HomeMy WebLinkAbout2018-612 Planning - Moffat Pipe change order 5 PROJECT: Historic Rogers Road Sewer Expansion Project
CHANGE ORDER NO.: 5
Page 1 of 4
CHANGE ORDER
CHANGE ORDER NO.: 5 DATE: September 21,2018
Project: Historic Rogers Road Sewer Expansion Project
Contractor: Moffat Pipe,Inc.
Engineer/Architect: URS Corporation—North Carolina
CONTRACTOR is directed to make the following changes in the Contract Documents.
Description:
Moffat Pipe, Inc. (Moffat) is requesting the following revisions to the substantial completion and final
completion dates of the contract to account for delays in the project considered to be no fault of their own
and beyond their control. Specifically, the Contractor has been delayed with dense and large rock
formations resulting in unmet reasonable production rate of rock excavation, additional Orange County
Emergency Services (OCES) and Town of Carrboro resident and government-imposed requirements
beyond what was originally expected to obtain a blasting permit. Moffat Pipe, Inc. is requesting an
additional 102 calendar days and$181,593.97 in relation to these delays_An itemized list of the number
of days associated with specific issues can be found in Attachment A—HRRA Coordination Issues/Delays.
The requested number of additional contract days are for delays experienced between March 1, 2018 and
May 31, 2018 and does not account for potential future delays, or delays incurred between June 1 and
present.An official Notice of Delay was provided by Moffat to Orange County,OWASA,and AECOM on
March 1,2018. The funds being requested are related to this delay and include the additional cost of rock
removal via mechanical means along Outfall A between Sta. 1+00 and Sta. 13+89. More information is
discussed below:
1) At the time of bidding, the Contractor anticipated needing to obtain approval from the Town of
Carrboro,Town of Chapel Hill,and local Fire departments for any required blasting per Section 31
23 16,Article 1.05.C.3 of the Project Manual. The requirements and procedures for blasting were
set forth in Section 3123 16,Article 3.08,of the Project Manual. Prior to this project,Moffat had
not blasted in Carrboro,however,Moffat has completed many blasting operations in Chapel Hill
and used their past experience with obtaining permits and blasting operations in Chapel Hill as a
basis for what was to be expected in Carrboro. On February 21, 2018, National Quarry Service,
(NQS), Moffat's selected blasting subcontractor, was instructed by the Town of Carrboro Fire
Department to submit an application utilizing the Orange County Emergency Services (OCES)
form. Construction projects in Carrboro have not required blasting in recent years, with this in
mind,the Town of Carrboro decided to have the contractor complete and submit the Orange County
blasting permit in lieu of the Town of Carrboro blasting permit.NQS applied for a blasting permit
to cover rock blasting along Outfall A between the existing manhole "Outfall 1" and proposed
SSMH-A9. This area was considered `Phase 1' of the possible blasting area and encompassed
approximately 9 manholes and 1,750 linear feet of sewer pipe.The Town of Carrboro then passed
this application on to Jason Shepherd,the Orange County Fire Marshal,and on February 27,2018
Mr. Shepherd called Moffat to inform them he would be taking over review of the permit,and that
it was denied due to insufficient information.The requirements for a blasting permit by OCES were
more stringent than those originally expected to be required by the Town of Carrboro. OWASA
and Moffat began discussions with Mr. Shepherd to determine what permit exceptions, if any,
OCES and Carrboro would allow. Additionally, on March 1st, at the request of the Rogers Road
PROJECT: Historic Rogers Road Sewer Expansion Project
CHANGE ORDER NO.: 5
Page 2 of 4
Working Group(made up of representatives from OWASA,Orange County,Town of Chapel Hill,
and Town of Carrboro),a public meeting was held with the local community to discuss the blasting
plan and address resident concerns. As a result of this meeting, a joint decision by the members of
the Rogers Road Working Group was made to delay blasting until more information related to the
effects of blasting on wells and septic systems could be provided to the residents. At the request
of the Mayor and the Town Manager of Carrboro, a special neighborhood meeting was held on
March 13,2018,during which a decision was made by the Mayor to maintain some of the stricter
requirements of the OCES permit,such as requiring pre-blast surveys for all structures within a 500
foot radius,rather than the original radius of 250 feet as listed in Section 31 23 16,Article 3.08.B.10
of the Project Manual.Additionally,the Town Manager requested that all involved parties hold an
additional community meeting prior to initiating blasting. As such, the Contractor incurred
additional expenses and delay in relation to obtaining the blasting permit. Ultimately a group of
residents vocalized the intent of pursuing legal action against all involved parties should blasting
take place.These events occurred over the months of March,April,and May. During these months,
Moffat Pipe continued with rock removal via mechanical means (hoe-ramming, grinding, and
hammering)until the additional meetings and requirements could be met.These methods were less
efficient than blasting and required additional machinery due to the density of the rock.
