HomeMy WebLinkAboutORD-2018-032A Budget Amendment #3-A
ORD-2018-032
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: November 13, 2018
Action Agenda
Item No. 8-d
SUBJECT: Acceptance of Electric Motorcycle Grant and Approval of Budget Amendment
#3-A
DEPARTMENT: Asset Management Services,
Financial and Administrative
Services
ATTACHMENT(S):
Project Award Letter and Scope of Work
INFORMATION CONTACT:
Brennan Bouma, (919) 245-2626
Paul Laughton, (919) 245-2152
Charles Blackwood, (919) 245-2922
PURPOSE: To:
1) Accept $12,668 in reimbursement funds from the North Carolina Clean Energy
Technology Center (NCCETC) through its “Clean Fuel Advanced Technology (CFAT)”
grant program to purchase an electric motorcycle;
2) Approve Budget Amendment #3-A; and
3) Authorize the County Manager to sign the associated funding agreement and any other
necessary documentation for the successful completion of this project pending final
review by the County Attorney’s Office.
BACKGROUND: On July 11, 2018, Orange County staff responded to a request for proposals
from the North Carolina Clean Energy Technology Center (NCCETC) for Clean Fuel Advanced
Technology (CFAT) 2018 Round 2 grant funding. This grant program is sponsored by the NC
Department of Transportation and funded with federal Congestion Mitigation Air Quality funds.
The purpose of this grant is to buy down 80% of the difference in cost between a conventional
gasoline-powered vehicle and a clean fuel vehicle. Therefore, Orange County would be able to
purchase an electric motorcycle for only slightly more than the cost of a conventional
motorcycle.
With this grant funding, the Orange County Sheriff’s Office proposes to purchase a Zero brand
DSRP all-electric Motorcycle with the basic Police Package (lights & paint). This electric
motorcycle has a maximum range of 176 miles on a single charge with a top speed of 102 miles
per hour, all without the noise of a gasoline engine. The motorcycle would be able to recharge
fully in less than 2 hours.
1
The Orange County Sustainability Coordinator will work with the Sheriff’s Office to provide
administrative support, tracking, and reporting on this project to estimate and publicize pollution
reduction benefits.
This motorcycle will expand Orange County’s efforts to protect local air quality and the global
climate while expanding the capacity of the Sheriff’s Office to patrol County parks, trails, and
greenways along with regular duties in traffic enforcement, funeral escorts, dignitary escorts,
and outreach and education events.
Electric motorcycles are currently used by dozens of law enforcement entities nationwide,
including local examples in Davidson County and the Town of Matthews.
The grant project period of performance extends through September 2020, but staff expects to
complete the purchase of the motorcycle and ensure it is ready for duty this Spring.
FINANCIAL IMPACT: The total cost of the Zero brand DSRP all-electric Motorcycle with the
basic Police Package is $22,285. Orange County received approval to use a $6,450 quote on a
basic gasoline motorcycle as the base model comparison for the purposes of this grant. The
grant will cover 80% of the difference between these costs. The required County match will
come from available Drug Forfeiture funds. The base costs are detailed in the chart below:
Total Cost –
Electric Motorcycle $22,285
Total Cost – Basic
Gasoline
Motorcycle
$6,450
Difference in costs
between electric
and gasoline
$15,835
Grant (80% of
difference) Grant Award (80%)
Required match from Orange
County (20%)
$12,668 $3,167
Total cost to
Sheriff’s Office
$22,285 - $12,668 = $9,617
(optional accessories could add up to $2,000 more)
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals is applicable to
this item:
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary
for residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
The expansion of the County’s electric vehicle fleet supports the growing electric vehicle
industry in Orange County and North Carolina which supports jobs and investments in research
and development, charging station manufacturing, and electrical contracting. Electric vehicles in
Orange County are also able to refuel for less than half of the cost of gasoline.
2
• GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND
ENVIRONMENTAL POLICIES
The fair treatment and meaningful involvement of people of all races, cultures, incomes
and educational levels with respect to the development and enforcement of
environmental laws, regulations, policies, and decisions. Fair treatment means that no
group of people should bear a disproportionate share of the negative environmental
consequences resulting from industrial, governmental and commercial operations or
policies.
Studies have shown that operating an electric vehicle in North Carolina has some of the lowest
air quality impacts per mile of any personal or fleet vehicle. Electric vehicles are also the only
vehicle that gets cleaner over time since they depend on an electric grid that regulated to be
cleaner each year. Improving local transportation-related air quality helps to protect the health of
vulnerable populations in Orange County whose health is disproportionately affected by ground-
level ozone and other emissions.
