = (2015 PM — 2005 AM)/ 10 = 249 (ASGR = Annual Student Growth Rate; PM = Projected Membership, AM = Actual Membership) 5 . Attachments : a) Projections (includes : Total , Elementary, Middle , and High) 6 . Projection Performed : By : Brian Carson Date : 12/07/2005 7 . Projection Reviewed : By : Date : 8 . Projection Certified : 9 . Comments : 27 Section II Attachment II.B . I (page 8 of 10) STUDENT MEMBERSHIP PROJECTION School District: Chapel Hill - Carrboro Year/Date Issued : 12/07/05 Year/Date Based : November 15 , 2005 -2006 Years Projected : 2007 - 2016 A. Projection Type : 3 Year Cohort 1 . Projection Mathematical formula that computes the average advancement rate over Description/ the previous 3 years for each grade level and then uses each rate to calculate Characteristics : projected membership by school level . An assumed kindergarten membership is based on birth records and/or historical growth rates . 2. Projection Formula : -� K„ = Ktl-i + (Kn - i * 0 . 01) a = G„ l gn -1 ) l 3 b = gn-► ( a ) n=3 K=Kindergarten membership, n = Given school year, G= Given grade 's membership (other than Kindergarten), g =Previous grade 's membership, a =Average advaireement rate, b =Projected membership 3 . Projection Assumes a 1 % annual growth rate for the kindergarten grade level . Assumptions : Assumes the same percentage of students in each grade level graduate to the next level each year. 4. Average Annual 1 . 83 % Note: This is an average annual rate over all school levels over ten years. Growth Rate : 5 . Attachments : 6. Projection Performed : Byes Scroggs , Benedict, Dean Date : 12/07/2005 7. Projection Reviewed : By : Date : 8 . Projection Certified : 9 . Comments : 28 Section II =of STUDENT MEMBERSHIP PROJECTION School District : Chapel Hill - Carrboro Year/Date Issued : 12/07/05 Year/Date Based : November 15 , 2005 -2006 Years Projected : 2007-2016 A. Projection Type : 5 Year Cohort 1 . Projection Mathematical formula that computes the average advancement rate over Description/ the previous 5 years for each grade level and then uses each rate to calculate Characteristics : projected membership by school level . An assumed kindergarten membership is based on birth records and/or historical growth rates . 2 . Projection Formula : K„ = K„-� + (K„ -► * 0 . 01) a = �� U,, l g„ -1 ) l 5 b = �, -� (a ) =s Mathematical formula that computes the average advancement rate over the previous 5 years for each grade level and then uses each rate to calculate projected membership by school level . An assumed kindergarten membership 3 . Projection Assumes a 1 % annual growth rate for the kindergarten grade level . Assumptions : Assumes the same percentage of students in each grade level graduate to the next level each year. 4 . Average Annual 1 .90 % Note: This is an average annual rate over all school levels over ten years. Growth Rate : 5 . Attachments : 6 . Projection Performed : By : Scroggs , Benedict, Dean Date : 12/07/2005 7 . Projection Reviewed : By : Date : 8 . Projection Certified : 9 . Comments : 29 Section II Attachment ILB . I STUDENT MEMBERSHIP PROJECTION (page 10 of 10) School District : Chapel Hill - Carrboro Year/Date Issued : 12/07/05 Year/Date Based : November 15 , 2005 - 2006 Years Projected : 2007 -2016 A. Projection Type : 10 Year Cohort 1 . Projection Mathematical formula that computes the average advancement rate over Description / the previous 10 years for each grade level and then uses each rate to calculate Characteristics * projected membership by school level . An assumed kindergarten membership • is based on birth records and/or historical growth rates . 2 . Projection Formula : � Kp — Kn_l + (K _ * 0 . 01) a = ( � Gn l ) l 10 b = ( u) n l gn -1 ��n-1 n=10 K =Kindergarlen membership, n = Given school year, G = Given grade 's membership (other than Kindergarten), g=Previous grade 's membership, a =Average advancement rate, b =Projected membership 3 . Projection Assumes a 1 % annual growth rate for the kindergarten grade level . Assumptions : Assumes the same percentage of students in each grade level graduate to the next level each year . 4 . Average Annual 2 . 34 % Note: This is an average annual rate over all school levels over ten years. Growth Rate . 5 . Attachments : 6 . Projection Performed : By : Scroggs, Benedict, Dean Date : 12/07/05 7. Projection Reviewed : By : Date : 8 . Projection Certified : 9 . Comments : 30 Attachment II . B . 2 Section II (page 1 of 4 ) Orange County School District School Membership 2005 =2006 School Year ( November 15 , 2005 ) 11 / 15/04 Actual Projected 11 / 15/05 Change between actual 2004 -05 2005 = 06 Actual 2005 -06 Nov 2004 = Nov 2005 Elementary 3016 3006 = 10 Model Projection is T 3078 H72 OCP 3081 H75 10C 3014 H8 5C 3004 L2 3C 3038 H32 AVG 3043 H37 11 / 15/2005 Middle 1593 1589 = 4 Model Projection is T 1626 H37 OCP 1619 H30 10C 1598 H9 5C 1601 H12 3C 1624 H35 AVGJ 1614 H25 11 / 15/2005 High 2057 2121 + 64 Model Projection is T 2099 L22 OCP 2102 L19 10C 2115 L6 5C 2129 H8 3C 2165 H44 AVG 2122 H1 %yc_ -. , • a ' .. .." ., .rr - � . UTW t 6 . i r. . 11 / 15/2005 Totals Elementary 3016 3006 Middle 1593 1589 High 2057 2121 6666 6716 + 50 Model Projection is T 6803 H87 OCP 6802 H86 10C 6727 H11 5C 6734 H18 3CI 6827 H111 AVGJ 6779 H63 H means High L means Low * includes hospital school 31 Attachment II . B . 2 Section II (page 2 of 4 ) Orange County School District School Membership 2005 -2006 School Year ( November 15 , 2005 ) Statistical Findings PROJECTION TYPE ABBREVIATIONS TISCHLER (T ) 10 -YEAR COHORT ( 10C ) ORANGE COUNTY PLANNING ( OCP ) 5 -YEAR COHORT ( 5C ) 3 -YEAR COHORT ( 3C ) Elementary School Level • Projections were mostly high (from 32 to 75 ) but included a low projection off by of 2 ( 5C ) over the actual November 15 , 2005 membership . The average projection was 37 students higher than actual membership . • The membership actually decreased by 10 members between November 14 , 2004 and November 15 , 2005 . Middle School Level ® All projections were high ranging from being high by 9 to 37 . The average projection was 25 students higher than actual membership . • The membership actually decreased by 4 members between November 14 , 2004 and November 15 , 2005 . High School Level • Projections were mixed ( high and low ) ranging from a low of 6 to a high of 44 . The average projection was 1 student low . • The membership actually increased by 64 members between November 14 , 2004 and November 15 , 2005 . TOTAL • The total of all school level projections were high by between 11 and 111 students . The average projected was a 63 student increase . • The membership increased in total by 50 students , which is the sum of - 10 at Elementary , —4 at Middle and + 64 at High . • NC Department of Public Instruction ( NCDPI ) projected 6 , 811 (an increase of 145 ) , which is high ( i . e . overcount ) by 95 students of the actual November 15 , 2005 membership . 