Loading...
HomeMy WebLinkAboutOUTBoard agenda 112818 AGENDA Orange Unified Transportation Board November 28, 2018 6:30 p.m. You can bring your laptops/tablets if you would like to use them. West Campus Office Building 2nd Floor Conference Room 204 131 West Margaret Lane, Hillsborough *PLEASE NOTE CHANGE IN LOCATION* Page Item Title 3 1. 2. 3. 4. 5. 5.a. 5.b. 5.c. 6. Call to Order, Determination of Quorum, and Introductions of New Members Election of New Chair/Vice-Chair - The annual terms for the current Chair and Vice Chair are concluding; new appointments are needed. Approval of Minutes from September 19, 2018 and October 17, 2018 Consideration of Additions to the Agenda Transit Advisory Services/Orange County Public Transportation (OCPT) This section of the agenda is addressed jointly by the OUTBoard and supplemental staff from other County departments (Aging; DSS; Housing, Human Rights and Community Development; Health; and Child Support Enforcement) to address transit services. OCPT Administrative Updates (Theo Letman) – Information to be provided at the meeting. OUTBoard/Transit Advisory Services Action: Receive and review information, provide comments OCPT/OCCO Update (Allyson Coltrane) - PowerPoint presentation to be presented at the meeting. OUTBoard/Transit Advisory Services Action: Receive and review information, provide comments. Transit Advisory Services (TAS) Comments/Questions (Theo Letman) - Opportunity for TAS members to offer transit related comments and ask questions regarding issues not on the agenda. OUTBoard/Transit Services Action: P rovide comments and q uestions, receive feedback. Regular OUTBoard Agenda (Action Items) 15 27 35 37 49 6.a. 6.b. 7. 7.a. 7.b. 7.c. 8. Annual Report (2018) and Work Plan (2019) (Abigaile Pittman) - To discuss the OUTBoard Annual Report 2018 and Work Plan 2019 for the annual Board of County Commissioners (BOCC) planning retreat in early 2019. The Annual Report informs the BOCC of the past year’s activities of advisory boards/commissions and assists in overall County work planning for 2019. OUTBoard Action: Receive the information and provide any comments or direction that the Board might have; approve the annual report and work plan; and forward to the BOCC. Bicycle Safety Implementation Subcommittee Report (Abigaile Pittman) OUTBoard Action: Receive the information and provide any comments or direction that the Board might have. Staff Updates MPO/RPO NCDOT Project Updates (Abigaile Pittman) OUTBoard Orientation Materials (Abigaile Pittman) Call for High Impact – Low Cost Projects (Abigaile Pittman) Adjournment – There will be no meeting in December. The next regularly scheduled meeting date is January 16, 2019. Charge of the OUTBoard (from Section I, Part C of the adopted Rules and Procedures) 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. From time to time the OUT Board may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUT Board shall serve in an advisory capacity to the Planning Board. Meetings (from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Meetings are held on the third Wednesday of the month. The start time and location of the meeting shall be included on the agenda and shall typically be 6:30 p.m. at the Orange County West Campus Office Building located at 131 West Margaret Lane, Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any special circumstances, provided the information is included on the distributed agenda. DRAFT MINUTES 1 Orange County OutBoard Meeting 2 September 19, 2018 3 4 5 Members Present: Heidi Perry (Chair) At-Large Representative; Alex Castro (Vice-Chair), Bingham Township 6 Representative; Donna Musson, Eno Township Representative; David Laudicina, Cheeks Township Representative; 7 Jenn Sykes, At-Large; Ed Vaughn, Cedar Grove Township Representative; Brantley Wells, Hillsborough Township 8 Representative; Alyson West, At-Large Representative; Ted Triebel, Little River Township Representative; Art Menius, 9 At-Large Representative; 10 11 Members Absent: Jeff Charles, At-Large Representative; Justin Miller, At- Large Representative; Erle Smith, Chapel Hill 12 Township Representative; Gary Saunders, At-Large Representative 13 14 Staff Present: Abigaile Pittman, Transportation/Land Use Planner; Nishith Trivedi, Transportation Planner; Tina Love; 15 Administrative Assistant III 16 17 Others Present: Linda Griffin, Minutes Preparer 18 19 Agenda Item 1: Call to Order and Determination of Quorum 20 21 Agenda Item 2: Approval of Minutes from August 25, 2018 Meeting 22 Motion by Art Menius to Approve Minutes, seconded by Alex Castro. 23 Vote: Unanimous 24 25 Agenda Item 3: Consideration of Additions to the Agenda 26 There were none. 27 28 Agenda Item 4: Regular OUTBoard Agenda 29 30 4b. Bicycle Safety Implementation Subcommittee Report (Abigaile Pittman) 31 32 Abigaile Pittman presented a summary of recent events including a presentation to the Commissioners on June 5, 33 bicycle safety videos, the campaign logo and slogan, a draft of the bicycle safety web page, the purchase of branded 34 marketing materials, the design of five draft posters, the purchase of fifteen road signs, and the approval of 35 encroachment agreements by NCDOT. Upcoming work includes erecting the road signs, the design and distribution on 36 social media and radio ads. Community events may be deferred until next spring. 37 38 Abigaile Pittman: I think that some of the photos should be changed out for a couple of the posters, or some of the 39 wording revised because the safety message is not coming across well. 40 41 Jenn Sykes: The word ‘Police’ could be photo-shopped onto the car hood or another screen shot of a police car could 42 be used. 43 44 Abigaile Pittman: Consider adding wording to the ‘4 ft.’ poster stating that the law allows crossing the double yellow line 45 when passing bicyclists. 46 47 Abigaile Pittman: Does the Board think the information on the youth poster could be turned into a brochure? 48 49 There was general agreement among Board members, adding that the flip side of a folded brochure could be used for 50 providing rules of the road. 51 52 Abigaile Pittman: There could possibly there could be two different kinds of brochures. 53 54 55 3 4b. Efland-Buckhorn-Mebane Access Management Plan Update (Nish Trivedi) OUTBoard Action: To review and 56 comment on the Draft Efland-Buckhorn-Mebane Access Management Plan (E-B-M AMP). 57 58 Nish Trivedi: The background of this plan; it was originally adopted in November 2011. A Transportation Study was done 59 in 2017. It looked at existing conditions, environmental, traffic analysis and other issues related to the 2011 E-B-M AMP. 60 He explained the process of updating the plan. The Access Management Plan is the proposed long-range master plan 61 for the possibility of new roads and the connection to existing roads. The main purpose is to maintain the overall safety 62 of the transportation system, minimize congestion and crashes, provide efficient traffic flow and safety; and ensure 63 access to adjacent properties as development occurs over time. The plan is a long-range vision of the area. It is a means 64 of requesting right-of-way dedication during the development review process. Nish explained the history of the planning 65 process and what the plan does and does not do. In 2017 Volkert conducted the transportation study. The original 2011 66 E-B-M AMP included a map of the area and identified key intersections in the area. It included a variety of access 67 management strategies including 2 possible street cross sections. In September 2011 the Planning Board and 68 OUTBoard reviewed it and made its recommendations. There was a public information meeting held in November of that 69 year and the Board of County Commissioners adopted it that same month. In 2017 Volkert worked with Pilot 70 Environmental Inc. in completing the study. They determined the development potential for the area based on 71 environmental and other constraints as well as the traffic impact of that development. 72 73 Alex Castro: The Plan didn’t address multi-model concerns; it is only about roads. And there is nothing about commuter 74 rail, only about roads. 75 76 Nish Trivedi: The Plan addresses multimodal in the recommended NCDOT Standards Street cross-sections which are 77 covered later in the presentation. This study included a big spreadsheet with 30 rows of data that showed what the 78 various development sites might be. Hypothetical example is a 100 acre property was evaluated and it was determined 79 that only 30 acres was actually developable due to environmental issues, market factors and other constraints. 80 Maximizing the 30 acres development would result in a traffic impact; more cars on the road will be generated from that 81 development. The 2017 Transportation Study also considered NCDOT 24 different street cross sections, what State 82 routes should look like. It proposed 3 NCDOT standard street cross-sections for this area. The Study also took into 83 consideration the impact at intersections, what would be needed at those intersections, would turn lanes be needed due 84 to increased traffic. The slides show some of the intersections that would need turn lanes, stops signs, etc. to address 85 the increased traffic for that development. Now we are in the process of updating the original 2011 E-B-M AMP using 86 the 2017 Study. 87 88 David Laudicina: Study for Railroad 89 90 Nish Trivedi: NCDOT is having conversations with the railroads for improvements at railroad crossings. I have been told 91 that the railroad wants to close at-grade crossings. NCDOT is working with them on this issue and we have not heard 92 any specifics. The railroad has plans for this area and has ongoing conversations with NCDOT. I keep hearing different 93 things on their wish list going forward. We conducted a community meeting to let the public know what is going on in this 94 process and get their feedback. The study also included recommendations, and these are all presented to you for your 95 consideration as we draft the E-B-M AMP. We are taking the original 2011 E-B-M AMP, adding the 2017 Transportation 96 Study, with public comments, to create a whole new plan. The 2017 Transportation Study analyzed potential roads and 97 whether those roads were feasible and ensure everyone had access to their property while development occurs, and the 98 circles are for various intersection improvements. The green lines are from the study itself. The purple lines you see are 99 where staff determined additional roads and studies would be needed to address increased traffic brought on by the 100 development. The red circles are the intersections from the Transportation Study. We as staff think that additional 101 intersections will be needed, and more study and possible improvements needed for those intersections. Mebane has 102 also recently adopted a Comprehension Transportation Plan this June 2018. That is shown as the yellow line and yellow 103 circles. The study proposed 3 different cross sections and they include bike and pedestrian accommodations either by 104 paved shoulder and/or sidewalks. 105 106 Heidi: Does this include bike lanes? 107 108 Nish Trivedi: There are wide paved shoulders and/or sidewalks in the street cross sections but no specific bike lane 109 notations because plan does not include road design. Paved shoulders could be used as bike lanes. 110 111 4 Heidi Perry: What was the first right-of-way? 112 113 Nish Trivedi: There are four different street cross sections recommended in the plan, 60, 80, 90, and 100 feet. It 114 included a 60 ft. right-of-way for areas east of Buckhorn Road, 90 ft. right-of-way west of Buckhorn Road, and 80 ft. right-115 of-way for some of the major areas. The study also recommended improvements to various intersections, adding turn 116 lanes for various routes such as US-70, Buckhorn Road, West Ten Road and Ben Wilson Road. As part of community 117 outreach, we sent out letters to property owners in and around the study area. 118 119 Ted Triebel: How many people attended the public information meeting? 120 121 Nish Trivedi: We sent out over 700 notices about the community meeting. The community meeting was held last August 122 28, 2018 at Gravely Hill Middle School. An estimate 100 people attended. 123 124 Heidi Perry: What was the hot topic? 125 126 Nish Trivedi: Most wanted to know what is happening with their neighborhood. Some of them were at the intersection of 127 Green and Turner, some were from Mebane. The meeting had nice positive feedback. People engaging in knowing 128 what’s going on in the area. We created a website to keep the public informed and involved in the process and getting 129 more feedback as this process continues. We handed out a survey at the Community meeting to get feedback about 130 what was presented to them. We did not send these surveys through the mail. We also put this on the website, so 131 people can download from the website and return back to us. We have not gotten any back yet from that source. The 132 next steps – we are currently at the next step phase as we presented this to the Planning Board of the 5th of this month in 133 the same way as presented to you in your attachment to provide your comments. We will come back next month in 134 October for your recommendations to present to the Board of County Commissioners’. A tentative Public Hearing is 135 scheduled to go before the Board of County Commissioners’ in November along with the Planning Board’s and 136 OUTBoard’s recommendations. Depending on what they decide to do, they will act in November or December for their 137 decision. The plan will be implemented through the Unified Development Ordinance which requires development be in 138 compliance with adopted local plans like an Access Management Plan and it is through them we would use this 139 Ordinance to ask people to dedicate the right-of-way in the event these roads are needed. Any Questions? 