Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016-722-E Emergency Svc - Federal Engineering consulting
Revised 9/16 1 [Departmental Use Only] TITLE Federal Engineering, Inc. FY 2016-17 NORTH CAROLINA CONSULTING SERVICES AGREEMENT RFP---UNDER $90,000 ORANGE COUNTY This Agreement, made and entered into this 4th day of October, 2016, (“Effective Date”) by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina (hereinafter, the "County") and Federal Engineering, Inc., (hereinafter, the "Consultant"). WITNESSETH: That the County and Consultant, for the consideration herein named, do hereby agree as follows: ARTICLE 1 SCOPE OF WORK 1.1 Scope of Work 1.1.1 This Services Agreement (“Agreement”) is for professional consulting services to be rendered by Consultant to County with respect to (insert type of project): Countywide Radio Communications Interoperability and Systems Engineering Consulting Services. 1.1.2 By executing this Agreement, the Consultant represents and agrees that Consultant is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. 1.1.3 Time is of the essence with respect to this Agreement. 1.1.4 The services to be performed under this Agreement consist of Basic Services, as described and designated in Article 3 hereof. Compensation to the Consultant for Basic Services under this Agreement shall be as set forth herein. ARTICLE 2 RESPONSIBILITIES OF THE CONSULTANT 2.1 Services to be Provided. The Consultant shall provide the County with all services required in Article 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. 2.2. Standard of Care 2.2.1 The Consultant shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Consultant practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the performance of these services. Consultant is solely responsible for the professional quality, accuracy and timely completion and submission DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E Revised 9/16 2 of all reports, drawings, specifications, plans, documents and services (hereinafter “Deliverables”) related to the Basic Services. 2.2.2 The Consultant shall be responsible for all errors or omissions, in the deliverables prepared by the Consultant. 2.2.3 The Consultant shall correct at no additional cost to the County any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts in any Deliverables prepared by the Consultant. 2.2.4 The Consultant shall assure that all Deliverables prepared by it hereunder are in accordance with applicable laws, statutes, and that any necessary or appropriate applications for approvals are submitted to federal, state and local governments or agencies in a timely manner so as not to delay the Project. 2.2.5 The Consultant shall not, except as otherwise provided for in this Agreement, subcontract the performance of any work under this Agreement without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. 2.2.6 Any and all employees of the Consultant engaged by the Consultant in the performance of any work or services required of the Consultant under this Agreement, shall be considered employees or agents of the Consultant only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Consultant. 2.2.7 If activities related to the performance of this agreement require specific licenses, certifications, or related credentials Consultant represents that it and/or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. ARTICLE 3 BASIC SERVICES 3.1 Basic Services 3.1.1 The Consultant shall perform as Basic Services the work and services described herein and as specified in the County’s Request for Proposal, RFP Number #5217 for Countywide Radio Communications Interoperability and Systems Engineering Services (the “RFP”) issued January 29, 2016, which is fully incorporated and integrated herein by reference together with the following Attachment: Attachment A, Technical Proposal for: Countywide Radio Communications Interoperability and Consulting Services, Attachment B, Cost Proposal for: Countywide Radio Communications Interoperability and Consulting Services both of which are dated March 1, 2016 and Attachment C, Costs for Additional Procurement Support, dated October 4, 2016. 3.1.2 The Basic Services will be performed by the Consultant in accordance with the following schedule: DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E Revised 9/16 3 Phase 1 – Needs Assessment and Solution Selection Project Milestones Date* Existing Document Review 2 Project Initiation Meeting 3 Needs Assessment and Requirements Discovery 3 Stakeholders Interviews 3 Site Data and Equipment Inventory Review 4 Deliverable: Draft Orange County Radio Systems Alternatives Report 10 Meeting with Orange County to Review the Draft Report and Select Alternatives 11 Deliverable: Final Orange County Radio System Alternatives Report 11 Deliverable: Draft Orange County Radio System Recommendation Report 14 Meeting with Orange County to Review the Draft Report 15 Deliverable: Final Orange County Radio system Recommendations Report 15 Phase 2 – Procurement Project Milestones Date* Deliverable: Draft Orange County Radio System RFP 18 Deliverable: Final Orange County Radio system RFP 19 Develop Vendor Evaluation Criteria 19 Support Vendor Proposal Evaluation TBD * Date – Number of Weeks after Contract Execution 3.1.3 Should County reasonably determine that Consultant has not met the Milestone Dates established in Section 3.1.2 of this Article, County shall notify Consultant of the failure to meet the Milestone Date. The County, at its discretion may provide the Consultant seven (7) days to cure the breach. County may withhold the accompanying payment without penalty until such time as Consultant cures the Breach. In the alternative, upon Consultant’s failure to meet any Milestone Date the County may modify the Milestone Date schedule. Should Consultant or its representatives fail to cure the breach within seven (7) days, or fail to reasonably agree to such modified schedule County may immediately terminate this Agreement in writing without penalty or incurring further obligation to Consultant. This section shall not be interpreted to limit the definition of breach to the failure to meet Milestone Dates. ARTICLE 4 DURATION OF SERVICES 4.1 Scheduling of Services 4.1.1 The Consultant shall schedule and perform his activities in a timely manner so as to meet the Milestone Dates listed in Article 3. 4.1.2 Should the County determine that the Consultant is behind schedule, it may require the Consultant to expedite and accelerate his efforts, including providing additional resources and working overtime, as necessary, to perform his services in accordance with the approved project schedule at no additional cost to the County. DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E Revised 9/16 4 4.1.3 The Commencement Date for the Consultant's Basic Services shall be October 1, 2016. ARTICLE 5 COMPENSATION 5.1 Compensation for Services 5.1.1 The total compensation for Services shall not exceed a maximum of Eighty-Nine Thousand Nine Hundred Ninety-Nine dollars ($89,999). 5.1.2 Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Consultant from the County for all services under this Agreement except for any authorized Reimbursable Expenses which are defined herein. The maximum amount payable for Basic Services is Seventy-Three Thousand Four Hundred Seventy-Seven Dollars ($73,477). Payment for Basic Services shall become due and payable in direct proportion to satisfactory services performed and work accomplished. Payments will be in three payments as Project Milestones set out in Section 3.1.2 are satisfactorily achieved as follows: Project Milestone Payment Schedule Payment Site Data and Equipment Inventory Review Week 4 $25,700 Deliverable: Final Orange County Radio System Alternatives Report Week 11 $37,500 Support Vendor Proposal Evaluation Week 20 $10,277 5.1.3 Compensation for Additional Services. County shall not be responsible for costs related to any services in addition to the Basic Services performed by Consultant unless County requests such additional services in writing. Additional Services are list as “optional services” in Attachment A, Technical Proposal (See §1.2). Additional Services and the cost of those services are outlined in Attachment C, Costs for Additional Procurement Support. The County shall not be responsible for any other services other than those listed in Attachment A or C unless requested in writing an evidenced by an amendment to this Agreement. ARTICLE 6 RESPONSIBILITIES OF THE COUNTY 6.1 Cooperation and Coordination 6.1.1 The County has designated Emergency Services Director to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 6.1.2 The County shall be solely responsible for determining whether Consultant as satisfactorily completed Tasks associated with Milestone Dates. Upon Count y’s written determination to Consultant that a Task has been satisfactorily completed by its accompanying Milestone Date Consultant may submit an invoice for payment. It is agreed that County shall not unreasonably withhold its determination of satisfactory completion of any Task. In the event the amount of an invoice is disputed County may withhold payment until the dispute is resolved by DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E Revised 9/16 5 the parties. County may also withhold payment on an invoice until the satisfactory completion of a Task by Consultant. ARTICLE 7 INSURANCE AND INDEMNITY 7.1 General Requirements 7.1.1 Consultant shall obtain, at its sole expense, Commercial General Liability Insurance, Automobile Insurance, Workers’ Compensation Insurance, Professional Liability Insurance, and any additional insurance as may be required by County’s Risk Manager as such insurance requirements are described in the Orange County Risk Transfer Policy and Orange County Minimum Insurance Coverage Requirements (each document is incorporated herein by reference and may be viewed at http://www.orangecountync.gov/departments/purchasing_division/contracts.php). If County’s Risk Manager determines additional insurance coverage is required such additional insurance shall be designated here (if no additional insurance required mark N/A as being not applicable). Consultant shall not commence work until such insurance is in effect and certification thereof has been received by the County's Risk Manager. 7.2 Indemnity 7.2.1 The Consultant agrees to indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Consultant’s services relating to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Consultant except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Consultant to indemnify the County to the fullest extent permitted under North Carolina law for its negligence or misconduct. ARTICLE 8 AMENDMENTS TO THE AGREEMENT 8.1 Changes in Basic Services 8.1.1 Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Consultant. The Consultant shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. ARTICLE 9 TERMINATION 9.1 Termination for Convenience of the County 9.1.1 This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days prior written notice to the Consultant. 9.2 Other Termination DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E Revised 9/16 6 9.2.1 The Consultant may terminate this Agreement based upon the County's material breach of this Agreement; provided the County has not taken all reasonable actions to remedy the breach. The Consultant shall give the County seven (7) days' prior written notice of its intent to terminate this Agreement for cause. 9.3 Compensation After Termination 9.3.1 In the event of termination, the Consultant shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Consultant. 9.3.2 Should this Agreement be terminated, the Consultant shall deliver to the County within seven (7) days, at no additional cost, all Deliverables including any electronic data or files relating to the Project. 9.4 Waiver 9.4.1 The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Consultant with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. 9.5 Suspension 9.5.1 The County may suspend the work at any time for County’s convenience and without penalty to County upon three (3) days’ notice to Consultant. Upon any suspension by County the Consultant shall discontinue the work and shall not resume the work until notified to proceed by County. ARTICLE 10 ADDITIONAL PROVISIONS 10.1 Relationship of Parties 10.1.1 Consultant is an independent contractor of the County. Neither Consultant nor any employee of the Consultant shall be deemed an officer, employee or agent of the County. Consultant's personnel shall not be employees of, or have any contractual relationship with, the County. 10.2 Limitation and Assignment 10.2.1 The County and the Consultant each bind themselves, their successors, assigns, and legal representatives to the terms of this Agreement. Neither the County nor the Consultant shall assign or transfer its interest in this Agreement without the written consent of the other. 10.3 Governing Law 10.3.1 This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E Revised 9/16 7 Consultant shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal anti-discrimination laws, policies, rules, and regulations and the Orange County Anti-Discrimination Policy. Any violation of this requirement is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County. This paragraph is not intended to limit the definition of breach to discrimination. By executing this Agreement Consultant affirms that Consultant and any subcontractors of Consultant are and shall remain in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable, failure to maintain compliance with the requirements of Article 2 of Chapter 64 of the General Statutes constitutes Consultant’s breach of this Agreement. By executing this Agreement Consultant affirms Consultant is in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. By executing this Agreement, Consultant certifies that Consultant has not been identified, and has not utilized the services of any agent or subcontractor, on the Iran divestment list created by the State Treasurer pursuant to G.S. 147- 86.58. 10.4 Dispute Resolution 10.4.1 Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non-performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina and it is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. The Parties may agree to nonbinding mediation of any dispute prior to the bringing of such suit or action. 10.5 Extent of Agreement 10.5.1 This Agreement, together with the RFQ together with attachments distributed by the County and the Consultant’s submitted Response to the RFQ, all of which constitute the Contract Documents, represents the entire and integrated agreement between the County and the Consultant and supersedes all prior negotiations, representations or agreements, either written or oral. In the event of a conflict among the terms of the Contract Documents, the priority of documents shall be This Agreement, the County’s RFQ, attachments to the County’s RFQ, the Consultant’s Response to the RFQ. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. 10.6 Severability 10.6.1 If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. 10.7 Ownership of Deliverables 10.7.1 All Deliverables, together with all supporting materials, source documentation, data collected, field notes, and working drafts, developed in the performance of this Agreement shall become the property of the County and may be used on any other project without additional compensation to the Consultant. The use of the Deliverables by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E Revised 9/16 8 10.8 Non-Appropriation 10.8.1 Consultant acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County’s obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Consultant of the unavailability and non-appropriation of public funds. It is expressly agreed that County shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County’s statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects County’s authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Consultant of such limitation or change in County’s legal authority. 10.9 Notices and Signatures 10.9.1 This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures affixed hereto evidence the intent of the Parties to comply with Article 11A and Article 40 of North Carolina General Statute Chapter 66. 10.9.2 Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Federal Engineering, Inc. Attention: Emergency Services Director Ronald F. Bosco, President P.O. Box 8181 10600 Arrowhead Drive Hillsborough, NC 27278 Fairfax, Virginia 22030 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. COUNTY: Orange County CONSULTANT: Federal Engineering, Inc. _______________________________ ____________________________ Bonnie Hammersley, County Manager Ronald F. Bosco, President DocuSign Envelope ID: 67496B91-FC0D-4188-A6C5-F7496722386E L _. .. DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E 17 Orange County, forth Carolina ,.. r r r �rx� r t rr � ma's �6 `'Car° ✓� { .`w - - ^_ ,..:'"� ,,.,.�r°':',c• mac..,`,r' .�,'�m,;,�ry,,c�'"` >., '�` i DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E "Unleashing the Power of Technology" Federal Engineering, Inc. 10600 Arrowhead Drive Federal: Fairfax, VA 22030 Engineering° 703-359-8200 March 1, 2016 Mr. David Cannell, Purchasing Agent 200 S. Cameron Street Hillsborough, NC 27278 Dear Mr. Cannell: Federal Engineering, Inc. (FE) is Orange County, North Carolina's best choice to fulfill the requirements defined in the County's RFP#5217 for Countywide Radio Communications Interoperability and System Engineering Services, as amended and clarified in Orange County's responses to questions via Addendum 1 dated February 8, 2016 and Addendum 2 dated February 12, 2016. As required, the addenda acknowledgment forms are included in Section 4 of FE's technical proposal. With over 32 years of experience, FE leads the industry in providing public safety radio system consulting services. FE's proposal is complete and fully compliant with all of the requirements in the RFP as noted herein and describes, in detail, how we will accomplish the required tasks. FE possesses all permits, licenses, and professional credentials necessary to perform services as specified in the RFP. In addition, we unconditionally accept the project specifics, goals, and contractor responsibilities as delineated in this proposal and hereby express our commitment to work under the directives provided by the designated County project manager. Because Orange County is considered a key client, I will be your contact regarding this proposal and will participate in the negotiation of contractual issues. By my signature below, I hereby authorize submission of this proposal and bind Federal Engineering, Inc. to the terms and conditions of this proposal for a period of 90 days, beginning on the due date for proposals. FE looks forward to working with Orange County, North Carolina on this project. Sincerely, Ronald F. Bosco President and Chief Executive Officer Federal Engineering, Inc. DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E NORTH CAROLINA. I TIII+ SYST :. S E I E SERVICES Submitted to Mr. David Canneli,Purchasing Agent 200 S. Cameron Street Hillsborough,ITC 27278 Email: dlrannell@oirangecountync.gov Phone: 919 245-2651 Clo,sixg Date March 1, 2016 Federal Engineering Contact Donald F. Bosco, President 10600 Arrowhead Drive Fairfax,VA 22030 703-359-8200 Federal En ineerin 9 9 www.fedeng.corn 10600 Arrowhead Drive Fairfax,VA 22030.703-359-8200• Fax 703-359-8204 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Proprietau Notice This proposal, its contents, and appendices are proprietary to Federal Engineering, Inc. and shall not be disclosed to third parties without prior written permission from Federal Engineering, Inc. Should this proprietary notice conflict with any government procurement regulations, policies,or practices,the government procurement regulations shall take precedence. Copyright©2016 by Federal Engineering: Inc. All rights reserved. Printed in the United States of America. No part of this publication may be reproduced,stored in a retrieval system, or transmitted, in any form, or by any means, electronic, mechanical, photocopying, recording,or otherwise,without the prior written permission of the publisher. f Published by Federal Engineering, Inc. Fairfax,Virginia 04 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E J. Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NOR-MTki Cf1 Interoperability and System Engineering Services MU�F.1NA Table of Contents ICOST PROPOSAL............................................................................... .........................I.............1 1.1 Firm Fixed Price................................ ......................... ....................................................I 1.2 Attachment D—Cast Summary Sheet.................. .2 1,3 Basis of our Proposal.............................................................................. ...........................3 4 E q' i U ed Do N Duplicate Copyright Protect at up DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications NOOJTIA NonrO['A2ncIxw Interoperability and System Engineering Services 1 COST PROPOSAL 1.1 Firm Fixed Price The total project cost, including labor, travel, and other direct costs for the Orange County Countywide Radio Communications Interoperability and System Engineering Services project is $73,477. As requested in Section 6.0 of the RFP, the following table provides a breakdown of hourly labor rates by team member. Anticipated hours on the project are 546. eta - • r Tearn Member and Role Hourly-Rate Travis LePage, Project Director $170 Cliff Brown, Project Manager and Technical Lead, Senior Consultant $145 Adam Nelson, RI= Performance Specialist, Senior Consultant $130 The balance of this page is intentionally left blank. .i y Copyright Protected Do Not Duplicate 1 � DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE countywide Radio Communications COUNTY I�02'R-7"f3 1RM GXRgLiNA lnteroperability and System Engineering Services 1.2 Attachment D—Cost Summary Sheet County-wide Radio Commimications Interoperabihty a-ad Systems Eugineeriug Services Attachment D COST SUMMARY SHEET(Subunit only one copy,in separate envelope with Original copy of submittal) Personnel Costs $ 70,821 OTC Costs $ 2,656 E. TOTAL COSTS $ 73,477 I I 3 i i i I � f. RFP##5217 23 Copyright Protected Do Not Duplicate 2 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina COUN ORANGE Countywide Radio Communications TY NORTH CAR]LINA interoperabiiity and System Engineering Services 1.3 Basis of our Proposal 1. This proposal assumes Federal Engineering, Inc. will perform all of the tasks as called out in the technical proposal (excluding optional tasks). The deletion of a task, a significant change in scope of one or more tasks, or use of a phased implementation approach may affect the overall price. 2. FE will provide draft and final deliverables electronically to the Orange County, North p Y Carolina. 3. Any optional or additional tasking will be authorized by mutual agreement of the County and FE. Such tasking will be performed on a time and materials basis or on a fixed price basis as mutually agreed upon in a task order by the County and FE. 4. FE's ability to fulfill this task depends, in part, on the willingness and ability of the Orange County, County participants, equipment vendors, service providers, third parties, and others to provide information in a timely manner, and upon the accuracy of the information as supplied. The accuracy of input data, whether provided in electronic or hard copy form, and the recommendations, actions, system designs, and license filings resulting therefrom cannot, therefore, be warranted by FE nor can the performance, suitability, or reliability of I said systems be warranted by FE. x 5. FE will review two radio system vendor proposals. If additional proposals are received, a mutually agreeable amendment to this SOW will be executed by both parties. 6. This proposal is based upon a start date on or before April 4, 2016 and assumes a 19-week schedule to through RFP delivery to the County. The schedule for procurement will be adjusted after determination of the County's procurement requirements and schedule. Delays to the project schedule due to actions or lack of actions on the part of the County, County participants, third parties, and others including, but not limited to vendor protests, protracted contract negotiations, vendor delays that impact the program schedule and/or costs to the County will be brought to the attention of the County project manager in a timely manner, and will be reduced to writing via a mutually agreed upon contract amendment. k' 7. This proposal assumes a mutually agreeable invoicing schedule for work completed. 8. Our project plan calls for up to two FE personnel to be on-site for two consecutive days to for the project initiation and user requirements surveys. 9. It is not anticipated that CAD drawings will be required. However, should they become necessary, FE can provide them on an optional basis. 