ACTION AGENDA ITEM ABSTRACT
Meeting Date: August 17, 2004
Action Agenda
Item No. R-
SUBJECT: Contract Approval: Southern Orange Senior Center Architect
DEPARTMENT: Purchasing and Central PUBLIC HEARING: (YIN) No
Services
ATTACHMENT(S): INFORMATION CONTACT:
Pam Jones, (919) 245-2652
Cost Proposal
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To consider accepting the recommendation of the Southern Orange Senior Center
Architect Selection Panel; and approving a contract with Gurlitz Architects, Durham, North
Carolina.
BACKGROUND: Proposals were received from nine (9) firms interested in providing design
services for the Southern Orange Senior Center to be constructed on the County's Homestead
Road Campus, The Architect Selection Panel met on Monday August 2 to review the proposals
and prepare a list of firms that were candidates for interview, The Architect Selection Panel
included: Ann Johnson, Peachy Wicker, Nate Davis, Don Willhoit, representing the Southern
Orange Senior Center Planning Committee, as well as, Commissioners Halkiotis and Gordon
and County staff, John Link, Gwen Harvey, Paul Thames, Jerry Passmore, Janice Tyler and
Pam Janes.
The Panel opted to interview DTW Architects and Gurlitz Architects from Durham and two
Raleigh firms, Jill B, Smith Architect and Innovative Design. While each of the firms was well
qualified to design the proposed senior center, Gurlitz Architects received the Panel's
recommendation.
Gurlitz Architects has designed several projects related in scope and flmction to the County's
project, including, but not limited to: Carolina Meadows Recreation Center, the Durham Center
for Senior Life, which has been bid recently and is scheduled for completion in 2005, and the
existing Chapel Hill Senior Center at the Galleria in Chapel Hill.
In addition to Gurlitz Architects, the design team will include: Margaret Calkins/gerontology
consultant, Coulter Jewell Thames, PA/t_andscape Architecture and Site Engineering; Stroud,
Pence and Associates/Structural Engineering; and Sigma/Plumbing, Mechanical and Electrical
Engineering.
The project design will employ sustainable design/greenbtailding elements, with which the
Gurlitz team has significant experience. It is notable that the scope of work for Sigma includes
a commissioning of the mechanical, electrical and plumbing systems on the building to ensure
operation of is commensurate with the design intent. This work is generally accomplished
through a separate contract, which will now be unnecessary far this project.
A modification of the existing Special Use Permit (SUP) will be required for this project. The
estimated time to complete this process is customarily 9-12 months, however, owners of public
projects may request expedited review and reduce the time needed. Note that no part of the
process is circumvented by expedited review, however, it does allow the project to move
through the process faster in that it is required to be reviewed by staff as a priority item and is
set first on the Council's agenda, It is recommended that the Board direct the Manager to
request an expedited review far this project. The architect has estimated aten-month
construction time for the building.
FINANCIAL IMPACT:
The fees for design services have been proposed as follows:
• Basic Design Services from programming through project closeout,...,.,.,.,.$290,000
• Special Use Permitting and Site Development Fee .................................. 32 000
Total Fees ...........................................................................$322,000
The project budget is stated at $3,000,000 and will be funded through a combination of
proceeds from the 2000 Bond ($2,000,000) and Alternative Financing ($1,000,000),
RECOMMENDATION(S): The Manager recommends that the Board:
Accept the recommendation of the Southern Orange Senior Center Architect Selection
Panel to retain Gurlitz Architects for the design of the Center; and
• Approve a contract, contingent upon attorney and staff review, in an amount not to exceed
$322,000 as outlined in the attached cost proposal from Gurlitz; and
Authorize the Chair to sign on behalf of the Board; and
• Direct the Manager to request Expedited Review of the project from the Town of Chapel
Hill.
3
,~
c~~3~~, I~~,
August 10, 2004
Ms Pam Jones
Director of Purchasing and Central Services
County of Orange North Carolina
129 King Street
Hillsborough, North Carolina
Re: Southern Orange Senior Center
Dear Pam.