140 141 Abigaile Pittman: You have a month to review this plan (which is in your packet) and make comments at the next 142 meeting. 143 144 Nish Trivedi: You are welcome to send me any of your comments and I will get the comments together. My contact 145 information is provided. 146 147 Heidi Perry: In the Executive Summary near the end it states Orange County uses Access Management Plans to ensure 148 land use decisions take into consideration their impacts on transportation networks. Nothing is said about bicycle safety. 149 150 Nish Trivedi: Safety is included; we can include text about bicycle safety if you would like. There are also some of the 151 surveys that were completed at the Community Meeting in your packet, with the questions and answers we asked at the 152 Meeting. 153 154 Jenn Sykes: Was Ikea seriously asked about one of those sites? Someone thought Ikea looked at Mebane. 155 156 Nish Trivedi: It was at one time going to Cary and then they pulled out. I have not heard about them coming to Mebane. 157 158 Heidi Perry: Does anyone else have any questions for Nish? 159 160 Nish Trivedi: Just to let you know that from the 2011 E-B-M AMP only one road was built, the service road for Morinaga 161 Candy Factory. Even that road had to go through the NCDOT process. 162 163 Heidi Perry: Where is NCDOT with this Plan? 164 165 Nish Trivedi: They attended the Community Meeting to answer any questions. There is no design or construction of the 166 roads, nor is there any funding for them. No projects or work are specifically identified in the Plan. 167 5 168 Alex Castro: I see 4 crossings of the railroad, I am familiar with one at Mt Willing Rd where a young woman was racing 169 the train and did not make it at that crossing, so my question is, what kind of road modifications will be made if the 170 railroad does not want any more at-grade crossings with increase of traffic flow, is there any thought of reconfiguring 171 those roads so they are no longer at-grade crossings? The crossings are there, they are major roads. 172 173 Nish Trivedi: The Plan does not go into any detail about what specific crossing will be closed. It does not make any 174 recommendations at any railroad crossing. Some intersections with the railroad are identified in the Plan as needing 175 additional study. 176 177 Alex Castro: No at-grade crossing between 85 to 70 and the segment I am looking at on page 66; it just shows the 178 railroad. If they close all those at-grade crossings and you can’t get from 70 down to 85 in this area and if you are 179 coming out of the Economic Development Zone you are not going to get up there. The big rail crossings are Buckhorn 180 Road and Mt Willing Rd. I know this Board with the Planning Department looked at what was going to be done in terms 181 of the traffic flow down Buckhorn Road and the railroad and some of the proposals were ludicrous down to tractor trailers 182 being able to manage the roundabouts they were proposing. 183 184 Abigaile Pittman: That was part of Mebane Traffic Separation Study that was done, which studied about 5 existing 185 crossing. The Study recommended closing a couple and 3 were remaining. For Buckhorn they did 3 different options for 186 doing an overpass and the Orange County Planning staff had a preference that varied somewhat – A connection with 187 Frasier Road was favored, but without a round-about on Buckhorn Road just north of the interstate interchange. 188 189 Alex Castro: Some were problematic like the one where that accident occurred. That is very difficult for tractor trailers 190 and are also a problem for low-boy trailers that get hung up because of the crest of the railroad crossing and so, that is 191 why I brought up the question. The railroad is not going away, and you are talking about access management road 192 improvements and they co-inhabit, and you must co-exist with the railroad and how are you dealing where they meet. 193 194 Abigaile Pittman: The railroad also has some plan to alter the curve to make it less sharp because of the future train 195 speed increase. More planning needs to be done at the intersection of Buckhorn Road and the railroad. If you ever 196 want to see the Mebane Traffic Separation Study it is on the City of Mebane Website. The railroad will not have the 197 much higher speeds in Orange County as in other counties. 198 199 5.0 Staff Updates 200 201 5a MPO/RPO and NCDOT (Nish Trivdei) Materials to be provided at Meeting 202 OUTBoard Action: Receive Information. 203 204 Abigaile Pittman passed out project updates for the Burlington-Graham MPO which was not available at the time the 205 agenda packet was distributed. 206 207 Alex Castro: Question, Hwy 54 Corridor. Temporary traffic lights. They have been removed. Do you have any 208 information about what they found out about the lights, the effectiveness, traffic, cross traffic or any other results of the 209 test period? 210 211 Nish Trivedi: I can find out for you. 212 213 Alex Castro: The lights were removed completely. They were active for about 60 days at most. They were installed for 214 longer than that. A lot of people were complaining that it was causing traffic problems. 215 216 Heidi Perry: Was it signalization timing or something else? 217 218 Nish Trivedi: It slowed down traffic. It was supposed to improve the traffic. 219 220 Alex Castro: They put one at Hatch Rd and one at Neville and both roads were one way, the north side of both roads 221 were a dead end at 54, Hatch goes a little further but basically, they were a dead end at 54 and it was to prevent traffic to 222 flow out of Neville up 54 during the rush hour. 223 6 224 Nish Trivedi: I will find out from the consultant and get back to you. 225 226 Heidi Perry: It would be good to know what the people thought who were trying to get out and then the people already on 227 54. You will let us know? 228 229 Alex Castro: One traffic light has been added at Mebane Oaks Rd, that is far out. Play chicken crossing 54. 230 231 Heidi Perry: Report on 54? 232 233 Nish Trivedi: It has been pushed out another month. I will keep you informed. I will be presenting to you for your 234 comments in November. 235 236 Alyson West: When is STIP? 237 238 Nish Trivedi: Should be done in January or February. I think they pushed it out for another month due to the hurricane. 239 240 Alyson West: Are we going to see it again? 241 242 Nish Trivedi: Yes. Right now we are working on Division Points and pursuing local points on projects you recommended 243 get priority. OCPT’s 2 transit vehicles and Old Greensboro road. There is a chance NC 86 going north of Hillsborough to 244 NC 57 widening and intersection improvements getting funded if other division projects don’t. The Old Greensboro Rd. 245 was too high of a cost and will not get funded. 246 247 Alex Castro: They did put in a new Bridge on Old Greensboro Rd. east of the Edwards property, west of Jones Ferry Rd 248 and that permits bicyclists to be on the road at the bridge when someone is coming, just wide enough I would say. It 249 does have a shoulder to it. 250 251 Nish Trivedi: Right now, State projects and Regional projects have been determined. Right now you can go to NCDOT 252 STIP process and see the results, both with a map as well as the spread sheet which shows you the projects across the 253 state that have gotten Statewide and Regional Funding and the draft of the Division. 254 255 Heidi Perry: So, when you said we did not make a recommendation for 54 it didn’t get points but that’s the same 54 you 256 are going to be reporting on in October or November? 257 258 Nish Trivedi: Yes. There are several NC 54 projects in the STIP. There is the Old Fayetteville Rd and 54 intersection 259 improvement, Carrboro doesn’t want that one. 260 261 Alex Castro: The development of the Lloyd Property. 262 263 Nish Trivedi: Another NC-54 project from Orange Grove Road to Old Fayetteville Rd, the Operation Improvement project 264 is already funded, so they are doing that project. The widening of that same portion of NC-54 was not recommended for 265 points so it did not get funded. They are also waiting for the corridor study to be done. It is the 3rd highest scoring 266 Regional Project in Division 7. Just letting you know the results of the Regional Project. If it received local points it would 267 have been done because NCDOT division did put points on it. 268 269 Heidi Perry: Whether we wanted it or not. 270 271 Nish Trivedi: If it was recommended as one of the top 2 Orange County priorities in TARPO and it had gotten the local 272 input points. Division 7 put the points on it because they thought it was a great project and the study was almost 273 complete. The study would have been completed before the draft STIP went out for review. We did not put points on it in 274 either MPO or RPO so it’s not getting done. There is the other NC 54 widening project from Orange Grove Road to NC-275 119 in Alamance County. BGMCO submitted this project to NCDOT. BGMPO, I believe put points on it but nobody else 276 did therefore it did not get funded, that I am aware of. I will show you the results when the draft STIP is released. The 277 only project that has as chance for funding is NC 86 north of Hillsborough from 70 to NC 57, widening and improving the 278 intersection. 279 7 280 Heidi Perry: Widening of lanes? 281 282 Nish Trivedi: Yes. The draft will be out in January or February 283 284 Alex Castro: With these roads flooding and everything NCDOT did have a site, DriveNC.org which indicated what 285 segments of what roads were closed. You could go county by county, so if you were going out you could tell if you 286 needed to find an alternate road because such n such a road was flooded. That looked like it was effective. 287 288 Ted Triebel: The Waze app is a GPS app– road closures and stuff like that. I think the flooding was happening faster 289 than the site could keep up with. In some areas it was still cresting and in other areas it was going down, so you had to 290 know what was happening 291 292 5b. OUTBoard Members whose terms are ending (Abigaile Pittman): 293 Abigaile Pittman: At the end of the month the Board will have six vacancies. Abigaile the terms ending are for Alex 294 Castro, Earl Smith, Ted Triebel, Gary Saunders, Jeff Charles and Justin Miller. A Public Service Announcement (PSA) 295 was sent out several weeks ago, and a second one went out earlier today. I have copies available should Board 296 members want one to pass on potential applicants. A number of applications had been submitted but that more were 297 needed 298 299 Tina Love: I will email the PSA to Board members. 300 301 Certificates of Appreciation to the two Board members present: Alex Castro and Ted Triebel; and the staff and the Board 302 thanked them for their years of service. 303 304 Ted Triebel: I want to thank Heidi Perry for chairing the Board and Alex Castro for his astute comments to the Board. 305 306 Alex Castro: I want to thank Abigaile for coming forward. I am also on the Aging Advisory Board and helping with work to 307 implement the Master Aging Plan. One of the problems we had was that we developed it as dreamers, if you will, and 308 we lacked the practitioners, the people to make it happen. It’s people like Abigaile and Stephanie Trueblood, a planner 309 from Hillsborough that populated the committees and what they do is make it more realistic in terms of what we can 310 aspire to in terms of improvement. I think that is what we do at the OUTBoard meetings; we try to add to the government 311 what we feel all communities would wish to see in terms of what is happening transportation-wise. It is good that we are 312 cross-populating getting people involved. One of the things that I consider as an outstanding accomplishment of the 313 OUTBoard is the bicycle safety effort, and the fact that the High School students were involved in producing the video 314 PSAs. I feel other noteworthy accomplishments were the fencing on the bridge over I-40 on Orange Grove Road; and 315 the Department on Aging’s AARP grant for the purchase of Semme seats. There is a great deal of bureaucracy with 316 NCDOT and the BOCC. It seems that there are many bureaucrat hurdles for such simple things as fencing on a bridge. 317 or signage for bus stops. We’ve got to fight the good fight and it will always be ongoing. 318 319 Heidi Perry: With the end of Alex Castro’s term the Board will need a new Vice-Chair. 320 321 Tina Love: Board Members can continue to attend meetings for up to one year or until someone is appointed to take 322 their place. 323 324 The meeting adjourned. 325 8 DRAFT MINUTES 1 ORANGE COUNTY OUTBOARD 2 OCTOBER 17, 2018 3 REGULAR MEETING 4 5 MEMBERS PRESENT: Heidi Perry (Chair), At-Large Representative; David Laudicina, Cheeks Township 6 Representative; Ed Vaughn, Cedar Grove Township Representative; Brantley Wells, Hillsborough Township 7 Representative; Art Menius, At-Large Representative; Erik Broo, At-Large Representative 8 9 MEMBERS ABSENT: Jenn Sykes, At-Large; Alyson West, At-Large Representative; Donna Musson, Eno Township 10 Representative; 11 12 STAFF PRESENT: Abigaile Pittman, Land Use/Transportation Planner; Nishith Trivedi, Transportation Planner; Tina 13 Love, Administrative Assistant III; 14 15 OTHERS PRESENT: Cy Stober, City of Mebane; Betty Rogers; Brian & Bonnie Myers; Jennifer Terrell; Anthony 16 Corbett; Mai & Huong Hguyen; Octavio Hernandez Lesso; Dana Richardson; Jolanda Williams; Annie Whitted; 17 Kristen Marbais; Richard & Brenda Bright; Robert Jones; Knox Efland 18 19 AGENDA ITEM 1: CALL TO ORDER AND DETERMINATION OF QUORUM 20 There was not a quorum for the meeting 21 22 AGENDA ITEM 2: APPROVAL OF MINUTES 23 There was no quorum for the meeting so the minutes will be added to the November meeting 24 25 AGENDA ITEM 3: CONSIDERATION OF ADDITIONS TO AGENDA 26 There were none. 27 28 AGENDA ITEM 4: REGULAR OUTBOARD AGENDA 29 AGENDA ITEM 4A: BICYCLE SAFETY IMPLEMENTATION SUBCOMMITTEE REPORT (ABIGAILE PITTMAN) – 30 Receive information and provide comments 31 32 Abigaile Pittman: There were some revisions on the posters and more needs to be done before they are finalized. 