32 Attachment II . B . 2 (page 3 of 4 ) Section II Chapel Hill /Carrboro School District School Membership 2005 =2006 School Year ( November 15 , 2005 ) 11 / 15/04 11 / 15/05 Actual Projected Actual Change between actual 2004 -05 2005 - 06 2005 = 06 Nov 2004 - Nov 2005 Elementary 4695 4879 + 184 Model Projection is T 4824 L55 OCP 4819 L60 10C 4840 L39 5C 4839 L40 3CI 4774 L105 AVG 4819 L60 11110EST r ' 11 / 15/2005 Middle 2560 2572 + 12 Model Projection is T 2630 H58 OCP 2624 H52 10C 2539 L33 5C 2540 L32 3C 2505 L67 AVG 2568 L4 11 / 15/2005 High 3422 3514 + 92 Model Projection is T 3516 H2 OCP 3535 H21 10C 3504 L10 5C 3543 H29 3C 3553 H39 AVGI 3530 1 H16 Totals 11 / 15/2005 Elementary 4695 4879 Middle 2560 2572 High 3422 3514 10677 10965 + 288 Model Projection is T 10970 H5 OCP 10978 H13 10C 10883 L82 5C 10922 L43 3C 10832 L133 AVG 10917 L48 H means High * excludes hospital school L means Low 33 Attachment II . B . 2 Section II (page 4 of 4 ) Chapel Hill / Carrboro School District School Membership 2005 -2006 School Year ( November 15 , 2005 ) Statistical Findings PROJECTION TYPE ABBREVIATIONS TISCHLER ( T ) 10 -YEAR COHORT ( 10C ) ORANGE COUNTY PLANNING ( OCP ) 5 -YEAR COHORT ( 5C ) 3 -YEAR COHORT ( 3C ) Elementary School Level • All projections were low by between 39 and 105 students over the actual November 15 , 2005 enrollment . • The membership actually increased by 184 members between November 14 , 2004 and November 15 , 2005 . Middle School Level • Projections were mixed ( high and low ) ranging from being low by 67 to being high by 58 students over the actual November 15 , 2005 enrollment . • The membership actually increased by 12 members between November 14 , 2004 and November 15 , 2005 . High School Level • Projections were mostly high (from 2 to 39 ) but included a projection that was low by 10 students . The average projection was 16 students high . • The total membership actually increased by 92 members between November 14 , 2004 and November 15 , 2005 . TOTAL • The total of all school level projections were mixed ranging from being low by 133 to being high by 13 students . The average projection was low by 48 students . • The membership increased in total by 288 students , which is the sum of + 184 at Elementary , + 12 at Middle , and + 92 at High . • NC Department of Public Instruction ( NCDPI ) projected 10 , 824 ( an increase of 147 ) , which is low ( i . e . undercount ) by 141 students of the actual November 15 , 2005 membership . 34 Attachment II . B . 3 (page 1 of 4 ) Section II Orange County School District School Membership 2006 =2007 School Year ( November 15 , 2006) 11 / 15/05 Actual Projected 11 / 15/06 Change between actual 2005 = 06 2006 = 07 Actual 2006 - 07 Nov 2005 - Nov 2006 Elementary 3006 3072 + 66 Model Pro ' ection is T 3064 L8 OCP 3085 H13 10C 3063 L9 5C 3054 L18 3C 3065 L7 AVGI 1 1 3066 L6 11 / 15/2006 Middle 1589 1576 - 13 Model Pro ' ection is T 1620 H44 OCP 1611 H35 10C 1561 L15 5C 1572 L4 3C 1581 H5 AVGJ 1589 1 H13 11 / 15/2006 High 2121 2184 + 63 Model Pro ' ection is T 2162 L22 OCP 2160 L24 10C 2138 L46 5C 2170 L14 3C 2147 L37 AVG 2155 L29 jI ` 11 / 15/2006 Totals Elementary 3006 3072 Middle 1589 1576 High 2121 2184 6716 6832 + 116 Model Pro ' ection is T 6846 H14 OCP 6856 H24 10C 6762 L70 5C 6796 L36 3C 6793 L39 AVG 6810 L22 H means High L means Low * includes hospital school 35 Attachment II . B . 3 Section II (page 2 of 4) Orange County School District School Membership 2006 =2007 School Year ( November 15 , 2006 ) Statistical Findings PROJECTION TYPE ABBREVIATIONS ` TISCHLER ' LINEAR (T ) 10 -YEAR COHORT ( 10C ) ORANGE COUNTY PLANNING ( OCP ) 5 -YEAR COHORT ( 5C ) 3 -YEAR COHORT 3C Elementary School Level • Projections were mostly low ( from 6 to 18 ) but included a high projection off by of 13 over the actual November 15 , 2006 membership . The average projection was 6 students lower than actual membership . • The membership actually increased by 66 members between November 15 , 2005 and November 15 , 2006 . Middle School Level • Projections were mixed ( high and low) ranging from a low of 15 to a high of 44 . The average projection was 13 students high . • The membership actually decreased by 13 members between November 15 , 2005 and November 15 , 2006 . High School Level • Projections were all low by between 14 and 46 students . The average projection was 29 students low . • The membership actually increased by 63 members between November 15 , 2005 and November 15 , 2006 . TOTAL • The total of all school level projections were mixed ( high and low) ranging from a low of 70 to a high of 24 . The average projection was 22 students low . • The membership increased in total by 116 students , which is the sum of + 66 at Elementary , — 13 at Middle and + 63 at High . 36 Attachment II . B . 3 (page 3 of 4 ) Section II Chapel Hill /Carrboro School District School Membership 2006 =2007 School Year ( November 15 , 2006) 11 / 15/05 11 / 15/06 Actual Projected Actual Change between actual 2005 = 06 2006 - 07 2006 - 07 Nov 2005 = Nov 2006 Elementary 4879 4980 + 101 Model Projection is T 5012 H32 OCP 4995 H15 10C 5054 H74 5C 4998 H18 3C 4999 H19 AVG 5012 H32 11 / 15/2006 M iddle 2572 2592 +20 Model Projection is T 2642 H50 OCP 2655 H63 10C 2660 H68 5C 2660 H68 3C 2650 H58 yy AVGJ 2653 1 H61 11 / 15/2006 High 3514 3520 + 6 Model Projection is T 3610 H90 OCP 3600 H80 10C 3506 L14 5C 3536 H16 3C 3513 L7 AVG 3553 H22 Totals 11 / 15/2006 Elementary 4879 4980 Middle 2572 2592 High 3514 3520 10965 11092 + 127 Model Projection is T 11264 H172 OCP 11250 H158 10C 11220 H128 5C 11194 H102 3C 11162 H70 AVG 11218 H126 H means High * excludes hospital school L means Low 37 Attachment II . B . 3 Section II (page 4 of 4) Chapel Hill / Carrboro School District School Membership 2006 =2007 School Year ( November 15 , 2006 ) Statistical Findings PROJECTION TYPE ABBREVIATIONS ` TISCHLER ' LINEAR (T ) 10-YEAR COHORT ( 10C ) ORANGE COUNTY PLANNING ( OCP ) 5 -YEAR COHORT ( 5C ) 3 - YEAR COHORT ( 3C ) Elementary School Level • All projections were high by between 15 and 74 students over the actual November 15 , 2006 enrollment . The average projection was 32 students higher than the actual membership . • The membership actually increased by 101 members between November 15 , 2005 and November 15 , 2006 . Middle School Level • All projections were high by between 50 and 68 students over the actual November 15 , 2006 enrollment . The average projection was 61 students higher than the actual membership . • The membership actually increased by 20 members between November 15 , 2005 and November 15 , 2006 . High School Level • Projections were mixed ( high and low ) ranging from a low of 14 to a high of 90 . The average projection was 33 students high . • The total membership actually increased by 6 members between November 15 , 2005 and November 15 , 2006 . TOTAL • The total of all school level projections were all high by between 70 and 172 students . The average projection was high by 126 students . • The membership increased in total by 116 students , which is the sum of + 101 at Elementary , + 20 at Middle , and + 6 at High . 