Loading...
HomeMy WebLinkAboutOUTBoard agenda 091918AGENDA Orange Unified Transportation Board September 19, 2018 6:30p.m. You can bring your laptops/tabletsif you would like to use them. Conference Room 004(LowerFloor) Orange County West Campus 131 West Margaret Lane, Hillsborough Time Item Title 6:30 6:32 6:33 6:35 7:00 7:15 7:25 7:35 1. 2. 3. 4. 4.a. 4.b. 5.0 5.a. 5.b. 6.0 Call to Order and Determination of Quorum Approval of Minutes from August 15, 2018 Consideration of Additions to the Agenda Regular OUTBoard Agenda (Action Items) Efland-Buckhorn-MebaneAccess Management PlanUpdate(Nish Trivedi)–To review and comment on the Draft Efland-Buckhorn-Mebane Access Management Plan (E-B-M AMP). OUTBoard Action:Receive the information, discussand provide input. Bicycle Safety Implementation Subcommittee Report(Abigaile Pittman) OUTBoard Action: Receive the information and provide any comments or direction that the Board might have. Staff Updates MPO/RPO and NCDOT Updates (Nish Trivedi) –Materials to be provided at the meeting. OUTBoard Action: Receive the information. OUTBoard members whose terms are ending(Abigaile Pittman) Adjournment –The next regularly scheduled meeting date is October 17,2018. Charge of the OUTBoard (from Section I, Part C of the adopted Rules and Procedures) 1.The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2.From time to time the OUT Board may be directed to provide input on regulations on which the Planning Board has primary statutory and local ordinance advisory duties. In such instances, the OUT Board shall serve in an advisory capacity to the Planning Board. Meetings (from Section IV, Part C of the adopted Rules and Procedures) C. Date, Time, and Location of Regular Meetings Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. Meetings are held on the third Wednesday of the month. The start time and location of the meeting shall be included on the agenda and shall typically be 6:30 p.m. at the Orange County West Campus Office Building located at 131 West Margaret Lane, Hillsborough. The OUT Board Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any special circumstances, provided the information is included on the distributed agenda. DRAFT 1 MINUTES1 ORANGE COUNTY OUTBOARD2 AUGUST 15,20183 REGULAR MEETING4 5 6 MEMBERS PRESENT:Alex Castro (Vice-Chair), Bingham Township Representative;DavidLaudicina, Cheeks 7 Township Representative;Jenn Sykes, At-Large; Ed Vaughn, Cedar Grove Township Representative;Brantley 8 Wells, Hillsborough Township Representative; Art Menius, At-Large Representative; Alyson West, At-Large 9 Representative;Donna Musson, Eno Township Representative;10 11 MEMBERS ABSENT:Gary Saunders, At-Large Representative;Jeff Charles, At-Large Representative; Justin Miller, 12 At-Large Representative; Ted Triebel, Little River Township Representative; Heidi Perry (Chair), At-Large 13 Representative; Erle Smith, Chapel Hill Township Representative14 15 TRANSIT ADVISORY SERVICES MEMBERS PRESENT:Corintha Barber; Janice Tyler; Janet Sparks; Theo Letman, Allyson 16 Coltrane; Teleishia Holloway, Serena McPherson; Lisa Berkley17 18 STAFF PRESENT:Abigaile Pittman, Transportation/Land Use Planner;Nishith Trivedi, Transportation Planner; Tina 19 Love, Administrative Assistant III;20 21 AGENDA ITEM 1:CALL TO ORDER AND DETERMINATION OF QUORUM22 Alex Castro called the meeting to order at 6:30 p.m. and confirmed the presence of a quorum. 23 24 AGENDA ITEM 2:APPROVAL OF MINUTES25 Art Menius asked that the minutes becorrected to reflect that he was not present.26 MOTION by Art Menius to approve the May 16, 2018, OUTBoard Minutes with correction. Seconded by Donna 27 Musson.28 VOTE:UNANIMOUS29 30 AGENDA ITEM 3:CONSIDERATION OF ADDITIONS TO AGENDA31 There wasnone. 32 33 AGENDA ITEM 4:SPECIAL PRESENTATIONS34 There wasnone. 35 36 AGENDA ITEM 5A:OCPTADMINISTRATIVE UPDATES (THEO LETMAN)-37 Theo Letman reported that the department had recently been under compliance reviewwhich also included a federal 38 review. That review noted that Conflict of Interest forms need to be filled out by members of this board. Theo Letman 39 explained that the review include a snapshot of the organization’s statistics for one week. In comparing the snapshot 40 statistics, OCPT is in the middle of its peer group. Theo Letman said there is a problem with rider no-shows and 41 OCPT is working on limiting those. 42 43 Alex Castro asked for the percentage of rider no-shows. Theo Letman said he would get that information to him.44 45 Alex Castro said the total rider no-shows doesn’t seemthat high. Theo Letman said it’s not but when a vehicle is 46 dispatched to Cedar Grove and then a client doesn’t accept the service, that’s a waste of resources.47 48 When asked, Theo Letman said people are supposed to pay on the bus at the time of service butthere isa history of 49 allowing users to be billed later. Theo Letman said that the number of no-shows a person accumulatesis tabulated 50 and could lead to termination of services for that person. 51 52 Alex Castro asked if OCPT has a minivan. Theo Letman answered yes and there is a long-range plan to have more 53 with a plan to use somethinglike an Uber. 54 3 DRAFT 2 55 Alex Castro said the services are expanding, and asked if the finances also expanding. 56 57 Theo Letman answered that the department is doing well financially and is applying for grants from the local MPOs. 58 59 Abigaile Pittman said TARPO just made an announcement for the grant period opening for 5310grants.60 61 Theo Letman said the new 20-foot vans would be wheelchair accessible. 62 63 When asked, Theo Letman said the deadhead is the not-in-service miles. Art Menius asked if there is any way to 64 reduce that deadhead. Theo Letman answered that reduction of that is attempted. 65 66 Theo Letman said the fleet mechanic started working in June. 67 68 Theo Letman said one person in an administrative position left in May and the department was able to change that 69 position to a business position to help take care of billing. The person in that positionstarts Monday. The department 70 is currently recruitingfor three full-time drivers. The department is also looking at an occupational therapist position 71 that would do functional assessments for ADA compliancy and perhaps also an operations manager. 72 73 Theo Letman said the department has been going through a procurement process for dispatching and scheduling. 74 This software would also allow dispatchers to send messages to busses, which may be in radio dead zones. The 75 software also hasan app component for clients called Ecolane. 76 77 Theo Letman said that he can make room for additional staff in the existingOCPTspace. 78 79 Theo Letman mentioned that he could not find an Orange County ADA Transition Plan and had been asked for it. 80 Others assured him that Orange County has one and suggested people to contact in order to locate the plan. 81 82 AGENDA ITEM 5B:OCPT/OCCOUPDATE (ALLYSON COLTRANE)-83 Allyson Coltrane statedthat in May a “burn carbon” event was held at a bicycle shop in Hillsborough. She handed out 84 information at the event onbicycle safely. Also, she and Teleishia Holloway spoke at a Hillsborough/Orange County 85 Chamberof Commerce event and highlighted ShareTheRideNC and the new route from Hillsborough to Mebane. 86 Participants boarded the bus and took that route. When asked, Theo Letman said the route is intentionally different 87 from the ODX route. 88 89 Allyson Coltrane said Orange County is piloting a Go Pass program for county employees. Also, they are getting 90 quotes on shared bicycles and possibly electric scooters. She thinks it makes sense to start with shared bicycles until 91 other jurisdictionswork out the kinks with electric scooters. When asked, she said it would be five bicycles and they 92 would have to be returned to their docks or the user would be fined. Helmets are passed out at the launch but are not 93 kept available with the bicycles. 94 95 Allyson Coltrane reported that the Transit Academy would be held at the main library on Thursday, Sept. 20, 9:00 96 a.m.to 10:00a.m. The focus is for health care providers on how to get patients to their appointments. 97 98 Allyson Coltrane also reported that near Halloween there would be a “Lighten Up” event at the main library to make 99 sure children are safe and visible while trick-or-treating. 100 101 AGENDA ITEM 5C:TRANSIT ADVISORY SERVICES (TAS)COMMENTS/QUESTIONS (THEO LETMAN)-102 There was none.103 104 AGENDA ITEM 6:REGULAR OUTBOARD AGENDA105 106 107 108 4 DRAFT 3 AGENDA ITEM 6A:OUTBOARD ORIENTATION MATERIALS –SECTION 2(ABIGAILE PITTMAN)109 Abigaile Pittman then commenced reviewing the orientation materials. When requested, she said she would email 110 board members the page of links.111 112 Alex Castro requested a calendar that indicates what happens in the planning cycle. Abigaile Pittman said it is 113 difficult to provide a yearly calendar because the MPOs change their schedules and she sometimes only gets two-114 months notice.115 116 Alex Castro said new members of this advisory board could find it confusing because of thejurisdictions of the 117 MPOs, DOT andregions. 118 119 Abigaile Pittman shared the transportation map nowon the Planning Department’s transportation page. The map 120 enables you to search for projects, for instance to determine which are currently funded.121 122 There was consensus that these materials are ready for the web. 123 124 AGENDA ITEM 6B:INFORMATIONAL ITEMS (ABIGAILE PITTMAN)125 Therewas none.126 127 AGENDA ITEM 7:STAFF UPDATES 128 Abigaile Pittman shared that two North Carolina transportation projects have been recognized nationallyby the129 America’s Transportation Awards Competition. One was the Piedmont Improvement Program and the other was the 130 Wilmington Bypass. She read some details about each. 131 132 Tina Love shared that agenda packets would be given to board members electronically unless paper copies were 133 requested. 134 135 Abigaile Pittman shared that Tina Love was replacing Meredith Kern in serving as staff to this board. 136 137 AGENDA ITEM 7A:EFLAND-BUCKHORN-MEBANE ACCESS MANAGEMENT PLAN COMMUNITY MEETING138 (NISH TRIVEDI)139 Nish Trivedi reported that there is a community meeting scheduled for Aug. 28, 4:30 –6:30 p.m. at Gravelly Middle 140 School. Notices had been mailed to those within and immediately adjacent to the study area for this project.141 142 Abigaile Pittman shared a copyof the letter that was sent out. 143 144 AGENDA ITEM 7B:OUTBOARD PSA FOR APPLICANTS (ABIGAILE PITTMAN)145 Abigaile Pittman shared the public service announcement that is intended to help fulfill five upcoming vacancies. A146 few members asked for it to be sent out again because they missed it. 147 148 AGENDA ITEM:ADJOURNMENT 149 OUTBoard meeting was adjourned at 7:47p.m.150 151 ____________________________________ Heidi Perry, Chair 5 6 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date:September 19, 2018 Action Agenda Item No.4.a. SUBJECT: Efland-Buckhorn-Mebane Access Management Plan Update DEPARTMENT:Planning and Inspections ATTACHMENT(S):INFORMATION CONTACT: 1.Presentation 2.Draft Efland-Buckhorn-Mebane Access Management Plan Nishith Trivedi, Transportation Planner (919) 245-2582 PURPOSE:To review and comment on the DraftEfland-Buckhorn-Mebane Access Management Plan(E-B-M AMP) update. BACKGROUND:In order to better promote economic development opportunities and help preserve planned sewer and road corridors and associated capacities for all land uses within the E-B-M AMP planningarea, the Planning Director is suggesting consideration of updates to the current Access Management Plan. This update will utilize a 2017 Transportation Studyfor the Efland-Buckhorn-Mebane Study Area to renew and replace the original 2011 Efland-Buckhorn- Mebane Economic Development District Access Management Plan. In a few cases, it will also incorporate other road and intersection improvements recommended by planning staff. An access management plan is a conceptual master plan for roadway alignment and corridor width necessary to serve future land uses in acomprehensive manner. If development occurs, then this plan guides the specific part of their roadway construction as it supports the overall existing and proposed roadway network. The original Efland-Buckhorn-Mebane Access Management Planwas adopted November 15, 2011and itimplemented a recommendation of the Efland-Mebane Small Area Plan (2006). It also served as a tool for implementing the 2030 Comprehensive Planprinciples, goals and objectives. The original plan consisted of multiple access management strategies and was completed with limited on-site analysis. However, this plan was instrumental in gaining North Carolina Department of Transportation (NCDOT) acceptance and participation in roadwork improvements necessary to serve the Morinaga Candy Factory, which opened in 2016. Developments like this, along with increased residentialand commercialgrowth in Hillsborough, especially growth’s impact on traffic, demonstratethe plan’s importance. A thorough existing conditions, environmental, and traffic analysis was conducted as part of the 2017 Transportation Study, which was completed by a consultant. This report reinforces the original Efland-Buckhorn-Mebane Access Management Planwith a comprehensive investigation of the area’s development potential, traffic impact and recommended improvements. 7 CommunityMeeting Planning staff held a communitymeetingon August 28th at Gravelly Hill Middle Schooland collectedpublic commentson the presented analysis. Advertising for the Community Meeting was done through direct mailing to over 700property owners in and around the planning area. Next Steps x October 17rd –OUTBoardrecommendations to the BOCC on the draft plan. x November 1st –Tentatively scheduledBoard of County Commissioners public hearing on the draft plan. The same presentation and draftwas given to the Planning Board for their review and comment on October 3, 2018. Their comments will be included in the updated draft, as they are submitted to staff, along with OUTBoard comments. Both advisory board recommendations will be collected in October and submitted to Board of County Commissioners during the Public Hearing tentatively scheduled for in November. FINANCIAL IMPACT:Thereis no immediate financial impact associated with this item. RECOMMENDATION(S):Staff recommends that the OUTBoardreview and comment on the draft plan. 8 8/29/2018 Efland-Buckhorn-Mebane Access Management Plan August 28, 2018 Background o 2011 E-B-M AMP o 2017 Transportation Study Updating the Plan o Process o Analysis o Public Participation Next Step o Public Process & Actions o Implementation Outline Background ȂŠƒ–‹• Access Management Plan (AMP) is a proposed master plan of possiblenew roads & connections to existing roads while providing access to development, preserve traffic flow, safety & capacity. Improve overall transportation system Minimize congestion & crashes Efficient traffic flow, safety & access to properties Background 1981 - comprehensive plan 1991 - The Efland Area Study 2004 - Expansion of Public Water and Sewer to Efland- Buckhorn- Mebane 2006 - Efland- Mebane Small Area Plan 2011 - E-B-M AMP 2017 - Volkert transportation study •Highlighted key nodes & corridors BackgroundȂʹͲͳͳǦǦ •Multiple access management strategies •2 possible street cross sections BackgroundȂʹͲͳͳǦǦ September 7, 2011 Planning Board September 21, 2011 Orange Unified Transportation Board November 14, 2011 Public Information Meeting November 15, 2011 BOCCAdoption Attachment 1 9 8/29/2018 BackgroundȂʹͲͳ͹”ƒ•’‘”–ƒ–‹‘–—†› 4.25 sq. mi. •Existing conditions analysis •Cultural and environmental issues •Land use and traffic impacts •Corridor and intersection feasibilities BackgroundȂʹͲͳ͹”ƒ•’‘”–ƒ–‹‘–—†› 30 rows of data for 4.25 square miles of potential development BackgroundȂʹͲͳ͹”ƒ•’‘”–ƒ–‹‘–—†› 24 different NCDOT street cross sections evaluated BackgroundȂʹͲͳ͹”ƒ•’‘”–ƒ–‹‘–—†› Studied possible improvements UpdatingthePlan UpdatingthePlan Ȃ”‘…‡•• Community Meeting 2011 AMP and 2017 Transportation Study Recommendations AMP Update and Implemention 10 8/29/2018 UpdatingthePlan Ȃ”‘…‡•• New E-B-M AMP Public Input 2011 E-B-M AMP 2017 Transportation Study UpdatingthePlan ȂƒŽ›œ‡†‡–™‘” •NCDOT –“Typical” Highway Cross Section –2D •2 Lane undivided with paved shoulder and sidewalk •All streets west of Buckhorn Road UpdatingthePlan Ȃ”‘••‡…–‹‘ •NCDOT –“Typical” Highway Cross Section –2A •2 lane undivided with paved shoulder •All streets east of Buckhorn Road UpdatingthePlan Ȃ”‘••‡…–‹‘ •NCDOT –“Typical” Highway Cross Section –3A •2 Lane with two way left turn lane and paved shoulder UpdatingthePlan Ȃ”‘••‡…–‹‘ Intersection Improvements BenWilsonRoadatNewRoadA Southboundrightturnlane Northboundrightturnlane Westboundrightandleftturnlane WestTenRoadatNewRoadA Rightandleftturnlanesinalldirections WestTenRoadatBuckhornRoad Rightandleftturnlanesinalldirections Mt.WillingRoadatNewRoadH Rightandleftturnlanesinalldirections US-70/I-85Connector Westboundleftturnlane Eastboundrightturnlane Northboundrightandleftturnlane UpdatingthePlan Ȃ ’”‘˜‡‡–• 11 8/29/2018 UpdatingthePlan Ȃ—„Ž‹…ƒ”–‹…‹’ƒ–‹‘ Over 700 notices mailed out to property owners Website for public participation UpdatingthePlan Ȃ—„Ž‹…ƒ”–‹…‹’ƒ–‹‘ All comments included in plan NextStep NextStepsȂ—„Ž‹…”‘…‡••Ƭ…–‹‘• Board of County Commissioners Public Notice & WebsitePublic Notice & Website Public Hearing (November) Public Hearing (November) Consideration (November/December) Consideration (November/December) Orange Unified Transportation Board WebsiteWebsite Review (September) Review (September) Recommendation (October) Recommendation (October) Planning Board Public Notice & WebsitePublic Notice & Website Review (September) Review (September) Recommendation (October) Recommendation (October) Section 2.5.3 Site Plan (V) Compliance with County adopted access management, transportation and/or connectivity plans and denote the location of future roadway(s) and access easements, … SECTION 6.10.A (1) Roadway Design/Improvement (a) Whether improvements are required or not, adequate right-of-way must be dedicated to accommodate the projected right-of-way requirements as identified in adopted thoroughfare plans. NextStepȂ ’އ‡–ƒ–‹‘Questions? 12 8/29/2018 Contact Nishith Trivedi Orange County Planning Department 131 W. Margaret Lane, Suite 201 P.O. Box 8181 Hillsborough, NC 27278 E-mail:ntrivedi@orangecountync.gov Phone: (919) 245-2582 13 14 2018 Orange County Planning Department Orange County, NC 5/17/2018 Efland-Buckhorn-Mebane Access Management Plan Attachment 2 15 16 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Contents Executive Summary ........................................................................................................................................ i I. Introduction ...........................................................................................................................................1 A. State and Local Regulations ................................................................................................................................ 2 B. Background and Planning Area ......................................................................................................................... 3 C. Goals and Objectives .............................................................................................................................................. 5 D. Planned Projects ..................................................................................................................................................... 5 II. Access Management Plan .......................................................................................................................7 A. Community Meeting ............................................................................................................................................... 7 B. 2017 Transportation Study ................................................................................................................................ 7 1. Land Use Matrix and Future Network ..................................................................................................... 12 2. Pod Delineation and Analysis .................................................................................................................. 12 3. Intersection Analysis ................................................................................................................................ 13 C. Recommendations - Future Roadway and Intersection Improvements ........................................... 14 1. Street Cross-Section Requirements ......................................................................................................... 14 2. Intersection Improvement Requirements and TIA .................................................................................. 16 D. AMP Update and Implementation .................................................................................................................. 17 III. Enforcement ......................................................................................................................................... 20 A. Roles and Responsibilities ................................................................................................................................ 21 B. Resources ................................................................................................................................................................ 22 IV. Appendix .............................................................................................................................................. 23 A. 2011 E-B-M EDD AMP .......................................................................................................................................... 23 B. 2017 E-B-M Transportation Study.................................................................................................................. 23 C. Community Meeting ............................................................................................................................................. 23 17 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Figures Figure 1: Access vs Mobility ........................................................................................................................................1 Figure 2: Plan Chronology ..........................................................................................................................................3 Figure 3: E-B-M AMP Planning Area ...........................................................................................................................4 Figure 4: Transportation Projects Map .......................................................................................................................6 Figure 5: Planning Process ..........................................................................................................................................7 Figure 6: US-70 Traffic Trends ....................................................................................................................................8 Figure 7: Traffic Count Stations ..................................................................................................................................9 Figure 8:Crash by Severity ....................................................................................................................................... 10 Figure 9: Crash Frequency Trend ............................................................................................................................. 10 Figure 10: Rural vs Urban Crashes ........................................................................................................................... 