HomeMy WebLinkAboutAgenda - 04-28-2005-2c2To: Assembly of Governments Meeting From: Lori Taft, Orange County Recreation and Parks Director Date: April 22, 2005 Re: HOMESTEAD AQUATICS CENTER UPDATE Current Status: In design and permitting phase Design Firm: GGA This project involves the construction of an aquatics center within Homestead Park. Currently the building program includes two tanks, locker rooms, and a small meeting room. The main tank would be a 25 meter X 25 yard lap pool. The second would be a 25 meter X 10 yard tank that would include a zero entry ramp and would likely be set at warmer temperatures for youth, elderly, and mobility challenged persons. The following has occurred or is ongoing: • The Town Council reviewed a concept plan in .June 2004, , • A Special Use Permit was submitted in October. The complete SUP schedule has not yet been determined. Staff review has also started. • Town staff and GGA completed an analysis of preliminary cost estimates and determined that the budget was inadequate for the base program approved by the Council and Commissioners. This situation was created by recent increases in the costs of construction materials. Town staff and GGA have developed a new building program that reduces the size of the building but retains the two tanks. We should know by early May if the revised building program is within budget. • Town staff and GGA are trying to determine if budget will support a LEED certification for energy and sustainability.. On April 15 the Town Council's Committee on Sustainability, Energy, and Environment (SEE) discussed the proposed Aquatics Center and voted unanimously to recommend that the project not seek LEED certification, However, the Committee was interested in making sure that the building is built and designed in a manner that, if the Town were seeking certification, it would earn as many LEED points as possible within the existing budget. The Committee also explored possible uses of some of the Town's Energy Bonds for this project. The SEE will review options for use of Energy Bonds on May 6. On April 19 the Project Planning Committee (2 members each of the CouncilBOCC) reviewed a revised concept plan that reduces the size of the structure, but preserves the main program elements ofthe earlier design. This new design reduces the overall building size, deck space, storage space and the size of the offices. Locker room areas were redesigned to maximize efficiency. The size of the tanks was not reduced. The PPC agreed to recommend that the Council pursue a smaller footprint and new location. The PPC also recommended that some steps be taken to enlarge the northern pool deck so that there would be adequate space for occasional swim meets and other large events. We believe that a revised plan may be presented to the Council as early as May 9, with construction beginning about a year from now. Please see the attached slides for updated site plans, elevations and floor plans on this project. 600 oxpr' nOC �o �'-- %�' 7 ' o ago u -`- O r., \ '.mm. JL r o ! _ - _ m - 505- -i �...- - 9� I �JS — � -5G5- _ - - _ x" m� Cmyn mre� ' 1- . - _ iy \ �IiOG G9y OS`__ - ----- - _ -- - - -- 1 .0. _ _ Rz 5 r.asz v >i i. /' ,. .'•jj//yy��yy� ' %- --�'" -' N]diP9 �''=v ro^-.'c_ar__ `_ , - -�� --______ _ ,cZ�D DZO O /\ /' �. .'•••M'i'�� .i�N11aY1 `-'+V _ -`_- c�i'z � i /•� ' -FNTFR : *_ G ARCHITECTS z - - ARCHITECTS N v�N \ \ t \ t t \ t t \ t l \\ t t �t t \t� t i tt t MEGIINiIGaI tt uw�•. tt t .k tt 1 t >. I i E � � E 1 1 1 � tt t t MEN -,,r' Ei 1 i i 1 == i 1 �� =���E I i fi rg _ W=[ -: t t t y4NitCRIM ____ j ® 1 1 1 1 FVM aim -- I I I I I I I I I I I I I I I I I FUTURE GYM. I , I , I , I 1 � I 1 1 1 1 1 1 zA q4 I 1 j Q n � 4 44 -S '� m