33 34 Heidi Perov: I would like to include how to safely adjust a child’s helmet as a flyer. 35 36 Abigaile Pittman reviewed the posters 37 38 Consensus was all were ok with the exception of poster number 4 about facilitating passing of cars by pulling over. 39 40 Erik Broo: I can try to contribute some photos or get some; I do have a couple of friends that ride with cameras so I 41 can ask them for some shots. 42 43 Abigaile Pittman: The subcommittee will meet next week to try to finalize some of these items. 44 45 AGENDA ITEM 4B: EFLAND-BUCKHORN-MEBANE ACCESS MANAGEMENT PLAN UPDATE (NISH TRIVEDI) – 46 Make a recommendation on the Efland-Mebane Access Management Plan 47 48 Nish Trivedi reviewed a PowerPoint presentation on the draft plan. 49 50 Resident: Does this include Highway 70? 51 52 Nish Trivedi: There are no recommendations on Hwy 70; it was not recommended for any right-of-way changes. If 53 the state decides to pursue some of these projects, these are along state roads and NCDOT has their own process 54 to acquire any additional right-of way. 55 9 56 Resident: I live in the Cheeks Crossing community and I noticed the intersections around where I live are congested; 57 I see congestion isn’t mentioned. Were there any studies done at the intersections of South Frazier and Buckhorn 58 Rd, East Washington Street Extension and Buckhorn Road? Those are highly congested areas. We have had 59 several accidents there. It really needs improvements. Also, what are the specific plans in terms of extending of 60 those roads on Buckhorn beginning on Exit 157 off I-85/40 going along Buckhorn Road toward US 70? That’s the 61 community I live in; what were the specific plans; what were the studies and what were the results in those areas? 62 63 Nish Trivedi: We have Cy Stober from Mebane. 64 65 Cy Stober: My name is Cy Stober and I’m the Development Director with the City of Mebane. To answer your 66 questions, in May of this year the NC Railroad conducted a study recommending improvements in the exact area you 67 are talking about for what they call grade separation, a bridge over the railroad tracks. I have sketches there is not a 68 public process; no designs have been done. The project is not funded. It was the only project in this plan that was 69 not funded. There are a number of safety improvements that are being done from Gibson Road in Mebane all the 70 way through town. The Buckhorn Road project is estimated to be around 8.5 million dollars and so it would have to 71 be funded and done by the state. There are 3 sketches in here, Mr. Jones came by the office this morning and got a 72 copy of the plan. We have more copies of the plan and it’s available on our website. I would be happy to talk with 73 you after the meeting and show you some of the safety improvements suggested for that very area. In addition, the 74 City adopted its own transportation plan. The limit of our jurisdiction is Buckhorn Road. Widening of Buckhorn for 75 safety improvements including intersection improvements is identified in this plan as a priority project. The City 76 cannot afford to do that project, it is well beyond our means. We would have to rely on state funding and again this is 77 an unfunded project that we would like to pursue that would be entirely separate process from what Nish is doing 78 here this evening or that Orange County is considering. These are unfunded projects that would have to have a 79 totally separate public participation and design process that would come in the future should the project be funded. 80 81 Resident: So what is long range goal here in terms of the future? 82 83 Cy Stober: We actually had a meeting yesterday about how to acquire state funds to do these two projects. Best 84 case scenario would be that the projects would be nominated for state funding in spring 2019. That will be a one 85 year process of consideration by the state so we won’t even know for over a year. After that point, should they be 86 funded, there would be a design and public participation process that last another year to 2 years and then 87 construction would begin. The first year of construction, the public doesn’t see anything, nothing happens. The 88 fastest track that we could see anything would be 4 years from now roughly. The soonest you would hear something 89 is 18 months from now about whether the state has funded anything and if it is this project, how you can participate to 90 make sure your concerns are heard. We know there are concerns about impacts to the churches on Buckhorn and 91 of the 3 sketches that have been done so far, avoid the churches there. 92 93 Resident: What about the homes? 94 95 Cy Stober: There is one sketch that avoids all homes and then two others that do not. We need your input to help us 96 decide the best sketch. We don’t have a favorite, Orange County has two sketches that don’t like and the one they 97 do like is the one that does not impact any homes. They sent us a letter to that effect. 98 99 Resident: It still would be an impact, noise, getting out of their homes with a bridge. How close would it be near the 100 homes. There would be some impact. So as a homeowner there I would like to know now what would be the 101 foreseen impacts if I remain there. 102 103 Nish Trivedi: Right now it is not in the plan, if it is funded by the state it is in a ten year window. If within the first five 104 years it is guaranteed to be built. 105 106 Resident: I’m not asking about the process about when it will be built, I am asking about the study. If you did a study 107 and it was a holistic study then you should know the impact it would cause. You have 194 people in the Cheeks 108 Crossing Township that you are going to impact. What were the results in terms of if you did this, what would be the 109 impact on the people who remain living in that community? 110 10 111 Cy Stober: We simply cannot answer that question at this time because a design has not been determined. 112 113 Resident: So you did a transportation study and you don’t know the impact it is going to have on the community in 114 which you are going to put the road through? You did a transportation study, you had transportation engineers you 115 had environmental engineers and there is no results on how that would impact the 194 people that live there. There 116 were no results? 117 118 Nish Trivedi: In the 2017 study, that area was not studied. That is why we are saying additional study is required. 119 120 Resident: So when will it be done? The letter I received said you would connect Industrial to South Frasier, add two 121 lanes on Buckhorn starting from I-85/40 to Highway 70 so that is the Cheeks Crossing Township. That township has 122 194 people so that is not the study? You didn’t do any transportation study in that area? 123 124 Nish Trivedi: Not when the 2017 study was done, when the project is being done by the state the state would do a 125 separate, more detailed, on the ground public involvement study for that road. There is no design for that road at this 126 point. 127 128 Resident: You sent me a letter as a property owner telling me that you are going to impact my road and there still 129 was no study done. 130 131 Nish Trivedi: We’re not having any impact on your road, if you are not developing your property then there is no 132 impact at this stage. If the state doesn’t fund the project there is no impact. 133 134 Resident: Then why did I get a letter? 135 136 Nish Trivedi: To get your input and comments so we can include it in this plan when it is updated. If the state does 137 fund it we would come back to you again for more detailed, direct community meeting for that project - because there 138 is going to be increased traffic along Buckhorn Road, because of the development goal for this area and because if 139 any development does occur it is going to create more traffic. In the event that is not done it will create more safety 140 problems and more issues if not addressed. We feel that area needs to be studied and addressed. It is on the plan 141 as a blue dot indicating additional study needs to be done to address the increase of traffic that is going to be 10-20 142 years down the line for that road. 143 144 Resident: I would like to add there is already increased traffic. 145 146 David Laudicina: You mentioned the cross-section potential for bridges over the railroad, did they take into 147 consideration the fact that they may double that track in the future? 148 149 Cy Stober: That has been discussed with DOT and would be addressed by the design. Independent of all of this, 150 Orange County and Mebane have successfully lobbied DOT to put a traffic light at the intersection of Buckhorn Road 151 and US 70. It will be there by Christmas of this year. It’s been delayed already but we are working hard to get that 152 installed. 153 154 Nish Trivedi: One of the considerations the Planning Director made was to remove a road near the Mattress Factory 155 Road area because of a stream crossing and all the issues involved so we have removed some of that road network 156 to avoid touching the streams and the crossing and provide the same east/west connection. We have added text to 157 include bicycle safety based on the recommendations from the OUTBoard and to include that this network should be 158 for all users whether transit, auto or bike/ped. Another recommendation was how it addresses the Economic 159 Development objectives in the plan and how does it encourage mixed use projects to support walkable communities 160 and how does the plan address public transportation and alternative modes such as carpooling and park/ride 161 facilities. I will include more narrative about the cross section and try to meet these objectives. Now we are seeking 162 OUTBoard comments and recommendations. 163 164 Heidi Perov: You’ve had a lot of public comment, did any of it change any of the plans? 165 11 166 Nish Trivedi: The only real change was the removal of the roads in the Rock Quarry Road area we discussed. 167 168 Heidi Perov: The questionnaire you used was odd because you are working in an area where there isn’t any public 169 transit, bike or pedestrian facilities so it seems like the better way to ask this in the future is would you use transit if it 170 were available; would you ride bikes or walk in your community if there were facilities available; what is the one part 171 of your commute that is the most frustrating. Other comments I have is that I would like to see included in there in 172 the intersection improvements that roundabouts be considered along with turn lanes. I would say if you have a road 173 with sidewalks included in the cross-section that it would be good not to have a speed limit over 45 mph. I would also 174 say when you have a road with 12 foot lanes and 5 foot shoulders; I would consider changing that design to 11 foot 175 lanes and putting in an extra buffer between the lane and the shoulder with the other foot. Also, I didn’t hear anything 176 in the report about air quality. Is there anything that requires an air quality report would be part of that road 177 improvement process? 178 179 Nish Trivedi: No, I don’t think that is part of our UDO for development. 180 181 Heidi Perov: My last comment is that I think as part of this report there should be something that says that new 182 technologies should be taken into account and studied which may offer new ways to address intersection 183 improvements, traffic flow and safety without road widenings. I think there is going to be smart signalizations that are 184 going to improve in 10 years’ time and promoting transit to get people to not be in their cars which would actually 185 improve the roads to the point that we may not have to widen them. So I think new technologies and public transit 186 should be addressed. 187 188 AGENDA ITEM 4C: NC 54 CORRIDOR PLAN PRESENTATION (NISH TRIVEDI) – 189 Provide comments to the BOCC for November 1st meeting 190 191 Nish Trivedi reviewed a presentation on the draft plan. 192 193 Nish Trivedi: Because of the congestion along Hwy 54, people along 54 wanting to get out of their driveway have to 194 wait there for a long time just to get out. There are a couple of subdivisions along that road that people have 195 reported having to wait a very long time to get out on the road. 196 197 Heidi Perov: Where are the high crash points on this road, are there high crash points on this road? 198 199 Nish Trivedi: There have been crash studies done. As you can see on the bottom it shows the number of accidents. 200 201 David Laudicina: There is very high traffic on Mebane Oaks especially on the weekends going to Saxapahaw. 202 203 Nish Trivedi continued presentation 204 205 Heidi Perov: That’s not going to support our planet very well. There’s nothing in this project that support public 206 transit. 207 208 David Laudicina: Was there any talk about having a Bus Rapid Transit with stations along the way. Make them 209 dedicated. 210 211 Nish Trivedi: We can include that in the comments. One thing mentioned as PART to provide service along this 212 corridor all the way to UNC. The total cost of this project if the entire thing was done over the next 20 years or 30 213 years would be 180 million dollars; 80 million in Alamance County and 100 million in Orange County and it does 214 include the shared use path which 20% would be on the County. 215 216 Heidi Perov: They also don’t have the right-of-way. 217 218 Nish Trivedi: And it would require right-of-way acquisition. 