Loading...
HomeMy WebLinkAboutAgenda - 12-03-2018 7-a - River Park Improvements Update 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 3, 2018 Action Agenda Item No. 7-a SUBJECT: River Park Improvements Update DEPARTMENT: Environment, Agriculture, Parks and Recreation (DEAPR) ATTACHMENT(S): INFORMATION CONTACT: Proposed Improvements Map David Stancil, 919-245-2510 Adopted Master Plan Marabeth Carr, 919-245-2510 Possible Performance Stage Options PURPOSE: To review planned improvements to River Park in downtown Hillsborough prior to submittal to the Town of Hillsborough Historic District Commission. BACKGROUND: River Park is a nine-acre park in downtown Hillsborough between the Orange County Courthouse/Justice Facility/District Attorney's Office on East Margaret Lane and the Eno River. The park includes the David Price Farmers Market Pavilion, the Stillhouse Creek Stream Restoration Project, a portion of the Hillsborough Riverwalk, and an area of open space between the buildings and the river. Trails and a pedestrian bridge for the park were built consistent with a master plan for the park that was completed in conjunction with the Justice Facilities Expansion Project in 2010. The Farmers Market Pavilion was completed in 2008. Since that time, the pavilion and the park have been used for regular farmers markets, movies in the park, community egg hunts, concerts and other events. The site continues to be a desirable destination for events and is regularly scheduled for a range of activities. In June 2015, the Board approved funding in the Capital Investment Plan (CIP) and capital budget to build the remaining facilities in the 2009 master plan. This work includes several components (some of which are completed or underway): • A performance stage/shell for the concerts and events that the park hosts; • Realignment of the Riverwalk (part of the NC Mountains to Sea Trail) across a sturdier pedestrian bridge (completed); • Refurbishing and renovation of the Occoneechee Village (underway); • Electrical improvements near the Farmers Market Pavilion (completed), and the addition of more park benches; and • A new pedestrian entrance into the park from Churton Street, concurrent with the Town's pedestrian and transit improvements, including two new trail connecting segments and a stormwater control measure. 2 Staff and an engineering consultant (Mike Hammersley of CRA Associates, Inc.) have been working for the last several months to complete the needed design work for the remaining improvements above, for eventual Town permit approvals. In the last few months, staff has explored potential sponsorship or naming opportunities for a larger performance stage/shell (please see attached pictures) which could accommodate concerts and performances that the site has been shown to attract. The Orange County Arts Commission has expressed interest in this expanded performance stage/shell and sees this as a possible fundraising opportunity that may be attractive to County and Town community and business interests. FINANCIAL IMPACT: Prior years funding of $400,000 was appropriated for all of the planned work outlined above, with a basic stage concept. Approximately $370,000 remains from those funds. It is estimated that the enhanced performance shell and related appurtenances being discussed could cost an additional $125,000, with fundraising efforts potentially addressing some or all of these costs. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. The planned improvements to River Park will increase community access to open space to all persons, and create an opportunity for programs and events that build community. • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation. The facilities at River Park offer a free location for the participation in events, activities and programs that enable participation by all persons. RECOMMENDATION(S): The Manager recommends that the Board receive the report, review and discuss the potential for an enhanced performance stage/shell, and provide any direction to staff prior to a planned submittal to the Town of Hillsborough Historic District Commission for initial review in January. 3 E. Margaret Lane 0 Court House Dist. _ o _ Attorney Sheriff JA LLL I 0 m Y o -0 Proposed ADA Ramp E Proposed Li W W Bus Shelter W > W U W � tx � c1l'), � o Proposed Rain Garden 00 ` Proposed Stairs Existing Crosswalk Proposed ADA Ramp Proposed QPerformance Stage L i+ O L s U Proposed ADA Ramp L R ve r Park P ase 11 Improvements 4 1,MAR[MRIT LN L t �, 1011, ° uECaLO-srewN� Q�E IA�1. NI. HOUSE N°N E A1111 IN •' I ut - :w°C�E: : nwalaa[vwur _. � r ' 'i 1 Imp°raE! Gale war Y.Vi PVBLCII rle4neRhaNnlw — P Jp - Inc NC+V I': 1 1 y.0 �I On• L —-_ iI -a w Sra"a'.um - JuSrca Fpcdiy / P• 0 HR 11 66n[I�S nv PIC+Mi .. � F II,rnr e5s P! A• 1 Sia'geISN.- I ANNEX „__-'� ■■,��jj77 epbce +1�` �� Rf."e r 11� N G�' ��: PES11Y� a C+P d + ' 1 �• � � � � AlL Now f U y e }rf r l�` p `v L) ❑'❑ I `�s pip 1 CLINIC 1� aeNlas-0nM. . OCJ ERPANSIONR RIYFJt PAR% Rf4'ER Pn1tK LANDSCAPE PLAN - -. - tlatr IIk1Red INi�IfN111:Ni11YYNi:M 1l'X1PrF'AI.�FI)II YIIYIfWIIN[.Y 5 Examples of prefabricated types of wood Performance Stages that could be built in River Park r Glue laminated wood structure similar to the Farmer's Market Pavilion structure (Size shown is 25'deep x 50'across stage front) The same structure with a closed (screened) back The same structure with a closed (screened) back and enclosed storage/dressing rooms (which could include restrooms)