11 Figure 11: POD Delineation Process ........................................................................................................................ 12 Figure 12: POD Trip Generation .............................................................................................................................. 13 Figure 13: 2017 Transportation Study – Street Cross Section 2A ........................................................................... 15 Figure 14: 2017 Transportation Study – Street Cross Section 2B............................................................................ 15 Figure 15: 2017 Transportation Study – Street Cross Section 3A ........................................................................... 16 Figure 16: E-B-M AMP ............................................................................................................................................. 19 Tables Table 1: Traffic Trends ................................................................................................................................................8 Table 2: POD Buildable Acreage .............................................................................................................................. 12 Table 3: POD Daily Trips .......................................................................................................................................... 13 Table 4: Intersection Recommendations ................................................................................................................ 17 Table 5: AMP Practices ............................................................................................................................................ 17 18 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page i Executive Summary The Federal Highway Administration’s (FHWA) official access management definition is the process that provides access to land development while simultaneously preserving the flow of traffic on the surrounding system in terms of safety, capacity, and speed. This plan promotes FHWA’s access management practices by allowing local government to: x Maintain the overall safety of the transportation system; x Minimize congestion and crash rates; x Provide for efficient traffic flow and pedestrian safety; and x Provide appropriate access to adjacent business properties. The original Efland-Buckhorn-Mebane Access Management Plan (E-B-M AMP) was adopted November 15, 2011 and it implemented Efland-Mebane Small Area Plan (2006) recommendations. It has also advanced several 2030 Comprehensive Plan goals and objectives. The original plan identified access management strategies and areas where new connector roads would be needed to maintain and improve access within areas identified in the County’s land use plan for economic development purposes. This plan was instrumental in gaining North Carolina Department of Transportation (NCDOT) acceptance and participation in roadwork improvements necessary to serve the Morinaga Candy Factory, which opened in 2016, with limited on-site surveying and analysis. In 2017, a thorough existing conditions, environmental, and traffic analysis was completed through an engineering-based transportation study conducted by Volkert Inc., based in Raleigh, NC. Its Transportation Report for the Efland-Buckhorn-Mebane Study Area (See Appendix A), hereafter referred to as the 2017 Transportation Report, reinforces the original E-B-M AMP with a comprehensive investigation of the area’s development potential, traffic impact and recommended improvements. This update uses the 2017 Transportation Report to renew and replace the original 2011 Efland-Buckhorn-Mebane Economic Development District Access Management Plan. This plan takes into account input from local residents and businesses in the area through a public workshop conducted throughout the planning process. It also incorporates other road and intersection improvements recommended by planning staff based on their expertise and familiarity with economic development activities coordinated by the County’s Economic Development Department. 19 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 1 I.Introduction Orange County seeks to develop an access management plan in order to maintain and improve the functionality of the transportation network as the Efland-Buckhorn-Mebane (E-B-M) Study Area develops. This E-B-M AMP provides the basis and justification for requiring the dedication of right-of-way in the planning area. Orange County’s Unified Development Ordinance (UDO) requires that proposed site plans demonstrate compliance with adopted access management plans. As properties are developed, transportation interconnectivity and access become increasingly important. Orange County and regional metropolitan and rural planning organizations are dedicated to safe and efficient use of the transportation network through sound access management practices. These practices in form of local plans and policies are applied to highways, major arterials, and other roadways, including but not limited to: x Access Spacing: Increasing the distance between traffic signals improves traffic flow on major roadways, reduces congestion, and improves air quality for heavily traveled corridors. x Driveway Spacing: Fewer driveways spaced further apart allow for more orderly traffic merging and presents fewer challenges to drivers. x Safe Turning Lanes: Dedicated left- and right-turn, indirect left-turns and U-turns, and roundabouts keep through-traffic flowing. Roundabouts provide an opportunity to reduce conflict points within intersections for safe travel. x Median Treatments: Two-way left-turn lanes and non-traversable, raised medians are examples of some of the most effective means to regulate access and reduce crashes. x Right-of-Way Management: Right-of-way reservation for future widenings, good sight distance, access location, and other access-related issues. Such policies designate appropriate control levels for various land uses. Local residential streets are allowed full access, while commercial corridors have limited access. A wide range of road types are included, each requiring standards that ensure free traffic flow while allowing access to major businesses and other land uses along a road (FIGURE 1). Orange County uses Access management Plans to ensure land use decisions take into consideration their impacts on the transportation network. This practice is incorporated into the UDO as a means of implementing the County’s 2030 Comprehensive Plan. The County currently has three Access Management Plans in place: x Orange Grove Road (March 2003) x Efland-Buckhorn-Mebane (November 2011) x Eno Economic Development District (November 2013) A review of current legal and regulatory practices lists some fundamental access management aspects and authority: Figure 1: Access vs Mobility 20 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 2 x Access management starts at the state level through enabling legislation; x State-enabling legislation dictates power given to local jurisdictions; and x Land use planning techniques can be used to promote access management. This regulatory framework is detailed in the following section. A.State and Local Regulations Under State law - North Carolina General Statutes (N.C.G.S.) § 136-66.2 - Metropolitan Planning Organizations (MPOs) and municipalities shall develop Comprehensive Transportation Plans (CTPs) in cooperation with the NCDOT. Orange County’s is divided among three regional transportation agencies, each with a CTP. These agencies work with Orange County to meet state and federal regulations for all transportation projects, plans, and programs. They also ensure transportation planning is continuing, coordinated, and comprehensive (23 U.S.C. 134-135). x Burlington-Graham Metropolitan Planning Organization (BG MPO) x Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) x Triangle Area Rural Planning Organization (TARPO) TARPO’s CTP was adopted in 2013 and provides transportation project recommendations for Orange County’s rural areas, while the MPO CTPs address the urbanized areas. DCHC MPO CTP was adopted in 2017 and a BG MPO CTP is currently underway. It is important to note that the CTPs do not include every road on the highway system. As such, in accordance with state law, to complement the CTP roadway element, municipalities and MPOs may develop collector street plans. Additionally, locally approved transportation plans, such as the E-B-M AMP, may contain street or highway right-of-way alignment and dedication requirements, and collectively function as the collector street plan for the MPO or municipality as referenced in N.C.G.S. § 136-66.2. The Orange County Unified Development Ordinance (UDO) section 2.5.3.(v) and reiterated in section 6.10.A.1.(b), includes the requirements for reserving and dedicating right of way or requiring road construction listed in Access Management Plans or on the CTP. Specific mention is also made to the dedication of right of way based on the concepts shown on the CTP and locally adopted transportation plans, in accordance with N.C.G.S. § 136 66.2 and § 136 66.10. The CTP, collector street plan and locally adopted transportation plans pursuant to N.C.G.S. § 136-66.2 serve as the comprehensive legal framework referenced in N.C.G.S. § 136-66.10(a), addressing the reservation and dedication of right-of-way under local ordinances. 21 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 3 North Carolina requires development along state routes to be accordance with NCDOT’s Policy on Street and Driveway Access to North Carolina Highways. This document sets specific driveway and street access points criteria regulating their location, design, and operation. When any construction work is done on state routes or adjacent to existing roadways, connection and access points must meet this state regulation; including properties being modified or expanded. While the state’s policy focuses on the transportation network, local zoning ordinances and subdivision regulations address land use. Local access management plans play an important role in merging state policy and local authority in efforts to integrate land use and transportation, including Orange County planning processes. B.Background and Planning Area Several plans have been completed within the E-B-M area, beginning with the 1981 Comprehensive Plan, which was a Countywide plan addressing land uses for all of the County’s townships. FIGURE 2 illustrates the AMP’s chronology. The E-B-M AMP encompasses 4.25 square miles along I-85/I-40 between Efland and Mebane and is bounded by the following (FIGURE 3): x North: US Highway 70 x South: West Ten Road/Bowman Road x East: I-85/US-70 Connector x West: Ben Wilson Road 1981 - Comprehensi ve Plan 1991 -The Efland Area Study 2004 - Expansion of Public Water and Sewer to Efland- Buckhorn-Mebane 2006 - Efland- Mebane Small Area Plan 2011 - E-B-M AMP 2017 - Volkert Transportation Study Figure 2: Plan Chronology 22 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 4 Fi g u r e 3 : E - B - M A M P P l a n n i n g A r e a 23 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 5 C.Goals and Objectives This update advances goals and objectives of the Orange County’s adopted 2030 Comprehensive Plan (adopted in 2008) to ensure land use decisions take into consideration their impact on the transportation network. Specific goals and objectives advanced include: Economic Development (ED) Goal 2: Infrastructure that supports desired development. x Objective ED-2.1: Encourage compact and higher density development in areas served by water and sewer. x Objective ED-2.2: Encourage mixed use projects that support walkable communities. x Objective ED-2.3: Promote public transportation, alternative modes of transportation, and encourage carpooling and park-and-ride participation. x Objective ED-2.5: Identify lands suitable to accommodate the expansion and growth of commercial and industrial uses in the County. Land Use (LU) Goal 1: Fiscally and environmentally responsible, sustainable growth, consistent with the provision of adequate services and facilities and a high quality of life. x Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high- speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. x Objective LU-1.2: Evaluate and report on whether existing and approved locations for future residential and non-residential developments are coordinated with the location of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer services, high-speed internet access, streets and sidewalks). Transportation (T) Goal 3: Integrated land use planning and transportation planning that serves existing development, supports future development, and is consistent with the County’s land use plans which include provisions for preserving the natural environment and community character. x Objective T-3.3: Determine the policies to guide connectivity within and between residential developments based on their impact on neighborhood character. x Objective T-3.4: Direct development to higher density mixed-use districts along transit corridors and make necessary multi-modal transportation improvements to service lands that are slated for future intense development, such as Economic Development Districts. x Objective T-3.5: Use innovative techniques to increase mobility and reduce rush hour congestion. Additionally this AMP advances the Efland Mebane Small Area Plan’s following goals and objectives: Goal: In the future, the planning area should be well served by reliable infrastructure to accommodate orderly, planned growth. The planning area will retain the core village area that will be the center of community life. An efficient multi-modal transportation system will operate in the area and commercial and light industrial uses both in the planning area and nearby will provide job opportunities to area residents. There will be a mix of housing types and sizes that will be economically accessible to a broad spectrum of working people. Parks and greenspace will be connected by a system of greenways that will allow people to enjoy a high-quality outdoor environment while also serving as corridors for wildlife migration. x Objective: Orderly and planned expansion of the sewer system and a sufficient public water supply system. x Objective: Preservation of community character while allowing for planned, sustainable residential and non-residential growth. x Objective: Provision of an efficient, multi-modal transportation system. x Objective: A greater level of intergovernmental coordination between Orange County and the other governmental entities in the planning area. Given that a portion of the E-B-M AMP planning area is within the City of Mebane as designated in the city’s 2017 Mebane by Design Comprehensive Land Development Plan and addressed in the water and sewer agreement between Orange County and Mebane, Mebane in coordination with Orange County may seek to extend additional water and sewer lines into the planning area. Based on these policies, it is expected that any future development within the E-B-M planning area that requests water and sewer service from the City of Mebane may at some point be annexed by the City of Mebane. The planning process takes the adjacent city into consideration. D.Planned Projects I-85 bisects the planning area and is scheduled for pavement rehabilitation through NCDOT’s adopted FY 2018-2027 State Transportation Improvement Program (STIP). x TIP I-5954 & TIP I-5958 - I-40/I-85 pavement rehabilitation totaling $18,365,000 and covering 7.4 miles. Three projects from the FY 2016-2025 STIP remain critically important in Orange County and have a total project cost of $53,795,000. These projects are x SPOT ID – H140373 - Mattress Factory Road - extended to US-70 0.04 miles - $17,300,000 x SPOT ID – H090193 - I-40 - convert grade separation into interchange - 0.08 miles - $21,700,000 x SPOT ID – H090557 - SR 111 - multi-lane with bike/ped accommodations – 1.10 miles - $14,795,000 While these projects will not be part of the FY 2020-2029 STIP, they are an Orange County priority for the E-B-M planning area. Other projects include modernizing 7.29 miles of Buckhorn Road with paved shoulders and establishing and/or increasing ridership on Orange County Public Transit’s routes in the area. All of these projects are presented on the map in FIGURE 4. 24 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 6 Fi g u r e 4 : T r a n s p o r t a t i o n P r o j e c t s M a p 25 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 7 II.Access Management Plan The E-B-M AMP is updated using a strategic planning process. The detailed analysis included in the 2017 Transportation Study, located in APPENDIX B, documents the quantitative nature of the planning area, identifying key access management issues addressed by the original 2011 access management plan. This E-B-M AMP update is to follow a planning process similar to the original 2011 AMP. A community meeting was conducted to gather public input on the plan, including the issues, concerns, and recommendations of the attendees. Access Management strategies have been evaluated, recommended, and included in this document in order to execute a successful plan. A summary of the planning process is shown below in FIGURE 5 and detailed in this chapter. A.Community Meeting On August 28, 2018, Orange County Planning Department hosted a Community Meeting at Gravelly Hill Middle School, located within the planning area. Extensive outreach was conducted to get the public involved in the planning process, this included: x Individual letters mailed to each property owner in - and within 500’ of - the planning area notifying them of the Community Meeting and encouraging their participation. x Posted on County website urging public involvement and keeping them updated on the plan’s status. x Provided a schedule requesting public participate when the plan goes before Planning Board, Orange County Unified Transportation Board and Board of County Commission for approval. The Community Meeting was held in the gym at Gravelly Hill Middle School from 4:30 pm – 6:30 pm. Maps of the E-B-M planning area were displayed around the gym with comment cards and brief surveys soliciting their input while crafting the plan. Detail comments from the community meeting are included in Appendix C. They support the need for an update of the E-B-M AMP and are supportive of the implementation strategies necessary to address their transportation concerns in the planning area. B.2017 Transportation Study The 2017 Transportation Study (APPENDIX B) analyzed existing conditions for the planning area. The area is mostly rural in character with a few commercial properties scattered throughout. Sites such as Morinaga America Foods, Inc., Forma-Fab Metals, Cleora Sterling, and Gravelly-Hill Middle School are located within the planning area. I-85/I-40 bisects the area and is paralleled by US-70 and West Ten Road. Efland Fire Department Station 2, GE Industrial Solutions, and Efland Cheeks Elementary School as well as other uses are found along the area’s border. Since the 2011 AMP’s adoption and the subsequent 2017 Transportation Study, the planning area has been further analyzed, including updating traffic count and crash data and additional road and intersection improvements have been identified for the area. 2011 AMP and 2017 Transportation Study Community Meeting Recommendation AMP Update and Implementation Figure 5: Planning Process 26 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 8 In 2016, nineteen NCDOT traffic counting stations were located throughout the planning area (FIGURE 6). These stations count vehicular traffic traversing various corridors. Some stations collect traffic counts annually while others are collected every other year. Key highlights of traffic count analysis: x Station 6701742 – Buckhorn Road north of I-58 – currently accounts for twice as many vehicles (12,000) than 2006 (6,500). x Stations 6701742 and 6701751 – I -85 within the planning area – currently has an estimated 30% more traffic volume (113,000) than in 2006 (88,000). x Stations 6700018 and 6700009 – US-70 east of Efland Cedar Grove Road – continue experiencing increased traffic over the past few years (FIGURE 7). Figure 6: US-70 Traffic Trends x Traffic count stations along West Ten Road and Bowman Road indicate traffic has more than doubled (TABLE 1). ROUTE Station ID 2003 2005 2007 2009 2011 2013 West Ten Road6701749830870100090010001500 West Ten Road67047189809101100100012001400 West Ten Road6704719120013001400130016001800 Bowman Road6704717440460610630770840 Bowman Road67047164608601200120015001200 Table 1: Traffic Trends Increased traffic in the area has also resulted in greater number of accidents in the planning area. Access Management policies must address this increased traffic to ensure safe travel for all users. 3000 3500 4000 4500 5000 5500 2013201420152016 US 70 Westbound at Efland Cedar Grove Road (Station ID 6700018) US 70 Eastbound at Efland Cedar Grove Road (Station ID 6700009) US 70 Connector North of I-85 (Station ID 6700008) Av e r a g e A n n u a l D a i l y T r a f f i c C o u n t Year 27 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 9 Fi g u r e 7 : T r a f f i c C o u n t S t a t i o n s 28 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 10 This plan update includes a brief safety analysis, an analysis not included in the 2017 Transportation Study. A total of 1,385 estimated crashes have been reported in the planning area over the past ten year. Accidents in the urban area - as determined by the U.S. Census - account for only 2.74% (38) of all crashes (FIGURE 8). The urban area is mainly along US-70. Crashes along rural streets in the E-B-M area have constantly been increasing over the past ten years as reported to NCDOT (FIGURE 9). Five accidents in rural area have resulted in fatalities. This trend may continue as more accidents continue to occur along rural roads like Buckhorn Road, Bowman Road and West Ten Road. While US-70 portion of the planning area may be considered urban, the northern half is still rural. Access management policies will seek to reduce this growing trend, especially in the rural areas. Figure 8:Crash by Severity 0 100 200 300 400 RuralUrban Crash Locations by Severity Possible injury Suspected minor injury Suspected serious injury Fatal Nu m b e r o f A c c i d e n t s 0 50 100 150 200 2007200820092010201120122013201420152016 Crash Locations by Frequency Rural UrbanNu m b e r o f A c c i d e n t s Figure 9: Crash Frequency Trend 29 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 11 Fi g u r e 1 0 : R u r a l v s U r b a n C r a s h e s 30 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 12 1.Land Use Matrix and Future Network As part of the 2017 Transportation Study, the planning area was divided into eighteen potential development sites called “pods”. These sites were analyzed and their maximum buildable area was determined APPENDIX B. Institute of Transportation Engineers (ITE) trip generations were also evaluated to ascertain development impact on the transportation network. The Pod analysis, street cross sections and intersection improvements were developed to help identify and mitigate the traffic impact through this process and made as part of updated AMP. 2.Pod Delineation and Analysis The analysis completed as part of the Study estimates a total 638.2 buildable acres (27.73% of 2301.5 gross acres), due to environmental constraints and other factors. Pods range in size from 22 to 362 acres. A summary of each pod’s buildable acres is shown below (TABLE 2 & FIGURE 11). Refer to the 2017 Transportation Study in APPENDIX B for additional information and assumptions used in the analysis. Pod Gross Acres Buildable Acres Constraints/ Attributes Percentage Buildable 1 343.41 86.79 256.62 25.27% 2 75.35 19.06 56.29 25.29% 3 257.53 81.01 176.52 31.46% 4 362.35 135.16 227.19 37.30% 5 138.95 0.00 138.95 0.00% 6 109.73 19.65 90.08 17.91% 7 22.01 7.47 14.54 33.94% 8 243.19 70.07 173.12 28.81% 9 55.96 18.15 37.81 32.43% 10 192.12 48.60 143.52 25.30% 11 62.20 7.14 55.06 11.48% 12 35.32 4.91 30.41 13.92% 13 49.26 15.23 34.03 30.91% 14 63.26 8.52 54.74 13.47% 15 49.91 11.07 38.84 22.19% 16 23.59 1.76 21.83 7.44% 17 144.61 79.31 65.30 54.84% 18 72.77 24.28 48.49 33.36% Total 2301.52 638.17 1663.35 27.73% Table 2: POD Buildable Acreage Total acres Minus current development Minus environmental constraints Minus other attributes Buildable acres Figure 11: POD Delineation Process 31 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 13 These pods were also used to estimate how much additional traffic future development could generate. Each year, ITE publishes trip generations for individual land uses. Based on current analysis, if all pods were developed over time and based on the designated land uses and current zoning, the planning area could experience an additional 172,829 vehicular trips per day on the roads. Below is a summary of daily, morning, and evening peak hour trip generations for the planning area (TABLE 2 & FIGURE 12). Pod Daily 1 7,440 2 2,781 3 21,917 4 40,416 5 0 6 1,998 7 36,955 8 5,088 9 17,736 10 4,336 11 4,516 12 392 13 925 14 4,896 15 1,010 16 772 17 16,228 18 5,422 Table 3: POD Daily Trips 3.Intersection Analysis Various intersections in the planning area were analyzed for potential improvements. This investigation is based on the Annual Average Daily Traffic (AADT) being projected from 2014-2025 using historic trends. NCDOT monitors the AADT data and the 2017 Transportation Study estimates a 3% annual increase over the past 15 years. This data is collected from traffic count stations located throughout the planning area and helps in determining each road’s Level of Service (LOS). ITE defines the various LOS as described below: x LOS A: Free flow with individual users unaffected by others in the traffic stream. x LOS B: Stable flow with freedom to select speed with some influence by others. x LOS C: Restricted flow remaining stable with significant interaction with others. x LOS D: High-density flow with speed and maneuverability restricted but steady traffic stream. x LOS E: Unstable flow with poor comfort and convenience level. x LOS F: Forced flow characterized by stop-and-go waves and increased accident exposure. 