219 220 12 Heidi Perov: So it will never happen, I don’t even think you should include it because it is obvious – without the right-221 of-way. 222 223 Erik Broo: If the plan shows the path and it is being shown to the public and the conversation in this room is that it is 224 probably not going to happen, should the public be shown that without the context that we know. 225 226 Nish Trivedi: NCDOT is working on changing their bike/ped policies there is a big effort to change that rule. This is a 227 statewide issue and they’re changing it and it includes updating a complete street policy. There is an effort to push or 228 more bike/ped consideration in highways. Carrboro is very skeptical about the widening; they feel that intersections 229 improvement will address all the issues. There is an understanding that this is a 20-30 year long process because of 230 the phasing. 231 232 Erik Broo: So on the Orange County side most of the parcels of land are rural, and rural buffer. There is only a 233 handful of commercial properties and future land use doesn’t indicate that have changed to commercial. How does it 234 look on the Alamance side? 235 236 Nish Trivedi: Alamance County doesn’t have zoning. 237 238 Erik Broo: So is there an expectation that there be greater development on the Alamance County side than the 239 Orange County side? 240 241 Nish Trivedi: That’s a good question. 242 243 Erik Broo: So even if the public comments include that there isn’t going to see much development on the Orange 244 County side, we’re still going to see potentially a lot of development on the Alamance County side. 245 246 Nish Trivedi: And that development increases traffic. 247 248 Erik Broo: It’s like when Chapel Hill didn’t want Walmart so they just went across the line into Chatham County but 249 Orange County still has to manage all the traffic. 250 251 Nish Trivedi: Transit would help address some of the traffic that is why there needs to be better coordination 252 between PART and Chapel Hill Transit along this corridor. The plan doesn’t address it and that is one of the 253 comments that Carrboro is submitting and we will submit the same. There needs to be better coordination among 254 the transit agencies along this corridor. 255 256 Art Menius: We keep attacking this from the wrong end. Reducing use instead of increasing capacity. 257 258 David Laudicina: My concern is that we’re planning for all this road and more cars and it is going to be done by 2040. 259 Did that plan just come out that we are going to have a worldwide catastrophe with climate change in 2040 if we don’t 260 start doing something. A little thing like Bus Rapid Transit on this road would do something to reduce the usage. 261 262 Art Menius: I agree we don’t need wider roads, we need more transit along those corridors. 263 264 Heidi Perov: Unless the goal of NCDOT is to get more cars on the road, this is not the answer. I totally agree with 265 David, I think that global warming is right here right now whether anyone believes it or not. Pavement is increasing 266 that. I think the intersection improvements should be done but not the widening. Is it because people can’t get 267 where the want to go as fast as they want or is it a safety issue causing more crashes. I would like to see the crash 268 report and if that is the case then we have to improve the intersections where the crashes are occurring but we don’t 269 just pave over the entire western part of that area. I also think that technology is going to be changing a lot of the 270 congestion that we’re seeing with signalization being able to be synched in a way it puts people through in a more 271 efficient and safer way. 272 273 13 Erik Broo: With a lot of the road, if you want to pass someone there are certain sections that the elevation is too 274 great and there is no line of sight. If we are looking to increase driver safety and pedestrian and bicycle safety, are 275 there other ways of going about grading or making line of sight better or creating passing zones. 276 277 Brantley Wells: If you are talking about changing grade you might as well triple those costs. 278 279 Heidi Perov: Well, a passing lane if it is a constant problem in one spot. They have passing lanes all over Alaska 280 and it allows the slow vehicles to continue at their pace and the trucks and motorhome then everyone goes around 281 them. I just think it too much to widen that entire area. 282 283 Art Menius: I agree and would go beyond that to say I oppose the widening. 284 285 Heidi Perov: I would go with you on that and say I oppose the widening the entire length of 54 and would prefer to 286 see the intersection improvements done first based on safety and congestion. Identifying areas where passing is 287 especially problematic with possible location of passing lanes. Do we want more cars on 54 and remember that cars 288 coming into Carrboro are going to be quickly brought down to 2 lanes and it is going to cause a problem. 289 290 David Laudicina: They are also going to UNC to work, that’s the problem. People can’t afford to live here so they 291 have to live outside and drive in every day to go to work. 292 293 Heidi Perov: So if they have to have that commute why don’t they have a bus so they can actually ride or listen to 294 music on their way to work. 295 296 Art Menius: The reality is this massive exchange of traffic in and out of Orange County, the breakdown of white 297 collar- blue collar - managerial is almost identical with people leaving and people coming in. 298 299 Heidi Perov: You can also say that part of the reason for this because we are concerned about how it affects air 300 quality and the climate. 301 302 AGENDA ITEM 5: INFORMATION ITEMS 303 AGENDA ITEM 5A: IDENTIFICATION OF SMALL, RURAL, AND/OR MULTIMODAL TRANSPORTATION PROJECTS (ABIGAILE 304 PITTMAN) – Receive information and provide input to staff 305 306 Abigaile Pittman presented information on small transportation projects. 307 308 Abigaile Pittman: We are asking the OUTBoard to assist staff to develop a potential project list so when we get 309 requests we have this list that we can use. We want to have an ongoing process so we have greater input when 310 these funds become available. Typically we have a very short window of opportunity. 311 312 Consensus was to have bi-annual meetings with occasional reminders on the OUTBoard Agenda to email any 313 projects to staff who will keep a running list of projects. 314 315 AGENDA ITEM 6: STAFF UPDATES 316 AGENDA ITEM 6A: MPO/RPO AND NCDOT UPDATES (NISH TRIVEDI) – Receive information 317 318 Nish Trivedi reviewed the projects 319 320 *The next OUTBoard meeting is postponed one week to accommodate the member schedules for the 321 Thanksgiving Holiday and will take place Wednesday, November 28, 2018*. *There will be no OUTBoard 322 meeting in December* 323 324 AGENDA ITEM : ADJOURNMENT 325 OUTBoard meeting was adjourned 326 ____________________________________ Heidi Perry, Chair 14 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: November 28, 2018 Action Agenda Item No. 6.a. SUBJECT: OUTBoard Annual Report 2018 and Work Plan 2019 DEPARTMENT: Planning and Inspections ATTACHMENT(S): 1. Annual Report and Work Plan 2. BOCC Goals and Objectives INFORMATION CONTACT: Abigaile Pittman, Transportation/Land Use Planner, 919-245-2567 PURPOSE: To discuss the OUTBoard Annual Report 2018 and Work Plan 2019 for the annual Board of County Commissioners (BOCC) planning retreat in early 2019. The Annual Report informs the BOCC of the past year’s activities of advisory boards/commissions and assists in overall County work planning for 2019. BACKGROUND: As part of its annual planning retreat, the Board of County Commissioners (BOCC) welcomes input from various advisory boards and commissions, including the OUTBoard. The Planning Staff completes the Annual Report 2018, and consults with the OUTBoard on the development of the Work Plan for 2019. The Annual Report 2018 and Draft Work Plan 2019 is provided as Attachment 1 for the staff and the OUTBoard to complete and return to the Clerk’s office by December 14. The Annual Report will inform the BOCC of the past yearly activities of the OUTBoard. The Work Plan will provide a plan for future activities of the OUTBoard. These activities should be consistent with the adopted goals and objectives of the Board of County Commissioners (Attachment 2). FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): Staff recommends that the OUT Board: 1. Receive information; 2. Provide any comments or direction that the Board might have; 3. Approve the OUTBoard Annual Report 2018 and Work Plan 2019; and 4. Forward to the Clerk’s Office. 15 ORANGE COUNTY ADVISORY BOARDS AND COMMISSIONS INPUT FOR COUNTY COMMISSIONERS’ ANNUAL PLANNING RETREAT The Board of County Commissioners (BOCC) welcomes input from various advisory boards and commissions in preparation for its annual planning retreat. Please complete the following information, limited to the front and back of this form. Other background materials may be provided as a supplement to, but not as a substitute for, this form. NAME OF BOARD/COMMISSION: Orange Unified Transportation Board (OUTBoard) Report Period: 2018 Person to address the BOCC at Retreat (if requested by BOCC) and contact information: Heidi Perry, Chair. Telephone 919-618-8199; E-mail: heidiperov@gmail.com Primary County Staff Contacts: Primary Administrative and Professional Support for General Agenda Topics – Abigaile Pittman, Transportation/Land Use Planner Burlington-Graham Metropolitan Planning Organization (MPO) – Abigaile Pittman, Transportation/Land Use Planner Durham-Chapel Hill-Carrboro MPO and Triangle Area Rural Planning Organization (RPO) – Nish Trivedi, Transportation Planner Secondary Administrative – Tina Love, Administrative Assistant III (provided for distribution/website posting of agenda packets, quorum polling, room set-up, recording of meetings, note taking and pr eparation of detailed minutes, and coordination with the Clerk’s office regarding Member appointments and attendance records.) Transit Advisory Services – Theo Letman, Director, Orange County Public Transportation Department, OCPT; Teleishia Holloway, Transportation Administrator, OCPT; and Allyson Coltrane, Transportation Demand Management (TDM) Coordinator, OCPT. Planning Department Management – Craig Benedict, Planning Director; Tom Altieri, Comprehensive Planning Supervisor How many times per month does this board/commission meet, including any special meetings and sub-committee meetings? The OUTBoard meets as needed per its BOCC adopted Rules of Procedure (amended 09/06/2016), generally 7 to 8 times per year. When held, meetings take place on the third Wednesday of the month. The Board met 8 times in 2018, as needed to address Board of County Commissioners (BOCC) priorities. At 4 these meetings the Transit Advisory Services/OCPT Group, including supplemental staff from other County departments (Aging; DSS; Housing, Attachment 1 16 Human Rights and C ommunity Development; Health; and Child Support Enforcement) jointly addressed transit services agenda items with the OUTBoard. Following completion of the Bicycle Safety Task Force (BSTF) in 2017, an implementation sub-committee of the OUTBoard was formed that includes four members of the OUTBoard. This subcommittee has been meeting as needed, with staff support, throughout 2018. Brief Statement of Board/Commission’s Assigned Charge and Responsibilities: 1. The OUTBoard is charged with advising with Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board 2. From time to time the OUTBoard may be di rected to provide input on regulations on which the Planning Board has primary statutory and l ocal ordinance advisory duties. In such instances, the OUTBoard shall serve in an advisory capacity to the Planning Board. What are your Board/Commission’s most important accomplishments? In 2018, the OUTBoard has: 1. Received and reviewed information regarding Orange County’s SPOT 5.0 project lists and scores submitted by the DCHC MPO, the BG MPO, and the TARPO and NCDOT for ultimate consideration of inclusion in the 2020-2028 Statewide Transportation Improvement Program (STIP). 2. Received and r eviewed regular updates regarding NCDOT Division 7 projects located in the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO), (Burlington-Graham Metropolitan Planning Organization) BG MPO, and (Triangle Area Rural Planning Organization) TARPO. 3. Initiated a quarterly effort to assist Planning staff with the identification of small transportation projects, to be submitted to NCDOT when there are opportunities to submit requests to fund Orange County projects. Potential funding sources for these projects include the High Impact – Low Cost Project Program, the Resurfacing Program, and the Spot Safety Program. 4. Received updates and commented on the NC 54 Corridor Study. 5. Received updates and commented on t he revised Efland-Buckhorn- Mebane Access Management Plan. 6. Reviewed and commented on updated OUTBoard orientation materials. 7. Received reports from the Bicycle Safety Implementation Subcommittee, and participated in review and comments at OUTBoard meetings. 17 In 2018 the Transit Advisory Services (TAS) effort led by Orange County Public Transportation (OCPT) Department, has addressed transit topics at OUTBoard meetings relating to public transit: a. OCPT rebranding and marketing efforts in early 2018. b. OCPT Quarterly Operational Statistics, including Orange County ridership data. c. OCPT expansion services, including the recent purchase of three new 28-foot Light Transit Vehicles (LTV’s) to expand service delivery and replace older vehicles which has long reached their useful life. d. Implementation of a new route, the Orange Alamance connector, that provides midday service from northern Hillsborough out to Cone Health facility in Mebane, then back to southern Hillsborough, and through the heart of the historic downtown area. h. NCDOT compliance and safety audit results for OCPT, Department of Aging contractor audits, and Department of Social Services audits as a Medicaid contractor, required for certification as a Medicaid provider. i. Transit Scheduling and Planning Software upgrades and procurements. j. Orange County commuter options. List of Specific Tasks, Events, or Functions Performed or Sponsored Annually. 