To determine the additional cost of rock removal for this area,Moffat has calculated the cost to do
the work (including labor, materials, and equipment) minus the amount received (less materials,
subcontractors,and markup)to determine the difference. The amount of time to perform the work
was determined by reviewing the daily logs of the Moffat Superintendent and Foreman,as well as
the weekly inspection reports compiled by the AECOM Resident Project Representative. These
weekly inspection reports are not included with this Change Order request but are available upon
request from OWASA and AECOM.A brief summary of the work is shown in Attachment F.The
additional cost of rock removal as described in this paragraph is covered by Lines 1 through 14 in
Attachment B.
Adjustments to the Contract Price will be accomplished by lump sum for the additional cost of rock
removal along Outfall A as detailed in item 1 above per Section 00 57 00,Article 11.04-B.2.
• The lump sum price for this change is$181,593.97.
PROJECT: Historic Rogers Road Sewer Expansion Project
CHANGE ORDER NO.: 5
Page 3 of 4
CHANGE IN CONTRACT SUM OR PRICE: CHANGE IN CONTRACT TIME OR TIMES:
Original Contract Price Original Contract Times
$4,782,436.00 Final Completion: July 15,2018
Net change from previous Change Orders No. 1 to Net change from previous Change Orders No.I to
NoA: -$100,110.52 No.4: 124 days
Contract Sum or Price prior to this Change Order Contract Times prior to this Change Order
$4,682,325.48 Final Completion: October 27,2018
Net Increase of this Change Order Net Increase of this Change Order
$181,593.97 One Hundred and Two(102)calendar days
Contract Sum or Price with all approved Change Contract Times with all approved Change Orders
Orders
$4,863,919.45 Final Completion: February 6,2019
RECOMME : REVIEWE ACCEPTED
By: G�� By y: S�
Enginee Or County ont ct
ge or
Krista Paredes-Toledo,PE Craig Benedict,AICP se DuClau
Date: R 2S ( Date: Date:
The adjustment in Contract Sum or Price and/or Contract Time or Times stated in this Change Order shall
comprise the total price and/or time adjustment due or owed the CONTRACTOR for the work or changes
defined in this Change Order. By executing the Change Order, the CONTRACTOR acknowledges and
agrees that the stipulated price and/or time adjustments include the costs and delays for all work contained
in the Change Order, including costs and delays associated with the interruption of schedules, extended
overheads, delay, and cumulative impacts or ripple effect on all other non-affected work under this
Contract. Signing of the Change Order constitutes full and mutual accord and satisfaction for the
adjustment in Contract Sum or Price or Contract Time or Times as a result of increases or decreases in costs
and time of performance caused directly and indirectly from the change,subject to the current scope of the
entire work as set forth in the Contract Documents. Acceptance of the waiver constitutes an agreement
between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the
Contract,and that CONTRACTOR waives all rights to file a claim on this Change Order after it is properly
executed.
PROJECT: Historic Rogers Road Sewer Expansion Project
CHANGE ORDER NO.: 5
Page 4 of 4
IN WITNESS WHEREOF,the undersigned have caused the execution hereof:
CONTRACTOR:
MOFFAT PIP , INC
ATTEST: By:
Name: Jesse DuClau
reeia Title: Contractor
cr�t '''de Address: 4901 Unicon Drive
eat ••••++rrrr+r ���� / J�i�
44° �,•• '�•.,'-'j� s� CA st,/fNiC 27587
�O:RF
�U
�°°�: •• Date: �
� r
w rilt eat]
_
_
4
A �
s ` t
OWNER:
Orange County
ty
By:
Name: Bonnie Hammersley
Title: hOra ge o Manager
Date: �?