HomeMy WebLinkAboutAgenda - 09-21-2004-9cORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 21, 2004
Action Agenda
Item No. q-G
SUBJECT• Fairview and Northern (HSC) Parks -Timetables and Status Reports
DEPARTMENT: Environment and Resource PUBLIC HEARING: (Y/N) No
Conservation, Recreation and
Parks
ATTACHMENT
1) Park Facility Projects (PFP) Schedule
2) Northern Park-Adopted Preliminary Concept Plan
3) Northern Park -Adopted Process
4) Northern Park -Possible Timetable
5) Fairview Park and Campus -draft Preliminary
Concept Plan
6) Fairview Park and Campus -Possible Timetable
and MOA status report
INFORMATION CONTACT:
David Stancil, 245-2590
Lori Taft, 245-2660
Geof Gledhill, 732-2196
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To review a status report, preliminary concept plans and the proposed schedule
for design of the next two County parks projects -the Northern (Human Services Center)
Park and the Fairview Park and Campus (Phase II),
BACKGROUND: As of September 2004, several County parks projects are in various
stages of construction (Little River Park), and pre-construction (Efland-Cheeks Park Phase 2,
Smith Fields lighting project, Twin Creeks Park Phase I).
As previously identified in the Park Facilities Project (PFP) schedule, the next two projects to
get underway would be Northern Park and Fairview Park, Phase IL.
Steps have been taken late in 2003 and earlier this year to prepare for the design process of
these two facilities, which are funded by voter-approved 2001 Parks and Open Space Bonds.
A Preliminary Concept Plan and a process for accomplishing the design and public outreach
was adopted for Northern Park by the Board in Fall 2003., The process calls for design to be
accomplished through a series of community meetings instead of a Master Plan committee.
Preliminary survey work (detailed topographic survey, cultural and biological assessments)
has been completed.
At Fairview, a Steering Committee of elected officials from the County and Town of
Hillsborough has conducted site visits, and a staff Site Analysis report has been prepared
and reviewed by both boards. A draft Preliminary Concept Plan has been developed
2
(attached) and a draft Memorandum of Agreement (initial draft attached) between the County
and Town is under review by the attorneys to address the roles and responsibilities of the
jurisdictions, as well as the process for park design, construction and operation. In June, the
County authorized construction of a storage facility and base for Recreation and Parks on
land within the overall site to address immediate operational needs, and this project would
move forward outside of the Fairview design process. A pending land swap to allow
expansion of the Orange County Public Works facility, and relocation of the Hillsborough
facility, is one of the key decision points to be addressed by the MOA.
With the number of projects underway in the construction or pre-construction phase, staff
believes that it is feasible to undertake one of these two projects in the fall of this year, and
would propose to initiate the other project on or around February 2005. A general timeframe
of 2-4 months is anticipated to complete the design process (from initial design meeting to
draft Master Plan).
Information on the current status of both projects and draft plans and processes are provided
as attachments. The existing PFP timetable (which is updated periodically as events
changed but is not an adopted document) would have Northern Park design occur first,
followed by Fairview Park as the design for Northern Park winds down, Staff feels that that
this sequence is still the most appropriate, Both the County Attorney and staff are of the view
that the County/Hillsborough joint project at Fairview requires key decisions within the
Memorandum of Agreement (primarily the Master Plan) that impact the order of activities at
the Fairview Campus, Additionally, surveys (topographic, biological and
cultural/archaeological) have not yet been undertaken for Fairview, Staff would propose to
begin the process of the getting these surveys done in October.
The County Engineer has advised that the design process for the Northern Park would not
cause any adverse impacts on implementing proposed improvements to the water and sewer
system of the Northern Human Services Center building, should the Board direct staff to
move forward with the park design process at Northern Park,
FINANCIAL IMPACT: Funding exists for the design of both projects through previously-
appropriated funds in FY 2003-04 and FY 2004-05, A total of $49,416 has been expended to
date for the preliminary survey work at Northern Park (including survey work related to the
wastewater system). No funding for Fairview Park (Phase II) has been expended to date,
Design for the projects would be done in-house by the Open Space Design Specialist in
conjunction with other staff from ERCD, Recreation and Parks, Planning, and the County
Manager's office. Additional design and pre-construction costs are expected to be minimal.