0 500 1000 1500 2000 2500 3000 3500 4000 4500 123456789101112131415161718 AM Peak PM Peak POD Number Tr i p s Figure 12: POD Trip Generation 32 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 14 Refer to the 2017 Transportation Study for detail information on the planning area’s LOS. It provides the engineering bases for requiring developers mitigate the traffic impact they will have on existing transportation network in accordance with the County’s adopted 2030 Comprehensive Plan goals and objectives. C.Recommendations - Future Roadway and Intersection Improvements Based on the information presented in the 2017 Transportation Study and taking into account public comments, functional classification, design speed, traffic volumes, character and composition of traffic and type of right-of- way, the roadway network and intersection improvements are recommended on the following pages. In order to meet the goals and objectives identified on page 15, this AMP update recommends the following actions: x Require right-of-way dedication - based on the “Street Cross-Section Requirements” below - for all development throughout the Planning Area and acquire necessary easements for infrastructure improvements. x Work with NCDOT to pursue funding to advance the following improvements: o Install a traffic light at high frequency crash intersections to ensure safety and assist traffic flow. o Install a crosswalk with a flashing light at key intersections in the planning area. x Consider a provision that any development having ingress/egress in the Planning Area either construct its fair share of recommended improvements or provide payment in lieu of such improvements. x Work with developers, the Orange County Economic Development Department, and Orange County Planning and Inspection Department to implement access management recommendations. x Identify and promote transportation projects in the planning area to respective planning organizations and NCDOT. x Pursue NCDOT SPOT Safety projects for key intersections throughout the planning area. x Support NCDOT’s County Complete Street Policy, which was being updated at the time this Plan was prepared, to address multi-modal travel and protect pedestrian circulation around residential subdivisions and commercial areas. 1.Street Cross-Section Requirements Many existing roads will no longer have the capacity to handle the projected 172,829 additional vehicular trips. New roads will have to be constructed while existing ones may require widening. Road design plays an important role in access management. Several road cross sections have been designed to help address increased traffic. This AMP update also takes into consideration bicycle and pedestrian requirements along the proposed cross sections as demonstrated below (FIGURES 13-15). 33 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 15 Figure 13: 2017 Transportation Study – Street Cross Section 2A x All new streets east of Buckhorn Road including, existing Southern Drive, and Forrest Road. x Propose: 2 lanes and ditch/swale Figure 14: 2017 Transportation Study – Street Cross Section 2B x All new streets west of Buckhorn Road, including existing Bowman Road, Rock Quarry Road, and Ben Wilson Road. x Proposed: 2 lanes, ditch and sidewalk 34 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 16 Figure 15: 2017 Transportation Study – Street Cross Section 3A x Existing Ben Wilson Road, Buckhorn Road, West Ten Road, and Mt. Willing Road x To be done through State Transportation Improvement Program (STIP) x Current: 2 lanes and ditch - Proposed: 3 lanes, ditch/swale and sidewalk Implementation of the future roadway network and recommended cross sections is intended to occur over time and largely through the development approval process. Developers are required to dedicate right-of-way consistent with the recommended cross sections and construct roads in accordance with NCDOT Roadway Design Manual requirements. While the cross sections are designed for local and collector roads, their capacity is taken into account as intersections are also analyzed and recommendations are provided in an effort to address traffic impact. 2.Intersection Improvement Requirements and TIA Evaluating LOS determines the necessary recommendations at various intersections in the planning area. For reference, many municipal governments adopt policies like TIAs that require that new development not decrease LOS below level C or D. Determining the LOS for a given roadway involves complex calculations taking into account factors such as roadway grades and lane width. The 2017 Transportation Study identified the following intersections as those requiring specific improvements by developers and any transportation projects associated with them (TABLE 4). The 2017 Transportation Study serves as an overall Traffic Impact Analysis (TIA) for the E-B-M area, as each pod’s development potential was modeled in accordance with Section 6:17 - Traffic Impact Analysis – of the County’s UDO. The purpose of a TIA is to “insure that proposed developments do not adversely affect the highway network and to identify any traffic problems associated with access from the site to the existing transportation network.” TIAs also document the required traffic mitigations that must be incorporated into the proposed development. A TIA is required for all special use permits, subdivisions, conditional zoning applications and site plans. This is for all applications with an estimated trip generation exceeding 800 daily trips as the pods have previously demonstrated. 35 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 17 Intersection Recommendation Ben Wilson Road at New Road A South bound right turn lane North bound right turn lane West bound right and left turn lane West Ten Road at New Road A Right and left turn lanes in all directions West Ten Road at Buckhorn Road Right and left turn lanes in all directions Mt. Willing Road at New Road H Right and left turn lanes in all directions US-70/I-85 Connector West bound left turn lane East bound right turn lane Northbound right and left turn lane Table 4: Intersection Recommendations The AMP for the planning area consists of planned streets intersections as illustrated in FIGURE 16. Details of these intersection improvements are located on pp. 26-42 of APPENDIX B. D.AMP Update and Implementation Developers proposing projects within this area will be required to provide the appropriate street cross sections and intersection improvements as specified in this plan. The E-B-M AMP update includes the original 2011 AMP by carrying forward its list of access management concepts, treatments, and considerations as listed in TABLE 5. Concepts Treatments Driveway-Related Crashes, Spacing, Density and Consolidation Access Management and Pedestrian Safety Intersection Spacing and Traffic Signal Spacing Driveway Grade and Width Functional Areas of Intersections and Conflict Points Clearing Driveways Away From Corners and Driveway Turn Radius Speed Differential Between Turning Vehicles And Through Traffic Shared/Joint Driveways and/or Cross Access Benefits and Economic Impacts of Access Management Dedicated Left And Right Turning Lanes Continuous Two-Way Left-Turn Lanes Considerations Three-Lane Roadways With Two-Way Left-Turn Lanes Internal Circulation In Land Developments and Sight Distance Raised Medians at Intersections and Continuous Raised Median Incorporating Aesthetics Into Access Management Comparison Of Raised Median And Two-Way Left- Turn Lanes Clear Zones, Utility Placement And Lighting Frontage and Backage Roads Table 5: AMP Practices A detail explanation of each concept, treatment and consideration is provided in APPENDIX A at the end of this Plan. The E-B-M AMP below (FIGURE 16) illustrated the road network and intersection improvements planned in 36 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 18 the area. This plan is based on detail transportation analysis as documented in the 2017 Transportation Study (APPENDIX B) and public comments gathered throughout the planning process. 37 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 19 Fi g u r e 1 6 : E - B - M A M P 38 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 20 III.Enforcement The following is a list of plans, policies, and regulations currently in place aimed at addressing relevant issues: x Orange County 2030 Comprehensive Plan x Orange County Unified Development Ordinance x E-B-M Small Area Plan and Access Management Plan Consistent with adopted plans and access management practices, following is a list of criteria considered during the development review process: 1.Restrict access where possible from the functional area of intersections. 2.Control turning movements at entrances where recommended by a TIA, right-in/right-out entrance design prevents left ingress and egress turning movements. 3.Limit or share access through a proposed development in order to prevent vehicles from backing up on to the major roads and to enhance onsite circulation. 4.Space intersections and driveway access points to plan for reduced traffic conflict points as traffic congestion increases: a.Align major intersections and minor entrances with positive offset(s) to increase safety. b.Provide a limited number of strategically located median crossovers in the planning area. c.Add exclusive turn lanes where required by NCDOT. d.Provide adequate separation between traffic signals to expand road’s traffic capacity and simplify signal synchronization. 5.Where feasible along arterials and collectors, share joint entrance(s) with adjoining property owner(s) through the recordation of joint access easements with maintenance provisions by adjoining property owner(s). 6.Where feasible along arterials, provide vehicular and pedestrian connections between adjoining properties through the recordation of access easement(s) with maintenance provisions, and construct connection(s) to the boundary with adjoining undeveloped parcel(s). 7.Provide frontage roads with non-residential development/redevelopment to increase safety on arterials and collector roads, and promote non-residential development for economic benefit. 8.Provide an interconnected street network in the planning area as generally indicated on the map (FIGURE 16) 9.Provide an interior access network from identified primary access points along arterial and collector roads. 10.Accommodate transit, bicyclists and pedestrians on roadways in the planning area. 11.Limit perennial stream crossings, and impacts to wetlands and steep topographical areas. 12.Required future road cross-sections shall be subject to NCDOT and Orange County review and are incorporated in the Burlington Graham, Triangle Area Rural Planning Organization and Durham-Chapel Hill-Carrboro Metropolitan Planning Organization Comprehensive Transportation Plans (CTP) by reference. 39 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 21 A.Roles and Responsibilities NCDOT has full authority over state roads but not over local land use decisions. Orange County regulates land use decisions but does not own or maintain local roads. Therefore, coordination is essential in balancing the two authorities when it comes to access management policies and procedures. Each agency has authority over a different part of the process and the partnership benefits the public, developer, and property owner whose financial investment is at stake. Role/Responsibility of the NCDOT NCDOT is responsible for regulating the location, design, construction, and maintenance of street and driveway connections on the State Highway system. The NCDOT recognizes landowners have certain reasonable rights of access consistent with their needs. However, access connections are a major contributor to traffic congestion and poor roadway facility operations that can result in decreased highway capacity, and increased safety hazards. Early NCDOT review of development proposals helps ensure conformance with access management requirements and provides NCDOT an opportunity to suggest changes prior to local project approval, which may occur well in advance of a request for a driveway permit. The NCDOT Access Management Group (of the Congestion Management Section of the Traffic Engineering and Safety Systems Branch) examines the potential safety and capacity impacts that new or expanding traffic generation may have on the state roadway system and provides recommendations based on the analysis. This process typically requires the completion of a Traffic Impact Analysis by the Developer/ Property Owner/Applicant. Other recommendations may range from denying access, to requiring the developer to construct additional travel or turn lanes, access restrictions, internal traffic pattern operations or installing new traffic signals to minimize the traffic impact. Role/Responsibility of Orange County Several sections of the Orange County UDO assist with implementation of the E-B-M AMP. The UDO requires site plans to comply with County adopted access management, transportation and/or connectivity plans and to denote the location of future roadways(s) and access easements, whether public or private, and to ensure and encourage future connectivity. The UDO also provides additional requirements for Economic Development Districts as well as the Major Transportation Corridor Overlay District (MTC). An important implementation tool for access management is the UDO requirement of a traffic impact analysis for all special use permits, major subdivisions, conditional zoning applications, site plans that exceed 800 trips per day, and for 80 or more dwelling units of residential development. Additionally, a traffic impact analysis may be required when a road capacity or safety issue exists. The purpose of the traffic impact analysis is to insure that proposed developments do not adversely affect the road network and to identify any traffic problems associated with access from the site to the existing transportation network. The objective of the traffic impact analysis is to identify solutions to potential problems and to present improvements to be incorporated into the proposed development. 40 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 22 As individual developments occur in the planning area, permits can be issued that conform to the access management plan, or permits outlining conditions (whether through conditional zoning, special use permits, or site plan reviews) can be issued so that the development will ultimately be in conformance. NCDOT representatives provide technical assistance and support. Orange County can assist the NCDOT by attaching conditions to development approvals to require actions from the developer that support access management. This may include conditions that require unified access and circulations systems, alternative access roads, or joint and cross access. All development in the planning area must be in accordance with NCDOT Policy on Street and Driveway Access to North Carolina Highways. Continued intergovernmental coordination with the City of Mebane will be important to realizing desired development and access management within the planning area since the City will be the service provider of public water and sanitary sewer. Role/Responsibility of the Developer /Property Owner/Applicant A development applicant, such as the property owner and/or developer, is required to coordinate with Orange County and the NCDOT to identify possible conflicts with local, state, or federal regulations and plans, including adopted access management plans. A traffic impact analysis may be required to be prepared by the applicant’s engineer, to determine any traffic concerns associated with access from the site to the existing transportation network, and to identify solutions to potential problems for incorporation into the proposed development. Additionally, prior to beginning any site disturbance work, the applicant is responsible for obtaining all applicable permits required for construction within the highway right-of-way resulting from development, including but not limited to, a Street and Driveway Access Permit issued by the NCDOT District Engineer, and all applicable environmental permits (i.e., erosion control, water quality, and wetlands). All applicants are required to coordinate with all agencies involved, including other local governments, to identify conflicting or overlapping access issues. B.Resources The plan may require future updates as development occurs and other access management issues are identified. While North Carolina counties do not own or maintain local roads, they do have certain authority over land use decisions, and through innovative use of local regulations, Orange County can adopt local policies and ordinances aimed at addressing specific issues such as access management. A variety of tools are made available including and not limited to: x Land Development Regulations x Special Service Districts x Intergovernmental Agreements x Complete Streets Policy x Exactions 41 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 23 IV.Appendix A.2011 E-B-M EDD AMP B.2017 E-B-M Transportation Study C.Community Meeting 42 Efland-Buckhorn-Mebane Access Management Plan Orange County Planning Department Page 24 APPENDIX A 2011 Efland-Buckhorn-Mebane Access Management Plan 43 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 25 44 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 26 45 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n Or a n g e C o u n t y P l a n n i n g D e p a r t m e n t Page 27 46 Efland-Buckhorn-Mebane Access Management Plan ACCESSMANAGEMENTPROGRAM (ToBeAppliedWithinCorridorsAndDevelopmentZones) ACCESSMANAGEMENTCONCEPTS 1.Driveway-RelatedCrashes Muchofaccessmanagement involvesmanagingtrafficmovementsintoandout of commercial driveways. Thereasonforthisisthatdrivewaytrafficgeneratesa large number ofcrashesonmajor roadsandstreets-arterialsandcollectors. 2.DrivewaySpacing Maintaininganadequatespacingbetweencommercial drivewaysisoneof the most critical aspectsofaccessmanagement. 3.DrivewayDensityAndDrivewayConsolidation Drivewaydensity(thenumber ofdrivewaysperblockor permile)anddriveway consolidationareveryimportantconsiderationsinaccessmanagement.These roadwaycharacteristicsarebasicissuesinanyaccessmanagement planor program. 4.Intersection SpacingAndTrafficSignalSpacing Althoughmost discussionsabout accessmanagementfocusonthe management of privatedriveways,properspacingofroadwayintersectionsisan equallyimportant accessmanagement issue. Whyisintersectionspacingimportant? Theimportanceofintersectionspacingissimilar tothatofdrivewayspacing. As the number ofintersectionsper mileincrease,theopportunityfor crashes increases.The existenceoftoomanyintersectionsper milealsoincreasesdelay andcongestion.Ontheother hand, not providinganadequatelydensestreet networkforcesmotoristsand pedestrianstotravelfarther totheirdestinations. 5.FunctionalAreasOfIntersections Itisimportanttoprotect thefunctional areaofanintersectionfromdriveway access. Drivewayslocatedwithinthisareamayresultinhighercrashratesand increased congestion. What isthefunctional areaof anintersection? Thefunctional areaofanintersectionisthatareabeyondthephysical intersection of tworoadwaysthat comprisesdecisionandmaneuveringdistance,plusany requiredvehiclestoragelength.Thefunctional areaincludesthelengthofroad upstreamfrom anoncomingintersectionneededbymotoriststoperceivethe 47 Efland-Buckhorn-Mebane Access Management Plan intersectionandbeginmaneuverstonegotiateit.Theupstreamareaconsistsof distancefor travel duringa perception-reactiontime, travel formaneuveringand deceleration,andqueuestorage. Thefunctional areaalsoincludesthelengthof roaddownstreamfrom theintersection neededtoreduceconflictsbetweenthrough trafficandvehiclesenteringandexitinga property. 6.ConflictPoints Conflictspointsarecommonlyusedtoexplaintheaccident potential ofaroadway. Accessmanagement strategiesaretypicallydesignedtoreducethenumberand densityofconflictpoints. What isaconflict point? A conflict pointisthepointatwhichahighwayusercrossing,mergingwith,or divergingfromaroador driveway conflictswithanother highwayuserusingthesame roadordriveway.Itisanypointwherethepathsoftwothroughorturningvehicles diverge, merge, or cross. 7.Speed DifferentialBetween TurningVehiclesAndThrough Traffic Speeddifferential isasimpleyetimportant concept thatformsthebasisfor many accessmanagement measures. What isspeeddifferential? Speeddifferential isthedifferencebetweenthespeedofvehiclesthat arecontinuing alongthemainroadwayversusthosethatareenteringandexitingthedrivewayFor instance, ifthroughtrafficgenerallymovesat 35milesper hour andcarshavetoslow to10milesperhourtoenter adriveway,thespeeddifferential atandnearthat drivewayis25milesper hour. Whyisspeeddifferential important? A speeddifferential above20milesper hour beginstopresent safetyconcerns.When thespeeddifferential approaches30to35milesperhour,thelikelihoodofacollision betweenfast movingthroughvehiclesandturningvehiclesincreasesveryquickly. 8.BenefitsOfAccessManagement Aneffective,local accessmanagementprogram canplayanimportantrolein preservinghighwaycapacity,reducingcrashes,andavoidingor minimizingcostly remedial roadwayimprovements.Thetravelingpublicwouldthenbenefitfromfaster andsafertravel.Thegreat majorityofbusinesseswouldbenefitfromincreased economicvitalityalongawell-managedcorridor.Taxpayerswouldbenefitfrommore efficient useofexistingfacilities. Andpublicagencieswouldbenefitfromtherelatively lowcostofaccessmanagement;theycouldthenusetheirresourcesfor otherneeds. 