38 Section II C . Student Projections 1 . Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Planning Directors , School Representatives , Technical Advisory Committee ( SAPFOTAC) and referred to the BOCC for annual report certifications . Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. 2 . Definition — The result of the average of the five student projection models represented by 10 year numerical membership projections by school level (Elementary, Middle , and High) for each school district (Chapel Hill/Carrboro School District and Orange County School District) . 3 . Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District The 5 model average discussed in Section II . B The 5 model average discussed in Section II . B ( Student Projection Methodology) ( Student Projection Methodology) See Attachment II . C . 4 See Attachment II . C . 3 (Note : A change in Methodology is proposed (Note : A change in Methodology is proposed — see Section II . B) — see Section II . B ) 4 . Analysis of Existing Conditions The membership figures and percentage growth on the attachments show continued growth in both systems . Variability by school level and between the School Districts is also noted . Year-by- year percent growth is shown on the attached table as well as the projected LOS . The projections models were updated using current (November 15 ) memberships . Ten years of student membership were projected thereafter . 39 Section II Please note that the information contained in this report relates to existing school certified capacities . Capacity changes related to DPI (Department of Public Instruction) legislation affecting elementary school class sizes have been proposed for implementation in both school districts the year after the next elementary school opens which is anticipated to be CHCCS Elementary School # 10 in 2008 - 09 . When the reduced class size capacities go into effect, the result is 262 fewer seats available in CHCCS and 228 fewer seats available in OCS . Attachments 111 . C . 3 and H . C . 4 implement the reduced class sizes in grades K through 3 in 2009 - 10 . The SAPFO MOUs require that if overcapacity is reached at one or more levels within a school district, residential development approvals within that school district must be deferred until such time that student membership does not exceed capacities . Chapel Hill Carrboro School District Elementary The previous year (2005 ) projection for November 2006 at this level was overestimated by 32 students . The actual growth was + 101 . Over the previous six (6) years , this level has shown varying increases in growth . From 2001 until 2003 , growth steadily increased ; however, in 20049 the increase suddenly fell to an increase of only 3 additional students . The following year (2005 ) , student membership increased by 184 students . Projections done this year assume the opening of Elementary School # 10 in 2008 - 09 and show the need for Elementary School # 11 in 201041 . The need for Elementary School # 11 was moved up 1 year from 2011 - 12 due partially to the implementation of reduced class sizes in grades K through 3 and to the large increase in student membership that past two years , which factors into future projections that are based on historical growth . Although the projections assume an opening date for Elementary School # 10 in 2008 - 09 , an opening date of 2009 - 10 may be more realistic due to approvals that need to occur and construction time . If Elementary School # 10 does not open until 2009 - 10 , the result could be an 40 Section II overcapacity situation at this level during the 2008 - 09 school year . In accordance with the MOU and implementing regulations , CAPS (Certificate of Adequate Public Schools) would not be issued during a period of overcapacity. This means that development approvals for new residential structures could not be made for projects expected to generate students during periods of overcapacity. Middle The previous year (2005 ) projection for November 2006 for this level was overestimated by 61 students . The actual membership increased by 20 . Over the previous six (6) years , growth decreased precipitously from 214 to 68 to 4 , to —52 and then saw modest increases on + 12 and +20 . The projection models at this level were all high due to the precipitous decrease in actual student numbers for four years followed by modest increases . This year ' s continued modest increase has pushed back the projected need for Middle School #5 by one ( 1 ) year to 201344 , last year ' s projections predicted the need for Middle School # 5 in 2012 - 13 . High School The previous year (2005 ) projection for November 2006 for this level was overestimated by 22 students . The actual membership increased by + 6 . Over the previous six (6) years , growth has varied from a high of 199 students to this years low of 6 students . Actual real estate market conditions can suppress historical and mathematical trends , which is likely the case in all three school levels within the school system . Carrboro High School is expected to open in 2007 - 08 and the projections show a need for additional High School capacity in 201647 . This new projection pushes back the need for additional capacity by two school years ; last year ' s projection showed additional capacity at this level would be needed in 201445 . Additional High School capacity is expected to be achieved by expanding Carrboro High School from 800 students to 1 , 200 students , as was included in the construction plans for the high school . 41 Section II Orange County School District Elementary The previous year (2005 ) projection for November 2006 at this level was underestimated by 6 students . The actual membership increased by 66 students . Over the previous six(6) years , this level has experienced erratic enrollment which changed from - 185 to + 8 to +44 to +71 to — 10 to + 66 students a year . This created a historical base of negative growth which was captured by the various mathematical models to produce moderate growth projections . In the Orange County school system, historic growth is more closely related to development than in the Chapel Hill- Carrboro School District, which has a sizeable number of new families in older, regentrified housing stock. Therefore , development activity should be monitored off- line as a harbinger to student growth on a more equal level to historically based mathematical models . The need for an additional Elementary School is not anticipated in the 10 -year projection period . However, staff is closely monitoring new sizeable residential projects in the Orange County portion of Mebane and Hillsborough . Middle The previous year (2005 ) projection for November 2006 for this level was overestimated by 13 students . The actual membership decreased by 13 . Over the previous six (6) years , growth has varied widely and included an unexpected decrease of 78 students in 2004 - 05 with smaller decreases each year since ' 04 - ' 05 . However, certain models did reflect the negative growth (- 185 ) at the elementary school level in 2001 - 2002 as they progress into the middle school cohorts . Accordingly, the previously noted elementary growth (positive and negative) matriculated into slow continued growth at the middle school level . The district ' s third Middle School, Gravelly Hill Middle School, opened in October 2006 . The need for an additional Middle School is not anticipated in the 10 - year projection period . 