RECOMMENDATION(S): The Manager recommends that the Board consider the attached
schedule and status reports, and provide direction to staff on the Board's preferred sequence
of activities,
3
V
d
O
.U
V
Y
~. m
a°
C 9
~ u
V ~
u
p)a
C 'n
L c
a
ua
o' ~
a`W
z
d
>.
a
a
N
a
m`
t
e
A
r
2
v
w
A
~~
v
P
~ m
N ~
-u
n
v ~
O
u
~ 9
a ~
a ~
o m
Z 6
m
N G
N
O v
o
LL ~
.~ N
Q`a
~z
~~
a E
°-' c
m°@
h q
7 d
~E
¢'-
y
11 O
E~J
E Q
N 2
5
m
O
L
a .2
v ~
O N
U y
O C
~ a
d
E e
a c5 ¢°
m
C
2
m
n
a
a
E
3
N
N
S
m
LL
a
0
N
.o mo~~
..
~
~~~N
xp
'
m
ro^
`o cry
a
cE
'
y0
~s~~
w~
~~
~
N
(I3
~
L
~
+ PIG gG
.~-
C ~
VQ ~ LL
°
cn
~ ..,
•~ ~c~+(( o
®
V V N
^^,, /'
W {.{~
(
`~
i ~ O
C
=U
c ~
~
~
_
o
~
.
z a,
L
^
LL
d
c
m ~°~'
d
~ ¢ U
l0 G
d O Z
~~ ' Q tU N
~~ ~~ d
G
~ O
~
~~ ~
d
~
U
_ ~
O d l0
m N~= N N E
` y
8 ~ 3 'C '~ c m _
\ a ¢ ~ z° ¢ a° in
~
>
lJ
--- r
5
aster :Plan. rcess
Northern ~Iurnan
Services Center Park
Adopted June 3, 2003
(Preliminary Concept Plan adopted 9/2/03)
A. Site Information
Size: 48 acres (i~zcluditzg existi~zg btzilditzgs and fields), with
atz addittioizal 12,2 acres located across NC 86.
Location: Co-located with Northern Human Services Center,
seven miles north of Hillsborough on NC 86 in Cedar
Grove Towns7iip
Status: Existing Northern Hunzatz Services Center and one ballftield and
playground on original 8 acres, County acquired a,ddtitional 40
acres in 1998. Draft Preliminary Concept Plan for parla included
in Northeriz Human Services center report of 2001,
Funding: $1,200,000
Source: 2001 Parizs Bond ($200, 000 appropriated in FY 02-03)
B Proposed Timetable of Actions
Board approves charge and process
Topographic and culturaUarchaeological surveys
Board reviews timetable and adopts
Preliminary Concept Plan
Staff develops base maps and site analysis
Initial Community Meeting -Base Maps and
Opportunities and Constraints Analysis
(preceded by notices and public service
Second Community Meeting -Community
Interests for the Parlc, begin design
Third Community Meeting -Design Charette
Fourth Community Meeting -Community
Forum /final plan revisions
Master Plan recommendations completed
Board of Commissioners reviews and approves
Master Plan, instructs staffto develop
construction documents and drawings
Site plan submitted to Planning Department,
bid documents, solicit
onroves contract for cc
7
C. Rationale for Process
Development of the Master Plan for this park will involve
planning for both active and low-impact recreation opportunities
at the site. Special attention and consideration will be given
to coordination with plans for the adjoining Northern
Humana Services center°, to ensure compatibility of proposed
uses with the planned improvements to the Center.
D. Description of Design Process
The park design would be accomplished via a series of four
community meetings held over three months. Citizens in the
community will be invited to participate in the process by
attending meetings and participating in the design. Notice about
the community meetings will be publicized through mailings,
public, service announcements and notices placed in stores and
community centers.
The Open Space Design Specialist will be responsible for the
actual site design, working with the County Manager (or
designee), ERC Director and Recreation and Parks Directo~° -with
the Planning Director, County Engineer, Purchasing Director and
Land Conservation Manager also asked to participate as available
or needed.