48 Efland-Buckhorn-Mebane Access Management Plan 9.EconomicImpactsOfAccessManagement Businessownersoftenareconcernedthatchangesinaccesstotheirpremiseswill havetemporaryor permanentimpactsontheirsales. Theyareconcernedthat changesindirectaccesstotheir property-suchasconsolidatingdrivewaysorinstalling raisedmedianswillleadtodeclinesinpatronageandsales. Perceivedimpactsof accessmanagement onadjacentcommercial businessesandlandownersareoften majorimpedimentstoprojectsmovingforward. Inthecaseofaccessmanagement, perceptionsareoftenworsethanreality. Accessmanagement beforedevelopment offersclarityandrelievesthepost- developmentdifficultyinretrofitting. 10.AccessManagementAnd Pedestrian Safety Accessmanagementisusuallypromotedasawaytoimprovedrivingconditionsfor motorists.Clearly,accessmanagementtechniquescanleadtoroadsandstreetsthat aredramaticallysaferandmucheasier andmorepleasanttodrive. However, researchalsoindicatesthatseveralkeyaccessmanagementtechniquesarejustas valuabletopedestrians.Theseinclude: •reducingthenumber ofdriveways,particularlycommercial driveways,withina givendistance(per blockor mile) •providingfor greaterdistanceseparationbetweendriveway •providingasaferefugeforpedestriancrossingswithraisedmedians COMMONACCESSMANAGEMENTTREATMENTS 11.DrivewayGrade Alongolder urbanarterial streets,itiscommontofindrather steepdrivewayswith grades(or slopes) of5-10percentormore.Drivewayswithsteepgradeswereoften constructedtoallowthedrivewayandconnectingparkinglotstodrainmoreefficiently andtosaveearth-movingcosts.Ontheotherhand, morerecentlyconstructed arterialstypicallyfeatureverygentledrivewaygrades. Drivewaygradeisanimportant –yetoftenoverlooked–safetyconsideration. Themaximum practicalgradefor drivewaysvariesbetween8-14percentforlow- volumedrivewaysandfivepercent for high-volumedriveways(a30-footlongdriveway witha14percent gradewouldriseorfall aboutfour feet alongitslength). Furthermore, themaximumpracticalchangeingradeisabout 12percent.Abovethis value,manyvehicleswillscrapetheirbumpersorother low-hangingpartsonthe driveway,potentiallycausingdamagetothevehicleanddrivewayorroadwaysurface. Whilethismaybethemaximumpracticalgrade,itismuchsafertouseasmaller grade. Aminimalgrade(say,twopercent)isstill neededfordrainage. 49 Efland-Buckhorn-Mebane Access Management Plan 12.DrivewayWidth Alongolder urbanarterial streets,itiscommontofindmanynarrowdriveways. Older commercial drivewayandparkinglotdesignstendedtousetentofifteenfootwide driveways. Thistypeof designwill safelyaccommodateonlyonevehicleatatime, eitheranenteringoranexitingvehicle. Another commonproblemisdrivewaysin urbanandrural areasthataretoowide. Insomecases,thedrivewaymayhaveno discernibleboundariesorcurbs. Bothsituationscreateoperational andsafety concerns.A properlydesigneddrivewayhelpsturni ngtrafficmoveoff theroadway morequicklyandreducesthelikelihoodofcrashes. 13.Clearing DrivewaysAwayFromCorners Clearingdrivewaysawayfrom cornersisthesimplest,yet perhapsthemostcritical accessmanagement treatment. What iscornerclearance? Cornerclearanceistheminimum distancerequiredbetweenanintersectionandan adjacent drivewayalonganarterial roador collectorstreet. 14.Shared/JointDrivewaysAnd/OrCrossAccess Drivewayspacinganddrivewaydensityareimportant considerationsinmanaging access.Whendrivewaysarespacedtoocloselytogetherorthenumber ofdriveways perblockor milebecomestoolarge, a significantincreaseintrafficaccident rates occurs.Trafficalsotendstobecomecongestedmorequicklyinsuchsituations. What isdrivewaysharing? A shareddrivewayiswhentwoor moreadjacent propertiesusethesamedrivewayfor ingressand/or egress.Shareddrivewaysareverycommoninnewercommercial areas,forinstanceat stripmalls, regional shoppingcenters, andofficeparks.Sharing drivewaysissimplygooddesignpracticesinceconflictpointscausedbymotorists enteringandleavingthebusinessesarereduced.Thiswill,inturn,tendtoreduce trafficaccidentsassociatedwithturningtrafficandimprovethetrafficflowonthemain road. What arejointandcrossaccess? Jointandcrossaccessareformal,legalmethodsofensuringthat adjacent properties cansharedriveways. Inthecaseof jointaccess,twoadjacent propertyownersshare adrivewayalongtheir commonpropertyline. Inthecaseof crossaccess, one propertyownerhasthelegalrighttoaccessanduseadrivewaythatisontheadjacent propertyowner’sland. Jointandcrossaccesscanbebuiltintoprivatereal estatetitlesthrougheasements. Theycanalsobeencouragedor requiredinlocalplanningor designstandardsorin municipal andcountyordinances. 50 Efland-Buckhorn-Mebane Access Management Plan 15.ContinuousTwo-WayLeft-TurnLanes Continuoustwo-way-left-turnlanes(TWLTL) areacommonaccessmanagement treatmentwhencombinedwithdrivewayconsolidationandcorner clearance.TWLTLs simultaneouslyprovideaseparatelaneforleftturningvehiclesandpropertyaccess. Typically,theyareusedasthecenter laneofafive-laneroadway.Alesscommon designinvolvesthreelanes,aTWLTLinthecenter for leftturnsandonelaneineach directionfor throughtraffic. Recent theorysuggestsavoidingthisdesignunlessroadright-of-wayconditionsare restrictive. 16.Three-LaneRoadwaysWith Two-WayLeft-TurnLanes Continuous two-wayleft-turnlanes(TWLTL) areacommonaccessmanagement treatment. Typically,theyareusedinthecenterofafour-laneroadway.However,aless- commondesigninvolvingthreelanes–aTWLTLinthecenterfor leftturnsand one laneineachdirectionforthroughtraffic–isbeingusedmoreandmorefrequently.At first,theideaofathree-laneroadmayseem strange. Butundertheright circumstancestheycanworkverywell,operatingbetter andmoresafelythanafour- laneundividedroad. 17.RaisedMediansAtIntersections Raisedmedianswithleft-turnlanesatintersectionsoffer acost-effectivemeansfor reducingaccidentsandimprovingoperationsat higher volumeintersections.Theleft- turnlanesseparateslower turningvehiclesfrom throughtrafficandprovideaprotected spaceforthesevehiclestodecelerateandturn.Theraisedmedianprohibitsleftturns intoandoutofdrivewaysthatmaybelocatedtooclosetothefunctional areaofthe intersection. 18.ContinuousRaisedMedian Continuousraisedmedianswithwell-designedmedianopeningsareamongthemost importantfeaturesformanagingaccesstocreateasafeandefficient highwaysystem. 19.Comparison OfRaisedMedianAndTwo-WayLeft-TurnLanes Becauseraisedmediansarethemostrestrictiveaccessmanagement treatment, buildingaraisedmedianalonganarterial isoftenverycontroversial amongbusiness andpropertyowners.Two-wayleft-turnlanes(TWLTL) aremuchlessso. Business personsandpropertyownersfeel thatinstallationofraisedmedianswill havealarge, negativeimpactontheir customers,sales,andpropertyvalues. Therefore,TWLTLs areoftensuggestedasacompromisesolution. However,TWLTLsalsorepresent a safetycompromisewhencomparedtoraisedmedians. Theyshouldbeusedwith care. 51 Efland-Buckhorn-Mebane Access Management Plan 20.FrontageAndBackageRoads Frontageandbackageroadsrunparallel themainlinerouteandprovidealternative accesstoproperty.Propertyaccessisprovidedalongthefrontageorbackageroad, whichaccessesthearterial viaacrossroad(withatrafficsignal ifnecessary).This reducesthenumberanddensityofconflictpointsassociatedwithstripdevelopment. Theseroadsaregenerallyapplicabletocommercial development. A backageroad providesaccesstotherear sideofcommercial properties locatedbetweenthebackageroadandthearterial.It alsoprovides accesstopropertieslocatedontheoppositesideofthebackageroad fromthearterial,thusincreasinglandvaluesandreducinginfrastructure coststoindividual properties. A frontageroad providesaccesstothefront sideofcommercial propertieslocatedalongthearterial.Caremustbetakentoensure adequateseparationbetweenthearterial andtheintersectionofthe frontageandcrossroads. Whyarefrontageandbackageroadsimportant? Frontageandbackageroadsreduceconflictpointsbetweenthroughtrafficandturning trafficassociatedwithstripdevelopmentanddirectpropertyaccesstothearterial. Conflict pointsareassociatedwithreducedlevelsofroadwaysafetyandoperations. Studieshaveshownthat whendrivewayaccesstoarterial roadwaysisgrantedtotoo manypropertyownerswithout consideringfuturetrafficvolumesandroad classifications, theadditional drivewaysincreasetherateofaccidentsanddecrease theefficiencyoftheroadway. 21.Dedicated LeftAndRightTurningLanes Oneof themajor concernsoftransportationengineersandplannersincitiesand suburbanareasiskeepingthroughtrafficmovingat asmoothandevenpace.When trafficcan’tmoveat anevenpace,delaysandcongestionaretheresult.This frustratesmotoristsandcreatesopportunitiesfor“fender-bender” crashes.Oneofthe simplestwaystoaccomplishsmoothandeventrafficistoremovetheturningtraffic fromthethroughtrafficflowatroadintersectionsandnear busydriveways.Often, dedicatedturninglanesareprovidedtoservethat purpose. Manytimesturninglanes areusedinconjunctionwithraisedmediansandmediansatintersectionstoprovide additional safetybyprotectingturningtraffic. 22.DrivewayTurnRadius Turnradiusreferstotheextentthattheedgeofacommercial drivewayis“rounded” to permit easier entryandexitbyturningvehicles. Drivewayentranceswithlongerturn radii helpslower,turningtrafficmoveoff thearterial morequickly.Theyalsohelp trafficleavingadrivewayturnandenterthestreamoftrafficmoreefficiently. Guidelinesfor turnradiiaregenerallyappliedtonon-residential developmentsand subdivisions. 52 Efland-Buckhorn-Mebane Access Management Plan 23.InternalCirculationInLandDevelopments Internal sitedesignisprobablythemostneglecteddiscussionpoint inaccess management.Itwouldbenatural tothinkthataccessmanagement concernsstopat theroadwayright-of-wayline,but infact theycarrythroughintothepropertythat is providedwithaccess. Whyisinternal sitedesignimportant? Themovementof trafficintoandout ofpropertiescanbedramaticallyaffectedbythe internal designfor on-sitecirculation.Theinternal designofcirculationonaproperty mayhelpor hinder trafficturningofforontoanarterial street.Thisinturnaffectsthe speeddifferential betweenturningandthroughtraffic. What isthebestwaytodesignforinternalcirculation? Theinternalcirculationofalanddevelopment functionswellwhenitisdesignedwith respect tohighwayaccesspoint(s) rather thanthebuilding(s).Designshouldstart fromtheoutsideinandfinishwiththeparkingandbuilding.Veryoften,theopposite approachistaken.Thecirculationdesignofdrivewaysandparkinglotsaredonelast. Hereistheoptimal internal circulationdesignapproach: 1. Providesafeandreasonableaccesstoandfromthestreettomotoristsand pedestrians. 2. Provideareasonabletransitionbetweentheaccessandtheinternalcirculation, especiallybymakingsurethedrivewaysarewideandlongenough. 3. Designtheparkingareaandindividual parkingspaces. 4. Designthebuildingfootprintwithintheconstraintsoftheinternalcirculationandthe parking. OTHER CORRIDOR DESIGNCONSIDERATIONS 24.SightDistance Guidelinesfor adequatesight distanceareoneofthemostimportant andbasic approachesacommunitycantakeinmanagingaccesstoitsroadways. Sight distance guidelinescanhelpcommunitiesensurethat itsarterialsaresafeformotoristsand pedestrians.Sightdistanceguidelinescanalsohelpcommunitiespromoteadequate spacingofresidential andcommercial driveways. What issightdistance? Sight distanceisthelengthofhighwayvisibletoadriver.A safesightdistanceisthe distanceneededbyadriveronanarterial,oradriverexitingadrivewayorstreet,to verifythattheroadisclearandavoidconflictswithothervehicles. Sighlinesmust be keptfreeofobjectswhichmight interferewiththeabilityofdriverstoseeother vehicles. Featuressuchashills,curvesintheroad,vegetation,other landscaping, signs,andbuildingscanreducesightdistance. 53 Efland-Buckhorn-Mebane Access Management Plan 25.IncorporatingAestheticsIntoAccessManagement Accessmanagement projectsofteninvolvewideningexistingroadwaystoaddeither anadditional two-way-left-turnlane(TWLTL) or araisedmedian. Suchprojectscan leadtoawideexpanseofconcreteandasphalt.Anaestheticallypleasingtreatment, however,doesnotneedtoruncounter tosoundaccessmanagement practices.In fact,aestheticscanandshouldbeincorporatedintoaccessmanagement project plans. Whyareaestheticsimportant? Accessmanagement projectsaremuchmorelikelytobeacceptedbythepublicand bybusinessownersofadjacent propertiesiftheylookgoodaswell asimprovesafety andtrafficflow. 26.Clear Zones,UtilityPlacementAndLighting Adequateclear zoneswithproper placementofutilitiesandsufficientlightingare essential componentsofwell designedroadways. Properdesignwill helpensure sufficient sight distanceandimproveroadwayoperatingsafety. What isaclearzone? TheAmericanAssociationofStateHighwayandTransportationOfficials(AASHTO) GreenBook statesthat “aclearzoneisusedtodesignatetheunobstructed, relatively flatareaprovidedbeyondtheedgeofthetraveledwayfor therecoveryoferrant vehicles.”Utilities, structures, signs, trees,andotherobjectsshouldnot belocated withintheclearzone. 54 Efland-Buckhorn-Mebane Access Management Plan Bi k e l a n e Vehicle Lane Vehicle Lane Bi k e l a n e 2. 5 ’ Cu r b & g u t t e r Si d e w a l k Ut i l i t i e s Cu r b & g u t t e r Bi k e l a n e 2. 5 ’ Bi k e l a n e Ut i l i t i e s Si d e w a l k Figure1a. 80’PROPOSEDSTREETCROSSSECTION SHOULDERSECTION 80’ 11’–12’11’–12’ 19’–20’19’–20’ Shoulder &Shoulder & Drainage Drainage si d e w a l k si d e w a l k Figure1b. 80’PROPOSEDSTREETCROSSSECTION CURB&GUTTERSECTION 80’ 5’4’11’–12’11’–12’11’–12’4’5’ VehiclelaneLeftturn lane Vehiclelane 55 56 Efland-Buckhorn-Mebane Access Management Plan APPENDIX B 2017 Transportation Study 57 58 TransportationReportfortheEflandͲBuckhornͲ MebaneStudyArea PreparedFor: OrangeCountyPlanning&InspectionsDepartment 131W.MargaretLane,Suite201 P.O.Box8181 Hillsborough,NC27278 May2017 PreparedBy: 5540CenterviewDrive Raleigh,NC27606 59 Contents Section1ͲIntroduction...................................................................................................................................3 PurposeandBackground.....................................................................................................................................3 AccessManagement............................................................................................................................................3 BusinessImpacts..................................................................................................................................................5 ComprehensiveTransportationPlan(CTP).........................................................................................................5 Section2–ExistingConditions.......................................................................................................................6 EnvironmentalFeatures.......................................................................................................................................6 Cultural&ĞĂƚƵƌes......................................................................................................͘͘͘..................................6 ExistingRoadwayNetwork............................................................................................................................9 Section3–FutureNetwork....................................................................................................................10 FutureLandUseMap...................................................................................................................................10 StudyAreaBuildoutAnalysis.......................................................................................................................12 FutureRoadwayNetwork............................................................................................................................15 TypicalSections..............................................................................................................................................16 TrafficVolumeAnalysis...............................................................................................................................22 IntersectionAnalysis...................................................................................................................................25 Section4–CostAnalysis.........................................................................................................................43 ConceptualDesign..........................................................................................................................................43 ConstructionCostEstimate.............................................................................................................................43 Section5–Conclusion...............................................................................................................................44 AttachmentAͲStudyAreaMap...............................................................................................................45 AttachmentB–SHPOCulturalResourcesResponseLetters.................................................................47 StudyArea1ASHPOResponseLetter...........................................................................................................48 StudyArea1BSHPOResponseLetter...........................................................................................................50 StudyArea2ASHPOResponseLetter...........................................................................................................51 StudyArea2BSHPOResponseLetter...........................................................................................................53 AttachmentC–FormulasandAssumptions..........................................................................................54 Formulas........................................................................................................................................................55 Assumptions......................................................................................................................................................55 BuildoutAnalysisSpreadsheet......................................................................................................................58 AttachmentDͲTrafficVolumeData.....................................................................................................59 1 60 FiguresandTables Figures Figure1ͲStudyAreafortheEflandͲBuckhornͲMebaneTransportationReport……………………………………....4 Figure2ͲExistingConditions.........................................................................................................................7 Figure3ͲEnvironmentalFeatures...............................................................................................................8 Figure4ͲFutureLandUseMap..................................................................................................................11 Figure5ͲDevelopmentPodMap................................................................................................................14 Figure6ͲTypicalSection2D......................................................................................................................17 Figure7ͲTypicalSection2A......................................................................................................................19 Figure8ͲTypicalSection3A......................................................................................................................21 Figure9Ͳ2014AADT...................................................................................................................................23 Figure10Ͳ2025AADT................................................................................................................................24 Figure11ͲStudyIntersections...................................................................................................................42 Tables Table1ͲAnticipatedTrafficGeneratedfromDevelopment......................................................................1ϯ Table2ͲConstructionCostEstimatesforNewRoads...................................................................................43  Table3ͲConstructionCostEstimatesforUpdatingExistingRoads..............................................................44 2 61 Section1ͲIntroduction PURPOSEANDBACKGROUND Theprimarypurposeofthistechnicalreportistodeveloparoadwaynetworktosupportinvestmentin theEflandͲBuckhornͲMebaneStudyArea,basedonanexaminationofexistingplans,futurelanduse, environmentalconstraints,culturalandhistoricresources,keytransportationconsiderations,andfuture developmentpotential.Thedatapresentedinthistechnicalreportwillprovidethebasisandjustification forrequiringthededicationofrightsͲofͲwayintheEflandͲBuckhornͲMebaneStudyAreaandmayserve asanappendixtotheupdatedEflandͲBuckhornͲMebaneStudyAreaAccessManagementPlan. Accessmanagementoftheroadnetworkinthestudyareawillfacilitateaccesstolandfordevelopment, whilemaintainingthesafetyandefficiencyoftheState’stransportationsystem.Thegoalsofanaccess managementplanincludecreatingaccesstonewdevelopmentsandensuringthatexistingfacilities remainoperatingatafunctionallevel.WithinOrangeCounty,theEflandͲBuckhornͲMebaneStudyArea wasselectedasalocationtoencouragefutureeconomicdevelopmentactivities,basedonitsstrategic locationalongmajortransportationcorridors.TheEflandͲBuckhornͲMebaneStudyArearunsalongthe northsideofIͲ40betweenBuckhornRoadandIͲ85/US70ConnectorandalongthesouthsideofIͲ40 fromBenWilsonRoadandMt.WillingRoad.RecentgrowthalongtheIͲ85/40corridorhasresultedinan averageincreaseoftrafficof3%eachyear;withtheexpectedgrowthofresidentialactivityandoffice, service,research,commercialandindustrialdevelopmentinthestudyarea,thefuturetrafficis anticipatedtoalsointensify.AmapoftheprojectstudyareaisshowninFigure1. ACCESSMANAGEMENT Accessmanagementisthesystematiccontrolofthelocation,spacing,designandoperationofdriveways, medianopenings,interchangesandstreetconnectionstoaroadway1.TheFederalHighway Administration’s(FHWA)officialdefinitionofaccessmanagementis“theprocessthatprovidesaccessto landdevelopmentwhilesimultaneouslypreservingtheflowoftrafficonthesurroundingsysteminterms ofsafety,capacity,andspeed.”Bycontrollingtheseaccesspoints,alocalorstategovernmentcan: Maintaintheoverallsafetyofthetransportationsystem; Minimizecongestion; Provideforefficienttrafficflowandpedestriansafety; Minimizecrashrates;ĂŶĚ Provideappropriateaccesstoadjacentbusinessproperties. Ultimately,OrangeCountyseekstodevelopanaccessmanagementplaninordertomaintainthe functionalityofthetransportationnetworkastheEflandͲBuckhornͲMebaneStudyAreadevelops. 1AccessManagementManual,TransportationResearchBoard,WashingtonD.C.2003 3 62 · St u d y A r e a f o r t h e E f l a n d - B u c k h o r n - M e b a n e T r a n s p o r t a t i o n R e p o r t - F i g u r e 1 FO R E S T A VE OUT H E R N D R St u d y A r e a 1 in = 3,400 feet 0 2,000 Pa r c e l Feet Orange County Planning and Inspections Brian Carson (12/21/2016) ES T T E N R TON RD O SELEVENTHST ARRYRD CENTER IN 463 BUSINESSIMPACTS Addressingtheroadwaynetworkandaccessmanagementissuesduringtheplanninganddevelopment oflandinthestudyareaandtransportationprojectscanhelpacommunityinvariousways.Customers areseekingbusinesseswithunblockeddrivewaysandeasyaccesswhilebusinessesareseekingaccessto signalizedintersectionsandinterconnecteddevelopmentswhichalloweasyaccesstointerstatefacilities. Havingaplaninplacetoaddresstheneedsofthecommunityiscriticaltotheeconomicprosperityof theregionandultimatelytotheStateofNorthCarolina. COMPREHENSIVETRANSPORTATIONPLAN(CTP) TheNorthCarolinaDepartmentofTransportationandOrangeCountyadoptedtheOrangeCounty ComprehensiveTransportationPlan(CTP),whichprovidesprojectrecommendationsforruralareasof thecounty,in2013.TheDurhamͲChapelHillͲCarrboroMPO(DCHCMPO)CTPiscurrentlyunder developmentandwillbeadoptedin2017.Thisplanaddressedfuturetransportationneedsinthe urbanizedareas.TheOrangeCountyUnifiedDevelopmentOrdinance(UDO)willbeusedtofurtherfoster economicdevelopmentintheMebane/BuckhornEconomicDevelopmentDistrict(EDD). UnderStatelaw(N.C.G.S.§136Ͳ66.2),MetropolitanPlanningOrganizations(MPOs)andmunicipalities shalldevelopComprehensiveTransportationPlans(CTPs)incooperationwiththeNorthCarolina DepartmentofTransportation(NCDOT).Formunicipalitiesandcounties,orportionsthereof,located withinanMPOplanningarea,thedevelopmentofaCTPshallbebytheMPOincooperationwiththe NCDOT.TheCTPisnotrequiredtobefiscallyconstrainedandnominimumhorizonyearorupdate timeframesarespecified.TheCTPistheelementoftheMetropolitanTransportationPlan(MTP)that identifiestransportationneedsbeforefiscalconstraintisapplied. UnderFederallaw(23U.S.Code§134),MPOsarerequiredtoprepareaMTP.TheMTPisrequiredto addressthefederalplanningrequirementsin23U.S.C.§134,whichincludebeingfiscallyconstrained, havingaminimum20yearhorizon,andbeingupdatedevery4yearsinairqualitynonͲattainmentor maintenanceareas(every5yearsinattainmentareas). ItisimportanttonotethattheCTP/MTPdoesnotincludeeveryroadonthehighwaysystem.Assuch,in accordancewithG.S.§136Ͳ66.2,tocomplementtheroadwayelementoftheCTP,municipalitiesand MPOsmaydevelopacollectorstreetplanand/orincludeadditionalprojectsthatmaybeincludedinthe transportationplanifreasonableadditionalresourcesbeyondthoseidentifiedinthefinancialplanwere availabletoassistindevelopingtheroadwaynetwork.TheDepartmentofTransportationmayreview andprovidecommentsbutisnotrequiredtoprovideapprovalofthecollectorstreetplan.TheCTPand thelocallyapprovedcollectorstreetplan(s)worktogethertoidentifythefuturetransportationsystem. ThestreetandhighwayelementsoftheplansdevelopedpursuanttoG.S.§136Ͳ66.2shallserveasthe planreferencedinG.S.§136Ͳ66.10(a),whichaddressesthereservationanddedicationofrightͲofͲway underlocalordinances. LocallyapprovedtransportationplansmaycontainstreetorhighwayrightͲofͲwayalignmentand dedicationrecommendationsorrequirements,andcollectivelyfunctionasthecollectorstreetplanfor theMPOormunicipalityasreferencedunderG.S.§136Ͳ66.2. 5 64 TheconceptsshownonaCTPareforplanningpurposesandaresubjecttochange.Theseconceptswillneed additionalanalysistomeetstateandfederalenvironmentalregulations,todeterminefinallocationsand designs,andtobefundedforimplementation.TheOrangeCountyUDO,Sections6and7includesthe requirementsforreservinganddedicatingrightofwayorrequiringconstructionofroadslistedinAccess ManagementPlansorontheCTP.Specificmentionisalsomadetothededicationofrightofwaybasedon theconceptsshownontheCTPandlocalcollectorstreetplans,basedonN.C.G.S. §13666.2and§13666.10. Section2–ExistingConditions ENVIRONMENTALFEATURES Tobeginthetransportationreportdevelopmentprocess,OrangeCounty’senvironmentalcontractor,Pilot Environmental,Inc.(PEI)conductedpreliminarystudieswithintheStudyArea:Wetlandsdetermination, threatenedandendangeredspeciesdetermination.Specifically,PEI’sfieldworkanduseofexistingfederal andstateagencydatadeterminedthepresenceofanystreams,pondsandWetlands,assessmentofpotential historicproperties/structuresand/orarchaeologicalremains,andobtaininformationregardingfederally protectedthreatenedandendangeredspeciesthatcouldbelocatedinthearea.Theprojectwasbrokeninto fourstudyareas:1A,1B,2A,and2B,amapofwhichisshowninAttachmentA.Thepurposeoftheworkwas todocumentenvironmentallysensitiveareastoassisttheCountyinlongͲrangeplanningandregulating futureroadnetworksrelatedtodevelopmentproposalsinthearea.Thefutureroadnetworkproposalswill ultimatelybedevelopedtomitigateimpactsonenvironmentalfeaturesintheStudyArea.Figure2depicts theExistingConditions,highlightingwaterfeatures,schools,andcemeteries.Figure3contains EnvironmentalFeaturesincludingendangeredspeciesandelevationcontours. CULTURALFEATURES PEIalsoconductedaculturalresourcesinquiryintheStudyArea.Acemeteryandseveralhistoric structureswerelocated.PEIsubmittedalettertotheStateHistoricPreservationOffice(SHPO)soliciting commentspertainingtotheStudyArea.CopiesoftheirresponsesareshowninAttachmentB.SHPO determinedthattheroadnetworkasproposedwillnothaveaneffectonanyofthehistoricstructure,and additionally,thecemeteryisprotectedinaccordancewithNCGSChapter65. PortionsoftheStudyAreaalsohaveahighprobabilityforthepresenceofarcheologicalresources. ArchaeologicaldatawasobtainedbutisnotdepictedonFigure2inordertoprotectsensitiveareas ofarchaeologicalinterest. 6 65 Existing Conditions No t e : T h i s m a p i s f o r p r e s e n t a t i o n u s e o n l y an d n o t t o b e u s e d f o r c o n s t r u c t i o n p u r p o s e s . 4 4 WE S T T E N R D I N D U S T R I A L D R MATTRESS F A C T O R Y R D SO U T H E R N D R W E S T T E N R D ROCK QUARRY RD B O W M A N R D BEN WILSON R D SO U T H E R N R A I L W A Y I- 8 5 / 4 0 I- 8 5 / 4 0 Legend CemeterykjCemetery Riverines Ponds Wetlands Lakes 4Schools Wetlands Streams Railroad F 01 0. 5 Mi l e s §¨¦ §¨¦ §¨¦I-85/40 FO R E S T A V E BUCKHORN RD BUCKHORN R D MT. W I L L I N G R D US - 7 0 US-70 US - 7 0 US - 7 0 Figure 2766 Le g e n d Ri v e r i n e s Po n d s NW I W e t l a n d s La k e s En d a n g e r e d S p e c i e s El e v a t i o n C o n t o u r s 0 0. 5 1 Mi l e s No t e : T h i s m a p i s f o r p r e s e n t a t i o n u s e o n l y an d n o t t o b e u s e d f o r c o n s t r u c t i o n p u r p o s e s . En v i r o n m e n t a l F e a t u r e s M a p Figure 3 Ar c h a e o l o g i c a l d a t a i s n o t p r o v i d e d o n th i s ma p i n o r d e r t o p r o t e c t s e n s i t i v e a r e a s of ar c h a e o l o g i c a l i n t e r e s t . H o w e v e r a r c h a e o l o g i c a l si t e ac r e a g e i n t h e s t u d y a r e a w a s c o n s i d e r e d i n o u r an a l y s i s an d w a s r e m o v e d f r o m t h e t o t a l b u i l d a b l e area ca l c u l a t e d fo r t h e p u r p o s e s o f t r i p g e n e r a t i o n . F 867 EXISTINGROADWAYNETWORK Theprojectarea(showninFigure1)isapproximately4.25squaremilesboundedonthewestbyBen WilsonRoad,ontheeastbyTheIͲ85/USͲ70Connector,onthenorthbyUSͲ70,andonthesouthbyWest TenRoadandBowmanRoad.Thearealiesbetweentwomunicipalities,MebaneandHillsborough.A descriptionofthetransportationfacilitiesinthegeneralvicinityoftheprojectstudyareaisasfollows: IͲ40/IͲ85isaneightͲlaneinterstatethatrunsconcurrentlythroughGuilford,Alamance,andOrange Counties.IͲ40divergesfromIͲ85atexit163southofHillsborough.Thepostedspeedlimitis65mphand theAADTis98,000vehicles/day. BenWilsonRoadisatwoͲlanemajorconnectorwhichisaccessedfromtheMebaneOaksRoad interchangeonIͲ85/40andcarriesmainlyresidentialtraffic.Itwasrecentlyextendedtoactasaservice roadforemployeesofMorinagaAmericaFoods,Inc.TheextensionofBenWilsonRoadtoMebaneOaks Roadhasbeenstudied,howeverplanshavenotbeenapprovedandwillnotbediscussedinthisreport. Thepostedspeedlimitis35mph. WestTenRoadisatwoͲlanemajorconnectorsouthofIͲ40/IͲ85whichrunsfromMattressFactoryRoad totheIͲ85Connector.Thepostedspeedlimitis55mph,exceptfora45mphsectionnearGravellyHill MiddleSchool,andtheAADTis1,800vehicles/day. MattressFactoryRoadisatwoͲlanemajorconnectorthatisnorthofIͲ40/85whichrunsfromEast WashingtonStreet(SR1303)toWestTenRoad,intersectingatIͲ40/85.Thepostedspeedlimitis35mph andtheAADTis2,500vehicles/day. BuckhornRoadisatwoͲlanemajorconnectorstretchingfromUSͲ70inthenorthtoOrangeGroveRoad (SR1006)inthesouth.Withinthestudyarea,i.e.fromUSͲ70toWestTenRoad,BuckhornRoadhasa postedspeedof35mphandtheAADTis2,700vehicles/day. US70isatwoͲlaneroadclassifiedasanOtherPrincipalArterial,whichprovideseastͲwestaccessacross OrangeCountyfromIͲ85andDurhamintheeasttoMebaneinthewest.USͲ70representsthenorthern boundaryofthestudyarea.Thepostedspeedlimitis45mphandtheAADTisbetween3,600and5,300 vehicles/day. IͲ85/USͲ70ConnectorisafourͲlaneinterstateprovidingaccessbetweenIͲ40/IͲ85andUSͲ70.Afull accessinterchangeisprovidedatIͲ40/IͲ85,whileapartialaccessinterchangeispresentatUSͲ70.The partialaccessinterchangerestrictswestboundtravelontoUS70fromtheIͲ85/USͲ70Connectorand southboundtravelfromUSͲ70ontotheIͲ85/USͲ70Connector.Thepostedspeedlimitis55mphandthe AADTis4,400vehicles/day. 9 68 Section3–FutureNetwork FUTURELANDUSEMAP TheFutureLandUseMap(FLUM)(Figure4)isakeycomponentoftheadoptedOrangeCounty2030 ComprehensivePlan.TheFLUMprovidesguidanceanddirectionregardingfuturelanduseplanningand developmenteffortsundertakeninthecounty,includingtheStudyArea.TheFLUMdefinesthelocation ofappropriatelanduseclassificationsthatwouldachieveadesiredpatternofdevelopment,andiscritical forachievingsustainablegrowth. ImplementationofthestatedlandusegoalsandobjectivesoftheComprehensivePlanisaccomplished primarilythroughtheapplicationofzoningdistrictsconsistentwiththeFLUM.Thelanduseclassifications depictedbytheFLUMprovidethelocationsinthecountywherecertainzoningdistrictsmayormaynot beappropriate.TheclassificationsdesignatedfortheStudyAreaare:CommercialͲIndustrialTransition; EconomicDevelopmentTransitionActivityNode;and10ͲYearTransition.Avarietyofzoningdistrictsare appropriatefortheseclassificationswithspecificsprovidedthroughaLandUseandZoningMatrixthat isincludedintheComprehensivePlan.Ifaproposedzoningdistrictisnotcompatiblewiththe classificationscontainedintheMatrix,reͲzoningcannottakeplaceunlesstheFLUMisamended. ThelanduseclassificationsoftheFLUM,togetherwiththeexistingandprojectedfuturezoningdistricts, informedabuildͲoutanalysisfortheStudyArea.Theanalysisprovidesanestimationoffuture development.Itservesasthebasisforestimationsoftheamountofadditionaltrafficthatcouldbe generatediftheStudyAreawasdevelopedtoitsfullpotential,aswellasservingasatoolforplanning forfutureimprovementstothetransportationnetwork. 10 69 Me b a n e Ef l a n d US 7 0 W B U C K H O R N R D LEBANON RD ECENTERST US 70 W WEST TEN RD I85US70CONNECTOR R IC H MOND RD H E B R O N C H U RCH R D B O W M A N R D FRAZ I E R R D EFLAND CED A R GROVE RD M A T T R E S S F A C T O R Y R D MILL CREEKRD BROOKHOLLOWRD IRA RD BU S H Y C O O K R D H I G H R O C K RD M EB A N E O A K S R D C H ES T N U T R I D GE C H U R CH RD *H Q H U D O  6 W X G \ Ar e a Fu t u r e L a n d U s e M a p o f t h e O r a n g e C o u n t y C o m p r e h e n s i v e P l a n 01 , 0 0 0 Fe e t 1 i n = 3 , 5 0 0 f e e t . Adoption Date: Nov 18,2008 Amended through November 2014 Wa t e r s h e d C r i t i c a l A r e a s Wa t e r S u p p l y W a t e r s h e d s Re s o u r c e P r o t e c t i o n A r e a s Pu b l i c I n t e r e s t A r e a s 10 Y e a r T r a n s i t i o n 20 Y e a r T r a n s i t i o n Ru r a l R e s i d e n t i a l Ag r i c u l t u r a l R e s i d e n t i a l Ci t y L i m i t s ET J Ac t i v i t y N o d e s Ru r a l N e i g h b o r h o o d Ec o n o m i c D e v e l o p m e n t T r a n s i t i o n Co m m e r c i a l - I n d u s t r i a l T r a n s i t i o n Or a n g e C o u n t y a n d P l a n n i n g a n d I n s p e c t i o n s D e p a r t m e n t . This copy printed July 19, 2016. Map is for reference use only.Contact Planning staff for verification of data. )L J X U H   1170 STUDYAREABUILDOUTANALYSIS AnimportantelementoftheTransportationReportfortheEflandͲBuckhornͲMebaneStudyAreawasthe preparationofabuildoutanalysis.Thebuildoutanalysisprovidesanestimationoffuture developmentandhelpsdeterminequantityandlocationoffuturegrowth.Theanalysisutilizedan OrangeCountyparcelmapwithaGISoverlay,andwasbaseduponanumberofattributes,amongthe mostimportantbeing: x Existinglanduses; x Existingzoning;and x TheadoptedFutureLandUsePlan DelineationofDevelopmentPods Basedprimarilyonacombinationoftheexistingroadnetwork,theexistingZoningMap,andthedesignated futurelanduse(pertheadoptedLandUsePlan),eighteen(18)developmentpodswerecreatedasabasefor estimatingfuturetripgenerationforthestudyarea.ThedevelopmentpodsaredepictedinFigure5,and rangeinsizefrom22acresto362acres. Thebuildoutanalysisprocessincorporatedanumberofattributes: x ZoningandFutureLandUsePlandesignationsforthepods. x Grossacreagesofdevelopmentpods,undevelopedland,currentnonͲresidentialland,current residentialacreagesincludingsubdivisionsanddevelopment,existingnonͲresidential development,andotherdevelopedareatobepreserved; x Documentationofenvironmentalandculturalconstraintsbydevelopableareas; x EstimationofappropriatelandusesbyITEcodes; x Considerationofdevelopmentregulationsrestrictingthepercentageofsitedevelopment; x Provisionofpublicservices(water,sewer); x Proximityofinterstateinterchanges; x Proximityofandpotentialaccesstotherailline; x Potentialimpactoffuturetransit(OPT);and x Anappliedmarketreductionfactorbasedonlocationandavailablepublicservices. Theprimaryconcerninthestudyareaintermsofdevelopingafeasiblefutureroadwaynetworkarethe presenceofstreamsthathaveafiftyͲfootvegetativebufferbasedontheNeuseRiverRiparianBuffer Rules.Whileroadwaycrossingofstreamsareallowableperthebufferrules,Volkertattemptedto minimizestreamcrossingsinthedevelopmentofthefutureroadwaynetworkandassumedthatno developmentwouldtakeplacewithinthestreambuffers. ThetripgenerationanalysisissummarizedinthespreadsheetprovidedinAttachmentC.Theresultofthe analysiswastheestimatedbuildableacresperpod.Theanalysisprovidesvaluableestimatedprojections aboutfuturelandusesanddevelopmentpotential,andservesasthebasisforestimationsoftheamount ofadditionaltrafficthatcouldbegeneratedifthestudyareawasdevelopedtoitsfullpotential.The analysisalsoservesasatooltobeusedtoconsiderfutureneedsandimprovementstothetransportation networkservingtheStudyArea. 12 71 FutureTraffic Futuretripstoandfromthedevelopmentpodsweredeterminedbycombiningdatafromexisting transportationimpactanalyses(TIAs)inthevicinity,NCDOTtrafficcounts,andtripgenerationdata, calculatedbasedonvariouslandusecodesandthebuildableareasofthepods.Theformulasandland usecodesusedtodeterminethetripdataarealistedinAttachmentC.Theanticipatednumberof vehiclesgeneratedfromthedevelopmentineachpodinshowninTable1below. Table1–AnticipatedTrafficGeneratedfromDevelopment PodArea(acres) Total Daily Traffic AMPeak Hour PMPeak Hour 186.87,4409861,025 219.12,781338302 381.021,9172,2272,144 4135.240,4324,1143,270 5,619.71,998189203 77.536,9553,4762,865 870.15,088715738 918.117,7361,5341,492 1048.64,336586574 117.14,516468466 124.93925149 1315.2925128124 148.54,896509507 1511.11,010127124 161.87728181 1779.316,2281,9311,770 1824.35,422647614 Note:Pods5and6werecombinedbecausePod5didnothaveanydevelopablearea.Thereareplansforthedevelopmentof additionalsoccerfieldsattheSoccer.comcenterinPod5whichwilladdanother3vehiclestothepeakhourofPod5/6. 13 72 De v e l o p m e n t P o d M a p No t e : T h i s m a p i s f o r p r e s e n t a t i o n u s e o n l y an d n o t t o b e u s e d f o r c o n s t r u c t i o n p u r p o s e s . 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 WE S T T E N R D I N D U S T R I A L D R MATTRESS F A C T O R Y R D SO U T H E R N D R W E S T T E N R D ROCK QUARRY RD B O W M A N R D BEN WILSON R D I- 8 5 / 4 0 I- 8 5 / 4 0 F 01 0. 5 Mi l e s Po d s w e r e c r e a t e d i n a r e a s o f p o t e n t i a l de v e l o p m e n t t o d e t e r m i n e f u t u r e t r a f f i c vo l u m e s b a s e d o n l a n d u s e s a n d p o d s i z e . 5 FO R E S T A V E US-70 US - 7 0 US - 7 0 US - 7 0 BUCKHORN RD BUCKHORN RD MT. W I L L I N G R D Figure 5 1473 FUTUREROADWAYNETWORK Basedontheinformationpresentedinthisreportandtakingintoaccountfunctionalclassification,design speed,trafficvolumes,characterandcompositionoftrafficandtypeofrightͲofͲway,theroadway networkonthefollowingpagesisrecommended.NCDOTAnnualAverageDailyTraffic(AADT)counts wereusedtodeterminethetrafficvolumessurroundingthestudyarea,whiletrafficstudiesforadjacent streetswerealsousedtoinformthisanalysis.Inrecommendingthesenewfacilities,OrangeCountyused thefollowingcriteriaasguidelines: 1.Serveallofthefuturedevelopmentareas 2.Keeptrafficoffoftheexistingroadwaynetwork 3.Provideaccesstotheexistinginterchanges 4.Minimizestreamcrossings 5.Avoidhistoricalareas,cemeteries,andarchaeologicalresources 6.Avoidcurrentlydevelopedproperties 7.Avoidwetlands,poorsoil,androck 8.CreatebetterconditionsfornonͲautomobilemodes RoadswillbeconstructedtothedesignspeedsprovidedforeachcrossͲsection. 15 74 TYPICALSECTIONS Typicalsectionsfortheproposedstreetswereevaluatedandselectedbasedonananalysisoffuture trafficvolumes,theNCDOTAverageAnnualDailyTrafficandNCDOT’sRoadwayDesignManual guideůines͘AllroadsareclassifiedaslocalroadsorminorcollectorsaccordingtoNCDOTFunctional ClassificationMaps. A.ForproposedstreetsAͲF1,2and4(seeninfigure6)thecrosssection2Dincludes2lanes undividedwithpavedshouldersandsidewalks.DuetotheproximityoftheCityofMebane,the citymayconsiderannexationofsomeadditionalareasatafuturedateandthenwillassumethe costsofsidewalkconstructionandmaintenance.Anannexationprocesswouldinclude coordinationwithOrangeCounty. RoadwayTableforTypicalSection2D Roadway Name Map Identifier Roadway TypeResponsiblePartyProposedCrossͲSection Type(LineColor) NewAANewDeveloperBuiltwithSidewalkinROW(FutureMebaneArea)TwoLane,Ditch,Sidewalk NewBBNewDeveloperBuiltwithSidewalkinROW(FutureMebaneArea)TwoLane,Ditch,Sidewalk NewCCNewDeveloperBuiltwithSidewalkinROW(FutureMebaneArea)TwoLane,Ditch,Sidewalk NewEENewDeveloperBuiltwithSidewalkinROW(FutureMebaneArea)TwoLane,Ditch,Sidewalk NewF1F1NewDeveloperBuiltwithSidewalkinROW(FutureMebaneArea)TwoLane,Ditch,Sidewalk Bowman2ExistingStateTIPTwoLane,Ditch,Sidewalk RockQuarry4ExistingStateTIP/DeveloperTwoLane,Ditch,Sidewalk Wilson9ExistingStateTIPTwoLane,Ditch,Sidewalk 16 75 ItisrecommendedthattheabovemapbeconstructedaccordingtocrossͲsection2D 9 Figure6 17 76 B.ForproposedstreetsF2ͲK,6,and7(seeninfigure7),thecrosssection2Aincludes2lanes undividedwithpavedshoulders.Astheseroadsarenotanticipatedtofallwithinthejurisdiction ofanyneighboringcommunityintheforeseeablefuture,nopedestrianamenitiesareincludedin thisarea.TheCountydoesnotbuildormaintaininfrastructure. RoadwayTableforTypicalSection2A Roadway Name Map Identifier Roadway TypeResponsiblePartyProposedCrossͲSection Type(LineColor) NewF2F2NewDeveloperBuilt(SidewalkBuiltOutsideofROWbyDeveloperperOrdinance)TwoLane,DitchSection NewGGNewDeveloperBuilt(SidewalkBuiltOutsideofROWbyDeveloperperOrdinance)TwoLane,DitchSection NewHHNewDeveloperBuilt(SidewalkBuiltOutsideofROWbyDeveloperperOrdinance)TwoLane,DitchSection NewIINewDeveloperBuilt(SidewalkBuiltOutsideofROWbyDeveloperperOrdinance)TwoLane,DitchSection NewJJNewDeveloperBuilt(SidewalkBuiltOutsideofROWbyDeveloperperOrdinance)TwoLane,DitchSection NewKKExistingStateTIPTwoLane,DitchSection Southern6ExistingNoImprovementPossibleduetoRailRightͲofͲWayTwoLane,DitchSection Forest7ExistingNoImprovementPossibleduetoRailRightͲofͲWayTwoLane,DitchSection 18 77 ItisrecommendedthattheabovemapbeconstructedaccordingtocrossͲsection2A Figure7 19 78 C.Forproposedroads1,3,5,and8(seeninfigure8),thecrosssection3Aincludes2laneswitha twoͲwayleftturnlaneandpavedshoulders.Thecrosssectionsdepictedbythiscrosssection mayalsoincludesidewalkswiththeproperrightͲofͲwayreservation. RoadwayTableforTypicalSection3A Roadway Name Map Identifier Roadway TypeResponsiblePartyCurrentCrossͲ SectionType ProposedCrossͲSectionType (LineColor) BenWilson1ExistingStateTIPTwoLane,DitchThreeLane,Ditch,Sidewalk WestTen3ExistingStateTIP TwoLane,DitchThreeLane,Ditch,Sidewalk Buckhorn5ExistingStateTIP TwoLane,DitchThreeLane,Ditch,Sidewalk MtWilling8ExistingStateTIP TwoLane,DitchThreeLane,Ditch,Sidewalk 20 79 ItisrecommendedthattheabovemapbeconstructedaccordingtocrossͲsection3A Figure8 21 80 TRAFFICVOLUMEANALYSIS Afterdevelopingtheproposedroadwaynetwork,Volkertassignedthetrafficvolumesgeneratedas discussedabovetotheroadwaynetwork.Informationindicatingtheprocessusedtogeneratetraffic volumesisincludedinAttachmentD. Fortheareaswithfuturedevelopmentproposed,Volkertassumedthatalltrafficwouldbegoingto/ comingfromtheclosestinterchange,i.e.:trafficonthewestsideofthestudyareawouldbegoingto theinterchangeatBuckhornRoadandIͲ40andanytrafficontheeastsidewouldbegoingtothe interchangeatMountWillingRoadandIͲ40.ThePodTrafficvolumesgeneratedinTable1wereadded tothefuture2025AADTsoftheexistingroadwaynetworkbasedontheƉƌŽƉŽƐĞĚaccesspoints.Pod trafficvolumeswereassignedproportionallytoeachaccesspoint.Volkertassumedthatfiftypercent oftheprojecttrafficgoingthroughtheinterchangeswouldbeheadedwestboundonIͲ40andthe otherfiftypercentwouldbeheadedeastbound. ThesevolumeswereaddedtothevolumesfromtheNCDOTtrafficvolumemapsfortheareatogivea generalideaofhowmanylaneswouldneedtobecreatedfornewroadsoraddedtoexistingroads. ThedailytrafficvolumesalongwiththeAMandPMpeakhourtrafficvolumesareprovidedinthe followingfiguresfortheBuckhornRoad,W.TenRoad,andMt.WillingRoadinterchangeswithIͲ40. ExistingandfutureAADT’sareshowninfigures9and10respectively.Itshouldbenotedthatafuture interchangeatMattressFactoryRoadhasbeenproposedbytheBurlingtonͲGrahamMetropolitan PlanningOrganization(BͲGMPO)andwillsignificantlyimpacttrafficcountsifconstructed. Recommendationsforthefutureroadnetworkareto2025andmayrequireadditionaltechnical analysisatthetimeofimplementation. 22 ĂƐĞĚŽŶĨƵƚƵƌĞƚƌĂĨĨŝĐĨŽƌĞĐĂƐƚƐ͕ĂŶŝŶŝƚŝĂůϯͲůĂŶĞĐƌŽƐƐͲƐĞĐƚŝŽŶǁŝůůďĞƐƵĨĨŝĐŝĞŶƚƚŽŚĂŶĚůĞƚƌĂĨĨŝĐŽŶ ƵĐŬŚŽƌŶZŽĂĚŝŶƚŚĞƐŚŽƌƚƚĞƌŵ͖ŚŽǁĞǀĞƌ͕ŝƚǁŝůůůŝŬĞůLJďĞŶĞĐĞƐƐĂƌLJƚŽƌĞƚĂŝŶƌŝŐŚƚͲŽĨͲǁĂLJƚŽĂůůŽǁ ĨŽƌĂĨŽƵƌͲůĂŶĞǁŝƚŚŵĞĚŝĂŶŽƌĨŝǀĞͲůĂŶĞĐƌŽƐƐͲƐĞĐƚŝŽŶĂƐǁĂƌƌĂŶƚĞĚŝŶƚŚĞĨƵƚƵƌĞ͘ 81 41 0 0 6500 6300 1900 60 0 0 0 11 0 0 17 0 0 150 42 0 0 3 8 0 0 2400 21 0 0 30 0 0 470 6 4 0 98 0 0 0 99000 4 2 0 0 71 0 14 0 0 42 0 7800 3 4 0 0 9 6 0 0 0 2 6 0 33 0 0 42 0 0 29 0 910 10 0 0 8 2 0 11 0 0 4 1 0 460 14 0 0 2 3 0 0 18 0 0 1800 47 0 1600 1300 5000 3 2 0 WE S T T E N R D I N D U S T R I A L D R MATTRESS F A C T O R Y R D SO U T H E R N D R W E S T T E N R D ROCK QUARRY RD B O W M A N R D BEN WILS O N R D SO U T H E R N R A I L W A Y I - 8 5 / 4 0 I- 8 5 / 4 0 No t e : T h i s m a p i s f o r p r e s e n t a t i o n u s e o n l y an d n o t t o b e u s e d f o r c o n s t r u c t i o n p u r p o s e s . 01 0. 5 Mi l e s F US-70 US - 7 0 US - 7 0 US - 7 0 W I L S O N R D BUCKHORN RD BUCKHORN RD FO R E S T A V E MT. WILLIN G R D ϮϬϭϰd &ŝŐƵƌĞϵ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ocompletetheintersectionanalysis,thetrafficvolumesderivedfromthedevelopmentpodswere appliedtothestudyintersectionsshowninfigure11.Traveldemandwasprojectedfrom2014Ͳ2025by thetrendlineanalysismethod. ThismethodprojectsAnnualAverageDailyTraffic(AADT)basedonhistoricaltrends.Trafficvolumes overthepast15yearsinthisareahasincreasedat3%annuallyaccordingly.Trafficinthestudy intersectionswereincreasedtotheyear2025bythatrate. Boththe2014and2025trafficvolumesattheintersectionsareshowninthefollowingfigures.Cross sectionsforthe5intersectionsweredeterminedbasedontheestimatedtrafficfromthecapacity analysis,andcoordinationwithNCDOT.TheLevelofService(LOS)wascalculatedforeachnewand existingintersectionusingSynchro.LOSisbasedonameasureoftheaveragetimedelayatan intersectionandrangesfromAtoF,withAhavingtheshortestdelaytimeandFhavingthelongest. AccordingtoNCDOTLevelofServiceDefinitionsthesixlevelsofservicearedefinedas: LOSA:Describesprimarilyfreeflowconditions LOSB:Representsreasonablyfreeflowconditions LOSC:Providesforstableoperations,butflowsapproachtherangeinwhichsmallincreaseswillcause substantialdeteriorationinservice LOSD:Bordersonunstableflow LOSE:Describesoperationatcapacity LOSF:Describesforcedorbreakdownflow ThefiveintersectionsstudiedbyVolkertwere: 1)NewRoadAatBenWilsonRoad 2)NewRoadAatWestTenRoad 3)WestTenRoadatBuckhornRoad 4)NewRoadHatMt.WillingRoad 5)USͲ70/IͲ85Connector 25 84 1)NewRoadAandBenWilsonRoadͲBenWilsonRoadisatwoͲlaneroadwithaspeedlimitof 35mph.ThisroadwaycurrentlyoperatesatLOSCandwouldoperateatLOSAafteradding turnlanestoaccommodatetheanticipatedtrafficin2025onNewRoadA. 26 85 NewRoadAandBenWilsonRoad 27 86 28 87 2)NewRoadAandWestTenRoad–WestTenRoadisatwoͲlaneroadwithanexistingintersection atRockQuarryRoad.TheproposedintersectionwithNewRoadAwouldbe1300ftfromthe intersectionwithRockQuarryRoad.ThisroadwaycurrentlyoperatesatLOSBandwouldoperate atLOSDafteraddingturnlanestoaccommodatetheanticipatedtrafficin2025oftheNewRoad A. 29 88 NewroadAandWTenRoad 30 89 31 90 3)WestTenRoadandBuckhornRoadͲWestTenRoadisanexistingtwoͲlaneroadwithaspeed limitof55mph.BuckhornRoadistwoͲlaneroadwithaspeedlimitof45mph.Thisintersection currentlyoperatesatLOSFandwouldcontinuetooperateatLOSFafteraddingturnlanesto accommodatetheanticipatedtrafficin2025.