Loading...
HomeMy WebLinkAboutAgenda - 04-28-2005-1b1j r ,y i ~ ~ TOWN OF CARRBORO NORTH CAROLINA MEMORANDUM TO: Orange County Assembly of Governments Participants FROM: Dale McKeel, Transportation Planner, Town of Carrboro DATE: April 22, 2005 SIIB.IECT: Update of the Smith Level Road Project PURPOSE For several years there have been discussions between NCDOT and the Town of Cazrboro regarding the scope of the proposed widening of Smith Level Road between Morgan Creek and Rock Haven Road. On April 18, 2005, the N.C.. Department of Transportation proposed two options for consideration by the Town Of Cazrbom. The purpose of this agenda item is to discuss the two options proposed by NCDOT. INFORMATION Attachment A provides a map of the project limits, Attachments B and C provide a compazison of the two options proposed by NCDOT. The two options are as follows: ^ Option A -construct the project using Moving Ahead funds.. ^ Option B -construct the project through the Transportation Improvement Program process. Attachment D is the resolution adopted by the Board of Aldermen on March 18, 200.3 requesting that NCDOT consider a more modest design for the Smith Level Road project. BACKGROUND The N.C. Department of Transportation held a public hearing on the proposed widening of Smith Level Road on October 25, 2001. The plan presented to the public showed Smith Level Road being widened to four lanes with an 18-foot median, curb and gutter, and bike lanes and sidewalks on both sides of the road. Approximately 50 persons attended the open house and public hearing in addition to NCDOT and Town of Carrboro staff. Many of those present expressed support for the Planning Department • Planning Division 301 West Main Slreet, Carrboro, NC 2751Q • (919) 918-7329 • FAX (979) 960-9450 • TDD 1-800-735-2962 AN EQUAL OPPORTUNITY EMPLOYER bike lanes, sidewalks, and crosswalks, but there were major points of'contention, Several residents questioned the need for the project and stated that the focus should be on addressing current problems on Smith Level Road, including timing of signals, speeding, ingress/egress problems at Frank Porter Graham School, and the need for better pedestrian and bike connections to the school and across Morgan Creek, In response to citizen and Town comments during and following the public hearing, NCDOT prepared additional information on the project. There were also several meetings between NCDOT staff; Town staff, and Board of Aldermen members to discuss the project.. On March 18, 2003, the Board of Aldermen adopted a resolution requesting that the N.C. Department of Transportation consider an alternative design far the proposed modifications to Smith Level Road between Morgan Creek and Rock Haven Road (Attachment B). The adoption of this resolution followed a joint worksession that was held on October 15, 2002 with the Transportation Advisory Board (TAB) to meet with NCDOT staff and review the information that has been compiled, On January 5, 2005, there was a meeting between town officials, NCDOT staff; and Board Member Doug Galyon to discuss the project. NCDOT staff stated that their continued support for afour-lane, median divided design, but proposed the following alternative design to be funded with Moving Ahead funds: We propose to widen the existing pavement to provide 12' lanes with a 2' paved shoulder on the east side; a 4' bike lane with curb and gutter on the west side; right turn lanes NB at Culbreth Road and SB at Rock Haven Road and a left turn lane on NB Smith Level at Rock Haven Road. A sidewalk could also be constructed on the west side adjacent to the curb and gutter, Additional right of way and utility relocation will be required throughout the limits of this project. The Carrboro Board of Aldermen conducted an extensive review of the Moving Ahead proposal at its meetings on January 18, February 8, March 1, and March 