10. Federal Engineering reserves the right to assign/reassign work efforts and associated costs across tasks and between our professional staff members in order to meet our contractual obligations to the County. Copyright Protected Do Not Duplicate 3 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E r - Orange County, North Carolina Iwo IMMMIgam don lag NON k - F t•pi xrfFF.r_r t11lCF(97,/ Au g "Unleashing the Power of Technology" Technical Proposal for: Countywide Radio Communications Interoperability and Consulting Services RFP No. 5217 01- Federal March 1, 2016 �s Engineering"' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E `4 Undeashing the Pawerof7Technology•, Federal Engineering, Inc. 10600 Arrowhead Drive Federal Fairfax, VA 22030 Engineering' 703-359-8200 March 1, 2016 Mr. David Cannell, Purchasing Agent 200 S. Cameron Street Hillsborough, NC 27278 Dear Mr. Cannell: Federal Engineering, Inc. (FE) is Orange County, North Carolina's best choice to fulfill the requirements defined in the County's RFP#5217 for Countywide Radio Communications Interoperability and System Engineering Services, as amended and clarified in Orange County's responses to questions via Addendum 1 dated February 8, 2016, Addendum 2 dated February 12, 2016, Addendum 3 dated February 23, 2016, and Addendum 4 dated February 24, 2016. As required, the addendum acknowledgment forms are provided in Section 5—Required Forms. With over 32 years of experience, FE leads the industry in providing public safety radio system consulting services. FE's proposal is complete and fully compliant with all of the requirements in the RFP as noted herein and describes, in detail, how we will accomplish the required tasks. FE possesses all permits, licenses, and professional credentials necessary to perform services as specified in the RFP. In addition, we unconditionally accept the project specifics, goals, and contractor responsibilities as delineated in this proposal and hereby express our commitment to work under the directives provided by the designated County project manager. Because Orange County is considered a key client, I will be your contact regarding this proposal and will participate in the negotiation of contractual issues. By my signature below, I hereby authorize submission of this proposal and bind Federal Engineering, Inc. to the terms and conditions of this proposal for a period of 90 days, beginning on the due date for proposals. FE looks forward to working with Orange County, North Carolina on this project. Sincerely, ` ■r+r . Ronald F. Bosco President and Chief Executive Officer Federal Engineering, Inc. DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E ORANGE ORANGE COUNTY, 'BOUNTY NORTH CAROLINA NORTH CAROLINA RFP #5217 COUNTYWIDE RADIO COMMUNICATIONS INTEROPERABILITY AND SYSTEMS ENGINEERING SERVICES Submitted to Mr. David Cannell, Purchasing Agent 200 S. Cameron Street Hillsborough, NC 27278 Email: dcannell@orangecountync.gov Phone: 919 245-2651 Closing Date March 1, 2016 Federal Engineering Contact Ronald F. Bosco, President 10600 Arrowhead Drive Fairfax, VA 22030 703-359-8200 Federal Engineering° www.fedeng.com 10600 Arrowhead Drive Fairfax,VA 22030.703-359-8200- Fax 703-359-8204 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Proprietary Notice This proposal, its contents,and appendices are proprietary to Federal Engineering, Inc.and shall not be disclosed to third parties without prior written permission from Federal Engineering, Inc. Should this proprietary notice conflict with any government procurement regulations, policies,or practices,the government procurement regulations shall take precedence. Copyright©2016 by Federal Engineering, Inc. All rights reserved. Printed in the United States of America. No part of this publication may be reproduced,stored in a retrieval system,or transmitted, in any form,or by any means, electronic, mechanical, photocopying, recording,or otherwise,without the prior written permission of the publisher. Published by Federal Engineering, Inc. Fairfax,Virginia DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i(AHO INA Interoperability and System Engineering Services Table of Contents EXECUTIVESUMMARY........................................................................................................................1 1 INTRODUCTION (RFP Section 4.0).............................................................................................4 1.1 Understanding of the Project..................................................................................................4 1.2 Overall Project Approach (RFP 5.13.1)....................................................................................5 2 RESPONSE TO GENERAL REQUIREMENTS (RFP Section 4.0) .............................................7 2.1 Organizational Qualifications (RFP 4.13).................................................................................7 2.2 Company Background............................................................................................................7 2.2.1 Quality Assurance and Quality Control...........................................................................8 2.2.2 North Carolina Experience..............................................................................................9 2.2.3 Technology Experience................................................................................................11 2.2.4 Needs Assessment Experience....................................................................................11 2.2.5 Request for Proposal Development and Procurement Support Experience................ 13 2.2.6 P25 System Design and Implementation Experience.................................................. 14 2.3 Staff Qualifications and Facilities (RFP 4.0 and 4.D)........................................................... 16 2.4 References (RFP 4.G)..........................................................................................................17 3 RESPONSE TO TECHICAL REQUIREMENTS (RFP Section 5.0)...........................................22 3.1 Statement of Objectivity(RFP 4.E).......................................................................................22 3.2 Work to be Performed (RFP 5.C).........................................................................................22 3.2.1 Comprehensive Needs Analysis (RFP 5.C.1) ..............................................................22 3.2.2 Site Data and Equipment Inventory Review (RFP 5.C.2).............................................24 3.2.3 Alternatives Analysis (RFP 5.13.3) ................................................................................26 3.2.4 Existing System Coverage (RFP 5.D.3).......................................................................27 3.2.5 Proposed System Coverage Analysis (RFP 5.C.4)......................................................29 3.2.6 FETeamCoverageTA° (Optional Task)...........................................................................30 3.2.7 Interoperability Analysis (RFP 5.C.3) ...........................................................................31 3.2.8 Budgetary Costs (RFP 5.C.10).....................................................................................32 3.2.9 Migration Plan (RFP 5.C.5)...........................................................................................32 3.2.10 Acquisition and Implementation Process Recommendation (RFP 5.C.6)....................33 3.2.11 Generation of Recommendations Report.....................................................................33 3.2.12 Vendor Neutral RFP Development (RFP 5.C.7)...........................................................33 3.2.13 RFP Process Facilitation (RFP 5.C.8)..........................................................................34 3.2.14 CAD Drawings (RFP 5.C.9)..........................................................................................35 3.2.15 Optional Tasks..............................................................................................................35 3.3 Project Schedule and Work Plan (RFP 4.F).........................................................................37 4 COST PROPOSAL (RFP SECTION 6.0)....................................................................................39 5 REQUIRED FORMS (RFP Section 7.0).....................................................................................40 APPENDIX A—RESUMES..................................................................................................................48 Table of Exhibits Exhibit 1—Federal Engineering's Corporate Structure ..........................................................................8 Exhibit 2—Quality Assurance Review Board .........................................................................................9 Exhibit 3—Orange County Project Organization Chart........................................................................ 16 Exhibit 4—Sample Orange County VIPER Portable Coverage Map ...................................................28 Exhibit 5—SAFECOM's Interoperability Continuum.............................................................................31 Copyright Protected Do Not Duplicate i c+ DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NUM[i C.\(i(/1.INA Interoperability and System Engineering Services EXECUTIVE SUMMARY Orange County, North Carolina, has a rich and prosperous - history, contributing to the shaping of America, particularly theWelcome To southeastern United States and the State of North Carolina. Its • COUNTY young population (the median age is 30)enjoys rolling hills, 1 0 YOU LL BE A FAN F3R LIFE forests, and rural farming communities in addition to the teeming industrial, academic, and urban landscape. Its progressive ` culture makes Orange County a leader in embracing change. It is home to the University of North Carolina (UNC) at Chapel Hill, the first public university in the nation, which among its many contributions fosters technological research. The area—anchored by North Carolina State University, Duke University, and UNC at Chapel Hill and includes the cities of Raleigh and Durham and the towns of Cary and Chapel Hill—comprises what is known as The Research Triangle. This area produces a highly skilled workforce and attracts skilled workers from other areas. The current County population estimate is a little over 140,000, representing a consistent double digit growth since the 1950 U.S. Census. The enrollment at UNC adds another 29,000 transient residents, as well as visiting families of students and others who come to participate in academic and athletic events. The County has much to offer a young population. The County is home to the Orange County Speedway, boasting the fastest 3/8 mile track in the U.S. Orange County tourism contributes over$181 million annually to the tax base of the County.' In addition, Orange County is included in the Durham-Chapel Hill Metropolitan Statistical Area, which has a combined population of nearly 2 million people. The cities of Durham, Mebane, and Chapel Hill are situated partially in Orange County. All these characteristics that make Orange County so desirable as a place to live, work, learn, and visit present many challenges to the public safety and public service agencies and schools that serve the County's population. Project Understanding Orange County recognizes the importance of effective, reliable radio communications among all the agencies �. that protect and support its way of life. The County uses North Carolina's statewide Voice Interoperability Plan for Emergency Responders (VIPER) network as its primary means of public safety voice communications. In 2012 the County engaged Federal Engineering (FE) to assess its radio communications operation and make recommendations for enhancing coverage. FE enjoyed a successful working relationship with the County and completed the project to the satisfaction of the County. At the time of the previous system assessment, the County's primary concern was coverage. Since the completion of the 2012-2013 project, the County's population has grown by 7,000. The County ' http://www.visitchapelhill.org/information-statistics/tourism-statistics/ Copyright Protected Do Not Duplicate 1 �� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services now faces challenges of coverage, capacity, and the age of its existing equipment. In addition, the communications system the County envisions will include public works agencies, public schools, and interoperability with the surrounding counties of Person, Durham, Chatham, Alamance, and Caswell. A replacement system must address the following issues: • Expanding user needs • Existing equipment limitations and desired features for replacement equipment • Capacity of the existing equipment to accommodate current and anticipated growth • Changes in coverage, interoperability and user expectations The project entails collecting and analyzing user and stakeholder requirements, understanding currently available technology and options, and identifying workable solutions. Why Federal Engineering? Federal Engineering offers the County qualifications and experience unequaled by any other firm. Our recent work with Orange County, other North Carolina counties, and the State of North Carolina NG9-1-1 provides the FE team with insights into the Orange County infrastructure, terrain, operations, and culture that no other consulting firm can match. We offer Orange County greater services at less cost because FE already has intimate knowledge of your existing systems, operational requirements and user expectations. FE has earned the reputation as a premier public safety information systems and communications consulting firm throughout North America. Our over 32 years of experience will enable the County to successfully and affordably meet its emergency communications system needs. FE's demonstrated knowledge will result in low risk and high user satisfaction for County staff and those they support. Our proposal defines solid, proven approaches to executing each of the tasks required by the project. Orange County will benefit from the following: • We understand Orange County's unique needs and conditions and are well versed in the latest technology available to meet those needs. FE assisted with the implementation of the first P25 Phase 2 systems deployed by each of three of the major equipment vendors in the U.S. • A financially healthy firm who has never been involved with a lawsuit related to our work nor failed to successfully complete a contract. A company who, in fact, has been brought in to complete projects other consulting firms have left behind • Our numerous successful public safety systems engagements throughout North Carolina and the region, resulting in intimate knowledge of similar agencies, operations, and first responder needs • System procurement specification vendor neutrality exhibited by client satisfaction and positive vendor feedback. No procurement involving an RFP written by FE has ever been protested • A consistent record of cost savings for our clients. FE contract negotiations support has resulted in millions of dollars in savings in systems costs. Copyright Protected Do Not Duplicate 2 Gam' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM li(AR(/LINA Interoperability and System Engineering Services • A team with backgrounds specific to the requirements of the RFP with a deep staff bench that can be called upon to address all of the services needed for the project • And most importantly, Federal Engineering's proven commitment, exhibited in our previous engagements, to provide the highest quality services and the most knowledgeable staff for the required tasks. Public safety and public service information and communications systems consulting is Federal Engineering's business. This is our specialty. This is what we do. We provide "specialized professional services". We are not an architectural engineering firm, not a management consulting firm, and not a business consulting firm. FE will provide the County with local, knowledgeable skill sets in all aspects of the project. We are the right team for the County's project. Copyright Protected Do Not Duplicate 3 w DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM li(AHOLINA Interoperability and System Engineering Services TAB 1 -INTRODUCTION Copyright Protected Do Not Duplicate 0 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NUM[i(AHO INA Interoperability and System Engineering Services 1 INTRODUCTION (RFP SECTION 4.0) The proposer should first provide an explanation of their understanding of the tasks they believe to be necessary to accomplish the objectives outlined in the RFP. For each of these areas the proposer is to describe in a simple and straightforward manner the overall approach the consultant proposes to use when completing the study, as well as a discussion of how options and recommendations will be presented to the review committee and Orange County. 1.1 Understanding of the Project Orange County, North Carolina currently uses the state-owned and operated Voice Interoperability Plan for Emergency Responders (VIPER) 800 MHz trunked radio system. The County currently dispatches all law enforcement, fire, and emergency medical services (EMS) responders, as well as all County and local municipal users of that system. The following tables identify law enforcement, fire, EMS, and local/municipal agencies that serve the citizens of Orange County. Fire and EMS Departments Serving Orange County Caldwell Fire Department Mebane Fire Department Carrboro Fire Department New Hope Fire Department Cedar Grove Fire Department North Chatham Fire Department-Station 2 Chapel Hill Fire Department Orange Grove Fire Department Efland Fire Department Orange Rural Fire Department(Hillsborough) Eno Fire Department White Cross Fire Department Orange County EMS Alamance County EMS South Orange Rescue Squad Law Enforcement Agencies Serving Orange County Orange County Sheriff's Department Hillsborough Police Department Carrboro Police Department Mebane Police Department Chapel Hill Police Department UNC Public Safety Local and Municipal Agencies Serving Orange County Orange County Animal Services Orange County Social Services Orange County Health Department Carrboro Public Works Orange County Asset Management Services Chapel Hill Public Works Users have experienced problems with the VIPER system, including lack of coverage in many areas of the County, lack of in-building coverage, and an imbalance in the number of frequencies used in the sites that serve Orange County. The County also operates a VHF tone and voice paging system that is used to page the 12 fire departments that currently serve the citizens of Orange County. The County's major challenge is to address the fact that much of the VHF infrastructure equipment is beyond or very near end-of-life. Copyright Protected Do Not Duplicate 4 Gam' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i(AHO INA Interoperability and System Engineering Services 1.2 Overall Project Approach (RFP 5.13.1) Building on the work that FE performed for Orange County in 2013, FE proposes a phased approach for the execution of this project. Our proposed scope of work is partitioned into the following phases and tasks: Phase 1—Needs Assessment and Solution Selection • Project initiation • User interviews/ needs assessment • Analysis of site information • Interoperability analysis • Alternatives analysis • Coverage analyses • Budgetary estimates • County selects system option for procurement Phase 2—Procurement Support • RFP preparation • Vendor proposal review and recommendations • Pre-bid meeting support (optional) • Vendors' questions responses (optional) • Attend vendor best and final presentations (optional) • Contract negotiations support(optional) Scope of Task No. • • Phase 1—Needs Analysis and Alternatives Analysis Perform Needs Analysis 3.2 Meet with management personnel and end users of the current infrastructure to develop a comprehensive needs analysis addressing 5.C.1 3.2.1 functionality, capability and needs of all current infrastructure users. A draft needs analysis shall be presented to the end-users for validation in 5.C.1 3.2.2 at least two group meetings and then to the committee for final approval. Gather, analyze, and document operational, functional, and specific technical information of existing fixed sites and associated equipment for various emergency service departments that serve Orange County residents (may be an Orange County-based agency or a department in a 5.C.2 3.2.2 County adjacent to Orange County that serves/protects geography within Orange County), or Orange County emergency service departments that serve residents outside Orange County in order to understand the present status of our communications capabilities. Copyright Protected Do Not Duplicate 5 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.\HOLINA Interoperability and System Engineering Services Scope of • Task 1. Location Phase 1—Needs Analysis and Alternatives Analysis Review interoperability needs with all agencies serving citizens and/or territory within the county and those law and fire/EMS agencies bordering Orange County, including gateway or P25 ISSI needs for users not served by the proposed infrastructure (i.e. ambulances from outside Orange 5.C.3 3.2.7 County needing inter-communications with Orange County-based hospitals) as may be identified. Conduct and analyze coverage studies of proposed infrastructure based on multiple tower sites in order to provide countywide coverage including the potential of new communications sites, additional "satellite" receiver 5.C.4 3.2.4 sites, and/or paging sites. Perform Alternatives Analysis 3.2.3 Presentation of infrastructure alternatives to the review committee for the purposes of narrowing the alternatives down to one (1) recommended solution to be approved by the committee that will be the basis of the balance of the project. Alternatives that will be presented shall include 5.B.3 3.2.3 pros, cons, advantages, disadvantages, issues and considerations specific to the needs of Orange County users Obtain and submit budgetary costs for alternatives presented, and assist 5.C.10 3.2.8 the review committee to prioritize acquisitions and implementation Recommend and submit a planned acquisition and implementation process based on the option approved by the review committee. 5.C.6 3.2.10 Phase 2—Procurement Support Develop a comprehensive migration plan for all current infrastructure 5.C.5 3.2.9 users. Development of a vendor-neutral request for proposal (RFP) suitable to be released to the vendor community for the purposes of procuring the 5.C.7 3.2.12 approved alternative. Facilitation of the RFP process, including staff support to the County in conducting a comprehensive evaluation of RFP responses received. 5.C.8 3.2.13 Create and submit computer aided design (CAD) drawings as required. 5.C.9 3.2.14 The specific tasks to be performed in completing Orange County's project are detailed in Section 3 of this proposal. Copyright Protected Do Not Duplicate 6 Gam' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['[i C.\HOLINA Interoperability and System Engineering Services TAB 2- RESPONSE TO GENERAL REQUIREMENTS Copyright Protected Do Not Duplicate DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NVR['[i C.\HOLINA Interoperability and System Engineering Services 2 RESPONSE TO GENERAL REQUIREMENTS (RFP SECTION 4.0) 2.1 Organizational Qualifications (RFP 4.B) State the full name and address of your organization, including the name, address and telephone number of the person in your organization who has primary responsibility for developing this proposal and to whom technical questions may be addressed. Corporate Information Full Company Name Federal Engineering, Inc. Address 10600 Arrowhead Drive Fairfax, VA 22030 Mr. Skip Funk Proposal Contact 904-806-0221 sfunk@fedeng.com 2.2 Company Background Over the last 32 years, FE has become the nation's leading specialist in local and state government land mobile radio (LMR)voice and broadband consulting. Our consultants have assisted many levels of government, including hundreds of local and county governments, in implementing billions of dollars in communications projects. We complement our analytical knowledge of wireless and wired technologies with practical, hands-on experience providing reliable, flexible, cost-effective solutions to our clients. FE remains at the forefront of radio communications technology and operations. We continue to offer our clients knowledgeable, high-quality services as standards and technologies evolve, such as public safety LTE, P25 Phases 1 and 2, and as government mandates, such as rebanding and narrowbanding, continually impact our clients. Our corporate organization, shown in Exhibit 1, exemplifies the depth of our public safety communications technical staff. FE will provide Orange County with objective analyses, free from the influences of hardware vendors, software suppliers, or service providers. Our designs embody practical, cost-effective solutions customized to the specific needs of the Countyz. FE is a corporate affiliate of the following organizations: • Association of Public-Safety Communications Officials (APCO) NENA • National Emergency Number Association (NENA) Project 25 Technology Interest Group (PTIG) (� • Telecommunications Industry Association (TIA) FE consultants are heavily involved in PTIG, P25 Phase 2 Industry Roundtables and Best Practices Workshops, the Telecommunications Industry Association (TIA)wideband and land mobile radio 2 FE subscribes to the strict code of ethics of IEEE,Society for Technical Communication(STC),and Independent Computer Consultants Associate(ICCA),which explicitly forbid any conflict of interest in our consulting activities. Copyright Protected Do Not Duplicate 7 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services standards activities, the National Public Safety Telecommunications Council (NPSTC), and the Federal Partnership for Interoperable Communications (FPIC). Most recently FE consultants have been appointed by RadioResource Media Group to the MissionCritical Communications magazine editorial advisory board and by APCO to their International's Commercial Advisory Council. Our consultants chair national technical committees and have had papers published by many professional organizations. I Ronald F.Bosco PRESIDENT&CEO FINANCE �. �. ASSISTANTME PRESIDENTS TRANSPORTATION SHARED SERVICES GENERATION9-1-1 MANAGEMENT O. Exhibit 1—Federal Engineering's Corporate Structure FE's corporate capabilities align with public safety voice and broadband radio system planning, design, and deployment. FE has assisted numerous states, counties, cities, regions, and other organizations in major public safety and public service communications projects ranging from initial requirements definition through procurement and implementation support. FE's philosophy to "exceed client expectations to retain that client for life"has resulted client retention and repeat business since the firm's inception. 