1. The Transportation Improvement Program (TIP) is typically a recurring two-year process: First year: Develops priority list of projects to request in TIP for BOCC approval. Second year: Recommends comments regarding draft TIP for BOCC approval to submit to NCDOT during the public comment period. The OUTBoard assists with the identification and prioritization of NCDOT projects for rural (TARPO) and metropolitan (DCHC MPO and BG MPO) planning areas. 2. Reviews active NCDOT projects in the County, including various paving, construction and Congestion Mitigation and A ir Quality (CMAQ) Grant projects. 3. Receives updates and reviews the progress of NCDOT transportation projects within rural Orange County. 4. Receives updates and reviews the progress of Orange County transportation planning efforts. 5. Receives updates and reviews OCPT Operational Statistics for federal and state program transportation grants including the North Carolina 18 Department of Transportation Rural Operating Assistance Program (ROAP) Grant, NC Community Transportation Program (CTP) Grant, and the CMAQ Grant. 6. Receives updates on TARPO, BG MPO and DCHC MPO transportation planning activities. 7. Receives updates from the Planning staff on t he NCDOT quarterly luncheon topics of discussion. 8. Submits comments and questions for discussion with OCPT staff during TAS Group meetings. 9. Reviews and discusses current Board vacancies. 10. Other items as assigned by the BOCC. Describe this board/commission’s activities/accomplishments in carrying out BOCC goal(s)/priorities, if applicable. The OUTBoard is involved in the ongoing implementation of the 2030 Comprehensive Plan and related BOCC adopted goals/priorities. Annual work related to these efforts includes addressing the Transportation Improvement Program (TIP); the review of active NCDOT projects; the review of county transportation planning efforts, including the activities of TARPO, BCHC MPO and B-G MPO and local plans; and participating in the review of transit operational statistics for federal state and program transportation grants. If your board/commission played the role of an Element Lead Advisory Board involved in the 2030 Comprehensive Plan preparation process, please indicate your board’s activities/accomplishments as they may relate to the Comprehensive Plan’s goals or objectives. (The Element Lead Advisory Boards include: Planning Board, EDC, OUTBoard, Commission for the Environment, Historic Preservation Commission, Agriculture Preservation Board, Affordable Housing Board, Recreation and Parks Advisory Council) Following are specific Comprehensive Plan Goals and Objectives that have been part of the OUTBoard’s work in 2018: Transportation Overarching Goal: An efficient and balanced transportation system that uses multiple motorized and non-motorized modes of transportation and for which the planning, design, and implementation will be guided by the following overarching qualities: A. Protects air quality, water quality and quantity, soil quality, and biological resources B. Promotes public health and safety C. Encourages sustainable economic development D. Provides equal access to all users E. Is highly modally and inter-modally integrated and connected 19 F. Fosters sustainable and efficient use of resources, including financial and natural resources G. Protects the County’s natural and cultural heritage H. Uses creative and well-designed infrastructure I. Is attractive, user-friendly, and eas y to understand because of factors such as signage, brochures, and web pages J. Respects privacy and citizen rights. Transportation Goal 1: An efficient and integrated multi-modal transportation system that protects the natural environment and community character. Objective T-1.1: Increase the occupancy of automobiles through ridesharing and other means; and expand the use of public transit (including bus and rail), walking, and biking as primary modes of travel. Objective T-1.2: Facilitate the overall development and use of a transportation system that is more energy-efficient, reduces carbon emissions, and reduces the use of fossil fuels while promoting the use of local renewable and sustainable fuels. Objective T-1.3: Develop new transportation facilities in a manner that has a pos itive impact or avoids negative impacts on t he natural environment, including air quality, water resources, biological resources, and wildlife habitat. Objective T-1.4: Develop new transportation facilities in a manner that has a positive impact or avoids negative impacts on the community, including historical or cultural assets, existing neighborhoods, schools and recreational facilities, and the overall rural character in Orange County. Objective T-1.6: Expand the availability and use of public transportation (including bus and rail) throughout the County to provide better connections between employment centers, shopping and service locations, and other key points of interest in both urban and rural areas, particularly for the County's senior and disabled populations and others without access to automobiles. Transportation Goal 2: A multi-modal transportation system that is affordable, available, and accessible to all users and that promotes public health and safety. Objective T-2.1: Increase the provision of bikeways and walkways, and also increase supportive facilities such as bicycle parking zones. Objective T-2.2: Evaluate and serve special transportation needs of the senior population, youth, the economically disadvantaged and the disabled, including both everyday needs and disaster transit provision. Objective T-2.4: Improve the provision of public transit facilities and services, and also increase supportive facilities for transit, such as park and ride lots. 20 Objective T-2.5: Improve public education and advertising of existing transit services. Objective T-2.6: Increase safety awareness between car drivers and bicycle riders, and increase safety for pedestrians. Objective T-2.7: Construct bicycle facilities in Orange County that will make cycling safer, more convenient, and more efficient. Transportation Goal 3: Integrated land use planning and transportation planning that serves existing development, supports future development, and is consistent with the County’s land use plans which include provisions for preserving the natural environment and community character. Objective T-3.1: Improve the County’s transportation system by first enhancing existing facilities as opposed to developing new facilities. Objective T-3.2: Create and implement an Orange County Comprehensive Transportation Plan that provides the framework for a comprehensive and connected transportation system supporting a mix of all transportation modes, including sidewalks and bicycle facilities, bus and rail transit facilities, and highways. The plan should be coordinated with the goals and objectives of this Comprehensive Plan and seek to maintain and enhance community character and the natural environment. Objective T-3.3: Determine the policies to guide connectivity within and between residential developments based on their impact on neighborhood character. Objective T-3.4: Direct development to higher density mixed-use districts along transit corridors and make necessary multi-modal transportation improvements to service lands that are slated for future intense development, such as Economic Development Districts Objective T-3.5: Use innovative techniques to increase mobility and reduce rush hour congestion. Transportation Goal 4: A countywide and regionally-integrated, multi-modal transportation planning process that is comprehensive, creative and effective. Objective T-4.1: Work with nearby jurisdictions to integrate the County's transportation plans with those of other transportation planning agencies and service providers in Orange County and the Triangle region. T he resulting intermodal transportation system should reflect regional goals and objectives to meet projected travel demand and to reduce congestion and reliance on single occupancy vehicles. Objective T-4.2: Plan and integrate the County's multi-modal transportation routes and services with regional transportation agencies 21 and transit service providers, agencies and transit providers in neighboring counties, the North Carolina Department of Transportation, Amtrak, and the North Carolina Railroad. Identify any activities this board/commission expects to carry out in 2019 as they relate to established BOCC goals and priorities. If applicable, is there a fiscal impact (i.e., funding, staff time, other resources) associated with these proposed activities (please list). 1. Assist with the identification of potential NCDOT small transportation projects that may fit well within the context of the 2018-2019 High Impact – Low Cost Project Program, the Resurfacing Program, and the Spot Safety Program. Related staff time is a part of staff’s current work plan. 2. Continue to review and make recommended implementation efforts for the Bicycle Safety Task Force Report to the BOCC (BOCC Goal 3, Priority 20). Implementation efforts will utilize previously budgeted funds, and are a part of staff’s current work plan. 3. Review and comment on amendments to the UDO and revised Efland- Buckhorn-Mebane Access Management Plan (BOCC Goal 3). Related staff time is a part of staff’s current work plan. 4. Continue to work with staff and the BOCC to recommend and monitor Orange County Transportation Improvement Program (TIP) projects, including recommending new projects in 2018 (BOCC Goal 3, Priority 20). Related staff time is a part of staff’s current work plan. 5. Continue quarterly meetings with OCPT regarding Transit Advisory Services (TAS) to discuss new bus routes, unmet needs in the service area, service design and scheduling, marketing, billing rates and fares, resolve complaints; and to monitor compliance with federal regulations and the status of any deficiencies noted in any official federal, state or local review or report (BOCC Goal 3, Priority 20). Related staff time is a part of staff’s current work plan. 6. Review, comment and make recommendations on the B-G MPO CTP/ MTP (BOCC Goal 3, Priority 20). Related staff time is a part of staff’s current work plan. 7. Participate in the development of transportation projects as part of the TARPO, DCHC MPO and B-G MPO STI local input processes for SPOT 6.0. (BOCC Goal 3, Priority 20). Related staff time is a part of staff’s current work plan. 8. If referred by the BOCC: a. Implementation efforts related to the Safe Routes to School (SRTS) Action Plan (BOCC Goal 3, Priority 20). Related staff time would be a part of staff’s current work plan. 22 What are the concerns or emerging issues your board has identified for the upcoming year that it plans to address, or wishes to bring to the Commissioners’ attention? 1. Continue to explore implementation opportunities for Safe Routes to School (SRTS) projects, including prioritizing the county and the Town of Hillsborough working out an agreement for sidewalk construction and maintenance to facilitate sidewalks to the schools that are outside the Town limits; 2. Pursuit of funding sources for prioritized transportation projects and track status of project implementation; 3. Coordinate connectivity and infrastructural changes with the towns in order to create better conditions for bicycling and other alternate forms of non-motorized transportation; 4. Work with NCDOT to promote funding of pedestrian and bicycle projects in rural areas to a greater degree. 5. Promote alternative transportation modes during peak hours via public- private partnerships through collaboration with the Orange County Transportation Demand Manager (TDM) Coordinator. 23 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS  GOALS AND PRIORITIES    Goal One:  Ensure  a  community  network  of  basic  human  services  and  infrastructure that maintains, protects and promotes the well­  being of all County residents.  Priority 4: Review services to identify and protect ‘safety net’ programs  and services.  Priority  5:  Encourage  for  profit  investments  in  affordable  housing  and  review available tools.  Goal Two:  Promote an interactive and transparent system of governance  that reflects community values.  Priority 6: Develop plan and tools to improve how County and citizens  communicate with each other; foster two­way exchange.  Priority 7: Improve intra­ and intergovernmental coordination, cooperation  and collaboration.  (a) Work with Town of Hillsborough on:  Joint land use planning approaches, policies/ordinances, and annexation,  and Economic Development Districts. (b) Work with City of Durham on:  Economic Development Districts  Priority 8:  Examine advisory boards and commissions to: (a) Ensure they  are meeting their missions; (b) Determine how boards relate to each other  and  how  their  work  can  best be integrated with  the  BOCC;  (c)  Ensure  sustainability  goals;  (d)  Ensure  fit  with  overall  County  vision;  and  (e)  Recognize  (and  be  sensitive  to)  consistencies  represented  by  boards,  commissions when framing this review  Priority  26:  Clarify  and  communicate  to  public  how  and  why  County  funding is allocated the way it is  Goal Three: Implement  planning  and  economic  development  policies  which create a balanced, dynamic local economy, and which  promote diversity, sustainable growth and enhanced revenue  while embracing community values.  Priority  2:  Implement  Comprehensive  Plan  (a)  Rewrite  zoning  and  subdivision regulations (Unified Development Ordinance).  