HomeMy WebLinkAboutAgenda - 08-23-2004-CORANGE COUNTY
BOARD OF COMMISSIONERS
WORK SESSION AGENDA ITEM ABSTRACT
Meeting Date: August 23, 2004
Action Agenda
Item No. C
SUBJECT: Outreach Report of the Comprehensive Plan's Land Use Element Update Process
DEPARTMENT: Planning & Inspections
ATTACHMENT(S):
Outreach Report of the
Comprehensive Plan's Land Use
Element Update Process (Appendix
E, Staff Responses to Township
Meeting Questions, to be
completed and forwarded under
separate cover)
PUBLIC HEARING:- (Y /N) No
A. INFORMATION CONTACT:
Craig Benedict, Director, ext. 2592
Tom Altied, Planner III, ext. 2579
TELEPHONE NUMBERS:
Hillsborough 732 -8181
Chapel Hill 968 -4501
Durham 688 -7331
Mebane 336 - 227 -2031
PURPOSE: To receive a report on the public outreach meetings that were conducted during
March and April of this year as part of the informal input process for the Comprehensive Plan
Land Use Element Update. The main purposes of the report are: (1) to provide a summary of
the outreach process; (2) to respond to questions and comments that were voiced during the
process; and (3) to convey how Staffs ideas have changed thus far as a result of public input.
BACKGROUND: During March and April of 2004, Planning Department Staff conducted a
meeting in each of the County's seven townships to receive public input on Staffs ideas for the
Land Use Element update. At the outreach meetings, Staff recorded citizens' questions and
comments and also distributed a survey to measure citizens' preferences for which "issues of
concern" are most significant in Orange County, Staff considered citizens' questions and
comments and tabulated their preferences in order to prepare this outreach summary, which will
serve as the official Staff response. The following provides an outline of the topics discussed in
the Report:
I. Introduction
a. Purpose of Outreach
b. Description of the Land Use Element
c. Citizen Participation and Outreach in Orange County
Ga'wyq hmsi,e Miming Di, GENUS 004 Pub lie Ncannps ',Up'_3'Wo,k SnesildOM=Ich 9nm131an,084196x AbstracWcm
Outreach Process
a. Advertising the Outreach Meetings
b. Outreach Meetings
c. Outreach Meeting Attendance
d. Staff Responses to Township Meeting Questions
e. Outreach Survey Results
f. Land Use Element Map Amendment Requests
III. Results /Conclusions
a. What Was Learned
b. Outreach Outcomes
c. Next Steps
The Outreach Report (attached) will also be provided on the County's website under
"Comprehensive Planning / Land Use Element Update / Township Meetings ". All individuals
who attended outreach meetings and provided a mailing address will be notified of the Report's
availability. Copies of the report are also available for public review at the Planning
Department.
FINANCIAL IMPACT: None
RECOMMENDATION(S): For informational purposes.
GCGnm pre hcnsicc I9muiine Pie'GLMi do(W I'vhlie 1 23 %\ (jr), Sussinnfluircuch Summary` *0904 Ahsinftdnc
Comprehensive Plan Land Use Element Update
art
Of
�r
Lira
Prepared for Board of County Commissioners / Planning Board Joint Work Session
Held August 23, 2004
at
Judge F. Gordon Battle Courtroom in Hillsborough
Orange County Planning and Inspections Department
5
"Vd
1
OT i
5
Table of Contents
1. Introduction
A. Purpose of Outreach
B. Description of the Land Use Element
C. Citizen Participation and Outreach in Orange County
I1. Outreach Process
A. Advertising the Outreach Meetings
B. Outreach Meetings
C. Outreach Meeting Attendance
D. Staff Responses to Township Meeting Questions
E. Outreach Survey Results
F. Land Use Element Map Amendment Requests
III. Results /Conclusions
A. What Was Learned
B. Outreach Outcomes
C. Next Steps
Appendix A - Newspaper Advertisement
Appendix B - Posted Bulletin
Appendix C - Map of Posted Bulletin Locations Advertising Township
Meetings
Appendix D - Township Meeting Issues Survey
Appendix E - Staff Responses to Township Meeting Questions (To Be
Completed)
Appendix F - Comparison of Density Regulations Before and After Outreach
Process
I. Introduction
Purpose of Outreach
This outreach summary describes the process of and results from gathering citizen
feedback to update the Land Use Element (LUE) of the Orange County Comprehensive
Plan. The Planning Department held a series of public outreach meetings to inform the
public of Staffs ideas for updating the LUE. These ideas were designed to improve air
and water quality, reduce traffic congestion and limit sprawl in Orange County. The
outreach meetings were also held to collect citizen input on the update process and
draft of the LUE by garnering citizens' perspectives on existing and future conditions in
the County. This public outreach process follows years of input from committees and
task forces.
At the outreach meetings, Staff recorded citizens' questions and comments and also
distributed a survey to measure citizens' preferences for which "issues of concern" are
most significant in Orange County. Staff also accepted requests for mapped zoning
amendments to the LUE during this process. Staff researched scenarios and analyzed
data pertaining to citizens' questions and comments and then tabulated their survey
preferences in order to prepare this outreach summary. Also included in this report is a
discussion of how public outreach has shaped staffs recommendations.
This outreach document will be presented in its entirety to the Planning Board and the
Board of County Commissioners in August of 2004. Furthermore, this report is
available for public review: (1) on the county's website http• / /www co orange.nc.us
under Comprehensive Planning / Land Use Element / Township Meetings, and (2) at
the Planning Department (306F Revere Rd., Hillsborough). Staff sent a notice to all
citizens who attended the outreach meetings thanking them for their participation and
informing them about where to review a copy of this report.
1 -A -1
I,
I. Introduction
Description of the Land Use Element
The public outreach process is an important component of the process to update the
LUE of the Orange County Comprehensive Plan. The Comprehensive Plan is a support
document that sets goals, objectives and policies that guides regulation decisions
concerning development and redevelopment throughout the County. Although there are
several elements of the Comprehensive Plan, the Land Use Element is the unifying
component that spatially links the other elements. These other elements include the
following:
• Transportation
• Housing
• Economic Development
• Open Space (includes natural resources)
• Recreation
• Services and Facilities
• Water Resources
The LUE sets policy guidelines to determine what types of use and /or development
should occur and where in Orange County each type of development is most
appropriate. To ensure an appropriate and desirable pattern of land use, Orange
County must coordinate its land use guidelines with other Comprehensive Plan
components and base them upon projections about the future state of the County. The
LUE is based on an analysis of economic and demographic forces contributing to the
existing land use pattern and forecasts future conditions. It presumes that the County
can exert some measure of control over its future character by understanding the
factors, which defined its past and present character. Analyzing social, environmental
and economic factors allows the County to make conscious decisions about what is
desirable and appropriate concerning the future management, growth and development
of Orange County.
I-B -1
I. Introduction
Citizen Participation I Outreach
Essential to this decision- making process about the future character of the County is the
participation of Orange County citizens in the land use planning process. Shaping
Orange County's Future (SOCF) was a countywide community outreach effort of seven
years that began identifying changes resulting from growth and challenges associated
with future growth. More recently, Planning Staff has conducted outreach meetings to
inform the public of its current land use ideas and to collect constructive feedback on
the LUE before formally presenting it to the Planning Board and County Commissioners.
This public outreach process is a valuable base resource of community ideas that can
also help shape the future of Orange County.
The citizen participation strategy adopted by Orange County considers the citizen
involvement experience as one that provides the opportunity for achieving a more
responsive and effective public decision- making process. It is through the open and
inclusive participation of the County residents that broad support of the Orange County
Comprehensive Land Use Element and process and its effective implementation can be
assured. The primary legal tools for implementing the LUE are the Zoning and
Subdivision Ordinances, which serve as the means to achieve desired land uses and
development patterns. Other freestanding ordinances also provide avenues for
implementation, such as the Open Burning, Erosion Control and Adequate Public
Facilities' Ordinances (APFO).
INFORMAL PROCESS
Orange County provides an informal citizen input process (as shown in Table 1) and a
formal method for offering input for the LUE. The informal public input process began
as early as 1990 with task forces and boards appointed to study land use in Orange
County. Over twenty meetings were held with appointed boards to discuss ideas prior
to outreach. The County will continue to collect informal input until a Public Hearing on
the LUE is held..
I -C -1
I
to
1. Introduction
During the informal input process, eight public township meetings were conducted
throughout the county, where Planning Staff presented its ideas and then fielded
questions and comments from citizens. Planning staff also distributed a survey at the
conclusion of each township meeting to gauge the most important development - related
issues to county residents and received requests for zoning amendments. Staff has
prepared answers to these fielded questions and tabulated results from the survey; both
of these items are presented in this outreach summary, along with a response to the
zoning amendment requests. This document concludes with an official response to the
citizen input collected during the informal outreach process.
Citizens will have an additional opportunity to provide formal input during a public
hearing with County Commissioners later this year. This opportunity for formal public
input will last until the Planning Board has made its recommendation and the LUE is
brought back to the Board of County Commissioners for consideration.
I -C -2
I. Introduction
Table 1
LUE Update Process
Activity
Informal
Formal
Timeframe
Input
Input
Boards/Task Forces /Studies
RCS, SOCF, Water
X
1990-2003
Resources, and
UNRBA Rot.
Compilation by Staff and
Data collection & analysis
X
1999 - Present
Planning Board
CPLUC
Reviewed data,
X
June '02 —
challenges, 64 tools, &
Jan. '03
selected tools for use in
OC
Planning Board (PB) Input
Staff updates /feedback at
X
1999 - Present
and Review
Develop Professional
mt s.
Assimilate info &offer
X
March '03 -
Solution
options
Present
Policy Choices
Presentation Advisory
Presentation format
X
Jan. '04
Committee
C.1..1 Outreach
Township Mtgs.
X
March —
April '04
C.1 _,2 Report Outreach
X
Aug. 23,'04
Findings to BOCC
and PB
Feedback
From citizens, BOCC, and
X
March —
PB
Dec. '04
Recompile Policy Choices
Based on feedback
X
May — Sept. '04
Final Draft
Consideration given to any
X
Aug. '04
additional PB feedback
Quarterly Public Hearing
Present final
X
Sept. - Nov. '04
recommendations
Feedback at Hearing
Citizens, BOCC & PB
X
Sept. - Nov. '04
PB Recommendation to
X
Sept. — Nov. '04
BOCC
BOCC Consideration
Approve, approve with
X
Sept. — Nov, '04
amendments, or den
I -C -3
ll. Outreach Process
Advertising the Outreach Meetings
The advertisements requested that citizens attend at least one of the seven township
meetings to listen to Staffs ideas regarding changes to the Land Use Element of the
Orange County Comprehensive Plan and to offer insight and comments to improve its
update process. The planning department used five different medias to advertise for its
seven township meetings.
1. Newspaper Advertisements (see Appendix A for a sample)
2. Posted Bulletins (see Appendix B)
3. Direct Mailings
4. E -mails
5. Public Announcements
NEWSPAPER ADVERTISEMENTS
The planning department ran advertisements for the seven township meetings in
the three local newspapers listed below in Table 2. The advertisements ran
three times in each paper, for a total of 102,000 circulated advertisements.
T ill 2
a
e
Newspaper
Circulation
Dates
News of Orange
3/10, 3/17, and 4/7/04
1"
County
7,500
(Wednesdays)
News of Orange
County
500
3/9, 3/16, and 4/6/04
2.
Northern Orange Xtras
(Tuesdays)
3.
Chapel Hill Herald
26,000
3/14, 3/22, and 4/9/04
(Sunday, Monday, Friday)
102,000 (combined through 3
Total Circulation
34,000
cycles)
11 -A -1
13
14
11. Outreach Process
DIRECT MAIL
The planning department sent two direct mailings. The initial mailing advertised
all seven township meetings and the follow -up mailing advertised the
Hillsborough Township meeting only.
1.) The initial mailing on 3/12/04 for all seven township meetings went to:
100 churches (requesting their assistance in notifying their members);
• 32 civic groups (requesting their assistance in notifying their
members);
The Board of County Commissioners;
o The Planning Board;
o The Board of Adjustment;
The Comprehensive Plan Land Use Committee (CPLUC) and citizens
added to CPLUC mailing list; and
County Boards /Committees (Advisory Board on Aging, Board of Social
Services, Housing Advisory Board, Rural Character Study,
Commission for Environment, Historic Preservation Commission,
Economic Development Commission, and Shaping Orange County's
Future).
2.) The follow -up mailing on 4/21/04 for the Hillsborough Township
meeting went to:
• The Board of County Commissioners;
• The Planning Board;
• The Comprehensive Plan Land Use Committee (CPLUC) and citizens
added to CPLUC mailing list; and
• County Boards /Committees (those identified above with Hillsborough
mailing address).
E -MAIL
The planning department sent three sets of e- mails. The first two a -mails
advertised all seven township meetings and the third e -mail advertised the
Hillsborough Township meeting only.
