Loading...
HomeMy WebLinkAboutAgenda 8-l - Hillsborough Area Economic Development District Phase 1 Water and Sewer Extensions - Project Easements and Acquisitions ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 4, 2018 Action Agenda Item No. 8-l SUBJECT: Hillsborough Area Economic Development District Phase 1 Water and Sewer Extensions - Project Easements and Acquisitions DEPARTMENT: Planning and Inspections ATTACHMENT(S): 1. Map Showing Approved Scope of Project INFORMATION CONTACT: Craig Benedict, Director, 919-245-2592 Howard Fleming, Erosion Control/ Stormwater/Engineering Supervisor, 919-245-2586 James Bryan, Staff Attorney, 919-245- 2319 PURPOSE: To consider authorizing County Staff to acquire the private easements required to construct and maintain the Hillsborough Area Economic Development District (EDD) Phase 1 Water and Sewer Project by negotiation, purchase, or condemnation, if necessary. BACKGROUND: The County’s engineering consultant, The John R. McAdams Company, Inc. (McAdams), has recently completed design of the subject project and submitted for agency permit reviews, in preparation for issuing construction documents for bids. The project is a joint venture with the Town of Hillsborough, consistent with the Orange County Capital Investment Plan (CIP) and an Interlocal Agreement the BOCC approved on May 2, 2017. The project is composed of both gravity sewer and water lines needed to serve the EDD properties primarily west of Old NC Hwy 86 and south of the interchange with I-40. Orange County will transfer both the easements and infrastructure to the Town of Hillsborough following project completion for continued operation and maintenance in accordance with a jointly adopted agreement. The entire scope of the project involves the following: • Approximately 4,175 linear feet of 12” gravity sewer, including a bore & jack or tunnel under I-40, and possibly a bore & jack under Old NC Hwy 86, depending on bids. • Approximately 7,710 linear feet of 8” water line, including some directional drilling under some wetlands areas. Consistent with this phase of the project, now that the County is certain of the alignment, easements must be finalized for the sewer and water lines that need to be installed outside of North Carolina Department of Transportation (NCDOT) right of way. Staff aligned the sewer and water line within the existing service road where possible. Most of the property owners are in favor of the project and several have indicated their intent to grant easements. However, it is anticipated that one or two of the necessary easements may 1 need to be processed through legal easement acquisition proceedings. A property owner would still retain ownership of the land. Some use within permanent easements is curtailed, but easements are usually located in areas (lot edges) that cannot be used for structures. Cultural and archeological research has already occurred. The easements are for two purposes - temporary construction and future maintenance access to the sewer lines. The easements do not take up the entire property, only allowing the County’s contractor the right to construct the line and ultimately provide the Town of Hillsborough the right to enter and maintain the sewer lines. All areas disturbed during construction will be reseeded to re-establish vegetation once construction in that area is complete. The attached map shows the entire project area and scope. Compensation is offered during the easement acquisition process. Any easements that must proceed to condemnation will require a deposit with the court of the appraised value of the easement. The County Attorney’s office handles these activities. FINANCIAL IMPACT: The project budget has been previously authorized by BOCC. County staff has offered a standard monetary amount for each easement, based upon an historic percentage of appraised land value. There are eight (8) properties on which easements are required that are owned by six (6) different owners. Total formulaic-projection of easement costs is within the CIP Project 30048 budget for this specific expenditure of $50,000 line item. In the event of condemnation, the County will deposit an amount equal to the standard offer with the Court, upon filing of the condemnation complaint. If the easement acquisition costs exceed the amount set aside, additional funds will be accessed from the Capital Investment Plan (CIP) appropriations. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this item: • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. Adding water and sewer infrastructure to the Hillsborough Area EDD will result in positive outcomes related to the above Goal. RECOMMENDATION(S): The Manager recommends the Board: 1. Authorize County Staff to acquire and record the private easements required to construct and maintain the Hillsborough Area Economic Development District (EDD) Phase 1 Water and Sewer Project by negotiation, purchase or condemnation, if necessary; 2. Authorize the payment of easement purchase value to individual property owners, LLC’s, etc.; and 3. Authorize the County Attorney’s office to proceed with legal acquisition of utility easements with court filings, if necessary. 2 !"_$ 6" 16" 8" 12" 16" 16" Directional Drill Bore & JackStub Out Bore & JackUnder I-40 TemporaryConstruction Easement(Staging Area) HARD W O O D D R O U R S O D R ARONIA DR COUNTYSEATDR UPHILL C T WATERSTONEDR NUTBUSH CT DAVISRD MYRTLELN SAMTUCKERLN WATERSTONEDR LI N N E T D R PATRIOTPL DESTIN Y D R T W ISTED CT G LAD Y S L N W ELCH D R P O I N T E P L R I P P Y LN CATESCR E E K P K W Y OLD SOUTH D R SERVICERD C O L L E G E PARKRD O L D N C 8 6 O L D NC86 RU B R U M D R W A T E R S T ONEPA RKC I R F A RGO RD SUMMITTR A I L D R SWEET GUM DRBRICKHEARTHDR BONAPA R T E D R R E D H A T R D A LICELOOP ALICELOOP Proposed Water and Sewer South of I-40 Proposed Sewer (12") Proposed Water (8") Box Culvert (6') Streams Existing Sewer Existing Water City Limits ETJ EDH-1 EDH-2 EDH-5 R1 RB MPD-CZ ¯Orange County Planning and InspectionsBrian Carson (8/14/2018) 0 500Feet 1 in = 900 feet 3