Loading...
HomeMy WebLinkAboutAgenda - 12-04-2000-8qORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 4, 2000 Action Agenda Item No. SUBJECT: Housing Rehabilitation Contract Awards DEPARTMENT: Housing/Community Dev. PUBLIC HEARING: (Y/N) No ATTACHMENT(S): Bid Results Work Specifications INFORMATION CONTACT: Tara L: Fikes, ext. 2490 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To award two housing rehabilitation contracts for the HOME Housing Rehabilitation Program. BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program. The informal bidding process is governed by the North Carolina General Statues §143-131 and does not require a minimum number of bids. Additionally, present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. Sealed bids were solicited from participating contractors on November 13, 2000. Bid results are attached. Three bids were received for each unit with Taylor Home Improvements submitting the lowest responsible bid for both dwelling units. FINANCIAL IMPACT: The HOME Investment Partnership Program provides funding for this program. RECOMMENDATION(S): The Manager recommends awarding the following housing rehabilitation contract: Dwelling Unit Bid Amount Contractor Battle - 517 Hillsborough St.; Chapel Hill $26,960 Taylor Home Improvements Jacobs - #2 Jay Street; Chapel Hill $15,300 Taylor Home Improvements 2 RESULTS OF BID OPENING OWNER• Battle ADDRESS :._„_519 Hillsborough St . Chapel Hill, NC APPLICATION NLTNIDER: COST ESTIMATE:^$28,370 PERCENTAGE OE' BID OVER UNDER 5$ COST ESTIMATE CII~CK ONE: JOB BID x JOS NEGOTIATED COMPANY BID AMOUNT 1. Diamond Builders $49,311 2. Taylor Home Improvements $26,960 3. Triple J Construction Co. $29,980 4. 5. 6 SID OPENED BY: Donna Galloway TIME OF HID OPENING: 1:30PM DATE OF STD OPENING: November 13, 2000 WITNESSED BYs Jim Axelrod ********~r**,r***********.*************************~**~*~************ Lowest Acceptable Bid: $26,950 Negot~.ated Amount: N/A Contractor: Taylor ,Home Improvements NAME 605 Ruby Street; Durham, NC 27704 ADDRESS 919-220-0480 TELEPHONE NU1l~ER cor~NTS Submitted by: Tara L. Fikes Date_11-21-2000r Bid Approval Date Proceed Order Issued z 3 RESULTS OF BID OPENING OWNER• Jacobs ADDRESS:-#2 Jay Street Chapel Hill, NC APPLICATION NUMBER: COST ESTIMATE:_$17,210 PERCENTAGE OF SID OVER UNDER 11~~COST ESTIMATE CI~CK ONE:~708 82D x JOB NEGOTIATED COMPANY 1. Diamond Builders 2. Taylor Hame Improvements 3. Triple J Construction Co. 4. 5. 6. BID OPENED BY: Donna Galloway TIME OF BID OPENING: 1:30PM DATE OF SID OPENING: November 13, 2000 WITNESSED BY: Jim Axelrod r*************************************,r*********************~***** Lowest Acceptable Bid: $15,300 Negotiated Amount: N/A Contractor: Taylor Home Improvements NAME X605 Ruby Street; Durham, NC 27704 ADDRESS 919-220-0480 TELEPHONE NUMBER cora~NTS Submitted by: Tara L. Fikes Date_11-21-2000 Bid Approval Date Proceed Order Issued BID AMOUNT $22,755 $15,300 $20,980 3 4 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR Edward Battle AT 517 Hillsborongh St Chapel Hill, NC PHONE: DATE: September 12, 2000 BY: JIM AXELROD REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANCJAL, AND ORANGE COiJNTY MTNIlVIUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABII.ITATION PROGRAM. 5 Edward Battle 517 Hillsborough St. 94z-5448 9/12/00 EXTERIOR: 1. Remove the steps up to the front yard. Install steps and handrails of pressure treated lumber. 2. Remove the steps to the front porch, Install steps and handrails of pressure treated lumber. Paint the handrails on the front porch. Paint to cover completely. 3. Remove the front and rear porch roofs and framing. 4. Reframe the front porch roof so that the new pitch is not less than a 4x12 pitch. Install a 2xb header. Install'/z inch plywood, 1x6 fascia, and 12-inch soffitt. Insta112x6 rafters. 5. Reframe the back parch roof so that the new pitch is not less than a 4x12 pitch. Install 2x6 header. Install %z inch plywood, lxb fascia and 12-inch soffitt. Install 2x6 rafters. 6. Remove all trash and debris from the left and right side, back Yazd and from under the porch. 7. Install vinyl siding and trim. Install vinyl, vented soffit and trim. Fur the windows to accept J channel for the siding. Wrap the fascia and all window and door trim with aluminum coil stock. Install siding on both porch ceilings. Wrap the headers in aluminum coil stack. ROOF: 1. Remove the roof covering to the sheathing. 