2.2.1 Quality Assurance and Quality Control FE applies rigorous quality assurance (QA) and quality control (QC) measures throughout our project activities. Our QA/QC program supports the successful execution of the project plan by not only applying specific and rigorous QA/QC measures to each project phase, but also applying them to FE's recruiting, administrative, accounting, and business development practices. Through our industry contacts, client feedback, and use of subject matter experts (SME), we have developed a comprehensive deliverable review program, managed by our Quality Assurance Review Board, shown in Exhibit 2. Copyright Protected Do Not Duplicate 8 � DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E � - Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NOR,,,{lh 1401.1 MA Interoperability and System Engineering Services DeliverableFE X , Public Specialists Industry Subjed Matter Standards Experts 6- - -_ - . %M Exhibit 2—Quality Assurance Review Board FE's quality assurance review process takes advantage of best practices, SMEs, and client feedback to assure the highest quality in our project deliverables. Our Quality Assurance Review Board manages our peer review process to assure that our internal procedures and delivered documentation and reports are of the highest quality. Peer reviewers are individuals with skill sets directly applicable to the program. They are typically not involved in the day- to-day aspects of the program but, rather, serve in a "red team" capacity challenging the program team and assuring that all decisions have been well thought-out. Periodic technical reviews are conducted throughout the duration of the program and draft reports evaluated before delivery. The County will be an active participant in our quality assurance process by providing FE with feedback on drafts so we can include necessary revisions in the final deliverables. All technical reviews include detailed issue tracking, target date adherence, and requirements recommendations. This methodology provides the County with the best value for its consulting services investment. FE's president, Mr. Ronald F. Bosco, and our executive vice president and chief operating officer, Mr. John Murray, manage the Quality Assurance Review Board. 2.2.2 North Carolina Experience Orange County will immediately benefit from FE's strong presence in public safety consulting throughout the State and surrounding areas. We bring relevant experience and best practices from past projects performed for Orange County. FE is already intimately familiar with the culture, operations, and public safety requirements in the State of North Carolina and in Orange County. We have provided, or are currently providing, public safety systems consulting services to Orange County, New Hanover County, Buncombe County, Yadkin County, and other North Carolina clients as outlined below. Copyright Protected Do Not Duplicate 9 �� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO IN,, Interoperability and System Engineering Services Orange County, North Carolina—Orange County engaged FE to assist with resolving coverage issues they experienced with their public safety radio system. 17 ;, Orange County requested that FE assess their options for improving county radio coverage on the state VIPER Network and enhancing their paging coverage. FE conducted a user needs assessment, a system requirements assessment, and conducted a coverage workshop with the county to assess the coverage available from existing VIPER tower assets and determine what additional sites might be necessary to achieve the desired coverage. The assessment included a microwave path assessment and tower mapping. From the county's pre-defined coverage requirements, FE developed an alternatives report to assist the county in making an informed decision for the future of their public safety communications. New Hanover County, North Carolina—FE conducted needs assessments and STY coverage analyses and developed recommendations for a new, countywide public safety y \y mobile radio network. FE generated an RFP based on the design and provided procurement assistance, proposal evaluations, and contract negotiation support. FE ;q f ai conducted program management and implementation support for the county's new 800 2 �a MHz, digital public safety mobile radio network and continues that support as needed. We also provided program management and technical assistance or the county's 800 MHz rebanding. FE recently assisted the county by providing inside cable plant design, procurement, and implementation services for a new eight story government services facility. Buncombe County, North Carolina—FE was selected by the county to provide system assessment and upgrade planning consulting services. FE evaluated the existing VHF system and developed a Federal Communications Commission x (FCC) narrowband-com pliant design and technical specifications. FE also developed a budgetary cost estimate for the system. FE continues to provide implementation oversight services for the first Phase 2 implementation by Cassidian. Most recently, the county selected FE to perform a needs assessment to ascertain the system requirements to provide the required coverage and capacity, verify spectrum availability, number of user subscribers and ensure that the system provides interoperability with the county's existing P25 700/800 MHz system that covers the interior of the jail complex and the campus grounds. Upon county agreement to the requirements resulting from the needs assessment, FE generated an RFP soliciting vendors to provide this system. Yadkin County, North Carolina—FE was selected assist with the procurement process of acquiring a new public safety radio system to comply with FCC narrowbanding requirements. FE reviewed unsolicited system proposals the County had already received and recommended that the County issue an RFP. FE conducted an abbreviated needs assessment with baseline coverage study and developed an RFP. FE assisted the County with contract negotiations and implementation support, including tower structural analyses to verify the vendor's final design viability. Most recently, FE was asked to perform tower mapping and tower structural analysis services. Specifically, recording measurements of existing towers, antennas and feedlines to create a tower mapping report for which the County will use to model a new tower. Copyright Protected Do Not Duplicate 10 �,� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['[i C.\HOLINA Interoperability and System Engineering Services WITIE FE was selected by the State of North Carolina to assist the North Carolina 9-1-1 Board in developing a concept of operations document describing the broad goals, general user needs, and a high-level view of the operating environment that the Board is attempting to achieve by developing an RFP for an ESlnet and next `•� ,. generation-functional systems to all statewide PSAPs. The concept of operations will also serve to identify the operational scenarios to be supported and outline a transition plan for the orderly and error-free migration to new functional platforms. Ultimately, the concept of operations will form the basis for the general system design and requirements expressed in the RFP to the solution vendors. Additional services that FE will provide at the request of the Board include evaluating current 9-1-1 needs, providing an ESlnet IP backbone for NG9-1-1 applications, and increasing PSAP interoperability. 2.2.3 Technology Experience The projects listed in subsequent sections demonstrate that FE has performed similar analyses on state, regional, and county systems of comparable size and subscriber base. We are one of the largest independent public safety consulting firms in the country and this is just a sampling of our extensive background. FE consultants have worked on practically every type of system and in hundreds of project and operational situations. A sample of their knowledge includes the following: Land Mobile Radio Land Mobile Radio Broadband/Advanced Systems Technologies Wireless Technologies • Trunked 0 APCO TIA P25 9 LTE • Simulcast 0 MPT1327 0 WiMAX • Multicast 0 TETRA 0 WiFi • Analog 0 DMR 0 Integrated voice and data • Digital 0 SCADA Frequency Bands Manufacturers' Systems and Backhaul Systems • Low band Equipment 0 Microwave • T-band 0Harris (M/A-COM) 0 T-carrier • VHF 0Motorola 0 Optical fiber • UHF 0Tait • 700/800 MHz 0Airbus IDS (Cassidian) • 900 MHz 0EF Johnson • 2.4, 4.9, 5.8 GHz 0Raytheon • Other licensed and 0DataRadio unlicensed bands 0Others 2.2.4 Needs Assessment Experience FE has provided public safety radio communications existing system review and analysis services to numerous states, regions, counties, tribal communities, and cities which include site surveys, existing system performance analysis, and/or system upgrade/migration compatibility studies. FE has also Copyright Protected Do Not Duplicate 11 �,� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INT Interoperability and System Engineering Services completed needs assessments/requirements discovery services to develop a thorough understanding of current and future requirements. In addition, FE is often involved with system and equipment configuration activities during implementation further broadening our base of system analysis knowledge. The following table lists numerous relevant projects. FE Needs Assessment and Existing System Analysis Experience Counties Cities and Local Regions States Municipalities • Boone County, KY • Bowling Green, KY • Gainesville a Arizona • Buncombe County, NC • Chesapeake, VA Regional Utilities Colorado • Campbell County,WY • Collierville, TN • ORION, Hampton Iowa DPS • Camden County, GA • Davenport, IA Roads Region of Iowa DOC • Caroline County, VA • El Paso, TX Virginia Minnesota • Collier County, FL • Florence, AZ • San Diego and Nebraska • Contra Costa County, CA • Gillette,WY Imperial Counties, • New Mexico • Cortland County, NY • Hampton, VA California • North Dakota • Culpeper County, VA • Henderson, KY • San Francisco • Oregon • Dane County, WI • Lakeland, FL BayRICS • Washington • El Paso County, TX • Nashville, TN • State of Montana . Wisconsin • Essex County, NY • Newport News, VA 15-90 Interoperable . Wyoming • King & Queen County, VA • Portland, OR Communications • LaGrange County, GA • Portsmouth, VA Consortium • Lewis County, NY • Virginia Beach, VA • State of Montana • Manitowoc County, WI Big Sky Consortium • Mills County, IA • New Hanover County, NC • Orange County, NC • Pierce County,WA • Pinal County, AZ • Rappahannock County, VA • Rockbridge County, VA • San Francisco (City and County), CA • Sussex County, VA • Warren County, KY • Yadkin County, NC To execute an effective needs assessment and develop trusting relationships, FE relies heavily upon face-to-face sessions with individuals representing participating organizations. We employ a hierarchical approach, determining strategic direction from client management while determining systems performance and requirements from the actual users. FE also addresses the challenges of interoperability among a multitude of public safety organizations. Copyright Protected Do Not Duplicate 12 �,� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services 2.2.5 Request for Proposal Development and Procurement Support Experience FE has provided technical specification, RFP development, and procurement support services to numerous states, regions, counties, and cities. The following is a sampling of RFPs we have recently prepared. The majority of the RFPs we have prepared for radio systems include specifications for microwave backhaul. ' Development Client RFP Title City of Bowling Green/Warren County, RFP for Public Safety Voice Radio Communications System Kentucky City of Henderson, Kentucky Request for Proposals for Communications System Arizona Public Service RFP for 800 MHz Radio Communications Systems San Diego County, California RFP for Digital Microwave Radio Network RFP for Conventional Systems Technology Refresh San Francisco Bay Area Regional RFP for Radio Communications System(10 RFPs;one for Interoperable Communications System each of the counties) City of Lakeland, Florida 800 MHz Project 25 Radio Communications System Iowa State Department of Public Safety RFP for Interoperable Communications System Design and Implementation Plan State of Nebraska RFP for Public Safety Mobile Radio System State of Nevada RFP for Public Safety Mobile Radio System Chautauqua County, New York RFP for LMR Communications System Cortland County, New York RFP for Radio Communications System RFP for Public Safety Radio Communications System: Civil Engineering and Site Development Electrical Engineering Design Services Essex County, New York Generators Equipment Shelters Site Development, Construction, and Civil Engineering Services Public Safety Radio Communications System Tower Metropolitan Transportation Authority/ RFP for 800 MHz Digital Land Mobile Radio System New York City Transit, New York RFP for Radio Communications System Buncombe County, North Carolina RFP for Detention Facility of the Buncombe County Sheriff's Office Digital Trunked 800 MHz Radio Communications System New Hanover County, North Carolina RFP for Public Safety APCO 25(P25)Digital Radio Communications System State of North Dakota RFP for Public Safety Mobile Radio Communications State of Oregon RFP for Oregon Wireless Interoperable Network(OWIN)Radio System;Services, Equipment&Software Copyright Protected Do Not Duplicate 13 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM li(AHOLINA Interoperability and System Engineering Services RFP Development Client RFP Title City of Portland, Oregon RFP for Public Safety Voice Radio Communications System Town of Collierville, Tennessee RFP for Radio Communications System RFP for Console System City of El Paso, Texas Radio System Procurement and Implementation Support Technical Specification El Paso County, Texas Radio System Procurement and Implementation Support Technical Specification King & Queen County, Virginia RFP for VHF/UHF Simulcast Radio Communications Network Overlay Regional InterOperable RFP for a "Turnkey"Service Solution for a Project 25(P25) Network(ORION) 7001800 MHz Radio Overlay System for ORION Member Agencies Hampton Roads Region, Virginia RFP for Project 25 7001800 MHz Subscriber Equipment to be used on the ORION System Pittsylvania County, Virginia RFP#11-02-01 700 MHz Project 25 Radio Communications System Dane County, Wisconsin RFP for Interoperable Voice Radio Communications System Manitowoc County, Wisconsin Public Safety Radio and Antenna System Technical Specification FE's extensive experience in this area provides our team with proven tools to develop a fair, vendor- neutral RFP for Orange County. Orange County will receive specifications that specifically consider the County's issues and concerns. Our staff understands the technical, financial, funding challenges faced by local municipalities both large and small. We have guided our clients with large, complex systems such as the Oregon Statewide Radio Project, and the Iowa Statewide Interoperable Radio System; regional systems, as well as counties and cities such as Pittsylvania and King and Queen Counties in Virginia, in making critical decisions for the appropriation of funds. We help our clients determine what's right for them whether it be joining a regional or statewide system, funding a standalone system, procuring a system via competitive bid, or procuring from a sole source. FE's past and current clients have expressed satisfaction and given prompt approval of the RFPs we have written. We have received feedback from system vendors that RFPs developed by FE are fair and allow them to prepare comprehensive, clear responses. No award based on an RFP written by FE has been protested. 2.2.6 P25 System Design and Implementation Experience It is important to Orange County that the consultant engaged to perform the required wireless communication engineering services have experience and qualifications in the areas central to the success of the County's project. The following table of relevant projects in P25 system design, implementation planning/supervision demonstrates the depth of FE's experience in each of these areas, including system design and implementation in the 700/800 MHz spectrum (*denotes 700/800 MHz systems). Copyright Protected Do Not Duplicate 14 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.\HOLINA Interoperability and System Engineering Services Relevant Project Experience P25 System Design Implementation Planning and/or Supervision • San Francisco Bay Area Regional • State of Arizona* Interoperable Communications System* • Florence, AZ • City and County of San Francisco, CA* • Pinal County, AZ • San Diego/Imperial Counties, CA* • LA-RICS, CA* • State of Arizona* • San Diego/Imperial Counties, CA* • Florence, AZ • State of Iowa • Pinal County, AZ • Bowling Green Municipal Utilities, KY • Arizona Public Service* • Bowling Green/Warren County, KY* • State of Iowa • Boone County, KY • Gainesville Regional Utility, FL* • State of Maryland* • Lakeland, FL* • State of New York • Bowling Green Municipal Utilities, KY • Cortland County, NY • Bowling Green/Warren County, KY* • Essex County, NY • Boone County, KY (microwave backhaul) • New Hanover County, NC* • State of Montana • ORION, VA* • New York City Transit* • Hampton, VA* • Cortland County, NY • King and Queen County, VA* • Buncombe County, NC • Pittsylvania County, VA • Hew Hanover County, NC* Rockbridge County, VA • State of Oregon* a Dane County, WI* • El Paso, TX* 0 Manitowoc County, WI* • El Paso County, TX* • Overlay Regional Interoperable Network (ORION), VA* • Hampton, VA • Newport News, VA* • King and Queen County, VA* • Pittsylvania, VA • Portsmouth, VA* • Caroline County, VA • Dane County, WI* • Manitowoc County, WI* • Over 50 counties in Minnesota FE is proud to share our involvement with three of the first P25 Phase 2 system procurements and implementations and the largest LTE system deployment in the United States: • Buncombe County, North Carolina—FE assisted with the procurement and is supervising the deployment of the first Airbus DS (formerly Cassidian Communications) P25 Phase 2 implementation. • Bowling Green Municipal Utilities, Kentucky—FE assisted with the procurement and supervised the first P25 Phase 2 system implementation in the U.S., a Motorola Astro 25 system. • State of Oregon—FE assisted with the procurement of the first Harris Corporation P25 Phase 2 implementation in the U.S. Copyright Protected Do Not Duplicate 15 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E � - Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NOR I I I(.A 1401.1 NA Interoperability and System Engineering Services • Los Angeles Regional Interoperable Communications System (LA-RICS)—The LA-RICS Authority's board of directors, representing the public safety agencies in 86 municipalities, awarded the project and construction management contract to the Jacobs team, with FE providing LMR and broadband LTE systems expertise and managing the vendor design, procurement, implementation, and operations activities. 2.3 Staff Qualifications and Facilities (RFP 4.0 and 4.D) Proposals shall identify each member of the consultant's staff who would be assigned to work on the project, the role they will be performing, and the hourly rate to be charged to Orange County for their services, or alternatively a fixed price for services based on the established scope of work. Additionally, a resume'stating the background and qualifications of each individual should be attached. Particular attention shall be given to the individual named as the project coordinator. FE has assembled an exceptionally well-qualified team to provide Orange County with comprehensive technical consulting services in response to the RFP. Our project manager has experience with Orange County, having worked on the County's Emergency Radio Communication Tower and System Infrastructure Upgrade Plan project, giving the FE team intimate knowledge of the radio environment in Orange County. All proposed personnel have worked on projects with similar scope, and our staff members have, on average, over 20 years of experience in their field of expertise. Our proposed project staffing for the Countywide Radio Communications Interoperability and Systems Engineering Services project is shown in Exhibit 3. The team is composed of our most senior talent in public safety communication systems technologies. Team member qualification highlights and project roles are provided in this section. Resumes can be found in Appendix A, and our fixed price for services in support of the scope of work is listed in Section 3. PROJECT MANAGER o ORANGE Orange County, cos,lr _-- North Carolina Management PROJECT � QUALTIY REVIEW BOARD AND TECHNICAL LEAD Ronald Bosco Brown,Cliff k ti— EXECUTIVE SPONSOR John Murray RF PERFORMANCE SPECALIST Adam Neilson PROJECT DIRECTOR Travis LePage,PIMP,PMI-ACP Exhibit 3—Orange County Project Organization Chart The FE team brings a wealth of public safety and public service communications experience to the Orange County project. r Copyright Protected Do Not Duplicate 16 �,� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INA Interoperability and System Engineering Services Project Manager& Technical Lead Mr. Cliff Brown, P.E. will manage the day-to-day progress to keep the project on schedule and on target. He brings extensive experience in turning customer needs into deliverable solutions, including planning; product and services development; engineering design; RFP process; site development; network implementation; network testing; and ongoing operations and maintenance. He possesses a clearly demonstrated history of exceeding goals by finding the right people for the job, and challenging them to the highest levels of performance. Mr. Brown is very familiar with the challenges faced by Orange County radio system users, as he was part of the FE team that worked with the County on their Radio System Infrastructure Upgrade project in 2013. His experience includes the successful program and project management of systems ranging from citywide to nationwide in scope. He has managed multi-disciplinary teams consisting of planning, engineering, specification preparation and RFP response evaluation, deployment, ongoing O&M, finance, and management reporting. He is skilled in providing management and oversight in system and network designs to meet customer needs, using leading edge technologies such as P25, LTE, TV white space, WiFi, WiMAX, and public safety in-building DAS, among others. RF Performance Specialist Mr. Adam Nelson has over 12 years of experience providing consulting services in the fields of public safety, telecommunications, and information technologies. As a member of FE's Spectrum Center of Excellence, his specialties include radio frequency prediction and analysis, frequency and capacity planning, interference mitigation, LTE system design and analysis, and spectrum-related efforts pertaining to frequency licensing and coordination. 2.4 References (RFP 4.G) Proposers must include in their RFP a list of organizations, including points of contact(name, address, and telephone number), which can be used as references for work performed in the area of service required. Selected organizations may be contacted to determine the quality of work performed and personnel assigned to the project. The results of the references will be provided to the evaluation team and used in scoring the written proposals. The following project summaries illustrate FE's similar project experience in radio communications and interoperability planning, design, and implementation support. Copyright Protected Do Not Duplicate 17 `'. DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['li(AHOLINA Interoperability and System Engineering Services Orange County, North Carolina Infrastructure Upgrade Plan and Coverage Analysis �o tra< Project Dates Situation Nov 2012—Sep 2013 Steeped in American history, Orange County is located in the middle of North Carolina and includes rolling terrain,forested areas,and many rural farming Project Snapshot communities. With a population of approximately 134,000,Orange County is • Assessed options for home to the University of North Carolina in Chapel Hill, high technology improving radio coverage research areas,and growing suburban areas. These characteristics provide • Conducted a user needs diverse challenges for the public safety communications in the County, assessment including coverage and varied operational environments.The County selected • Conducted system FE to recommend a solution to resolve the County's public safety radio system requirements assessment coverage and capacity deficiencies. • Conducted a coverage workshop Approach • Developed alternatives FE conducted a thorough user needs assessment with County fire, law report enforcement,and EMS agencies to fill information gaps and gather • Performed coverage and requirements for the upgraded system. Our team explored the current portable, capacity analyses mobile,and in-building coverage and capacity issues in depth with County agency representatives during the needs assessment. Project Reference Jim Groves Using this information,FE developed a set of high-level requirements for Former Orange County enhancements to the VIPER network that can be used to provide an upgrade to Emergency Service Director a viable digital system for County agencies. Based on the County-approved 919-560-0660 requirements, FE performed coverage and capacity analyses to recommend a radio site constellation and set of channels,determine required modifications to existing towers,specify equipment needs to upgrade to P25,consider the inclusion of a backup conventional subsystem that includes a station and unit paging system, and outline the tower type and construction for any new sites. Results and Benefits FE's evaluation of user needs,combined with baseline assumptions,VIPER and technology trends,allowed for the identification of specific system requirements that will be used in the development of RF coverage improvements for the 800 MHz VIPER system,as well as for the station alerting and paging systems in use. Copyright Protected Do Not Duplicate 18 Gam' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['li(AHO1.INA Interoperability and System Engineering Services Buncombe County, North Carolina Existing System Assessment & Narrowband Upgrade Planning 410On-call Technical Consulting, and RFP Development Project Dates Situation June 2010—Present Buncombe County, North Carolina needed to upgrade the County's existing system to meet the FCC's narrowbanding mandate. The County engaged Federal Project Snapshot Engineering to evaluate the existing system, plan for the upgrade, design a compliant • Perform system system,and recommend a solution. propagation analysis • Prepare propagation maps Approach • Conduct needs analysis FE conducted a needs analysis,collecting,compiling,and analyzing key information • Conduct infrastructure obtained from county public safety wireless systems users.We also conducted an assessment assessment of the county's existing infrastructure,surveying the five simulcast • Provide estimated costs for transmit sites and the one receive-only site used for radio coverage to determine if site improvements they were suitable for continued use or if modifications are required for an upgraded • Develop and submit Needs system. Estimated costs associated with improving the sites to meet the county's Assessment and System needs were provided. Recommendation Report • Develop and submit FE performed system propagation analysis to analyze outdoor and in-building Conceptual Design Report coverage and modeled coverage in the VHF, UHF and 700 MHz frequency bands. • Present recommended We also developed a conceptual design for the system infrastructure,backhaul,and solution to the county capacity meeting the County's requirements and developed the County's RFP for • Provide on-call technical Detention Facility of the Buncombe County Sheriff Office Digital Trunked 800 MHz consulting services Radio Communications System. regarding PSMR Results and Benefits technology, microwave FE recommended cost-effective,shared,reliable mobile wireless infrastructure systems,consoles,and enhancements which met the County's requirements. dispatch center systems • Develop RFP The County retained FE to provide on-call technical consulting services regarding Project References public safety mobile radio technology, microwave systems,consoles,and dispatch Clint C.Gorman center systems. Radio Administrator 59 Woodfin Place Asheville, NC 28801 828-250-6834 clint.gorman@buncombecounty.org Bryan Dillingham Network and Communications Manager 59 Woodfin Place Asheville, NC 28801 828-250-6807 bryan.dillingham@buncombe county.org Copyright Protected Do Not Duplicate 19 c+ ` DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.