42 Section II High School The previous year (2005 ) projections for November 2006 for this level underestimated by 29 students . The actual membership increased by 63 . Over the previous six ( 6) years , growth was relatively constant Even though 4 - year historic growth at the high school level is moderate and recognizable , future projections are more moderate because of the slowing of growth at the elementary and middle school levels . The need for an additional High School is not anticipated in the 10 -year projection period . Additional Information for Orange County School District The City of Mebane lies partially within Orange County and students within the Orange County portion of Mebane attend Orange County schools . However, the City of Mebane is not a party to the SAPFO agreement and therefore does not issue CAPS (Certificate of Adequate Public Schools) . In previous years , development activity within the Orange County portion of Mebane was minimal . However, development activity and platting of new subdivisions has been steadily increasing over the past two years . At this time , there are approximately 1 , 450 undeveloped but expected residential dwellings within the Orange County portion of the City of Mebane . Development of these dwellings is expected to generate approximately 365 additional students (over the three school levels) at current student generation rates . Studies need to be completed to determine if development with Mebane generates students at the same rate as other development within Orange County. There are some reasons to believe that development within Mebane actually generates students at a greater rate . However, without completion of a study, this is only speculation . Orange County expects to contract with a consultant to update student generation rates and school impact fees in mid 2007 . Increased coordination with the City of Mebane regarding development issues may be necessary in the future . OCS currently has capacity to serve additional growth, but it is possible that rampant development in the Orange County portion of Mebane could quickly encumber available capacity. 43 Section II 5 . Recommendation - Use statistics as noted in 3 above 44 CWPINe oy : Ounces County Budget Olffte OCS Student Projections (' ] (4) 113470A0 Bennentary School Year 2000.01 2001 -02 1 2002-03 2003-04 2004-05 2005-06 200647 2007-08 2006-09 200940 2010-11 2011-12 201243 201114 20144S 2015.16 Actual 3 078 2.893 2 901 2 945 3,016 3,006 Tiscttler r' 3 064 3, 122 3 179 3 237 3,295 3 353 3 410 3 468 3 .526 3 5B4 OC Planning 3 085 3 164 3 247 3 332 3 419 3 510 3 ,604 3 701 3 801 3 904 10 Vear Growth 3 063 3 135 3 176 3 231 3 238 3 270 3 303 3,336 3 ,369 3 403 5 Year Growth 3 054 3 115 3 142 3 , 187 1 3 181 3 213 3 245 3 27A 3 310 3 344 3 Year Growth 3 ,0665 3 ,135 3 166 1 3 217 3 213 3 245 1 3 278 3 311 1 3 344 3 377 Average 3100 3,134 3 182 3,241 3 269 3 318 32368 9 419 3,470 9 522 Annual Change - Increase Decrease in Actual 8 Projected Membership) 6 44 71 60 68 48 59 28 49 5o 51 51 52 G - 100% Level of Service 3 820 3,820 3 820 3 820 3 820 3,11)20 3 920 3 920 ] 637 3 637 3 617 3 677 3 637 3 637 3 637 31637 Number of Students Actual and Projected, Over Under 100% LOS 421 (9271 ISIS) 67 804 914 88 396 '319 2M ' 16 105% Level of Service - 4011 4AII 4011 4a§l1 4011 41,1114 4116 116 1 3 19 3819 1 3919 3819 SA19 3812 3819 3919 Number of Students, Actual and Projected, Over Under 105% LOS 933 ( 1 .1161 . 110 (1 99 (1 ,110) 1 982 6371 578 i5.`; :;. ' Sol ) 431 . 49 '2961 Actual - % Level of Service 80.6% 75.7% 75.9% T7A % I 79.0% 76.7% Average - % Level of Service 78.2% 80.o% 87.5°/a 89. 1 % 89.9% 91 .2% 92.6% 94 .0% 95,4a/o 96.80h Annual Student Growth Rats (7 .6.01% 028% 1,�Ya 2.41% a&33% 2.00% 2M% 1 .53% 0.80% 1 .50X 1 .50% 1 .51% 1 .50% law add0onal I:A new scars 3, Hill;ppouah Elemmrary OCS Student Projections(' ) Middle School Year 2000-01 1 2001 -02 2002-03 2003-04 1 200405 1 2005-06 1 200&07 200748 116 20MIO 2010.11 2011-12 2012.13 2013.14 2014.15 201546 Actual 1 504 1 ,527 1 .631 1 ,671 1 .593 1 .590 Taschler 12' L620 1 650 11711 1 .742 11772 1 803 1 833 1 8&t 1 894 OC Planning1 611 1 638 1 695 1 725 1 755 1 786 1 819 1111511 1 BBS 10 Year Growth 1 561 1 547 1538 1 821 1 648168ti 1 678 1 895 1712 5 Year Growth 1 572 1563 1 556 1 640 1 653 1 683 1 661 1677 1694 3 Year Growth 1581 1579 1 588 1 ,682 1 .6981 1 736 1 715 1 .7321 1 749 Average 1 569 1 595 1 S92 1 616 1 682 1 705 1 739 1 t741 1 764 1 787 Annual Change - Increase Decrease in Actual 8 Projected Membership) 23 104 40 6 26 64 23 34 2 23 A166 Capacity - 100% Level of Service 1 466 1 466 1 ,466 1 .466 1 466 1 466 2 166 2 166 2 lSfi 2 166 2 166 2 166 2 166 2 166 2 166 Number of Student Actual and Projected, Over Under 100% LOS 39 61 165 205 127 124 107% Level of Service 1 569 1 ,569 1 569 1 569 1 569 1 569 2 318 a 2 318 318 2,311 1 2 318 1 2lilt 2 318 1 2 318 1 Z318 2 318 Number of Student Actin and Projected Over Under 107% LOS 62 102 24 21 Actual - 04, Level of Service 102 6% 104 .2% 111 .3X 114 . 0% 10870/ol 108.5% Average - % Level of Service 73.4% 1 73.74'a 1 715% 1 74.7°/, 77 .7% 78.7% 80.3% 80.4% 81 .4,5 82.5% Annual Staderd Growth Rat (3) 1 .S%% 6181%1 2.4SX -4.6ml 41.19% -0.04%1 0.40% oft3% 1 1 .62% Im% 1 0.11% 1 1 .UM mk$dr rchool e3 opens in fvi 2006 wmi 700 aCmoonai seam OCS Student Projections (' ) High School Year 2000-01 2001 -02 2002-03 2003-04 2004-05 2005.06 2006-07 200748 200609 2009.10 2010=11 201142 201243 2013.14 2014.15 2015,16 Actual 1 ,672 1 .753 1 ,828 1 , 887 2,057 2. 124 Tischler izj 2, 162 2 2 2 284 2 325 2 366 2 406 2,447 2 488 2 529 OC Planning 2, 160 2 198 2 2 279 2 322 2 ,366 2 ,411 2,457 2 504 2 552 10 Year Growth 2 138 2 061 2031 1 953 1 ,913 1 940 1 916 11998 2 047 2 ,073 5 Year Growth 2 170 2 150 2 152 2 087 2 O57 2,089 2 ,061 2 150 2 190 2 206 3 Year Growth 2 147 2 130 2 145 2 094 2 074 2, 118 2, 100 2,202 2 250 2 .271 Average 2 1 SS 211 2 162 2 139 2 138 2 176 2 179 2,251 1 2 296 2 326 Annual Chanae - Increase Decrease in Actual 6 Projected Membership) 81 75 59 170 67 31 13 38 3 72 45 30 G ci - 100% l.ewlofService 1518 1518 2516 2518 2516 518 2518 2516 2518 2518 2518 2518 518 2513 2518 Number of Student, Actual and Projected Over Under 100% LOS 154 235 690 631 '356 379 30C . 