ĂƐĞĚŽŶĨƵƚƵƌĞƚƌĂĨĨŝĐĨŽƌĞĐĂƐƚƐ͕ŝƚǁŝůůŝƚǁŝůůůŝŬĞůLJ ďĞŶĞĐĞƐƐĂƌLJƚŽƌĞƚĂŝŶĂĚĚŝƚŝŽŶĂůƌŝŐŚƚͲŽĨͲǁĂLJƚŽĂůůŽǁĨŽƌĂǁŝĚĞƌŝŶƚĞƌƐĞĐƚŝŽŶĐƌŽƐƐͲƐĞĐƚŝŽŶǁŝƚŚ ĂĚĚŝƚŝŽŶĂůůĂŶĞƐ͕ĂƐǁĂƌƌĂŶƚĞĚďĂƐĞĚŽŶƚĞĐŚŶŝĐĂůĂŶĂůLJƐŝƐĂƚƚŚĞƚŝŵĞŽĨŝŵƉůĞŵĞŶƚĂƚŝŽŶ͘ 32 91 WTenRoadandBuckhornRoad 33 92 34 93 4)NewRoadHandMt.WillingRoadͲMt.WillingRoadisatwoͲlaneroadwithaspeedlimitof45 mph.ThisroadwaycurrentlyoperatesatLOSCandwouldcontinuetooperateatLOSCafter addingturnlanestoaccommodatetheanticipatedtrafficin2025attheNewRoadH. 35 94 NewRoadHandMt.WillingRoad 36 95 37 96 5)USͲ70/IͲ85Connector–USͲ70isatwoͲlaneroadwithaspeedlimitof50mph.IͲ85Connectorisa fourͲlanedividedhighwaywithaspeedlimitof55mph.ThiscurrentconfigurationoperatesatLOS C.Poorconnectivityledtoaninterchangereconfigurationprojectwhichdidnotscorewellenough toreceivefundinginNCDOT’sprioritizationprocess,andamorecosteffectivealternativewas requested.NCDOTHighwayDivision7hasstudiedthisintersectiontodeterminewhethera roundaboutorsignalizationwouldbemoreeffectiveintherealignmentoftheintersectionand determinedaroundaboutwouldyieldbetterresults.Withtherealignmentandaddedtrafficfor 2025,thisintersectionwouldoperateatLOSD. 2016 38 97 Aconceptualmapofapossibleintersectionimprovementisshownabove. 2025 39 98 US70/IͲ85Connector 40 99 41 100 ±00.510.25Miles ST U D Y I N T E R S E C T I O N S )L J X U H    Le g e n d Pl a n n e d R o a d s St u d y I n t e r s e c t i o n s Ra i l r o a d De v e l o p a b l e A r e a WE S T T E N R D I N D U S T R I A L D R MATTRESS F A C T O R Y R D SO U T H E R N D R W E S T T E N R D ROCK QUARRY RD B O W M A N R D BEN WILS O N R D SO U T H E R N R A I L W A Y I - 8 5 / 4 0 I- 8 5 / 4 0 US - 7 0 US - 7 0 US-70 US - 7 0 BUCKHORN RD MT W I L L I N G R D FO R E S T A V E W I L S O N R D BUCKHORN RD 42101 Section4–CostAnalysis CONCEPTUALDESIGN Volkertrefinedtheroadwaynetworksbasedontheforecastfuturetrafficvolumes.Specificallyturnlanes wereaddedatkeylocationswithhighturningvolumesandsignalswereassumedtobelocatedatareas withhighcrossingandturningvolumes.Theconceptualdesigntookallenvironmentalfeaturesinto considerationandoutlinedthelocationsofplannedroads,takingintoaccountwheretheplannedroads wouldcrossthewatersources.Theroadsgenerallyavoidallenvironmentalfeatures.Theconceptual designalsoincludesfrontageroadsasaccessmanagementoptions. Mostoftheseroadsareintendedtoprovideaccesstotheareasofassumeddevelopment.Others,such asnewroads,areplacedtoconnectexistingroadstootherexistingroadsinordertoprovidemore connectionswithinthesystem.Inordertoaccommodatenewtrafficfromthepods,changestoexisting roadswerealsoproposed. CONSTRUCTIONCOSTESTIMATE Usingtheconceptualanalysisdescribedabove,costestimatesweredevelopedforeachnewroadand forroadwayimprovementstotheexistingroadways.Table2belowdetailsthecostforeachnewroadway basedontherecommendedtypicalsection.Theoverallcostforconstructingtheapproximately11miles ofroadwayis$30.9million. Table2ͲConstructionCostEstimatesforNewRoads NewRoadTypicalSectionSidewalkLength(mi)CostEstimate A2DY1.52$4,351,189 B2DY0.69$1,975,653 C2DY1.16$3,321,323 D2DY0.47$1,345,883 E2DY0.37$1,059,139 F12DY0.52$1,488,508 F22AN1.28$3,520,000 G2AN0.23$632,500 H2AN3.99$10,972,500 I2AN0.34$935,500 J2AN0.18$495,000 K2AN0.29$797,500 Total11.04$30,894,260 43 102  Table3detailsthecostforupgradingtheexistingroadwaysdescribedinthisreport.BowmanandRock QuarryRoadsarealreadytherecommendedtypicalsectionandthereforethecostsshownareforadding sidewalk.Theoverallcostforupgradingtheseexistingroadwaysis$13.6million. Table3ͲConstructionCostEstimatesforUpdatingExistingRoads WidenedRoadTypicalSectionSidewalkLength(mi)Cost BenWilsonRd3AY0.85$1,672,794 BowmanRd2DY1.42$159,722 WTenRd3AY4.33$8,505,230 RockQuarryRd2DY0.5$56,372 BuckhornRd3AY1.10$2,156,046 MtWillingRd3AY0.55$1,078,023 Total8.75$13,628,190 SouthernandForestRoads,identifiedinthereport,havenorecommendedimprovementsandarenot shownineithertable. Section5ͲConclusion Theprimarypurposeofthistransportationreportistoinformdevelopmentofaroadwaynetworkto supportinvestmentintheEflandͲBuckhornͲMebaneStudyArea.Thenewroadwaysidentifiedinthis reporthavebeenlocatedinsuchawayastotakeintoconsiderationenvironmentalfeaturesandcultural resources.Typicalsectionsforboththenewandexistingroadwaysarerecommendedbasedonthe anticipatedgrowthofthe18developmentpodsidentifiedbyOrangeCounty. Fivekeyintersectionswerestudied,forecastingfuturetrafficvolumesintheyear2025.Volkertwasable torefinetheproposedroadwaynetworks,specificallyaddingturnlanesatkeylocations.ALevelofService (LOS)ratingwascalculatedforeachintersection.Thetotalcosttoprovidetheidentifiedroadwaynetwork andassociatedimprovementstoexistingroadsisapproximately$44million. 103 ATTACHMENTA 45 104 En v i r o n m e n t a l F e a t u r e s M a p No t e : T h i s m a p i s f o r p r e s e n t a t i o n u s e o n l y an d n o t t o b e u s e d f o r c o n s t r u c t i o n p u r p o s e s . F 01 0. 5 Mi l e s Le g e n d Pr o j e c t A r e a 1 a Pr o j e c t A r e a 1 b Pr o j e c t A r e a 2 a Pr o j e c t A r e a 2 b Pr o j e c t A r e a 2 c AT T A C H M E N T A 46105 TransportationReportfortheEflandBuckhorn MebaneStudyArea ATTACHMENTB 47 106 NorthCarolinaDepartmentofCulturalResources StateHistoricPreservationOffice RamonaM.Bartos,Administrator GovernorPatMcCroryOfficeofArchivesandHistory SecretarySusanKluttzDeputySecretaryKevinCherry June18,2015 BradleyLuckey PilotEnvironmental,Inc. POBox128 Kernersville,NC27285 Re:ConstructRoadNetwork,IͲ40900AcreTract,Efland,PEI1012,OrangeCounty,ER15Ͳ1240 DearMr.Luckey: ThankyouforyourletterofMay28,2015,transmittinginformationforourreviewconcerningtheabove project. Therearenorecordedarchaeologicalsiteswithintheproposedprojectarea,althoughithasneverbeen systematicallysurveyedforthepresenceofarchaeologicalresources.Theadjacentpropertythathas beensurveyedcontainsseveralNativeAmericanarchaeologicalsites.Certainportionsofyourproposed projectareahaveahighprobabilityforthepresenceofsuchresources.Inaddition,theOrangeCounty soilsurveydated1977showsthelocationofacemeterywithinyourprojectarea.Althoughcemeteries arenotordinarilyeligibleforinclusionintheNationalRegisterofHistoricPlaces,theyareprotectedby statestatutes.Ifthecemeteryistobeaffectedbyyourproposedproject,itwillneedtobepreservedor movedinaccordancewithNCGSChapter65. IfyourprojectissubjecttoSection106oftheNationalHistoricPreservationAct,werecommendthat youforwardprojectplanstoussowecandelineatethoseareasthatshouldbesubjectedtoa comprehensivesurveybyanexperiencedarchaeologistinordertoidentifyandevaluatethesignificance ofarchaeologicalremainsthatmaybedamagedordestroyedbytheproposeddevelopment.Potential effectsonunknownresourcesmustbeassessedpriortotheinitiationofconstructionactivities. Twocopiesoftheresultingarchaeologicalsurveyreport,aswellasonecopyoftheappropriatesite forms,shouldbeforwardedtousforreviewandcommentassoonastheyareavailableandwellin advanceofanyconstructionactivities. Alistofarchaeologicalconsultantswhohaveconductedorexpressedaninterestincontractworkin NorthCarolinaisavailableatwww.archaeology.ncdcr.gov/ncarch/resource/consultants.htm.The archaeologistslisted,oranyotherexperiencedarchaeologist,maybecontactedtoconductthe recommendedsurvey. Wehavedeterminedthattheprojectasproposedwillnothaveaneffectonanyhistoricstructures. 48 107 TheabovecommentsaremadepursuanttoSection106oftheNationalHistoricPreservationActandthe AdvisoryCouncilonHistoricPreservation’sRegulationsforCompliancewithSection106codifiedat36CFR Part800. Thankyouforyourcooperationandconsideration.Ifyouhavequestionsconcerningtheabove comment,contactReneeGledhillͲEarley,environmentalreviewcoordinator,at919Ͳ807Ͳ6579or environmental.review@ncdcr.gov.Inallfuturecommunicationconcerningthisproject,pleasecitethe abovereferencedtrackingnumber. Sincerely, Ramona M. Bartos 49 108 June18,2015 BradleyLuckeybluckey@pilotenviro.com PilotEnvironmental,Inc. POBox128 Kernersville,NC27285 Re:ConstructRoadNetwork,IͲ40,300AcreTract,Efland,OrangeCounty,ER15Ͳ1241 DearMr.Luckey: ThankyouforyourletterofMay28,2015,concerningtheaboveͲreferencedundertaking.Wehave reviewedthematerialssubmittedandofferthefollowingcomments. Therearenoknownarchaeologicalsiteswithintheproposedprojectarea.Basedonourknowledgeofthe area,itisunlikelythatanyarchaeologicalresourcesthatmaybeeligibleforinclusionintheNational RegisterofHistoricPlaceswillbeaffectedbytheproject.We,therefore,recommendthatno archaeologicalinvestigationbeconductedinconnectionwiththisproject. TheS.C.ForrestIIHouse(OR1409),whichmaybeeligibleforlistingintheNationalRegisterofHistoric PlacesislocatedonthenorthsideofUS70andwithindirectviewofthethreehundredacretractbeing consideredforroadconstruction.Inaddition,thereareanumberofsurveyedpropertiesalsolocated withintheprojectarea.Wewillofferadeterminationofeffectonceadetailedscopeofworkhasbeen submittedforenvironmentalreview. TheabovecommentsaremadepursuanttoSection106oftheNationalHistoricPreservationActandthe AdvisoryCouncilonHistoricPreservation’sRegulationsforCompliancewithSection106codifiedat36CFR Part800. Thankyouforyourcooperationandconsideration.Ifyouhavequestionsconcerningtheabovecomment, contactReneeGledhillͲEarley,environmentalreviewcoordinator,at919Ͳ807Ͳ6579or environmental.review@ncdcr.gov.Inallfuturecommunicationconcerningthisproject,pleasecitethe abovereferencedtrackingnumber. Sincerely, Ramona M. Bartos 50 109 July7,2014 DavidS.Brame PilotEnvironmental,Inc. POBox128 Kernersville,NC27285 Re:ConstructRoadsona400AcreTract,WilsonRoad/BowmanRoad,Mebane,PEI1012, OrangeCounty,ER14Ͳ1189 DearMr.Brame: ThankyouforyourletterofJune3,2014,transmittinginformationforourreviewconcerningtheabove project. Therearetwopreviouslyrecordedarchaeologicalsiteswithintheproposedprojectarea.Thesetwosites, 31OR640and31OR641,wererecordedduringasurveyfortheBuckhornͲMebaneEDDPhase2waterand sewerimprovementsprojectbyOrangeCounty.Thearchaeologicalsurveywasconductedasaresultof OrangeCountypolicy,notforSection106oftheNationalHistoricPreservationActcompliance,soour officehasnotyetreceivedacompletecopyoftheresultingreport. Theinformationwedohaveconcerningthesetwoarchaeologicalsitesindicatesthatonesite,31OR640 containsaburiedculturalhorizonanditmaybeeligibleforinclusionintheNationalRegisterofHistoric Places.Site31OR641hasbeenrecommendedasnoteligibleandnoadditionalworkisrecommendedby theconsultant.Themapincludedwithyourrequestforcommentsdidnotindicatetheproposedlocations fortheroads,soweareunabletodetermineifeithersitewillbeaffected. IfyourprojectissubjecttoSection106,werecommendthatyouforwardspecificinformationregardingthe locationsoftheproposedroadsandanyotherplansforthepropertysowemaydetermineeffects.Inthe meantime,wewillrequestacopyofthearchaeologicalreportfromOrangeCountysowehavecomplete siteinformation. Wehavecheckedourmapsandfilesandfindthattherearethreepropertiesintheprojectareathatwere identifiedina1993Ͳ1994countysurveyofhistoricbuildings.TheyaretheBenWilsonHouse(OR1141), HeathLogHouse(OR1662)andL.M.RayHouse(OR1663).FromourGIS,theyappeartostillbestanding andmayhaveoutbuildingsassociatedwiththem.Ifyourprojecthasthepotentialtoaffectthesebuildings, theirpotentialforNationalRegistereligibilitywillneedtobedetermined. 51 110 TheabovecommentsaremadepursuanttoSection106oftheNationalHistoricPreservationActandthe AdvisoryCouncilonHistoricPreservation’sRegulationsforCompliancewithSection106codifiedat36CFR Part800. Thankyouforyourcooperationandconsideration.Ifyouhavequestionsconcerningtheabove comment,contactReneeGledhillͲEarley,environmentalreviewcoordinator,at919Ͳ807Ͳ6579or renee.gledhillͲearley@ncdcr.gov.Inallfuturecommunicationconcerningthisproject,pleasecitethe abovereferencedtrackingnumber. Sincerely, Ramona M. Bartos 52 111 NorthCarolinaDepartmentofCulturalResources StateHistoricPreservationOffice RamonaM.Bartos,Administrator GovernorPatMcCroryOfficeofArchivesandHistory SecretarySusanKluttzDeputySecretaryKevinCherry April21,2015 BradLuckey PilotEnvironmental,Inc. POBox128 Kernersville,NC27285 Re:DevelopRoadNetworkforMixedUseSite,ProjectArea2B,BuckhornRoad&WestTenRoad, Mebane,OrangeCounty,ER15Ͳ0780 DearMr.Luckey: ThankyouforyourletterofApril6,2015,concerningtheaboveproject. Wehaveconductedareviewoftheprojectandareawareofnohistoricresourceswhichwouldbeaffected bytheproject.Therefore,wehavenocommentontheprojectasproposed. TheabovecommentsaremadepursuanttoSection106oftheNationalHistoricPreservationActandthe AdvisoryCouncilonHistoricPreservation’sRegulationsforCompliancewithSection106codifiedat36CFR Part800. Thankyouforyourcooperationandconsideration.Ifyouhavequestionsconcerningtheabovecomment, contactReneeGledhillͲEarley,environmentalreviewcoordinator,at919Ͳ807Ͳ6579or environmental.review@ncdcr.gov.Inallfuturecommunicationconcerningthisproject,pleasecitethe abovereferencedtrackingnumber. Sincerely, Ramona M. Bartos 53 112 ATTACHMENTC 54 113 Formulas Pod1DailyTraffic=(Pod1Areain1000sSqFt)*0.5*(RateofDailyTrafficforLUC110)*(FloorArea Ratio)+(Pod1Areain1000sSqFt)*0.25*(RateofDailyTrafficforLUC140)+(Pod1Areain1000sSq Ft)*0.25*(RateofDailyTrafficforLUC150) Otherpodsarecalculatedthesameway AssumptionsforPodTraffic xPod1(4996000sqft) o 50%GeneralLightIndustrial(110) o 25%Manufacturing(140) o 25%Warehousing(150) o Pod2(1198000sqft) o 100%GeneralLightIndustrial(110) o Pod3(4265000sqft) o 47%GeneralLightIndustrial(110) o 50%Manufacturing(140) o 3%HighTurnoverSitDownRestaurant(932) o Pod4(7113000sqft) o 90%GeneralLightIndustrial(110) o 8%Warehousing(150) o 1%FastFoodRestaurantwithDriveThruWindow(934) o 1%Gasoline/ServiceStationwithConvenienceMarket(945) xPod5(0sqft) o None x Pod6(1032000sqft) o 100%SingleFamilyDetachedHousing(210) x Pod7(392000sqft) o 20%FastFoodRestaurantwithDriveThruWindow(934) o 25%Gasoline/ServiceStationwithConvenienceMarketandCarWash(946) 6gaspumps o 55%GeneralLightIndustrial(110) x Pod8(3803000sqft) o 50%GeneralLightIndustrial(110) o 50%Manufacturing(140) x Pod9(1076000sqft) o 70%GeneralLightIndustrial(110) o 2%FastFoodRestaurantwithoutDriveThruWindow(933) o 15%AutomobileCareCenter(942) o 13%AutomobilePartsandServiceCenter(943) x Pod10(2910000sqft) o 50%GeneralLightIndustrial(110) 55 114 o 25%Manufacturing(140) o 25%Warehousing(150) x Pod11(423000sqft) o 100%GeneralLightIndustrial(110) x Pod12(292000sqft) o 100%GeneralLightIndustrial(110) x Pod13(880000sqft) o 100%GeneralLightIndustrial(110) x Pod14(501000sqft) o 100%GeneralLightIndustrial(110) x Pod15(662000sqft) o 100%GeneralLightIndustrial(110) x Pod16(91000sqft) o 100%GeneralLightIndustrial(110) x Pod17(4156000sqft) o 100%BusinessPark(770) x Pod18(1446000sqft) o 100%Warehousing(150) 56 115 Assumptionsfortotaltraffic 3%Increaseintrafficeachyearuntil2025 AssumptionsfromMattressFactoryTrafficPlanningStudy: x MattressFactoryRoadandIndustrialDrive o 50%ofcombinedWBLandSBTtrafficintoPod2 o 50%ofcombinedWBLandSBTtrafficintoPod3 o 50%ofcombinedNBTandNBRtrafficoutofPod2 o 50%ofcombinedNBTandNBRtrafficoutofPod3 x AtBuckhornRoadandI40WBRamps: o 100%ofcombinedNBTandWBRtrafficintoPod7 o 100%ofcombinedSBTandSBRtrafficoutofPod7 x AtBuckhornRoadandI40EBRamps: o 50%ofcombinedSBTandEBRtrafficintoPod3 o 50%ofcombinedSBTandEBRtrafficintoPod4 o 50%ofcombinedNBTandNBRtrafficoutofPod3 o 50%ofcombinedNBTandNBRtrafficoutofPod4 x Dailytrafficis10timestheaverageoftheAMandPMtraffic AssumptionsfromBowmanRoadResidentialDevelopmentTIA: x AtBenWilsonRoadandBowmanRoad o NBT,NBR,EBT,andEBLareconsideredtrafficintoPod1 o SBT,SBL,SBR,WBT,WBL,andWBRareconsideredtrafficoutofPod1 o Dailytrafficis10timestheaverageoftheAMandPM trafficAssumptionsfromNCDOTAADT x AMandPMtrafficareeach10%ofthedailytraffic x Anytrafficshownontheborderofapodwasassumedtogotothatpod o Iftrafficisshownatapointonaroadthatborderstwopods,itwassplitevenlybetween thetwo 57 116 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 34 3 . 4 1 7 5 . 3 5 2 5 7 . 5 3 3 6 2 . 3 5 1 3 8 . 9 5 1 0 9 . 7 3 2 2 . 0 1 2 4 3 . 1 9 5 5 . 9 6 1 9 2 . 1 2 6 2 . 2 3 5 . 3 2 4 9 . 2 6 6 3 . 2 6 4 9 . 9 1 2 3 . 5 9 1 4 4 . 6 1 7 2 . 7 7 O/ R M , AR A R O / R M , R1 ED B Ͳ2, R1 ,  PD H R 1 E D B Ͳ2E D B Ͳ2, R1 , AR E D B Ͳ2, R1 E D B Ͳ2, R1 R 1 , EC 5 R 1 R 1 , EC 5 R 1 R 1 , AR R1 , EI , NC2, I2 R 1 , AR,I1LC1,NC2,R1O/RM,AR,R1AR Co m m ͲIn d  Tr a n s Co m m ͲIn d  Tr a n s Co m m ͲIn d  Tr a n s Co m m ͲIn d  Tr a n s ; Ec o n ͲDe v  Tr a n s Ec o n ͲDe v  Tr a n s Ec o n ͲDe v  Tr a n s , Ag r i ͲRe s 10 ͲYe a r  Tr a n s , Ec o n Ͳ De v Tr a n s Ec o n ͲDe v  Tr a n s ,  Co m m ͲIn d  Tr a n s 10 ͲYe a r  Tr a n s Co m m ͲIn d  Tr a n s 10 ͲYe a r  Tr a n s 10 ͲYe a r  Tr a n s 10 ͲYe a r  Tr a n s Co m m ͲInd Tr a n s CommͲIndTransCommͲIndTransCommͲIndTransAgriͲRes 12 9 . 4 8 1 7 . 4 1 9 0 . 5 13 1 . 4 3 0 7 5 . 7 2 1 1 . 6 5 1 8 8 . 4 8 8 . 3 7 1 3 4 . 9 4 1 9 . 8 8 1 5 . 7 9 1 8 . 4 9 9 . 1 3 8 . 7 9 7 . 0 9 2 0 . 4 1 0 26 . 7 6 2 . 3 5 3 0 . 7 1 2 8 . 5 1 3 8 . 9 5 0 1 . 8 6 4 9 . 5 7 0 2 5 . 8 7 1 . 3 4 3 . 1 4 0 3 2 . 6 2 1 1 . 0 3 4 . 1 0 0 18 7 . 1 6 5 3 . 5 9 1 3 6 . 2 9 1 0 2 . 4 2 0 3 3 . 9 9 8 . 4 7 5 . 1 2 4 7 . 5 7 3 1 . 3 1 4 1 . 0 3 1 3 . 3 9 3 0 . 7 8 2 1 . 5 3 0 . 0 9 1 2 . 4 1 1 2 4 . 1 9 7 2 . 7 7 54 . 7 1 4 . 3 5 4 1 . 6 4 3 2 . 8 4 1 3 8 . 9 5 1 5 . 4 4 4 . 7 1 4 9 . 8 0 1 . 3 9 2 5 . 8 7 3 9 . 3 3 1 9 . 2 8 0 . 3 1 3 2 . 6 2 1 1 . 0 3 1 8 . 8 0 0 . 0 0 0 . 0 0 28 8 . 7 0 7 1 . 0 0 2 1 5 . 8 9 3 2 9 . 5 1 0 . 0 0 9 4 . 2 9 1 7 . 3 0 1 9 3 . 3 9 5 4 . 5 7 1 6 6 . 2 6 2 2 . 8 7 1 6 . 0 4 4 8 . 9 5 3 0 . 6 4 3 8 . 8 8 4 . 7 9 1 4 4 . 6 1 7 2 . 7 7 We t l a n d s X X X X Ͳ X X X X X X Ͳ XX X X X X Se v e r e Sl o p e s X Ͳ XX Ͳ XX X Ͳ X ͲͲ X ͲͲͲXX Co n s e r v a t i o n La n d s Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Fl o o d p l a i n s Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ St r e a m s an d Re q u i r e d  Bu f f e r s XX X X Ͳ X Ͳ XX X X X X ͲXXXX Hi s t o r i c Si t e s (O n  Re g i s t e r of Hi s t o r i c  Pl a c e s ) ͲͲ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ar c h a e o l o g i c a l X ͲͲ X Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ce m e t e r y X X ͲͲ Ͳ XX ͲͲ X Ͳ XX ͲͲͲͲ Ut i l i t y Ea s e m e n t s X X X X Ͳ X X X X X X Ͳ X ͲXXXX To t a l 47 . 5 6 6 . 8 4 4 0 . 0 8 4 9 . 3 2 0 . 0 0 6 . 2 3 1 . 5 2 4 1 . 8 3 5 . 8 0 3 2 . 7 5 3 . 0 1 1 . 6 2 7 . 3 5 0 . 1 1 1 0 . 6 3 1 . 4 0 1 2 . 3 0 1 9 . 4 2 24 1 . 1 5 6 4 . 1 7 1 7 5 . 8 1 2 8 0 . 1 9 1 3 8 . 9 5 8 8 . 0 6 1 5 . 7 7 1 5 1 . 5 6 4 8 . 7 7 1 3 3 . 5 1 1 9 . 8 5 1 4 . 4 1 4 1 . 6 1 3 0 . 5 4 2 8 . 2 5 3 . 3 9 1 3 2 . 3 1 5 3 . 3 5 11 0 , 14 0 , 15 0 1 1 0 1 1 0 , 14 0 , 93 2 11 0 , 15 0 , 93 4 ,  94 5 21 0 9 3 4 , 94 6 1 1 0 , 14 0 11 0 , 93 3 ,  94 2 ,94 3 11 0 , 14 0 ,  15 0 11 0 1 1 0 1 1 0 1 1 0 1 1 0 1 1 0 7 7 0 1 5 0 0% 0 % Ͳ5% Ͳ30 % N / A Ͳ69 % Ͳ15 % Ͳ30 % Ͳ30 % Ͳ30 % Ͳ30 % Ͳ30 % Ͳ30 % Ͳ30 % Ͳ30%Ͳ30%Ͳ30%Ͳ30% Ͳ39 % Ͳ45 % Ͳ31 % Ͳ3% N/ A 0 % Ͳ21 % Ͳ3% Ͳ9% Ͳ5% Ͳ12 % Ͳ15 % Ͳ10 % Ͳ25 % 0 % 0 % 1 1 % 0 % 14 7 . 1 3 5 . 3 1 1 2 . 5 1 8 7 . 7 0 . 0 2 7 . 3 1 0 . 1 1 0 1 . 5 2 9 . 8 8 6 . 8 1 1 . 5 7 . 9 2 5 . 0 1 3 . 7 1 9 . 8 2 . 4 1 0 7 . 2 3 7 . 3 Wa t e r / S e w e r ? Se w e r W a t e r Wa t e r / Se w e r W a t e r /Se w e r Wa t e r / Se w e r W a t e r /Se w e r Wa t e r / Se w e r W a t e r Wa t e r / Se w e r N o n e Wa t e r / Se w e r Wa t e r / Se w e r Wa t e r Wa t e r / Se w e r N oneWater/SewerWater/SewerWater/Sewer Pr o x i m i t y of In t e r s t a t e  In t e r c h a n g e ? ͲͲ XX Ͳ XX X ͲͲ Ͳ Ͳ Ͳ Ͳ Ͳ XXX In t e r s t a t e Ex p o s u r e ? X Ͳ XX X X X X Ͳ X ͲͲ X ͲXXXͲ Pr o x i m i t y to Ra i l ? ͲͲ Ͳ Ͳ Ͳ Ͳ XX X X X X X X X X X X Fu t u r e Tr a n s i t ? Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ Ͳ XX X X ͲͲͲͲ 41 % 4 6 % 2 8 % 2 8 % N / A 2 8 % 2 6 % 3 1 % 3 9 % 4 4 % 3 8 % 3 8 % 3 9 % 3 8 % 4 4 % 2 6 % 2 6 % 3 5 % 86 . 8 1 9 . 1 8 1 . 0 1 3 5 . 2 0 19 . 7 7 . 5 7 0 . 1 1 8 . 1 4 8 . 6 7 . 1 4 . 9 1 5 . 2 8 . 5 1 1 . 1 1 . 8 7 9 . 3 2 4 . 3 IT E Tr i p Ge n e r a t i o n Co d e s Po d In f o r m a t i o n fo r Tr i p Ge n e r a t i o n An a l y s i s Ͳ  Me b a n e / B u c k h o r n Ec o n o m i c De v e l o p m e n t Di s t r i c t Tr a n s p o r t a t i o n Pl a n Po d ID Gr o s s Ac r e a g e Cu r r e n t Zo n i n g Fu t u r e La n d Us e Pl a n De s i g n a t i o n Cu r r e n t De v . No n Re s i d e n t i a l Ac r e a g e Cu r r e n t De v . Re s i d e n t i a l Ac r e a g e TO BE PR E S E R V E D : Ex i s t i n g No n ͲRe s i d e n t i a l  De v e l o p m e n t , Es t a b l i s h e d Re s i d e n t i a l  Ar e a s / S u b d i v i s i o n s , Ot h e r De v e l o p e d Ar e a s Gr o s s Re d e v e l o p a b l e Ar e a (A c r e s ) En v i r o n m e n t a l  Co n s t r a i n t s of  De v e l o p a b l e Pa r c e l s Gr o s s Re d e v e l o p a b l e Ar e a mi n u s En v i r o n m e n t a l  Co n s t r a i n t s (A c r e s ) Un d e v e l o p e d La n d IT E Co d e s : 11 0 (G e n e r a l Li g h t In d u s t r i a l ) , 14 0 (M a n u f a c t u r i n g ) . 15 0 (W a r e h o u s i n g ) , 21 0 (S i n g l e ͲFa m i l y De t a c h e d Ho u s i n g ) , 93 2 (H i g h ͲTu r n o v e r Si t ͲDo w n Re s t a u r a n t ) , 93 3 (F a s t ͲFo o d Re s t a u r a n t wi t h o u t Dr i v e ͲTh r u Wi n d o w ) , 93 4 (F a s t ͲFo o d Re s t a u r a n t wi t h Dr i v e ͲTh r u Wi n d o w n ) , 942(AutomobileCareCenter),943(AutomobilePartsandServic Ce n t e r ) , 94 5 (G a s o l i n e / S e r v i c e St a t i o n wi t h Co n v e n i e n c e Ma r k e t ) , 94 6 (G a s o l i n e / S e r v i c e St a t i o n wi t h Co n v e n i e n c e Ma r k e t an d Ca r Wa s h %Wa t e r s h e d / I m p e r v i o u s Su r f a c e Re s t r i c t i o n %Se t b a c k s , Pa r k i n g , Et c . (a d j u s t e d fo r do u b l e Ͳ co u n t i n g ) Es t i m a t e d Ac r e a g e of De v e l o p m e n t Ot h e r At t r i b u t e s Ma r k e t Re d u c t i o n Fa c t o r Bu i l d a b l e Ar e a (A c r e s ) 5117 ATTACHMENTD 59 118 Po d Ac r e s 1 0 0 0 Sq . Ft .  Da i l y  Da i l y In D a i l y Ou t A M  AM In A M Ou t P M P M In P M Ou t Po d D a i l y T o t a l AMTotalPM 1 8 6 . 8 3 7 8 1 4 3 3 4 2 1 6 7 2 1 6 7 7 0 5 5 7 7 1 2 8 6 8 5 2 3 1 4 5 3 1 7 4 4 0 9 8 6 1 0 2 5 2 1 9 . 1 8 3 2 9 8 9 4 9 5 4 9 5 1 4 3 1 1 9 2 4 1 3 9 3 1 1 0 8 2 2 7 8 1 3 3 8 3 0 2 3 8 1 . 0 3 5 2 8 1 7 0 0 6 8 5 0 3 8 5 0 3 1 7 3 1 1 1 4 7 5 8 5 1 6 5 7 8 6 6 7 9 2 3 2 1 9 1 7 2 2 2 7 2 1 4 4 4 1 3 5 . 2 5 8 9 3 3 7 4 5 9 1 8 7 3 0 1 8 7 3 0 3 7 8 0 2 2 4 2 1 5 3 8 3 0 0 9 1 2 8 2 1 7 2 8 4&5 4 0 4 3 2 4 1 1 4 3 2 7 0 50 0 0 0 0 0 0 0 0 0 0 5000 6 1 9 . 7 8 5 8 5 1 3 2 5 6 2 5 6 4 1 1 3 2 8 5 4 3 6 1 8 6 1 9 9 8 1 8 9 2 0 3 7 7 . 5 3 2 7 2 5 8 2 6 1 2 9 1 3 1 2 9 1 3 2 3 6 3 1 2 1 9 1 1 4 4 1 7 5 2 8 9 8 8 5 4 7 3 6 9 5 5 3 4 7 6 2 8 6 5 8 7 0 . 1 3 0 5 4 3 1 7 8 1 5 8 9 1 5 8 9 5 2 4 4 6 1 6 3 5 4 7 2 1 1 3 3 6 8 5 0 8 8 7 1 5 7 3 8 9 1 8 . 1 7 8 8 1 4 3 9 4 7 1 9 7 7 1 9 7 1 1 9 9 6 6 9 5 3 1 1 1 5 8 5 0 9 6 5 0 9 1 7 7 3 6 1 5 3 4 1 4 9 2 10 4 8 . 6 2 1 1 7 2 4 2 6 1 2 1 3 1 2 1 3 3 9 5 3 2 3 7 1 3 8 3 1 3 0 2 5 4 10 4 3 3 6 5 8 6 5 7 4 11 7 . 1 3 0 9 3 6 8 1 8 4 1 8 4 5 3 4 4 9 5 2 1 1 4 0 11 4 5 1 6 4 6 8 4 6 6 12 4 . 9 2 1 3 2 5 4 1 2 7 1 2 7 3 7 3 1 6 3 6 8 2 8 12 3 9 2 5 1 4 9 13 1 5 . 2 6 6 2 7 8 7 3 9 4 3 9 4 1 1 4 9 5 1 9 1 1 0 2 4 8 6 13 9 2 5 1 2 8 1 2 4 14 8 . 5 3 7 0 4 4 0 2 2 0 2 2 0 6 4 5 3 1 1 6 2 1 4 4 8 14 4 8 9 6 5 0 9 5 0 7 15 1 1 . 1 4 8 4 5 7 5 2 8 7 2 8 7 8 3 6 9 1 4 8 1 1 8 6 3 15 1 0 1 0 1 2 7 1 2 4 16 1 . 8 78 9 3 47 4 7 1 4 1 1 2 1 3 3 1 0 16 7 7 2 8 1 8 1 17 7 9 . 3 3 4 5 4 1 1 8 7 8 5 9 3 9 5 9 3 9 1 4 9 6 1 2 7 1 2 2 4 1 3 3 5 2 6 7 1 0 6 8 17 1 6 2 2 8 1 9 3 1 1 7 7 0 18 2 4 . 3 1 0 5 9 1 3 9 1 6 9 5 6 9 5 2 4 4 1 7 5 6 8 2 1 1 7 4 1 3 7 18 5 4 2 2 6 4 7 6 1 4 63 8 . 3 12 1 9 1 3 1728441810716348 La n d Us e Co d e s D a i l y D a i l y In  Da i l y Ou t A M A M In A M Ou t P M P M In P M Ou t 11 0 5 1 . 8 0 2 5 . 9 0 2 5 . 9 0 7 . 5 1 6 . 2 3 1 . 2 8 7 . 2 6 1 . 6 0 5 . 6 6 14 0 3 8 . 8 8 1 9 . 4 4 1 9 . 4 4 7 . 4 4 6 . 9 2 0 . 5 2 8 . 3 5 4 . 4 3 3 . 9 2 15 0 5 7 . 2 3 2 8 . 6 2 2 8 . 6 2 1 0 . 0 3 7 . 2 2 2 . 8 1 8 . 6 9 3 . 0 4 5 . 6 5 21 0 2 6 . 0 4 1 3 . 0 2 1 3 . 0 2 2 . 0 6 0 . 6 4 1 . 4 2 2 . 7 4 1 . 8 1 0 . 9 3 77 0 1 4 9 . 7 9 7 4 . 8 9 5 7 4 . 8 9 5 1 8 . 8 6 1 6 . 0 3 1 2 . 8 2 9 1 6 . 8 4 3 . 3 6 8 1 3 . 4 7 2 93 2 1 2 7 . 1 5 6 3 . 5 8 6 3 . 5 8 1 0 . 8 1 5 . 9 5 4 . 8 6 9 . 8 5 5 . 9 1 3 . 9 4 93 3 7 1 6 . 0 0 3 5 8 . 0 0 3 5 8 . 0 0 4 3 . 8 7 2 6 . 3 2 1 7 . 5 5 2 6 . 1 5 1 3 . 3 4 1 2 . 8 1 93 4 4 9 6 . 1 2 2 4 8 . 0 6 2 4 8 . 