\HOLINA Interoperability and System Engineering Services f,P New Hanover County, North Carolina Public Safety Needs Assessment, System * Design and Implementation Administration Building Inside Cabling Design and Specification Project Dates Situation January 2005—Present New Hanover County, North Carolina was in need of a consultant to provide needs assessment,design, RFP generation,system procurement,and implementation Project Snapshot services for their 800 MHz public safety system. • Collect information on and Subsequently,the county required the design of low voltage signaling infrastructure assess radio infrastructure, for IT,telecom,and security systems to support the daily operations of the County licenses,applications, Administration Building. operations,channel usage, and sites Approach • Assess all existing sites FE assessed the needs of the county's mobile and portable radio users by collecting and several potential sites information about the existing radio infrastructure, licenses,applications,operations, • Develop system channel usage,and sites via interviews and questionnaires. specifications and features RFP The FE site survey team assessed existing sites and several potential sites for an • Assess vendor technical additional tower to improve coverage. FE consultants then developed system proposals and recommend specifications and features for both the land mobile radio system and the compliant vendor to county microwave network and incorporated them into an RFP. To facilitate the • Provide program procurement process, FE developed an evaluation matrix for ranking the vendors' management and IV&V technical proposals,conducted the vendor pre-bid conference,reviewed vendor services questions,and prepared the responses and RFP addenda. • Rebanding program FE evaluated new vendor technical proposals in accordance with the approved management evaluation matrix,processed the vendors'cost proposals,combined the technical • Low voltage systems and cost proposals to rank the vendor proposals,and recommended a compliant design and implementation vendor to the county. oversight for Admin Bldg FE also provided program management and Independent Validation and Project Reference Verification(IV&V)activities for all phases of the program,including assistance in Mr.Warren Lee license applications for 800 MHz and 6 GHz frequencies for the microwave system. Director of Emergency During the implementation phase, FE coordinated the Installation and Management Implementation Oversight Plan with the installation and equipment vendors'plans. New Hanover County This detailed oversight plan guided FE to oversee and evaluate the implementation Department of Emergency of each site(for both radio stem and microwave installation)and the dispatch Management center. It also listed validation criteria for items such as coverage, subscriber use, 230 Market Place Drive system and equipment programming and optimization,system simulcast operation Suite 115 and system cutover for our engineers to use for each other areas. Wilmington, NC 28403 FE also provided program management and technical assistance for the county's 910-798-6900(office) 800 MHz rebanding as well as design and implementation oversight for low 910-798-6904(fax) voltage systems in the County Administration Building. wlee@nhcgov.com Results and Benefits The 800 MHz P25 countywide system is currently operational and meets New Hanover County's requirements for a reliable first responder network. Copyright Protected Do Not Duplicate 20 c+ DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.\(i(/1.INA Interoperability and System Engineering Services Yadkin County, North Carolina Procurement and Implementation Support • Tower Inspection Services Project Dates Situation April 2013—Present Yadkin County, North Carolina,was operating a three-site Tait Quasi-Sync wideband VHF public safety mobile radio system supporting 12 combination(paid/ Project Snapshot volunteer)fire and/or rescue agencies,countywide emergency medical services, • Reviewed unsolicited the County sheriff(court,detention,patrol,civil and investigations divisions), system proposals received animal services,County public safety answering point,and other County by the County agencies.The system supported the police departments and other departments • Provided recommendation within the municipalities of Boonville, East Bend,Jonesville,and Yadkinville. that the County issue an Federal Engineering(FE)was selected to provide procurement support for RFP upgrades or modifications to the system that will satisfy the narrowbanding • Conducted abbreviated requirement. needs assessment with baseline coverage study Approach • Developed RFP FE assessed the current Tait Communications proposal and made • Assisted County with recommendations, performing the following activities: contract negotiations and . Reviewed the work products of the previous consultant including the initial implementation support assessment and recommendations • Tower structural analyses • Presented the findings and recommendations to the County Administrator and Project Reference County Board Lisa Hughes FE conducted a coverage assessment and produced a set of maps for both Deputy County Manager mobile and portable subscriber units depicting major geographical landmarks and 217 East Willow St. the area topography, including scale,color schemes, highway/road data, Yadkinville, NC 27055 jurisdictional boundaries,and desired performance characteristics. 336-679-4200(o) Ihughes@yadkincountync.gov FE provided the following services to support the procurement of the Yadkin County radio system. • Develop technical specifications to serve as the basis for an RFP for vendors to submit consistent proposals and to be verifiable through acceptance testing • Updated the technical specifications based on County review and comments and submitted a final version to be used in a competitive RFP • Reviewed the vendor proposal selected by the County,assisted the County with contract negotiations,and provided support for technical issues FE assisted the County in resolving radio and microwave(MNI)vendor implementation issues,oversaw the vendor's punch list development and resolution process,identified vendor performance issues,and made appropriate recommendations to the County. FE conducted tower mapping and tower structural analysis services to create a tower mapping report that the County will use to model a new tower. Results and Benefits FE was engaged by the County to review and continue the work of another consultant and complete the procurement and implementation of a new system. The County is very satisfied with the execution of these services,the contract with the radio system vendor,and the implementation of the system. Copyright Protected Do Not Duplicate 21 u DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E � -- Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['[i C.\HOLINA Interoperability and System Engineering Services TAB 3- RESPONSE TO TECHNICAL REQUIREMENTS Copyright Protected Do Not Duplicate p DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NVR['li(AHOLINA Interoperability and System Engineering Services 3 RESPONSE TO TECHICAL REQUIREMENTS (RFP SECTION 5.0) 3.1 Statement of Objectivity (RFP 4.E) It is the intent of Orange County to hire a firm that is neutral with respects to radio communications companies or equipment. Proposals will be accepted only from independent consultants not engaged in or associated with the business of selling, servicing, or renting communications equipment. Respondents must clearly state the independence and objectivity of the consultant. The selected firm shall not be allowed to provide provisioning services. FE's certified independence guarantees that Orange County will receive totally objective analyses, free from the influences of hardware vendors, software suppliers, and service providers. Unlike some consulting firms, FE has no business relationship with any suppliers of public safety communications equipment or software. FE is not engaged in, nor are we associated with, the business of selling, servicing, or renting radio communications, telephony, CAD, or any other systems. Because we have no affiliation with equipment manufacturers or service providers, we are truly your trusted advisor; our recommendations and designs are not biased toward any particular technology, product, or approach. However, since many of our professionals have worked for equipment manufacturers in the past, our designs embody practical, cost-effective solutions customized to the specific needs of our clients. At FE, we take pride in the vendor neutrality of our recommendations, system designs, and specifications. The results of some recent system procurements shown below are evidence that FE's involvement has resulted in a wide range of major system vendor selections. Client Radio System Vendor State of Oregon Harris King and Queen County, Virginia Tait City of Virginia Beach, Virginia Motorola ORION, Hampton Roads Region, Virginia Motorola Buncombe County, North Carolina Airbus DS (Cassidian) Manitowoc County, Wisconsin Motorola Dane County, Wisconsin Harris Pittsylvania County Virginia Harris 3.2 Work to be Performed (RFP 5.C) 3.2.1 Comprehensive Needs Analysis (RFP 5.C.1) 1. Meet with management personnel and end users of the current infrastructure to develop a comprehensive needs analysis addressing functionality, capability and needs of all current infrastructure users. A draft needs analysis shall be presented to the end-users for validation in at least two group meetings, and then to the committee for final approval. Copyright Protected Do Not Duplicate 22 � ' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services Existing Documentation Review Prior to an on-site project initiation meeting, FE will request and review County-supplied system documentation, including previous studies, FCC licenses, site surveys, inventories, maintenance contracts, and other relevant documentation to begin assessing the existing system. FE will also review the information we provided to the County in Project Initiation 2013. Performing a detailed review of the current documentation provides our Meeting Agenda team with a common starting point and a foundation for a complete understanding of the current status of the communications system. • Introductions • Clarify roles Project Initiation Meeting • Review project objectives and expectations FE will conduct a project initiation meeting with the County project manager • Review key issues and other officials from participating agencies as identified by the County on a • Review key milestones mutually agreed upon date following contract signing. This initial meeting will and schedule establish a common understanding of the project goals, objectives, and vision, • Review and clarify items best understood through a close working relationship between our deliverables respective management teams and staffs. • Plan interviews and identify interview Based on the outcome of the meeting, FE will deliver a project plan and participants timetable that will serve as guiding documents throughout the program. We • Review status reportingmethodologies will also use this meeting to renew our ongoing relationships. • Determine progress review meeting schedule Needs Assessment and Requirements Discovery • Resolve immediate issues Federal Engineering's requirements discovery methodology places • Build relationships considerable emphasis on consensus building and accurately determining the needs of the system owners and system users, both for the county and participating agencies. Our approach can be summarized as follows: • Work with the County project manager to identify the participants to be interviewed • Allow time during the interview session to discuss each agency's issues and requirements as well as their comments on a new countywide system • Request agencies categorize their priorities so that commonalities and differences are easily identified across the agencies • Define a prioritized set of needs and requirements to highlight stakeholders' 'must-haves' • Based on the collected needs, explore what resources can be shared among agencies and what assets can be reused to achieve cost savings for the County. Stakeholder Interviews Once FE has reviewed available documentation and any other applicable standards and guidelines, we will be able to discern gaps in the information as we prepare for the user interview. We will work with the County project manager to define an assessment questionnaire that will be used during the interviews. The questionnaire will highlight current issues and concerns, as well as future requirements for an upgraded LMR system. Copyright Protected Do Not Duplicate 23 �� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services Because we recognize that this task establishes the foundation for all future work, we will gather sufficient information necessary to accurately document the County's needs. Typically, the questionnaire will cover areas that include the following: • Functionality • Physical infrastructure • Backhaul • Daily and tactical operations • Performance including any coverage, capacity, and interference issues • Spectrum use • Current and future interoperability within the County and with other jurisdictions, agencies, and organizations • Number, type of subscriber units, and feature sets used • User needs and expectations The questionnaire will also consider the following specific County concerns: • Potential new site locations • Additional functional requirements/goals • In-building and underground coverage 0 Current and expected level of service • Available and expected funding 0 Network management needs • Specialized operating features 0 Disaster recovery FE proposes conducting a needs assessment interview with County system users, stakeholders, and local agency technical representatives. We propose that the interview, to be conducted immediately following the project initiation meeting, includes the technical representatives in the same sessions as users and stakeholders to promote synergy among the disciplines and help achieve consensus. This combined session will adequately collect the current concerns and future requirements, as well as identify any issues affecting the modification and continued use of equipment sites. FE will meet with the designated personnel and, using the pre-approved assessment questionnaire as a basis for discussion, discover and document the County's issues, concerns, and expectations for the future. FE will catalog the collected information and conduct follow-up discussions with participants as necessary to complete the assessments. 3.2.2 Site Data and Equipment Inventory Review (RFP 5.C.2) 2. Gather, analyze, and document operational, functional, and specific technical information of existing fixed sites and associated equipment for various emergency service departments that serve Orange County residents (may be an Orange County based agency or a Department in a County adjacent to Orange County that serves/protects geography within Orange County), or Orange County emergency service departments that serve residents outside Orange County in order to understand the present status of our communications capabilities. FE already has the County's site data from previous projects. We will review our existing site data to verify that it is current. We will refresh this data, as necessary, via information collected during the needs assessment interviews (described above). The County may have added sites since we conducted our previous analysis. We will review available data the County has for those sites as well Copyright Protected Do Not Duplicate 24 �,� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services and discuss with the County the impact of adding additional sites in the future. Because we already have the detailed knowledge about the County's sites and equipment, we will save the County money, reduce the schedule time, and reduce the risks. Although we believe we have the current site data, as an option and if the County desires, FE can perform physical site surveys and structural analysis on all sites. We will analyze both the transmitter and dispatch sites. Our analysis will include control equipment, backhaul equipment, repeaters, base stations, dispatch equipment, and other critical communications infrastructure installations. We will evaluate the capability of existing equipment to be used in the new, upgraded radio system. FE will identify any issues that affect the modification and use of the sites for a new/upgraded Orange County system. FE will use the results of our analysis in subsequent system alternatives analysis tasks. High-level Requirements Definition FE will develop a set of high-level requirements based on the needs assessment meetings and assumptions agreed upon with the County. We will typically define requirements for the following: • Basic functionality • Mobile and portable coverage needs • Mobile and portable roaming needs • Infrastructure and backhaul components • Number and basic functionality of subscribers • Network management • Capacity and spectrum • Interoperability among local agencies and public service departments, adjacent counties, state and federal agencies • Dispatch center capabilities • Maintenance and service level We will consider the desired and feasible use of the County's site and equipment investments for each applicable requirement. Deliverable—Needs Analysis Report (RFP 53.2 and 5.C.1) B.2. Documentation and assessment of existing communications capabilities;including review, summarization and validation of previous documents and studies. C.1.A draft needs analysis shall be presented to the end-users for validation in at least two group meetings, and then to the committee for final approval. FE's needs analysis report will include the following: • Discussion of issues and existing system capabilities/vulnerabilities • Analysis of interoperability gaps • Mobile, portable, and in-building coverage requirements Copyright Protected Do Not Duplicate 25 c+ DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM li(AR(/LINA Interoperability and System Engineering Services • Functional, performance, and operational requirements • Paging system requirements FE will include the needs analysis in the Orange County Radio System Alternative Report and present our findings to the Orange County project team, users, and governing committee as described in Section 3.2.3 below. 3.2.3 Alternatives Analysis (RFP 5.8.3) Once FE has completed and analyzed the information from the project initiation meeting, user needs interviews, and site and equipment documentation, we will develop a mutually agreed upon number of radio system alternatives. Our alternatives will provide a uniform approach to developing a countywide network that reuses as many County assets as possible and that relies on industry best practices stemming from numerous similar, successful projects. The alternatives will provide the same or better reliability and redundancy as the existing system, and will be focused on improving the coverage provided by the current system. These alternatives will be subjected to the analyses described in Sections 3.2.4 to 3.2.8 below. The alternatives will address the advantages, disadvantages, issues and considerations specific to the needs of Orange County users, and focus on coverage (outdoor and in-building), capacity, and interoperability. Areas to be considered will include the following: 1. Frequency range (low band, high band, UHF, 700, 800) and an analysis of spectrum availability within each frequency range 2. Wide band versus narrow band radios 3. Analog, digital or combination including P25 Phase I and II air interface compatibility 4. Encryption options and capabilities 5. Countywide radio communications interoperability and systems engineering services 6. Operating protocol (conventional, trunking, combination) 7. One infrastructure or more, meaning the following: i. A single infrastructure to serve the combined needs of all users in the County, or ii. Two or more infrastructures (one or more to serve the urban/metro area, and/or one or more to serve the areas outside the urban/metro area)with appropriate interoperability capabilities 8. Procurement scope, meaning the following: i. County procures the core infrastructure, and each user entity(towns, OWASA, schools, and other end users) must procure their own end-user equipment(base, mobile and portable radios, and pagers) ii. County procures all core infrastructure and all end user entity equipment (based on the number of end user equipment items in service at the time of the needs analysis) iii. County procures all core infrastructure and all end user entity equipment, but individual end user entities need to procure infrastructure enhancements to improve coverage or other issues above and beyond what is provided by the current infrastructure 40 4� Copyright Protected Do Not Duplicate 26 .. DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM li(AR(/LINA Interoperability and System Engineering Services 9. With respect to the potential options above, interoperability with the following: i. Agencies serving Orange County residents both on a day-to-day and event related basis. This includes State of North Carolina and University of North Carolina entities, and fire and EMS entities in adjoining Counties that serve territories in Orange County. ii. Interoperability with adjoining county emergency service entities (for adjoining county units responding into Orange County and for Orange County units responding into adjacent counties). This includes the Alamance, Chatham, Caswell, Person, and Durham systems. The alternatives assessments will include coverage analyses as defined in subsequent sections. FE will accomplish the following: 1. Model existing system to determine current coverage 2. Identify gaps between current coverage and user needs derived from the needs assessment 3. Develop alternatives 4. Model the alternatives 5. Identify the best alternative selection that meets users' needs Budgetary cost estimates will also be presented for each viable alternative. At the conclusion of these alternatives analysis, a draft Orange County Radio System Alternatives Report will be delivered to the County. FE will facilitate a meeting with the County review committee to assess the alternatives and select one alternative for the further analyses described in Sections 3.2.8 to 3.2.10 below. FE will gather comments during the meeting and issue a final Orange County Radio System Alternatives Report which will include the selected alternative. 3.2.4 Existing System Coverage (RFP 5.D.3) 3. Coverage maps depicting current public safety infrastructure user performance for both mobile and portable radios, and paging receivers, to verify gaps as noted from the various interviews. FE will use our in-house tool, FEPerformanceProTM to provide coverage analysis for the County's current system. This integrated set of tools provides our consultants with state-of-the-art network modeling technology to analyze the performance of a system. These tools include the following: • FECoverageTM — complete coverage analysis tool • FEMapperTM — high-resolution mapping tool • FENetworkTM — reliable capacity analysis tool • FEMitigateTM (optional)— system-wide interference analysis FEPerformanceProTM uses ATDI's powerful ICS Telecom industry standard network propagation and planning software as its engine. ICS Telecom's accuracy in modeling communications networks, performing interference analyses, and facilitating frequency planning has been validated by the federal government in field tests. FEPerformanceProTM will be used to demonstrate the coverage provided by Orange County's current system. We will provide coverage maps that depict current mobile, portable, and paging coverage and identify coverage gaps. r 27 Copyright Protected Do Not Duplicate �� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtItr,1<riLINA Interoperability and System Engineering Services Deliverable—Existing System Coverage Performance (RFP 5.D.3) 3. Coverage maps depicting current public safety infrastructure user performance for both mobile and portable radios, and paging receivers, to verify gaps as noted from the various interviews. FE will produce a mutually agreed upon set of coverage maps for both mobile and portable subscriber units depicting major geographical landmarks and the area topography, including scale, color schemes, highway/road data,jurisdictional boundaries, and desired performance characteristics. Exhibit 4 shows an example of a coverage map that FE prepared for Orange County in 2013, depicting coverage provided by the current VIPER 800MHz system. Orange County, NC- Existing VIPER Coverage 900 MHz Analog Coverage;Portable Talk-In(Radio to Repeater)at Various Quality Levels fi? LAWS + .. . y. 157 1 3 TO t9 ENO MTN. 57 I SOLE MILL R�. 