Priority 3:  Develop economic plans for three (3) districts. Attachment 2 24 2  Priority 9:  Update economic development plan for County:  (a) Clarify  economic development plan for each district; (b) Identify spectrum of tools;  (c) Identify other stakeholders; and (d) Identify what the County wants to  see happen.  Priority 10:  Develop an energy plan that includes economic development  strategies to attract, retain, and grown ‘green’ business  Priority 19:  Be actively involved and informed about UNC­CH decisions  and intentions  Priority 20:  Support transit, pedestrian, and bicycle facilities and other  alternatives to the single passenger automobile.  Priority 21:  Amend County zoning to address and modernize airport and  related issues.  Goal Four:  Invest in quality County facilities, a diverse work force, and  technology to achieve a high performing County government.  Priority 11:  Invest in technology to increase work efficiencies; e.g. web  streaming, paperless agendas, integrated tracking systems between field  and office.  Priority  22:  Review  and  update  County  personnel  and  operational  policies and procedures.  Priority 23: Design and fund space for County Attorney Offices. Manager  and BOCC to discuss concept and staffing  Goal Five:  Create,  preserve,  and  protect  a  natural  environment  that  includes  clean  water,  clean  air,  wildlife,  important  natural  lands  and  sustainable  energy  for  present  and  future  generations.  Priority 1:  Conserve high priority natural areas, wildlife habitat, and prime  forests.  Priority 12:  Implement County’s Environmental Responsibility goals  Priority  15:  Complete  stewardship  and  management  plans  for  Lands  Legacy.  Priority 16:  Develop an accounting and assessment system of water and  air pollution: (a) In conjunction with ICLEI; Set emissions reduction target 25 3  for  2030;  Conduct  public  education  campaign;  and  Link  public  with  opportunities  to  improve  energy  efficiency  and  use  sustainable  energy  sources; (b) Begin multi­year implementation of Observable Well Network  Priority 24:  Plan to acquire/land bank for future park development.  Priority 25:  Develop a policy/update current plan about how parks will be  developed,  appropriate  ratio  of  parks  to  population,  length  of  time  to  develop, and incorporation of such into the Capital Investment Plan (CIP).  Goal Six:  Ensure  a  high  quality  of  life  and  lifelong  learning  that  champions  diversity,  education  at  all  levels,  libraries,  parks,  recreation, and animal welfare.  Priority 13:  Plan to provide ‘equitable’ library services for Orange County  residents.  Priority  14:  Fulfill  remainder  of  bond  issuance  approved  by  voters  in  2001 for soccer and Twin Creeks  Priority  17:  Review  the  Schools  and  Adequate  Public  Facilities  Ordinance: (a) Is it doing what it was originally intended to do? (b) Does it  have application for Durham and Mebane?  Priority  18:  Address  inequities  between  old  and  new  schools.  Older  schools are in need of capital improvements. Building new schools has  been the funding priority. 26 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date:November 28, 2018 Action Agenda Item No.6.b. SUBJECT:Bicycle Safety Implementation Subcommittee (BSIS) Report DEPARTMENT:Planning and Inspections ATTACHMENT(S): 1. Final Posters 2. Draft Rules of the Road Brochure INFORMATION CONTACT: Abigaile Pittman, Transportation/Land Use Planner, 919-245-2567 PURPOSE:Receive a report on the recent activities of the BSIS. BACKGROUND:Since the October 17 OUTBoard meeting, four posters have been approved by the BSIS (Attachment 1) and printing ordered by staff. A draft brochure focused on ‘Rules of the Road’ has been prepared for OUTBoard review and comment (Attachment 2). Additionally, the bicycle safety website has been completed and is now live: https://orangecountyncbicyclesafety.com/. The video PSAs are included on the website and the poster still shots from the videos are being circulated through information monitors at locations throughout Orange County. Next Steps x Staff and the BSIS will continue to work on: x Social media ads and posts, and radio ads will be underway late fall of this year. Budgeted funds will be utilized for social media ads on Facebook, Instagram and Twitter, print and/or radio ads (WCHL Radio, News of Orange, etc.). Audio PSAs will be produced by WCOM Radio next spring. x The installation of fifteen bicycle safety road signs at entry points to the county and along frequently used bicycle routes late this year. FINANCIAL IMPACT:There is no i mmediate financial impact associated with this item. Budgeted funds from are being utilized. RECOMMENDATION(S):Staff recommends that the OUTBoard: 1. Receive information; and 2. Provide any comments or direction that the Board might have. 27 When passing a bicyclist in a no passing zone, the operator of the passing vehicle must allow four feet of space or change lanes.4 FeetGeneral Statute 20-150(e)For more information, call 919-245-2567www.orangecountyncbicyclesafety.com"UUBDINFOU28 Riding 2 abreast is allowed in North Carolina. It makes cyclists more visible and shortens the passing distance needed.General Statute 20-150(e)For more information, call 919-245-2567www.orangecountyncbicyclesafety.com29 Both motorists and bicyclists must pull over and stop for sirens and lights!General Statute 20-157(a)For more information, call 919-245-2567www.orangecountyncbicyclesafety.com30 • DRESS BRIGHT FOR SAFETY: Makeyourself visible by wearing bright orreflective clothing when you ride.• WATCH FOR AND AVOID ROADHAZARDS: Look for hazards that maycause you to crash, such as potholes,broken glass, gravel, puddles, leaves, and dogs.• USE BIKE LANES OR BIKE PATHS, IFAVAILABLE: While bikes are allowed on roads, riders may feel safer being separated from traffic. A lane or path is a safer chose than riding on a sidewalk. Sidewalk riding puts you at risk for crashes at driveways and intersections.• CONTROL YOUR BIKE: Ride with twohands on the handlebars unlesssignaling a turn. Place books and other items in a bike carrier or backpack. • USE VERBAL AND NON-VERBALCOMMUNICATION:This includes eyecontact with drivers,bells, turn signals,pointing to road hazards forbicyclists behind you, andstating “passing on your left,” or “on your left.” Protect your brain, save your lifeFitting Your Bike Helmet•EYES: Helmet should sit one or twofinger widths above your eyebrow.• EARS: The straps should meetright under your ear lobes toform a “Y.”• MOUTH: The strap should be looseenough so you can breathe andinsert a finger between the buckleand your skin, but tight enoughthat if you drop your jaw you canfeel the helmet pull down on thetop of your head.For more information: www.nhtsa.gov/sites/nhtsa.dot.gov/files/8019_fitting-a-helmet.pdfAIR. Be sure tires are properly inflated and spin the wheels to make sure the tires are not worn out and the wheels don’t wobble.BRAKES. Check to be sure coaster brakes will stop the bike when you pedal backward. To check hand brakes, squeeze them back and make sure they don’t hit the handlebars. Brake pads should still have ¼ “ of pad on them and should not be rubbing against the wheel rim. Test the brakes to be sure they can stop the bike before you ride.CRANKS, CHAINS, COGS. The crank arms are what the pedals attach to. Pull your cranks away from the bike – if they are loose, tighten the bolt. Check your that your chain is free of rust and gunk. If you bike has gears, check to be sure the chain can go from one gear (cog) to another.• WATCH FOR PARKED CARS: Ride far enough from aparked car to avoid being hit by a car door openingor a car pulling out.• WATCH FOR CARS COMING FROM DRIVEWAYSAND SIDE STREETS: Be prepared to stop if you see acar entering the road in front of you.•YIELD TO TRAFFIC and PEOPLEWALKING: Slow down and look.• ENTERING THE ROAD: Look left,right, then left again before enteringthe road.• USE LIGHTS: White lights onthe front of the bike and a red reflector and red light on the back are required at night.• RIDE ON THE RIGHT: Ride withthe flow of traffic, not against it.• FOLLOW ALL TRAFFIC LAWS:Obey traffic signs, signals andlane markings.• BE PREDICTABLE: Ride in astraight line, don’t weave, useturn signals.• SIGNAL BEFORE TURNING: Look behind, thensignal, watch for traffic.BE PREPARED • BE PREDICTABLE • BE VISIBLEQUICK RELEASE. Some bikes have quick releases on the wheels or the seat post. Check to be sure the quick releases are tight and closed properly. CHECK THE BIKE. Check the seat and the handlebars to be sure they are tight and at the proper height. Get on the bike and check to make sure everything works before riding.Passing on your left!For more information, call 919-245-2567www.orangecountyncbicyclesafety.com31 ROLL with RESPECT A Guide for People who Drive and People who Ride What to put on back panel? "UUBDINFOU 32 Orange County Cares about the safety of all of its road users. Please follow these rules and best practices to keep everyone safe on our roads. CYCLISTS Ride Predictably • Bicycles are vehicles in NC and shouldoperate as vehicles • )ollow ALL traϫc laws • Always ride in the same direction as traϫc • Ride as far to the right as is practicable (oftendebris or broken pavement, preparing to changelanes, or the need for more conspicuity, mayrequire you to ride in the center of the lane,which is allowed) • Scan behind you before changing lanes • Signal when turning • Do not swerve between parked cars • Do not ϧlter up beside stopped cars atintersections • Make eye contact with motorists, especiallyat intersections & driveways • Give an audible warning to pedestrianswhen approaching from behind • Pull over for emergency vehicles with sirens and lights on Be Safe, Be Visible • Don’t wear headphones while riding • Wear a properly ϧtting helmet (NC law requiresthose under 16 to wear a helmet) • When riding at night, NC law requires cycliststo have a white front headlight, a rear reϩector,AND a red rear light or reϩective clothing MOTORISTS Watch for Bicycles In NC, bicyclists have the same rights & duties as a motorist & are subMect to traϫc vehicle laws Some laws for motorists changed in 16 )or more info visit httpswwwncdotgovdivisions bikepedPagesbikepedlawsasp[ • Always Drive Cautiously • Scan for cyclists in traϫc & at intersections • Look for cyclists before opening your car door • Do not te[t while driving or drive distracted • Cyclists are vehicles & should be givenappropriate right of way • Cyclists may use the entire traϫc lane, andare not required to ride single ϧle Pass with Care • Reduce speed when encountering cyclists • Give cyclists e[tra trailing & passing roomin potentially dangerous situations • Drivers may legally cross a double yellow lineto pass a cyclist provided they have clear sightdistance and it is safe to do so • Motorists passing bikes must provide at least4 feet between their vehicle & the bicyclist, orthey must completely change lanes to pass • Do not blast your horn at or near cyclists • Drivers causing cyclists to leave their travel lane& causing a crash or inMury can be ϧned up to  4 feet or change lanes 33 34 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: November 28, 2018 Action Agenda Item No. 7 SUBJECT: Staff Updates DEPARTMENT: Planning and Inspections ATTACHMENT(S): 1. MPO/RPO NCDOT Project Updates 2. Criteria for High Impact – Low Cost Projects 3. High Impact – Low Cost Funding Report INFORMATION CONTACT: Abigaile Pittman, Transportation/Land Use Planner, 919-245-2567 Nish Trivedi, Transportation Planner 919-245-2582 PURPOSE: Receive staff updates and provide any comments that the Board might have. Item 7.a – MPO/RPO NCDOT Project Updates - NCDOT regularly releases lists of transportation projects underway in the DCHC MPO and BG MPO. See Attachment 1. Item 7.b. – OUTBoard Orientation Materials – At several meetings earlier this year, staff reviewed and revised OUTBoard Orientation materials with the Board. The proposal was to bring all information up to date, to add new topics that have arisen over the past several years, and t o provide materials that would be most helpful to Board members. The orientation materials are now available online through the Boards and Committees section of the Planning Department’s web page: http://www.orangecountync.gov/2005/OUTBoard- Orientation-Materials . Links are also provided within the orientation sections to information that is already provided elsewhere and/or regularly updated by other agencies, such as NCDOT and the MPOs/RPO. In this way, information is uniformly and accurately updated by the responsible agency. Staff will schedule an orientation session with new OUTBoard members in December, and any other members that wish to attend. Item 7.c. – Call for High Impact – Low Cost Projects – At its October 17 meeting, staff requested OUTBoard members assist them in developing potential project lists by making note of needed small transportation improvements as they travel county roads. Throughout each fiscal year opportunities arise for Orange County to submit requests to fund small transportation projects to the North Carolina Department of Transportation (NCDOT). Potential funding sources for these projects include the 2018-2019 High Impact – Low Cost Project Program. Last week staff received a notice from NCDOT that they are requesting project submittals under the High Impact – Low Cost Project Program. NCDOT expects the program will be funded at $1.78M/year for each of the 14 NCDOT Divisions. 