Loading...
HomeMy WebLinkAboutAgenda - 09-21-2004-9aARANGE CAUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 21, 2004 Action Agen a Item No. - SUBJECT: Conceptual Design for CHCCS High School #3 DEPARTMENT: Manager/Budget PUBLIC HEARING: (Y/N) No ATTACHMENT(S): 04/22/04 CHCCS Agenda Materials Related to High School #3 INFORMATION CONTACT: Rod Visser, 245-2300 Donna Dean, 245-2151 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To review the conceptual design for Chapel Hill-Carrboro City Schools (CHCCS) High School #3, BACKGROUND: In November 2000, the Board of Commissioners approved a "Policy on Planning and Funding School Capital Projects" that identifies two levels of school construction projects. Of those, Level 2 projects (such as High School #3) are major projects that require several phases tc complete. For these projects, the Commissioners approve project funding in four phases; • ConceptlPre-Planning Phase -includes preliminary programming and design work that would result in conceptual drawings and preliminary cost estimates. • Planning Phase -includes siting the facility, construction of infrastructure, and preparation of construction documents in preparation for bidding process, • Design and Construction Phase -includes final design, facility construction and purchase of equipment, furnishings, technology, and one-time start up items. Final Accounting Phase - provides a reconciliation of actual project expenditures with approved budget. In June 2003, the Commissioners appropriated about $2.77 million in funding for the Concept/Pre-Planning phase and for site acquisition for High School #3. Commissioner Brown was appointed to serve as the Commissioner liaison for this project. She and Assistant County Manager Rod Visser were asked by CHCCS to serve on the High School #3 Advisory Committee, which met on many occasions with the project architects throughout FY 2003-04 to provide feedback about the high school building design. Commissioner Gordon attended Advisory, Committee meetings when Commissioner Brown was unable to attend, CHCCS representatives and the architects are ready to present the conceptual design plans to the Board of Commissioners for review at this September 21 BOCC meeting. Background materials provided to the Board of Education by the architects and CHCCS staff for the Board of Education's April 22, 2004 meeting are provided with this abstract as background information for the BOCC, FINANCIAL IMPACT: Na additional financial impact is associated at this time with this agenda item. The current BOCC-approved High School #3 project budget is $30,842,000, This includes the basic project appropriation of $27.8 million, an additional $1,9 million for "smart growth" initiatives, and an additional $1.142 million in accumulated CHGGS school impact fees that were earmarked for additional costs of site acquisition, RECOMMENDATION(S): The Manager recommends that the Board of County Commissioners review plans for High School #3 as presented by representatives of the Chapel Hill-Garrboro City Schools, Chapel Hill -Carrboro City Schools Lincoln Center, Merritt Mill Road Chapel Hill, NG 27516 Telephone: (919) 967-8211 Fax: (919) 933-4560 Neil Pedersen, Superintendent Nettie Collins•Hart, Assistant Superintendent for Inslnictional Services Ray Reitz, Ohief Technology Officer Steve Scroggs, Assistant Superintendent for Support Services To: Neil Pedersen, Superintendent From: Steve Scroggs,Assistant Superintendent Re: High School #.3 Update Date: April 2, 2004 Included is an update on the planning process for High School #3. The update wilt include a presentation by the architects on the design and development stage of the project, Further information is provided on the schedule, square Footage and budget. 1. Design The design for high school #3 includes a student capacity of 800 with a core facility for 1,200 students. The proposed design includes a full gym, auditorium, commons and athletic complex. The design reflects the needs of the high school reform committee by designating career and feclmieal education space for academies and a design that features smaller learning comrnuttities. The High School Advisory Connnittee has spent a great deal of time ensuring thaC shdent areas are sufficient in size and that the school reflects a kinder, gentler and wanner atmosphere, Moseley Architects will provide a presentation highlighting these planting efforts so far'. 2. Presentation Moseley Architects will present the present status of the high school design. This design was reviewed by the High School Advisory Committee on Monday, April 5 and received a broad base of support. While the design process continues, the committee felt strongly enough to move the plan forward for Board of Education review. There are several concerns about the project that must be addressed as the planning process moves forward. Those include the schedule, square footage and the budget.. Each concern is more fully explained below. 