10 a 4 �o r, 15 Sw CIiAPEL HILL se r � CHATHAM MTN. 51 15' tyy' �} Existing 800 MHz Radio Site Orange County Border O Portable Talk-In Coverage>=DAQ 2.0 Portable Talk-in Coverage>=DAQ 3.0 0 1 2 4Miles 1♦ Portable Talk-In Coverage>=DAQ 3A 1 Exhibit 4—Sample Orange County VIPER Portable Coverage Map Copyright Protected Do Not Duplicate 28 v DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services 3.2.5 Proposed System Coverage Analysis (RFP 5.C.4) 4. Conduct and analyze coverage studies of proposed infrastructure based on multiple tower sites in order to provide countywide coverage including the potential of new communications sites, additional"satellite"receiver sites, and/or paging sites. (RFP 5.C.4) FE will then model the coverage of the alternative systems. Alternatives will leverage existing sites and potential new sites to fill coverage gaps. In addition to coverage analyses, FE will also perform the following for the viable alternatives: • Coverage Analysis—FE will use FEPerformanceProTM to provide coverage analysis of each of the viable alternatives as assess how they meet the users' needs. • Capacity Analysis—FE will use the approved requirements to assess the expected traffic load of the system. We will then estimate the number of sites and channels required to meet Orange County's needs. • Backhaul Analysis—FENetworkTM facilitates backhaul network analysis and design. Our consultants will assess the backhaul needs for the County based on requirements. As an option, we can use FENetworkTM to graph individual path profiles for each link or provide a representation of the entire backhaul network. • Interference Analysis—As an option, FE will analyze both co-channel interference (also known as "carrier interference") and adjacent channel interference (interference from a frequency that is directly adjacent to the desired frequency). Both of these types of interference can degrade audio quality when a subscriber unit's antenna simultaneously receives signals broadcast from different sites. FEMitigate IS TM powerful analysis engine can evaluate either global (all received channels at a given location) or best server(the strongest received channel at a given location)to provide the information needed to determine a recommended solution. • Spectrum Planning—Proper frequency planning is necessary to implement a successful public safety communications system. FE has provided frequency planning, allocation, rebanding, narrowbanding, and licensing services to multiple agency levels, from local to statewide. Our experience covers all public safety frequency bands including VHF, UHF, 700 MHz, 800 MHz, and 900 MHz, and includes the discovery of available frequencies, consideration and allocation of FCC rules, ensuring interoperability, and accurate FCC license filing and coordination. To help the County establish a future spectrum strategy, FE will analyze spectrum needs based on the results of the interviews. We will evaluate the potential use of low band, high band, UHF, 700 and 800 MHz frequencies for use in an upgraded network and indicate if the County should acquire additional spectrum to meet their anticipated needs. FE will consider interoperability among public safety and public service agencies who will use the new network, interoperability with state systems, and interoperability with surrounding counties and jurisdictions. Federal Engineering's Spectrum Center of Excellence has immediate access to FCC databases and is constantly apprised of all issues surrounding frequency acquisition and Copyright Protected Do Not Duplicate 29 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i(A(i(/LINA Interoperability and System Engineering Services use. FE monitors the FCC's rules and regulations, as well as the latest reports, orders, notices, and memoranda that pertain to the wireless regulatory arena. We will put the County on our watch list for any items that may affect the existing FCC licenses As an option, FE can prepare FCC Form 601 license applications, frequency coordination forms, and FAA forms and file applications with the designated frequency coordinator or other appropriate entity on behalf of the County, or file directly with the FCC when frequency coordination is not required for simple license modifications, special temporary authority, rule waiver requests, and certain license applications. Deliverable—New System Coverage Performance (RFP 5.D.4) 4. Propagation studies showing expected coverage of the recommended system at standards identified by end user needs and as approved by the committee for both mobile and portable radios, and paging receivers. FE will produce a mutually agreed upon set of coverage maps of the recommended new system for both mobile and portable subscriber units depicting major geographical landmarks and the area topography, including scale, color schemes, highway/road data,jurisdictional boundaries, and desired performance characteristics. 3.2.6 FETeamCoveragel(Optional Task) As an option, we offer FE Team Coverage', our powerful, interactive tool that involves clients in the system design process. The process is facilitated by a subject matter expert from our Spectrum Center of ExcellenceTm. FE Team Coverage'is a unique Federal Engineering offering based upon proven modeling software and has been consistently lauded by our clients. It builds user consensus and facilitates "buy-in" of the eventual system. The following are addressed during the FE Team Coverage'workshop: • System users' coverage needs • Other participating jurisdictions' coverage needs • Coverage problem areas identified during the needs assessment • How to meet fire-ground and in-building coverage needs • Areas where traditional tower-based coverage is not possible (i.e., locations that are environmentally protected, difficult access, or have no power) • Leveraging existing sites and potential new sites to fill coverage gaps As radio coverage is modeled and gaps are indicated, FE's subject matter expert will interactively, and in real-time, manipulate the model and display the effects of changing site equipment or placing additional sites in the network. Workshop attendees will immediately be able to evaluate the impact of these changes and determine what should be done to meet user requirements. At the conclusion of the workshop, FE will produce a mutually agreed upon set of coverage maps, customized to your needs, depicting major geographical landmarks, area topography, highway/road data,jurisdictional boundaries, and desired performance characteristics. FE Team Coverage can be provided over the Internet via collaborative software or in a classroom environment at your option. Copyright Protected Do Not Duplicate 30 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY LVVKI It(AHOLINA Interoperability and System Engineering Services 3.2.7 Interoperability Analysis (RFP 5.C.3) 3. Review interoperability needs with all agencies serving citizens and/or territory within the county and those law and fire/EMS agencies bordering Orange County, including gateway or P251SSI needs for users not served by the proposed infrastructure (i.e.: ambulances from outside Orange County needing inter-communications with Orange County based hospitals) as may be identified. As the County is aware, SAFECOM's continuum indicates an agency's level of interoperability based upon criteria in each lane: Governance, Standard Operating Procedures, Technology, Training & Exercise, and Usage. As shown by the continuum in Exhibit 5, true interoperability increases as agencies are able to demonstrate that they align on the right side of the continuum. The third lane, Technology, defines the steps to achieve SAFECOM's highest level of communications equipment and systems interoperability: the ability of public safety and public service agencies to communicate across disciplines and jurisdictions, exchanging voice and/or data with one another on demand, in real time, when needed, and as authorized. Homeland Interoperability Continuum Security 0 Regional Committee — 0 Individual Agencies Informal Key Multi.Disciplme Working within a Statewide qCq, Gdy@masnc@ � Working Coordination Staff Collaboration Communications Interoperability N E Independently Betwoon Agencies on a Regular Basis Plan Framework 07 m ; rn8 P � � d o rn p E N O n3 National Incident Standard E so Individual Regional Bat of o m operating Agency joint SUPS Joint sops Communications Management .W y Procedures SOPS for Pia nned Events for Emergencies sops System a w Integratedated 30 Ps � o One-Way Two-Way a [3 47 RATA Swap Common Custom-Interfaced Standards-Based Standards-Sased m .- 5 bra Krs Files Applicalions Applications Sharing Sharing o w Technologym c ......................... .............................. GO M S9 a,�rs Swap GatewayShared Channels Pro pnatary Shared Standards-Based - Radios System Shared System m m a m w General Single Agency Multi-Agency Multi-Agency C o° m Orientation on Tabletop Exorcises Tabletop Exercises Full Functional Regular Camprehenalye 4 _ `m Equipment and for Key Field and for Key Field and 'Exercises Involving Regionwide Training and Exert; 'S m m Applications Support Staff Support Staff All$taff m @ to y E E — _ .0 Q E g Localized Regional incident Daily Use = :- c Planned Events Emergency Incidents Management Throughout Region Exhibit 5—SAFECOM's Interoperability Continuum' During the user and stakeholder interviews, FE will discover the County's desired levels of regional interoperability with adjacent municipalities and counties, the North Carolina State Police, and federal agencies. Our analysis will specifically address the Technology lane and associated interoperability, interfaces, and interactions among County agencies, surrounding jurisdictions, and other state and federal agencies as requested. ' http://www.safecomprogram.gov/SiteCollectionDocuments/Interoperability_Continuum_Brochure_2.pdf y Copyright Protected Do Not Duplicate 31 Gam' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services FE's analysis will use the SAFECOM Continuum and the SAFECOM Interoperable Statement of Requirements (SoR) as guides to identify user's interoperability needs, and how those needs are, or are not being met by the current system. Deliverable—Interoperability Gap Analysis (RFP 5.D.2) Analysis of interoperability gaps as provided through interviews of the various existing infrastructure users. Coverage Analysis Included in the Orange County Radio System Alternatives Report, FE will provide Orange County with interoperability requirements identified by the users, and an analysis identifying where those needs are or are not being met by the current system. 3.2.8 Budgetary Costs (RFP 5.C.10) 10. Obtain and submit budgetary costs for alternatives presented, and assist the review committee to prioritize acquisitions and implementation Using our in-house FECostProTM tool, FE will estimate the cost of each viable alternative. This high-level, quantitative analysis relies on our team's knowledge base, which spans numerous similar county projects. Cost estimates will be further refined for the single alternative chosen by the County review committee. 3.2.9 Migration Plan (RFP 5.C.5) 5. Develop a comprehensive migration plan for all current infrastructure users. Orange County will benefit from our experience preparing migration plans for hundreds of public safety entities, including municipalities, counties, and states. FE will work with the County to define a user migration plan for the selected solution. This top level plan will outline the steps necessary to efficiently transition to a new system and focus on these key areas: 1. Implementation planning 2. Financial alignment 3. Operational planning 4. System cutover FE's migration plans typically address the following activities related to the overall new or upgraded system, so that internal planning can be done in a logical sequence well in advance of vendor contract award. • Radio site development • Dispatch center development • Procurement • Negotiations • Deployment • Training • Acceptance testing • Acceptance • Cutover Copyright Protected Do Not Duplicate 32 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NOMIt(AHO INA Interoperability and System Engineering Services Deliverable—Comprehensive Transition Plan (RFP 5.D.5) 5. A comprehensive transition plan for all current infrastructure users to the new/proposed infrastructure. The plan shall be designed to ensure no loss of functionality and/or capabilities during the transition. FE will include migration planning considerations in the Orange County Radio System Alternatives Report. 3.2.10 Acquisition and Implementation Process Recommendation (RFP 5.C.6) 6 Recommend and submit a planned acquisition and implementation process based on the option approved by the review committee. FE has extensive experience working with clients to determine the best means of procurement. Our expertise allows our clients to realize significant cost savings in their system implementations. FE will work closely with the Orange County project manager and purchasing organization to determine the best means of procuring the new radio system. This will entail analyzing the alternatives outlined in Section 5.B.3.g of the County's RFP and recommending the best alternative for the selected system solution. 3.2.11 Generation of Recommendations Report At the conclusion of the above tasks and before the procurement phase of this project, FE will deliver to the County, a draft Orange County Radio System Recommendations Report. FE will meet with the County to review the report, gather comments, and then issue a final report. This final report will serve as the basis for the development of the equipment vendor RFP. 3.2.12 Vendor Neutral RFP Development (RFP 5.C.7) 7. Development of a vendor-neutral Request for Proposal(RFP) suitable to be released to the vendor community for the purposes of procuring the approved alternative. FE will develop a set of technical specifications for an Orange County public safety P25 radio system based on the County-approved requirements and selected solution for use in an RFP. These specifications will describe the radio system's functional and performance requirements in sufficient detail for vendors to submit consistent proposals, will be verifiable through future acceptance testing, and will stress the use of existing investments wherever possible. The detailed design of the system will be left to the radio system vendor to allow for innovative approaches and to ensure the vendor remains responsible for system performance in accordance with the specifications. These specifications will be the foundation for vendor proposal evaluation and as acceptance criteria. FE's specifications are properly crafted to tightly define performance and at the same time encourage competition and innovation. FE typically includes the following in our specifications: • System functional, protocol, and 0 Expandability to accommodate future operational requirements growth • Regulatory and standards compliance • Backhaul connectivity • Leverage existing resources 0 Network management Copyright Protected Do Not Duplicate 33 c+ DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i(A(i(/LINA Interoperability and System Engineering Services • Infrastructure equipment • Network and physical security • Suggested site locations and • Overall project schedule and development implementation plan • Site subsystems (power, HVAC, etc.) 0 Migration and cutover/transition • Site/shelter modifications requirements for continuity of • System delivery and installation operations • Dispatch equipment 0 User(operational) and technical staff • Subscribers (mobiles, portables) training requirements • System reliability and redundancy 0 Network management • Required coverage and capacity 0 Required legacy and new interfaces • Spectrum usage and restrictions Factory, interoperability, coverage, • Local, regional, state, and federal site, system, and acceptance test interoperability guidelines and criteria • System functional, protocol, and Regulatory and standards compliance operational requirements Orange County will receive specifications that address the County's needs. Our staff understands the technical, financial, funding challenges faced by local municipalities both large and small. FE's past and current clients have expressed satisfaction and given prompt approval of the RFPs we have written. We have received feedback from system vendors that RFPs developed by FE are fair and allow them to prepare comprehensive, clear responses. In addition, no procurement that FE was involved in has been protested by a vendor. This is a testament to our outstanding project management methodologies and team. Deliverable—Vendor Neutral RFP(RFP 5.D.6) 6. A vendor-neutral Request for Proposal(RFP), including recommended tower requirements suitable to be released to the vendor community for the purposes of procuring the approved alternative. FE will develop a complete Orange County Radio System RFP incorporating the technical specifications, boilerplate terms and conditions, and other local purchasing requirements. We will submit the draft RFP to the County for review and comment, update based on the County's review, and submit a final RFP. 3.2.13 RFP Process Facilitation (RFP 5.C.8) 8. Facilitation of the RFP process, including staff support to the County in conducting a comprehensive evaluation of RFP responses received. In addition to vendor proposal evaluation, FE can provide expert technical recommendations and advice to the County during the entire competitive solicitation. As an option, the following tasks not called out in the County RFP can be performed in close consultation with the County. • Attend and assist the County with the vendor pre-proposal conference • Respond to any technical questions from the bidders concerning the RFP • Generate addenda to the RFP as necessary Copyright Protected Do Not Duplicate 34 Gam' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i(AHO INN Interoperability and System Engineering Services • Attend and assist with vendor best and final presentations as necessary TYPICAL RFP RESPONSE EVALUATION CRITERIA Deliverable—Vendor Selection Criteria (RFP 5.D.7) 7. Criteria to be used for vendor selection. Feasible P25 design Adequate coverage and FE will work with the County to develop evaluation criteria for determining capacity vendor qualifications and capabilities, compliance with functional/technical Sites proposed—paying specific attention to any specifications, and any other evaluation factors. This will include criteria for new sites assessing and comparing the cost of vendor proposals. Complete equipment list Adequate factory, Certain criteria we expect to be "pass/fail". These include financial stability coverage,functional, of the vendor, whether or not the vendor is debarred or suspended from performance,and doing business, and completeness of the vendor's proposed response acceptance test plans (evaluates whether all required items included in the proposal). Adherence to the technical specification and other 3.2.14 CAD Drawings (RFP 5.C.9) requirements Backhaul design or upgrade 9. Create and submit computer aided design (CAD) drawings as Required interoperability required. Reliability and redundancy We do not expect there to be a need for CAD drawings. Schedule Deliverable—CAD Drawings (RFP 5.D.8) 8. CAD drawings as required. If required, FE will provide CAD drawings on an optional basis. Deliverable—Training Requirements Recommendation (RFP 5.D.9) 9. Recommended training requirements for the new communications system The RFP that FE develops for Orange County will include requirements for the selected vendor to provide training for multiple audiences. Typically vendors are required to provide training in the following subject matter areas: • End user training • System administrator training • System maintenance training FE will review the vendors training plans submitted with their proposals, and will provide the County with recommendations for modification if needed. 3.2.15 Optional Tasks FE offers the following options for consideration. These options are not priced in this proposal; however, pricing can be provided upon County request. Radio System Vendor Contract Negotiations—FE can provide the County with experienced contract negotiations support. FE has considerable experience negotiating public safety radio systems, equipment, and services, with a proven track record of saving millions of dollars for our Copyright Protected Do Not Duplicate 35 �,� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NORtIt(AHO INN Interoperability and System Engineering Services clients. Because of their dealings with radio system vendors on a regular basis, our consultants have insights into vendors' negotiation methods and practices and can assist the County in resolving negotiation issues. As an example, in one of our current county projects in Virginia, our negotiations resulted in a savings of approximately 40 percent of the total cost of the system. Grant Research and Application Support—FE can assist with researching grant and other funding sources to subsidize the implementation of the County's system. We can also assist with completing and submitting applications. Implementation Oversight and Management—FE is fully capable of providing unbiased and objective implementation oversight and management services should the County desire. Many of FE's clients who have contracted our firm to provide needs assessment, design, and/or procurement services have also retained FE to oversee implementation. FE can provide these services to Orange County as well, refining the activities based on the final radio system specifications and approved vendor contract. These activities may include the following. • Detailed System Design and Acceptance Test Plan Reviews • Detailed system design and ATPs (vendor produces and presents, FE reviews) • Shop drawings including structures (vendor or engineer produces, FE reviews) • Factory test plan(vendor tests, FE verifies results) • Equipment Inspections • Equipment list(vendor produces, FE reviews) • System component delivery (vendor orders, FE verifies) • Installation Inspections • Site and subscriber installation inspections (radio and construction vendor, FE observes and verifies) • Site inspections—workmanship, structural and civil work, etc. (radio and construction vendor, FE observes and verifies) • Dispatch center console inspections (radio and console vendor, FE observes and verifies) Testing Oversight Services—FE can also provide radio system testing oversight services. The following list of activities would be refined based on the final radio system specifications and approved vendor contract. • Factory Testing • Factory testing at system vendor location (radio vendor tests, FE observes and reviews test results) • Field and Coverage Testing • Radio system coverage testing (radio vendor tests, FE reviews test results) • Other system performance testing (radio vendor tests, FE reviews test results) • System interoperability testing (radio vendor tests, FE reviews test results) • Submit test results (radio vendor) • Rework unaccepted tests (radio vendor, FE reviews test results) Copyright Protected Do Not Duplicate 36 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM li(AR(/LINA Interoperability and System Engineering Services • System Acceptance Testing • Final system acceptance test inspection and certification (FE reviews, evaluates, and provides recommendation) Governance for Radio—Whether you are installing a new radio system or are managing an existing one, governance is critical. Who decides how the system will be used, who will use it, and how it will be maintained, expanded, and refreshed?And how do those decision-makers reach their decisions? The FE team brings tremendous depth in the design, evaluation, and support of governance structures for public safety communications. We propose to evaluate your current structure, recommend improvements, and—to the extent desired by the client—support that structure's meetings and deliberations. FE will tailor its approach to your particular needs, gaining a thorough understanding of the legal and policy underpinnings of your current structure as well as an informed view of its strengths and challenges through both documentary research as well as interviews with informed governance participants. Examples of potential deliverables include governance structure evaluation reports, charters and bylaws, and proposed legislation. 3.3 Project Schedule and Work Plan (RFP 4.F) As part of this proposal the vendor must submit a proposed project work plan and schedule. The vendor must identify all assumptions and constraints on which the project schedule and work plan are based. The schedule shown below provides a nominal schedule for FE to perform the project described in the RFP assuming contract execution and notice is received on or before April 4, 2016. Weeks After Milestones Contract Execution Phase 1—Needs Assessment and Solution Selection Existing documentation review 2 Project initiation meeting 3 Needs assessment and requirements discovery 3 Stakeholder interviews 3 Site data and equipment inventory review 4 Deliverable: Draft Orange County Radio System Alternatives Report 10 Meeting with Orange County to review the draft report and select alternative 11 Deliverable: Final Orange County Radio System Alternatives Report 11 Deliverable: Draft Orange County Radio System Recommendations Report 14 Meeting with Orange County to review the draft report 15 Deliverable: Final Orange County Radio System Recommendations Report 15 Copyright Protected Do Not Duplicate 37 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['li(AHOLINA Interoperability and System Engineering Services ExecutionWeeks After Milestones Contract Phase 2—Procurement Support Deliverable: Draft Orange County Radio System RFP 18 Deliverable: Final Orange County Radio System RFP 19 Develop vendor evaluation criteria 19 Support vendor proposal evaluations TBD This schedule is tentative and will be adjusted to meet the needs of the County. FE will work with the County project manager to finalize the above schedule as well as invoicing milestones. All assumptions and constraints are provided in the cost proposal. Copyright Protected Do Not Duplicate 38 w DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.