Loading...
HomeMy WebLinkAbout2018-680-E Solid Waste - Draper High Rock Convenience Center proposal September 7, 2018 Mr. Kevin Lindley, PE Orange County Solid Waste Management PO Box 17177 Chapel Hill, NC 27516 Re: Proposal for Professional Engineering Services High Rock Road Convenience Center Rehabilitation Design and Bid Documents Efland, North Carolina DAA Project Number R00592-178N Dear Kevin: Draper Aden Associates appreciates the opportunity to provide the following proposal to Orange County Solid Waste Management (Client) for preparation of design plans for the proposed renovation of the High Rock Road Waste and Recycling Center in Efland, NC. The project involves the modernization of an existing waste disposal convenience center to include site paving, new waste compactors, and on-site water and sewer provisions to serve the attendant office. PROPOSED SCOPE OF WORK Draper Aden Associates (DAA) will provide professional services as outlined below. The proposed scope of work has been prepared in general accordance with the engineering standard of practice and discussions of the project with the Client and consists of the following detailed services: TASK 1 DESIGN PHASE SERVICES: 1.Preliminary Site & Grading Plan DAA will prepare an overall preliminary site and grading plan for discussion with the Client. This plan will indicate locations of buildings, compactors, dumpsters, other waste disposal areas, parking areas, driveways, entrances and other pertinent data as required for review and approval of the design concept. We will then review the revised preliminary site plan and grading plan with the Client and incorporate review comments into the construction documents. 2.Construction Documents Based upon conceptual layout dimensions and a footprint of the proposed buildings, dumpsters, and compactors (assumed to be the same as those from the Eubanks Road project, unless provided otherwise by the Client), DAA will complete the site design and prepare Construction Documents. Construction Documents will be prepared in DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E Kevin Lindley, PE September 7, 2018 Page 2 of 8 accordance with the requirements of the Orange County Planning Department. Specific scope items included for the Construction Documents submittal are as follows: Demolition Plan – DAA will prepare a site demolition plan to show the removal of the existing structures and other improvements located within the work area. The plan will include notes to direct the contractor to the level of demolition necessary to begin work on the modified site. Site Layout Plan – DAA will prepare a Site Layout Plan for the proposed modification based on dimensional information provided by the Client. The site layout plan will typically show the following items: building setbacks, adjoining streets, access drives, parking and loading areas, fencing, limits of asphalt and/or gravel areas, typical dimensions and additional information as may be required by the Orange County Site Plan Submission Requirements. Grading & Drainage Plan –DAA will prepare a Grading & Drainage plan for the proposed improvements. This plan will show both existing and proposed contours along with spot elevations as necessary. Stormwater Quality and Quantity Permitting – It is DAA’s understanding, per the client, that no new storm water control features will be needed for the project. Utility Plan – It is assumed that no extension of water and/or sewer utility mains will be required such that a Utility Plan will not be prepared and is not included in this scope of services. Water services and well location to the new building(s) will be depicted on the site layout plan Erosion Control Plan: It is assumed that this project will result in the disturbance of less than 1 acre of land such that an Erosion & Sedimentation Control Permit will not be required. However, since there will still be land disturbance, the project will still require erosion and sediment control measure. DAA will develop a plan for the contractor to follow and will indicate appropriate erosion control measures on the Erosion Control Plan. DAA will also prepare the necessary calculations to appropriately size the control measures. Planting and Buffer Plan: The Landscape Plan will be prepared to address local permitting requirements for the modified site (if required). Preparation of an irrigation plan is not included in this proposal. Structural Design Plans – DAA will prepare the appropriate structural plans, detail sheets, cross sections, and profiles to detail the proposed concrete pads and bollards. Structural engineering will include the designs and details required for the preparation of construction documents which will include the structural specifications and pad details. Electrical Design Plans – DAA will prepare a set of electrical site design plans for the project. The site plan will depict the new site lighting, location of the empty conduits for the security cameras (design of security and camera system not included within the scope). A photometric plan will be provided to obtain approval from the County. Power and lighting DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E Kevin Lindley, PE September 7, 2018 Page 3 of 8 design will be provided for the revised site. Necessary details, panel schedules, and fixture schedules will be included. Construction Detail Sheets – DAA will prepare required construction detail sheets for the project associated with erosion control, pavement sections, and other details as may be required. Any specialty details required by the project should be provided to DAA by Client. Deliverables: x General Notes and Legend Plan x Demolition Plan x Site Plan(s) x Grading and Drainage Plan x Erosion and Sediment Control Plan x Planting and Buffer Plan x Structural Plan(s) x Electrical Plan(s) x Construction Details 3.Project Manual Draper Aden Associates will prepare a Project Manual for the work associated with the proposed improvements described above. The Project Manual will consist generally of Contract Documents, General Conditions and other related documentation including formats for Pay Requests and Change Orders, and Technical Specifications for the work. Standard readily available forms will be used to the extent practical. The manual will be provided to the Owner in electronic format, and up to five printed copies will be made available. The project manual will be prepared in a format acceptable to the Owner. DAA will attend a meeting to present final Construction Documents to the Owner for review. 4.Opinion of Probable Construction Costs Draper Aden Associates will prepare an updated opinion of probable construction costs for the project at the 50% drawing level and at the final Construction Document (CD) level. The 50% Design opinion of probable construction costs will be reviewed with the Owner to identify potential phasing of the work, scope items for deletion or scope items to be made into bid alternates. The CD level opinion of probable construction costs will be generated and provided to the Owner to demonstrate compliance with the project budget prior to advertising for bid. Draper Aden Associates opinions of probable construction cost are to be made on the basis of Draper Aden Associates’ experience and qualifications and represent Draper Aden Associates’ best judgment as an experienced and qualified professional generally familiar with the construction industry. However, because Draper Aden Associates has no control over the cost of labor, materials, equipment, or services furnished by others, or over contractors’ methods of determining prices, or over competitive bidding or market DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E Kevin Lindley, PE September 7, 2018 Page 4 of 8 conditions, Draper Aden Associates cannot and does not guarantee that proposals, bids, or actual construction cost will not vary from opinions of probable construction cost prepared by Draper Aden Associates. TASK 2 PERMITTING PHASE SERVICES: Consultant will assist Client with obtaining site plan approvals by preparing permit applications, responding to review comments, and making plan revisions related to plan review comments. Payments of all permit application or other regulatory fees will be the responsibility of the Client. The anticipated permitting authorities applicable to this site include: x Site development review (Orange County) x Erosion & Sedimentation Control (Orange County) x Driveway Permit (NCDOT)- Include notification of any revisions to the existing driveway. TASK 3 BID ADMINISTRATION SERVICES DAA will assist the Owner in advertising the project for bid, conduct a prebid meeting, issuing addenda as necessary, conducting a bid opening, evaluate the bids received, and recommendations of award to the Owner. Upon Award of the Bid, DAA will prepare and assist the Owner in proper execution of the contract documents, respond to contractors’ questions and provide technical support through the contracting process. We will assist the Owner in obtaining and reviewing construction contract documentation and other preliminary actions through issuance of formal Notice-to-Proceed. TASK 4 CONSTRUCTION PHASE SERVICES DAA will perform Construction Phase Services as follows: a.Consult with Owner and act as Owner’s representative as provided in the Construction Contract. b.Review product submittals and shop drawings from the selected Contractor for compliance with regulatory and design specifications. c.Coordinate and oversee the pre-construction meeting. d.Perform site visits as necessary to observe utility installation and testing, building construction, review as-built information provided by contractor, inspect site construction for compliance with approved plans, and address field questions by contractor. Observations by DAA are not intended to be exhaustive or intensive in nature, but to verify general compliance with standards and approved plans based on DAA personnel’s professional judgment. Upon the completion of the site visit, a written report will be issued to the Owner indicating observations, and specifically any deficiencies in the work that may need to be addressed. e.Issue necessary clarifications and interpretations of the Contract Documents as appropriate to the orderly completion of Contractor’s work. Su ch clarifications and DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E Kevin Lindley, PE September 7, 2018 Page 5 of 8 interpretations will be consistent with the intent of and reasonably inferable from the Contract Documents. Subject to limitations in the Contract Documents, Draper Aden Associates may issue field orders authorizing minor variations in the Work from the requirements of the Contract Documents. f. Recommend change orders and work change directives to Client as appropriate, and prepare change orders and work change directives as required. g.Review Contractor’s applications for payment and, if found to be consistent with the level of work performed, make recommendation to the Owner of payment. h.Produce the necessary project closeout and certification documents necessary to meet the requirements of the local approvals and provide the owner with a record file. Record Documents will be based on field observations and redline as-built drawings provided by the contractor and the observations during the site inspections. DAA shall not have responsibility for acts or omissions of the contractor or subcontractors, their agents or employees, or other persons performing the project construction. Due to the nature of these activities, DAA will complete these items based upon a time and materials basis per our standard rate schedule. For budgeting purposes, we have included an estimated fee for this task in the schedule below. Deliverables: x Record Drawings as required. x Site Visit and Testing reports from onsite inspections x Recommendations of pay requests from the Contractor x Minutes from Construction Meetings x Change Order and Field Order documents, as necessary, for Owner execution Additional Services: Services that are not included in this proposal consist of, but are not limited to, the following: 1.Revisions to the plan requested by CLIENT after first submittal of Design Documents to the local jurisdiction; 2.Geotechnical report, testing, pavement design and foundation recommendations except as noted herein; 3.Subsurface utility locating services and subsurface utility engineering (SUE) services except as indicated herein; 4.Conditional letter of map revision (CLOMR), letter of map revision (LOMR); 5.Individual 404 Permit and/or mitigation design; 6.NCDENR Transportation Facilities Permit; 7.Phase I/II Environmental Site Assessments; 8.Environmental assessments for the presence of wetlands or endangered species. 9.Irrigation design; 10.Phasing plans. This project is being designed and is being permitted as an overall project in one phase except as noted above; 11.Traffic impact analysis, traffic signalization or other traffic studies; DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E Kevin Lindley, PE September 7, 2018 Page 6 of 8 12.Right-of-way negotiations/acquisition; 13.Preparation of easement acquisition maps; 14.Off-site roadway work except as outlined above; 15.Design of telephone, cable, or gas utilities. DAA can coordinate with these utility companies and provide them copies of plan sheets as necessary, but the individual companies will design their own utilities; 16.Design or coordination of water features/ fountains/ pools, exterior signage/graphics or courtyards; 17.Changes to the construction plans after construction document approval; 18.Construction staking; 19.Review agency fees and plat recording or filing fees. If paid directly by DAA, we will invoice for these fees as reimbursable expenses; 20.Other CLIENT directed services not specifically included. COMPENSATION Compensation for engineering services and reimbursable expenses shall be based on the following fees. These fees will be invoiced monthly based on our estimation of the percentage complete on each task or on a time and materials basis depending upon the task. Fee 1 Design Phase Services Preliminary Site & Grading Plan$6,800.00 Fixed Fee Construction Documents$22,400.00 Fixed Fee Project Manual $5,700.00 Fixed Fee Opinion of Probable Construction Cost$7,180.00 Fixed Fee Total Design$42,080.00 Fixed Fee 2 Permitting$17,860.00 Fixed Fee 3 Bid Phase Services$6,030.00 T&M 4 Construction Phase Services$34,410.00 T&M TOTAL PROJECT ESTIMATE$100,380.00 Task DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E Kevin Lindley, PE September 7, 2018 Page 7 of 8 This proposal is valid for 30 days from the date of the proposal. If the proposal is not accepted within 30 days, we reserve the right to revise or withdraw the proposal entirely at our discretion. Please confirm your acceptance of this proposal by signing one copy and returning it to our office. Our receipt of the executed copy of this proposal will serve as our Notice to Proceed and contract to perform the work described herein. Work will be conducted in accordance with this proposal and the existing contract between Orange County and Draper Aden Associates dated February 22, 2017. Sincerely, DRAPER ADEN ASSOCIATES C. Tyrus Clayton, Jr., PE Senior Project Manager W. Charles Kreye II, P.E. Managing Principal – Site Development & Infrastructure, Vice President W. Charles Kreye IIIIIIIIIIIIIIIIIIIII,IIIIIIIIIIIIIII P.E. DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E Kevin Lindley, PE September 7, 2018 Page 8 of 8 Orange County Solid Waste High Rock Road Convenience Center Rehabilitation Draper Aden Associates Proposal No. R00592-178N AUTHORIZATION TO PROCEED Orange County Solid Waste Management date THIS INSTRUMENT HAS BEEN PRE-AUDITED IN THE MANNER REQUIRED BY THE LOCAL GOVERNMENT BUDGET AND FISCAL CONTROL ACT: Office of the Chief Financial Officer date THIS SCOPE OF WORK IS SUBMITTED PURSUANT TO THE TERMS OF THE AGREEMENT DATED FEBRUARY 22, 2017 BETWEEN DRAPER ADEN ASSOCIATES AND ORANGE COUNTY. Draper Aden Associates date DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E