0 6 4 5 . 4 2 2 3 . 1 6 2 2 . 2 6 3 2 . 6 5 1 6 . 9 8 1 5 . 6 7 94 2 2 6 . 8 0 1 3 . 4 0 1 3 . 4 0 2 . 2 5 1 . 4 9 0 . 7 7 3 . 1 1 1 . 4 9 1 . 6 2 94 3 4 4 . 6 0 2 2 . 3 0 2 2 . 3 0 4 . 4 6 1 . 8 7 2 . 5 9 4 . 4 6 1 . 8 7 2 . 5 9 94 5 1 6 2 . 7 8 8 1 . 3 9 8 1 . 3 9 1 0 . 1 6 5 . 0 8 5 . 0 8 1 3 . 5 1 6 . 7 6 6 . 7 6 94 6 1 5 2 . 8 4 7 6 . 4 2 7 6 . 4 2 1 1 . 8 4 6 . 0 4 5 . 8 0 1 3 . 8 6 7 . 0 7 6 . 7 9 Po d Tr a f f i c To t a l Traffic 60 ΎW Ž Ě   Đ ƌ Ğ Ă Ő Ğ  Ś Ă Ɛ  ď Ğ Ğ Ŷ  Ƶ Ɛ Ğ Ě  ƚ Ž  Ő Ğ Ŷ Ğ ƌ Ă ƚ Ğ  ƚ Ś Ğ     d ͘ 119 Po d D a i l y A M  AM In A M Ou t P M P M In P M Ou t Po d D a i l y A M P M Po d D a i l y A M  AM In A M OutPMPMInPMOut 1 1 1 0 0 1 1 0 6 6 4 4 1 1 0 6 6 4 4 1 1 1 0 0 1 1 0 1 1 0 1 6 4 5 3 6 1 6 1 9 9 3 3 2 6 1 2 7 9 5 9 3 5 1 4 2 6 6 3 6 3 0 2 8 2 0 8 2 8 2 2 3 3 5 5 5 4 0 1 1 8 6 2 1 5 3 1 0 1 7 0 1 4 0 3 7 4 5 2 9 1 2 0 3 4 4 6 0 7 8 3 4 4 4 1 4 8 6 4 2 3 0 0 2 3 0 2 3 0 4 5 50 0 0 5 6 6 1 4 0 0 1 4 0 1 4 0 6 7 5 4 0 5 4 1 5 3 9 5 4 3 3 2 1 7 9 9 0 0 9 9 0 9 9 0 7 8 8 1 8 0 0 1 8 0 1 8 0 8 9 9 3 1 5 0 3 1 5 3 1 5 9 10 10 1 8 0 0 1 8 0 1 8 0 10 11 11 3 9 1 0 3 9 1 3 9 1 11 12 12 1 3 0 1 3 1 3 12 13 13 1 3 0 1 3 1 3 13 14 14 4 2 0 0 4 2 0 4 2 0 14 15 15 4 1 0 4 1 4 1 15 16 16 6 4 0 6 4 6 4 16 17 17 4 1 0 0 4 1 0 4 1 0 17 18 18 3 8 0 0 3 8 0 3 8 0 18 Po d D a i l y 20 1 6 Ex i s t i n g Tr a f f i c (3 % in c r e a s e / y e a r )  AM  AM  In  AM  Ou t  PM P M In P M Ou t Po d D a i l y A M P M Po d D a i l y A M  AM In A M OutPMPMInPMOut 1 1 2 7 5 1 2 8 7 7 5 1 1 2 8 7 7 5 1 1 1 1 6 7 1 1 7 1 1 7 1 6 6 4 3 7 1 7 2 0 9 6 3 3 6 3 2 9 2 2 1 0 8 5 9 4 9 7 7 4 2 3 5 2 8 7 0 8 7 8 7 2 3 4 1 2 1 4 6 5 2 1 6 2 4 9 3 5 9 1 9 7 1 6 2 3 7 9 0 3 1 1 2 7 3 4 5 3 3 9 0 4 0 5 1 1 6 9 7 4 2 4 4 0 2 4 4 2 4 4 4 5 50 0 0 5 6 6 1 4 8 5 1 4 9 1 4 9 6 7 6 2 6 6 3 1 8 4 5 6 3 3 8 2 4 7 1 0 5 0 3 1 0 5 0 1 0 5 0 7 8 8 1 9 1 0 1 9 1 1 9 1 8 9 9 3 3 4 2 3 3 4 3 3 4 9 10 10 1 9 1 0 1 9 1 1 9 1 10 11 11 4 1 4 8 4 1 5 4 1 5 11 12 12 13 8 14 14 12 13 13 1 3 8 1 4 1 4 13 14 14 4 4 5 6 4 4 6 4 4 6 14 15 15 4 3 5 4 3 4 3 15 16 16 6 7 9 6 8 6 8 16 17 17 4 3 5 0 4 3 5 4 3 5 17 18 18 4 0 3 1 4 0 3 4 0 3 18 Ex i s t i n g Tr a f f i c 20 1 6 NC D O T AA D T 20 1 4 NC D O T AA D T 20 1 1 Ex i s t i n g Tr a f f i c fr o m Me b a n e TI A &Wi l s o n Rd 20 1 5 Ex i s t i n g Tr a f f i c fr o m BowmanRoadResidentialTIA 20 1 6 Ex i s t i n g Tr a f f i c fr o m BowmanRoadResidentialTIA 61120 Efland-Buckhorn-Mebane Access Management Plan APPENDIX C Community Meeting 121 Efland-Buckhorn-Mebane Access Management Plan Tuesday, August 28, 2018 Orange County Planning Department hosted a community meeting at Gravely Hill Middle School Auditorium. An estimated 100 property owners, residents, and businesses attended the meeting where they received information on the planning process and current analysis of the area. People signed in, picked up a copy of the agenda, map, survey, explored the boards, saw a brief presentation and spoke with staff. Here are some key highlights from the meeting: x People spoke one-on-on with staff regarding specific properties and neighborhoods. x Some submitted comments in person and through email and filled out a survey. x NCDOT’s Division Engineer Chuck Edwards attended the meeting to answer any questions. x Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) Aaron Cain attended. x Cy Stober, Mebane’s Development Director, also added to address any questions for Mebane. x People wanted to know more about future sewer and water infrastructure planned for the area. The following is a collection of all the material, comments, surveys, questions and answers provided during the community meeting and public review. 122 Efland-Buckhorn-Mebane Access Management Plan Community Meeting Efland-Buckhorn-Mebane Access Management Plan August 28, 2018, 4:30 –6:30 pm Gravelly Hill Middle School Auditorium 4801 W Ten Rd, Efland, NC 27243 What is an Access Management Plan? Access Management Plans are proposed long-range master plans of possible new roads and connections to existing roads. These plans promote an orderly, cost effective, efficient and environmentally sensitive roadway program, which help guide development decisions and investment. Ultimately, Orange County seeks to develop an access management plan in order to maintain the functionality of the transportation network as the Efland-Buckhorn-Mebane Study Area develops over time. Purpose: x Gain information on the current 2011 plan and 2017 Transportation Study x Provide comments,get answer to your questions, and see next steps Format: The meeting is primarily open house with the following agenda: x 4:30 –5:45 pm –open discussion with staff x 5:45 –6:15 pm –presentation with question and answer x 6:15 –6:30 pm –complete surveys and provide comments How can I participate tonight? Review the material, ask questions, and provide comments directly to staff, complete survey and leave with staff. Next Steps Orange County Planning Board –September 5, 2018 Orange Unified Transportation Board –September 19, 2018 A formal public hearing on a proposed Access Management Plan will be held by the Board of County Commissioners later this year, currently targeted for November. You will receive another written notice about the public hearing closer to the hearing date. Staff Contact: Nishith Trivedi, Orange County Planning Department 131 W. Margaret Lane, Suite 201 P.O. Box 8181 Hillsborough, NC 27278 E-mail: ntrivedi@orangecountync.gov Phone: (919) 245-2582 Website:http://www.orangecountync.gov/departments/planning_and_inspections/efland-buckhorn- mebane_access_management_plan/index.php 123 Ef l a n d - B u c k h o r n - M e b a n e A c c e s s M a n a g e m e n t P l a n 124 Efland-Buckhorn-Mebane Access Management Plan What mode of travel do you use most often? How long is your commute? What roads do you use most often? Do you support the analyzed street network? If not, what street network do you suggest? Do you support the analyzed street cross section? If not, what street cross section do you suggest? Any additional comments: ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ Car Bike Transit Walk 5 – 15 min 16 – 30 min 31 – 60 min > 1 hour Yes No Yes No 125 Efland-Buckhorn-Mebane Access Management Plan 126 Efland-Buckhorn-Mebane Access Management Plan 127 Efland-Buckhorn-Mebane Access Management Plan 128 Efland-Buckhorn-Mebane Access Management Plan 129 Efland-Buckhorn-Mebane Access Management Plan 130 Efland-Buckhorn-Mebane Access Management Plan 131 Efland-Buckhorn-Mebane Access Management Plan 132 Efland-Buckhorn-Mebane Access Management Plan 133 Efland-Buckhorn-Mebane Access Management Plan 134 Efland-Buckhorn-Mebane Access Management Plan 135 Efland-Buckhorn-Mebane Access Management Plan 136 Efland-Buckhorn-Mebane Access Management Plan 137 Efland-Buckhorn-Mebane Access Management Plan 138 Efland-Buckhorn-Mebane Access Management Plan 139 Efland-Buckhorn-Mebane Access Management Plan 140 Efland-Buckhorn-Mebane Access Management Plan 141 Efland-Buckhorn-Mebane Access Management Plan 142 Efland-Buckhorn-Mebane Access Management Plan 143 Efland-Buckhorn-Mebane Access Management Plan 144 Efland-Buckhorn-Mebane Access Management Plan 145 Efland-Buckhorn-Mebane Access Management Plan 146 Efland-Buckhorn-Mebane Access Management Plan 147 Efland-Buckhorn-Mebane Access Management Plan 148 Efland-Buckhorn-Mebane Access Management Plan Questions and Answers The following questions and answers are paraphrased as the meeting was not recorded. Question: Will any of the current roads be removed? Answer: No Question: So all existing roads will stay? Answer: Yes Question: What are you planning around the Preston Loop area? Answer: Nothing in the subdivision. There will be a 100’ buffer between the residential area and the surrounding large parcels should future development occur. We also want to make sure a road network through that development will be sufficient to address the increased traffic brought on by that new development. Question: Can you tell us about the sewer and water infrastructure north of I-85 and Buckhorn Road mainly for several residents there that are not tied to any lines even though we are supposed to? Answer: There is an agreement in place for that area’s connection to Mebane’s water and sewer. Question: What about US-70? What are the findings along that road and are there any recommendations for it? Answer: While there are no findings in the 2017 Transportation Study, we has staff will be studying this corridor more in determining what is best needed to ensure safe access along this route. It has been identified by NCDOT and DCHC MPO as a Strategic Freight Corridor. There are several intersections identified by staff that may require improvements to address the increasing traffic especially around Efland-Cedar Grove Road, I-85 connector, and Buckhorn Road. The map will be updated as more information is collected and appropriate access management solution is determined. Question: What is actually going to develop in this area? Answer: The 2017 Transportation Study, economic development nature of the area and an ever expanding water and sewer services have primed this area for all manner of residential and non-residential growth. The 2017 Transportation Study documents future residential, commercial, industrial, retail, restaurants, business parks and warehouses all along 18 different sections of the area. Future land use designations allow for commercial-industrial transition, economic development transition, agriculture-residential, and 10-year transition. Question: When will all these roads occur? 149 Efland-Buckhorn-Mebane Access Management Plan Answer: As development occurs. There is no horizon or set year when this transportation network will be realized. Even since the 2011 E-B-M AMP, only one road, the one to Morinaga, has actually been constructed. Question: Why do you have a road cutting through the residents along Center Street? Answer: This is part of the planned Turner Street which calls for a 50’ right of way and extends it Ben Johnston Road. It is the current right of way still in existence passed on from the original owner. We are studying how to address the growing traffic in the area; especially should the large property east of the neighborhood be fully developed. Question: When will Mebane expand into this area with all its growth? Answer: The western portion of the planning area, to Buckhorn road, is seen as how far the city will grow. However, the city cannot annex the area on its own. Developers and property owners must petition to annex into the city due to changes in state law. 150 ORANGE COUNTY ORANGE UNIFIED TRANSPORTATION BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date:May 16, 2018 Action Agenda Item No.4.b. SUBJECT:Bicycle Safety Implementation Subcommittee (BSIS) Report DEPARTMENT:Planning and Inspections ATTACHMENT(S): 1. Draft bicycle safety posters INFORMATION CONTACT: Abigaile Pittman, Transportation/Land Use Planner, 919-245-2567 PURPOSE:Receive a reporton therecentactivities of the BSIS. BACKGROUND:On June 5, the Board of County Commissioners (BOCC) received a presentation from Planning staff regarding initial activities of the Bicycle Safety Campaign, reviewedfourvideo public service announcements (PSAs) completed by the Cedar Ridge High School Videography Club; and recognizedthe Videography students and their instructor. Campaign initiativesto datehave included: x The creation of the slogan ‘Ride Safely Drive Safely’ and logo; x Design and distribution of brochures and posters; x Social media ads and posts, and radio ads; x The purchase of branded marketing items(“swag”); x The purchase of fifteen bicycle safety road signsto be erectedat entry points to the county and frequently used bicycle routes, and the x The design and pending launch of the orangecountyncbicyclesafety.com website; in collaboration with the Community Relations Department. Current activities include: x Campaign Posters -Designs for Campaign posters and brochures are being developed andreviewed and will be developed by the Community Relations Department. Four different posterswith bicycle safety themes coordinating withthe videos have been drafted for review, (Attachment 1). Afifth draft poster targeted towards youthmay be available for review at the OUTBoard meeting. Next Steps x Staff and the BSIS will continue to work on: o The design and production of posters and brochures; o Website design and launch, and o Circulation of the video PSAs. x Attendance at local events will begin this fall. x The exact date for a Bike Rodeo will be coordinated with the Sheriff’s Department. 151 x Social media ads and posts, and radio ads will be underway later this year.Budgeted funds will be utilizedfor social media ads on Facebook, Instagram and Twitter, print and/or radio ads (WCHL Radio, News of Orange, etc.). Audio PSAs will be produced by WCOM Radio. x Road sign installation will occur thisfall. FINANCIAL IMPACT:There is no immediate financial impact associated with this item. Budgeted funds fromare being utilized. RECOMMENDATION(S):Staffrecommends that the OUTBoard: 1.Receive information;and 2.Provide any comments or direction that the Board might have. 152 Bo t h m o t o r i s t s a n d b i c y c l i s t s mu s t p u l l o v e r a n d s t o p f o r si r e n s a n d l i g h t s ! Fo r m o r e i n f o r m a t i o n , c a l l 9 1 9 - 2 4 5 - 2 5 6 7 ww w . o r a n g e c o u n t y n c b i c y c l e s a f e t y . c o m General Statute 20-157(a) "U U B D I N F O U   153 Fo r m o r e i n f o r m a t i o n , c a l l 9 1 9 - 2 4 5 - 2 5 6 7 ww w . o r a n g e c o u n t y n c b i c y c l e s a f e t y . c o m Wh e n s a f e f o r th e c y c l i s t t o do s o , a c y c l i s t ca n f a c i l i t a t e pa s s i n g . 154 Fo r m o r e i n f o r m a t i o n , c a l l 9 1 9 - 2 4 5 - 2 5 6 7 ww w . o r a n g e c o u n t y n c b i c y c l e s a f e t y . c o m Ri d i n g 2 a b r e a s t i s a l l o w e d i n N o r t h C a r o l i n a . I t m a k e s c y c l i s t s mo r e v i s i b l e a n d s h o r t e n s t h e p a s s i n g d i s t a n c e n e e d e d . General Statute 20-150(e)155 Fo r m o r e i n f o r m a t i o n , c a l l 9 1 9 - 2 4 5 - 2 5 6 7 ww w . o r a n g e c o u n t y n c b i c y c l e s a f e t y . c o m Wh e n p a s s i n g a b i c y c l i s t i n a n o p a s s i n g z o n e , t h e o p e r a t o r o f t h e pa s s i n g v e h i c l e m u s t a l l o w f o u r f e e t o f s p a c e o r c h a n g e l a n e s . 4 F e e t General Statute 20-150(e)156 Contract Number:C203394 Route:I-885, NC-147, NC-98 US-70 Division:5 County:Durham TIP Number:U-0071 Length:4.009 miles Federal Aid Number: NCDOT Contact:Cameron D. Richards NCDOT Contact No:(919)835-8200 Location Description:EAST END CONNECTOR FROM NORTH OF NC-98 TO NC-147 (BUCK DEAN FREEWAY) IN DURHAM. Contractor Name:DRAGADOS USA INC Contract Amount:$141,949,500.00 Cost Overrun/Underrun:8.96% Work Began:02/26/2015 Letting Date:11/18/2014 Original Completion Date:05/10/2020 Revised Completion Date: Latest Payment Thru:08/22/2018 Scheduled Progress:69.22% Latest Payment Date:09/05/2018 Actual Progress:70.22% Contract Number:C203492 Route:SR-2220 Division:5 County:Durham TIP Number:EB-4707B Length:1.756 miles Federal Aid Number:STPDA-0505(64) NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:SR-2220 (OLD CHAPEL HILL ROAD) FROM SR-1113 (POPE ROAD) TO SR-1116 (GARRETT ROAD). Contractor Name:FSC II LLC DBA FRED SMITH COMPANY Contract Amount:$7,295,544.75 Cost Overrun/Underrun:5.37% Work Began:06/26/2017 Letting Date:05/16/2017 Original Completion Date:05/14/2019 Revised Completion Date: Latest Payment Thru:07/31/2018 Scheduled Progress:59.3% Latest Payment Date:08/10/2018 Actual Progress:58.72% Contract Number:C203567 Route:NC-55 Division:5 County:Durham TIP Number:U-3308 Length:1.134 miles Federal Aid Number:STP-55(20) NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:NC-55 (ALSTON AVE) FROM NC-147 (BUCK DEAN FREEWAY) TO NORTH OF US- 70BUS/NC-98 (HOLLOWAY ST). Contractor Name:ZACHRY CONSTRUCTION CORPORATION Contract Amount:$39,756,916.81 Cost Overrun/Underrun:2.65% Work Began:10/05/2016 Letting Date:07/19/2016 Original Completion Date:03/30/2020 Revised Completion Date:07/16/2020 Latest Payment Thru:08/15/2018 Scheduled Progress:38.1% Latest Payment Date:08/27/2018 Actual Progress:31.36% Contract Number:C203987 Route:SR-1616 Division:5 County:Durham TIP Number:B-4943 Length:0.18 miles Federal Aid Number:BRZ-1616(10) NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:BRIDGE #20 OVER DIAL CREEK ON SR-1616. Contractor Name:FSC II LLC DBA FRED SMITH COMPANY Contract Amount:$1,475,475.00 Cost Overrun/Underrun:1.97% Work Began:05/07/2018 Letting Date:01/16/2018 Original Completion Date:04/30/2019 Revised Completion Date:05/14/2019 Latest Payment Thru:07/31/2018 Scheduled Progress:42% Latest Payment Date:08/10/2018 Actual Progress:37.4% Contract Number:C204087 Route:US-70 Division:5 County:Durham TIP Number: Length:44.124 miles Federal Aid Number: NCDOT Contact:Cameron D. Richards NCDOT Contact No:(919)835-8200 Location Description:1 SECTION OF US-70 AND 106 SECTIONS OF SECONDARY ROADS. Contractor Name:CAROLINA SUNROCK LLC Contract Amount:$7,054,264.20 Cost Overrun/Underrun:0.21% Work Began:01/16/2018 Letting Date:09/19/2017 Original Completion Date:11/15/2018 Revised Completion Date: Latest Payment Thru:04/30/2018 Scheduled Progress:26% Latest Payment Date:05/08/2018 Actual Progress:23.67% *UFNB.10310BOE/$%056QEBUFT 157 Contract Number:C204167 Route:-, SR-1118, SR-1407 SR-1811, SR-1966 Division:5 County:Durham TIP Number: Length:24.77 miles Federal Aid Number: NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:51 SECTIONS OF SECONDARY ROADS. Contractor Name:CAROLINA SUNROCK LLC Contract Amount:$0.00 Cost Overrun/Underrun:0% Work Began:08/01/2018 Letting Date:05/15/2018 Original Completion Date:11/30/2019 Revised Completion Date: Latest Payment Thru:Scheduled Progress:0% Latest Payment Date:Actual Progress:0% Contract Number:C204168 Route:- Division:5 County:Durham TIP Number: Length:15.188 miles Federal Aid Number: NCDOT Contact:Cameron D. Richards NCDOT Contact No:(919)835-8200 Location Description:14 SECTIONS OF SECONDARY ROADS. Contractor Name:CAROLINA SUNROCK LLC Contract Amount:$5,334,770.46 Cost Overrun/Underrun:0% Work Began:07/02/2018 Letting Date:05/15/2018 Original Completion Date:11/30/2019 Revised Completion Date: Latest Payment Thru:07/31/2018 Scheduled Progress:4% Latest Payment Date:08/09/2018 Actual Progress:6.8% Contract Number:DE00173 Route:SR-1104 Division:5 County:Durham TIP Number:W-5205V Length:0 miles Federal Aid Number:HSIP-1104(19) NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:SR 1104/SR 1105 (HERNDON RD) AT SR 1106 (MASSEY CHAPEL/ BARBEE RD) IN DURHAM COUNTY Contractor Name:TRIANGLE GRADING & PAVING INC Contract Amount:$1,046,988.75 Cost Overrun/Underrun:17.95% Work Began:05/01/2017 Letting Date:11/09/2016 Original Completion Date:08/18/2017 Revised Completion Date:11/05/2017 Latest Payment Thru:08/15/2018 Scheduled Progress:100% Latest Payment Date:08/21/2018 Actual Progress:82.81% Contract Number:DE00206 Route:SR-1308 Division:5 County:Durham TIP Number: Length:0.23 miles Federal Aid Number: NCDOT Contact:Cameron D. Richards NCDOT Contact No:(919)835-8200 Location Description:BRIDGE #117 OVER MUD CREEK SR 1308 (CORNWALLIS ROAD) Contractor Name:DANE CONSTRUCTION INC Contract Amount:$919,328.69 Cost Overrun/Underrun:3.02% Work Began:05/09/2018 Letting Date:12/13/2017 Original Completion Date:02/24/2019 Revised Completion Date: Latest Payment Thru:08/15/2018 Scheduled Progress:67.12% Latest Payment Date:08/23/2018 Actual Progress:57.08% Contract Number:DE00228 Route:I-85 Division:5 County:Durham TIP Number:I-5729 Length:5.61 miles Federal Aid Number:NHPP-0085(013) NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:I-85 FROM US-15/501 TO EAST OF SR-1827 (MIDLAND TERRACE RD) IN DURHAM Contractor Name:INTERSTATE IMPROVEMENT INC Contract Amount:$4,168,265.78 Cost Overrun/Underrun:56.23% Work Began:03/13/2018 Letting Date:10/11/2017 Original Completion Date:11/01/2018 Revised Completion Date: Latest Payment Thru:08/22/2018 Scheduled Progress:100% Latest Payment Date:08/28/2018 Actual Progress:76.06% Contract Number:DE00248 Route:SR-1637 158 Division:5 County:Durham TIP Number: Length:0.18 miles Federal Aid Number:15005.1032011 NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:BRIDGE #72 IN DURHAM COUNTY Contractor Name:DANE CONSTRUCTION INC Contract Amount:$1,123,051.10 Cost Overrun/Underrun:0.01% Work Began:06/14/2018 Letting Date:05/23/2018 Original Completion Date:03/21/2019 Revised Completion Date: Latest Payment Thru:08/07/2018 Scheduled Progress:28% Latest Payment Date:08/13/2018 Actual Progress:20.13% Contract Number:DE00253 Route:- Division:5 County:Durham TIP Number:W-5705K Length:0 miles Federal Aid Number:HSIP-1327(006) NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:SR 1327 (GREGSON ST) AND LAMOND AVE Contractor Name:TRAFFIC CONTROL DEVICES INC Contract Amount:$0.00 Cost Overrun/Underrun:0% Work Began:09/01/2018 Letting Date:07/25/2018 Original Completion Date:02/28/2019 Revised Completion Date: Latest Payment Thru:Scheduled Progress:0% Latest Payment Date:Actual Progress:0% Contract Number:DE00255 Route:US-501 Division:5 County:Durham TIP Number:W-5705C Length:0 miles Federal Aid Number:HSIP-0501(046) NCDOT Contact:James M. Nordan, PE NCDOT Contact No:(919)220-4680 Location Description:US 15-501 AT SR 1116 (GARRETT RD) US 15-501 BUS AT WESTGATE DR Contractor Name:ALS OF NORTH CAROLINA LLC Contract Amount:$0.00 Cost Overrun/Underrun:0% Work Began:Letting Date:05/23/2018 Original Completion Date:12/21/2018 Revised Completion Date: Latest Payment Thru:Scheduled Progress:0% Latest Payment Date:Actual Progress:0% 159 Le t E s t TI P S u b N o . Le t T y p e De s c r i p t i o n R/ W ( B ) Di v i s i o n P r o j e c t M a n a g e r Co n E s t RO W E s t Comments 12 / 1 8 U - 5 7 4 5 D i v i s i o n P O C NC 7 5 1 ( H O P E V A L L E Y R O A D ) A T S R 1 1 8 3 ( U N I V E R S I T Y D R I V E ) I N T E R S E C T I O N I N DU R H A M . C O N S T R U C T R O U N D A B O U T . 07 / 1 7 S T E P H E N R E I D D A V I D S O N $ 1 , 3 0 0 , 0 0 0 $ 1 5 0 , 0 0 0 Utility Agreement needed with City 12 / 1 8 E B - 4 7 0 7 A D i v i s i o n P O C SR 1 8 3 8 / S R 2 2 2 0 F R O M U S 1 5 / 5 0 1 I N O R A N G E C O U N T Y T O S R 1 1 1 3 ( P O P E R O A D ) IN D U R H A M C O U N T Y B I C Y C L E , P E D E S T R I A N A N D T R A N S I T I M P R O V E M E N T S 08 / 1 5 B E N J A M I N J . U P S H A W $2 , 8 4 4 , 0 0 0 $ 1 , 5 3 4 , 0 0 0 Utility Agreement needed with OWASA 12 / 1 8 W - 5 6 0 1 E M D i v i s i o n P O C SR 1 1 1 8 ( F A Y E T T E V I L L E R O A D ) A T P I L O T S T R E E T A N D C E C I L S T R E E T . S A F E T Y IM P R O V E M E N T S . JO H N E D W A R D S A N D O R $1 4 , 0 0 0 coordinating with the city 01 / 1 9 W - 5 7 0 5 M D i v i s i o n P O C I- 4 0 W E S T B O U N D A T N C 1 4 7 S A F E T Y I M P R O V E M E N T S ( M P : 9 . 3 5 9 - 9 . 3 5 9 ) JO H N E D W A R D S A N D O R $ 8 0 , 0 0 0 waiting on final designs 01 / 1 9 W - 5 7 0 5 U D i v i s i o n P O C US 7 0 B U S I N E S S ( M O R G A N S T R E E T ) A T C A R O L I N A T H R E A T R E JO H N E D W A R D S A N D O R $ 2 0 , 0 0 0 01 / 1 9 W - 5 7 0 5 V D i v i s i o n P O C NC 5 4 A T H U N T I N G R I D G E R O A D JO H N E D W A R D S A N D O R $ 8 0 , 0 0 0 04 / 1 9 U - 5 9 6 8 R a l e i g h L e t t i n gCI T Y O F D U R H A M U P G R A D E I T S / S I G N A L S Y S T E M $2 1 , 8 6 5 , 0 0 0 $ 7 5 0 , 0 0 0 08 / 1 9 I - 5 9 9 4 D i v i s i o n D e s i g I- 4 0 - D U R H A M C O U N T Y F R O M U S 1 5 / U S 5 0 1 T O E A S T O F N C 1 4 7 . B R I D G E RE H A B I L I T A T I O N . M U L T I P L E S T R U C T U R E S . C O O R D I N A T E W I T H I - 5 9 9 3 . DO U G L A S R . M C N E A L $6 , 6 5 2 , 0 0 0 08 / 1 9 I - 5 9 9 5 Di v i s i o n D e s i g I - 4 0 - D U R H A M / W A K E C O U N T I E S F R O M E A S T O F N C 1 4 7 T O S R 3 0 1 5 ( A I R P O R T BO U L E V A R D ) . P A V E M E N T R E H A B I L I T A T I O N . DO U G L A S R . M C N E A L $5 , 2 7 2 , 0 0 0 01 / 2 0 I - 5 9 9 3 Di v i s i o n D e s i g I- 4 0 - D U R H A M C O U N T Y F R O M U S 1 5 / U S 5 0 1 T O E A S T O F N C 1 4 7 . P A V E M E N T RE H A B I L I T A T I O N . C O O R D I N A T E W I T H I - 5 9 9 4 . P R O J E C T C R E A T E D P E R T H E D R A F T 20 2 0 - 2 0 2 9 S T I P . DO U G L A S R . M C N E A L $4 , 9 0 0 , 0 0 0 04 / 2 0 U - 5 7 1 7 Di v i s i o n D e s i g US 1 5 / U S 5 0 1 @ S R 1 1 1 6 ( G A R R E T T R O A D ) I N D U R H A M C O N V E R T A T - G R A D E IN T E R S E C T I O N T O I N T E R C H A N G E 04 / 1 9 B E N J A M I N J . U P S H A W $2 7 , 7 0 0 , 0 0 0 $ 5 3 , 5 0 0 , 0 0 0 25% plans approved, VE study completed 05 / 2 0 U - 5 5 1 6 D i v i s i o n D e s i g AT U S 5 0 1 ( R O X B O R O R O A D ) T O S R 1 4 4 8 ( L A T T A R O A D ) / S R 1 6 3 9 ( I N F I N I T Y R O A D ) IN T E R S E C T I O N I N D U R H A M . I N T E R S E C T I O N I M P R O V E M E N T S . 05 / 1 9 B E N J A M I N J . U P S H A W $5 , 5 0 0 , 0 0 0 $ 6 , 3 4 1 , 0 0 0 Public meeting 8/23/2018 06 / 2 0 I - 5 7 0 7 R a l e i g h L e t t i n gI- 4 0 - F R O M N C 5 5 ( A L S T O N A V E N U E ) T O N C 1 4 7 ( D U R H A M F R E E W A Y / T R I A N G L E EX P R E S S W A Y ) I N D U R H A M 06 / 1 9 $3 , 5 5 0 , 0 0 0 $ 3 2 3 , 0 0 0 06 / 2 0 P - 5 7 1 7 Ra l e i g h L e t t i n gNO R F O L K S O U T H E R H L I N E C R O S S I N G 7 3 4 7 42 W A T S R 1 1 2 1 ( C O R N W A L L I S R O A D ) IN D U R H A M . C O N S T R U C T G R A D E S E P A R A T I O N . 06 / 1 9 $1 0 , 0 0 0 , 0 0 0 $ 2 , 5 0 0 , 0 0 0 09 / 2 0 W - 5 7 0 5 S Di v i s i o n P O C US 1 5 / 5 0 1 A T N C 7 5 1 S O U T H B O U N D O N R A M P - E X T E N D R A M P JO H N E D W A R D S A N D O R $4 6 0 , 0 0 0 12 / 2 0 B - 5 6 7 4 R a l e i g h L e t t i n gRE P L A C E B R I D G E 8 0 O V E R S R 1 3 0 8 I N D U R H A M O N U S 1 5 - 5 0 1 N O R T H B O U N D 09 / 1 9 $ 2 , 2 0 9 , 0 0 0 $ 1 1 0 , 0 0 0 04 / 2 1 W - 5 7 0 5 T D i v i s i o n P O C SR 1 8 1 5 / 1 9 1 7 ( M I N E R A L S P R I N G S R O A D ) A T P L E A S A N T D R I V E C O N S T R U C T RO U N D A B O U T 04 / 2 0 J O H N E D W A R D S A N D O R $8 0 0 , 0 0 0 $ 8 5 , 0 0 0 01 / 2 2 I - 6 0 0 0 Di v i s i o n P O C I- 5 4 0 - D U R H A M / W A K E C O U N T I E S F R O M I - 4 0 I N D U R H A M T O U S 1 I N R A L E I G H . BR I D G E P R E S E R V A T I O N / R E H A B I L I T A T I O N . C O O R D I N A T E W I T H I - 5 9 9 8 & I - 5 9 9 9 . DO U G L A S R . M C N E A L $4 , 5 4 1 , 0 0 0 02 / 2 2 U - 5 9 3 4 De s i g n B u i l d LNC 1 4 7 F R O M I - 4 0 T O F U T U R E I - 8 8 5 ( E A S T E N D C O N N E C T O R ) I N D U R H A M A D D LA N E S A N D R E H A B I L I T A T E P A V E M E N T 44 6 0 7 $1 7 7 , 1 0 0 , 0 0 0 $ 2 , 1 4 8 , 0 0 0 03 / 2 2 U - 5 7 2 0 A De s i g n B u i l d LUS 7 0 ( M I A M I B L V D ) F R O M L Y N N R O A D T O S R 1 9 5 9 ( S O U T H M I A M I B O U L E V A R D / S R 18 1 1 ( S H E R R O N R O A D ) 44 6 3 5 $5 7 , 0 0 0 , 0 0 0 $ 3 5 , 8 0 0 , 0 0 0 03 / 2 2 U - 5 7 2 0 B De s i g n B u i l d LUS 7 0 ( M I A M I B L V D ) A T S R 1 9 5 9 ( S O U T H M I A M I B O U L E V A R D ) / S R 1 8 1 1 ( S H E R R O N RO A D ) I N T E R S E C T I O N 44 6 3 5 $2 5 , 3 0 0 , 0 0 0 $ 1 7 , 3 2 1 , 0 0 0 03 / 2 2 U - 5 7 2 0 C De s i g n B u i l d LUS 7 0 ( M I A M I B L V D ) F R O M S R 1 9 5 9 ( S O U T H M I A M I B L V D ) / S R 1 8 1 1 ( S H E R R O N RO A D ) T O S R 2 0 9 5 ( P A G E R O A D E X T E N S I O N S ) . U P G R A D E T O C O N T R O L L E D - AC C E S S F A C I L I T Y A N D C O N V E R T A T - G R A D E I N T E R S E C T I O N T O I N T E R C H A N G E . 44 6 3 5 $1 1 0 , 8 0 0 , 0 0 0 $ 4 0 , 4 0 0 , 0 0 0 01 / 2 3 I - 5 9 9 8 Di v i s i o n P O C I- 5 4 0 - D U R H A M / W A K E C O U N T I E S F R O M I - 4 0 I N D U R H A M T O U S 7 0 I N R A L E I G H . PA V E M E N T R E H A B I L I T A T I O N . C O O R D I N A T E W I T H I - 5 9 9 9 & I - 6 0 0 0 . DO U G L A S R . M C N E A L $ 3 , 8 0 0 , 0 0 0 NC D O T D i v i s i o n 5 C o n t r a c t S t a t u s 160 Le t E s t TI P S u b N o . Le t T y p e De s c r i p t i o n R/ W ( B ) Di v i s i o n P r o j e c t M a n a g e r Co n E s t RO W E s t Comments NC D O T D i v i s i o n 5 C o n t r a c t S t a t u s 02 / 2 3 U - 6 0 2 1 D i v i s i o n D e s i g SR 1 1 1 8 ( F A Y E T T E V I L L E R O A D ) , F R O M W O O D C R O F T P A R K W A Y T O B A R B E E R O A D IN D U R H A M . W I D E N T O 4 - L A N E D I V I D E D F A C I L I T Y W I T H B I C Y C L E / P E D E S T R I A N AC C O M M O D A T I O N S . 02 / 2 1 B E N J A M I N J . U P S H A W $1 3 , 7 7 0 , 0 0 0 $ 5 , 7 6 9 , 0 0 0 traffic analysis under review 03 / 2 3 U - 5 9 3 7 R a l e i g h L e t t i n gNC 1 4 7 D U R H A M F R E E W A Y , D U R H A M C O U N T Y F R O M S R 1 4 4 5 ( S O U T H D U K E ST R E E T ) T O B R I G G S A V E N U E I N D U R H A M . C O N S T R U C T A U L I L I A R Y L A N E S A N D OP E R A T I O N A L I M P R O V E M E N T S . 03 / 2 1 $4 7 , 0 0 1 , 0 0 0 $ 1 0 , 2 0 2 , 0 0 0 161 TI P / W B S # D e s c r i p t i o n Le t / S t a r t Da t e Co m p l e t i o n Da t e Co s t St a t u s Project Lead SS - 4 9 0 7 B S 44 8 9 4 . 2 . 1 44 8 9 4 . 3 . 1 In s t a l l a t i o n o f t r a f f i c s i g n a l a t t h e i n t e r s e c t i on o f U S 7 0 a n d SR 1 1 1 4 ( B u c k h o r n R o a d ) E a s t o f Me b a n e . 5/ 3 1 / 2 0 1 7 De c . 2 0 1 8 $4 0 , 5 0 0 R / W $4 3 , 2 0 0 C O N Ut i l i t y r e l o c a t i o n s c o m p l e t e , R / W ac q u i s i t i o n p e n d i n g , r i g h t o f e n t r y co m p l e t e Dawn McPherson W - 5 7 0 7 A 44 8 5 3 . 1 . 1 Cu r b r a m p i m p r o v e m e n t s a t t h e fo l l o w i n g i n t e r s e c t i o n s : S R 20 4 8 ( S o u t h R o a d ) a t R a l e i g h S t r e e t ; S R 2 0 4 8 ( S o u t h Ro a d ) a t C o u n t r y C l u b R o a d , S R 1 9 0 2 ( M a n n i n g D r i v e ) a t Pa u l H a r d i n D r i v e , a n d S R 1 9 0 2 ( M a n n i n g D r i v e ) a t R i d g e Ro a d / S k i p p e r B o w l e s R o a d i n Ch a p e l H i l l 6/ 2 1 / 2 0 1 8 A u g . 2 0 1 8 $ 8 0 , 0 0 0 Si g n a l p e d e s t r i a n i m p r o v e m e n t s co m p l e t e . R e - l e t a n d a w a r d e d t o Li t t l e M o u n t a i n B u i l d e r s o f C a t a w b a Co u n t y , I n c . Chad Reimakoski R- 5 8 2 1 B 47 0 9 3 . 1 . 3 47 0 9 3 . 2 . 3 47 0 9 3 . 3 . 3 In t e r s e c t i o n i m p r o v e m e n t s a t N C 5 4 a n d S R 1 0 0 6 ( O r a n g e Gr o v e R o a d ) 6/ 2 1 / 1 8 F Y 2 0 1 9 $ 8 2 0 , 0 0 0 Ut i l i t i e s c o m p l e t e , R O W c e r t i f i e d , Pr o j e c t l e t a n d a w a r d e d t o F r e d Sm i t h C o m p a n y Brian Ketner U- 5 8 4 6 50 2 3 6 . 1 . 1 50 2 3 6 . 2 . 1 50 2 3 6 . 3 . 1 Co n s t r u c t a r o u n d a b o u t a t S R 1 7 7 2 ( G r e e n s b o r o S t r e e t ) an d S R 1 7 8 0 ( E s t e s D r i v e ) i n Ca r r b o r o . 6/ 2 8 / 2 0 1 8 F Y 2 0 2 0 $ 7 7 5 , 0 0 0 Ut i l i t y c o o r d i n a t i o n u n d e r w a y , R / W ce r t i f i e d w i t h d e l a y o f e n t r i e s , P r o j e c t le t a n d r e c e i v e d n o b i d s , R e - l e t TB D Chad Reimakoski U- 5 8 5 4 46 3 8 2 . 1 . 1 46 3 2 8 . 2 . 1 46 3 8 2 . 3 . 1 Co n s t r u c t a r o u n d a b o u t a t S R 10 0 8 ( M t . C a r m e l C h u r c h Ro a d ) a n d S R 1 9 1 3 ( B e n n e t t R o a d ) i n Ch a p e l H i l l 6/ 2 8 / 2 0 1 8 F Y 2 0 2 0 $ 7 7 5 , 0 0 0 Ut i l i t y c o o r d i n a t i o n u n d e r w a y , R / W ce r t i f i e d , P r o j e c t l e t a n d a w a r d e d t o Ca r o l i n a S u n r o c k , L L C Chad Reimakoski 47 7 9 8 In c r e a s e l e n g t h o f e x i s t i n g tu r n l a n e / s l i p r a m p a n d im p r o v e e x i s t i n g r a d i u s i n t h e S E q u a d r a n t o f U S 7 0 Bu s i n e s s / N C 8 6 a t U S 7 0 B y p a s s i n Hi l l s b o r o u g h De c . 2 0 1 8 J u n . 2 0 1 9 $1 8 9 , 0 0 0 Pl a n n i n g a n d d e s i g n a c t i v i t i e s un d e r w a y - 2 5 % p l a n s u n d e r r e v i e w Chad Reimakoski I- 5 8 2 2 50 4 6 5 . 1 . 1 50 4 6 5 . 3 . 1 Pa v e m e n t R e h a b i l i t a t i o n o n I - 4 0 fr o m I - 8 5 t o E a s t o f S R 17 3 4 ( E r w i n R o a d ) 1/ 1 5 / 2 0 1 9 F Y 2 0 2 0 $1 2 , 4 5 0 , 0 0 0 Pl a n n i n g a c t i v i t i e s p e n d i n g Chris Smitherman U- 5 8 4 7 50 2 3 8 . 1 . 1 50 2 3 8 . 2 . 1 50 2 3 8 . 3 . 1 In t e r s e c t i o n i m p r o v e m e n t s a t SR 1 0 1 0 ( W e s t F r a n k l i n S t . ) an d S R 1 7 7 1 ( M e r r i t t M i l l R d ) / S R 1 9 2 7 ( B r e w e r L a n e ) i n Ch a p e l H i l l / C a r r b o r o . 1/ 1 7 / 2 0 1 9 F Y 2 0 2 0 $ 7 7 5 , 0 0 0 Pl a n n i n g a n d d e s i g n a c t i v i t i e s un d e r w a y Chris Smitherman NC D O T D I V 7 P R O J E C T S L O C A T E D IN D C H C M P O - U N D E R D E V E L O P M E N T 162 TI P / W B S # D e s c r i p t i o n Le t / S t a r t Da t e Co m p l e t i o n Da t e Co s t St a t u s Project Lead NC D O T D I V 7 P R O J E C T S L O C A T E D IN D C H C M P O - U N D E R D E V E L O P M E N T B- 4 9 6 2 40 1 7 4 . 1 . 1 40 1 7 4 . 2 . 1 40 1 7 4 . 3 . 1 Re p l a c e B r i d g e # 4 6 o v e r E n o r i v e r o n U S 7 0 B y p a s s 4 / 1 6 / 2 0 1 9 F Y 2 0 2 1 $ 5 , 8 2 6 , 0 0 0 Pl a n n i n g a n d D e s i g n a c t i v i t i e s un d e r w a y , R O W a c q u i s i t i o n un d e r w a y Kevin Fischer W - 5 7 0 7 C 44 8 5 3 . 1 . 3 44 8 5 3 . 3 . 3 47 4 9 0 Re v i s e p a v e m e n t m a r k i n g s a nd o v e r h e a d l a n e u s e s i g n s f o r re m o v a l o f i n s i d e l a n e d r o p c o n f i g u r a t i o n o n I - 4 0 W e s t b o u n d i n v i c i n i t y o f U S 1 5 - 5 0 1 i n t e r c h a n g e . Re s u r f a c i n g I - 4 0 W B b y u s e o f c o n t i n g e n c y f u n d s 6/ 3 0 / 2 0 1 9 A u g . 2 0 1 9 $ 3 9 5 , 0 0 0 Pl a n n i n g a n d d e s i g n a c t i v i t i e s un d e r w a y , r e - l e t d u e t o b i d s ex c e e d e d e n g i n e e r s e s t i m a t e , n e w le t d a t e p e n d i n g - t e n t a t i v e J u n e 20 1 9 Chad Reimakoski P- 5 7 0 1 46 3 9 5 . 1 . 1 46 3 9 5 . 3 . 1 Co n s t r u c t P l a t f o r m , P a s s e n g e r R a i l S t a t i o n B u i l d i n g a t Mi l e p o s t 4 1 . 7 N o r f o l k S o u t h e r n H - l i n e i n Hi l l s b o r o u g h 6/ 3 0 / 2 0 2 1 F Y 2 0 2 2 $ 7 , 2 0 0 , 0 0 0 PE f u n d i n g s c h e d u l e d 7 / 1 / 2 0 2 0 , Co o r d i n a t e w i t h U - 5 8 4 8 Matthew Simmons R- 5 8 2 1 A 47 0 9 3 . 1 . 2 47 0 9 3 . 2 . 2 47 0 9 3 . 3 . 2 Co n s t r u c t o p e r a t i o n a l i m p r o v e m e n t s i n c l u d i n g Bi c y c l e / P e d e s t r i a n a c c o m m o d a t io n s o n N C 5 4 f r o m S R 10 0 6 ( O r a n g e G r o v e R o a d ) t o S R 1 1 0 7 / S R 1 9 3 7 ( O l d Fa y e t t e v i l l e R o a d ) . 6/ 2 1 / 2 0 2 2 FY 2 0 2 4 $3 , 9 2 4 , 0 0 0 Pl a n n i n g a n d d e s i g n a c t i v i t i e s un d e r w a y , c o o r d i n a t i n g w i t h N C 5 4 W e s t C o r r i d o r S t u d y Jennifer Evans U- 5 8 4 8 50 2 3 7 . 1 . 1 50 2 3 7 . 2 . 1 50 2 3 7 . 3 . 1 Ex t e n d S R 1 0 0 6 ( O r a n g e G r o v e R o a d ) o n n e w l o c a t i o n w i t h Si d e w a l k s a n d b i k e l a n e s f r om e x i s t i n g S R 1 0 0 6 ( O r a n g e Gr o v e R o a d ) t o U S 7 0 B u s i n e s s i n Hi l l s b o r o u g h . 3/ 2 1 / 2 0 2 3 F Y 2 0 2 5 $ 5 , 3 2 6 , 0 0 0 Pl a n n i n g a n d D e s i g n a c t i v i t i e s un d e r w a y , C o o r d i n a t e w i t h P - 5 7 0 1 an d U - 5 8 4 5 Laura Sutton I- 3 3 0 6 A C 34 1 7 8 . 1 . 6 34 1 7 8 . 2 . 5 43 4 1 7 8 . 3 . 9 In t e r c h a n g e i m p r o v e m e n t s a t I - 4 0 a n d N C 8 6 i n Ch a p e l H i l l 3/ 2 1 / 2 0 2 3 F Y 2 0 2 5 $ 1 6 , 5 0 0 , 0 0 0 Pl a n n i n g a n d D e s i g n a c t i v i t i e s un d e r w a y Laura Sutton I- 5 9 5 9 45 9 1 1 . 1 . 1 45 9 1 1 . 3 . 1 Pa v e m e n t R e h a b i l i t a t i o n o n I- 8 5 f r o m W e s t o f S R 1 0 0 6 (O r a n g e G r o v e R o a d ) t o D u r h a m C o u n t y l i n e 11 / 2 1 / 2 0 2 3 F Y 2 0 2 5 $ 1 1 , 1 5 5 , 0 0 0 F u n d i n g a p p r o v e d 1 0 / 1 0 / 1 7 Chris Smitherman I- 5 9 6 7 45 9 1 7 . 1 . 1 45 9 1 7 . 2 . 1 45 9 1 7 . 3 . 1 In t e r c h a n g e i m p r o v e m e n t s a t I- 8 5 a n d S R 1 0 0 9 ( S o u t h Ch u r t o n S t r e e t ) i n Hi l l s b o r o u g h 1/ 1 6 / 2 0 2 4 F Y 2 0 2 7 $ 2 0 , 7 0 0 , 0 0 0 Pl a n n i n g a n d D e s i g n a c t i v i t i e s un d e r w a y Laura Sutton163 TI P / W B S # D e s c r i p t i o n Le t / S t a r t Da t e Co m p l e t i o n Da t e Co s t St a t u s Project Lead NC D O T D I V 7 P R O J E C T S L O C A T E D IN D C H C M P O - U N D E R D E V E L O P M E N T U- 5 8 4 5 50 2 3 5 . 1 . 1 50 2 3 5 . 2 . 1 50 2 3 5 . 3 . 1 W i d e n S R 1 0 0 9 ( S o u t h C h u r t o n S t r ee t ) t o m u l t i - l a n e s f r o m I - 40 t o E n o R i v e r i n Hi l l s b o r o u g h 1/ 1 6 / 2 0 2 4 F Y 2 0 2 7 $ 4 9 , 7 5 1 , 0 0 0 Pl a n n i n g a n d D e s i g n a c t i v i t i e s un d e r w a y , C o o r d i n a t e w i t h U - 5 8 4 8 an d I - 5 9 8 4 Laura Sutton I- 5 9 8 4 47 5 3 0 . 1 . 1 47 5 3 0 . 2 . 1 47 5 3 0 . 3 . 1 In t e r c h a n g e i m p r o v e m e n t s a t I - 8 5 a n d N C 8 6 i n Hi l l s b o r o u g h 11 / 1 8 / 2 0 2 5 F Y 2 0 2 7 $ 1 6 , 4 8 8 , 0 0 0 Fu n d i n g a p p r o v e d 1 0 / 1 0 / 1 7 , Co o r d i n a t e w i t h U - 5 8 4 5 a n d I - 5 9 5 9 Laura Sutton U- 6 0 7 1 47 4 9 6 . 1 . 1 47 4 9 6 . 2 . 1 47 4 9 6 . 3 . 1 In t e r s e c t i o n i m p r o v e m e n t s a t NC 5 4 a n d S R 1 0 0 7 ( O l d Fa y e t t e v i l l e R d ) i n Ca r r b o r o 1/ 1 5 / 2 0 2 6 FY 2 0 2 7 $1 , 2 1 6 , 0 0 0 Pl a n n i n g a n d d e s i g n a c t i v i t i e s un d e r w a y Jennifer Evans164 Co n t r a c t Nu m b e r TI P Nu m b e r Lo c a t i o n D e s c r i p t i o n Co n t r a c t o r N a m e Re s i d e n t En g i n e e r Co n t r a c t B i d Am o u n t Av a i l a b i l i t y Da t e Co m p l e t i o n Da t e Wo r k S t a r t Da t e Estimated CompletionProgressScheduleCompletionPercent No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Ac t i v e P r o j e c t s U n d e r C o n s t r u c t i o n - O r a n g e C o . C2 0 3 6 4 0 RE P L A C E M E N T O F 4 B R I D G E S I N GU I L F O R D C O U N T Y A N D 3 B R I D G E S IN O R A N G E C O U N T Y . HA Y M E S B R O T H E R S , IN C . Lo r e n z , P E , K r i s $ 3 , 1 2 4 , 5 0 0 . 0 0 0 6 / 0 1 / 2 0 1 5 1 1 / 0 1 / 2 0 1 7 0 9 / 0 2 / 2 0 1 5 1 1 / 0 1 / 2 0 1 7 9 3 . 2 0 8 6 . 9 3 C2 0 3 6 4 1 RE P L A C E M E N T O F 5 B R I D G E S I N GU I L F O R D C O U N T Y A N D 5 B R I D G E S IN O R A N G E C O U N T Y . R. E . B U R N S & S O N S CO . , I N C . Ki r k m a n , P E , Ch r i s t o p h e r D $5 , 9 4 0 , 3 2 3 . 0 0 0 6 / 0 1 / 2 0 1 5 1 1 / 0 1 / 2 0 1 8 0 6 / 0 1 / 2 0 1 5 0 8 / 3 1 / 2 0 1 8 1 0 0 . 0 0 9 9 . 4 0 C2 0 3 9 4 6 B - 5 3 4 8 DA N E C O N S T RU C T I O N IN C Ki r k m a n , P E , Ch r i s t o p h e r D $9 8 4 , 5 9 6 . 9 8 0 2 / 0 1 / 2 0 1 8 1 2 / 2 7 / 2 0 1 8 0 2 / 0 1 / 2 0 1 8 0 1 / 3 0 / 2 0 1 9 7 2 . 0 0 7 5 . 4 0 C2 0 4 0 2 5 I - 5 9 5 4 3$ 9 ( 0 ( 1 7  5 ( + $ %  2 1  , -4 0 / I - 8 5 FR O M E A S T O F N C - 5 4 I N GR A H A M TO WE S T O F S R - 1 1 1 4 ( B U C K H O R N RD ) IN O R A N *(   & 2  AP A C - A T L A N T I C I N C TH O M P S O N A R T H U R DI V I S I O N Ki r k m a n , P E , Ch r i s t o p h e r D $9 , 6 9 9 , 0 5 3 . 6 8 DG 0 0 3 0 2 P - 4 4 0 5 K E X T E N D B R Y D S V I L L E R O A D T O N C 86 A N D R E M O V E R A I L C R O S S I N G TR I A N G L E G R A D I N G & PA V I N G I N C Ki r k m a n , P E , Ch r i s t o p h e r D $1 , 6 8 3 , 9 0 0 . 0 0 0 7 / 0 1 / 2 0 1 6 1 2 / 3 0 / 2 0 1 7 0 9 / 2 9 / 2 0 1 6 1 0 / 3 1 / 2 0 1 8 1 0 0 . 0 0 8 9 . 8 7 DG 0 0 3 2 1 SR 1 0 0 4 ( E F L A N D - C E D A R G R O V E R D ) C A R O L I N A S UN R O C K LL C Ki r k m a n , P E , Ch r i s t o p h e r D $1 , 7 1 1 , 1 3 3 . 0 5 0 4 / 0 2 / 2 0 1 8 0 4 / 0 2 / 2 0 1 9 0 4 / 0 2 / 2 0 1 8 0 4 / 0 2 / 2 0 1 9 2 5 . 0 0 4 9 . 8 6 DG 0 0 3 3 2 W - 56 0 1 I F ,     GU A R D R A I L E N D T E R M I N A L UP G R A D E 6 NI C K E L S T O N IN D U S T R I E S I N C Ki r k m a n , P E , Ch r i s t o p h e r D $4 9 4 , 2 4 3 . 0 0 1 2 / 0 5 / 2 0 1 6 0 9 / 0 5 / 2 0 1 7 0 5 / 0 1 / 2 0 1 7 0 9 / 0 5 / 2 0 1 8 1 0 0 . 0 0 1 0 0 . 0 0 DG 0 0 3 7 1 5( 6 8 5 ) $ & (  9 S E C O N D A R Y R O A D S C A R O L I N A S U N R O C K LL C Ki r k m a n , P E , Ch r i s t o p h e r D $1 , 6 8 8 , 7 5 0 . 3 3 0 7 / 0 5 / 2 0 1 7 1 1 / 0 1 / 2 0 1 8 0 8 / 3 0 / 2 0 1 7 1 1 / 0 1 / 2 0 1 8 4 2 . 4 0 9 2 . 4 3 DG 0 0 3 7 2 R - 57 8 7 B  $ ' $  & 8 5 %  5 $ 0 3 6  IN B U R L I N G T O N , GI B S O N V I L L E , G R A H A M , M E B A N E  ,1  $ / $ 0 $ 1 & (  & 2    CA R R B O R O & CH A P E L H I L L I N OR A N G E C O  AT L A N T I C CO N T R A C T I N G CO M P A N Y , I N C . Ki r k m a n , P E , Ch r i s t o p h e r D $1 2 8 , 9 1 0 . 0 0 0 7 / 2 4 / 2 0 1 7 0 3 / 2 8 / 2 0 1 9 0 2 / 2 6 / 2 0 1 8 0 3 / 2 8 / 2 0 1 9 4 0 . 9 5 5 4 . 5 2 DG 0 0 3 9 1 5( 3 / $ & (  BR I D G E # 1 0 4 O V E R ST O N E Y C R E E K ON S R 1 7 1 2 (U N I V E R S I T Y S T A T I O N RD ) R. E . B U R N S & S O N S CO . , I N C . Ki r k m a n , P E , Ch r i s t o p h e r D $5 6 1 , 5 6 2 . 0 2 0 1 / 3 0 / 2 0 1 8 1 0 / 2 6 / 2 0 1 8 0 3 / 0 1 / 2 0 1 8 0 5 / 0 2 / 2 0 1 9 4 9 . 2 8 6 0 . 0 2 DG 0 0 3 9 3 5( 6 8 5 ) $ & (  SR 1 1 0 1 , S R 1 1 1 8 , S R 11 1 9 , S R 1 1 2 4 , SR 1 1 2 5 , SR 1 1 2 7 , S R 11 2 8 S R 11 3 0 , SR 1 1 3 4 , S R 1 1 3 5 , S R 11 3 7 , S R 1 1 4 1 , SR 1 1 4 3 , E T C . RI L E Y P A V I N G I N C K i r k m a n , P E , Ch r i s t o p h e r D $1 , 0 8 4 , 5 2 0 . 4 0 0 4 / 0 2 / 2 0 1 8 1 0 / 1 2 / 2 0 1 8 0 6 / 1 8 / 2 0 1 8 1 0 / 1 2 / 2 0 1 8 2 4 . 0 0 2 5 . 9 8 DG 0 0 3 9 5 5( 3 / $ & (  BR I D G E # 1 8 9 O N S R 1 1 1 4 (B U C K H O R N R O A D ) O V E R C A N E  CR E E K ST W O O T E N CO R P O R A T I O N Ki r k m a n , P E , Ch r i s t o p h e r D $7 2 3 , 9 2 4 . 1 3 0 4 / 0 1 / 2 0 1 8 0 1 / 0 1 / 2 0 1 9 0 5 / 0 7 / 2 0 1 8 0 2 / 0 7 / 2 0 1 9 4 5 . 0 0 2 6 . 4 6 DG 0 0 4 1 3 5( 6 8 5 ) $ & (  US 7 0 B U S , S R 1 0 0 9 , S R 11 0 2 , S R 11 2 9 , S R 1 2 3 9 , S R 1 3 5 2 , S R 17 1 6 A N D SR 1 8 4 1 CA R O L I N A S U N R O C K LL C Ki r k m a n , P E , Ch r i s t o p h e r D $3 , 5 6 2 , 2 3 2 . 6 6 0 5 / 2 8 / 2 0 1 8 1 1 / 0 1 / 2 0 1 9 0 5 / 2 9 / 2 0 1 8 1 1 / 0 1 / 2 0 1 9 2 3 . 0 0 2 4 . 5 3 DG 0 0 4 1 9 5( 6 8 5 ) $ & (  NC 8 6 $ 1 ' 17 SE C O N D A R Y R O A D S CA R O L I N A S U N R O C K LL C Ki r k m a n , P E , Ch r i s t o p h e r D $3 , 7 6 4 , 0 0 1 . 6 4 0 5 / 1 4 / 2 0 1 8 1 1 / 0 1 / 2 0 1 9 0 5 / 1 4 / 2 0 1 8 1 1 / 0 1 / 2 0 1 9 2 6 . 0 0 7 . 3 2 DG 0 0 4 2 7 BR I D G E # 5 1 O N S R 1 5 3 4 ( M C K E E RO A D ) O V E R B U F F A L O C R E E K NA T I O N A L B R I D G E BU I L D E R S L L C Ki r k m a n , P E , Ch r i s t o p h e r D $5 2 1 , 4 4 3 . 8 2 0 5 / 0 7 / 2 0 1 8 0 3 / 0 4 / 2 0 1 9 DG 0 0 4 3 5 $6 7  5 ( 7 5 ( $ 7 0 ( 1 7  2 1     6( & 2 1 ' $ 5 <  5 2 $ ' 6 W H I T E H U R S T P A V I N G CO I N C Ki r k m a n , P E , Ch r i s t o p h e r D $8 4 6 , 3 4 0 . 6 6 0 4 / 0 1 / 2 0 1 9 1 0 / 1 1 / 2 0 1 9 DG 0 0 4 4 5 R - 5 7 8 7 B B I N S T A L L A T I O N O F A D A C O M P L I A N T CU R B R A M P S A T V A R I O U S IN T E R S E C T I O N S LI T T L E M O U N T A I N BU I L D E R S O F CA T A W B A C O U N T Y IN C Ki r k m a n , P E , Ch r i s t o p h e r D $3 1 9 , 3 1 9 . 8 0 0 6 / 2 5 / 2 0 1 8 0 2 / 1 5 / 2 0 2 0 5( 3 / $ & (  % 5 , ' * (      2 9 ( 5  3 + , / 6  &5 .  2 1  6 5      2 / '  * % 2 5 2  5 ' 165 Co n t r a c t Nu m b e r TI P Nu m b e r Lo c a t i o n D e s c r i p t i o n Co n t r a c t o r N a m e Re s i d e n t En g i n e e r Co n t r a c t B i d Am o u n t Av a i l a b i l i t y Da t e Co m p l e t i o n Da t e Wo r k S t a r t Da t e Estimated CompletionProgressScheduleCompletionPercent No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Ac t i v e P r o j e c t s U n d e r C o n s t r u c t i o n - O r a n g e C o . DG 0 0 4 4 5 W - 5 7 0 7 A I N S T A L L A T I O N O F A D A C O M P L I A N T CU R B R A M P S A T V A R I O U S IN T E R S E C T I O N S LI T T L E M O U N T A I N BU I L D E R S O F CA T A W B A C O U N T Y IN C Ki r k m a n , P E , Ch r i s t o p h e r D $3 1 9 , 3 1 9 . 8 0 0 6 / 2 5 / 2 0 1 8 0 2 / 1 5 / 2 0 2 0 166 Co n t r a c t # o r WB S # o r T I P # De s c r i p t i o n L e t D a t e Co m p l e t i o n Da t e Co n t r a c t o r P r o j e c t A d m i n . Pr o j e c t C o s t Notes R- 5 8 2 5 Up g r a d e a n d R e a l i g n I n t e r s e c t i o n 1 / 2 2 / 2 0 1 9 T B D T B D Gr e g D a v i s (9 1 0 ) 9 4 4 - 2 3 4 4 TB D Right of Way in progress C h a t h a m C o u n t y - D C H C M P O - U p c o m i n g P r o j e c t s - D i v i s i o n 8 - - S e p t e m b e r 2 0 1 8 Ro u t e NC 7 5 1 a t S R 1 7 3 1 (O ' K e l l y C h a p e l R o a d ) 167 168 Item 5.b. OUTBoard Members Whose Terms are Ending04.25.18 Orange Unified Transportation Board Membership and Contact List Position NAME OF MEMBER HOME ADDRESS/ TELEPHONE DATE OF APPT REPRESENTATIONEx pertise or Specific Interest BUSINESS TELEPHONE E-M AIL APPT EXPIRES 1.Alex Castro (Vice Chair) 5915 Morrow MillRoad Chapel Hill, NC 27516 10/20/2015 Bingham Township N/A alexcastrojr@hotmail.com (919) 619-1510(Day) (919) 929-6368(Evening) 9/30/2018 2nd Term 2.David Laudicina 5333 Lucas Farm Lane Chapel Hill, NC 27516 09/20/2016Cheeks Township (Serving At-Large) N/A Laud9876@bellsouth.net (919) 942-4444 (Day/Evening) (919) 428-1009 (Cell) 9/30/2019 1st Term 3.Ed Vaughn 412 Lake Orange Road Hillsborough, NC27278 10/21/14Cedar Grove Township N/A eddievee@nc.rr.com (919) 283-4444(Day/Evening) 9/30/2020 2nd Term 4.Erle Smith 103 Sunset Creek Cir Chapel Hill NC 27516 10/20/2015 Chapel Hill Township N/A Erle@ErleSmith.com Day Phone: (919) 259-2100 Evening Phone: (919) 929-1596 9/30/2018 1st Term 5.Donna Musson 600 Sinai Circle Hillsborough, NC 27278 09/20/2016Eno TownshipN/A donna@musson.org (919) 428-3683 (Cell) 9/30/2019 1st Term 6.Brantley Wells 1314 US HWY 70E Hillsborough, NC 27278 10/15/2013Hillsborough Township N/A wells.l4544@gmail.com (919) 998-8630 (919) 732-3883 (Work) (919) 730-2524 (Work Cell) 9/30/2020 2nd Term 7.Ted Triebel 6601 Sirladdinn Lane Rougemont, NC 27572 10/20/2015 Little River Township N/A triebel@mindspring.com (919) 732-6691(Day/Evening) 9/30/2018 2nd Term 8.Art Menius 4720 Green Riley Rd Rougemont,NC 27572 10/21/2014At-Large*ED art@artmenius.com (919) 675-2787(Day/Evening) (919) 675-2787 (Cell) 9/30/2020 2nd Term 9.Jenn Sykes 210 Collins Ave Hillsborough, NC 27278 02/07/2017At-Large*P sykes.jennifer@gmail.com (919) 442-8152 9/30/2020 1st Term 10.Gary Saunders 103 Woodshire Lane Chapel Hill, NC 27514 10/20/2015 At-Large*EI gary.saunders@ncdenr.gov (919) 733-1497(Day) (919) 942-0045(Evening) 9/30/2018 2nd Term 11.Heidi Perry(Chair) 407 Robert Hunt Drive Carrboro, NC 27510 10/21/2014At-Large*BT heidiperov@gmail.com (919) 962-0572 (Day) (919)929-8671 (Home) (919)618-8199 (Cell) 9/30/2020 2nd Term 12.Dr. Jeff Charles 5904 Treetop Ridge Durham NC 27705 10/20/2015 At-Large*PAS jmc51@ix.netcom.com (919) 489-7753 (919) 489-7753 9/30/2018 1st Term 13.Alyson West 901 N Greensboro Apt D Carrboro, NC27510 09/20/2016At-Large*PT Alyson.west@gmail.com (503) 734-5299 (Cell) 9/30/2019 1st Term 14.Justin Miller 5505 US 70 Mebane NC 27302 12/13/2016 At-Large PH Justindm8@yahoo.com 919-448-1376 (cell) 9/30/2019 Term STAFF: Abigaile Pittman 245-2567 abpittman@orangecountync.gov *Through the appointment process, the County will attempt to maintain a balance among the OUTBoard’s At-Large membership that captures as many of the following areas of expertise or specific interests as possible: Bicycle Transportation (BT), Pedestrian Access and Safety (PAS), Public Transit (PT), Environmental Issues (EI), Economic Development (ED), Planning (P), Public Health (PH) 169