\HOLINA Interoperability and System Engineering Services TAB 4- COST PROPOSAL Copyright Protected Do Not Duplicate DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NUM[i(AHO IN.. Interoperability and System Engineering Services 4 COST PROPOSAL (RFP SECTION 6.0) The cost proposal should show personnel classifications including sub-contractors, hourly wage, and anticipated hours on the project. A summary of personnel costs should accompany the cost proposal. Other Direct Costs (ODC) should include travel, lodging, and meals, printing, postage, and other non-personnel/sub-contract costs associated with completing this project. A summary of ODC costs should accompany the cost proposal. Two (2) copies of the cost proposal should be submitted in a separate envelope with the written proposal. The proposal will be scored using a standard quantitative calculation where the most cost criteria points will be awarded to the proposal with the lowest cost. As required by the RFP, FE is submitting two copies of our cost proposal in a separate sealed envelope. Copyright Protected Do Not Duplicate 39 w DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['li(AHOLINA Interoperability and System Engineering Services TAB 5- REQUIRED FORMS Copyright Protected Do Not Duplicate DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NVR['li(AHOLINA Interoperability and System Engineering Services 5 REQUIRED FORMS (RFP SECTION 7.0) The following forms just be completed and submitted with the proposal in accordance with the instructions provided in section 2.0. Blank forms are in the following attachments: • Attachment A Signature Affidavit • Attachment B Vendor Data Sheet • Attachment C References • Attachment D Cost Summary Page The required forms listed below are provided on the following pages. • Attachment A—Signature Affidavit • Attachment B—Vendor Data Sheet • Attachment C—References • Attachment D—Cost Summary Page is provided in the separately sealed cost proposal • Addendum 1 Acknowledgment • Addendum 2 Acknowledgment • Addendum 3 Acknowledgment • Addendum 4 Acknowledgment The balance of this page is intentionally left blank. Copyright Protected Do Not Duplicate 40 w DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Attachment A SIGNATURE AFFIDAVIT In signing this proposal,we also certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a proposal; that this proposal has been independently arrived at without collusion with any other proposer competitor or potential competitor; that this proposal has not been knowingly disclosed prior to the opening of proposals to any other proposer or competitor; that the above statement is accurate under penalty of perjury, The undersigned,submitting this proposal,hereby agrees with all the terms,conditions and specifications required by the County in this Request for Proposal,and declares that the attached proposal and pricing are in conformity therewith. Ronald F. Bosco President Name [Type or Print] Title Federal Engineering, Inc. Signature Firm 10600 Arrowhead Drive #160, Fairfax, VA 22030 Address: (Street, City, State, Zip Code) 703-359-8200 703-359-8204 rbosco@fedeng.com Telephone Fax E-Mail 2/11/2016 Date RFP# 5217 'li DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['li(AHOI.INA Interoperability and System Engineering Services Counlywide Radio Cornnrunicalions lnleroperabilily and Syslenrs Engineering Services Attachment B VENDOR DATA SHEET 1. Proposing Company Nance Federal Engineering, Inc. Telephone 703-359-8200 Toll tree Telephone NIA Fax 703-359-8204 Address: 10600 Arrowhead Drive City: Fairfax State: VA Zip+Four. 22030-7321 2. Contact Person in the event there are questions about your proposal Name: Skip Funk Title: Senior Vice President, Business Development Telephone: 904-806-0221 Toll Free Telephone: NIA Address: 10600 Arrowhead Drive City: Fairfax State: VA Zip+Foul: 22030-7321 3. Mailing address where County purchase orders contracts are to be mailed and person the Department can contact concerning orders and billing. Nance: Ronald F. Bosco Title: PresidentlCEO Telephone: 703-359-8200 Trill Free Telephone; NIA Address: 10600 Arrowhead Drive City: Fairfax State: VA Zip+Four. 22030-7321 RFP##5217 Z r Copyright Protected Do Not Duplicate 42 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E �- � Orange County, North Carolina ORANGE Countywide Radio Communications CUl.1NTNA NOR 1 1 I t.:E It(11.1 NA Interoperability and System Engineering Services . Countywide Radio Cornniunications lnierapenihility and Systems Engineering Services Attachment C REFERENCES Provide company name,address,contact person, telephone number,and appropriate information on the product(s)and/or service(s) used for three(3)or more installations/services with requirements similar to those included in this solicitation document. If vendor is proposing any arrangement involving a third party,the named references should also be involved in a similar arrangement. Company Name: Buncombe County, North Carolina Company Address: 59 Woodfn Place,Asheville,NC 28801 Telephone/email: 828-250-6834(Gorman)1828-250-6807(Dillingham)1 clint.gorman@_huncomhecounty.org!hryan.dillingham@_buncomhecounty.org Contact Person:Clint Gorman,Radio Administrator and Bryan Dillingham,Network and Communications Manager Services provided by proposer/vendor: Existing systems assessment, narrowband upgrade planning, on-call technical consulting,and RFP development Company Name: New Hanover County, North Carolina Company Address:230 Market Place Drive, Suite 115,Wilmington, NC 28403 Telephone/email:910-798-6900 f wlee@nhogov.com Contact Person: Warren Lee, Director of Emergency Management Services provided by proposer/vendor: Public safety needs assessment, system design, and implementation; Administration Building inside cabling design and specifications Company Name: Yadkin County, North Carolina Company Address:217 East Willow Street, YadkinviIle, NC 27055 Telephone/email:336-679-42001 IhughesQyadki ncountync.gov Contact Person: Lisa Hughes, Deputy County Manager Services provided by proposer/vendor: Procurement and implementation support and tower inspection services Company Name: Company Address: Telephone/email: Contact Person: Services provided by proposer/vendor: Company Name: Company Address: Telephone/email: Contact Person: Services provided by proposer/vendor: RFP#5217 22 Copyright Protected Do Not Duplicate 43 w DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E � - Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NOR I l I.(.A 1401.1 MA Interoperability and System Engineering Services ORANGE COUNTY NORTH CAROLINA Orange County Financial Services Department ADDENDUM #1 February 8, 2016 R FQ 5217 Countywide Radio Communications Interoperability And Systems Engineering Services To all Vendors: Modifications to bid documents for the above-named Request for Proposal are made as follows and shall be included in the proposed amount. Questions received with County's responses are on page 2 of this document All other terms and conditions shall remain the same By: David E. Cannell, Purchasing Agent;dcannell(&co.oran-ge.nc.us 1(919) 245-2651 Acknowledgement of receipt of this addendum shall be included with your submittal Company Name: Federal Engineering. Inc. By: Laura L. Crass, Proposal Manager Date Received: February 8, 20116 P.O. Box 8181 200 South Cameron Street Hillsborough, North Carolina 27278 Telephones:Area Code 919-245-2651 Fax: 919-636-4913 Orange County,200 S. Cameron Street, Hillsborough, North Carolina 27278 Page 1 Copyright Protected Do Not Duplicate 44 c+ ` DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E � - Orange County, North Carolina ®K'NGE Countywide Radio Communications COUNTY NOR I l I.(.A 1401.1 MA Interoperability and System Engineering Services ORANGE COUNTY NORTH CAROLINA Orange County Financial Services Department ADDENDUM#2 February 12, 2016 R FQ 5217 Countywide Radio Communications Interoperability And Systems Engineering Services To all Vendors: Modifications to bid documents for the above-named Request for Proposal are made as follows and shall be included in the proposed amount. The due date has been extended to March 1, 2016 at 5:00 pm. We anticipate issuing at least one additional addendum to address questions received All other terms and conditions shall remain the same By: David E. Cannell, Purchasing Agent; dcannell@co.orance.nc.us f(919)245-2651 Acknowledgement of receipt of this addendum shall be included with your submittal Company Name: Federal Engineering, Inc. By: Laura Cross, Proposal Manager Date Received: February 12, 2716 P_O. Box 8181 200 South Cameron Street Hillsborough, North Carolina 27278 Telephones:Area Code 919-245-2651 Fax: 919-636-4913 Orange County,200 S.Cameron Street, Hillsbarough,North Carolina 27278 Page 1 Copyright Protected Do Not Duplicate 45 u DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['[i C.\(i(/1.INA Interoperability and System Engineering Services ORANGE COUNTY NORTH CAROLINA Orange County Financial Services Department ADDENDUM #3 February 23, 2016 R FQ 5217 Countywide Radio Communications Interoperability And Systems Engineering Services To all Vendors: Modifications to bid documents for the above-named Request for Proposal are made as follows and shall be included in the proposed amount. Questions received with County's responses are on pages 2-4 of this document All other terms and conditions shall remain the same By: David E. Cannell, Purchasing Agent; dcannell@co.orange.nc.us/ (919) 245-2651 Acknowledgement of receipt of this addendum shall be included with your submittal Company Name: Federal Engineering, Inc. By: Laura L. Cross, Proposal Manager Date Received: February 23, 2016 P.O. Box 8181 200 South Cameron Street Hillsborough, North Carolina 27278 Telephones: Area Code 919-245-2651 Fax: 919-636-4913 Orange County, 200 S. Cameron Street, Hillsborough, North Carolina 27278 Page 1 Copyright Protected Do Not Duplicate 46 W DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E � - Orange County, North Carolina OKANGE Countywide Radio Communications COUNTY NOR I l I.(.A 1401.1 MA Interoperability and System Engineering Services ORANGE COUNTY NORM CAltOLINA Orange County Financial Services Department ADDENDUM 94 February 24, 2016 R FQ 5217 Countywide Radio Communications Interoperability And Systems Engineering Services To all Vendors: Modifications to bid documents for the above-named Request for Proposal are made as follows and shall be included in the proposed amount. Questions received with County's responses are on page 2 of this document All other terms and conditions shall remain the same By: David E. Cannell, Purchasing Agent; dcannellCcDco.oran-gemc.us 1(919) 245-2651 Acknowledgement of receipt of this addendum shall be included with your submittal Company Name: Federal Engineering, Inc. By: Laura Cross, Proposal Manager Date Received: February 24, 2016 P.O. Box 8181 200 South Cameron Street Hillsborough, North Carolina 27278 Telephones:Area Code 919-245-2651 Fax: 919-636-4913 Orange County,200 S.Cameron Street,Hillsborough, North Carolina 27278 Page 1 " Copyright Protected Do Not Duplicate 47 �� DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['li(AHO1JNA Interoperability and System Engineering Services APPENDIX A-RESUMES Copyright Protected Do Not Duplicate 0 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.\HOLINA Interoperability and System Engineering Services APPENDIX A—RESUMES TRAVIS C. LEPAGE, PMP, PMI-ACP Project Director GENERALBACKGROUND Mr. Travis LePage is a highly talented and accomplished consultant EDUCATION&TRAINING on the FE team with a demonstrated track of successfully leading 0 Advanced and managing complex multi-million dollar programs and Certificate,Program enterprise/agency-wide projects for state and municipal governments Management,George and public and private organizations. Travis has several years of Washington University,2010 experience delivering project results to meet the unique needs, 0 Master of Business requirements, and expectations of stakeholders. Administration,Technology Mr. LePage is an expert in program and project management; Management,State University • Senator's06, stakeholder requirements analysis; land mobile radio(LMR), of New York, microwave radio, LTE, and paging system implementations and Scholar operations; radio site development(civil works); interoperable Bachelor of Science, communications plan development; public safety communications Telecommunications systems; RF spectrum management; and voice/data network Engineering, engineering. of New York, •• Honors2,with PROJECT EXPERIENCE AREAS OF Erie County, New York Interoperable Communications Project, aProgram an' project Project Manager and Lead Consultant management • Spearheaded the planning and execution of a five-phased 0Public safety and commercial interoperable communications program, comprising a carrier communication tactical interoperable communications plan (TICP)and systems analysis,design,and Communications Assets and Survey Mapping (CASM) implementation update, interoperability channel sharing plan, multi-agency 0 Stakeholder training program, lifecycle cost analysis, and narrowbanding 0 Public safety interoperable support communications • - • Project benefits include the consolidation and sharing of development VHF, UHF, and 800 MHz interoperability channels,the 0 RF spectrum planning and development of a comprehensive inventory and cost management analysis for regional communications assets/capabilities, 0 System integration project and the establishment of a regional training program management Schenectady County, New York Unified Communications Center 0 Voice/data network (UCC), Lead Consultant and Project Manager optimization • Led a team of engineers, business process analysts, and 0 Organizational and procurement professionals to develop a UCC migration plan technology planning and • Effort involved performing existing system analyses, positioning developing design documents and procurements 0Procurement "' and specifications, and evaluating alternative system vendor management configurations PROFESSIONAL ORGANIZATIONS • Project benefits include cost savings and improvements in 0 Association of Public Safety service delivery by consolidating multiple dispatch centers Communications Officials serving six jurisdictions, 23 fire departments,seven law enforcement agencies,and three EMS providers 0 Project Management Institute City of Portland, Oregon Voice Radio System Design and Specifications Development, Project Manager 0 Toastmasters International • Led a multidisciplinary team comprising engineering and management personnel to develop detailed specifications and a conceptual design for the city's public safety voice radio system • Effort involved validating system inventory, performing user needs analysis, and evaluating alternative solutions Copyright Protected Do Not Duplicate 48 Gam' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.HOLINA Interoperability and System Engineering Services • Project results positioned the city to sustain an efficient, interoperable, and reliable public safety voice radio system CERTIFICATIONS Project ..- Chautauqua County, New York Public Safety Communication Professional System Evaluation, Project Manager and Lead Consultant 0 Project Management • Evaluated the existing public safety communication Agile CertifiedPractitioner system • Recommended alternative solutions • Developed business case and financial analysis • Project provided County, local, and mutual aid users with Grounding an efficient, reliable, and interoperable radio 0 Norte] Multiplex communications system Onondaga County, New York UASI TICP Development, Lead StateSHORT COURSES Environmental Consultant Developed and completed TICP Review Act(SEQRA) • Established governance structure 0 Harris O' enSky System • Captured procedures and policies for UASI resources and Administration personnel 0 HarrisO' Provided TICP implementation support Design • Developed interoperability initiatives WORKSHOPS&COMMITTEES • Established interoperability partnerships with surrounding a ProjectManagement jurisdictions Special • Project resulted in the establishment of a TICP, integral for day-to-day operations and natural and manmade disaster response 0 Northeastern U.S.FCC Rochester-Monroe County, New York UASI TICP Exercise Regional Planning Committees Development and Evaluation Services, Exercise Design and PREVIOUS AFFILIATIONS Evaluation Consultant • Designed a TTX and FEX for the UASI Evaluated exercises in accordance with HSEEP 0 Global Crossing • Prepared the TTX and FEX AAR/IP 0 SmithBroadcasting • Project provided first responders with visibility into target improvement areas concerning policies, processes, and communication procedures Lewis County, New York Public Safety Communication System Evaluation, Project Manager and Lead Consultant • Evaluated the existing public safety communication system • Performed alternative analysis • Conducted coverage workshop • Developed conceptual design and business case • Provided grant guidance support • Project benefited the County by outlining radio system replacement alternatives and discovering grant funding opportunities Copyright Protected Do Not Duplicate 49 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM[i C.\HOLINA Interoperability and System Engineering Services CLIFTON P. BROWN, P.E. Project Manager& Technical Lead/Senior Consultant GENERALBACKGROUND Mr. Clifton Brown is a highly motivated, creative, and versatile • • N&TRAINING manager in the wireless telecommunications industry,with extensive f Science,Electrical experience in turning customer needs into deliverable solutions, Bachelor_ • including planning; product and services development; engineering Illinois design; RFP process; site development; network implementation; Technology network testing; and ongoing operations and maintenance. He AREAS OF possesses a clearly demonstrated history of exceeding goals,finding 0 Program management the right people for the job, and challenging them to the highest 0 Project Management levels of performance. As a result,financial targets, revenue and margins, and schedules were met and often exceeded. Engineering0 Risk assessment management Mr. Brown's experience includes the successful program and project 0 Asset Management management of systems ranging from citywide to nationwide in Product and s" scope. He has managed multi-disciplinary teams consisting of development planning, engineering, RFP preparation and RFP response 0 Engineering design evaluation, deployment, ongoing O&M,finance, and management 0 RFP process reporting. He is skilled in providing management and oversight in a Site development system and network designs to meet customer needs, using leading a Network implementation; edge technologies such as LTE, TV white space,WiFi,WiMAX, public safety in-building DAS, P25, MESH-based SmartGrid, 0 Ongoing ope . . broadband backhaul (fiber, MOE, microwave), and cloud-based maintenance network management. a Profit and loss management PROJECT EXPERIENCE PROFESSIONAL ORGANIZATIONS a Institute of Electrical and Orange County, North Carolina Infrastructure Upgrade Plan, EngineersElectronics Project Manager • Conduct research into geographical areas, urban structural LICENSES&CERTIFICATIONS interference and other anomalies negatively affecting 0 Professional transmission and reception for the 800 MHz VIPER system, Illinois(inactive) as well as the County Fire Station Alerting and Paging system AWARDS • Perform data analysis on the information gathered and 0 JD Power Award for Customer provided by the county, NCSHP VIPER and other third- parties and stakeholders PREVIOUS AFFILIATIONS • Provide needs assessment of communications requirements, identifying required coverage levels both on- 0 LCC InternationalMireless street and in-building Facilities, Inc. • Recommend possible VIPER and Fire Station 0 Bell South DCS Alerting/Paging system infrastructure upgrades 0 Bell Atlantic Mobile • Ensure compliance with County Unified Development 0 United States Cellular Ordinance 0 Terence J.Collins Associates, • Provide recommendations for tower heights, siting, and construction to ensure County coverage requirements are 0 AT&T Network Systems met 0 Motorola Communications and State of North Carolina NG9-1-1 System Planning and Electronics,Inc. Procurement,Associate Project Manager • Preparation of Concept of Operations for the statewide NG9-1-1 system, including ESlnet, Hosted Call Solution, GIS, Network Monitoring and Assistance center, CAD interoperability, and radio interoperability • Preparation of Cost Analyses of new NG9-1-1 system • Development of Conceptual Designs and RFPs for ESlnet, Hosted Call Solution, GIS interfaces, Network Monitoring and Assistance Center, CAD interoperability, and radio interoperability • Procurement support for each RFP process y � � Copyright Protected Do Not Duplicate 50 c+ ` DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NUM li(AR(/LINA Interoperability and System Engineering Services • Evaluation of RFP responses City of Henderson and Henderson County, Kentucky P25 Phase 2 System Consulting, Project Manager • Conduct City and County needs analysis for replacement radio system for Sheriff, Police, Fire, and EMS, including interfaces to City/County CAD and 911 systems, VHF paging, and Fire Station Alerting • Development of RFP specifications for procurement of a P25 Phase 2 system, providing full County and City coverage, including in-building coverage for critical buildings and schools • Provide technical assistance to City and County during the procurement phase: pre-bid meeting, development of answers to vendor questions, and preparation of technical addenda • Review and evaluation of multiple vendor Proposals, submitted in response to RFP, determination of technical compliance to RFP requirements • Provided vendor contract negotiation support to City and County New Kent County,Virginia P25 Phase 2 Radio System Implementation Support, Project Manager • On-call technical support as requested by County • Provide technical support for review of detailed system design, and recommendations to County • Provide review of test plans:factory staging; equipment and system acceptance; RF coverage • Review vendor acceptance test results and provide County with recommendations • Review vendor's proposed system optimization plans, and system optimization results • Monitor vendor's project schedule and identify risk areas • Review and provide recommendations on County acceptance of system documentation and Final System Acceptance City of Chesapeake,Virginia P25 Phase 2 Radio System Procurement and Implementation Support, Project Manager • Review of multiple vendor Proposals,verify compliance to RFP requirements • Prepare"pros"and"cons"for each vendor Proposal • Attend vendor presentations and determine RFP compliance • Prepare negotiation points for Chesapeake • Verify vendor's proposed RF coverage through in-house propagation studies • Provide technical support for review of detailed system design, and recommendations to City • Provide review of test plans:factory staging; equipment and system acceptance; RF coverage • Review vendor acceptance test results and provide City with recommendations • Review vendor's proposed system optimization plans, and system optimization results • Monitor vendor's project schedule and identify risk areas • Prepare master codeplug (subscriber template)for City use • Review and provide recommendations on City acceptance of system documentation and Final System Acceptance City of Bartlett,Tennessee Replacement Radio System, Project Manager • Conduct city needs analysis for replacement radio system for police,fire, and EMS, including interfaces to VHF paging • Development of RFP specifications for procurement of a P25 Phase 2 system, providing full city coverage, including in-building coverage for critical buildings and schools • Provide technical assistance to city during the procurement phase: pre-bid meeting, development of answers to vendor questions,and preparation of technical addenda • Review and evaluation of multiple vendor proposals submitted in response to RFP, determination of technical compliance to RFP requirements • Provided vendor contract negotiation support to city and county City of Bowling Green/Warren County, Kentucky Public Safety/Wireless Communications Consulting, Project Manager • Review and assist with preparation and issuance of an RFP • Participate in pre-bid/pre-proposal meetings • Prepare written response to all technical questions posed by vendors, prepare technical Addenda • Review vendor RFP responses for compliance with technical specifications Copyright Protected Do Not Duplicate 51 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E � - Orange County, North Carolina ORANGE Countywide Radio Communications CUl.1NTNA NOR 1 1 I t.:E It(11.1 NA Interoperability and System Engineering Services . ADAM S. NELSON RF Performance Specialist/Senior Consultant GENERALBACKGROUND Mr.Adam Nelson has over 15 years of experience providing • • N&TRAINING consulting services in the fields of public safety, . Master's telecommunications, and information technologies. As a member ofDegree, Geographic FE's Spectrum Center of Excellence, his specialties include radio Pennsylvania State Information frequency prediction and analysis,frequency and capacity planning, 14 interference mitigation, LTE system design and analysis, and Post-baccalaureate • spectrum-related efforts pertaining to frequency licensing and ' '' ' coordination. in Geographic • • ' Systems,The Pennsylvania Mr. Nelson's background includes performance engineering, State University, 2011 optimization, and systems design of both public and private wireless 0 Bachelor communications systems. His background also includes the Information Technology, management and maintenance of various municipal wireless University Phoenix,2003, networks, specifically in the realm of public safety communications. with honors He has participated in all phases of communications system lifecycle from needs assessment, system recommendations, RFP AREAS OF development, through implementation. 