339 67 (222 . �2 110% Level of Service 1 670 1 ,670 2,770 770 2 770 2394 X770 I 2 770 2 770 2.770 1 2 770 2 770 770 2770 770 2,770 Number of Student Actual and Projected Over Under 110% LOS 2 83 "942 483 43 1646 614 6J81 '63C` 432 591 '� 79' 474` '444 Actual - % Level of Service 1 110. 1 % 115.5% 1 72,6% 1 74.9% 1 81 .7% 84.4% Average - % Level of Service85.6% 85.3% 85.9% 849% 1 86.4% 1 86.5% 89A% 91 .2% 92.4% Annual Student Growth Rat (3) 4.94%1 4.28%1 3.23%1 9.01%1 3.26% 1 1 ,43%1 mO,32% 1 0,62%1 el,04%1 1 .76% 1 0,14%1 3.30% 200%1 1 .32% Q cedar Moe hch opens with 1,000 seas in fan 2002 Q Indicates fast year that district surpasses $Ch0015 APFO recommended Level of Service Vt 11u 0 is important to note that this reflects the November 15, 2005 date of membership as outlined in by the Schools Adequate Public Facilities Ordinance. It does not include CHCCS students attending the HOspital School. rzu The Tischer Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used in prior years projection models included the linear Extrapolation Method' for CHCCS. CD real Annual growth rate calculated using actual membership for years 2000-01 through 2005-06 and average membership for years 2006-07 through 2015-16. ZS c° Class saes for grades K-3 = 123 for school years 2006-07 and 2007.08. In accordance with 2005 School Collaboration Work Group direction, wrth planned opening of CHCCS Elementary #10 in school year 2008-09. K-3 class sizes for school years 2008-09 through 2015-16 reflect 1 :21 as directed by past State legislative action. This results in OCS 1--I elementary capacity reduction (district wide) of 297 seats (decreasing from 4 , 116 [105% LOS Q 1 :23 Gass size] to 3,819 [105% LOS ® 1 :21 class size]). !-1 l 1 'T' c"im by orwoo county 9u*wt Once 03/O M CHCCS Student Projections (1 ) (4) Elementary School Year 2000-01 2001 -02 2002-03 200344 2004-05 2005-06 i4'999 2007-09 2006-06 20M-90 2010.11 2011.12 201243 2015.14 201416 2015.16 Actual 4,444 4 ,474 4 ,551 4,692 4 fi95 4 ,878 Tdchler (2i 5 , 146 5 279 6 413 5 5" 6 679 5 813 5 946 6 090 fi 213 OC Planning 5 115 5 205 5 287 5 380 5 460 6 540 5 6" 5 749 5 853 10 Year Growth 5 275 5 425 5 524 5,688 5 745 5 802 5 8W 5 919 5 B78 5 Year Growtn 5 172 5 280 5 342 5 476 5 531 5 586 5 642 5 698 5 755 3 Year Growth 5, 178 5 ,292 5,361 5 499 6,654 5.610 5 ,666 5.722 5.7110 kiperatio 40il9177 SM BASS S 619 6 U4 50670 S 752 S 934 6914 Annual Change • Increaea Decrease In Actual i Pro ectad Membership) 30 77 141 3 194 133 1 " lit 99 132 76 76 at 82 92 CaLmckly - 100% Level of Senrke LOS 4 302 4 302 4.302 4je 4 921 4 921 4 921 4 921 5 59 5 259 5 259 3 259 6 256 51259 Sx2511 S 216 Number ofS Ached and Projected, Over Under 100% LOS 142 172 246 229 2:. .>) ( 1 99 256 37 129 25e 915 411 N3 575 95! Capacity • 109% Level of Service LOS 4 517 4 617 4,517 5197 5167 5 167 5 167 5 167 5,522 51522 6 522 5 522 5 922 5 522 3 322 5 522 Number of Students Actual and Pro d Over Under tOSX Los (sir ) 475) _ - - 10 , �71 ! ! 72 1M 230 312 354 Actual - % Level of Service 103 3% 104-0% 105.8% 95.3% 95 4% 99. 1 % - _ Aver e - % Level of Service _ 101 .8X 105.2°/ 100.76h 1 .4% 104.94'° 106.4°� 107 .8% 109.4% 110.9% 112.5% AIV" Stadwd Growth Rob 3) 1 .72% itY% 3.62% L70% 1 2,49% 1.79% 1 .3TA 1 .M% 1471E 1A1% Elmnebry 09 ope-e h W 2003 weh addennal 619leans For No ben 150 2➢05 Certdred U Wary 6kdatora, 0406 proles Etrmenrry e10 opening for school year 200a-09. In acco dancs with B= adopted Schod Corutrumon Standards, elementary school capanry totals 600 sa°darrta. iasperdet Nebo: par 2005 aareewnt of Sraool Coltaberad" Wort Groep, Grades K-3 close sin replaced &am 1:23 to 3:21 with opening of Vellum" $10 (to allow for prior CHCCS Student Projections 11 ) lyialaWe Adel ra: noloced ctaes erne) Middle School Year 1 2000-01 1 2001 -02 1 2002-03 1 2003-04 1 2004-05Jr21653 2007-09 2006-09 2009=10 2010.11 2011A2 2012.13 2093-14 201415 201576 Actual 2.326 2 540 2,608 2 ,612 2,560Tuchier (2) 2713 2,783 2 853 2924 2994 3064 3 135 3205 3 .275 OC Plato 2730 2802 2872 2 .929 2 999 3069 3 , 114 3 158 3,202 10YearGrovrth 2660 2747 2872 2 , 983 3122 3204 3356 3390 3 ,424 5 Vear Growth 2645 2 720 2,817 2900 2993 3031 3152 3183 3215 3 Year Growth 2 633 2694 2784 2869 2,966 3 014 3136 3 167 3199 Awra 2,676 2 749 2 640 2 921 3 015 3 076 3179 39221 3v263 Annuol Chan as Increase Decrease in Actwl B Projected Membership) 214 N 4 12. 61 21 73_ 90 6 94_ 62 102 42 42 Capacity - 100% Lewl of Service [ 2 106 94 2 0 940 2 U0 2111140_ - 2 940 NO 2 640 2 MO 2 640 2 640 2 NO 2 "0 2 B" Number of Studearday Actual and Projected, Over Under 100% LOS 218 (300) (232) (228) (280 268 18 164 m (G 91 17S 236 339 341 423 107% Laval of service 2,256 ] 039 ! M ] 039 34039 3 030 3 039 soon 3 M 3 039 ] oL = 3 039 3 039 ] 039 3 039 Number at Students, Actual and Projected, Over Under 107% LOS 70 - _ ) 431 ) (327) di75 ', "71 {.' ;S (:. {� 24i 39 140 1@ 224 Actual - % Level of Service 110.3% 89.4% 91 .8% 92.0% 90. 1 % 90.6% Ave e - % Level of Service 3.4% 1 94.2% 1 96.8X 100.0% 102.9% 106.2% 108.3% 111 .9% 113 .4% 114 .9% � 939% 92. 91E 0.191E - d - l.1 . . . .. - . . - . _ - - -. - 4 . 1 IJI CHCCS Student Projections [1 ) High School Year 2000-01 1 2001 -02 1 2002-03 1 2003-04 2004-05 1 200S-06 200947 2007-05 2006-06 2009.lO 201041 2011 .12 2012.13 2013•'14 2014=15 2095.16 Actual 2,815 2 963 3 , 162 3330 3.422 3,514 Tischler '31 3,610 3 706 3 B02 3 898 3 ,994 4 091 4 187 4 283 4 ,379 4 ,475 OC Planning3 600 3 ,675 3 ,768 3 857 3 946 4 036 4,126 4 ,217 4 308 4 ,400 10 Year Growth 3 506 3 573 3 608 3 616 3 665 3 768 3 939 4 ,011 4 254 4 411 5 Year Growth 3 536 3 619 3 656 3 676 3 ,708 3 788 3 941 3 969 4 155 4.264 3 Year Growth 3 513 3,568 3 601 3 615 3 632 3,706 3 843 3 ,870 4 057 41170 Average 3 553 3 628 1687 ] 732 3 789 1 1978 4 007 4,070 4r231 4 344 Annual Change - Increase Decrease In Actual i1 Prollacted Membsrshl 149 1 " 1 " 92 92 39 75 59 45 57 69 129 63 161 113 Capacity - 100% Level of Service 31035 3035 3 0]5 11035 ] 035 31035 ] 015 ] ig35 ] itf6 J 9J5 3935 ! 93b ] 9]615 ] 9]5 9 9J5 3 6 Number of Stuclennta Actual and Projected Over Under 100% LOs 220 127 295 397 479 519 D 48 103 46 43 172 235 396 509 110% Level of Service 3r= 3JM ] 339 34339 3 339 9 339 J 339 41219 4 4 9 4 19 4 219 4 219 4 191 41219 42219 lhlumbsrofStudonts Actual and Proischadp Over Under 110% LOS 324 378) (ITn L I 63 176 215 500 532 G 430 12 1 126 Actual - % Level of Service 1 92.8% 97.6% 1042% 109.7% 1126% 1 115 .E Aver e - % Level of Service 117. 1 % 94,9% 96.1% 97.3 98.8% 1 161 .1 % 1 104.5% 1D& 1 % I 110,3% 1 113 .3% : Ylr�ei 6rwr Rags p) S ]1% Z 2 w u 12J% 1 .52% Uu%i &34% 1 smi 3 "llil 2AK n high school e3 opens in NY 20117 we a00 addoorW .-.- indicates first year that district surpasses Schools APFO recommended Level of Service ON 1r ' It is important to note that this reflects the November 15, 2005 date of membership as outlined in by the Schools Adequate Public Facilities Ordinance. it does rot include CHCCS students attending the Hospital School. The Tuctuler Model provides for the "Linear Method' of projections for lath CHCCS and OCS. Original projections used in prior years projection modes included the -Linear Extrapolation Method' for CHCCS . Annual growth rate calculated using actual membership for years 2000-01 through 2005-06 and average membership for years 2006.07 through 2015-16. 1+1 Class sizes for grades K-3 = 1 :23 for school years 2006.07 and 2007-08. In accordance with 2005 School Collaboration Work Group direction, with planned opening of CHCCS Elementary 910 in school year 2008-09, K-3 class sees for school years 200"9 through 2015. 16 reflect 1 :21 as directed by past State legislative action. This z results in CHCCS elementary capacity reduction (district wide) of 275 seats (decreasing from 5,797 [105% LOS Q 123 class size] to 51522 [105% LOS ® 1 :21 class size)). Class see reduction results in need for CHCCS Elementary #11 to come online in school year 2011 - 12 ( 1 :21 ratio) compared to 2014-15 ( 1 :23 ratio). 1--1 1^-1 l 1 N Compiled by Orange County Budget Office 0129l07 OCS Student P:ojaclions ' " "' Capacity Figures Rovlsod by Planning Dept . on 522r07 Elementoro School Yoar 2000-01 2001412 200243 2003-04 2004-05it, 2006-07758 !40 2OW10 2010.1173,437' 201243 201344 201415 73,333 2016-17 Ar4uat 3.07E 29893 2.901 2,945 3,016 3,072 Trsrhl8r " 3247 3.306 3,423 3,481 3.540 3,857 OC Planm 3,240 3,334 3531 3,634 3,741 3,964 tO Year Growth 3, 181 3,165 3235 3,267 3, 300 3,386 S vearGrowfh 3.232 3.21E 3,282 3. 315 3.348 3,416 3 Yca• Growth 3,214 3,203 >,265 3. 302 3, 335 3,402 AwriDO 3,223 9,245 3,34ti 3.400 3,463 3,5f1 Annual Change • Increase (Dvcr:)ase1 in Actual 8 Projected Mornborsnip) 146 6 44 tits 53 zo 52 51 s2 53 55 Capacity - 100`/. Leval of Service L80 3,620 3120 3,820 3,820 3,920 3,920 3,920 3,920 3 ,694 3,694 3.694 3,604 30694 3,694 31694 3,694 Number of Studonls. Actual and Protected. Over (Under) 1009r LOS '92'1 819) (875 �041 f9141 \ 84u 1790+ 175d+ r39 .: nl 12841 (:di 1 - - 105% Level of Sorvlce 41011 4,W 48011 4,011 4,116 116 4*116 4,116 3,879 3,879 31gn 3,879 3,879 3179 3,879 3,879 Number of Students, Actual and Protected, Over (Under) 105% LOS (lolls '1 , 110' ( 10060 01110) 1 , toad1 (0401 e 6 16341 !.',tilt 1.37 1479 ;4261 1373) 316 Actual - °,. Lt�+^I of Service 75 7% 75 9% 77 1 % 75 0% 76 7b 78 4r,ti Aver„ye Level 01 S«rvic .b •: BC 94: 87 2 87.8% D9 3% 90 6% B2 0% 93 5% W 9% 96.4% nw u ni row o 80114 1. 2.41% -033% 1. 1 .26•f. ow000* 1 .BEit 0,49% 1 ,6 1. 1 .6 "l addiUcnal ] 00 new SedLS H,"nientdry OCS Student ProjeetionsM Middto School Yvar 2000-01 2001 -02 2002,0 1 2003-04 2004-05 2005-06 2006.07 200748 200849 20D94,010 2010.11 201142 2012-13 2013.14 201445 Z01S-16 2016.17 Actual 1 „v4 15:7 1 ,WI 1671 iti93 1 ,550 1500 TtStNer " ' 1 ,606 10636 1 ,666 1 ,696 1126 1 ,756 1 ,786 11816 1 ,846 11876 OC Plann,nr, 1 ,612 1 ,653 1 697 1 ,727 1 ,757 14769 1 ,821 1 ,854 1 ,888 1 ,923 10 1'e:a Growth 1 ,Se5 1 ,553 1 ,551 10631 1,631 1 ,656 1 ,623 1 ,t46 1 ,662 14679 5 Year Giawlh 1 ,605 1 ,592 1 .620 14728 1 ,755 1 ,787 1 ,753 1 773 1 . 790 I OW8 ? Yr•nr 1597 1 .5135 1605 1 .705 1 .723 1 ,750 I '2= 1 742 1 .750 10777 Avorago 10601 1 .604 1 ,629 1 ,07 lolls 1 ,748 1 , 741 10766 14789 1 ,819 Annual Change - Inava" (Dac•weo) in Actua, wv Protected Mombumhtpl 23 104 40 1 21 3 25 6b 21 29 26 23 24 Capacity - 100% Level of Somice 1 ,466 1 .466 7R66 IA66 1 a66 1 ,466 2,166 Z166 2A66 2.166 29166 2,16E 29166 20 % 66 2.186 2,166 2.166 Number of Students. Actual and Projected, Over (Undor110D% LOS 38 61 165 205 127 124 .;• 2Ll (56 ; (562) 537 '4e'9 '448) 4tdl 425 460' 1771 $3 107!6 Level of Sumco 1569 1 ,569 1 ,569 1 ,569 1 ,569 1569 2,318 318 2,31E 2,31E Z318 2.31E 2.31E 2,318 2.31E 2.31E 2,31E Number of Students, Actual and Projected, Over (Undor) 107% LOS 65) 142) 62 102 24 2} , 7361 (714) (689 fR0 ;5991 (570) 5 ^) 5511 %5291 'SOS Actual - ti, Level ar 1qo"L41.e 1026% 104 2% 11 t "Aro t 14 •i^, IUt+ i % I :�L� .S':, 72 S'b / - Averape - 'M Level of Set vti_ ?? tea \ 740!v 75 ? '�, ?8.4% 793% all 7% AC4°,;, tl1 .5% 82.6% 83. 7% nt 1.53% 6.619fi 2A5% •4.677G 0.19% -0.63N. 1 , 33% Owl'I% I5S% , d 1 1 .70% •U.38'4 7.4y1t. 1 " 1 middle school x3 oplsls in fall 2006 with 700 add,tianal scats OCS Sludunt Projoctionc i ° High School Yoar 1 2000-01 2001 -02 2002-03 2003*04 2004iliV 200607 2007.0E 2008.09 2OW10 2010-11 2011-12 20/b13 724 2014/5 2015016 201&16 Actual 1 ,672 1 .753 1 .828 1 ,887 2. t80 Tischiar-' ' 2,226 2267 2.309 2,351 2,392 2,434 2517 2,559 2,600 OC Planning 2.247 21309 2,345 2.381 2,419 2,456 2.537. 2,578 2620 1DYeat Growth 29138 2, 100 2.005 c .970 2,003 1 ,968 2,056 2063 2.088 5 Year Growth ^.. 167 2. I031 2 139 2 . . 27 2 192 2,194 2.359 2.387 2.414 3 Year Growth 1 .;fi 2 151 037 2 . 074 :> I23 2, 1212,259 2,281 2..303 AvvraOe2,} 85 G203 2 ,177 2, 183 ."0 ZoM , E 20346 2,374 Z405 Annual Change - Incmaso (Decruasvt in Actu,d 6 Pro{octud Memourshrpt 81 75 58 56 18 '2E) S 43 9 73 37 28 31 Capacity • 100% Leval of Service 1 ,51s 19518 2518 2.518 2 518 2,S18 2S18 2,51E 2.518 2051g24454182,518 2,516 20518 Z 78 2,S78 Mile Number of Students, Actual and Protected, Over (Under) 100% LOS 154 235 , n00 461 �, 333 43151 341 ) 12321 25b) (172) 1" (113 110!4 Level of Serv,,:e 1 .670 1 ,670 2.T70 \ 2,770 2,770 2,770, 2,770 2,770 Z770 2,77021770 Z770 , 2,770 2,770 Z770 2,770 Number of Students, Actual and Protected, Over (Under) 110% LOS 83 (942 883 r13 W6 590 ses 566 592544; (535 462 4240 '396 365 A�ual - °» Levc-I u1 Service i ' n IS° 1 77 bgo ;26% 74,90l6 at 7"9 tot •1% 86.6% Average - % Level of Sernre 96 8% V 5% 86 5% 884%ti 88 8% 91 1% 93 .2% N 3% 96 5% PWI Student rows to ) 484!: 4,28% 9.01 % 3,26%1 - 0,89r% •L164: - OA14. 3.2E 1 .62% wwO 1 ,19% 1 .3 Cedar rdge high opens with I,000 Wail sit fall 2W2 vldicata8 first year that district surpasses Sctlools APFO recommended Level of Sermce it' u ,s important to rote that this reflects Ine November 15, 2006 date of momborship as outlined in by the Schools Adequate Public Facilities Ordinance . It does riot Include CHCCS slucien7s attending the Hospital School F' The Tlschler Model provides for the 'Un"r Method" of Projections for troth CHCCS and OCS Original pojecions used in prior years proloctlon models included the linear Egrapolation Meince' (or CHCCS. " Annual growth fate calculated using actual momberstup for years 2000-01 through 2006,07 " average membership for years 2006.07 through 2016-17. j41 Class sizes for grades K,,3 = 1 :23lor school years 2006-07 and 2007-08. In accordance will) 2005 School Collaboration Work Group direction, with panned opening of CHCCS Eldmonlary 410 In school year 2008-09, K-3 class sizes for school years 2008.09 through 2015-16 reflect 1 :21 as directed by pa54 State teg,slauw Q apron. This rosu8s m OCS elementary wpacdy redlxtlOn (dlstncl wide) of 297 seats (decreasing from 4, 116 1105% LOS 123ssi ) l03,87910 % LOS .Fm 1 . 21 class sze)) 01 CD i--1 l 1 W J 2005 = 2006 Orange County Student Projections Elementary 2005-2006 ! 2006-2007 2007-2008 200&2009 20094010 2010-2011 2011 -2012 2012=2013 2013-2014 2014-2015 2015-2016 School Year Actual Membership 31006 31066 3 , 134 3 , 182 37241 3 , 269 31318 3 , 368 j 31419 3 , 470 31522 Average % Increase 2 , 00 % 2 . 22 % 1 . 53 % 1 . 85 % 0 . 88 % 1 , 50 % 1 . 50 % 1 . 51 % 1 . 50 % 1 . 51 % Middle 2005-2006 200&2007 2007-2008 200&2009 2009-2010 2010-2011 2011 -2012 2012-2013 2013-2014 2014-2015 2015-2016 School Year actual Membership 11590 1 , 589 11595 11592 1 , 618 1 , 682 17705 11739 11741 13764 1 , 787 Avers e % Increase -0 . 06 % 0 .40 % - 0 . 23 % 1 . 62 % 3 , 98 % 1 , 38 % 1 . 99 % 0 . 11 % 1 , 30 % 1 . 30 % Hi h School School Year 2005-2006 200&2007 2007-2008 2008-2 20 009 2009-2010 2010- 11 2011 -2012 ! 2012-2013 2013 -2014 2014-2015 M15-2016 actual Membership27124 27155 23148 2 , 162 2 , 139 2 , 138 2 , 176 21179 21251 2 , 296 21326 Average % Increase I 1 .48 % -0 . 32 % 1 0 . 62 % - 1 . 04 % - 0 . 06 % 1 . 76 % 0 . 14 % 3 . 30 % 2 . 00 % 1 . 32 % Chapel Hill / Carrboro Student Projections Elementary School Year 2005-2006 2006=2007 2007-2008 200&2009 20W2010 2010-2011 2011 -2012 2012-2013 2013-2014 2014-2015 , 2015-2016 actual Membership 4 , 879 51012 j 5 , 177 51296 51385 51518 51594 5 , 670 5 , 752 5 , 834 51916 Average % Increase 2 . 72 % 3 . 30 % 2 . 30 % 1 . 68 % 2 . 46 % 1 . 38 % 1 . 37 % 1 . 44 % 1 . 43 % 1 . 41 % Middle 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011 -2012 2012-2013 2013 -2014 ' 2014-2015 2015-2016 School Year (actual) f Membership 21572 21653 21676 21749 27840 2 , 921 3 , 015 33076 31179 3 , 221 37263 Average % Increase 3 . 16 % 0 , 86 % 2 . 73 % 329 % 2 . 87 % 3 . 21 % 2 , 04 % I 3 . 32 % 1 . 32 % 1 . 32 % High School 2005-2006 2006-2007 2007-2008 2008-2009 2009- 2010 2010-2011 2011 -2012 2012 -2013 2013-2014 2014-2015 2015-2016 School Year ( actual ) Membershi 31514 3 , 553 31628 3 , 687 3732 31789 31878 41007 41070 ! 4 , 231 41344 Average % Increase 1 . 11 % 2 , 12 % 1 . 62 % 1 .23 % 1 . 52 % 2 . 34 % 3 . 34 % 1 . 57 % 3 . 95 % 2 . 68 % o � o � v, n Source: Oran ,e County [3udget 5 Model Compilation liom PSTAC nxtnbcrs to determine average based on November 1 5, 3005 membership numbers and historical data N Orange County Planning and Inspections Department Extraction of Annual Growth Rate from Averages � (D d 2006 - 2007 Orange County Student Projections Elementary 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 ZOIi - 201 ? ' O1 ? -2013 3013 -2014 2014-2015 2015-20i6 ? Oib- 17 P School Year ( actual) Membership 31072 37130 3 , 170 31223 31245 31297 31348 31400 31453 31506 31561 Average % Increase 1 . 89 % 1 .28 % 1 . 66% 0 . 68% 1 . 61 % 1 . 55% 1 . 55% 1 . 56 % 1 . 55% 1 . 56% Middle 2001r2007 2007? 008 2008- 2069 2009-Z010 2010-2011 2011 -2012 2012 - 2013 2013-2014 2014- 20i5 2015-2016 2015- 17 actual _ Membership 11580 15601 11604 17629 1 , 697 1 , 718 11748 11741 11766 11789 1 , 813 Averagre % Increase 1 . 33 % 0 . 17% 1 . 55% 4 . 22 % 1 .24 % 1 . 70% .0 . 38 % 1 .45% 1 .29% High School 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011 -2012 21012 -2013 2013-2014 2014-2015 2015-2016 201b- 17 School Year (actual ) Membership 27180 21185 21203 21177 27183 21226 21235 21308 21346 21374 21405 Average % Increase 0 .22 % 0 . 85 % - 1 . 18 % 0 .24% 1 . 98% 0 .41 % 3 .28 % 1 . 62 % 1 . 19 % 1 . 32 % Chapel Hill / Carrboro Student Projections Elementary 2006 2OU7 2007-2008 2008- 2009 2009-2010 2010-2011 2011 -2012 2012-2013 2013-2014 2014-2015 2015-2016 201647 School Year actual r Membership 41980 51142 51273 53389 51541 51654 51739 5 , 825 5 , 912 5 , 998 67086 Averse % Increase 3 .25 % 2 . 55 % 2 . 20 % 2 . 81 % 2 .04% 1 . 51 % 1 .49 % 1 .49 % 1 . 47 % 1 .46 % Middle 2006-2007 2007-2008 2008-2009 2009-2010 3010-2011TDUNM12 2012-2013 2013 -2014 2014-2015 20i5-20 ! 6 2016- 17 School Year actual Membership 2 , 592 2 , 622 21686 21772 21833 1 21902 29989 3 , 108 31185 31226 31267 Averse % Increase 1 . 17% 2 .43% 3 .20 % 2 . 22 % 2 .42 % 3 . 00 % 3 . 99 % 2 .48 % 1 . 28 % 1 .26% High School 2006-2007 2007-2008 2008 -2009 2009-2 School Year 010 2010-2011 j 2011 -2012 2012 -2013 2013 ? 014 f 3014-2015 1 2015-2016 2016- 17 Membership (3e520) 3 , 599 31648 3 , 659 31704 j 3 , 787 31884 31948 42068 I 41196 4 , 305 6 CD Averse % Increase 2 . 24 % 1 . 38 % 0 . 29 % 1 . 24 % 2 . 23 % 2 . 56 % 1 . 65 % 3 .06 % 3 . 14% 2 . 59 % .��. N O CD O J �-r Source: Orange County Budget 5 Model Compilation from PSTAC members to determine average based on November 15, 2006 membership numbers and historical data Orange County Planning and Inspections Department Extraction of Annual Growth Rate from Averages N E . Student / Housing Generation Rate 1 . Responsible Entity for Suggesting Change — The updating of this section will be conducted by Plannrectors , School Representati ing Dives , Technical Advisory Committee ( SAPFOTAC) and referred to the BOCC for certification . Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification . 2 . Definition - A projected number of students that are generated from two different types of housing, " single - family" and "other" . Single - family also includes double-wide or greater manufactured and modular homes . " Other" includes multifamily and single - wide mobile homes . The standards were created during the Tischler and Associates School Impact Fee Report of February 2001 . 3 . Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District See Attachment II . E . 1 See Attachment II . E . 1 4 . Analysis of Existing Conditions Orange County expects to enter into a contract with Tischler & Associates in mid 2007 to update the student generate rate analysis and impact fee levels . Also , note that students are generated from new housing as well as from existing housing where new families have moved in . The CAPS system estimates new development impacts and associated student generation but it is important to understand that student increases are a composite of both of these factors . This effect can be dramatic and can vary greatly between areas and districts where either new housing is dominant or new families move into a large inventory of existing housing stock . Section II 5 . Recommendation — No change Use Tischler Generation Rates (2001 ) until alternate rates are developed and endorsed . 53 con n O ti Tischler Student Generation Rates Orange County Schools Elementary Middle High All Grades Sin le4amil 0 . 150 0 . 075 0 . 084 0 . 309 Other 0 . 084 0 . 033 0 . 030 0 . 147 All Housing Types 0 . 140 0 . 068 0 . 076 0 . 284 Chapel Hill- Carrboro Schools Elementary Middle High All Grades Single4amily 0 . 168 0 . 095 0 . 123 0 . 386 Other 0 . 094 0 . 042 0 . 043 0 . 179 All Housing Types 0 . 134 0 . 070 0 . 086 0 . 290 Source: 2001 Student Generation Rate and School Impact Fee Report by Tischler & Associates Section III III . FLOWCHART OF SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PROCESS Abstract : The Schools Adequate Public Facilities Ordinance process has two distinct components . A . Capital Investment Plan ( CIP ) (Process 1 ) Timeframe : In November of each year, Student Membership and Building Capacity is transmitted from the school districts to the Orange County Board of Commissioners for consideration and approval and used in the following years CIP (e . g . November 15 , 2004 membership numbers used to develop a CIP to be considered for adoption in June , 2005 ) . Process Framework 1 . SAPFOTAC projects future student membership from historical data, current membership and hypothetical growth rates from established methodologies . 2 . School Districts and BOCC compare projections to existing capacity and proposed Capital Investment Plan . 3 . SAPFOTAC forwards data and projections to all Schools APFO partners . 4 . School Districts develop Capital Investment Plan Needs Assessment during this process 5 . The Capital Investment Plan work sessions and Public Hearings are conducted by the BOCC in the spring of each year. 6 . The adoption of CIP that sets forth monies and timeframe for school construction (future capacity) by BOCC . 55 Section III School Adequate Public Facilities Ordinance Process I - Capital Investment Planning ( CIP ) CIP CAPS Projection Method Approval System2 (Historical Membership ' (Proposed New Construction (Certificate of plus Hypothetical Growth Rate i . e . School Capacity Adequate Public Added by number seats & year) Schools T Actual Adjustments (Current Year Actual Replaces Past Year Membership Proi ection) ' Historical Membership is a product of students generated from: ( 1 ) pre-existing/approved undeveloped lots where new housing is built, (2) existing housing stock with new families/children, and (3 ) newly approved housing development (in the future this component will be known as CAPS approved development) CD 2The only part of the CAPS System (i . e . , computer spreadsheet subdivision tracking) that receives data from the Process 1 CIP includes the actual membership (November 15 of preceding CIP year) and new school capacity amount (seats) in a specific year pursuant to the CIP . 56 Section III B . Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) Update (Process 2 ) Timeframe : The CAPS system is updated approximately November 15 of each year when the school districts report actual membership and ` pre- certified ' capacity, whether it is CIP associated or prior `joint action ' agreement . ` Joint action ' determinations of changes in capacity due to State rules or other non- construction related items are anticipated to be done prior to the November 15 capacity and membership reporting date . This update may reflect the Board of County Commissioners action on the earlier year Capital Investment Plan (CIP) as it affects capacity and addition of new actual fall membership . The Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS ) stays in effect until the following year — (e . g . * November 15 , 2005 to November 14 , 2006) . New development is originally logged for a certain year. As the CAPS system is updated , each CAPS projection year is ` absorbed ' by the actual estimate of a given year . Later year CAPS projections of the same development remain in the future year CAPS system accordingly. For example, if a 504ot subdivision is issued a CAPS , 15 lots may be assigned to "Year l , " 10 lots to "Year 2 , " 10 lots to "Year 3 , " 10 lots to "Year 4 , " and 5 lots to "Year 5 . " When "Year 1 " is updated, the students generated from the 15 lots are absorbed by the actual estimate . The students generated in "Years 2 , 3 , 4 , and 5 " are held in the CAPS system and added to the appropriate year when the CAPS system is updated . As was discussed in Section II . C , The City of Mebane is not a party to the SAPFO and does not issue CAPS . However, residential development within the Orange County portion of Mebane has increased dramatically in the last two years and over 1 , 000 residential lots are currently undeveloped . Increasing development within this area of the county has the potential to encumber a significant portion of the available capacity within the Orange County School District . 57 Section III Please note that the two processes (CIP and CAPS ) are on separate but parallel tracks . However, the CIP does create a crossover of capacity information between the two processes . For example, the Schools APFO system for both school districts that will be established / initiated / certified each year in November and is based on prior year created and / or planned CIP capacity and current school year membership . The SAPFOTAC report including new current year membership and projections are to be used for upcoming CIP development as noted in Process 1 . CIP Process 1 (for CIP 2007 — 2017) November 2006 — June 2007 (using 2006 SAPFOTAC Report) Schools APFO CAPS Process 2 (for Schools APFO System 2006 — 2007) November 2006 - November 2007 58 Section III School Adequate Public Facilities Ordinance Process 2 - Certificate of Adequate Public Schools ( CAPS ) Allocation 2007 CAPS system is effective November 15 , 2006 through November 14 , 2007 . The system is updated with new membership , CIP capacity changes , and any other BOCC/ School District joint action approved capacity prior to November 15 , 2006 . This information is received within 5 days of November 15 and posted within the next 15 days . This CAPS system recalibration is retroactive to November 15 , 2006 . CAPS Allocation System CAPS System 1 . Certified Capacity AC2 = Sc2 - (ADM2 +ND 12 +ND22+ . . . 2 LOS Capacity 3 . Actual Membership 4 . Year Start Available Capacity 5 . Ongoing Current Available Capacity (includes available capacity decreases from approved CAPS development by year) AC ! 0 - Issue CAPS 6 . CAPS approved development a. Total units AC < 0 - Defer CAPS to later date b . Single Family' c . Other Housing ' ' Student Generation Rates from CAPS housing type create future membership estimate . Please note that this CAPS membership future estimate is different than the projection based on historical data and projection models used in the CIP process 1 . This estimate only captures new development impact, which is the component that the SAPFO can regulate . 2AC - Available Capacity - Starts at Annual Update Capacity and reduces as CAPS approved development is entered into the system. SC - Certified School Level Capacity ADM - Average Daily Membership ND - New Development ; ND means first approved CAPS approved development 59