We are pleased to present this proposal for design services for the new Southern Orange Senior
Center This proposal is based on the information included in the request for qualifications issued by
Orange County referencing this project. The proposal is inclusive of all design services currently expected
to be required for the project. As of this writing, we are currently exploring the extent of approvals from the
Town of Chapel Hill existing for the site and the extent of approvals that will be needed to further the
project The approvals process will in some degree affect the fees associated with it process.
Gurlitz Architectural Group is excited about this project and understands its importance to the
community. We look forward to working with Orange County in providing a well conceived community
resource
Z ARCHITECTURAL GROUP
~~~ ~u~
A Gurlitz
iUl i~li ::h:hn~ -nU2. ~V e 20
Du h.m .sklr f v li : 27T.:,4
5-~1'i 959 ,,FC ;I
919 19? fi3_ - ~....
_.. ,ay ~~Gc<. .. _ ~ ,
Pam Jones f
Southern Orange Senior Center
August 10, 2004
Scope of Project
The project is the construction of a +/- 25,000 SF facility to house the functions of the Southern Orange
Senior Center The construction is to include all required site improvements on a site currently owned by
Orange County on Homestead Road in Chapel Hill The site currently is also supporting the existing
Southern Orange Human Services building
The budget for the project is $3 million - to include design services, building and site construction,
furnishings and equipment, material testing and surveying, approvals and permits
The site selected is part of a larger parcel owned by Orange County It is in the northeast corner of the site
adjacent to both the existing entry drive and Homestead Road. The site is moderately sloping falling
fourteen feet in the area suggested for the building location. The site is currently wooded with a mix of
predominantly hardwoods with some pine along Homestead Road.. For the purposes of this proposal, it is
assumed that all major utilities required for the construction and operation of this facility are available
either from the entry drive or on Homestead Road
Scope of Services
The services delivered for this project will include architecture, civil engineering, structural design,
mechanical, electrical and plumbing design Augmenting these disciplines will be cost consulting,
acoustical design, interior design and consulting for sustainable design directed at LEEDS certification
This proposal includes full commissioning for the mechanical, electrical and plumbing systems It is
exclusive of a full LEEDS certification
The architect will coordinate his services with the civil engineer in obtaining the required use permits from
the jurisdiction of Chapel Hill and the soil and erosion control permits from the jurisdiction of Orange
County It is understood as of this writing that the parcel is currently encumbered by a Special Use Permit
achieved for the existing Southern Human Services Building. The required permitting for this facility will be
a modification of that Special Use Permit The expected duration for a modification of a SUP is 9-12
months Expedited review may be requested for a public property that reduce the review time The
expedited review does not eliminate any of the process requirements, It does move the project through the
process faster in that it is required to be reviewed by staff as a priority item and set first on every
commission agenda.
It is understood that the design process for this project will include public information meetings to be
coordinated and facilitated by the architect in concurrence with Orange County agencies involved in the
management and construction of the project
3i6 ii Alstc nne, Sud.~. '20
Our , w l +r P.l r hi '_??L'
9I~??43119::: it..
r~i ~, I' ° .~.. .~..
Pam Jones
Southern Qrange Senior Cenier
August 10, 2004
Fees
The fees for basic services are as follows:
Basic Design Services % of Fee
Programming 5°I° $14,500
Schematic Design 15% $43,500
Design Development 2D% $58,000
Construction Documents 30% 587,000
Bidding 5% 514,500
Construction Admin 20% $58,000
Project Closeout 5% $14,500
Total 100% $290,000
Special Use Permitting 532,000
Site Development Fee
Fees for additional services if requested in writing by the Owner:
Principal Architect or Engineer 5125.00/Hr
Design Architect or Engineer $ 95.00/Hr
Project designers $ 85,DOIHr
iJ
The above fees are based on the scope of project as indicated above. If the project budget or scope
change by more than 5%, the fees for services shall be adjusted accordingly