0 RF propagation prediction/ analysis for LMR voice and PROJECT EXPERIENCE data RF Coverage Prediction, Capacity Analysis, Interference interference Analysis, and/or Channel Planning for the following projects: and mitigation Broadband wireless system County Projects design, modeling,• Boone County, Kentucky Microwave Network analysis, LTE systems • Buncombe County, North Carolina Radio System Design . System capacity planning Alternatives and Recommendations Frequency planning o Detailed design of transmit/receive sites 0 Frequencycoordination o Channel availability studies licensing o Development and submission of FCC licensing coordination, documentation per RPC requirements analysis, and modeling o Oversight of vendor design and implementation efforts • Camden County, Georgia Radio Consulting and mitigation o Coverage analysis of existing VHF system 0 Network operations and o Coverage analysis of alternative systems in VHF, maintenance UHF, and 700/800 MHz . Voice/data communications • Caroline County,Virginia Land Mobile Radio System Design Information_ technology fundamntals • Collier County, Florida Radio System Consulting lication o Coverage analysis of existing EDACS system Web-based development.�' o Coverage analysis of potential P25 Ph2 system, including in-building coveragenetworking • Dane County,Wisconsin Radio Consulting protocols o Coverage analysis;focus on in-building analysis of new design o Evaluating vendor studies for providing requisite in-building coverage • Essex County, New York Radio Consulting o Intermodulation studies o Low-band VHF spectrum analysis o FCC licensing support • Cortland County, New York Interoperable Emergency Communications System o Design, procurement, and implementation o Spectrum availability analysis and frequency licensing • Henry County, Georgia Radio System Consulting o Radio coverage analysis Copyright Protected Do Not Duplicate 52 0 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E - 1 Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY NVR['[i(A(i(/LINA Interoperability and System Engineering Services 0 Conducted Spectrum and Coverage Workshop • Isle of Wight County, Virginia System Analysis CERTIFICATIONS&TRAINING o Analyze mobile and portable coverage of existing VHF st Radio Systems, countywide system -- Certified Training • Evaluate potential candidate sites to bolster coverage 0 Integrated Voice and Data holes throughout county Systems, Motorola Certified o Coverage workshop with county personnel, Training demonstrating results of analysis 0 RAPTR Certified Training • King William County, Virginia 0 ATDIDeveloper o Analysis of vendor-proposed RF and microwave design 0 ArcGIS Developer ' o Licensing of 700 MHz interoperability channels PROFESSIONAL ORGANIZATIONS • Lewis County, New York System Analysis 0 PublicAssociation of o Analysis of existing public safety network infrastructure Communications Officials and performance o System design effort for potential countywide radio PREVIOUS AFFILIATIONS system 0 City of Phoenix,Arizona o Frequency availability study • New Kent County,Virginia Radio Consulting 0 BellSouth Mobility 0 800 MHz channel availability studyWest/Qwest Wireless 0 FCC licensing support 0 ' icestrearn Wireless • Pitt County, North Carolina VHF System Expansion with Narrowband Migration • Pittsylvania County, Virginia Radio System Design Alternatives and Recommendations • Rockbridge County,Virginia Public Safety Mobile Radio Consulting PROFESSIONAL PROFICIENCIES Propagation Analysis • Subject matter expert in radio frequency propagation analysis and GIS mapping • Versed in many propagation models including: o Okamura Hata(National Public Safety Planning Advisory Committee[NPSPAC]-approved) o ITU R.P370, ITU R.525/526, and ITU-R 1812-2, as described in TSB-88.2-C 0 Deygout diffraction model o Irregular Terrain Model,also known as Longley Rice(NTIA-recommended, NPSPAC-approved) o Free Space (NPSPAC-approved) o CCIR(NPSPAC-approved) • Produces clear and concise reports and visual representations of RF coverage analysis that are individually tailored to meet a client's specific requirements • Effectively employs FE's RF network analysis tool suite, FEPerformanceProTm in carrying out radio coverage analysis, developing propagation maps, performing radio frequency analysis, and assessing network channel loading • Fluent in FCC rules for frequency licensing-including contour evaluations, interference analyses, co- channel and adjacent channel conflict studies, and filing requirements. • Works regularly with Regional Planning Committees who oversee distribution of 700 MHz and 800 MHz frequency allocations to government entities. • Incorporates current and comprehensive GIS layers such as population distribution, growth projections, political boundaries, and various topological features into RF system design efforts to deliver results tailored to specific client needs • Develops throughput analysis,site selection, and coverage maps for LTE and other broadband technologies Noise and Interference Analysis • Proficient in transmitter noise and power analysis,and receiver sensitivity analysis • Subject matter expert in interference analysis including co-channel, adjacent channel, and intermodulation studies, as well as simulcast interference analysis and mitigation • Successfully designed many systems requiring frequency reuse among radio sites, in both simulcast and multicast environments Copyright Protected Do Not Duplicate 53 � ' DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E I � 1 [t 4 APPA�- 4 Federal Engineering® 10600 Arrowhead Drive Fairfax,VA 22030 Tel 703.359.8200 Email info@fedeng.com www.fedeng.com DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Unleashing the Power of Technology Federal Engineering, Inc. 10600 Arrowhead Drive Federal Fairfax, VA 22030 EngineeringO' 703-359-8200 G October 4, 2016 Ms. Dinah L. Jeffries, ENP Director Orange County Emergency Services 510 Meadowlands Drive, Hillsborough 27278 Via email:djeffries@orangecountync.gov Dear Ms. Jeffries: Attached, pursuant to your request, is the revised cost information for the optional procurement support services we proposed on September 22, 2016. Contract negotiations will now be provided via teleconference rather than on-site. We have also reduced our overall cost as an incentive for the County to execute the contract this week. am available if you have any additional questions or areas of clarification. FE looks forward to working with Orange County, North Carolina on this project. Sincerely, ` Ronald F. Bosco President and Chief Executive Officer Federal Engineering, Inc. DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications NOQICNTY Interoperability and System Engineering Services 1 COSTS FOR ADDITIONAL PROCUREMENT SUPPORT 1.1 Firm Fixed Price The following table provides the firm-fixed-price costs for additional procurement support services, as requested by the County. The assumptions below provide the basis for these costs. Additional ProcurementSupport Proposed Cost 1. Vendor Pre-Bid Meeting Support, including one day onsite $2,830 2. Vendor RFIs and Addenda Support $1,040 3. Vendor BAFO Presentation Support, including two days onsite $6,630 4. Contract Negotiations Support, including three days onsite $6,000 Total for Optional Procurement Services: $16,500 1.2 Basis of our Proposal 1. Vendor Pre-Bid Meeting: FE will assist in preparing the agenda for the vendor pre-bid meeting. One FE senior consultant will attend the meeting and help lead the meeting. 2. Vendor Questions and RFP Addenda: FE will support the County in reviewing questions submitted by vendors. Working with the procurement manager, our senior consultant will respond to any technical questions and assist the County in drafting the addendum to vendors. 3. Vendor BAFO Presentations: FE will support the County in preparing the agenda and coordinating with the short-listed vendors for the best and final presentations to be held at the County's offices over two consecutive days. One FE senior consultant will attend the presentations, support the technical discussion with the vendor, participate in County discussion following the presentations, and provide written notes and technical observations. 4. Contract Negotiations: The level of effort for contract negotiation support can vary greatly depending upon the winning system vendor and the County's procurement practices. FE will review the vendor contract and provide one senior consultant for 16 hours of teleconferenced negotiation support to the County during the vendor contract negotiation process. If additional hours or on-site support are required, a mutually agreeable amendment to the scope of work will be executed by both parties. 5. Invoicing will occur at the completion of each of the above tasks. 6. FE's ability to fulfill this task depends, in part, on the willingness and ability of the Orange County, County participants, equipment vendors, service providers, third parties, and others to provide information in a timely manner, and upon the accuracy of the information as Copyright Protected Do Not Duplicate 1 �, DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Orange County, North Carolina ORANGE Countywide Radio Communications COUNTY Interoperability and System Engineering Services supplied. The accuracy of input data, whether provided in electronic or hard copy form, and the recommendations, actions, system designs, and license filings resulting therefrom cannot, therefore, be warranted by FE nor can the performance, suitability, or reliability of said systems be warranted by FE. Copyright Protected Do Not Duplicate 2 Q DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E AMODIO- ORANGE COUNTY NORTH CAIRUC.)LINA REQUEST FOR PROPOSAL RFP #5217 COUNTYWIDE RADIO COMMUNICATIONS INTEROPERABILITY AND SYSTEMS ENGINEERING SERVICES ISSUED: January 29, 2016 DUE DATE: 5:00pm — February 18, 2016 Attn: Mr. David Cannell, Purchasing Agent 200 S. Cameron Street PO BOX 8181 Hillsborough, NC 27278 Tel: (919) 245-2651 Email: dcannellkoran eg countync.gov DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services This Page is Intentionally Blank RFP#5217 2 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Table of Contents REQUESTFOR PROPOSAL............................................................................................................................1 1.0 GENERAL INFORMATION.....................................................................................................................5 1.A. Introduction and background.........................................................................................................5 1.B. Scope of the Project............................................................................................................................5 B.1.1. Project Description.....................................................................................................................5 B.1.2. Objectives.......................................................................................................................................5 B.1.3. Background...................................................................................................................................6 1.C. Procuring and Contracting Agent..................................................................................................6 1.D. Definitions..............................................................................................................................................6 1.E. Clarification and/or revisions to the requirements of this RFP........................................7 1.F. Calendar of Events ..............................................................................................................................7 1.G. Contract Term and Funding............................................................................................................8 2.0 PREPARING AND SUBMITTING THE PROPOSAL........................................................................8 2.A. General Instructions...........................................................................................................................8 2.13. Proprietary Information...................................................................................................................8 2.C. Incurring Costs.....................................................................................................................................9 2.D. Submitting the Proposal...................................................................................................................9 2.E. Proposal Organization and Format..............................................................................................9 2.F. Multiple Proposals........................................................................................................................... 10 2.G. Oral Presentations and Site Visits.............................................................................................. 10 3.0 PROPOSAL SELECTION AND AWARD PROCESS....................................................................... 10 3.A. Preliminary Evaluation.................................................................................................................. 10 3.B. Proposal Scoring............................................................................................................................... 11 3.C. Right to Reject Proposals and Negotiate Contract Terms................................................. 11 3.D. Evaluation Criteria........................................................................................................................... 11 3.E. Award and Final Offers................................................................................................................... 11 3.F. Notification of Intent to Award................................................................................................... 11 4.0 GENERAL PROPOSAL REQUIREMENTS....................................................................................... 12 4.A. Introduction........................................................................................................................................ 12 RFP#5217 3 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services 4.B. Organization Capabilities.............................................................................................................. 12 4.C. Staff Qualifications........................................................................................................................... 12 4.D. Experience........................................................................................................................................... 12 4.E. Statement of Objectivity................................................................................................................. 12 4.F. Project Schedule and Work Plan................................................................................................. 13 4.G. Proposer References....................................................................................................................... 13 5.0 SCOPE OF WORK................................................................................................................................... 13 5.A. Introduction and Definitions........................................................................................................ 13 5.B. Study Expectations........................................................................................................................... 14 5.C. Work to Be Performed.................................................................................................................... 16 5.D. Deliverables........................................................................................................................................ 17 6.0 COST PROPOSAL................................................................................................................................... 18 6.A. General Instructions on Submitting Cost Proposals........................................................... 18 6.13. Fixed Price Period............................................................................................................................ 18 7.0 REQUIRED FORMS................................................................................................................................ 18 AttachmentA.................................................................................................................................................. 20 AttachmentB .................................................................................................................................................. 21 AttachmentC................................................................................................................................................... 22 AttachmentD.................................................................................................................................................. 23 RFP#5217 4 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services 1.0 GENERAL INFORMATION Z.A. Introduction and background The purpose of this document is to provide interested parties with information to enable them to prepare and submit a proposal for Radio Communications Interoperability and Systems Engineering Services The County, as represented by its Orange County Emergency Services Department, intends to use the results of this process to award a contract for Radio Communications Interoperability and Systems Engineering Services. Z.B. Scope of the Project B.1.1. Project Description Orange County is soliciting proposals to provide professional consulting, planning, and facilitation services relative to its short and long-term Radio communications and interoperability needs. The purpose of the study is to determine the most economical, efficient, reliable and state-of-the-art method for designing and provisioning a new countywide radio communications systems used by local government entities to meet the long term voice communications, paging, and voice interoperability needs of the emergency and non-emergency agencies serving residents,workers, and visitors of Orange County. B.1.2. Objectives Orange County seeks strategic and tactical plans that will review and analyze the current and future requirements for all law enforcement, fire, EMS, public works, schools, planning/inspections,transit, and other County and local government voice and interoperability communications requirements. Orange County requires a plan that will best meet short and long term interoperability needs and addresses other communications system(s) issues such as capacity, RF coverage, features and capabilities along with outlining how the County's current or envisioned systems will be able to migrate towards and integrate with future technologies. The ultimate output of the selected consultant's work shall be development of a vendor-neutral Request for Proposal (RFP) based on recommendations made by the consultant and approved by the committee, suitable to be released to the vendor community for the purposes of procuring the approved alternative, and the development of criteria for ultimate vendor selection. RFP#5217 5 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services B.1.3. Background The Orange County Emergency Communications Center currently dispatches law enforcement, fire, EMS and all County and local municipality users. The County's existing emergency services (public safety) radio system is a State owned and operated P25 trunked 800MHz system named VIPER. The County operates a VHF voice-tone paging system that is used to page out the fire departments. Much of the VHF infrastructure equipment is aging and is beyond or very near the end of its life expectancy. In addition to the VIPER and County VHF Paging systems,there are numerous other radio systems in operation within the County that are in various stages of decay. Solid Waste and Orange County Transportation and local governments, including the Towns of Carrboro, Chapel Hill, and Hillsborough operate their own, distinct radio systems for various services such as Public Works,Transit, Schools, etc. The Orange Water and Sewer Authority (OWASA) also operate a distinct radio system. Communications issues that have been problematic in many areas of the County including overloading the VIPER system, tower channel imbalance, lack of coverage in all areas of the county, lack of coverage inside buildings, lack of a clear direction on a system design, new partnerships creating changing needs, and cost of ownership have hindered Orange County in reaching a solution to its radio communications system needs. While the County has conducted numerous studies of radio communications, none of these studies has been definitive. None of these studies have provided enough information to provide a clear direction for the policy makers and decision makers in the County to identify a solution to the problem. 1.c. Procuring and Contracting Agent This Request for Proposal (RFP) is issued by the Orange County Purchasing Agent,who is the sole point of contact for the County during the selection process. The person responsible for managing the procurement process is David Cannell, Purchasing Agent. The contract resulting from this RFP will be administered by Orange County Department of Emergency Services. 1.D. Definitions The following definitions are used throughout this RFP: County: Orange County Emergency Services RFP#5217 6 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Proposer/Vendor: Any firm submitting a proposal in response to this RFP Contractor: The proposer that is awarded the contract Date/Time: Date/time specified in this contract is Eastern Standard Time 1.E. Clarification and/or revisions to the requirements of this RFP Questions concerning this RFP must be submitted in writing (mail or email) on or before February 11, 2016 at 4:00 pm to: Mr. David Cannell, Purchasing Agent 200 S. Cameron Street PO Box 8181 Hillsborough, NC 27278 Email: dcannell@orangecountync.gov (preferred) Phone: 919 245-2651 Vendors are expected to raise any questions, exceptions, or additions they have concerning the RFP document at this point in the RFP process. If a vendor discovers any significant ambiguity, error, conflict, discrepancy, omission, or other deficiency in this RFP,the vendor should immediately notify the above named individual of such error and request modification or clarification of the RFP document. In the event that it becomes necessary to provide additional clarifying data or information, or to revise any part of this RFP, revisions/amendments and/or supplements will be provided to all recipients of this initial RFP. Each proposal shall stipulate that it is predicated upon the terms and conditions of this RFP and any supplements or revisions thereof. 1.F. Calendar of Events Listed below are specific and estimated dates and times of actions related to this Request for Proposal (RFP). The actions with specific dates must be completed as indicated unless otherwise changed by the County. In the event that the County finds it necessary to change any of the specific dates and times in the calendar of events listed below, it will do so by issuing a supplement to this RFP. There may or may not be a formal notification issued for changes in the estimated dates and times. RFP#5217 7 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services DATE EVENT January 29, 2016 Date of issue of the RFP February 11, 2016 at 4:00 Last day for submitting written inquiries February 13, 2016 at 4:00 Notification to vendors of supplements/revisions February 18,2016 at 5:00pm Proposals due from vendors February- March 2016 Possible Oral presentation by invited vendors March 2016 Notification of intent to award sent to vendors April 2016 Contract start date 1.G. Contract Term and Funding The contract shall be effective on the contract execution date and shall run until the contract for the request for proposals is finalized, approximately one year. 2.0 PREPARING AND SUBMITTING THE PROPOSAL 2.A. General Instructions The evaluation and selection of a contractor and the contract will be based on the information submitted in the vendor's proposal plus references and any required on-site visits or oral presentations. Failure to respond to each of the requirements in the RFP may be the basis for rejecting a response. Elaborate proposals (e.g. expensive artwork) beyond that which is sufficient to present a complete and effective proposal, are not necessary or desired. 2.B. Proprietary Information Proprietary information submitted in a proposal, or in response to the RFP, will be handled in accordance with the applicable North Carolina State Statute(s). Proprietary information must be clearly stated and identified by the proposer. To the extent permitted by law, it is the intention of Orange County to withhold the contents of the proposal from public view until such times as competitive or bargaining reasons no longer require non-disclosure, in the opinion of Orange County. At that time, all proposals will be available for review in accordance with the North Carolina Open Records Law. RFP#5217 8 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services 2.C. Incurring Costs Orange County is not liable for any cost incurred by proposers in replying to this RFP. 2.D. Submitting the Proposal Proposers must submit and original and five (5) copies of all materials required as well as their proposal in a single .pdf file on a thumb drive or CD for acceptance of their proposal by February 18, 2016 at 5:00pm to: Mr. David Cannell, Purchasing Agent 200 S. Cameron Street PO Box 8181 Hillsborough, NC 27278 Email: dcannell@orangecountync.gov Phone: 919 245-2651 Proposals must be received in the above office by the specified time stated above. All proposals must be time-stamped in by the County Purchasing Agent by the stated time. Proposals not so stamped will not be accepted. All proposals must be packaged, sealed and show the following information on the outside of the package: ✓ Proposers name and address ✓ Request for proposal title as shown on this RPF ✓ Request for proposal number as shown on this RFP ✓ Proposal due date as shown on this RFP 2.E. Proposal Organization and Format Proposals should be typed and submitted on 8.5 by 11 inch paper bound securely. Proposals should be organized and presented in the order and by the number assigned in the RFP. Proposals must be organized with the following headings and subheadings. Each heading and subheading should be separated by tabs or otherwise clearly marked. The RFP sections which should be submitted are: ✓ Introduction (Section 4) RFP#5217 9 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services ✓ Response to general requirements (Section 4) o Organizational Qualifications o Staff Qualifications and Facilities o References ✓ Response to technical requirements (Section 5) ✓ Cost proposal (Section 6) ✓ Required Forms (Section 8) o Attachment A Signature Affidavit o Attachment B Vendor Data Sheet o Attachment C References o Attachment D Cost Summary ✓ Appendices (additional info the proposer submits) 2.17. Multiple Proposals Multiple proposals from a vendor will be permissible however each proposal must conform fully to the requirements for proposal submission. Each such proposal must be separately submitted and labeled as Proposal #1, Proposal #2, etc. on each page included in the response. Alternate acquisition plans do not constitute multiple proposals. 