2. Replace approx. 2001.f. of 1x6 sheathing. 3. Install 151b. felt, aluminum drip edge, three tab, twenty-yeaz shingles and new plumbing boots. Install a shingle type ridge vent ventilation system. 6 Battle 4. Repair twelve rafter tails on the rear of the house. 5. Install 1x6 fascia on the front and rear of the house. 6. Remove the gable fascia and insta112x4 fascia. 7. Remove the chimney to below the roofline. INTERIOR: WINDOWS: 1. Replace all windows with double insulated, vinyl replacement windows and trim. PAINT: 1. Prepare all surfaces for paint. Patch all holes. Prime all dark color walls with a latex primer. Paint the walls with flat latex paint, the ceiling with ceiling white latex paint, and the true and doors with semigloss latex paint. Paint the kitchen and bath walls with semigloss latex paint. Paint to cover completely FLOOR COVERINGS: 1. Install carpet and pad. Carpet to cost not less $14/yd. 2 Install vinyl floor covering in the kitchen and bath. Install shoemold and metal trim. Vinyl to cast not less than$14/yd. LIVING ROOM: 1. Remove the exterior door unit. Install a six panel, metal insulated door unit, threshold and weather-stripping. Insta111ockset and deadbolt to be keyed the same. Install a wide view peephole. Battle 2. Install an aluminum over wood core storm door with pneumatic closurer and vinyl sweep, Door to have self storing glass and screen, button lock and key and a lifetime warranty KITCHEN: 1. Remove the exterior wall and base cabinets. Remove the wall covering to the studs. Remove the floor covering back eight feet from the exterior wall. 2. Replace approx. 161.E of sill plate with pressured treated, likesize lumber. 3. Replace approx. 16 l.f. of band with pressure treated likesize lumber. 4. Replace 6 floor joists with likesize lumber. 5. Insta113/4 inch subfloor, '/2 inch AC plywood finish floor. Install '/4 inch loan plywood. Prepaze the plywood for vinyl. 6. Jack the floor to as close to level as possible, Install metal basement jacks set on 2ftx2ftx4in. concrete footers. 7. Insulate the exterior wall with R-15 batt insulation. $. Install %Z inch sheetrock on the exterior wall. Tape and finish the sheetmck smooth. - 9. Install a six panel, metal insulated door unit with weather-stripping and threshold. Install a lockset and deadbolt to be keyed the same. Install a wide view peephole and matching interior trim. 10. Install an aluminum over wood core storm door with pneumatic closurer and vinyl sweep. Door to have aself-storing glass and screen, button lock and key and a lifetime warranty, 8 Battle HALL: 1. Remove the pull down attic stairway. Install an aluminum pull down unit and trim. BATH: 1. Remove the wall covering to the studs, up to the paneling. Remove the finish and subfloor to floor joists. 2. Replace 81.f. of sill. 3. Install 3/4 inch subfloor, % inch AC finish floor. 4. Prepare the floor for vinyl. Install vinyl floor covering, baseboard, shoemold and metal trim. Vinyl to cost not less than $14/yd. S. Install %z inch moisture resistant sheetrock. Tape and finish the sheetrock smooth. Install trim where paneling joins the sheetrock. 6. Install plastic tub enclosure with comer shelves. 7. Install a five piece accessory kit to include tumbler, paper holder, soap dish and two towel bars. Anchor securely. 8. Install a medicine cabinet. 9. Install a six panel, wood door unit and lockset. 10. Install a full louvered door unit and closet lockset on the closet. CENTER/REAR BEDROOM: 1. Install 3/8 inch sheetrock on the -ceiling. Tape and finish the sheetrock smooth. Install bed mold. 2. Install a six panel, wood door unit and lockset. A 9 Battle R,IGHT/REAR BEDROOM: 1. Repair the door to close properly. Install a new lockset. PLUMBING: 1. Install a 7-inch, stainless steel, double bowl kitchen sink, strainers, washerless faucet, p-trap, supply lines and cutoffs for the kitchen. 2. Install a handicap commode, supply and cutoff in the bath. 3. Install a 24 inch vanity, molded marble top, washerless faucet, supply lines, p- trap and cutoffs. 4. Install a washerless faucet and drain line assembly for the bathtub. S. Install a washing machine box, make all supply and waste connections. 