RECOMMENDATION(S): The Manager recommends that the Board:
1) Accept $12,668 in reimbursement funds from the North Carolina Clean Energy
Technology Center (NCCETC) through its “Clean Fuel Advanced Technology (CFAT)”
grant program to purchase an electric motorcycle;
2) Approve Budget Amendment #3-A;
3) Authorize the Manager to sign the associated grant funding agreement and any other
necessary documentation for the successful completion of this project pending final
review by the County Attorney’s Office; and
4) Instruct staff to proceed with the project.
3
College of Egineering
N.C. Clean Energy Technology Center
Campus Box 7409
Raleigh, NC 27695-7401
919.515.2788 (P)
resapienza@ncsu.edu
www.nccleantech.ncsu.edu
October 10, 2018
Brennan Bouma
Orange County Asset Management
P.O. Box 8181
137 W. Margaret Lane, Suite 301
Hillsborough NC 27278
Mr. Bouma:
We are pleased to inform you that the Orange County application for the purchase of one (1)
ZERO Electric Motorcycle received final approval from the program sponsor, the NC
Department of Transportation and the Federal Highways Administration. The project award is
for an amount up to $12,688.00 with minimum required cost share of 20%.
You will receive a statement of work (SOW) within 1 week, based on your application and
discussions and modifications that occurred during the application and review process, for
review and approval before it is submitted to the NCSU Contracts and Grants office. This is the
time to be sure of project parameters, costs and timing. This award is for reimbursement of a
fixed amount. If the costs to complete the project exceed that outlined in the SOW, the
additional costs will be borne by Orange County. However, if the project costs are less than the
estimated budget, the amount reimbursed may not be the full amount of the SOW. The
amount reimbursed will be subject to the 20% minimum cost share requirement.
It is also important to note that there are several state and federal requirements that need to
be met:
• “Useful life/replacement standards” requirement for the project as defined per 41 CFR
102.34.270 (up to two years for all leases). Note that lease agreements cannot result in
the owner’s acquisition/ownership of the equipment.
• “Buy America compliance certification” , all projects need to certify that all purchased
components using CFAT funding meet the FHWA Buy America requirements. For
FHWA, the requirements are specific to all steel and iron used on a project and states
that "all manufacturing processes, including application of a coating, for these materials
must occur in the United States" with little exception. (See link below on FHWA Buy
America requirement.)
FHWA Buy America link: https://www.gpo.gov/fdsys/pkg/CFR-2013-title23-
vol1/xml/CFR-2013-title23-vol1-sec635-410.xml
4
College of Egineering
N.C. Clean Energy Technology Center
Campus Box 7409
Raleigh, NC 27695-7401
919.515.2788 (P)
resapienza@ncsu.edu
www.nccleantech.ncsu.edu
• “Procurement standards” per 2 CFR 200 and the exemptions
obtained by the US Department of Transportation, codified at 2 CFR
1201 require the Subrecipient shall follow a competitive
procurement process similar to the state regulations for procuring
goods and services. When procuring property and services under a
Federal award, a state must follow the same policies and procedures it uses for
procurements from its non-Federal funds. The state will comply
with §200.322 Procurement of recovered materials and ensure that every purchase
order or other contract includes any clauses required by
section §200.326 Contract provisions. All other non-Federal entities,
including subrecipients of a state, will follow §§ 200.318 General procurement
standards through §§200.326 Contract provisions. An applicant organization must
submit their procurement policies or a description of their procurement process
demonstrating a transparent, open and competitive procurement process.
Link to 2 CFR 200 and sub-paragraphs (318 through 326
included): https://www.gpo.gov/fdsys/granule/CFR-2014-title2-vol1/CFR-2014-title2-
vol1-sec200-320
After the SOW is finalized, we encourage you to issue a press release and take advantage of
every opportunity to educate others about your use of alternative fuel(s) and advanced
transportation technologies. Along with recognizing the NC Clean Energy Technology
Center/NC State University, please acknowledge the NC Department of Transportation.
Thanks for your commitment and interest in improving North Carolina’s air quality. We look
forward to working with you on successful completion of the project.