The end-product of this process will be a Master Plan for the park,
along with a brief written report, to be prepared by the end of
December 2003,
E Guiding Principles
In addition to the charge, the Master Plan process shall use fhe
following Guiding Principles:
• Any proposed substantive modifications to the Preliminary
Concept Plan should be conveyed to the Board of Commissioners
as soon as practical for approval
• The facilities to be designed and built should recognize the co-
loration with the Northern Human Services Center, working in
concert with future plans for the center and sharing infrastructure
where possible
• The park should, to the degree possible, promote apedestrian-
friendly environment and discourage unnecessary automobile
traffic or parking areas
• The protection of important stream corridors and natural areas
should be a foremost consideration, and facilities should be
designed in concert with the natural surroundings wherever
possible. Grading and alteration of the natural landscape should
be minimized
• Generally, all portions of the site not identified for playing fields or
other active recreation facilities should adhere to "Olmsteadian"
park and open space design principles, promoting open spaces,
meadows, and fields that may flexibly be used for a variety of
public leisure purposes
• Open spaces, including trails, should be developed with a vision
for both an internal and potential future external network, with
leisure and pedestrian movement between the Northern Human
Services Center and the park addressed internally, and linkage to
any nearby residential areas considered externally
• The plan should promote xeriscaping (native vegetation and
minimal water use) within the entire site
• The Work Group should hold at least one community forum or
open house to present draft recommendations, prior to submittal of
the Committee report
• Additional basic operating principles may be developed
Northern HSC Parlc -Proposed Project Timetable
9/04
•o
`'January 2004
Conduct topographic, biological and culttual suiveys
September-October 2004 Draft Challenges and Opportrurities report (staff prepared
October 4 Initial meeting notice placed on NHSC sign, flyers to citizens
and conununity stores about first park design community
meeting
October 28 Community Meeting #1 (Opportunities and Constraints
report presented, initial park design ideas solicited)
November 18 Communty Meeting #2 (Design charette)
December 9 Community Meeting #3 (Complete char'ette /develop draft
recommendations)
Tanuary 20, 2005 Gomrnunity Meeting #4 (Final meeting -recommendations
and Park Master Plan)
February 2005 Park and Campus Master Plair presented to BOCC
March 2005 BOCC approves Park Master Plan with/without modi£cation
Apri12005 BOCC approves site plan submittal for" park
April -September 2005 Park construction bid documents prepared, bids solicited and
received
October 2005 Bid award to BOCC for action
November 2005 -
October 2006 Park Construction
Fall 2006 Park opening (tentative)
Timetable subject to change
Fairview Campus -Preliminary Concept Plan
Draft
io
Q County & Hliisborough Parcels
~ Parcel Boundary
Sbeams. Stream Buffer, Steep Slopes
Exlsling Public Works /
Storage Faclilty -Orange Courtly
'. Public Works FJrpansion-orange County
Proposed Public W orks -Hillsborough
TI1 Posslbie Hillsborough Public Works /
Mature Hardwootl Stand
f ~ Active Recreation
Storm Debds
® Fortner Landfill 8 Surface Trash
Low Impact Recreation 8 Open Space
BO 0 BO 160240 Feet
~®
~l
Gounly al Osage
Environmenl8 Resource
Canservalbn eepvMenl
M Jones BIfWM
Fairview Parlc and Campus -Proposed Project Timetable
9/04
•~ e.•
October-December, 2004
Conduct topographic, biological and cultural surveys
November-December
2004 Pre-Concept Plazr and MOA (with master plan process)
approved
December 2004 -January
2005 Draft Challenges acid Opportunities report (staff) prepared
January 2005 Appointments made to Fairview Parlt and Canlpus Master
Plan Committee
February 2005 Committee Meeting #1 (Opportunities and Constraints report
presented, initial park design ideas solicited)
Mazch 2005 Corrunittee Meeting #2 (Design charette)
April 2005 Committee Meeting #3 (Complete charette /develop draft
reconunendations)
May 2005 Committee Meeting #4 (Final meeting - reconunendations
and Pazk Master Plan)
August 2005 Pazic and Campus Master Plan presented to BOCC
September 2005 BOCC approves Park Master Plan witlr/without modification
October 2005 Land swap reviewed az7d approved. BOCC approves site plan
submittal for Phase II of pazk
November 2005 -April
2006 Parlc (Phase II) construction bid documents prepared, bids
solicited and received
May 2006 Bid award to BOCC for action
June 2006-May 2007 Park (Phase II) Constniction
Late-spring 2007 Pazlc (Phase II) opening (tentative)
Timetable subject to change
Status Report of Draft Fairview Parlc and Campus Memorandum of
Agreement (MOA)
The Town Attorney and County Attorney have begun review of the draft MOA (dated
4/23/0.3). The MOA addresses a variety of topics related to the site, including agreement
to master plan and utilize both Town and County lands for the project, the process for
designing the Master Plan (including the appointment of a citizens committee), and
operation and management issues related to the park.
The County Attorney has noted that the master plan should be adopted prior to the
proposed land swap for public works taking place, to ensure that the lands to be swapped
are consistent with plamring for the site (infi astructure, roads, parking etc). The
mechanism to accomplish the master plan is currently included within the MOA - it
could be separated from the IvIOA and begun. while the remaining issues of the MOA are
discussed, if desired.