35 NCDOT uses a quantitative, evidence-based formula when selecting Highway projects to receive funding for 2019 candidate projects (Attachment 2). The criteria address: • Current volume/AADT • Accident rate (Combined Safety Score) • Existing lane width • Existing shoulder width • Pavement condition score • Non-Highway modal components included in project • Other Funding Availability • County Tier Designation NCDOT Division 7’s 2018 list of funded projects is also provided for reference (Attachment 3). If estimated candidate project costs exceed $250,000, a Resolution of Support from the Board of County Commissioners (BOCC) is required. The turn-around time between NCDOT notification of requested projects, and the deadline for submission is typically very short and rarely allows sufficient time for full OUTBoard review and discussion. The deadline to submit projects for funding under the High Impact – Low Cost Project Program is Monday, December 3, 2018. Staff will bring a list of proposed project submissions to the November 28 meeting. OUTBoard is invited to submit suggestions for candidate projects to staff by Wednesday, November 28, 2018 (at the OUTBoard meeting). FINANCIAL IMPACT: There is no i mmediate financial impact associated with this item. Budgeted funds from are being utilized. RECOMMENDATION(S): Staff recommends that the OUTBoard: 1. Receive information; and 2. Provide any comments that the Board might have. 36 TIP/WBS # Description Let/Start Date Completion Date Cost Status Project Lead SS-4907BS 44894.2.1 44894.3.1 Installation of traffic signal at the intersection of US70 and SR 1114 (Buckhorn Road) East of Mebane. 5/31/2017 Dec. 2018 $40,500 R/W $43,200 CON Utility relocations complete, Right of entry complete, R/W acquisition pending Dawn McPherson U-5846 50236.1.1 50236.2.1 50236.3.1 Construct a roundabout at SR 1772 (Greensboro Street) and SR 1780 (Estes Drive) in Carrboro. 9/6/2018 FY2021 $775,000 1st bid opening received no bids, Re-let 9/6/18 bids exceeded engineers estimate, project cost evalution being performed Chad Reimakoski W-5707C 44853.1.3 44853.3.3 47490 Revise pavement markings and overhead lane use signs for removal of inside lane drop configuration on I-40 Westbound in vicinity of US 15-501 interchange. Resurfacing I-40 WB by use of contingency funds 11/1/2018 Aug. 2019 $395,000 Planning and design activities underway, re-let due to bids exceeded engineers estimate, new let date 11/1/18 Chad Reimakoski 47798 Increase length of existing turn lane / slip ramp and improve existing radius in the SE quadrant of US 70 Business/ NC 86 at US 70 Bypass in Hillsborough 1/17/2019 Jun. 2019 $189,000 Planning and design activities complete, R/W certified 9/18/18 Chad Reimakoski U-5847 50238.1.1 50238.2.1 50238.3.1 Intersection improvements at SR 1010 (West Franklin St.) and SR 1771 (Merritt Mill Rd)/SR1927 (Brewer Lane) in Chapel Hill / Carrboro. 1/17/2019 FY 2020 $775,000 Planning and design activities underway, bike/ped improvements to be completed under project 48283 Chris Smitherman 48283 Remove and replace existing curb & gutter and sidewalk, add pedestrian signals, concrete island, and signal modifications on SR 1010 (E. Main St / W. Franklin St) from Brewer Ln to Graham St. in Chapel Hill and Carrboro 5/31/2019 Sept. 2019 $250,000 Funds approved 9/6/18, Construction May 2019 Chris Smitherman B-4962 40174.1.1 40174.2.1 40174.3.1 Replace Bridge #46 over Eno river on US 70 Bypass 4/16/2019 FY 2021 $5,826,000 Planning and Design activities underway, ROW acquisition - 15% complete Kevin Fischer NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT Attachment 1 37 TIP/WBS # Description Let/Start Date Completion Date Cost Status Project Lead NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT SS-4907CD 47936.1.1 47936.2.1 47936.3.1 Horizontal curve improvements on SR 1710 (Old NC 10) west of SR 1561/SR 1709 (Lawrence Road) east of Hillsborough. Improvements consist of wedging pavement and grading shoulders. 12/5/2019 Spring 2020 $261,000 Planning and design activities underway Chad Reimakoski I-3306A 34178.1.3 34718.2.2 34178.3.3 Wideing I-40 from I-85 in Orange Co. to Durham Co. line (US 15/501 Interchange) TBD TBD $98,800,000 Planning and design activities underway, No schedule at this time other than CE doucment scheduled for 12/28/2018 Laura Sutton P-5701 46395.1.1 46395.3.1 Construct Platform, Passenger Rail Station Building at Milepost 41.7 Norfolk Southern H-line in Hillsborough 6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020, Coordinate with U-5848 Matthew Simmons R-5821A 47093.1.2 47093.2.2 47093.3.2 Construct operational improvements including Bicycle/Pedestrian accommodations on NC 54 from SR 1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville Road). 6/21/2022 FY2024 $3,924,000 Planning and design activities underway, coordinating with NC54 West Corridor Study Jennifer Evans U-5848 50237.1.1 50237.2.1 50237.3.1 Extend SR 1006 (Orange Grove Road) on new location with Sidewalks and bike lanes from existing SR 1006 (Orange Grove Road) to US 70 Business in Hillsborough. 3/21/2023 FY 2025 $5,326,000 Planning and Design activities underway, Coordinate with P-5701 and U-5845 Laura Sutton I-3306AC 34178.1.6 34178.2.5 434178.3.9 Interchange improvements at I-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities underway Laura Sutton I-5959 45911.1.1 45911.3.1 Pavement Rehabilitation on I-85 from West of SR 1006 (Orange Grove Road) to Durham County line 11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17 Chris Smitherman I-5967 45917.1.1 45917.2.1 45917.3.1 Interchange improvements at I-85 and SR 1009 (South Churton Street) in Hillsborough 1/16/2024 FY 2027 $20,700,000 Planning and Design activities underway Laura Sutton 38 TIP/WBS # Description Let/Start Date Completion Date Cost Status Project Lead NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT U-5845 50235.1.1 50235.2.1 50235.3.1 Widen SR 1009 (South Churton Street) to multi-lanes from I- 40 to Eno River in Hillsborough 1/16/2024 FY 2027 $49,751,000 Planning and Design activities underway, Coordinate with U-5848 and I-5984 Laura Sutton I-5984 47530.1.1 47530.2.1 47530.3.1 Interchange improvements at I-85 and NC 86 in Hillsborough 11/18/2025 FY 2027 $16,488,000 Funding approved 10/10/17, Coordinate with U-5845 and I-5959 Laura Sutton U-6071 47496.1.1 47496.2.1 47496.3.1 Intersection improvements at NC 54 and SR 1007 (Old Fayetteville Rd) in Carrboro 1/15/2026 FY 2027 $1,216,000 Planning and design activities underway Jennifer Evans 39 ContractNumberTIPNumberLocation DescriptionContractor NameResidentEngineerContract BidAmountAvailabilityDateCompletionDateWork StartDateEstimatedCompletionDateProgressSchedulePercentCompletionPercentNorth Carolina Department of TransportationActive Projects Under Construction - Orange Co.C203640REPLACEMENT OF 4 BRIDGES INGUILFORD COUNTY AND 3 BRIDGESIN ORANGE COUNTY.HAYMES BROTHERS,INC.Lorenz, PE, Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 12/01/2018 100.00 87.93C203946 B-5348DANE CONSTRUCTIONINCKirkman, PE,Christopher D$984,596.98 02/01/2018 12/27/2018 02/01/2018 01/30/2019 99.00 92.33C204025 I-5954PAVEMENT REHABI-40/I-85 FROM EAST OF NC-54 IN GRAHAM IN ALAMANCE CO. TO WEST OF SR-1114 (BUCKHORN RD) IN ORANGE CO.APAC - ATLANTIC INCTHOMPSON ARTHURDIVISIONKirkman, PE,Christopher D$9,699,053.68DG00302 P-4405K EXTEND BRYDSVILLE ROAD TO NC86 AND REMOVE RAIL CROSSINGTRIANGLE GRADING &PAVING INCKirkman, PE,Christopher D$1,683,900.00 07/01/2016 12/30/2017 09/29/2016 10/31/2018 100.00 89.87DG00321IMPROVEMENTS ONSR 1004 (EFLAND-CEDAR GROVE RD) CAROLINA SUNROCK,LLCKirkman, PE,Christopher D$1,711,133.05 04/02/2018 04/02/2019 04/02/2018 04/02/2019 85.20 69.86DG00332W-5601 IF I-85 GUARDRAIL END TERMINALUPGRADESNICKELSTONINDUSTRIES INCKirkman, PE,Christopher D$494,243.00 12/05/2016 09/05/2017 05/01/2017 08/22/2018 100.00 100.00DG00371RESURFACE 9 SECONDARY ROADSCAROLINA SUNROCKLLCKirkman, PE,Christopher D$1,688,750.33 07/05/2017 11/01/2018 08/30/2017 11/01/2018 62.00 96.08DG00372R-5787B ADA CURB RAMPS IN BURLINGTON,GIBSONVILLE, GRAHAM, MEBANE IN ALAMANCE CO., CARRBORO & CHAPEL HILL IN ORANGE COUNTYATLANTICCONTRACTINGCOMPANY, INC.Kirkman, PE,Christopher D$128,910.00 07/24/2017 03/28/2019 02/26/2018 08/31/2018 89.81 98.29DG00391REPLACE BRIDGE # 104 OVER STONEY CREEK ON SR 1712 (UNIVERSITY STATION RD)R.E. BURNS & SONSCO., INC.Kirkman, PE,Christopher D$561,562.02 01/30/2018 10/26/2018 03/01/2018 05/02/2019 99.00 63.09DG00393RESURFACE SR 1101, SR 1118, SR 1119, SR 1124, SR 1125, SR 1127,SR 1128 SR 1130, SR 1134, SR 1135, SR 1137, SR 1141, SR 1143, ETC.RILEY PAVING INC Kirkman, PE,Christopher D$1,084,520.40 04/02/2018 10/12/2018 06/18/2018 10/12/2018 60.00 63.83DG00395REPLACE BRIDGE #189 ON SR 1114 (BUCKHORN ROAD) OVER CANE CREEKS T WOOTENCORPORATIONKirkman, PE,Christopher D$723,924.13 04/01/2018 01/01/2019 05/07/2018 02/07/2019 97.00 99.75DG00413RESURFACE US 70 BUS, SR 1009, SR 1102 , SR 1129, SR 1239, SR 1352, SR 1716 AND SR 1841CAROLINA SUNROCKLLCKirkman, PE,Christopher D$3,562,232.66 05/28/2018 11/01/2019 05/29/2018 11/01/2019 32.00 38.14DG00419RESURFACE NC 86 AND 17 SECONDARY ROADSCAROLINA SUNROCKLLCKirkman, PE,Christopher D$3,764,001.64 05/14/2018 11/01/2019 05/14/2018 11/01/2019 40.00 23.23DG00427REPLACE BRIDGE #51 ON SR 1534 (MCKEE ROAD) OVER BUFFALO CRKNATIONAL BRIDGEBUILDERS LLCKirkman, PE,Christopher D$521,443.82 05/07/2018 03/04/2019 07/30/2018 04/29/2019 23.00 24.84DG00435RESURFACE 22 SECONDARY ROADSWHITEHURST PAVINGCO INCKirkman, PE,Christopher D$846,340.66 04/01/2019 10/11/2019DG00444 R-5821B INTERSECTION IMPORVEMENTS ATTHE INTERSECTION OF NC 54 ANDSR 1006 (ORANGE GROVE ROAD)FSC II LLC DBA FREDSMITH COMPANYKirkman, PE,Christopher D$1,039,900.00 07/16/2018 05/16/2019 08/13/2018 05/16/2019 14.21 4.85DG00445 R-5787BB INSTALLATION OF ADA COMPLIANTCURB RAMPS AT VARIOUSINTERSECTIONSLITTLE MOUNTAINBUILDERS OFCATAWBA COUNTYINCKirkman, PE,Christopher D$319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 10.00 22.75REPLACE BRIDGE #85 OVER PHILS CRK ON SR-1005(OLD G'BORO RD)W-514340 ContractNumberTIPNumberLocation DescriptionContractor NameResidentEngineerContract BidAmountAvailabilityDateCompletionDateWork StartDateEstimatedCompletionDateProgressSchedulePercentCompletionPercentNorth Carolina Department of TransportationActive Projects Under Construction - Orange Co.DG00445 W-5707A INSTALLATION OF ADA COMPLIANTCURB RAMPS AT VARIOUSINTERSECTIONSLITTLE MOUNTAINBUILDERS OFCATAWBA COUNTYINCKirkman, PE,Christopher D$319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 10.00 22.75DG00451 U-5854 SR 1008 (MT. CARMEL CHURCHROAD) AND SR 1913 (BENNETTROAD) ROUNDABOUT AND RELATEDSAFETY IMPROVEMENTSCAROLINA SUNROCKLLCKirkman, PE,Christopher D$1,833,468.84 08/15/2018 04/30/202041 ContractNumberTIPNumberLocation DescriptionContractor NameResidentEngineerContract BidAmountAvailabilityDateCompletionDateWork StartDateEstimatedCompletionDateProgressSchedulePercentCompletionPercentNorth Carolina Department of TransportationActive Projects Under Construction - Orange Co.C203640REPLACEMENT OF 4 BRIDGES INGUILFORD COUNTY AND 3 BRIDGESIN ORANGE COUNTY.HAYMES BROTHERS,INC.Lorenz, PE, Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 11/01/2017 93.20 86.93C203641REPLACEMENT OF 5 BRIDGES INGUILFORD COUNTY AND 5 BRIDGESIN ORANGE COUNTY.R.E. BURNS & SONSCO., INC.Kirkman, PE,Christopher D$5,940,323.00 06/01/2015 11/01/2018 06/01/2015 08/31/2018 100.00 99.40C203946 B-5348DANE CONSTRUCTIONINCKirkman, PE,Christopher D$984,596.98 02/01/2018 12/27/2018 02/01/2018 01/30/2019 99.00 85.05C204025 I-5954PAVEMENT REHAB ON I-40/I-85 FROM EAST OF NC-54 IN GRAHAM TO WEST OF SR-1114 (BUCKHORN RD) IN ORANGE COUNTY.APAC - ATLANTIC INCTHOMPSON ARTHURDIVISIONKirkman, PE,Christopher D$9,699,053.68DG00302 P-4405K EXTEND BRYDSVILLE ROAD TO NC86 AND REMOVE RAIL CROSSINGTRIANGLE GRADING &PAVING INCKirkman, PE,Christopher D$1,683,900.00 07/01/2016 12/30/2017 09/29/2016 10/31/2018 100.00 89.87DG00321SR 1004 (EFLAND-CEDAR GROVE RD) CAROLINA SUNROCKLLCKirkman, PE,Christopher D$1,711,133.05 04/02/2018 04/02/2019 04/02/2018 04/02/2019 25.00 49.86DG00332W-5601 IF I-85 GUARDRAIL END TERMINALUPGRADESNICKELSTONINDUSTRIES INCKirkman, PE,Christopher D$494,243.00 12/05/2016 09/05/2017 05/01/2017 09/05/2018 100.00 100.00DG00371RESURFACE 9 SECONDARY ROADSCAROLINA SUNROCKLLCKirkman, PE,Christopher D$1,688,750.33 07/05/2017 11/01/2018 08/30/2017 11/01/2018 42.40 92.43DG00372R-5787B ADA CURB RAMPS IN BURLINGTON,GIBSONVILLE, GRAHAM, MEBANE IN ALAMANCE CO., CARRBORO & CHAPEL HILL IN ORANGE COUNTYATLANTICCONTRACTINGCOMPANY, INC.Kirkman, PE,Christopher D$128,910.00 07/24/2017 03/28/2019 02/26/2018 03/28/2019 40.95 54.52DG00391REPLACE BRIDGE # 104 OVER STONEY CREEK ON SR 1712 (UNIVERSITY STATION RD)R.E. BURNS & SONSCO., INC.Kirkman, PE,Christopher D$561,562.02 01/30/2018 10/26/2018 03/01/2018 05/02/2019 60.07 72.05DG00393RESURFACE SR 1101, SR 1118, SR 1119, SR 1124, SR 1125, SR 1127,SR 1128 SR 1130, SR 1134, SR 1135, SR 1137, SR 1141, SR 1143, ETC.RILEY PAVING INC Kirkman, PE,Christopher D$1,084,520.40 04/02/2018 10/12/2018 06/18/2018 10/12/2018 24.00 25.98DG00395REPLACE BRIDGE #189 ON SR 1114 (BUCKHORN ROAD) OVER CANE CREEKS T WOOTENCORPORATIONKirkman, PE,Christopher D$723,924.13 04/01/2018 01/01/2019 05/07/2018 02/07/2019 95.25 69.47DG00413RESURFACE US 70 BUS, SR 1009, SR 1102 , SR 1129, SR 1239, SR 1352, SR 1716 AND SR 1841CAROLINA SUNROCKLLCKirkman, PE,Christopher D$3,562,232.66 05/28/2018 11/01/2019 05/29/2018 11/01/2019 23.00 24.53DG00419RESURFACE NC 86 AND 17 SECONDARY ROADSCAROLINA SUNROCKLLCKirkman, PE,Christopher D$3,764,001.64 05/14/2018 11/01/2019 05/14/2018 11/01/2019 26.00 7.32DG00427REPLACE BRIDGE #51 ON SR 1534 (MCKEE ROAD) OVER BUFFALO CRKNATIONAL BRIDGEBUILDERS LLCKirkman, PE,Christopher D$521,443.82 05/07/2018 03/04/2019 07/30/2018DG00435AST RETREATMENT ON 22 SECONDARY ROADSWHITEHURST PAVINGCO INCKirkman, PE,Christopher D$846,340.66 04/01/2019 10/11/2019DG00444 R-5821B INTERSECTION IMPORVEMENTS ATTHE INTERSECTION OF NC 54 ANDSR 1006 (ORANGE GROVE ROAD)FSC II LLC DBA FREDSMITH COMPANYKirkman, PE,Christopher D$1,039,900.00 07/16/2018 05/16/2019REPLACE BRIDGE #85 OVER PHILS CRK ON SR-1005(OLD G'BORO RD)W-514342 ContractNumberTIPNumberLocation DescriptionContractor NameResidentEngineerContract BidAmountAvailabilityDateCompletionDateWork StartDateEstimatedCompletionDateProgressSchedulePercentCompletionPercentNorth Carolina Department of TransportationActive Projects Under Construction - Orange Co.DG00445 R-5787BB INSTALLATION OF ADA COMPLIANTCURB RAMPS AT VARIOUSINTERSECTIONSLITTLE MOUNTAINBUILDERS OFCATAWBA COUNTYINCKirkman, PE,Christopher D$319,319.80 06/25/2018 02/15/2020W-5707A INSTALLATION OF ADA COMPLIANTCURB RAMPS AT VARIOUSINTERSECTIONSLITTLE MOUNTAINBUILDERS OFCATAWBA COUNTYINCKirkman, PE,Christopher D$319,319.80 06/25/2018 02/15/2020DG00451 U-5854 SR 1008 (MT. CARMEL CHURCHROAD) AND SR 1913 (BENNETTROAD) ROUNDABOUT AND RELATEDSAFETY IMPROVEMENTSCAROLINA SUNROCKLLCKirkman, PE,Christopher D$1,833,468.84 08/15/2018 04/30/202043 TIP/WBS # Description Let/Start Date Completion Date Cost Status Project Lead ER-2971 3607.3.08 Install widening, curb and gutter, and construct sidewalk on NC 49 (Main St.) between the east side of the Haw River Bridge and Stone St. in Haw River 1/27/16 Oct. 2018 $275,000 LAP- Under construction - 100% complete, final inspection pending Donnie Huffines SS-4907BS 44894.1.1 44894.2.1 44894.3.1 Installation of traffic signal at the intersection of US70 and SR 1114 (Buckhorn Road) East of Mebane. 5/31/17 Dec. 2018 $40,500 R/W $43,200 CON Utility relocations complete, Right of entry complete, R/W acquisition pending Dawn McPherson SS-4907BQ 44757.1.1 44757.2.1 44757.3.1 Intersection improvements (All Way Stop) at SR 1005 (Greensboro-Chapel Hill Road) at SR 2369 (Sylvan School Road) and SR 2371 (Pleasant Hill Road) in Snow Camp. 8/15/17 Fall 2018 $22,500 R/W $153,000 CON 4-way stop installation and flasher completed 4/17/18, R/W certified 9/25/18, utility relocations underway, widening Fall 2018 Chris Smitherman Dawn McPherson SS-4907CB 47675.1.1 47675.2.1 47675.3.1 47721 Installation of traffic signal at the intersection of SR 1530 (Burch Bridge Road) at SR 1515 (Flora Avenue) north of Burlington. 7/2/2018 Dec. 2018 $107,500 Traffic signal activated, Project completed pending final RTE inspection Dawn McPherson U-6015 47160.1.1 47160.2.1 47160.3.1 Burlington-Graham Signal System upgrade 9/18/18 FY2020 $11,851,000 R/W Certified 7/18/2018, Let and awarded contract to ALS of North Carolina Sherry Yow U-5843 50233.2.1 50233.3.1 Intersection improvements at US 70 (South Church Street) and SR 1817 (Graham-Hopedale Road) in Burlington 11/15/18 FY2020 $2,300,000 R/W Certified, Utility relocations pending, Project let and received no bids, Re-let 11/15/18 Chad Reimakoski ER-2971 3607.1.16 3607.3.16 Construct sidewalk on the east side of SR1716 (N. Graham Hopedale Rd) between Wilkins St. and North Ashland Drive in Burlington Nov. 2018 Apr. 2019 $70,000 LAP, Let schedule pending Donnie Huffines NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT 44 TIP/WBS # Description Let/Start Date Completion Date Cost Status Project Lead NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT 47771 Widen and improve right turn taper, radius and signal upgrade at the intersection of NC 54 and SR 1945 (Riverbend Rd.) in Graham. Nov. 2018 Mar. 2019 $250,000 Planning and design activities underway, scope reduction in progress Chad Reimakoski 48712 Planning and design of SR 1446 (Rockwood Ave.) from existing end of maintenance to NC87 in Glen Raven. Develop roadway, hydraulic and ROW plans N/A N/A $500,000 Funding approved Sept. 2018 Chris Smitherman 47786 SM-5707B 47903.2.1 Intersection improvements on SR 1007 (Mebane Oaks Rd) at SR 2126/2128 (Old Hillsborough Rd) south of Mebane. Improvements include addition of left and right turn lanes, radii widening, signal installation, resurfacing, and pavement markings. Jan. 2019 May. 2019 $898,500 Planning and design activities underway, ROW acquisition pending, CFI schedule pending Chad Reimakoski AV-5737 46331.1.1 46331.2.1 Burlington-Alamance Regional Airport, Obtain navigation easements and clear obstructions in runway 24 approach Jan. 2019 FY2019 $1,200,000 Funding approved Feb. 2018, R/W acquisition scheduled 10/27/18 Rachel Bingham W-5707D 44853.1.4 44853.2.4 44853.3.4 Safety improvements for curve on NC 49 located between Buckingham Mountain Road (non-system) and SR 2363 (Beale Road) in Snow Camp. 5/16/19 FY2020 $200,000 R/W $450,000 CON Planning and design activities underway Chad Reimakoski I-5711 50401.2.1 50401.3.1 Interchange improvements at I-40/I-85 and SR 1007 (Mebane Oaks Rd) in Mebane 9/17/19 FY2022 $17,446,000 Planning and design activities underway Laura Sutton U-6010 47145.1.1 47145.2.1 47145.3.1 Intersection improvements at US 70 (South Church Street) and SR 1226/SR 1311 (University Drive) in Burlington 10/20/20 FY2021 $1,300,000 Planning and design activities underway Brian Ketner U-6011 47146.1.1 47146.2.1 47146.3.1 Intersection improvements at US 70 (South Church Street) and SR 1158 (Huffman Mill Rd) in Burlington 11/17/20 FY2021 $1,300,000 Planning and design activities underway Brian Ketner U-5844 50234.1.1 50234.2.1 50234.3.1 Construct multi-lanes on NC62 from SR 1430 (Ramada Road) to US 70 (South Church Street) in Burlington 11/17/20 FY2021 $10,900,000 Planning and design activities underway, R/W acquisition tentatively scheduled for 8/30/19 Chris Smitherman 45 TIP/WBS # Description Let/Start Date Completion Date Cost Status Project Lead NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT U-6017 47162.1.1 47162.2.1 47162.3.1 Intersection improvements at NC 54 (East Harden St.) and NC 49 (East Elm St.) in Graham 1/19/21 FY 2022 $1,216,000 Planning and design activities underway Chad Reimakoski U-6009 47144.1.1 47144.2.1 47144.3.1 Widen and construct center turn lane on US70 (West Church St) from Tarleton Ave. to Fifth Street in Burlington 6/15/21 FY2023 $11,319,000 Planning and design activities underway Chad Reimakoski U-6013 47158.1.4 47158.2.4 47158.3.4 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- Hawfields Rd)/ SR 2126 (Old Hillsborough Rd) to Lowes Blvd (non-system) in Mebane. 7/19/22 FY 2024 $8,700,000 Planning and design activities underway Jennifer Evans U-6014 47159.1.1 47159.2.1 47159.3.1 Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with Bicycle/Pedestrian accommodations from SR 1720 (West Hanover Rd) to Morningside Drive in Burlington 7/19/22 FY 2024 $15,200,000 Planning and design activities underway Chad Reimakoski I-6009 47962.1.1 47962.2.1 47962.3.1 Interchange improvements at I-40/I-85 and SR 1158 (Huffman Mill Road). Construct additional right turn lane on I- 40 WB Ramp and improve operations at SR 1308 (Garden Road) intersection in Burlington 6/18/26 FY2027 $1,936,000 PE funding approved 6/5/18 Chris Smitherman 46 ContractNumberTIPNumberLocation DescriptionContractor NameResidentEngineerContract BidAmountAvailabilityDateCompletionDateWork StartDateEstimatedCompletionDateProgressSchedulePercentCompletionPercentNorth Carolina Department of TransportationActive Projects Under Construction - Alamance Co.C203676 B-5239REPLACE BRIDGE #126 OVER MILL RACE AND BRIDGE #119 OVER HAW RIVER ON NC-87.DANE CONSTRUCTIONINCKirkman, PE,Christopher D$4,786,122.27 03/15/2018 03/29/2020 03/15/2018 03/29/2020 27.00 25.98C203782 I-5309PAVEMENT REHAB ON I-40/I-85 FROM EAST OF THE GUIL. CO LINE TO 0.2 MILES EAST OF NC-54 IN GRAHAM.APAC - ATLANTIC INCTHOMPSON ARTHURDIVISIONKirkman, PE,Christopher D$11,966,430.84 04/25/2016 11/30/2017 07/05/2016 11/15/2018 100.00 100.00I-5836PAVEMENT REHAB ON I-40/I-85 FROM EAST OF THE GUIL. CO LINE TO 0.2 MILES EAST OF NC-54 IN GRAHAM..APAC - ATLANTIC INCTHOMPSON ARTHURDIVISIONKirkman, PE,Christopher D$11,966,430.84 04/25/2016 11/30/2017 07/05/2016 11/15/2018 100.00 100.00C203844 U-3109A NC-119 RELOCATION FROM I-40/85TO SR-1921 (MEBANE ROGERS RD/STAGE COACH RD).THALLECONSTRUCTION CO.,INC.Kirkman, PE,Christopher D$45,389,069.36 06/26/2017 01/28/2021 08/03/2017 02/01/2021 38.10 31.47C203984 B-5347REPLACE BRIDGE #170 OVER A PRONG OF BIG ALAMANCE CREEK ON SR-1145 (POND RD).MOUNTAIN CREEKCONTRACTORS INCKirkman, PE,Christopher D$1,182,371.52 03/15/2018 03/09/2019 04/16/2018 04/25/2019 68.00 67.44C204025 I-5954PAVEMENT REHAB ON I-40/I-85 FROM EAST OF NC-54 IN GRAHAM IN ALA. COUNTY TO WEST OF SR-1114 (BUCKHORN RD) IN ORANGE CO.APAC - ATLANTIC INCTHOMPSON ARTHURDIVISIONKirkman, PE,Christopher D$9,699,053.68C204026 I-5956PAVEMENT REHAB ON I-40/I-85 FROM EAST OF SR-3056 (ROCK CRK DAIRY RD) TO WEST OF SR-1226 (UNIV. DR).APAC - ATLANTIC INCTHOMPSON ARTHURDIVISIONIngram, PE, J.Paul$4,067,357.08 08/28/2017 07/01/2018 04/30/2018 11/16/2018 95.00 90.48C204106 U-3109B NC-119 RELOCATION NORTH OFSR-1921 (MEBANE ROGERS RD) TOSOUTH OF SR-1918 (MRS WHITE RD).THALLECONSTRUCTION CO.,INC.Kirkman, PE,Christopher D$8,151,660.80 08/27/2018 11/28/2020 10/04/2018 11/28/2020 6.70 2.52DG00372R-5787B ADA CURB RAMP IMPROVEMENTS ATINTERSECTIONS IN BURLINGTON GIBSONVILLE, GRAHAM, MEBANE,CARRBORO & CHAPEL HILLATLANTICCONTRACTINGCOMPANY, INC.Kirkman, PE,Christopher D$128,910.00 07/24/2017 03/28/2019 02/26/2018 08/31/2018 89.81 98.29DG00379RESURFACE NC 119 FROM +/- 100' W. OF FOUST RD TO US 70, SR 1972 FROM SR 1963 TO E.O.M., SR 1973 FROM SR 1972 TO E.O.M & SR 1975CAROLINA SUNROCKLLCKirkman, PE,Christopher D$757,199.74 07/05/2017 11/01/2018 08/30/2017 11/01/2018 96.50 35.11DG00382RESURFACE SR 1928, SR 1940, SR 2113, SR 2123, SR 2132, SR 2156 SR 2312, SR 2317, SR 2451APAC - ATLANTIC INCHOMPSON ARTHURDIVISIONKirkman, PE,Christopher D$1,455,626.94 07/05/2017 11/01/2018 09/13/2017 11/01/2018 94.00 99.93DG00392RESURFACE 26 SEC. ROADS IN ALAMANCE CO. AND 1 SEC. ROAD IN GUILFORD COUNTY (SR 3349)RILEY PAVING INC Kirkman, PE,Christopher D$1,059,904.41 04/02/2018 10/12/2018 08/02/2018 10/12/2018 57.00 60.81DG00393RESURFACE SR 1101, SR 1118, SR 1119, SR 1124, SR 1125, SR 1127,SR 1128 SR 1130, SR 1134, SR 1135, SR 1137, SR 1141, SR 1143, ETC.RILEY PAVING INC Kirkman, PE,Christopher D$1,084,520.40 04/02/2018 10/12/2018 06/18/2018 10/12/2018 83.37 78.37DG00424REPLACE BRIDGE # 307 ON SR 1936 (STONE ST. EXT) OVER UNNAMED TRIBUTARY OF BACK CREEKNATIONAL BRIDGEBUILDERS LLCKirkman, PE,Christopher D$1,204,877.32 06/04/2018 05/02/2019 08/02/2018 05/02/2019 43.50 36.96DG00426RESURFACE A PORTION OF NC 87 AND PORTIONS OF 3 SEC. ROADSRILEY PAVING INC Kirkman, PE,Christopher D$3,463,032.95 07/09/2018 11/01/2019B-573547 ContractNumberTIPNumberLocation DescriptionContractor NameResidentEngineerContract BidAmountAvailabilityDateCompletionDateWork StartDateEstimatedCompletionDateProgressSchedulePercentCompletionPercentNorth Carolina Department of TransportationActive Projects Under Construction - Alamance Co.DG00431AST RETREAMENT ON 29 SECONDARY ROADS IN ALAM. CO.WHITEHURST PAVINGCO INCKirkman, PE,Christopher D$868,412.06 04/01/2019 10/12/2019DG00432RESURFACE A PORTION OF US 70AND 6 SECONDARY ROADS INALAMANCE COUNTY AND A PORTIONOF 1 SR IN GUILFORD CO.RILEY PAVING INC Kirkman, PE,Christopher D$1,878,598.12 07/09/2018 11/01/2019DG00441DECK OVERLAYS W/LATEXMODIFIED CONCRETE - VERY EARLYSTR BRDG JNT REPL ON BRIDGE#71-ALA, 90,195,261 - GUILFORDEXTREME CONCRETECUTTING OF GAFFNEYLLCKirkman, PE,Christopher D$1,248,556.25 06/04/2018 09/24/2018 08/08/2018 11/22/2018 100.00 86.56DG00445 R-5787BB INSTALLATION OF ADA COMPLIANTCURB RAMPS AT VARIOUSINTERSECTIONSLITTLE MOUNTAINBUILDERS OFCATAWBA COUNTYINCKirkman, PE,Christopher D$319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 10.00 22.75W-5707A INSTALLATION OF ADA COMPLIANTCURB RAMPS AT VARIOUSINTERSECTIONSLITTLE MOUNTAINBUILDERS OFCATAWBA COUNTYINCKirkman, PE,Christopher D$319,319.80 06/25/2018 02/15/2020 08/06/2018 02/15/2020 10.00 22.75DG00457INTERSECTION IMPROVEMENTS AT US 70 (CHURCH STREET) AND SR 1301 (ST. MARKS CHURCH ROAD)SHARPE BROTHERS ADIVISION OF VECELLIO& GROGAN INCKirkman, PE,Christopher D$1,790,372.74 09/04/2018 03/31/2020 10/23/2018 03/31/2020 4.00 3.8548 Attachment 2 49 WBS COUNTY DESCRIPTION YEAR ONE ALLOCATION TOTAL COST $1,714,285.71 47725 Guilford SR 1850 Sandy Ridge Road & Johnson St Inters. - Realign intersection of Johnson Street (SR 1818) at Sandy Ridge Road (SR 1850) and install traffic signal. $400,000 $500,000 47771 Alamance NC 54 @ Riverbend Road - Widen and improve right turn taper, radius and signal upgrade at the intersection of NC 54 and SR 1945 ( Riverbend Road) $250,000 $250,000 47758 Guilford SR 3056 (Rock Creek Road) Two foot widening on each side of road, increase length of existing turn lanes, add signal, signal upgrade, resurface, guardrail and pavement markings on SR 3056 (Rock Creek Dairy Road ) from SR 3058 (Judge Adams Road) / SR 3000 (McConnell Road) to US 70 . $410,000 $820,000 47724 Caswell NC 62,US 158 & NC 86 - Install Traffic Signal $110,000 $110,000 47752 Alamance SR 2158 (Swepsonville - Saxapahaw Road)-Two foot widening on each side of road, resurface and pavement markings on SR 2158 (Swepsonville - Saxapahaw Road) from SR 2171 (Church Rd) / SR 2146 (Saxapahaw - Bethlehem Church Rd) to SR 2116 (Boywood Road) To provide additional pavement width.. $240,000 $2,200,000 TOTAL SPENDING YEAR ONE $1,410,000 FUNDS REMAINING $304,286 WBS COUNTY DESCRIPTION YEAR TWO ALLOCATION STATUS 47753 Caswell & Rockingham NC 150 - Two foot widening on each side of road, resurface and pavement markings on NC 150 from NC 87 in Rockingham county to US 158 in Caswell County. $1,345,011 $3,539,502 47799 Guilford Pleasant Garden Road & Neelley Road - Install left turn lane on SR 3505 (Pleasant Garden Road) south bound onto SR 3418 (Neelley Road). $300,000 $300,000 47798 Orange US 70 Bypass and NC 86 - Increase the length of the existing turn lane / slip ramp and improve the existing radius in the southeast quadrant of US 70 Business / NC 86 at US 70 Bypass. $189,000 $225,000 47786 Alamance Mebane Oaks Road & Old Hillsborough Road- Intersection improvement on SR 1007 (Mebane Oaks Road) and SR 2126 / SR 2128 (Old Hillsborough Road). Add left & right turn lanes, widen radii, traffic signal, pavement markings and resurface. $300,000 $600,000 TOTAL FUNDED $2,134,011 Year two Allocation $1,714,285.71 Remaining funds from year 1 - $304,286 $304,286 Total Remaining High Impact Funding $2,018,571 Overspent -$115,439 DIVISION 7 YEAR ONE HIGH IMPACT / LOW COST HIGH IMPACT / LOW COST PROJECTS DIVISION 7 YEAR TWO HIGH IMPACT / LOW COST Attachment 3 50