3. Schedule The schedule for completion of the third high school in August 2006 has become more difficult. A variety of factors has contributed to this scheduling difficulty and should be reviewed by the Board. • The normal approval process by the Town of Carrboro will not be completed before the summer recess. Even with the Alderman's best efforts, further l~ reviews will be required. They are now examining a parCial or slab approval that would allow site work to begin before the final approval takes place. This idea has only recently been introduced and a final answer on the feasibility of the request has not been received. • The lengthy site selection process by the Board of L^ducation took longer than expected. The additional review of the Old L,ystra Road and the Southern Park site removed time From an already compressed schedule. Re-reviews of sites requested by the Commissioners also added time to the site selection process, • A delay in approval of the use of etninent domain by the County Commissioners, Cied to Che interlocal agreement, has also contributed to delays in the project. The use of the interlocal agreement required several board meetings stretching over the sunmier months in 2003. • The length of time devoted to the interlocal agreement, addendum "B" and "smart growth" efforts that are still not completed have added time to the planning effort. • The change in projecC architects by Moseley Architects has required additional transition time. • Support Services experienced a delay in securing permission to do field work on Che Glover property, again adding to the potential for delay.. While no single group or firm contributed excessively to the delay, all the involved parties collectively contributed their small part. Those small parts when combined together have resulted in a schedule that may not be met. 4. Square Footage The original square footage of the building was established at 182,000 square feet The $30,000,000 budget reduced that figure to 155,000 square feet. The present option contains 161,556 square feet. That square footage has been reviewed by staff and architects for additional areas for reduction and few, if any, are available. Any further reduction in square footage would have a permanent impact on the core facilities that would be difficult to compensate for later. To reach the square foot target of 155,000 would require a reduction of an additional 6,500 square feet. This is the equivalent of eight classrooms or the auditorium. A review of the comparable projects around the state indicates that our square footage is lower than other similar sized projects. Student S uare Foota e S .Ft. Per S .Ft. Per Project Capacity Core Total Capacity Core Southside 750 1,286 169,674 226 132 Northside 905 1,225 176,510 195 144 CHCCS 800 1,200 163,500 204 136 Cedar Ride 1,000 1,500 206,900 207 138 Using the School Planning Division guidelines and extrapolating a 1,200-core capacity, a square footage requirement of over 170,000 square feet is indicated. As the High School Advisory Committee worked through the design and development 5 process, additional square footage was always requested. Unless the program or capacity numbers are changed, any architectural reduction would be minimal at best. 5. Budget The administration and the architects have been working on the design for a $.30,000,000 high school. That figure is a reduction from the $.33..9 million dollars originally requested. The original budget included a larger school with off site athletic facilities. With a $30 million budget, the capaaity of the school was reduced by 200 students, thus reducing the square footage.. This allowed enough site room for a track and competition field to be added back into the project. The reduction in capacity did not entirely offset the additional cost of the field and track, The present budget is approximately $.30,64.3,951 or $644,000 over budget.. This figure also includes moving baseball and softball field construction to another phase or Ending different revenue streams. This estimate cost overrun is approximately the same as the per square foot cost associated with the square footage increase from 155,000 to 161,556. The estimates above are being researched. Independent estimates are being solicited for site development work to ensure accuracy, as those numbers have seemed high, even for a difficult site. The current steel marlceC is also of concern as prices for constntction have risen due to the rapid steel price increase. Summar°y Design work is moving ahead and the final design will be oue that serves students well for many years to come.. The smaller learning conununities, bright and open conuuon spaces and compact design are all forward-looking elements. As work continues, the schedule and budget are two of the critical areas that must be continually monitored to ensure no additional slippage. Help from the Town of Carrboro on the approval process and additional revenue from some other sources will be required to bring the project in, on time and within budget, Mr. Scroggs and representatives from Moseley Architects will be present to answer any questions you may have. G Z a J G. W H s O Z O~{ ~~ V ~ <~' ~, -~` ~ ~ __ ~,:- _ ~. .: ,,- ~'`~' ~- p ~~ ~p ~ I I I I I ~ I d i i b ~~:,.. r, u~~:, ^.,, ~ ~ W ,e i ~{ ~® ~~~ ~~ p ~ ,, :, _ ,__ ;.-, ,. v „ - ~ ~ - - - - z . ~ __.._ . i1 I r .i _~~ ~ ii ~ ~ r_ 7 - 11 _~,~ - r' 1 - ~ -°~~> ~'~___ -_ „, ,, ~g i ~ -:, ~~ ;~~~_~ ~Sl ~ 311'H~~tJd1.3'13 SO W i ~lS, F {iiC .. ... 1 ~F 3 5 ~ ~' pg3 ~ ~~ ~ S " ~ ~ 2~ ~i ~r~r:o ^orr.:~ VNOObYJ NinON'08L1Ytltl'q nooNOS Un onoennw~mxisarxa ~, £'ONIOOHOSH9IH - °": ~~~ s R ~y e SN •J8 ~4;.i ~.: vwnonvo ~unoH'ononnnro" "°N nooxxwo onoannvo •nix inarxo _ ~g ~51~311~F1~2J`dA3'13SOWj £oN'IOOH~SH91H - °s~jQ ~~~~ i .' '° ~ ~ / ~~ "Y ~ ~ ~l '~ 1 ' ~~ ~, t g ~ti ~ I ~ «. !~ ° k ~` ~ n ~ ~g`~ k ! ! ~rj v ..__......,. .. ~ [1.1 _. ._ ~ 11 i II o I F.' 11 u' ttt~~~ 1 <3. t 1 7! ~~ i o$: e _. 1 e' ' e ~ 1 a ~, __~ ~,. ~~~~ ~~ g6~~~i~~8 zee u E ELI-:i^ ^O::i':~i';~: ~o