15. Town staff' also spentrnany hours discussing aspects of the proposal with Division Engineer Mike Mills as well as John Hunsinger and Tim Jackson of the Division 7 staff. On March 15, the Board of Aldermen voted unanimously to request that NCDOT build the scaled-down TIP project U-280.3 as specified in the March 18, 200.3 resolution rather than the Moving Ahead project.. The Board of Aldermen expressed concern that the right- of=way and utility relocation costs for the Moving Ahead project could be much higher than estimated and therefore have a negative impact on the Town's financial standing. Planning Department • Planning Division 301 West Main Street, Carrboro. NC 27510 • (919) 918-7329 • FAX (919) 960-9450 • TDD 1-800-735-2962 AN EQUAL OPPORTUNITY EMPLOYER Attachment A ~~ >~ ~~ ~ ~\ ~ l ,y ~ I ~~LINCO{f~1lN ~~ a~~HCT 3 uw m~ m 0 og~Ea? 3 ,3,' '$ .w wea ,r :rn~wt~~f ~ ssr e`'~~;~r r Q c ~ J / ~ ''1 '~ ~ ~~~F x`3 ~~ ~~ea /~ R m aw ~ .~% 9Y t'r ~er~~ 3 ~, jx .., ~ ey. ~ ~ ~ xua \,~ u ,~'~~ ~~~ ~~ ~.. . '~1J,.BPH(«~~~~~ `=~`""RR~oc~~. ^`S~ BemProect~'~.,, ~~ ~s~ ~ ~ ~ ~A 1 A a GT~\~z r!1> } ~ BPW CLUB Rb- ~ %~ 1 ~ ~% (~ fJ ~~ 7994 ~y ~% Hi h School Site P~„M..m~ ~~ K HAVEN RD ~`'~ a -v ~~~F ~-- ("tb CBRE _`'{{}~,~'1srlRD t- -,r y mi a µrrrr€e xN U u )/ ~'" " ~~SR 1988 ~ ~~~~ a ~~ ~ EndPro'ect ~~~~~v~oocRESroR ~ x~~'~~`~'- L'`~ nggcf g --.^-&-. a ~ ~\ `~ ~hcyc, \\'~p"\c ® Smith Level Road .... , ~F: n.. ~~ u.. <.,,,::~. .~reamu Tezl Strcd Nmncs r ~r^~; ~ Wamr DoJics ,~rq mm~nr c,mxiona ~ RovJs j. r F'jJ~~ c.zn~i w nc cn~o ' `'n'.'..... ,... ,~.... .... nm.mr urvmn rune:ormxvwmm~smxu:rtw.n~ceover m.,..w..r,mua.....ora.....am...Nm,..mrx.e~.,r,•enmrm, .rye..e~m.m..~m:.,m+,.r~.,m,......~rsm~s..n, .n~.~.wean.a.:<~.Rare.u.,u~e....w„~.,,r...e.,.:W uo. Attachment B Comparison of Options Option A -Moving Ahead Option B -TIP Project Roadway Two lanes with curb and gutter on Three lanes (one lane in each direction Cross-Section one side and intersection and a center turn lane) with curb and improvements gutter on both sides and intersection im rovements PedesU ian Sidewalk on west side of Smith Sidewalk on both sides of Smith Level Faeilities Level Road. Road. Bicycle Bike lane on west side of Smith Standard 4-foot bike lanes on both sides Facilities Level Road; some pavement of Smith Level Road. widening on the east side (not a standard 4-foot bike lane). Cost Estimate Right-of--way: $320,000 No cost estimate available. The draft Utilities relocation: Not known 2006-2012 TIP lists the following funds Construction: $1..7 million as available funds for the 4-lane design: Mitigation: $1..354 million Right-of--way and utilities: $600,000 Construction: $2.75 million Cost to Town $300,000 over afive-year period for Approx. $66,300 (30 percent of cost of ri ht-of--way and utili relocation sidewalks) Anticipated 1 to 2 years 3 % to 5 years Beginning of Construction Enrergetrcy Bike lane and wide pavement will In addition to bike lanes on both sides of Services provide space for' vehicles to pull the road which provide space for over, allowing emergency vehicles vehicles to pull to the curb, center turn to proceed through the center. lane will facilitate safe passage of emer enc vehicles. Coordination Maybe possible to complete Construction will not begin prior to with Carrboro construction prior to school opening school opening in August 2007. Hi h School in Au ust 2007 Impact orr If the Moving Ahead funds are used Not applicable. Other Projects for Smith Level Road, these funds will not be available to build curb and gutter and a sidewalk on Homestead Road between High School and Ro ers roads Attachment C Option A - Movin;; Ahead Protect Two-Lane Section With Bike Lane, Curb and Gutter, and Sidewalk on West Side Only ~ 12 „ .,F.12ft _.~~ / I / / I T Some pavement widening; i 4 ft bike lane Not a standard 4-foot bike lane Centerline plus 2 ft gutter 5 ft sidewalk on west side only The proposed cross-section is similar to some sections of Old Fayetteville Road in Carrboro. Attachment C Oation B -TIP Proiect Three-lane Section With Curb and Gutter, Bike Lanes, and Sidewalks on Both Sides I-tz ,~ 5 ti sidewalk on both sides of the road I Centerline 4 a bike lanes plus 2 ft gutter on boot sides of the road Illustration of a three-lane street in another community. E~; 4'r,~'ip 1'i~l TOWN OF CARRBORO NORTH CAROLINA WWW TOW NOFOAR RBORO OftG The following resolution was introduced by Alderman Joal Hall Broun and duly seconded by Alderman Alex Zaffron.. A RESOLUTION REQUESTING THAT THE N.C, DEPARTMENT OF TRANSPORTATION CONSIDER AN ALTERNATNE DESIGN FOR THE PROPOSED MODIFICATIONS TO SMITH LEVEL ROAD BETWEEN MORGAN CREEK AND ROCK. HAVEN ROAD Resolution No. 123/2003-04 WHEREAS, the N.C, Department of Transportation (NCDOT) has proposed to widen a portion of Smith Level Road, from the Morgan Creek Bridge to Rock Haven Road (TIP Project U-2803); and WHEREAS, it is the Board's desire to modify Smith Level Road to the extent that it can safely and effectively accommodate existing and future pedestrian, bicycle, and vehiculaz traffic; and WHEREAS, it is important to the Board that such modifications be designed and constructed to minimize disturbance of adjacent properties and maximize the mobility, safety, and access of transit users, pedestrians, and bicyclists; and WHEREAS, the Boazd believes that the principles and procedures of Context-Sensitive Design should be incorporated into the development of the project; and WHEREAS, the Boazd believes that the principles of Transportation Demand Management should be utilized to reduce the amount of traffic on Smith Level Road; and WHEREAS, the project proposed by the N.C. Department of Transportation (NCDOT) includes construction of a four-lane, median-divided roadway with two travel lanes in each direction, a raised center median, curb and gutter, bike lanes, sidewalks, and bus pull-offs; and WHEREAS, the Board believes that a more modest project design could meet the objectives of the Town and the State with regard to Smith Level Road, at a lower cost than the State's proposed option, and with less disturbance of adjacent properties; NOW, THEREFORE, BE IT RESOLVED by the Carrboro Board of Aldermen that the Boazd proposes a project design for Smith Level Road that would consist of two travel lanes (one lane in each direction) with intersection improvements, turn lanes, pedestrian crosswalks, and bus pull-offs where necessary; that sidewalks, bike lanes, and curb and gutter be provided on both sides of the roadway; and that a median on portions of the project could provide aesthetic and safety benefits and should be considered. 301 WEST MAIN STREET CARRRO RO NC 275 i0 !9191 942-8541 FA% 1919) 9164456 TDD (6001 8267653 AN EQUAL OPPORTUNITY PROVIDER Page 2 Town of Canboro Resolution No. 123/2003-04 BE IT FURTHER RESOLVED that the Board understands that the State acquire right-of--way on the basis of a four-lane median divided cross-section to facilitate the design and construction of the project. BE IT FURTHER RESOLVED that the Board requests that the State reallocate any surplus project funds, which may accrue as a result of a more modest project design to additional pedestrian, bicycle, and vehicular safety and efficiency improvements in the vicinity of Smith Level Road. The foregoing resolution having been submitted to a vote, received the following vote and was duly adopted this 18th day of March, 2003: Ayes: Joal Hall Broun, Jacquelyn Gist, John Herrera, Michael Nelson, Alex Zaffron Noes: None Absent or Excused: Mazk Dorosin, Diana McDuffee I, Sarah C. Williamson, Town Clerk of the Town of Carrboro, do hereby certify that the foregoing is a true and correct copy of a resolution adopted by the Carrboro Board of Aldermen at its meeting on March 18, 2003. Town Clerk