Sincerely,
Richard Sapienza
Clean Transportation Program Director
NC Clean Energy Technology Center
NC State University
5
North Carolina Clean Energy Technology Center
1
2018 ROUND 2
Clean Fuel Advanced Technology (CFAT)
Statement of Work
Overview & Basic Information
Organization Name: Orange County
Project Coordinator (first and last name): Brennan Bouma
Mailing Address:
Orange County Asset Management
P.O. Box 8181
137 W. Margaret Lane, Suite 301
City: Hillsborough
County: Orange
Zip Code: 27278
Telephone: 919-245-2626
Cell Phone: 919-406-4909
Email: bbouma@orangecountync.gov
Fax: 919-644-3001
Project Location (if different than mailing address):
Orange County Sheriff’s Office
106 E. Margaret Lane
Hillsborough, NC
Alternate Contact Person (first and last name): Jamison Sykes, Chief Deputy
Alternate Contact Person (telephone): 919-245-2913
Alternate Contact Person (email): jsykes@orangecountync.gov
Applicant Type (public or private): Public
Amount requested ($): $12,688
Matching funds ($) -- minimum 20% of total project cost: $3,167 (plus $6,450 in base costs)
Total Project Cost ($) (includes both funds requested and matching funds): $15,835 (plus cost)
Percent matching funds of total project cost: 20%
Applicable Project Type and Specifics
6
North Carolina Clean Energy Technology Center
2
Alternative Fuel Vehicle (AFV) Purchase
Vehicle type (make, model, year): Zero DSRP Electric Motorcycle
Dedicated or Bi-Fuel: Dedicated
Number of vehicles: 1
Estimated or projected per-vehicle annual mileage: 3,000 miles. This is based on the annual
utilization of the Sheriff’s Office’s Harley Davidson motorcycles (2,800 miles) and adding on the duties of
patrolling parks, trails, and greenways.
Estimated or projected % miles using alternative fuel (bi-fuel or PHEV applications): 100%
Conventional fuel type (Diesel or Gasoline): Gasoline
Average conventional fuel economy (MPG): 55 mpg
This comes from an average of the two types of motorcycles whose duty miles this electric motorcycle will
replace.
Conventional 1 Suzuki DR-Z400S 65 mpg
Conventional 2 Harley Davidson FLHTP 45 mpg
Electric ZERO DSRP ZF14.4 (city) 419 MPGe
(highway) 172 MPGe
Alternative fuel station(s) where vehicle(s) will refuel or recharge (street address):
Orange County Sheriff’s Office (110V exterior outlet)
106 E. Margaret Lane
Hillsborough, NC
OR
Orange County Parking Deck (4 Level 2 EV charging stations)
Nash and Kollock St
Hillsborough, NC 27278
Statement of Work
Project Summary:
The Orange County Sheriff’s Office will purchase a ZERO DSRP ZF14.4 electric motorcycle (police
package). The Orange County Sustainability Coordinator will work with the Sheriff’s Office to provide
administrative support, tracking, and reporting on this project throughout the reporting period.
Plan for Deliverables
Plan for Task #1 Acquisition / Installation of Equipment with Documentation of Work:
7
North Carolina Clean Energy Technology Center
3
Deliverable 1.1: The Orange County Sheriff’s Office will submit copies of paid invoices for all costs
associated with project. If submitting more than one invoice for reimbursement, final invoice will be
marked as such. If only submitting one invoice, this will be marked as final. Cost share letter will be
submitted with final invoice [refer to deliverable 4.1].
Deliverable 1.2: The Orange County Sheriff’s Office will provide a brief description of what was
accomplished during acquisition and installation.
Plan for Task #2: Usage tracking of project technology/fuel:
Deliverable 2.1: The Orange County Sheriff’s will provide at least twelve (12) months of recorded
tracking will be provided in acceptable form.
Deliverable 2.2 The Orange County Sheriff’s will provide an estimate of technology/fuel usage for
additional months to give a total of thirty-six (36) months of actual and estimated combined usage.
Zero Motorcycles provides the Zero Motorcycles App that enables a phone-based Bluetooth interface
with each of its motorcycles. Among other functionality, this app will allow us to read detailed trip
statistics, including “average watt-hours per mile, cost per mile, money saved vs gasoline, and reduced
CO2 emissions vs gas” (link). These trip statistics will be recorded regularly and reported quarterly.
Plan for Task #3: Public Awareness and Education.:
Deliverable 3.1: The Orange County Sheriff’s Office will provide documentation of all Public Awareness
and Education activities provided via the quarterly report template provided by the NC Clean Energy
Technology Center.
Deliverable 3.2: The Orange County Sheriff’s Office will provide NCCETC with contact information of
their communication and social media staff.
Deliverable 3.3: Copies of all press releases and promotional material used to showcase the project
to the public will accompany quarterly reports. All press releases will acknowledge support through
the "NC Clean Energy Technology Center at NC State University with federal Congestion Mitigation
Air Quality funding provided from the NC Office of Transportation."
Deliverable 3.4: Photo of project signage and/ or photo of required vehicle decals will be provided to
NCCETC.
Deliverable 3.5: The Orange County Sheriff’s Office will provide documentation of participation in NC
Smart Fleet initiative.
Orange County will promote the project through the local news media and County social media as well as
at public forums and functions as appropriate. The NC Dept. Of Transportation and the NC Clean Energy
Technology Center will be recognized as project sponsors on all public awareness materials.
The Orange County Sheriff’s Office is active on social media and has a reputation for well-vetted
innovation. The project will be communicated to their large following.
NC Smart Fleet Decals will be affixed to the motorcycle if it meets the duty requirements of the Sheriff’s
Office, and if not then the decals will be affixed to the charge points serving the vehicle. In either case,
8
North Carolina Clean Energy Technology Center
4
the Smart Fleet logo will accompany the project promotion on the Orange County Sustainability website.
Plan for Task #4 Reporting.:
Deliverable 4.1: Cost share documentation on letterhead will accompany final invoice. If more than
one invoice, each invoice will include cost share.
Deliverable 4.2: The Orange County Sheriff’s Office will submit of quarterly progress reports.
Deliverable 4.3: Copies of paid invoices for grant funded project [see Deliverable 1.1] will
accompany all requests for reimbursement.
Deliverable 4.4 The Orange County Sheriff’s Office will submit a final report summarizing project
deliverables.
Cost share documentation will accompany the single invoice we expect to produce. The Orange County
Sustainability Coordinator will work with Sheriff’s Office Staff to pull the information necessary to provide
quarterly updates. Upon completion of the project, a final report will be completed and delivered
summarizing the actions taken and their impact.
Timeline
Final invoicing to NC CETC is to be on or before: August 15, 2019
Final report due: September 30, 2020
Project Term: November 01, 2018 – September 30, 2020
1st Quarter: November 01, 2018--December 31, 2018
● Receive award notification and obtain approval to receive grant funding.
● Finalize order with Zero Motorcycles.
Quarterly reports due: January 15, 2019
2nd Quarter: January 01, 2019—March 31, 2019
● Receive vehicle.
● Train deputies in the use of the vehicle, the app, and the charging equipment.
Quarterly report due: April 15, 2019
3rd Quarter: April 01, 2019– June 30 2019
● Use vehicle on patrol and continue to optimize its use in the field.
Quarterly reports due: July 15, 2019
4th Quarter: July 01, 2019 – September 30, 2019
● Use vehicle on patrol and continue to optimize its use in the field.
● Educate public about project at annual Earth Evening event.
● Report on first 6 months of usage in news article and through other media
Quarterly report due: October 15, 2019
5th Quarter: October 01, 2019– December 31, 2019
● Use vehicle on patrol.
9
North Carolina Clean Energy Technology Center
5
Quarterly reports due: January 15, 2019
6th Quarter: January 01, 2020 – March 31, 2020
● Use vehicle on patrol.
● Consider expansion of electric vehicle fleet based on the success of this project within
FY21 budget cycle preparations.
Quarterly report due: April 15, 2020
7th Quarter: April 01, 2020– June 30, 2020
● Use vehicle on patrol.
● Educate public about project at annual Earth Evening event
Quarterly reports due: July 15, 2020
8th Quarter: July 01, 2020 – September 30, 2020
● Use vehicle on patrol and continue to optimize its use in the field.
● Report on first 12 months of usage in news article and through other media
● Prepare final report
Final report due: September 30, 2020
Budget
Expense DescriptionQuantityPer Item CostCFAT FundsCost ShareTotal
Itemized equipment ‐$
Zero 18MY DSRP NA ZF14.4 ABS WHIT 1$22,285 ‐$
‐$
Suzuki DR‐Z400S (Base for
comparison)1 6,450$ ‐$
Difference between models 1 15,835$ 12,668$ 3,167$ 15,835$
Project Total 12,668$ 3,167$ 15,835$
% of project total 80%20%
10