1.) The 3/8/04 e-mail for all seven townships went to:
• The Board of County Commissioners
• The Planning Board
• Chapel Hill, Carrboro, Durham, Mebane, and Hillsborough Planning Staffs
• Sunshine list maintained by County Clerks Office
2.) The 3/12/04 e-mail for all seven townships went to:
Department Heads (Orange Public Transportation, Dept. on Aging,
Cooperative Extension, Economic Development Commission,
Environment Resources Conservation, Environmental Health, Health
Dept., Chapel Hill Carrboro City Schools, Orange County Schools, and
Solid Waste)
ll -A -2
H. Outreach Process
3.) The 4/19/04 follow -up e-mail for the Hillsborough Township
meeting went to:
Chapel Hill, Carrboro, Durham, and Hillsborough Planning Staffs
POSTED BULLETINS
The planning department posted over thirty vivid, color bulletins advertising the
seven township meetings in public locations throughout Orange County.
Locations included convenience stores, gas stations, supermarkets, firehouses,
post offices, and government buildings (see Appendix C for a map of specific
locations).
PUBLIC ANNOUNCEMENTS
The planning department made three types of public announcements, including:
announcements at meetings, a TV announcement, and an internet
announcement.
1.) Meeting Announcements
Announcements were made at Board of Commissioners Meetings and at
a Joint Assembly of Governments Meeting,
2.) A TV Announcement
An additional scrolling announcement was provided by the People's
Network (local cable access channel) and aired during the broadcast of
the Commissioners Meeting.
3.) An Internet Announcement
A flashing announcement at the top of Orange County's Homepage
provided a link to the complete schedule of township meetings.
11 -A -3
I�D
1-7
►►. Outreach Process
Outreach Meetings
SUMMARY OF MEETINGS
The Planning Department held numerous outreach meetings to receive feedback for
updating the Land Use Element of the Orange County Comprehensive Plan. Before the
official outreach meetings began, Staff held a number of preliminary meetings beginning
in 2000 with the Planning Board and Board of County Commissioners to develop ideas
for updating the LUE. The first meeting was a Joint Orange County Boards and
Commissions meeting, held at the Southern Human Services Center in Chapel Hill on
May 14, 2003, intended to get initial feedback on Staffs ideas and to begin generating
interest and discussion.
The second meeting was a Presentation Advisory meeting held on January 21, 2004 to
receive constrictive criticism on Staffs presentation, to be delivered at each of the
subsequent township meetings. Then, the Planning Department held an open house for
Orange County Staff to view the presentation and comment on the proposed changes to
the Land Use Element.
Next, Planning Staff held a series of seven public township meetings. Each township
meeting lasted approximately two hours, and the dates and locations for these meetings
are listed below in Table 3. Since completion of the township meetings, Staff made one
additional formal presentation on May 26, 2004 at the Holiday Inn Express in
Hillsborough for the County's Chambers of Commerce and area Civic Groups.
Additional informal presentations have been delivered to the Triangle J Council of
Governments Smart Growth Committee, the Orange County Board of Health, and New
Hope Creek Corridor Advisory Committee.
Table 3
Township Meetings
County Comprehensive Plan Land Use Element and Zoning
—All Meetings to be held from 7:00 — 9:00 p.m. -- --
Township
Date
Meeting Location
Chapel Hill
March 23 2004
Southern Human Serv. Ctr., 2501 Homestead Rd.
Little River
March 30 2004
Caldwell Community Center, 7607 NC 157
Bingham
Aril 12, 2004
Orange Grove Comm. Bldg., 6800 Oran a Gr. Rd.
Cheeks
Aril 15, 2004
Efland- Cheeks Comm. Ctr., 117 Richmond Rd.
Eno
Aril 19, 2004
Pleasant Green Comm. Ctr., 3030 Comm. Ctr. Rd.
Cedar Grove
Aril 22, 2004
Northern Human Services Center, 5800 NC 86 N.
Hillsborou h
Aril 28, 2004
F. Gordon Battle Courtroom, 106. E. Margaret Ln.
fl-B-1
TALI
It. Outreach Process
TOWNSHIP MEETINGS
The seven township meetings were conducted in locations within each township
commonly used for community functions. Light refreshments were provided. Each
township meeting began with a registration period when citizens signed the attendance
sheet and had an opportunity to talk with staff while viewing posters and maps, provided
at five stations around the room.
DISP J� ^ ^�
Each station represented a key topic for the LUE and are as follows:
• Process and Citizen Participation
• Farm Economy
• Rural Character
Population
• Environment
STAFF PRESENTATIONS
The staff presentations (available on the Orange County website under Comprehensive
Planning /Land Use Element Update/Township Meetings) had three components: (1)
Defining the Comprehensive Plan Land Use Element; (2) Why Orange County is
updating the Comprehensive Plan Land Use Element; and (3) Ideas for updating the
Comprehensive Plan Land Use Element.
QUESTIONS AND COMMENTS
Following the presentation, Staff entertained citizens' questions and comments. Staff
provided answers to questions when appropriate, and recorded all questions for
additional research, In addition, Staff collected citizens' questions, written on notecards,
which were provided at each station in the room. Both questions requiring additional
research and notecard questions are compiled in this report, in addition to questions
that reoccurred at multiple township meetings. All of these questions have been
researched and will be presented at the August 23, 2004 joint work session of the
Planning Board and County Commissioners. After the question and comment session,
Staff discussed Next Steps for the County, while still accepting citizen input.
ONE -ON -ONE DIALOGUE AND SURVEY
At the conclusion of Staffs presentation, citizens were provided more time to review the
material on display and to interact with Staff to further discuss points of interest. Before
leaving, citizens were encouraged to complete a survey regarding issues of greatest
concern within the County. The results from this survey are also reported in this
document.
11 -B -2
ti
IL Outreach Process
Outreach Meeting Attendance
The Planning Department would like to thank all of those who attended the outreach
meetings, which were designed to gather public input for updating the Land Use
Element of Orange County's Comprehensive Plan. Staff is pleased with the overall
attendance at the seven township meetings. Having a good citizen turnout at the
outreach meetings ensures that a significant sample of the county population is
represented and allows staff to capture a diverse set of opinions and suggestions. A
summary of the township meeting attendance is presented below in Table 4:
T�LI A
1 aule Y
Township
Meeting
Citizens
BOCC/Planning
Total -
County Staff
Total with
Date
Board
Excluding
Staff
Chapel Hill
3/23/2004
10
5
15
7
22
Little River
3/30/2004
16
3
19
8
27
Bingham
4/12/2004
18
2
20
5
25
Cheeks
4/15/2004
14
6
20
7
27
Eno
4/19/2004
16
2
18
7
25
Cedar Grove
4/22/2004
27
6
33
10
43
Hillsborough
4/28/2004
30
8
38
10
48
Totall
131
32
163
54
217
Average
19
5
23
8
31
People who did not sign the attendance sheet at the township meetings are not
reflected in these numbers.
On average, 31 people attended each township meeting. Of these 31, about 19 were
general citizens, 5 were County Commissioners (BOCC) or Planning Board members
and 8 were Planning Department Staff members. The County Commissioners'
Chairman attended every meeting. A total of 163 citizens and board members attended
the township meetings to offer their input. Since these meetings, Staff has continued to
discuss ideas with some participants.
An additional 20 people (excluding staff) attended the Joint Boards and Commissions
meeting on May 14, 2004 and 12 people (excluding staff) attended the ,Joint Chambers
of Commerce and Civic Groups meeting on May 26, 2004.
11 -C -1
It. Outreach Process
Meeting attendance climbed gradually from the first township meetings to the latter ones
(see Figure 1). Attendance at the final Hillsborough township meeting more than
doubled that of the first township meeting in Chapel Hill.
Figure 1
II -C -2
2.0
V
11. Outreach Process
Staff Responses to Township Meeting Questions
Following the presentation at each of the township outreach meetings, Staff entertained
citizens' questions and comments. Staff provided answers to questions when
appropriate, and recorded all questions for additional research. In addition, Staff
collected citizens' questions, written on notecards, which were provided at information
stations around the room. Staff prepared detailed responses (see Appendix E), with
the most recent data available, to address both questions requiring additional research
and notecard questions, in addition to questions that reoccurred at multiple township
meetings. Staff has categorized the questions into the following seven topic headings:
1. Existing Conditions and Population Projections
2. Growth Management — Sustainability
3. Development Standards — How Sustainable Growth is Designed
4. Environmental Constraints
5. Cost of Public Services
6. Affordable Housing
7. Economic Development
11 -D -1
*Abbreviations: Bigm = Bingham; CG = Cedar Grove; CH = Chapel Hill; Cks = Cheeks; LR = Little River;
Hills = Hillsborough
ZZ
IL Outreach Process
Following are the questions listed by topic headings. After each question, a township
abbreviation is provided indicating the township at which the question was posed and
frequency. Staffs responses can be found in Appendix E, under the same topic
headings shown here.
1)
a) Population
i) In general terms, explain the different population forecasts that are available
for Orange County and their varying results. (CG, Cks)
b) Build -out
I) When is build -out anticipated for Chapel Hill and Carrboro and what effects
could this have on Orange County? (Bigm, Hills)
c) Determining Acreage
I) How is undeveloped acreage determined by the county's Geographic
Information Systems (GIS)? (Cks)
2) Growth Management -- Sustainability
a) Density /Minimum Lot Size
i) What is the difference between density and minimum lot size? (LR)
ii) Do lower densities and larger lots encourage sprawl? (CG, Eno, LR)
iii) Would the density and minimum lot size recommendations apply if public
water and sewer were provided? (Cks)
iv) In siting a mobile home, are the same density and minimum lot size standards
required as those for a stick/site built home? (Cks)
v) Density
(1) How many years of data are used in the calculations that determine
"Historic Density? (Cks)
(2) If Historic, Density is low, why is Staff recommending reduced densities?
(LR, Hills)
(3) What technical tools have been considered to reduce density? (Hills)
(4) Why is Staff providing varying density recommendations for different areas
of the county? (Hills)
(5) Will all lots be subject to the proposed reduced density requirements even
if soils present on a particular tract are better than average for a septic
system? (Eno)
(6) What impacts will reducing density have on our neighboring counties?
(LR)
(7) What is the desired density within the county's Transition Areas and what
is the capacity to accommodate new development in these areas? (Eno)
(8) How do the recommendations increase density near urban areas? (Eno)
(9) What impacts may a reduction in density have on the mobile home
industry? (Cks, Eno)
II -D -2
'Abbreviations: Bigm = Bingham; CG = Cedar Grove; CH = Chapel Hill; Cks = Cheeks; LR = Little River;
Hills = Hillsborough
Z3
IL Outreach Process
vi) Minimum Lot Size
(1) Does the methodology used in the Water Resources Report, which
supports a countywide 2 -ac minimum lot size average, take groundwater
recharge from septic fields into consideration? (Hills)
(2) Will larger lots decrease land value? How will this affect property- owners
who depend on the equity in their land? (CG)
(3) Will existing lots less than 2 acres in size become "non- conforming" if
Staffs recommendations are adopted? (CG)
(4) What is the difference between a lot and a farm? (LR)
b) TDRs
i) When will a Transfer of Development Rights (TDR) program be available in
Orange County? (Cks, Eno)
ii) Where in the county could a receiving area for Transfer of Development
Rights (TDR) be applied? (CH)
c) Zoning
i) Has Staff considered creating any agriculturally exclusive zoning districts?
(CH)
ii) Has Staff considered creating a zoning district that would allow agricultural
subdivisions or "farmettes'? (CH)
d) Transit
i) What are the plans for public commuter rail through Orange County? (Hills)
ii) Are there plans for public transportation in the Efland- Cheeks area? (Cks)
3) Development atanuarus - nvw 0uZ)LaJJJ0uJV ���•y••�
a) Subdivision Type and Design
i) Conventional
(1) Is Staff proposing that the county do away with the conventional
development option? (CH)
ii) Dev. Nodes
(1) What is a "Rural Activity Node" and what are the recommended uses
within them? (Bigm)
(2) What is the process and what are the requirements to create a new or
expand an existing Commercial Node? (Eno)
iii) Multifamily
(1) Where in the county can multi- family development be accommodated?
(Eno)
iv) Major, Minor, & Exempt
(1) Will the definitions of Minor and Major Subdivisions and their respective
approval processes remain the same? (Eno)
(2) Is the minor subdivision process the same for those who are subdividing
for relatives and those subdividing for profit? (Bigm, Cks, Eno)
(3) Is there any way to expedite the minor subdivision approval process?
(Bigm, Cks)
(4) Will the proposed recommendations encourage exempt, 10 -acre lot,
subdivisions? (CH)
11 -D -3
*Abbreviations: Bigm = Bingham; CG = Cedar Grove; CH = Chapel Hill; Cks = Cheeks; LR = Little River;
Hills = Hillsborough
24
IL Outreach Process
v) Homeowners Associations
(1) Will every subdivision be required to have a homeowners association?
(Eno)
b) Open Space
I) Explanation
(1) What are the changes that are being recommended relevant to the
provision of open space within subdivisions? (Eno)
(2) What is the difference between Primary and Secondary open space?
(Eno)
(3) How is open space taxed? (Cks, LR)
ii) In -lot v. Shared
(1) What are the pros and cons of in -lot versus shared open -space in
subdivisions? (Cks)
(2) How are in -lot open space requirements enforced? (CH, Cks)
(3) What can shared open space areas be used for within subdivisions? (Cks,
Eno)
iii) Used for Agriculture
(1) Is it possible to use shared open space for agricultural purposes? (CH,
LR)
(2) If open space can be leased for farming, how does it affect the residents
of the subdivision and farmland? (LR)
(3) How do you get the residents that are leasing the farmland to agree on
what is leased? (Cks, LR)
(4) How is the leased area that is being used for agricultural purposes taxed?
(Cks, LR)
4) Environmental Constraints
a) Air quality
I) How will the land use recommendations reduce Vehicle Miles Traveled (VMT)
and what effect will this have on Orange County air quality? (Hills, LR)
b) Septic
i) What is the failure rate of septic systems in the county? Is there data
available specifically for 40,000 square foot lots? (Eno)
c) Water
i) What is the capacity of the existing water reservoirs in the county? (Hills)
d) Wastewater
i) In flexible or cluster developments, are community well and septic systems
better than individual private systems? (Bigm)
ii) Several years ago, there was a wastewater sludge disposal issue in the
Bingham Township, Is this issue still a concern? If so, what are the plans for
addressing it? (Bigm)
5) Cost of Public Services
a) Will the proposed land use changes
would this raise taxes? (Hills)
increase the cost of public services? If so,
H -D -4
'Abbreviations: Bigm = Bingham; CG = Cedar Grove; CH = Chapel Hill; Cks = Cheeks; LR = Little River;
Hills = Hillsborough
25
IL Outreach Process
b) At what point, in assessed value, does a single family residential home provide
enough tax income to equal what it costs the county to provide services? (Hills)
6) Affordable Housing
a) What is the definition of affordable housing in Orange County? (Eno)
b) What impacts will the density and minimum lot size recommendations have on
affordable housing? (Bigm, CG, CH, Cks, Hills)
c) Are there any financing implications /barriers that may result from having small,
affordable homes on fairly large lots? (Cks)
7) Economic Development
a) What is being done to bring jobs to Orange County? (CG, Cks)
b) What types of industry/manufacturing are encouraged in Orange County? (CG)
c) What is the county proposing that will encourage the farm economy? (CH)
d) Why is there a large emphasis on agriculture when it is such a small part of the
county's economic base? (Eno)
e) What is Orange County doing to address the "wireless revolution" and the siting
of telecommunications towers? (Bigm)
II -D -5
'Abbreviations: Bigm = Bingham; CG = Cedar Grove; CH = Chapel Hill; Cks = Cheeks; LR = Little River;
Hills = Hillsborough
II. Outreach Process
Outreach Survey Results
Planning staff distributed surveys (see Appendix D) to citizens at the conclusion
of each township meeting as an additional means of determining the planning
issues of importance in Orange County. Although most citizens voiced their
opinions during the open discussion portion of the outreach meetings or while
talking with planning staff members after the meetings; some citizens elected to
express their opinion by filling out the "issues" survey. Thirty -nine citizens
responded to the survey, but an uneven number from each township responded.
Hillsborough and Little River township meetings had the most respondents.
Due to the relatively small sample size and a few surveys that were not properly
completed, Staff can only make general inferences from the survey data.
Therefore, staff has not provided actual statistics from the survey tabulation in
this summary.
Growth and Development
The survey found that respondents overwhelmingly feel that growth and
development are major issues of concern in their townships.
Issues of Importance
In addition to concern about growth and development in Orange County, the
survey asked about the degree of importance for issues under the following three
categories:
1.) Environment/Conservation
• Air pollution
• Natural resource protection
• Open space /wildlife corridor establishment
• Stormwater management
• Watershed protection
2.) Economic Prosperity
• Business development / employment opportunities
• Efficient public services
• Promotion of farming opportunities
• Maintaining property values
• Manageable tax rates
3.) Community Character / Equity
• Equitable distribution of new facilities
• Greater regional coordination
• Historic preservation
• Maintaining rural character
• A livable built community
11 -E -1
Z'1
M
II. Outreach Process
Of these fifteen issues, respondents found the following five (in no particular
order) to be the most important:
1. Manageable tax rates
2. A livable built community
3. Air pollution
4. Business development / employment opportunities
5. Maintaining rural character
Of the fifteen issues, respondents found the following six (in no particular order)
to be somewhat important:
1. Natural resource protection
2. Watershed protection
3. Efficient public services
4. Promotion of farming opportunities
5. Maintaining property values
6. Greater regional coordination
Of the fifteen issues, respondents found the following four (in no particular order)
to be the least important:
1. Equitable distribution of new facilities
2. Stormwater management
3. Open space /wildlife corridor establishment
4. Historic preservation
Citizen Reactions to Staff's Proposal
After attending the outreach meetings, most respondents either remained
undecided or agreed that the ideas described during the presentations and at the
stations (posters) around the room would be beneficial to Orange County. In
other words, some respondents understood the implications of Staffs proposal
and were satisfied, while others were still unclear about the effects that Staffs
proposal would have on the County, Few respondents were completely
unsatisfied with Staff's proposal.
How Citizens Found Out About Outreach Meetinns
The most common way that respondents heard about the outreach meetings was
via a direct mailing or e-mail. Some respondents heard about the meetings by
word -of -mouth from a neighbor or friend and others saw a posted bulletin at a
convenience store or other prominent public location. Few respondents attended
the meetings on account of a newspaper advertisement.
11 -E -2
Z`i
IL Outreach Process
Land Use Element Map Amendment Requests
During the informal citizen input process, which will continue until a Public
Hearing on the Land Use Element (LUE) update is held, Staff received three
separate requests for LUE Map amendments, These requests were made as a
necessary step prior to applying for re- zonings. Staff informed those who made
the requests that Staff would provide a response to their request as part of this
report. The response would indicate that their amendment request had either
been incorporated into Staffs recommendations for the LUE update or excluded
and why. The following provides a brief summary of these requests:
1. Change from 10-Year Transition Area to a classification that would allow
for commercial development at the northwest corner of the E. Washington
Street/Buckhorn Road intersection;
2. Change from Agricultural Residential to a classification that would allow
for commercial development at the northwest quadrant of the New Sharon
Church Road /St. Mary's Road intersection; and
3. Change from Agricultural Residential to a classification that would allow
for commercial development at the southern corner of the NC 57 /Mile
Branch Road intersection.
The Planning Department will draft a staff response to each of the informal
requests summarized above after completion of the following small -area planning
efforts: Orange County/Town of Hillsborough Urban Transition Area Task Force
and the update to the 1991 Efland Area Study. These small -area planning efforts
are particularly germane to request numbers 1 and 2 above. If Staff finds that
there is sufficient information available to respond to these requests before these
small -area planning efforts are complete, earlier responses may be provided.
11 -F- 1
M
11L ResultslConclusions
What Was Learned
Through listening, documenting, and responding to the questions and comments voiced
by citizens during the outreach meetings, Planning Staff are able to identify prominent
issues and concerns.
The most frequently asked question or concern was the effects of lowering density and
increasing minimum lot size on housing costs. Staff has recognized a paradox that
surrounds the issue of housing affordability. Many of Orange County's citizens desire
their own property value to increase while maintaining housing affordability on a
countywide basis for relatives and others. The concern over affordable housing is not
new in Orange County. In fact, "adequate, reasonably priced, safe housing in an
appropriate variety of types in proximity to jobs and daily activities for all citizens' was a
Goal included in the 1981 Orange County Land Use Plan and continues to remain an
important goal.
Although not nearly as prominent as affordable housing, questions and concerns over
the existing Minor Subdivision approval process and effects of lowering density on
sprawl were voiced. Regarding the Minor Subdivision process, the comments involved
the length of time required to obtain approval and the feeling that it was too long and
onerous; and in regard to sprawl, the question was whether a decrease in density would
encourage sprawl to take place.
Following is a list of some additional general topic areas of discussion and questions
posed during outreach meetings:
• Economic development and demand for additional jobs
• Open space requirements and uses of open space
• Sprawl
• North Carolina's exemption of lots 10 acres and larger from subdivision
regulations
• Transfer of Development Rights (TDR) and possible receiving areas for density
A complete list of relevant questions and comments, including those discussed above,
raised during outreach is provided in Appendix E. Planning Staffs responses to these
questions have also been provided.
111 -A- 1
32
33
111. ResultslConclusions
Outreach Outcomes
The following provides a summary of changes to Staffs recommendations or new
initiatives that have resulted from comments and/or questions received during public
outreach:
1. Review of Minor Subdivision process for possible amendment(s);
2. Review of Flexible Development Standards for possible amendment(s);
1 Change in Staffs recommendations for Targeted Densities;
4. Research ways to lessen impacts of Targeted Densities on affordable housing;
5. Creation of Orange County/Town of Hillsborough Urban Transition Area Task
Force and update of 1991 Efland Area Study
Further description of items included in the above numbered list are as follows.
1 Review of Minor Subdivision process for possible amendments)_— Following the
Land Use Element Update and associated zoning amendments, Orange County will be
pursuing the development of an Unified Development Ordinance (UDO), The main
purpose of the LIDO will be to create a user - friendlier document by combining all of the
County's land use related ordinances under one cover and eliminating inconsistencies.
During the development of the UDO, the Minor Subdivision process can be reviewed to
identify ways to streamline the process. Several citizens expressed their dissatisfaction
with the existing process during outreach meetings.
2 Review of Flexible Development Standards for possible amendments) —The
Planning Board, together with Staff, will be assessing the effectiveness of the County's
Flexible Development Standards at achieving their purpose which is "to preserve
agricultural and forestry lands, natural and cultural features, and rural community
character that might be lost through conventional development approaches." Should
this assessment result in the identification of incentives that could improve the Flexible
Development Standards and their effectiveness, required amendments could be
addressed during the development of the LIDO.
3 Change in Staffs recommendations for Targeted Densities — As a result of questions
and comments received during outreach, Planning Staff have made changes to their
recommendations for Targeted Densities. In summary, the changes to Staffs Targeted
Densities reflect a less aggressive density reduction than those presented prior to and
during outreach meetings, The changes to Staffs density recommendations were in
response primarily to the following two issues: 1) housing affordability; and 2) lot size
required to enable a property owner to subdivide for a member of their family.
Appendix F provides a table summarizing Staffs recommendations for Targeted
Densities before and after outreach.
4 Research ways to lessen impacts of Targeted Densities on affordable housing —
Although Planning Staff believes that the impacts of Targeted Densities and a larger
minimum lot size on affordable housing in Orange County will be minimal (See
W -B- 1
34
►►►. ResultslConclusions
Appendix E for Staffs response), it was such a widespread concern during public
outreach that additional consideration is necessary. Planning Staff will be meeting with
affordable housing developers like Habitat for Humanity, EmPOWERment Inc., and
Orange Community Housing and Land Trust to discuss affordable housing and
measures that can be taken to offset any negative impacts on affordable housing that
may result from the implementation of Targeted Densities and a larger minimum lot
size. The additions of exemptions or density bonuses for subdivisions that include
affordable housing are two possible mitigating actions for consideration.
5 Creation of Orange County/Town of Hillsborough Urban Transition Area (UTA) Task
Force and U date of 1991 Efland Area Stud — A sentiment expressed often during
outreach was the need to provide some locations for higher density residential
development if density were to be lowered in the majority of the County. Staff agrees
that if the proposed Targeted Densities are adopted there should be areas identified in
the County were higher densities can be accommodated and permitted through the
rezoning process. Planning Staff have identified the fringe areas of Hillsborough and
Mebane /Efland as possible areas for higher residential density within the County's area
of jurisdiction. However, additional study of these areas is necessary to further
determine their potential for development. Therefore, the County has started working
on the following two initiatives: 1) Orange County/Town of Hillsborough Urban
Transition Area (UTA) Task Force; and 2) Update of 1991 Efland Area Study.
In June 2004, Orange County and the Town of Hillsborough appointed members,
representing their respective governments, to serve on the Orange County/Town of
Hillsborough UTA Task Force. The Task Force will be meeting in August and
September to complete their work and make recommendations for inclusion into the
Comprehensive Plan, Land Use Element Update to be completed later in the year.
In July 2004, a group of citizens, some of whom were involved in the original 1991
Efland Area Study, were asked to serve on an informal committee to work with Staff to
review and update the Study. This Committee will work within the same schedule as
the UTA Task Force, August — September, so that recommendations from this update
can also be included in the Land Use Element Update.
Ill -B- 2
35
Ill. ResultslConclusions
Next Steps
The following table provides a summary of next steps to be taken toward adoption of the
Land Use Element Update and associated zoning amendments.
Tahia 1
w
LUE Update Process
Activit
Timeframe
1.
BOCC informational
Present outreach report
Aug. 23, '04
Meeting with PB
2.
Meeting with affordable
Discuss ways to minimize
Aug '04
housing builders in Orange
impacts of zoning
County
amendments
3.
Orange County/Town of
Study development
Aug. — Sept. '04
Hillsborough Urban
potential of Transition
Transition Area Task Force
Areas
4.
1991 Efland Area Study
Update text to reflect any
Aug. — Sept. '04
Update
changes in conditions
5.
Draft zoning amendments
Consideration given to any
Sept. '04
additional PB feedback
67
Draft Land Use Element
Consideration given to any
Sept. — Oct. '04
LUE Text
additional PB feedback
7.
Quarterly Public Hearing
Present Draft LUE Update
Nov. '04
and zoning amendments
8.
Feedback at Hearin
Citizens, BOCC & PB
Nov. '04
9.
PB Recommendation to
For or against
Dec. '04
10.
BOCC
BOCC Consideration
Approve, approve with
Dec. '04. —Jan. '05
amendments, or den
111 -C -1
36
Appendix A — Newspaper Advertisement
ORANGE COUNTY COMPREHENSIVE PLAN LAND USE ELEMENT
AND ZONING UPDATE PROCESS
TOWNSHIP MEETINGS FOR IDEAS AND FEEDBACK
Who: Orange County Planning and Inspections Department.
What: Orange County is in the process of
updating the Land Use Element
of its Comprehensive Plan originally adopted in 1981.
portion
When:
Township Date/Time
Meeting Location
All meetings,
7:00 — 9:00 pm
Chapel Hill March 23, 2004
Southern Human Services Center
2501 Homestead Rd.
Little River March 30, 2004
Caldwell Community Center
7607 NC 157
Bingham April 12, 2004
Orange Grove Community Bldg.
6800 Orange Grove Rd.
Cheeks April 15, 2004
Efland- Cheeks Community Center
117 Richmond Rd.
Eno April 19, 2004
Pleasant Green Community Center
3030 Community Center Rd.
Cedar Grove April 22, 2004
Northern Human Services Center
5800 NC 86
Hillsborough April 28, 2004
F. Gordon Battle Courtroom
106 E. Margaret Ln.
Why: The update process is required by County ordinance. Orange County
and its citizens can create an update that addresses the many challenges
that impact quality of life now and in the future.
Theme: Studying growth trends and projections and identifying challenges. The
Land Use Element guides development patterns and affects what a
landowner can do with their property.
3-1
Land use discussion topics include:
• Water Quality
• Air Quality
• Traffic Congestion
• Urban Sprawl
• Population Density
Appendix A — Newspaper Advertisement
• Protection of Farmland
• Preservation of Open Space
• Rural Character
• Environmental Preservation
• Community Building
You are invited to come ask questions, offer your insight, hear ideas
for zoning, and provide your verbal and /or written comments at the
Comprehensive Plan Land Use Element Township Meetings.
This is a great opportunity to meet with Planning Staff on an informal basis. Similar to
an Open House format, various maps and data prepared for the Land Use Element
Update will be on display for your review and comment. County Planning Staff will also
conduct a brief presentation that will include, among other items, Staffs
recommendations for Zoning. Light refreshments will be provided.
There will be additional, more formal, public hearing opportunities during this Land Use
Element Update and Zoning Ordinance amendment process, to review and comment on
strategies that are designed to address the challenges in the County.
For directions or other questions, contact Tom Altieri, AICP, Comprehensive Planning
Supervisor, Planning and Inspections Department, at 245 -2579.
COMPLIANCE WITH THE "AMERICANS WITH DISABILITIES ACT" - interpreter
services and /or special sound equipment are available with prior notice. If you need this
assistance, call the County Clerk's office at 732 -8181, ext. 2130. If you are disabled and
need assistance, contact the ADA Coordinator at extension 2300 or TDD# 644 - 3045..
iT
r ,.:
County Comprehensive Plan
11. �%<
\rr
Of
�+�
(v 1 C Ql
Appendix B — Posted Bulletin
Land Use Element and Zoning
31
You are invited to come ask questions,
offer your insight, hear ideas for
zoning, and provide your verbal and /or
written comments. Staff will conduct a
brief, 30- minute presentation. The
remainder of the meeting will be
informal and structured to receive your
input and ideas.
Llcrht / -el6resh inents [till/ he j,-to vi 'ed.
All Meetings Conducted 7:00 -9:00 p.m.
For directions or other questions, contact Tom Altieri, AICP, Comprehensive Planning
Supervisor, Planning and Inspections Department, at 245 -2579.
Appendix C — Map of Posted Bulletin Locations Advertising Township Meetings 4t
Land Use Element Update Township Meeting Notification
GIS Map Prepared by Miriam Coleman, orange County Planning Department, 5118101
ns
nd
or, Location
1,US Pod Otloo
2, N-inem Hoorn SeMm Certer
3,Cerbot Con -only Slart
4. HohdYMdV5
5. Fenn a Gorden
6. Mi. Mr. ado
i. LIN.W Sloe
a, The FWd Mad
S. Telaw COmeN -ce Stoe
10, S.'e Food Mod
i t, E. 0onvehenee Slone
12. EOOM Superd.,kel end Herd-le
13.P1 -Wng11 igrduou eCerter,
PlmNrq 61vP <.ibm D <paM1m<nl
Luepua H.Alen
F. mm<obMO
l
So, Las<nae-
14, Econmd De Ietrdo tCommlclon
15. Goo .e Sore. Cooler
Tv DmP<
UN R—ld,
Flere Deol d 46L
ib. M, Mel. Ce-voHe ev Slone
17, Tcmm SIMloo Cer"hee —Store
18,A Ouk Slop
19. ADC Sloe
20,necy�ly Corder
21, Trod der Moudeln (2)
22.0 -ngc Omve Fbe Slm`m
23. Moge Ve Feon Iw Co.
24, Locdled'e Trvdog Peet and 011
25. E.h Mel.
2a, PloodnW. Feed a SUPP7'
2T.6P Mo .
20. E.n Mod.
29, Me Sell.
30,OCSddWede Cerdo
4�
43
Appendix D — Township Meeting Issues Survey
TOWNSHIP MEETING
ISSUES SURVEY
Directions: Please complete this survey after the presentation.
1.) To what extent do you feel growth and development are issues of
concern in your township (please circle one)?
Not an issue Minor issue Major issue
1 2 3 4 5
2) Do you feel that growth and development are issues of concern in
your township (please circle one)?
Not an issue Minor issue Major issue
1 2 3 4 5
3) Please rank the five (5) "environment /conservation" issues from the
following list (with "1" being the most important):
Air pollution reduction
Natural resources protection
open space /wildlife corridor establishment
Stormwater management
Watershed protection
4) Please rank the five (5) "economic prosperity" issues from the
following list (with "1" being the most important):
Business development /employment opportunities
Efficiency of public services
Promotion of farming opportunities
Maintaining property values
[. \CnmPr-ehensive Plenning uiv�TAl'icr i'..I::nd aye element \Outreech D'3 p; \(hrt�'ench P,cker \A.ppendice5\AppendiKD do:
W
Appendix D — Township Meeting Issues Survey
Manageable tax rates
5) Please rank the five (5) "community character /equity" issues from
the following list (with "1" being the most important):
Equitable distribution of new facilities (shopping, employment, etc.)
Greater regional coordination
Historic preservation
Maintaining rural character
Liveable built community
6) In general, to what extent do you believe the ideas described in the
presentation and at the stations around the room can be beneficial to
Orange County (please check one)?
Strongly
Agree
Undecided
Disagree
Strongly
Agree
Somewhat
Somewhat
Disagree
❑
❑
❑
❑
❑
7) How did
you hear of the meeting tonight
(please check one)?
Newspaper
Direct
Posted
Neighbor
Other
Mailing
Bulletin
Friend
❑
❑
❑
❑
❑
Please drop off this survey with a staff member before you leave.
Thank You!
"emurenersi•e clanninn N'\ r?ITMr`bnd Urse ^lement�,Ouir=ach 03 05',pu':rrnch P�ckt \Appendices \Anpendi;:G do-
Appendix E — Staff Responses to Township Meeting Questions
This section to be completed and mailed to County Commissioners and
Planning Board in advance of Joint Work Session on Monday, August
23rd
4s
m
Appendix F — Comparison of Density Regulations Before and After Outreach Process
47
A B C D E
Option 1 No Option 3 Option 3.1
Change Proposal Proposal
Abbrev. Watershed Existing before after
Density Outreach Outreach
2
h( (1
rfyco vFeetc - VI:1 V1 Y uuvul
_ . ,
3
shcp
South Hyco Creek - Protected
1 du / 0.92ac
1du / 5ac
1 du / 5ac*
4
frp
Flat River Protected
11 du / 0 92ac
1du / 5ac
1du / 5ac*
5
nbcp
North. Back Creek Protected
1
du 104C,
'1 5ac*
1 du / 3ac
s
sbc
South Back Creek - Protected
1 du / 0.92ac
1 du / 3ac*
1du / 3ac*
7
nlrp
North Little River - Protected
1du / 2ac
1du / 5ac
1du / 5ac*
s
slrp
South_L�ttle i�1vel Protected, _ ,
1
du / 2ac,___ _
1 du / 3ac* __ _
g
uec
Upper Eno - Critical
1du / 2ac
1du / 5ac*
1du / 5ac*
10
ue n
Upper Eno - Protected - North
1du / 0.92ac
1du / 5ac*
1du / 5ac*
11
ue m
Up er Eno - Protected - Middle
1du / 0.92ac
1du / 5ac*
1 du / 5ac*
12
ue s
Upper Eno - Protected - South
1du / 0.92ac
1du / 5ac*
1du / 5ac*
13
uet of
Upper Eno -Transition Efland
1 du / 0.92ac
No Chan e
No Change
14
nhc me
North Haw Creek - Mebane, part),
1 du / 0.92ac
No Change._
No Change
15
shcu
South Haw Creek Unprotected „
1du / 0.92ac
1du / 3ac*
1du / 3ac*
16
lepa '.
� Lower Eno Protected a (lepa) y
1du / 0.92ac
- 2 du /lac
No Change
17
lepb
;Lower Eno Protected ti` (lepbj ::
1du / 0 92ac f+
1du / 2ac
1du/ 3ac*
1s
lepe
Lower Eno
Protectedey(lepe)
1du10.92ac 6
1du1.2ac
1du /3ac *i
.___..
Lower Eno -Protected d led
ldu / 0.92ac
1du/3ac*
1du / 3ac*
19
lepd
20
lepe
Lower
Eno Protected
21
leua
Lower Eno - Un ro Hills ei a
N/A
N/A
N/A
22
leub
Lower Eno Unpro (Hills et1) b _
N/A
N/A
N/A
23
leuc
Lower Eno Unpro (Hills rem) c
1du / 0 92ac
1du / 2ac
1du / lac*
24
feud
Lower Eno- Unpro (Hills rem) d
ldu/0.92ac
1du / 3ac
1du / 3ac*
25
cec
Cane Creek - Critical
1 du / 5ac*
No Change
No Change.
* First 5 lots of a subdivision at 2 ac. minimum. Bold indicates a change to this in option s. i
Light Grey: Indicates higher density in Option 3,1
Dark Grey: Indicates lower density in Option 3.1
4/21/04
Appendix F — Comparison of Density Regulations Before and After Outreach Process
* First 5 lots of a subdivision at 2 ac. minimum. Bold indicates a change to this in Option 3.1.
Light Grey: Indicates higher density in Option 3.1
Dark Grey: Indicates lower density in Option 3.1
4/21/04
M
A
g
C
D
E
26
Abbrev.
Watershed
Option 1 No
Change Existing
Density
Option 3
27
CCP
Cane Creek - Protected
1du / 5ac*
No Change
No Change
26
shrp
South Haw River •- Protected
1du / 0.92ac
1du / 5ac
1du / 5ac*
29
nhru
North Haw River- Unprotected
1du / 0.92ac
1du / 5ac
1du / 5ac*
30
ulc
University Lake - Critical
1du / 5ac*
No Chan e
No Chan e
31
UIP
Universit Lake - Protected
1du / 5ac*
No Change
No Change
32
ilp
Jordan Lake •- Protected
1du / 2ac*
1du / 3ac*
1du / 3ac*
33
nrbu
North Rural Buffer - Unprotected
1du / 2ac
1du / 3ac*
1du / 3ac*
34
cfu
Cape Fear - Unprotected (Chapel
Hill & Carrboro )
I N/A
I N/A
I N/A
* First 5 lots of a subdivision at 2 ac. minimum. Bold indicates a change to this in Option 3.1.
Light Grey: Indicates higher density in Option 3.1
Dark Grey: Indicates lower density in Option 3.1
4/21/04
M