2.G. Oral Presentations and Site Visits Selected vendors may be required to make oral presentations and/or site visits to supplement their proposals, if requested by the County. The County will make every reasonable attempt to schedule each presentation at a time and location that is agreeable to the proposer. Failure of a proposer to conduct a presentation to the County on the date scheduled may result in rejection of the vendor's proposal. 3.0 PROPOSAL SELECTION AND AWARD PROCESS 3.A. Preliminary Evaluation The proposals will first be reviewed to determine if requirements in Section 2.0 are met, and if additional mandatory requirements are met (see Section 4.0). Failure to meet mandatory requirements will result in the proposal being rejected. In the event that all vendors do not meet one or more of the mandatory requirements,the County reserves the right to continue the evaluation of the proposals and to select the proposal which most closely meets the requirements specified in this RFP. RFP#5217 10 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services 3.13. Proposal Scoring Accepted proposals will be reviewed by an evaluation committee and scored against the stated criteria. The committee may review references, request oral presentations, and conduct an on-site visit and use the results in scoring the proposals. 3.C. Right to Reject Proposals and Negotiate Contract Terms The County reserves the right to reject any and all proposals and to negotiate the terms of the contract, including the award amount,with the selected proposer prior to entering into a contract. If contract negotiations cannot be concluded successfully with the highest scoring proposer,the County may negotiate a contract with the next highest scoring proposer. 3.1). Evaluation Criteria The proposals will be scored using the following criteria: 1. General Requirements 80% a. Prior experience and references 20% b. Qualifications of firm and staff 20% c. Project Schedule and work plan 20% d. Project Approach 20% 2. Cost 20% TOTAL 100% 3.E. Award and Final Offers The award will be granted to the offer that offers the best value to the County. The award may be granted to the highest scoring responsive and responsible proposer. Alternatively, the highest scoring proposer or proposers may be requested to submit final and best offers. If final and best offers are requested, they will be evaluated against the stated criteria, scored and ranked. 3.17. Notification of Intent to Award As a courtesy,the County may send a notification of award memo to responding vendors at the time of the award. RFP#5217 11 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services 4.0 GENERAL PROPOSAL REQUIREMENTS 4.A. Introduction The proposer should first provide an explanation of their understanding of the tasks they believe to be necessary to accomplish the objectives outlined in the RFP. For each of these areas the proposer is to describe in a simple and straightforward manner the overall approach the consultant proposes to use when completing the study, as well as a discussion of how options and recommendations will be presented to the review committee and Orange County. 4.13. Organization Capabilities State the full name and address of your organization, including the name, address and telephone number of the person in your organization who has primary responsibility for developing this proposal and to whom technical questions may be addressed. 4.C. Staff Qualifications Proposals shall identify each member of the consultant's staff who would be assigned to work on the project,the role they will be performing, and the hourly rate to be charged to Orange County for their services, or alternatively a fixed price for services based on the established scope of work. Additionally, a resume' stating the background and qualifications of each individual should be attached. Particular attention shall be given to the individual named as the project coordinator. 4.1). Experience Proposals shall identify each member of the consultant's staff who would be assigned to work on the project,the role they will be performing, and the hourly rate to be charged to Orange County for their services, or alternatively a fixed price for services based on the established scope of work. Additionally, a resume' stating the background and qualifications of each individual should be attached. Particular attention shall be given to the individual named as the project coordinator. 4.E. Statement of Objectivity It is the intent of Orange County to hire a firm that is neutral with respects to radio communications companies or equipment. Proposals will be accepted only from independent consultants not engaged in or associated with the RFP#5217 12 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services business of selling, servicing, or renting communications equipment. Respondents must clearly state the independence and objectivity of the consultant. The selected firm shall not be allowed to provide provisioning services. 4.F. Project Schedule and Work Plan As part of this proposal the vendor must submit a proposed project work plan and schedule. The vendor must identify all assumptions and constraints on which the project schedule and work plan are based. 4.G. Proposer References Proposers must include in their RFP a list of organizations, including points of contact (name, address, and telephone number),which can be used as references for work performed in the area of service required. Selected organizations may be contacted to determine the quality of work performed and personnel assigned to the project. The results of the references will be provided to the evaluation team and used in scoring the written proposals. 5.0 SCOPE OF WORK S.A. Introduction and Definitions The following is intended to illustrate the types of services that will be required of the consultant. It is not intended to exclude other services that the consultant believes to be necessary and is able to provide. The actual scope of the work will be determined upon selection of the consultant and shall be mutually agreed upon by both parties. For purposes of responding to this RFP the communications infrastructure shall be understood to include: 1. Two-way radio infrastructure and equipment (base, mobile, portable, pager, fixed receiver) for all County and Town end users serving the residents, workers, and visitors in Orange County that is interoperable with the State VIPER system, our surrounding Counties, and the University of North Carolina - Chapel Hill 2. Communications infrastructure backbone (microwave, fiber, or other) 3. New and/or upgrades to existing towers, supporting buildings, and backup power RFP#5217 13 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services 4. The Orange County Communications Center, Orange County backup Communication Center location 5. Voice paging infrastructure 6. Fire and EMS station alerting infrastructure S.B. Study Expectations The scope of the study shall include a voice and paging communications infrastructure that enables operability and interoperability to best meet short and long term needs for all agencies served by the Orange County Emergency Communications Center 1. Recommendations as to a proposed approach to the overall study, including: a. Identification of key project milestones. b. Number of expected meetings with the review committee. c. Recommended timeline for the project, mapped out for compatibility with the County budgeting cycles. d. Recommendations on effective stakeholder engagement throughout the process. 2. Development of a comprehensive needs analysis addressing functionality, capability and needs of all current infrastructure users. Inputs shall include information obtained from current infrastructure users and previous studies completed for Orange County. 3. Presentation of infrastructure alternatives to the review committee for the purposes of narrowing the alternatives down to one (1) recommended solution to be approved by the committee that will be the basis of the balance of the project. Alternatives that will be presented shall include pros, cons, advantages, disadvantages, issues and considerations specific to the needs of Orange County users, including, but not limited to: a. Frequency range (low band, high band, UHF, 700, 800), and analysis of spectrum availability within each frequency range b. Wide band versus narrow band c. Analog, digital or combination, including P25 Phase I and II air interface compatibility d. Encryption options and capabilities RFP#5217 14 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services e. Operating protocol (conventional,trunking, combination) f. One infrastructure or more, meaning: i. A single infrastructure to serve the combined needs of all users in the County, or ii. Two or more infrastructures (one or more to serve the urban/metro area, and/or one or more to serve the areas outside the urban/metro area) with appropriate interoperability capabilities g. Procurement scope, meaning: i. County procures the core infrastructure, and each user entity (Town, OWASA, Schools, and other end users) must procure their own end-user equipment (base, mobile and portable radios, and pagers) ii. County procures all core infrastructure and all end user entity equipment (based on the number of end user equipment items in service at the time of the needs analysis) iii. County procures all core infrastructure and all end user entity equipment, but individual end user entities need to procure infrastructure enhancements to improve coverage or other issues above and beyond what is provided by the current infrastructure h. With respect to the potential options above, interoperability with: i. Agencies serving Orange County residents both on a day-to- day and event related basis. Note: This includes State of North Carolina and University of North Carolina entities, and fire and EMS entities in adjoining Counties that serve territories in Orange County. ii. Interoperability with adjoining County Emergency Service entities (for adjoining County units responding into Orange County, and for Orange County units responding into adjacent Counties). i. Options in (g) shall be presented with detailed propagation studies at standards levels consistent with identified end user needs as approved by Committee. RFP#5217 15 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Options presented to the Committee shall include budgetary cost estimates associated with each. Options analyzed, presented and recommended for consideration shall represent an enabling infrastructure, meaning the infrastructure needs to enable the end users to meet their identified needs, not adapt their needs to the recommended alternative. 4. Once an option in (g) is selected and approved by the review committee: a. Develop a comprehensive cost analysis b. Develop a comprehensive transition plan for all current infrastructure users to the new/proposed infrastructure. The plan shall be designed to ensure no loss of functionality and/or capabilities during the transition. c. Develop a vendor-neutral Request for Proposal (RFP) suitable to be released to the vendor community for the purposes of procuring the approved alternative. Facilitation of the RFP process, including staff support to the County in conducting a comprehensive evaluation of RFP responses received. 5.C. Work to Be Performed Expectations of work to be performed include: 1. Meet with management personnel and end users of the current infrastructure to develop a comprehensive needs analysis addressing functionality, capability and needs of all current infrastructure users. A draft needs analysis shall be presented to the end-users for validation in at least two group meetings, and then to the committee for final approval. 2. Gather, analyze, and document operational, functional, and specific technical information of existing fixed sites and associated equipment for various emergency service departments that serve Orange County residents (may be an Orange County based agency or a Department in a County adjacent to Orange County that serves/protects geography within Orange County), or Orange County emergency service departments that serve residents outside Orange County in order to understand the present status of our communications capabilities. 3. Review interoperability needs with all agencies serving citizens and/or territory within the county and those law and fire/EMS agencies bordering Orange County, including gateway or P25 ISSI needs for users RFP#5217 16 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services not served by the proposed infrastructure (i.e.: ambulances from outside Orange County needing inter-communications with Orange County based hospitals) as may be identified. 4. Conduct and analyze coverage studies of proposed infrastructure based on multiple tower sites in order to provide countywide coverage including the potential of new communications sites, additional "satellite" receiver sites, and/or paging sites. 5. Develop a comprehensive migration plan for all current infrastructure users. 6. Recommend and submit a planned acquisition and implementation process based on the option approved by the review committee. 7. Development of a vendor-neutral Request for Proposal (RFP) suitable to be released to the vendor community for the purposes of procuring the approved alternative. 8. Facilitation of the RFP process, including staff support to the County in conducting a comprehensive evaluation of RFP responses received. 9. Create and submit computer aided design (CAD) drawings as required. 10. Obtain and submit budgetary costs for alternatives presented, and assist the review committee to prioritize acquisitions and implementation S.D. Deliverables 1. Documentation and assessment of existing communications capabilities; including review, summarization and validation of previous documents and studies. 2. Analysis of interoperability gaps as provided through interviews of the various existing infrastructure users. 3. Coverage maps depicting current public safety infrastructure user performance for both mobile and portable radios, and paging receivers,to verify gaps as noted from the various interviews. 4. Propagation studies showing expected coverage of the recommended system at standards identified by end user needs and as approved by the committee for both mobile and portable radios, and paging receivers. 5. A comprehensive transition plan for all current infrastructure users to the new/proposed infrastructure. The plan shall be designed to ensure no loss of functionality and/or capabilities during the transition. RFP#5217 17 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services 6. A vendor-neutral Request for Proposal (RFP), including recommended tower requirements suitable to be released to the vendor community for the purposes of procuring the approved alternative. 7. Criteria to be used for vendor selection. 8. CAD drawings as required. 9. Recommended training requirements for the new communications system 6.0 COST PROPOSAL 6.A. General Instructions on Submitting Cost Proposals The cost proposal should show personnel classifications including sub- contractors, hourly wage, and anticipated hours on the project. A summary of personnel costs should accompany the cost proposal. Other Direct Costs (ODC) should include travel, lodging, and meals, printing, postage, and other non-personnel/sub-contract costs associated with completing this project.A summary of ODC costs should accompany the cost proposal. Two (2) copies of the cost proposal should be submitted in a separate envelope with the written proposal. The proposal will be scored using a standard quantitative calculation where the most cost criteria points will be awarded to the proposal with the lowest cost. 6.B. Fixed Price Period All prices, costs, and conditions outlined in the proposal shall remain fixed and valid for acceptance for 90 days starting on the due date for proposals. 7.0 REQUIRED FORMS The following forms just be completed and submitted with the proposal in accordance with the instructions provided in section 2.0 Blank forms are in the following attachments: Attachment A Signature Affidavit Attachment B Vendor Data Sheet Attachment C References Attachment D Cost Summary Page RFP#5217 18 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services RFP#5217 19 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Attachment A SIGNATURE AFFIDAVIT In signing this proposal,we also certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a proposal; that this proposal has been independently arrived at without collusion with any other proposer competitor or potential competitor; that this proposal has not been knowingly disclosed prior to the opening of proposals to any other proposer or competitor; that the above statement is accurate under penalty of perjury. The undersigned, submitting this proposal, hereby agrees with all the terms, conditions and specifications required by the County in this Request for Proposal, and declares that the attached proposal and pricing are in conformity therewith. Name (Type or Print) Title Signature Firm Address: (Street, City, State, Zip Code) Telephone Fax E-Mail Date RFP#5217 20 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Attachment B VENDOR DATA SHEET 1. Proposing Company Name Telephone Toll Free Telephone Fax Address: City: State: Zip+ Four: 2. Contact Person in the event there are questions about your proposal Name: Title: Telephone: Toll Free Telephone: Address: City: State: Zip + Four: 3. Mailing address where County purchase orders/contracts are to be mailed and person the Department can contact concerning orders and billing. Name: Title: Telephone: Toll Free Telephone: Address: City: State: Zip + Four: RFP#5217 21 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Attachment C REFERENCES Provide company name, address, contact person, telephone number, and appropriate information on the product(s) and/or service(s) used for three (3) or more installations/services with requirements similar to those included in this solicitation document. If vendor is proposing any arrangement involving a third party, the named references should also be involved in a similar arrangement. Company Name: Company Address: Telephone/email: Contact Person: Services provided by proposer/vendor: Company Name: Company Address: Telephone/email: Contact Person: Services provided by proposer/vendor: Company Name: Company Address: Telephone/email: Contact Person: Services provided by proposer/vendor: Company Name: Company Address: Telephone/email: Contact Person: Services provided by proposer/vendor: Company Name: Company Address: Telephone/email: Contact Person: Services provided by proposer/vendor: RFP#5217 22 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E Countywide Radio Communications Interoperability and Systems Engineering Services Attachment D COST SUMMARY SHEET (Submit only one copy, in separate envelope with Original copy of submittal) Personnel Costs $ ODC Costs $ TOTAL COSTS $ RFP#5217 23 DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E FEDEENG-01 MSANDY ACQ► a CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 10/5/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Certificate Department NAME: Preferred Insurance Services,Inc PHONE FAX 4035 Ridge Top Road,Suite 150 (A/C,No,Ext):(703)667-5940 (A/C,No):(703)991-4838 Fairfax,VA 22030 ADDRIESS:certs@preferins.com INSURERS AFFORDING COVERAGE NAIC# _ INSURER A:National Fire Insurance Company of Hartford 20478 INSURED INSURER B:Valley Forge Insurance 20508 Federal Engineering, Inc. INSURER C:Continental Casualty Company 20443 10600 Arrowhead Drive#160 INSURER D:National Fire Insurance Company Fairfax,VA 22030 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSD WVD MM/DD/YYYY MM/DD A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR 6012243370 07/01/2016 07/0112017 DAMAGE TO RENTED 500,000 X PREMISES Ea occurrence $ MED EXP(Any oneperson) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY JECOT- LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,000 Ea accident $ X ANY AUTO 6012197507 07/01/2016 07/01/2017 BODILY INJURY Perperson) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident $ X HIRED X NON-OWNED PerOaccitlenDAMAGE $ AUTOS ONLY AUTOS ONLY C X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 3,000,000 EXCESS LIAB CLAIMS-MADE X X 6012243529 07/01/2016 07/01/2017 AGGREGATE $ 3,000,000 DED X RETENTION$ 10,000 C WORKERS COMPENSATION X PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER 6012243515 07/01/2016 07/01/2017 1,000,000 ANY PROPRIMBER/PXCLUDE/EXECUTIVE N/A X E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT D Technology E&O 6012243370 07/01/2016 07/01/2017 Per Claim/Agg 4,000,000 D Technology E&O 6012243370 07/01/2016 07/01/2017 Deductible 25,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Re: Orange County,200 South Cameron Street,PO Box 8181,Hillsborough,NC 27278 its officers,official agents and employees are Additional Insured with respect to General Liability regarding all work performed by the named insured. Waiver of Subrogation in favor of Additional Insureds applies to Workers' Compensation. Umbrella Liability Follows form. 30 Days Cancellation. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Orange Count Emergency Services THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN g y g y ACCORDANCE WITH THE POLICY PROVISIONS. Attn: Dinah L.Jeffries,Director 510 Meadowlands Drive Hillsborough, NC 27278 AUTHORIZED REPRESENTATIVE Ai�, ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E AGENCY CUSTOMER ID: FEDEENG-01 MSANDY LOC#: ' �%. ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY NAMED INSURED Preferred Insurance Services, Inc Federal Engineering, Inc. 10600 Arrowhead Drive#160 POLICY NUMBER Fairfax,VA 22030 Fairfax EE PAGE 1 CARRIER NAIC CODE ,SEE PAGE 1 ISEE P 1 EFFECTIVE DATE:SEE PAGE 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance California Workers Compensation Workers Compensation policy 6012243496 effective 7/1/16-7/1/17 for the State of CA with limits of$1,000,000/$1,000,000/$1,000,000. ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E FEDEENG-01 MSANDY ACQ► a CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 10/5/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Certificate Department NAME: Preferred Insurance Services,Inc PHONE FAX 4035 Ridge Top Road,Suite 150 (A/C,No,Ext):(703)667-5940 (A/C,No):(703)991-4838 Fairfax,VA 22030 ADDRIESS:certs@preferins.com INSURERS AFFORDING COVERAGE NAIC# _ INSURER A:National Fire Insurance Company of Hartford 20478 INSURED INSURER B:Valley Forge Insurance 20508 Federal Engineering, Inc. INSURER C:Continental Casualty Company 20443 10600 Arrowhead Drive#160 INSURER D:National Fire Insurance Company Fairfax,VA 22030 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSD WVD MM/DD/YYYY MM/DD A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR 6012243370 07/01/2016 07/0112017 DAMAGE TO RENTED 500,000 X PREMISES Ea occurrence $ MED EXP(Any oneperson) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY JECOT- LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,000 Ea accident $ X ANY AUTO 6012197507 07/01/2016 07/01/2017 BODILY INJURY Perperson) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident $ X HIRED X NON-OWNED PerOaccitlenDAMAGE $ AUTOS ONLY AUTOS ONLY C X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 3,000,000 EXCESS LIAB CLAIMS-MADE X X 6012243529 07/01/2016 07/01/2017 AGGREGATE $ 3,000,000 DED X RETENTION$ 10,000 C WORKERS COMPENSATION X PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER 6012243515 07/01/2016 07/01/2017 1,000,000 ANY PROPRIMBER/PXCLUDE/EXECUTIVE N/A X E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT D Technology E&O 6012243370 07/01/2016 07/01/2017 Per Claim/Agg 4,000,000 D Technology E&O 6012243370 07/01/2016 07/01/2017 Deductible 25,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Re: Orange County,200 South Cameron Street,PO Box 8181,Hillsborough,NC 27278 its officers,official agents and employees are Additional Insured with respect to General Liability regarding all work performed by the named insured. Waiver of Subrogation in favor of Additional Insureds applies to Workers' Compensation. Umbrella Liability Follows form. 30 Days Cancellation. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Orange Count THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 9 y ACCORDANCE WITH THE POLICY PROVISIONS. 200 South Cameron Street PO Box 8181 Hillsborough, NC 27278 AUTHORIZED REPRESENTATIVE Ai�, ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E AGENCY CUSTOMER ID: FEDEENG-01 MSANDY LOC#: ' �%. ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY NAMED INSURED Preferred Insurance Services, Inc Federal Engineering, Inc. 10600 Arrowhead Drive#160 POLICY NUMBER Fairfax,VA 22030 Fairfax EE PAGE 1 CARRIER NAIC CODE ,SEE PAGE 1 ISEE P 1 EFFECTIVE DATE:SEE PAGE 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance California Workers Compensation Workers Compensation policy 6012243496 effective 7/1/16-7/1/17 for the State of CA with limits of$1,000,000/$1,000,000/$1,000,000. ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD