HomeMy WebLinkAboutSWAG agenda 052015I
Agenda
Solid Waste Advisory Group
May 20, 2015 - 6:00 p.m.
Solid Waste Operations Center
1. Call to Order— Chair
2. Approve Meeting Summary from April 22 2015 — Chair, Attachment
3. Update on House Bill 430 — County Omnibus Legislation (Recycling Fee Issue) — County
Attorney Staff
4. Next Steps for Surveying Service /Facility Users — Staff, Attachment
5. Towns and County Staff Revised Priority Solid Waste Issues Report — Staff, Attachment
6. Program Performance & Measurement Reporting —Staff, Attachment
7. Other
a. Update on Interlocal Agreement Manager Discussions
8. Public Comments — Chair
9. Next Meeting
10. Adjourn (8:00) - Chair
Dinner will be provided
DRAFT 2
Solid Waste Advisory Group Meeting Summary
DATE: April 22, 2015
LOCATION: Solid Waste Administration Training Room
MEMBERS PRESENT: Hillsborough Commissioner Kathleen Ferguson, Carrboro Alderman Randee Haven -
O'Donnell, UNC- Healthcare Representative Mel Hurston, Orange County Commissioner Barry Jacobs, Chapel Hill
Mayor Mark Kleinschmidt, Carrboro Mayor Lydia Lavelle, Orange County Commissioner Penny Rich, UNC - Chapel
Hill Representative Bruce Runberg, Chapel Hill Councilmember Jim Ward
MEMBERS ABSENT: UNC - Chapel Hill Representative Matt Fajack, Hillsborough Commissioner Brian Lowen
STAFF PRESENT: OC Solid Waste Eric Gerringer, County Manager Bonnie Hammersley, Hillsborough Public Works
Director Ken Hines, OC Solid Waste Jennie Knowlton, Chapel Hill Public Works Director Lance Norris, OC Solid
Waste Blair Pollock, Carrboro Public Works Director George Seiz, Chapel Hill Solid Waste Wendy Simmons, UNC -
CH Solid Waste Program Manager BJ Tipton, OC Solid Waste Management Director Gayle Wilson, OC Solid
Waste Kristina Witosky, Assistant County Manager Cheryl Young
Towns and County Staff Revised Priority Solid Waste Issue Report
• #13. Develop strategy for measuring and tracking solid waste services
• Surveys and data collection should be consistent and on -going
• Jacobs suggests renumbering item as #7
• Staffs to make data collection and reporting recommendation and to establish new surveys. Outline and
framework could be included in Interlocal Agreement. Program updates can be made to SWAG
periodically
• Finalized Priority Report will be shared with boards
• Add to "Guiding Principles" that this list is fluid, not fixed. Some items can be ongoing simultaneously
Interlocal Agreement for Solid Waste /Recycling
• November 12, 2014 version, with two exceptions:
o III -B: Need to confirm elimination
o Reincorporation of Appendixes into original document
• Staff suggests "VII. Financial" and "I. Term and Termination" sections be priorities
o Suggestions on how to include UNC -CH and UNC - Healthcare requested
• Definition of "Debt ", "Debt Allocations ", and "Majority" need to be considered and made clear
• Interlocal Agreement to be reviewed by Town, County and University Staffs, Managers and Attorneys;
County Manager to coordinate; update to be provided for next meeting
DRAFT
3
Other
• School of Government Study (value for dollar: Towns vs. County) has been petitioned to OCBOCC
Public Comments
• None
Next Meetings
Mz
Jur
Meeting ac
Name of IV
Memorandum
To: Solid Waste Advisory Group
From: George Siez, Carrboro Public Works Director
Ken Hines, Hillsborough Public Works Director
Gayle Wilson, Orange County Solid Waste Director
Subject: Program Usage Surveys
Date: May 20, 2015
The Solid Waste Advisory Group (SWAG) has expressed interest in acquiring information related to the
jurisdictional source (incorporated vs unincorporated) of the users of various recycling programs. It is
our understanding that the SWAG desires reliable usage data with which to make informed decisions.
The primary method of obtaining this information is through surveying users to determine where they
live. Staff recently provided information on Solid Waste Convenience Center users based on a survey
designed, validated and presented by the UNC Odum Institute for Research in Social Science.
Survey Options
As staff evaluated survey opportunities for upcoming FY 2015 -16 there were four possible areas to
consider for ascertaining the place of residence of program users:
0 Solid Waste Convenience Centers (SWCC)
Convenience centers are of special interest to the SWAG with regard to user residence. The first user
survey conducted was for SWCC's with the results being reported to the SWAG at their March 6, 2015
meeting. It was expressed by the SWAG that additional SWCC surveys were expected to be conducted.
The Eubanks Road SWCC is the center most heavily utilized by municipal residents and is scheduled to
undergo a major reconstruction beginning in the summer of 2015 with completion not expected until
approximately late spring of 2016. Given that this site will be closed for construction for several months
it was anticipated that no surveys would be conducted at SWCC's until this construction was complete
and the newly modernized and expanded center reopened for business. With this site closed it was
further anticipated that users would temporarily initiate new waste and recycling use patterns such as
visiting other SWCC's, taking recyclables to 24 -hour drop -off sites, increasing use of curbside collection
services or other waste disposal and recycling behavioral changes. Therefore the efficacy of conducting
a survey during this period would seem to be of little value. SWAG staffs were in general agreement
with this conclusion, although committed to proceeding with a survey at the SWAG's direction.
However, there is a small window prior to the expected beginning of construction (July 13 -26) when a
SWCC survey could be conducted should the SWAG wish to proceed. Staff assumes that such a survey
would be used to gain additional information to supplement the previous survey. Staff has consulted
the Odum Institute regarding both the issue of SWCC surveying during Eubanks Road SWCC construction
(surveying the other four centers and a temporary Eubanks Road center) and of conducting a quick
survey prior to the beginning of construction.
5
The Odum Institute responded to the suggestion of conducting another convenience center survey at
this time as follows:
1. The January 2015 SWCC survey provided an accurate and reliable snapshot of SWCC usage by
residents who live within and outside town limits. It is not clear to us the purpose of collecting
additional data on this some matter. While overall SWCC usage rates do fluctuate with weather
and other seasonal changes, such fluctuations would change the survey conclusions only if they
affect the behavior of residents within town limits differently than those outside town limits.
Weather affects everybody. Vacations and holidays affect everybody. Before spending
resources on another SWCC user survey, we urge the SWAG to consider what parameters, if any,
can reasonably be expected to affect in -town and out -of -town residents differentially.
2. Some may feel that "more data is always better data." If data were free and obtainable without
involvement of the humans under study, this might be true. But neither is true here. The
sampling ratio needed to get good survey estimates of the SWCC in a reasonable length data
collection period is one in five; one of every five users entering the SWCC is surveyed. ;, a
sampling ratio of 1 in 5 means that a large number of users will be sampled for survey more than
once, and some more than twice. The "annoyance" factor of this situation is significant and the
result is refusals (known as "nonresponse. ") Nonresponse introduces "noise" in the data and
reduces the trustworthiness of survey estimates. In the January 2015 survey, field staff
encountered a total of 16 refusals (about 1 %). This reflects a good cooperation rate and the
"noise" from the substitutions is likely having no effect on the survey estimates. But the more
surveys that are conducted, and the more frequently, the less tolerant the public will be, and the
higher the refusal rate. Data from additional surveys are not necessarily better data if they
contain more noise.
3. If an additional survey were conducted, it would not be appropriate to combine the two surveys
into a single estimate. They would be two individual snapshots in time, and if they differ, the
SWAG would need to decide how they would be used as such for policy and decision making
purposes.
4. With an unlimited budget, one could consider a continuous data collection design in which SWCC
users are sampled and surveyed across all operating hours of all SWCCs across the entire
calendar year, with a sampling ratio much lower than 1 in 5. This would account for all seasonal
variations and minimize nonresponse, but it would be extremely costly and would require a
complete calendar year of data collection to generate results.
5. We understand that Orange County plans to close the Eubanks Convenience Center for upgrades
beginning in August 2015 and will not re -open it until May of 2016, and that a temporary
replacement site will provided only for collection of bagged household waste Since this
interruption of normal operations could result in temporary changes in user behavior (e.g. users
may go to other SWCCs or even to out -of- county locations), we caution the SWAG about making
conclusions about long -term behavior from any data collected during this period —if any are
collected.
X
Odum Conclusion: Barring a continuous year -long design, it is our opinion that the snapshot provides the
best information about proportionate usage by in -town and out -of -town residents, and at present we see
no compelling evidence that a second snapshot is likely to be different than the one from January 2015.
Should the SWAG wish to proceed with the July survey prior to construction, notwithstanding the
recommendation from the Odum Institute, staff is prepared to begin planning for the execution of the
survey immediately. It is estimated that the cost for such a survey would be about $22,500. No funds
were budgeted for this survey in the proposed FY 2015 -16 Solid Waste budget due to Odum Institute
advice.
Staff Recommendation: Delay SWCC surveys until Eubanks Road SWCC construction is complete and
new usage patterns stabilized and consider surveying other programs below.
• 24 -hour Recycling Drop -off Sites
Staff also anticipates conducting user surveys at the five 24 -hour recycling drop -off sites. However,
based on the discussion surrounding the upcoming construction of Eubanks Road there is a strong
likelihood that established user patterns at these drop -off sites will be altered because recycling will not
be available at the temporary site during construction, making the results of questionable usefulness.
Staff has not yet obtained a cost estimate for a drop -off site survey and would propose to use the Odum
Institute.
A survey at drop -off sites is likely further complicated by the question of when are the best times to
survey as sites are open continuously and as they accessible from more than one direction making how
to control sampling is a challenge. Thus if there is an attempt to gain a useful sample at these sites, it
could be more complex than those surveys conducted at the SWCCs. Staff will require Odum Institute
assistance for these surveys.
Staff Recommendation: Delay 24 -hour recycling drop -off site surveys until Eubanks Road SWCC
construction is complete and usage patterns stabilized.
• Household Hazardous Waste (HHW
In order to continue making progress toward providing valuable user information over the period where
further surveying of convenience centers and drop -off sites is delayed it would be possible to conduct a
user survey of the two HHW facilities. This survey could be developed and a survey began in the
summer of 2015. Staff has not engaged the Odum Institute with regard to HHW surveys but could do so
if the SWAG was amenable. Alternatively, it is anticipated that existing staff could perform the survey
without the Odum Institute involvement given the rather controlled and uncomplicated nature of this
program. The purpose of the survey would be to determine the number of users from incorporated and
unincorporated areas of the county.
While no funds were specifically budgeted for this survey the cost would be less than a convenience
center or drop -off site survey and funds could be identified to perform the work. Staff estimates a cost
less than $5,000 for in -house managed survey. If the Odum Institute is utilized a budget of about
$15,000 would be necessary.
Staff Recommendation: Direct county staff to begin planning for a survey of HHW program users and to
keep the SWAG briefed on progress, with a final report to be presented during FY 2015 -16. A full 30 day
survey could be managed by County staff with a report to the SWAG for a November 2015 meeting.
7
• Shred -a -thons
Although shred -a -thons are a relatively minor and inexpensive program, they are very popular with
county residents and hundreds of users line up for the service, making conduction of a survey fairly
straightforward and simple with this relatively 'captive' audience. There would be little cost (in the
hundreds of dollars) to this survey if County staff managed the task. Again, this is a rather controlled
and uncomplicated activity that staff believes would not necessitate Odum Institute involvement and
expense.
Staff Recommendation: Direct staff to prepare and manage a survey of both October 2015 shred -a -thon
events (Chapel Hill and Hillsborough). A report could be prepared and presented by the end of 2015.
Staff requests guidance on how the SWAG wishes to proceed with regard to program user surveys.
Memorandum
To: Solid Waste Advisory Group
From: George Seiz, Carrboro Public Works Director
Lance Norris, Chapel Hill Public Works Director
Ken Hines, Hillsborough Public Works Director
Gayle Wilson, Orange County Solid Waste Director
Subject: Staff Suggested Priority Solid Waste Issues (revised -2)
Date: May 20, 2015
Towns and County staff were requested by the Solid Waste Advisory Board to prepare a list of
solid waste issues and their relative priorities for consideration and discussion at the April 1,
2015 meeting. At the April 1 meeting the SWAG proposed several revisions /suggestions that
are reflected in the memorandum below. Additional revisions were made at the April 22
meeting, including a request to provide a chart or other graphic representation of the listed
short to mid -term priorities.
A Gantt Chart is provided (attached) for SWAG review. The 13 short to mid -term priorities are
listed and tracked over a five year period. Following SWAG review and approval of the Gantt
Chart format staff will finalize. Once endorsed by the SWAG the chart will be refined and
maintained as an ongoing practice, with additional task details added or modified as necessary.
Guiding Principles
Your staffs have discussed and evaluated various topics and opportunities to provide a technical
or industry and local government managerial professional viewpoint. Staffs have utilized
varying degrees and in a general sense the following standards /criteria in our issue discussions
and have amended the list of priorities based on April 1 and April 22 SWAG comments.
• Potential to reduce waste and /or increase recycling
• Other environmental impacts such as fuel usage, toxicity reduction, pollution
prevention, etc.
• Cost and Cost Effectiveness
• Efficiency
• Citizen understanding /user friendliness /complexity /equity
• Industry best management practices
• Innovation /Creativity
• Public Involvement, and
• Environmental Education and Outreach
9
Staff Suggestions /Priorities
Based in part on the above criteria and discussions from the April 1 and April 22 SWAG
meetings, staff has adjusted the following priorities and issues for SWAG consideration as short
or mid -term actions, as amended by the SWAG. Staff is recommending the first 7 issues as
short term priority issues that are recommended to be pursued now and concurrently as time
allows. Suggested timeframes are provided. Schedules and priorities will remain fluid to the
extent possible. Staff has listed items that are likely to be addressed first, but some flexibility is
necessary and staff must remain responsive to governing body requests for adjustments.
1. Adopt funding mechanism (as necessary to allow the County to assess fees for FY
2015/16)
■ Open -ended or longer term timeframe (closure on funding issue) is preferred by
staff rather than an interim or short approval or recurring annual multi -
jurisdictional approvals
Suggested Timeframe: Governing boards to agree on Option 2 — Solid Waste Programs
Fee (single county -wide fee) before May 1. Fee approved in municipal budget
ordinances to be effective July 1, 2015. Funding mechanism can be reconsidered at any
time as requested by SWAG or a participating board.
✓ DONE — April 2015
2. Adopt Formal Interlocal Agreement — By January 1, 2016
• Incorporate funding mechanism
• Waste collection would continue to be responsibility of individual jurisdictions
• Include UNC -CH and UNC - Healthcare to the extent possible
• Assume long term relationship
• Include withdrawal provision
• Include amendment provision
• Establish citizen advisory function
• Establish fee increase limitations or municipal fee approval triggers
• Set new county -wide waste reduction goal
• Address future of SWAG
• Staffs to have substantive technical role
Suggested Timeframe: SWAG could prioritize discussion of Interlocal Agreement for
upcoming meetings, beginning with the April 22 meeting. Target January 1, 2016 to
have consensus draft approved by governing boards'. This is a possible topic for
November 2015 AOG meeting. Address county /municipal issues first and then
incorporate UNC -CH and UNC - Healthcare.
10
3. Rural Curbside Recycling Expansion (implementation active upon adoption of Funding
Option)
■ 3 year phased implementation to begin in spring FY 2015/16
Suggested Timeframe: Consistent with fee option proposal rural expansion element
county staff is currently planning and has incorporated into the FY 2015116 proposed
budget phase 1 rural expansion (of three year phasing) of curbside recycling with roll cart
option. We anticipate that phase 1 implementation (cart distribution and collection to
about 3,500 or half of the parcels not currently being serviced curbside) will be complete
by March -April 2016. Completed implementation for curbside recycling to all improved
residential properties in the County is estimated to be March -April 2018. County staff is
initiating a routing study and data collection.
4. Development of Local Waste Disposal Facility
• Landfill or transfer station
• Minimize environmental and neighborhood impacts of siting
• Maximize waste reduction
• Generate revenue to fund facility operations and debt
• Reduced operating costs
• Consider proven alternative technologies as appropriate
Suggested Timeframe: Given the extraordinary cost and effort for hauling waste to
Durham County disposal facilities (less so for Hillsborough), coupled with the time
required to successfully site, design, permit and construct a local facility, staff believes it
is necessary to begin the process as soon as possible. Staff suggests that preliminary
discussions begin asap (summer 2015). Under reasonably deliberate and meaningful
jurisdictional collaboration, it could take 3 -4 years to plan and construct a transfer
station. Deduct 1 year if a site search is not required. A landfill proposal could likely take
a minimum of 6 -7 years and a site search would be required. Staff at this time has
received no guidance from the SWAG on this issue, including process and /or timeline.
Note: Staffs can prepare updated cost estimates for hauling waste to Durham disposal
facilities compared to using a local facility within the next 2 -3 SWAG meetings if desired.
5. Exploration and Implementation of cooperative operations with UNC -CH and UNC -
Healthcare (initial explorations underway)
Suggested Timeframe: Staff is already engaged in this endeavor with UNC -CH and once
the "low hanging fruit" has been evaluated and addressed additional opportunities will
be explored. The evaluation of collaborative opportunities with UNC- Healthcare can be
initiated over the remainder of 2015. Staff will provide periodic progress updates to the
11
SWAG. A comprehensive technical assessment of opportunities may require the
assistance of a consultant. A waste composition study should be considered.
6. Secure Permanent Emergency Storm Debris Management Sites
• Larger site for extreme weather event in Northern Orange
• Replacement site for Millhouse Road site when park development begins
Suggested Timeframe: Staff will initiate evaluation of alternative sites. Suggested
options to be presented to and discussed with SWAG in fall of 2015. The issue of a larger
northern site will be the first staff priority as the current southern site is adequate until
the future Millhouse Road Park property is ready for development.
7. Develop strategy for measuring and tracking solid waste services
Suggested Timeframe: The staffs would discuss the various indicators, yardsticks and
benchmarks available or necessary as those relate to various programs and services. Staff
would then consider the data collection methodology and reporting frequency that would be
suitable. Establishing data collection and reporting protocols could be phased in, beginning
with services /programs with the most interest.
Initial discussions and data collection and reporting recommendations could take place over the
summer of 2015. Full broad -based program data reporting and monitoring (including program
cost data and efficiency and effectiveness measures) could take up to 1 -2 years depending on
other workload and data objectives. Also, to have a meaningful evaluation of program
performance and objectives it is necessary to have data collection over a multi -year period. It is
likely that this data collection and reporting effort will be an ongoing and evolving activity. A
first step recommendation is being recommended at the May 20, 2015 meeting.
Note: It is unlikely that staff can proficiently manage any more than the above
priorities over the next 2 -3 years. The SWAG can reorder the priorities from
among the above and below issues; however there is a practical limit to the
number and complexity of projects staff can manage at one time. Not on this
priority list but a previously identified BOCC priority is the modernization of
Solid Waste Convenience Centers that is also to be managed within the 2 -3 year
timeframe. Some of these priorities can be addressed simultaneously.
8. Evaluation of Non - residential Programs (initial data gathering underway)
• Improve /expand non - residential collection programs
• Consider both wet (food waste) and dry (co- mingled recycling) materials
• Facilitate maximization of recovery from non - residential programs
12
• Consider alternative methods of service delivery
• Evaluate costs /benefits of programs
• Could be informed by waste characterization study
Suggested Timeframe: Comprehensive evaluation of non - residential recycling services will
likely take up to 1 year and potentially involve the assistance of a consultant. A waste
composition study is proposed and could take approximately 6 additional months. Following
evaluation, staffs would develop recommendations for SWAG consideration. Further
timeline would depend on subsequent SWAG recommendations and elected board decisions.
Total timeline could be approximately 2 -3 years.
9. Assess the Effectiveness of and Compliance with the Regulated Recyclable Materials
Ordinance (RRMO)
■ Make ordinance or enforcement adjustments as necessary
Suggested Timeframe: This item would require staff to develop a method of assessment and
conduct the assessment over a period of time, possibly 1 -2 years. Further timeline would
depend on results of assessment, such as requirements for ordinance revisions, changes in
enforcement strategies, etc. Total timeline could be approximately 2 -2.5 years.
10. Consider Options for Providing Non - municipal Operated Waste Collection Services — i.e.
franchising
• Reduce fuel usage
• Minimize costs
• Maximize access to services
Suggested Timeframe: Assessment of current non - governmental waste collection services
and development of a recommendation for SWAG consideration could take up to 1 year.
Further consideration by the SWAG leading to a recommendation to elected boards could
require another year or more. Depending on the final decision an additional 18 months for
implementation would likely be required. Total time could be approximately 3 -3.5 years.
11. Evaluation of Urban Curbside Program
• Collection frequency upon request by Towns
• Capacity for adding additional materials to recycling stream (ongoing)
Suggested Timeframe: An assessment of moving from weekly to bi- weekly (every other
week) municipal curbside recycling services, including costs and other implications could be
performed in approximately 6 months. Actual implementation of bi- weekly services could
depend on budget cycle timing, timeliness to inform residents of a change, willingness of
contractor to negotiate mid - contract and /or modify the remaining term on an existing
13
collection agreement. It is desired and recommended to implement a change in frequency of
collection to the contract upon contract renewal discussions. Currently, we are in the second
year of a five -year term agreement for weekly curbside collection. Total time to implement
could range from 1 year to 2+ years.
12. Residential Organics
■ Assess feasibility and costs /benefits
■ Could be informed by waste characterization study
Suggested Timeframe: An assessment of expanding residential organics collection, which
would include a waste composition study, would take about 1 year and likely involve a
consultant. Depending on the resulting staff recommendation to the SWAG and the
subsequent recommendation to elected boards including time for public comment and input,
another 1 year would be likely. Depending on the specific implementation (if recommended
and endorsed by the boards) an implementation could take an additional 1 -2 years. Total
timeline to implement could range from 3 -4 years.
13. Pay -As- You -Throw (PAYT) Waste Collection
■ Assess feasibility and costs /benefits
■ Could be informed by waste characterization study
Suggested Timeframe: Numerous evaluations, analysis and reports have been conducted by
the various staffs over the past several years and another report could be completed in less
than one year. A waste characterization study prior to considering PAYT would be
recommended and can take about 6 months. It is estimated that another year could be
spent discussing and debating among the SWAG as to what, if any, recommendation should
be provided to the governing boards. If the boards agreed upon a particular PAYT
methodology it is estimated that it could take 1 -2 years to plan and implement the program
simultaneously in all jurisdictions. Considerable attention to public education and outreach
would be required limiting other staff workload for that period. UNC -CH and UNC-
Healthcare may also have an interest in any decision. Total time to implement could range
from 3 to 4 years.
Long Term Issues
Staffs believe that some sort of technical advisory committee would be appropriate and
necessary to explore and evaluate more intricate or longer term type issues or issues that are
likely to be publically contentious. Alternatively, local government staff could provide this
function once satisfactory progress is made on more short /mid -term priorities.
• Uses for closed landfills
• Alternative technologies
14
o develop criteria /principals for evaluation
➢ consider only proven
➢ determine impact on recycling
➢ evaluate risk
➢ define local interests
• Evaluate and update solid waste ordinances
• Development of regional /multi- county cooperative relationships
• Biosolids
General
Timeframe - Most new program implementation, major current program expansions and all
facility construction require multiple years to plan and implement. So wording such as "short -
term", "mid- term" and "long- term" may not be viewed by everyone through the same
timeframe lens. For example, it may be suggested that expansion of rural curbside recycling is
a short -term action, but that action has been proposed as a three year phased implementation
that will not be fully implemented until the fourth year.
Workload — Your staffs' capacity to plan and implement multiple programs and facilities is
frequently limited given ongoing routine service provision and administrative obligations, in
addition to other programatic and facility improvements and modifications that are continually
in progress. Even the use of consultants requires close oversight and guidance. There are
genuine limits to the overall staff capability at any one time if quality program performance,
cost effectiveness and effective citizen education and outreach activities are desirable
objectives. Nevertheless, your staffs are prepared to undertake the issues deemed priority by
our respective governing boards.
Funding FY
IZile
Carrboro
Approval
j7� Chapel Hill
proval
Hillsborough
1_
�t County
Manager
— ILI, Recommendation Attorney Review
Interlocal '• CarrWro Approval
Agreement Chapel Hill
(including I Approval
UNC Approval
Present to AGG
UNC Healthcare
Rural Curbside
Expansion
Development
of Local Waste
Disposal
Facility
Explore/Imple
ment
Cooperative
operations
with UNC and
UNC- Healthcar
e
Solid Waste Secure
Priorities Permanent
Emergency
Storm Debris
Developllmple
men
measuring and
tracking
methods
Evaluate
Non- PAsidentin
Assess
effectiveness
and compliance
with RRMQ
Consider
options for
Non - Municipal
operated Waste
Collection
Services
Evaluate Urban'
Curbside
Residerntial
organics
Evaluate Pay as
You Throw
i
_Phase One �
f County Approval
Phase Twos
' Hillsborough
Hauling Cost
Analyses a
Update to
�. SWAG
Consider Waste
Composition
NFL Study
Evaluate
J Recommend
— Northern Site
r site to 9oCC
Options
Format
14115 Annual
Report
Quarterly Data
Reports
—
quarterly
_ - Addition of
Reports- Data,
Cost Data
Cost &
Efficiency
Waste
Composition
AWL Study
16
SWAG review
17
Memorandum
To: Solid Waste Advisory Group (SWAG)
From: George Seiz, Carrboro Public Works Director
Ken Hines, Hillsborough Public Works Director
Gayle Wilson, Orange County Solid Waste Director
Subject: Measuring and Tracking Solid Waste Services
Date: May 14, 2015
Staff was tasked by the Solid Waste Advisory Group (SWAG) at their April 22, 2015 meeting, in
conjunction with priority #7 of the suggested priority solid waste issues, to develop measures for
tracking recycling and solid waste program performance over short and long -term time periods.
Attached please find a draft of proposed program data tables separated by program area and, where
appropriate, by jurisdiction to track recycling and solid waste program performance. The tables do not
include any data as we wanted to ensure the format and information to be provided is acceptable by
SWAG members. Below is a brief description of each data table.
It is also important to note when reviewing the data tables that due to the integrated nature of recycling
collection operations throughout the county which helps to ensure efficient and optimal collection
services, there is some overlap of collection services by program areas, e.g. The commercial recycling
route collects some multi - family locations. To the extent possible, these variations in service collection
are apportioned to each specific program accordingly.
1) Annual Recycling Program Summary (page 1)
This page illustrates the annual tons collected /received by Orange County by recycling
material /item for the entire fiscal year. For the Household Hazardous Waste (HHW)
program, the number of total annual users of the Eubanks Road and Walnut Grove sites
combined is also included. In addition, the total tons of single- stream recycling
collected by each major program are included separately on a chart for further
comparison. Please note for all data tables provided, the percentage change column
compares the current to previous fiscal year or quarter listed.
2) Solid Waste Collection by Jurisdiction (page 2 & 3)
These pages illustrate on a quarterly and annual /fiscal year basis the amount of
municipal solid waste, yard waste and non - residential municipal waste collected by each
Town and by all five solid waste convenience centers combined. The waste measured
from convenience centers is residential waste only. Non - residential waste includes any
waste not collected as municipal solid waste, such as waste from commercial
establishments.
W
3) Urban Recycling Program by Jurisdiction and Other Collection Programs (page 3 & 4)
These pages include on a quarterly and annual /fiscal year basis the total tons of single -
stream recycling material collected in each Town by the urban curbside collection
program, multi - family (MF) dwelling collection and commercial /non - residential
collection. Also included is the total single- stream tons collected for other collection
programs such as the rural curbside collection program, collection from each 24 -hour
drop -off site and by each convenience center site. The average setout rate comparison
is also included for the rural curbside collection program. Due to collection data
constraints, participation rate data for the rural curbside program is not feasible. Please
also note that the single- stream recycling data does not include corrugated cardboard,
except for cardboard which is placed in curbside recycling carts /bins. This is due to
cardboard being collected separately and in an integrated manner across program and
jurisdictional boundaries.
A brief description of how the tons are derived may be helpful to better explain the
origin of the numbers for the urban recycling program summary by jurisdiction. The
total tons of single- stream recycling collected in the Urban Curbside Collection program
is apportioned according to the participation rate and number of homes by jurisdiction,
assuming that each cart collected from each residence has the same average weight
when collected. The participation rate is the proportion of households served that take
part in the curbside collection program each month, averaged over a three month basis.
The setout rate is the proportion of households that set out their recycling cart in any
given week, averaged over a three month basis. Participation and setout rates only for
the urban curbside program are derived from the Radio Frequency Identification (RFID)
collection data uploaded as each cart is collected. See EXAMPLE "A" below which
provides an example data set for deriving the aforementioned data.
Similarly, the total tons of single- stream recycling material collected in the multi - family
and commercial programs are apportioned based on the total number of carts collected
in each jurisdiction at each MF /Commercial site in that jurisdiction. This data also
assumes that each cart collected has the same average weight when collected.
Should the SWAG agree to the format of the data tables presented, staff will begin compiling and
inputting the data in the spreadsheets, with a plan to provide the SWAG an annual report program
summary starting with FY 14/15 data by August 2015 and begin quarterly data input starting the 1st
Quarter of FY 15/16. The SWAG may find quarterly reporting excessive and prefer a semi - annual and
annual schedule instead. This data collection and comparison is a first step, and it is proposed to include
summary program cost allocation data as well as other efficiency/ effectiveness measures in the future.
Once the data collection and data input is complete, staff will begin the process of working on cost
allocation by program. Once cost allocations by program area are developed, a presentation of the data
will be submitted to the SWAG for consideration. Also, for future consideration will be the potential
inclusion of data from UNC Hospital and University recycling and solid waste programs.
19
EXAMPLE "A" (For illustrative purposes only)
EXAMPLE: CARRBORO
Total # of Households Participating = A x B 2,000 x 90% =1,800
Total Porpotion By Jurisdiction of Households Participaing = C/Total 1,800/6,425 = 28%
Total Tons by Jurisdiction = D x E 28% x 1,000 = 280 Tns
E
TOTAL
TONS
COLLECTED
IN URBAN
PROGRAM
1, 000
A
B
C
D
661
HI LSBOROUGHI
58
TOTAL
PROPORTION BY
1ST QUARTER
TOTAL
TOTAL #OF
JURISDICTION OF
NUMBER OF
HOUSEHOLDS
HOUSEHOLDS
HOUSEHOLDS
PARTICIPATION RATE
PARTICPATING
PARTICIPATING
CARRBORO
2,000
90%
1,800
28%
CHAPEL HILL
5,000
85%
4,250
66%
HILLSBOROUGH
500
75%
375
6%
TOTALI
7.500
6.425
EXAMPLE: CARRBORO
Total # of Households Participating = A x B 2,000 x 90% =1,800
Total Porpotion By Jurisdiction of Households Participaing = C/Total 1,800/6,425 = 28%
Total Tons by Jurisdiction = D x E 28% x 1,000 = 280 Tns
E
TOTAL
TONS
COLLECTED
IN URBAN
PROGRAM
1, 000
TOTAL TONS BY
JURISDICTION
CARRBORO
280
CHAPEL HILL
661
HI LSBOROUGHI
58
EXAMPLE: CARRBORO
Total # of Households Participating = A x B 2,000 x 90% =1,800
Total Porpotion By Jurisdiction of Households Participaing = C/Total 1,800/6,425 = 28%
Total Tons by Jurisdiction = D x E 28% x 1,000 = 280 Tns
E
TOTAL
TONS
COLLECTED
IN URBAN
PROGRAM
1, 000
5/14/3015
URBAN RECYCLING PROGRAM SUMMARY BY JURISDICTION*
PAGE 4 and 23
-
URBAN CURBSIDE COLLECTION PROGRAM"
MUTLI - FAMILY COLLECTION...
COMMERCIAL COLLECTION *"
-
fARRB0R0:-
- "-
TONS
-
TONS
- - --
TONS
% CHANGE
- FROM
PRMOU5-
:__YEAR -.
SETOUT
RATE-
SETOUT
RATE
SCOUT
-RATE
%CHANGE
FROM
PREVIOUS
- YEAR
- PARTICIPATION-
RATE
PARTICIPATION
RATE'
PAROCPATION
RATE
%CHANGE
FROM
PREVIOUS
YEAR
-TONS
TONS --
-
- TONS-
%CHANGE
FROM
PREVIOUS
-- YEAR
TONS
_
TONS
TONS
%CHANGE
FROM
PREVIOUS
YEAR --
-
FY13 /14
-
H14 /15
FY 35 /16
-
FY13 /14
- -
FY14 /33
FYd /16
_ - _
FY 33/14
= TY 14/15 -_
_ - _
_ PY 15116
FY 13/14
FY 14/15
H15/16 _
-fY 13114
-
FY34 /15
__
FY 35/16
1st Quarter
TONS
- TONS
TONS _
FROM
TONS --
-TONS
TONS
FROM
COLLECTION
PREVIOUS
PREVIOUS
- PREVIOUS
PREVIOUS
ig
-
2nd Quarter
- -
-
-
ANALYSIS _
H13114
FY 14/15.
FY 35/16
-. _YEAR
H23/14
FY 19/35
H15/16
_ YEAR . _
_ _ FY 13114_ .
_.- H U /15. _
3Y 15/16 -.
3rd Quarter
FY 13/14
H 14 /15 - `
- FY 2116.
- -. YEAR
FY 33/14 -
FY14/15
H15/16
YEAR_:
1st Coaster
O[h Quarter
2nd Quarter
Annual
3rd Quarter
-
URBAN CURBSIDE COLLECTION PROGRAM **
MUTLI - FAMILY COLLECTION••'
COMMERCIAL COLLECTION...
CHAPELHILL
_
_ _
TONS
-
-TONS-
TONS
%CHANGE
FROM -
PREVIOUS
YEAR
SETOUT
RATE
SEFOUT
- RATE
SETOIQ
-RATE
%CHANGE
FROM
PREVIOUS
- YEAR
PARTICIPATION
" -RATE
PARTICPATION
-' RATE
PARTIOPATION
RATE -
%CHANGE
FROM
PREVIOUS
- YEAR -_
-
_ TONS
TONS -
TONS
%CHANGE
FROM
PREVIOUS
_ YEAR _
-
TONS -
TONS-
TONS
%CHANGE
FROM --
PREVIOUS
YEAR --
FY 13/14
FY 14/15
FY 15/16
FY 13/14
FY 14/15
FY15116
- - _
FY 13/14
C 14/15
FY 15/16-
FY 13114
- FY 14/15
-
FY 15/16
-
FY131M
H14/15
-
HIS/16
1st Quarter
TONS
- TONS
TONS _
FROM
TONS --
-TONS
TONS
FROM
COLLECTION
PREVIOUS
PREVIOUS
- PREVIOUS
PREVIOUS
ig
-
2nd Quarter
- -
-
-
ANALYSIS _
H13114
FY 14/15.
FY 35/16
-. _YEAR
H23/14
FY 19/35
H15/16
_ YEAR . _
_ _ FY 13114_ .
_.- H U /15. _
3Y 15/16 -.
3rd Quarter
FY 13/14
H 14 /15 - `
- FY 2116.
- -. YEAR
FY 33/14 -
FY14/15
H15/16
YEAR_:
1st Coaster
4th Quarter
2nd Quarter
Annual
3rd Quarter
-
URBAN CURBSIDE COLLECTION PROGRAM **
MUTLI - FAMILY COLLECTION * **
COMMERCIAL COLLECTION * *'
HILLSBOROUGH
-
- _
--
TONS
TONS
-
-TONS
CHANGE
f0.0M
_PREVIOUS
.:YEAR
SETOUT
RATE
SETOUT
RATE-
SETOUT
RATE-
%CHANGE
FROM -
PREVIOUS
YEAR
PARTICIPATION
"OE
PARTICPATION
RATE
PARTICPATION
RATE -
%CHANGE
FROM
PREVIOUS
.YEAR-
- -
_ TONS
PARTICPATION.
%CHANGE-
%CHANGE
- .FROM
PREVIOUS
YEAR
-
TONS
_ _
TONS
TONS
- %CHANGE
FROM
PREVIOUS
YEAR --
- -
FY 33/14
FY 14/15
FY 15/16
_
FY 13/14
FY 39/15
-
FY 15 /i6
— -
FY 13/14.
-
FY 14/15 __
FY 15 /16
FY 13/19
- RATE.
FROM
- FY,13/14
- FY14 /15
-
FY -15 /16
15l Quarter
TONS
- TONS
TONS _
FROM
TONS --
-TONS
TONS
FROM
COLLECTION
PREVIOUS
PREVIOUS
- PREVIOUS
PREVIOUS
ig
-
2nd Quarter
- -
-
-
ANALYSIS _
H13114
FY 14/15.
FY 35/16
-. _YEAR
H23/14
FY 19/35
H15/16
_ YEAR . _
_ _ FY 13114_ .
_.- H U /15. _
3Y 15/16 -.
3rd Quarter
FY 13/14
H 14 /15 - `
- FY 2116.
- -. YEAR
FY 33/14 -
FY14/15
H15/16
YEAR_:
1st Coaster
4th Quarter
2nd Quarter
Annual
3rd Quarter
TOTALSINGLE-
URBAN CURBSIDE
COLLECTION
PROGRAM'*
MUTLI - FAMILY COLLECTION*^
COMMERCIAL COLLECTION*'•
'STREAM -
%CHANGE
SETOUT
SETEI
SEDEM
%CHANGE
PARTICIPATION
PARTCPATION
PARTICPATION.
%CHANGE-
-
- -
-.
%CHANGE
-
- -
% CHANGE
TONS
TONS
TONS-
.FROM.
°RATE -
RATE'
- RATE.
FROM
-RATE
RATE
RATE.
FROM -
TONS
- TONS
TONS _
FROM
TONS --
-TONS
TONS
FROM
COLLECTION
PREVIOUS
PREVIOUS
- PREVIOUS
PREVIOUS
PREVIOUS -
-
- - --
- -
-
-
ANALYSIS _
H13114
FY 14/15.
FY 35/16
-. _YEAR
H23/14
FY 19/35
H15/16
_ YEAR . _
_ _ FY 13114_ .
_.- H U /15. _
3Y 15/16 -.
_ YEAR
FY 13/14
H 14 /15 - `
- FY 2116.
- -. YEAR
FY 33/14 -
FY14/15
H15/16
YEAR_:
1st Coaster
2nd Quarter
3rd Quarter
4th Quarter
Annual
• Due tothe integrated nature of recycling collection operations throughout the county which helps to ensure efficient and optimal collection service, there is some minor overlap ofcallection services by program areas, e.g. The commercial recycling mute collects some multi - family
locations. To the extent Possible, these variations In service collection are apportioned to each specific program accordingly.
•• The total tons by jurisdiction in the Urban Curbside Collection program Is apportioned assuming to the participation rate and number of homes by lurlsdinion. This assumes that each cart collected at the curb has the same average weight when collected.
• ** Tons are apportioned in the Multi Family and Commercial programs based on the average number of carts collected in each jurisdiction at each MF /Commercial site for that quarter. This assumes that each cart collected At each site has the same average weight when collected.
NOTES:
Participation Rate -the proportion of households served that take part In the curbslde collection program at least once per month.
Setout Rate - the proportion of households that set out their recycling cart in any given week.
5/14/2015
OTHER COLLECTION PROGRAMS
RURAL CURBSIDE COLLECTION PROGRAM
RURALCURBSIOE
COMMON
-
TONS
_
TONS
TONS
% CHANGE
- FROM _
PREVIOUS
YEAR
- SETOUT
_ RATE
SCTOUT.
RATE.-
SEFOUT
RATE
%CHANGE
FROM
- PREVIOUS
YEAR
FY13 /14.
FY14/15
FY15 /16
FY13/14
FY14 /15
FY15 116.
1st Quarter
FY35 /36
H13114 -__
-. FY14115
3rd Quarter
Fl15 /16
H13/14
FY14 /15
HIS/16
2nd Quarter
FY14 /15
FY35 /i6-
tat Quarter
Annual
3rd Quarter
-
-
4th Quarter
2nd Quarter
2quarter
Annual
NOTE: It Is not possible given Current data collection constraints to gather particpation rate in the rural program.
24 -HOUR DROP -OFF SITES - SINGLE STREAM*
PAGE 4 and 5. 2q
Corrugated cardboard is not included in the single - streamtonnage. Cardboard is collected separately from single stream in an Integrated manner across program and jurisdictional boundaries and is included fn the annual report
......-...... ..-- .....-
_
-
CAXR00RO PLAZA-
- %CHANGE"
FROM
PREVIOUS
- YEAR
CEDAR FALLS
%CHANGE
FROM
- PREVIOUS
YEAR_-
_ _. - -
HAMPTON POINT (HOME DEPOT) -
%CHANGE
FROM
PREVIOUS
YEAR
MEADOWMONT
%CHANGE
FROM
- PREVIOUS
YEAR
- - -
UNIVERSITY MALL
%CHANGE
FROM
PREVIOUS
YEAR
fY13/34
FY34 /15
FV15 /i6
FY13/14
FY34 /15
FY35 /36
H13114 -__
-. FY14115
3rd Quarter
Fl15 /16
H13/14
FY14 /15
HIS/16
FY13 /M
FY14 /15
FY35 /i6-
tat Quarter
Annual
-
-
2nd Quarter
2quarter
Sid Quarter
3rd quarter
=ILL
-
4th Quarter
4th Quarter
-
Annual
Annual
--
- -
Corrugated cardboard is not included in the single - streamtonnage. Cardboard is collected separately from single stream in an Integrated manner across program and jurisdictional boundaries and is included fn the annual report
......-...... ..-- .....-
............--
..... -.
-.... -. -..
%CHANGE
FROM -
PREVIOUS
- YEAR
TOTAL
FOR FY
2013/14
TOTAL
FOR FY
2014/15
TOTAL
FOR FY
2015/16
%CHANGE
FROM
PREVIOUS
YEAR
Ist Quarter
%:CHANGE
FROM -
PREVIOUS
YEAR
FY13/16
FY14125
PYIS /16
2nd Quarter
FY14/15
-
- FY15 /36
-
-- H13114
FY14 /15
3rd Quarter
H13/14
FY14 /$
-
-
FY 15116
FY13 /14.
4th Quarter
-
FYIS /16
1st Quarter
Annual
CONVENIENCE CENTER RECYCLING - SINGLE - STREAM*
Corrugated cardboard is not included in the single-stream tonnage. Cardboard is collected In an integrated manner across program and jurisdictional boundaries and is included in the annual report.
I uu mnmc
-. BRADSHAWQUARRY- -
%CHANGE
FROM
PREVIOUS
YEAR
EUBANKS RD
%CHANGE
FROM -
PREVIOUS
- YEAR
FERGUSON RD-
%CHANGE
FROM
PREVIOUS
YEAR
HIGH ROCK
%_CHANGE
- FROM
PREVIOUS
YEAR
WAINUTGROVE
%:CHANGE
FROM -
PREVIOUS
YEAR
FY13/16
FY14125
PYIS /16
FY13/14
FY14/15
-
- FY15 /36
-
-- H13114
FY14 /15
HM/16
H13/14
FY14 /$
-
-
FY 15116
FY13 /14.
FY14 /15
-
FYIS /16
1st Quarter
Annual
2nd Quarter
Sid Quarter
=ILL
-
4th Quarter
Annual
--
- -
Corrugated cardboard is not included in the single-stream tonnage. Cardboard is collected In an integrated manner across program and jurisdictional boundaries and is included in the annual report.
I uu mnmc
`CIMIc
p
TOTAL
FOR FY
2013/14
TOTAL
FOR FY
2014 15
TOTAL
FOR FY
2015116
- FROM
PREVIOUS
YEAR
1st Quarter
2nd Quarter
3rd Quarter
4th Quarter
Annual