HomeMy WebLinkAboutAgenda - 05-03-2005-7bORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 3, 2005
Action Agenda
Item No.
SUBJECT: Presentation of Proposed Northern Park Master Plan
DEPARTMENT: ERCD /Recreation and Parks PUBLIC HEARING: (Y/N) No
ATTACHMENT INFORMATION CONTACT:
Proposed Master Plan and Map
David Stancil, 245-2590
Lori Taft, 245-2660
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To receive a presentation on the proposed master plan for Northern Park at the
Northern Human Services Center, developed by citizens and staff between October 2004
and March 2005.
BACKGROUND: In November 2001, Orange County voters approved a Parks and Open
Space bond including $1,2 million toward a park on 49 acres of land adjacent to and
including the Northern Human Services Center on NC 86 North, A park at this location was
identified in the adopted 1988 Master Recreation and Parks Plan, Over the past several
years, a BOCC Task Force has been working toward both the park and upgrades to the
Center, In 2004, the Board agreed to move forward with a park planning effort that was
separated from the Center upgrades, but was cognizant of the need for coordination with
current and future plans for the Center,
The Northern Park Master Plan process as adapted by the Board represented a departure
from the usual process for park design in that no committee of citizens was formed, Citizens
interested in the project were instead encouraged to participate in a series of community
meetings held at the Northern Human Services Center to design the park, Flyers, mailings
and signs (including the new marquee sign at the Center) were used to advertise the
meetings,
A total of 37 different citizens participated in the four community meetings that culminated in
the design presented tonight. The process used to create the design included:
2
• A kickoff meeting where information about the process and the site was presented,
including astaff-prepared Challenges and Opportunities document, and a straw vote
was conducted on the types of facilities for the park desired by the residents present;
• A design charette, where attendees broke into five subgroups at individual tables and
created their own vision far the park -and then came together to compare drawings
and discuss similarities and differences (the designs were remarkably similar in many
ways);
• Review and consideration of a draft master plan; and
• Final review and agreement on a master plan to be recommended, including
prioritization of facilities using cost estimates.
As with all master plan designs, the attendees were invited to "think outside of the box" in
terms of facilities and park design, with the understanding that some prioritization would be
needed based on cost and site constraints, The proposed Master Plan that emerged from
the meetings includes facilities desired by those present ,including:
• Retention of the hardwood forest areas identified far low-impact recreation, with a loop
trail generally identified (the actual location of the trail would be located later as
construction drawings are prepared)
• Retention of the existing ball field and a relocated play area adjacent to the Center
• A skate park area and basketball courts located in the back portions of the original 9-
acre Northern Center lot, along with nearby restrooms
• Two new softball/baseball fields, one located in the northeast corner of the 40-acre
tract, and another (possibly part of a future phase) to the southwest)
• Amulti-purpose field that could be used for a variety of activities, including tee-ball
and other field sports, along the northern field configuration
• Two tennis courts and a second play area between the two northern fields, along with
a picnic shelter with restrooms and a horseshoes area
• Two other picnic shelters in the wooded trails area
At their final meeting on March 9`h, residents identified which of these facilities in the design
they considered to be mast important, recognizing that funding would not permit all of the
designed activities to be built at this time. The prioritization included several "givens" that
would be needed regardless of choices, or could be simply and easily built at a low cost:
1, An entry road and two parking lots to serve the park facilities
2.. A picnic shelter with restrooms
3. The play area located near the Center
4. A service road to the proposed fields on the northern part of the site
5. Picnic tables and benches at locations TBA throughout the park
6, Horseshoes and volleyball courts
The group then identified the top priorities from the proposed facilities in the design:
1. The new baseball/softball field in the northern part of the park
2, The skate facility
3. The multi-purpose field (Tee-ball and other field sports)
4. The basketball courts
5. The nature trails/measured walking track
3
FINANCIAL IMPACT: Funding for construction of the Northern Park was included in the
November 2001 Parks and Open Space bond in the amount of $1,200,000, all of which has
been appropriated to date. Approximately $33,000 of this amount has been expended to
date for a topographic survey, natural and cultural resource survey work (approved by the
BOCC in 2004) and cost estimates. As a potential supplemental funding source,
approximately $125,000 exists in Northern District Park payment-in-lieu funds. Operating
and maintenance casts for this park would be addressed in a subsequent agenda item.
RECOMMENDATION(S): The Manager recommends that the Board receive the
presentation, thanking the citizens for their efforts in creating the master plan, and ask staff
to report back at a subsequent meeting with additional cost information (including projected
operating and maintenance costs) and a site plan submittal and park timetable.
Northern Park
at the
Northern Human Services Center
Master Plan and Report
April , 2005
5
Background
In 1988, the Parks Element of the Orange County Comprehensive Plan identified
a fixture park in conjunction with the Northern Human Services Center on NC 88
north. The Northern Human Services Center was originally built in the 1950's as
the Cedar Grove School, an African-American school. Abaseball/softball field
located at the site was utilized for recreation programs beginning in the 1980's,
and some programs also took place in the gym of the building.
In 1998, the County acquired 40 acres (known as the Kennedy tract) adjacent to
the 9-acre tract containing the Center, playground and ball field, This land was
acquired to be part of the future park site,
In 2001, Orange County voters approved a Parks and Open Space band that
included $1,200,000 earmarked for the future park. A draft Preliminary Concept
Plan was created in 2002, and a process for planning the Northern (Human
Services Center) Park was considered and approved in late 2003. In the spring
of 2004, property across NC 86 from the site was acquired for a wastewater field,
and plans to move forward with the park master plan were finalized, A series of 4
community meetings to design the park (excluding the building) were held
between October 2004 and March 2005.
At the current time, the facilities that exist at the site are:
• The Northern Human Services Center (NHSC) building, including a
gymnatorium, cafeteria and a number of rooms used or proposed to be
used far a variety of activities
• A branch library (in the NHSC building)
• A children's playground adjoining the Center
• Alighted playing field for softball/youth baseball
In 2003, the Board of County Commissioners considered and adopted a process
far the planning and design of this park. This process did not include the planned
upgrades to the Northern Human Services Center, although the need for
consistency and compatibility was addressed. The process may be found as
Appendix 1.
In general, the adopted process called for a series of community meetings to
develop a master plan. As a part of the design process, the community meetings
were to yield a park master plan that, among other features:
• Recognizes co-location with the Center, and works in concert with and
shares infrastructure where passible
• Promotes apedestrian-friendly environment and discourages unnecessary
traffic or parking areas
• Protects important stream corridors and natural areas, and minimize
grading of the natural landscape
During the summer of 2004, staff began preparing background information for the
project. The Master Plan's community meeting phase began in October 2004,
Preliminary Concept Plan
At the outset of each park design project, the process is initiated by the approval
of a Preliminary Concept Plan by the Board of Commissioners, The "Pre-Concept
Plan," as it is sometimes called, is to be used as a guiding tool to identify the
types of activities deemed suitable far the park and to provide possible general
locations for those activities, It also serves as the guide for the more-specific
master plan that follows.
The Preliminary Concept Plan for this park was adopted in 2003. It projected
continued use of the existing ball field and playground as shown, along with an
area far future active recreation along the northern portion of the property, The
portions of the property to the south and west were projected to include low-
impact recreation -retaining the mixed hardwood and pine forest that exist, with
hiking trails, picnic areas and benches,
The Master Plan that has been created by the community meetings reflects two
changes from the Preliminary Concept Plan, First, the buffers for a new stream
identified on the site (for additional information, please see the following section)
effectively took away part of fhe area originally identified for active recreation, To
compensate for that, an area of loblolly pine to the southwest was opened up for
active recreation, since this was the least sensitive area of the forested portion of
the tract.
SITE ANALYSIS /
OPPORTUNITIES AND CONSTRAINTS REPORT
One of the background products developed by staff for the project was an
"Opportunities and Constraints" report that was presented at the initial meeting in
October 2004, This report evaluated the natural and cultural features present on
site, and provided an overview of zoning and other planning issues. The full
report may be found as Appendix 2.
This property is identified in the Land Use Element of the Comprehensive Plan
as part of the Agricultural Residential (AR) classification, within the Upper Eno
Protected Watershed, and is zoned AR (Upper Eno Watershed Protected),
This zoning district provides primarily for agricultural and residential land uses,
with a minimum lot size of 40,000 square feet per dwelling unit, Additionally, the
Upper Eno Watershed overlay zoning requires that impervious surfaces be
limited to 12% of the total site area and that stream buffers be provided,
Adjacent land uses to this property include:
To the north: An undeveloped tract of 25 acres and small residential lots along
NC 86,
West: The property boundary cuts across a 25-acre pond known locally as
Compton's Pond, which serves as a large sediment retention and flow
augmentation lake on the East Fork of the Eno River, which it impounds via a
man-made dam,
South: seven residential lots that are partially occupied,
East: NC 86 and a 12-acre tract acquired across NC 86
Access to the site is provided via NC 86, and parking areas exist on both the
south and north sides of the Northern Human Services Center, A service road on
the north side of the building provides access to the rear of the building. There is
an old, unimproved roadway that runs from the ball field to the pond, and there
are currently a number of downed trees along this old road from storms in 2003
and 2004.
The area surrounding the Northern Human Services Center has been maintained
to allow for the continued use of the existing ball field, playground and other
structures related to the building, including an old water tower used by volunteer
fire departments,
The 40 acres west of the building and ball field remain largely wooded, The vast
majority of the property is wooded with a mixture of hardwoods and pine. A 12-
acre section of the upland property nearest the NHSC is comprised entirely of
mature hardwoods-50 to 60-feet-tall, Major canopy trees include red and white
oaks, hickories, tulip poplar and American beech, This mature deciduous forest
provides numerous benefits, including habitat for wildlife and native plants, and
protection of water quality by filtering out sediment and pollutants from runoff
before it enters the adjacent pond and the East Fork of the Eno River.
The lower-lying woodlands in the western part of the property are a mixture of
pine and hardwoods adapted to the wetter sails nearer to the lake. Dense stands
of loblolly pine occur along the northern property boundary and the southwestern
boundary, both providing 100-200 foot buffers from the neighboring properties,
Two small clearings are located in the far northeast and southwest corners of the
property, One is at the impoundment far Compton's Pond; the other has been
used by someone to store abandoned vehicles and debris.
A biological analysis of the site was conducted and found no identified natural
areas or prime forest areas on the site. Stream identification work performed by
staff in late 2004 identified apreviously-unmapped stream that runs from
northeast to southwest to the pond, which will need to be buffered as part of the
watershed standards. The property drains from east to west into Compton's
Pond. Slopes on the property are relatively slight, with increasing moderate
slopes as one nears the pond to the west. Soils are primarily of the Georgeville
and Herndon types, and are generally suitable for park facility uses.
A cultural and archaeological survey was conducted in January 2004, which
identified two unrecorded archaeological sites; neither of the sites was deemed
worthy of further analysis. While not a part of the park master plan, the 12-acre
property east of NC 86 was also surveyed and the deteriorated house (ca 1911),
related outbuildings, hand-dug well, and above-ground fuel storage tanks were
recorded as part of that project. The rear portion of this 12-acre tract contains a
large field formerly in agriculture that was beginning to feature early succession
vegetation before being cleared as part of a planned wastewater system for the
Center.
A topographic survey was also conducted to identify contours at one-foot
intervals and all trees with an 18-inch caliper and greater.
In summary, the report identified several opportunities and constraints for the
site:
Existing and potential assets for park development include:
• Existing lighted baseball/softball field (also used for youth soccer)
• Existing children's playground (in need of improvement)
• Mature hardwood forest (suitable for nature trails)
• Other forested areas (which help to buffer the park from adjacent private
properties)
• A pond (potential scenic and recreational amenity)
• Old unimproved roadway (potential service road and/or walking trail)
Potential constraints to the development of the property include:
• Low-lying area east of the pond is within the 100-year floodplain
Small portions of the eastern shoreline are not within the County property,
which will limit access to some portions of the waterfront
• Drainage ditches (2) on the northern half of the Kennedy tract
• Pre-existing 60-foot easement for access to the Kennedy tract from NC 86
(this is likely no longer an issue since Orange County owns bath properties)
• Newly-identified stream will need to be buffered and protected
9
COMMITTEE MEETINGS AND DESIGN PROCESS
From October through March, four community meetings were held to create a
master plan far the park, Area residents were invited to participate in the process
by a variety of outreach tools. Flyers were left in community stores and were
mailed to homes in the area of the park, and subsequently to meeting attendees
and other interest parties. The new marquee sign at the Northern Center was
also used to advertise each meeting (with the assistance of the branch library
staff), Attendance at the meetings ranged from 14-32 persons, and many of the
group remained engaged in the design meetings throughout. The activities at the
community meetings are summarized in the following table:
--
October 28 Overview of project; mission and charge; presentation of
Challenges and Opportunities report, discussion of facility
needs/ reference surve ,next ste s charette
November 18 Group brake into 5 small groups for design charette to create
their own vision for the ark, then reconvened to look at desi ns
Janua 20 Meetin cancelled due to ice
February 10 Review new information, review draft master plan created from
the charettes, discuss designs and identify a preferred design,
lans for final meetin
March 9 Review and adopt final draft master plan map and report,
rioritize facilities usin cost estimates
The master plan map identified and agreed to by the community meeting
participants is shown on the following page,
_- _-
~i /
~ ~~
~'~
~ {
~ 1i ~I ~~ fi,[[~~
~ Qt~ ~~1 ~~ U i I
d
_
> g
~ A v
ao
s ~~
6
,~
' P
' m ~ L
' u~ a
$'
r~
~ ~
~
~!il ~li
C Ilil
m I_ .~...
C
t
a
V N O
K N N
~r
O A
K <
W ~
~ a
3 --~~
~ ~
L IL
N
U
a
. Q
,,
~, II~~~.
.~~ t
::-_=
..
`.
ili i ~1 ~ I~T~~ '~~~ u' y
t
n
~ , ,~a,~
a c~
a
spc3 y m m
~, ~ ~ 5
~
~ H
LL
°
/ /
!
/ ~ ~
~ r waE
..
n
~
/ F ~ 1
/~ ~ '
~
~
i
mg
~
m
t i
~ ~ 1
`k
w ~
~ J
~.ls\ ~.
V p~ \,
N ~ \
N0.
IJ'
°HI
y u
99 Nr ~
O 1
~ ~
G
~ s
ti a
I II~~ r ~
~. ~ 1 ~ ~ ~~_ / ~
~ i
~ v J ~.
Cm2 ~
;'~ ~ ~ I'
\~ LLn
m~ ti
~,
~ -J
(i~.II iii .~~~~`
~
e<~w~ t g
'~ ~
~E"
F=ALL
I Q
~ n
a.
L L -
} ~ ~
~ 1
G`$z'~o
m
t ~
t} z u
a
Q
~~ u
,~
II
11
FEATURES OF THE PROPOSED MASTER PLAN
After working through the above process and considering the site information,
community needs and the desired facilities, the community meetings have
yielded a Master Plan as shown on the preceding page that features the
following components:
• Retention of the hardwood forest areas identified for low-impact
recreation, with a loop trail generally identified (the actual location of the
trail would be located later as construction drawings are prepared)
• Retention of the existing ball field' and a relocated play area adjacent to
the Center
• A skate park area and basketball courts located in the back portions of the
original 8-acre Northern Center lot, along with nearby restrooms
• Two new softball/baseball fields, one located in the northeast corner of the
40-acre tract, and another (possibly part of a future phase) to the
southwest)
• Amulti-purpose field that could be used for a variety of activities, including
tee-ball and other field sports, along the northern field configuration
• Two tennis courts and a second play area between the two northern fields,
along with a picnic shelter with restrooms and a horseshoes area
• Two other picnic shelters in the wooded trails area
The site would be accessed by an enhancement of the entrance road on the
north side of the Center, which would continue west toward the proposed new
facilities. The plan assumes that the proposed Northern Human Services Center
parking lot in front of the building will be constructed in the future (but dces not
rely on this lot to provide parking for the park), and that the existing lot on the
south side of the Center would be retained.
The entrance road would wind back through the park, with two additional parking
areas near the two new playing fields to the north. A third parking area and a
short drive is dashed in for future use if needed between the fields and facilities
along the northern boundary. This drive would involve crossing of the headwaters
of the newly identified stream.
Another facility that was identified as desirable by meeting attendees was an
outdoor swimming pool, but the cost of this facility led the group tc omit it from
the master plan, with a notation of its possible future location to the west.
Funding for the Northern Park comes from the 2001 Parks and Open Space
Bond. A total of $1.2 million from those proceeds were identified for the park
The potential for expanding the outfield fence was considered but eventually not recommended
because of cost of moving the existing lights and close proximity of adjacent structures
tz
Throughout the master plan process, it was noted that these funds would likely
not be sufficient to build the entirety of the park as proposed, and that some
prioritization would be necessary.
PRIORITIZATION OF FACILITIES
Accordingly, at the final community meeting on March 9, 2QQ5, County sataff
provided estimates prepared by a professional cost-estimating firm, for all costs
typically associated with each facility. Those present were asked to identify their
top priorities far the park, and use the cost estimates to rank those priorities as
their formal recommendations for the Master Plan (as shown below). The cost
estimates were as comprehensive as possible and included all known associated
costs with each facility,
As the first part of this discussion, there were several "givens" that were listed as
necessary and implicit facilities that would be needed for construction:
"Givens"
1, An entry road and two parking lots to serve the park facilitiesZ
2. A picnic shelter with restrooms
3, The play area located near the Center3
4. A service road to the proposed fields on the northern part of the site4
5, Picnic tables and benches at locations TBA throughout the park
6. Horseshoes and volleyball courtss
The total estimated cost of the above items is approximately $4QO,000,
As a next step, the citizens present looked at the proposed facilities, the
identified/desired needs, the cost estimates and the projected remaining
available funds, and identified the following as priorities for the park
construction:
1. The new baseball/softball field in the northern part of the park
2. The skate facility
3. The multi-purpose field (Tee-ball and other field sports)
4. The basketball courts
5. The nature trails/measured walking track
- This does not include the proposed parking lot in front of the Northern Human Services Center, which
would be part of the proposed building upgrades.
' The current play area in this site would be impacted by the entry road, and is old and in need of
replacement.
The master plan shows a possible future parking lot and wider road for these fields that may need to be
constructed at some future date. It is not proposed for the construction of park facilities here.
e While not "givens," these facilities are inexpensive and deemed not to require the group's time for
prioritization because of their small size and low cost.
13
The total of these facilities is approximate to or slightly above the available
funding of $1,2 million,
CONCLUSION
The creation of Northern Park is expected to yield a facility that can provide many
recreational opportunities for the Cedar Grave community, including residents
living in close proximity to the park and those living in northwestern Orange
County. Two new playing fields, basketball courts, a skate facility, trails and a
picnic shelter with restrooms are proposed for construction with the available
funds.
There are other facilities that have been planned in the design that could be part
of a future phase, if additional funds become available in the future, including a
third baseball/softball field, tennis courts, a second playground area, and two
additional picnic shelters,
In considering the potential facilities, the meetings have attempted to be
cognizant of plans for the Northern Human Services Center, The Northern Park
Master Plan moreover has been designed to be compatible with the current and
expected future plans for the building.
The addition of the facilities outlined above will fiirther enhance recreation, open
space and leisure activities for citizens in the Cedar Grove community and
beyond. The design, consistent with the Preliminary Concept Plan, attempts to
balance the protection of the hardwood forest areas and stream buffers on site,
while still providing for active recreation and low-impact recreation facilities.
The existing playground at the Northern Center
14
APPENDICES
Appendix 1 -Adopted Process and Charge for Northern (Human Services
Center) Park
Appendix 2 -Challenges and Opportunities Report
15
Master Plan Process
Northern Park
at the Northern Human Services Center
Adopted June 3, 2003
(Preliminary Concept Playa adopted 9/2/03)
16
A. Site Information
Size: 48 acres (including existing buildings and fields), with
an additional I2,2 acres located across NC 8G,
Location: Co-located with Northern Human Services Center,
seven miles north of Htillsborough on NC 86 in Cedar
Grove Township
Status: Existing Northerta Htcman Services Center and one ballfield and
playground on original 8 acres. County acquired additional 40
acres in 1998, Draft Preliminary Concept Plan for parlx included
in Northern Human Services center report of 2001.
Funding: $1,200,000
Source: 2001 Parks Bond ($200, 000 appropriated in FY 02-03)
8. Proposed Timetable of Actions
~.
Topographic and culturallarchaeological surveys Late 2003-Early 2004
approved and conducted
Staff develops base maps and site analysis September-October 2004
(O ortunities and Constraints Analysis)
Initial Community Meeting -Base Maps and October 28, 2004
Opportunities and Constraints Analysis,
Community Interests
Second Community Meeting -Design Charette November 2004
Third Community Meeting -Review draft Plan December 2004 or January 2005
and re ort (community forum)
Fourth Community Meeting -Adopt proposed January or February 2005
Master Plan (map and report)
Master Plan re ort and ma finalized February 2005
Board of Commissioners receives proposed March-April 2005
Master Plan
Pre-Construction and Construction
Board adopts plan and instructs staff to develop
site lan, construction documents and drawin s
Site plan submitted to Planning Department,
construction drawings prepared
Develo construction bid documents, solicit bids
BOCC approves contract for construction
Construction of Parlc
17
C. Rationale for Process
Development of the Master Plan for this park will involve
planning for both active and low-impact recreation opportunities
at the site. Special attention and consideration will be given
to coordination with plans for the adjoining Northern
Human Services center, to ensure compatibility of proposed
uses with the planned improvements to the Center.
D. Description of Design Process
The park design would be accomplished via a series of four
community meetings held over three months. Citizens in the
community will be invited to participate in the process by
attending meetings and participating in the design. Notice about
the community meetings will be publicized through mailings,
public service announcements and notices placed in stores and
community centers.
The Open Space Design Specialist will be responsible for the
actual site design, working with the County Manager (or
designee), ERC Director and Recreation and Parks Director -with
the Planning Director, County Engineer, Purchasing Director and
Land Conservation Manager also asked to participate as available
or needed.
The end-product of this process will be a Master Plan for the park,
along with a brief written report, to be prepared by March 2004.
18
E. Guiding Principles
In addition to the charge, the Master Plan process shall use the
following Guiding Principles:
• Any proposed substantive modifications to the Preliminary
Concept Plan should be conveyed to the Board of Commissioners
as soon as practical far approval
• The facilities to be designed and built should recognize the co-
location with the Northern Human Services Center, working in
concert with future plans for the center and sharing infrastructure
where possible
• The park should, to the degree possible, promote apedestrian-
friendly environment and discourage unnecessary automobile
traffic or parking areas
• The protection of important stream corridors and natural areas
should be a foremost consideration, and facilities should be
designed in concert with the natural surroundings wherever
possible. Grading and alteration of the natural landscape should
be minimized
• Generally, all portions of the site not identified for playing fields or
other active recreation facilities should adhere to "Olmsteadian"
park and open space design principles, promoting open spaces,
meadows, and fields that may flexibly be used for a variety of
public leisure purposes
• Open spaces, including trails, should be developed with a vision
for both an internal and potential future external network, with
leisure and pedestrian movement between the Northern Human
Services Center and the park addressed internally, and linkage to
any nearby residential areas considered externally
• The plan should promote xeriscaping (native vegetation and
minimal water use) within the entire site
• The Work Group should hold at least one community forum or
open house to present draft recommendations, prior to submittal of
the Committee report
• Additional basic operating principles may be developed
19
Northern Park
at the Northern Nurnan Services Center
Challenges and Opporfiunifiies
October 2004
Orange County
Environment and Resource Conservation Department
Northern (HSC) Park
Challenges and Opportunities 20
I. Background
Orange County owns 60 acres in Cedar Grove Township containing the county's
Northern Human Services Center (NHSC) and a ballfield and playground, Acquisition
of additional land in 1999 and 2004 was made in preparation for the construction of a
park, as identified in the Parlcs Element of the Comprehensive Plan. This park,
Northern (Human Services Center) Parlc, would serve as a community park for
northwestern Orange County, The property is located on a ridgetop on two sides of NC
Highway 86, approximately 7 miles north of Hillsborough (Figure 1).
The property consists of three tracts: A) the County's Northern Human Services Center
(NHSC), located in the former Cedar Grove School, on 9,28 acres; B) an adjacent
undeveloped 39-acre parcel (the "Kennedy Tract") which is located west of the NHSC
and includes a portion of a large pond known as Compton's Pond; and C) a 12,22-acre
parcel located on the east side of NC 86 and directly across from the NHSC. The
eastern tract, which the County acquired in 2004, is known as the "Vincent property"
and will be primarily used for the planned upgrade to the NHSC wastewater system,
II. Zoning
The property is zoned Agriculturo.l Residential, which is intended for agricultural uses
and other compatible uses that help to preserve "rural character.." This district allows
parks and government facilities. A "Resource Protection Area" is identified for alow-
lying area along the far western boundary next to Compton Pond-a large sediment
retention pond located on the East Fork of the Eno River, upstream of Lake Orange,.
This property is also within the Upper Eno Protected Watershed overlay district, which
has a 12% impervious surface limitation, a minimum 150-foot stream buffer width for
new structures, and a minimum 100-foot distance requirement for septic systems from
perennial or intermittent streams. Situated within the Neuse River Basin, the State's
Neuse Buffer Rules also apply, and require that vegetated buffers be maintained
adjacent to streams and other water bodies, including ponds.
III. Surrounding Land Uses
The site is generally surrounded by largely undeveloped property to the north and west,
and by smaller lots with single-family residences to the south and east. An aerial view
of the property is provided as Figure 2.
The portion of the property located west of NC 86 is bounded to the west by Compton
Pond-a 25-acre pond impoundment on the East Forlc of the Eno River, Along the
southern boundary there are seven single-family residential lots, and to the east is NC
86. The northern property boundary abuts a large tract currently in agricultural use..
An adjacent property on the northeast corner has several old vehicles and debris piled
up along a chain link boundary fence. Trash piles encroach on the County property.
Across NC 86, the Vincent Tract portion of the property is bounded to the west by NC
86, to the north by 3 small residential lots along NC 86 and an 11-acre agricultural
property, to the east by 5 small residential lots in the Green Pines subdivision, and to
the south by 2 two-acre lots, only one of which is developed with a home site.
Northern (HSC) Park Challenges and Opportun/ties 21
IV. Cultural and Archaeological Survey
A cultural and archaeological survey of the property was completed by Legacy Research
Associates in January 2004.. The survey identified two previously unrecorded
archaeological sites, but neither is considered to contain significant information about
the prehistory or history of the region. Neither site is eligible for the National Register
of Historic Places and no future archaeological work is recommended.
V. Property Description
The following is a more detailed description of the three individual tracts that comprise
the County's 60-acre site. The descriptions reference an accompanying site map (Figure
1), aerial map (figure 2), topographic map (Figure 3) and soils map (Figure 4).
A. Northern Human Services Center Tract (9.28 acres)
The NHSC property is identified as Tract A on the Site Map (Figure 1). This portion of
the County property is already developed, with aone-story 1962 brick building, which
once served as the Cedar Grove School-an elementary school for the African-American
community prior to integration. It also contains gravel parking lots, abaseball/softball,
and a small playground.
The existing baseball softball field is located in the southwest quarter of this tract.. It
has overhead lighting on poles along the outfield fence, The field is operated and
maintained by the County Recreation and Parlcs department, and is also used for a
County youth soccer league in addition to youth baseball and softball.. A sign at the
entrance to the field indicates that the field was constructed with grant funds from the
federal Land and Water Conservation Fund (LWCF), Note: Any future altera.ti:ons to lh,e
field nta.y require th,e consent of the LWCFprogranti.
Near the north side of the NHSC building is a small children's playground.. A portion of
the playground is within a fenced area with shade trees, and the other portion is
outside the fence, Between the ballfield and the playground there is an acre or more of
maintained grass open space that is not used for any particular activity.
An above ground water storage tank exists on the site behind the building, although it
is not in use for drinking water.. The existing well for the NHSC is located under the
building in the boiler room and must be abandoned and relocated. The current
wastewater disposal area for the NHSC complex is located underground and directly to
the east (front) side of the building. A relocation and expansion of the existing
wastewater treatment system has been proposed for this site. Relocating the existing
system would allow the construction of an improved entrance and possible additional
parking for the Center.
Access
The NHSC property has 600 feet of road frontage along the west side of NC 86. Two
gravel driveways enter the site at either end of the Center. A service road provides
access to the rear of the building and to the athletic field.
Northern (HSCJ Park
Challenges and Opportun/ties 22
Existing Vegetation
This 9-acre portion of the property is almost completely open and maintained in grass
except for the building, playground and parking areas. There is a narrow fringe of
woodland forest in the rear of the property, which continues west into the "Kennedy
Tract" portion of the County property..
Wetlands and Hydroloey
There are no streams or wetlands on this portion of the County property.
Tonoeranhv and Soffs
The land is fairly flat with a slight downgrade toward the rear of the property. The
soils are classified Georgeville B by the Orange County Soil Survey. Georgeville soils
are highly suitable for most kinds of urban uses and all forms of recreational uses, No
areas of the property are within 100-year floodplain.
B. "Kennedy Tract" (39 acres)
The Kennedy Tract is identified as Tract B on the Site Map (Figure 1). This portion
of the County property is mostly wooded with a mixture of hardwood and pine forest..
Access
An old unimproved roadway (10 feet wide) provides access to the rear of the property
and the south end of the pond.. The roadway begins near a fenced area beside the
children's playground (NHSC tract) and leads due west with pine forest to right and
hardwood forest to left. Trash piles are located alongside the roadway. One pile
includes appliances, car parts, glass/cans, etc. Midway back through the property, the
roadway turns to the southwest and around an adjacent private property, then angles
back in more westerly direction to the southern end of Compton's Pond and its high
earthen dam. Downed trees and limbs from ice and windstorms of 2003-04 currently
block portions of the old roadway.
Vegetation
The vast majority of the property is wooded with a mixture of hardwoods and pine. A
12-acre section of the upland property nearest the NHSC is comprised entirely of
mature hardwoods-50 to 60-feet-tall.. Major canopy trees include red and white oaks,
hickories, tulip poplar and American beech.. This mature deciduous forest provides
numerous benefits, including habitat for wildlife and native plants, and protection of
water quality by filtering out sediment and pollutants from runoff before it enters the
adjacent pond and the East Forlc Eno River..
The lower-lying woodlands in the western part of the property are a mixture of pine
and hardwoods adapted to the wetter soils nearer to the lake. Dense stands of loblolly
pine occur along the northern property boundary and the southwestern boundary, both
providing 100-200 foot buffers from the neighboring properties. Two small clearings
are located in the far northeast and southwest corners of the property. One is at the
impoundment for Compton's Pond; the other has been used by someone to store
abandoned vehicles and debris.
Northern (HSCJ Park Challenges and Opportun/ties 23
Wetlands and Hydrology
Runoff from the property drains from east to west into Compton's Pond-a 25-acre pond
that impounds the East Fork of the Eno River, upstream of Lalce Orange. Lalce Orange
is a "flow augmentation" lake that is part of the Upper Eno water supply watershed
network.. The pond borders the property for nearly 1,200 feet along the western
property line. The county property east of the pond includes aloes-lying area within the
100-year floodplain. That area is identified with a "Flood Easement Line" in the
County Land Records database.
A narrow, linear depression drains roughly one-half of the property. A drainage ditch
receives runoff fiom the surrounding uplands and from an 8-inch PVC discharge pipe
(origin unknown) located about 300 feet from NW corner of the NHSC property. The
narrow ditch carries water in westerly direction toward the pond.. A second ditch runs
parallel to the primary ditch (20-30' apart) and travels about 500 feet before ,joining the
primary ditch. The ditch becomes more stream-like as it meanders through the forest
and empties into the pond at a small cove. Another small channel drains the southwest
corner of property and flows into the pond. If the old roadway is improved for future
use, it may be necessary to install a culvert for proper drainage.
Tonoerauhy and Soils
Slopes on the property are mostly gentle (2-8%) with some broader areas of moderate
slope (8-15%) descending down from the uplands towards the pond.. The gentle to
moderate slopes on the property are suitable for a variety of uses and do not pose a
significant limitation to the property.
Georgeuille soils are mapped for the upland slope in the eastern section of the property
and in the far southwest corner below the pond. Abroad area of Herndon soils occurs
throughout the middle portion of the property. Those soils are suited for a variety of
uses, including recreation fields, Enon soils are mapped in the northwest corner of the
property close to the pond.. Enon soils are suitable for some recreational uses, but not
for any intensive development..
C. "Vincent Tract" (12.22 acres)
The Vincent Tract is identified as Tract C on the Site Map (Figure 1). This portion of
the County property features an old house (ca.. 1911) and a few associated outbuildings,
all in a severely deteriorated condition. The Vincent buildings were surveyed in the
early 1990s as part of a countywide architectural history inventory, and at that time
the house was still occupied as a residence.
An environmental site assessment (Phase I level) of the property was conducted in 2003
by Quantum Environmental, Inc. prior to the County's purchase of this site. The survey
identified three aboveground fuel storage tanks and some solid household waste, which
will need to be removed and disposed of properly.. The survey findings also determined
that the old house might contain some materials made of asbestos, which would also
need to be handled and disposed of properly.
Northern (HSCJ Park Challenges and Opportunities 24
Access
This property has 190 feet of frontage along NC 86 and is accessible from an
unimproved (dirt and gravel) driveway leading from NC 86 to the south side of the
farmhouse.. The portion of the driveway nearest NC 86 has standing water on a regular
basis. From this drive, one can also access the remainder of the property..
Existing Vegetation
The approximately 10 acres located behind (east of) the farmstead building complex is
open land that was in agricultural use until the County purchased the tract. This area
was beginning to grow up with early succession vegetation until it was recently bush
hogged by the County for engineering work associated with a proposed underground
wastewater treatment system for the NHSC. There is a small section of woodlands in
the northeast corner of the property,. A few small trash piles can be found amongst the
trees, adjacent to the neighboring properties,
Tooo~raohy and Soils
The farmstead building complex is sited on the highest point of the property (720 feet
elevation) and about 150 feet from NC 86. From there the land slopes gradually to the
east down to about 680 feet elevation at the rear property boundary.. Soils are mapped
as Georgeville B and Georgeville C with good suitability for most urban and active
recreational uses.
Wetlands and Hvdroloev
There are no streams or wetlands on this portion of the County property.
VI. Opportunities and Constraints
The following are existing/potential assets and constraints identified for the property:
Existing and potential assets for park development include:
• Existing lighted baseball/softball field (also used for youth soccer)
• Existing children's playground (needs improvements)
• Mature hardwood forest (suitable for nature trails)
• Other Forested areas (help to buffer the park from adjacent private properties)
• Compton's Pond (potential scenic and recreational amenity)
• Old unimproved roadway (potential service road and/or walking trail)
Potential constraints to the development of the property include:
• Low-lying area east of the pond is within the 100-year floodplain
• Small pm•tions of the eastern shoreline are not within the County property, which
will limit access to some portions of the waterfront
• Drainage ditches (2) on the northern half of the Kennedy tract
• Pre-existing 60-foot easement for access to the I{ennedy tract from NC 86 (this is
likely no longer an issue since Orange County owns both properties)
Northern (HSC) Park Challenges and Opportun/ties 25
VII. Preliminary Concept Plan
The property is well suited for the creation of the "Northern Park" around the Northern
Human Services Center (NHSC) and existing public recreational uses. The co-location
of the park with the NHSC offers the opportunities for providing For both indoor and
outdoor leisure and recreational uses, as well as educational opportunities linking the
building and the park.
The Orange County Board of Commissioners adopted a Preli.minaa;y Concept Plan for
the park in 2003. A copy of the Plan is provided as Figure 5.
The area shown in Orange on the Plan (16 acres) is reserved for the NHSC and
associated facilities, including proposed new entranceway and parking.. The area east
of NC 86 ("Vincent Tract") is reserved for a new wastewater treatment system for the
NI3SC, The potential use of that site for other purposes will be explored in the future,
and is outside of the scope of this park planning effort, The County is, however,
interested in learning more about the history and use of the Vincent farmstead.
The area shown in Yellow (12-15 acres) includes the existing recreational facilities
(ballfield and playground) and the portion of the Kennedy Tract that is more suitable
for additional active recreation facilities. The pine woodlands are in an area more
disturbed from previous uses, and was probably in agricultural use 20-25 ,years ago.
The area shown in Green (27-30 acres) is reserved for low-impact recreational uses,.
The upland portions offer a mature hardwood forest setting suitable for wallting trails
and a sheltered picnic area close to the existing and proposed active recreation areas.
Trails could lead visitors from that area of the forest down to Compton Pond.. The
western portion of the property is wooded with large pine trees and young hardwoods,
A few small creeks flow through the forest before entering the pond. Walking trails
might need to include small bridges or a boardwalk in some places,. (Approximate trail
locations are shown on Figure 5 as examples..)
The area near Compton Pond offers scenic views of the large pond itself, as well as the
open pasture and woodlands along the opposite shorelines.. The best views are from
high ground located above the eastern shore, south of the cove. Large trees provide
shade for a potential picnic area or benches.. An existing trail follows the shoreline of
the pond within five feet of the water's edge. Relocating the trail to higher ground
would reduce shoreline erosion and trail maintenance needs. The peninsula located
just north of the cove offers another nice setting for benches and overlooks.
VIII. Summary
The following are the existing facilities and proposed new facilities envisioned thus far
for each section of the property shown in the Preliminary Concept Plan:
NHSC & Associated Facilities (Orange):
- Center building (existing)
- Front entranceway to Center building (new)
- Panting areas (improved)
- Wastewater treatment system (expanded, relocated)
Northern (HSC) Park
Challenges and Opportun/ties 26
Active Recreation Area (Yellow):
- Ball fields (existing and proposed additional fields)
- Playground (improved? expanded?)
- Basketball court?
- Wallcing trail? (hard surface)
- Picnic shelter(s)?
- Other?
Low-Impact Recreation Areas (Green):
- Hiking trails (natural)
- Benches?
- Picnic areas? (tables and grills?)
- Water activities?
- Scenic overlooks at pond?
- Other?
View of Compton's Pond from dam; County park property is along right shoreline,