6. Connect the drain line to the sewer line at the street. ELECTRIC: 1. Install GFI outlets in the kitchen and bath. 2. Install new fixtures for each room. 3. Install fixture and switch for the rear entrance. 4. Install porcelain, pull chain fixture in the attic. MECHANICAL: 1. Install a gas pack heat and air system with insulated ductwork. Make all necessary mechanical and electrical connections. 2. Remove the existing ductwork and furnace. 1( Battle INSULATION: 1. Install R-30 insulation in the attic. 2. Install R-19 insulation under the floor. 3. Install a 6 mill vapor barrier in the crawl space. TERNIITE TRREATMENT: 1. Provide a termite inspection and treatment. TOTAL ii fl,~ ,~/Is6oro~.ST" 12 oRANGE coUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR Hiwatha Jacobs AT 2 J Street Chapel Hain, NC PHONE: DATE: September X2, 2000 BY: ]IlV[ AXELROD REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GFNF1zAL CONDITIONS, NORTH CAROLINA BUII.DING CODES MANUAL, AND ORANGE COUNTY SUM HOUSING CODE DOCUMENTS. IT L5 NOT THE IlV'I'ENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRT'I"E-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING RE.HABII.ITATION PROGRAM, 13 0 Hiwatha Jacobs 2 J Street Chapel Hill, NC 9/7/00 EYTERIOR: l . Install an aluminum storm door with pneumatic closurer and vinyl sweep. Door to have self-storing glass and screen, push button lock and key and life-time warranty. 2. Remove the existing rear, basement soffitt. Insta113/8 inch, BC plywood and trim. Paint the soffitt and trim with semigloss latex paint. Paint to cover completely. 3. Pressure wash the siding and decks. Secure all loose pickets aad decking. 4. Stain the decks with a gray stain /preservative. 5. Install aluminum, continuous gutter and downspouts. Install splashblocks under each downspout. ROOF: 1. Remove the front roof covering to the sheathing. Remove the existing chimney to below the roofline. Install aluminum drip edge, 1 S-lb. felt and three tab, twenty- year shingles. 2. Replace 501.f. of 1x6 sheathing. INTERIOR: LIVING ROOM: 1. Remove the existing picture window. Install three, mulled, double insulated, wood windows sand trim. Cover the exterior of the windows with coil stock. Paint the window sashes with semigloss latex paint. Paint to cover completely. 14 JACOBS LEFT/REAR BEDROOM: 1. Install trim for the bifold closet doors. HAIL: 1. Replace the pull down, attic access door with an aluminum pull down unit. BATH: 1. Install six panel, wood door unit and lockset. 2. Prepaze the floor for vinyl. Install vinyl floor covering, shoemold and metal trim. 3. Paint the ceiling and trim with semigloss latex paint. Paint to cover completely. KITCHEN: 1. Remove the lritchen base cabinets and finish floor. Cover the remaining cabinets with plastic. Replace approx. 64 sq.ft. of subfloor with likesize material. Install %4 inch loan plywood. 2. Prepaze the plywood for vinyl. Install vinyl floor covering, shoemold and metal trim. vinyl to cost aot less than $1 Myd 3. Paint the ceiling with ceiling white latex paint, the walls, cabinets and trim with semigloss latex paint. Paint to cover completely. JACOBS 4. Install baseboard and new door casing. 5. Install factory built cabinets with wood fronts and formica rolled edge counter tap. RIGHT/REAR BEDROOM: 1. Install a wood, double insulated window and trim. Cover the exterior trim with aluminum coil stock. Paint the window sashes with semigloss, exterior latex paint Paint to cover completely. 2. Remove the existing ceiling. Install 5/8 inch sheetrock. Tape and finish the sheetrock smooth. 3. Install bed mold. 4. Install a bifold door unit and trim. BASEMENT STAIRWAY: 1. Frame a new landing so that the first step has the same riser height as the rest of the stairs. Install finish plywood, vinyl floor covering, shoemold and metal trim. 2. Install a waod handrail to be anchored to the studs. BASEMENT ENTRANCE: 1. Paint the walls with semigloss latex paint, the ceiling with ceiling white latex paint and the trim with semigloss latex paint. 15 15 Jacobs LEFT/REAR BEDROOM: 1. Install a vinyl replacement windows and trim. 2. Fur the closet walls. Insulate the block walls with ~/< inch Styrofoam. Install %z inch sheetrock. Tape and finish the sheetrock smooth. Paint the sheetrock. Paint to cover completely. 3. Install a closet and and 1x12 shelf. -. 4. Install bedroom lockset for the entrance door. RIGHT/REAR BEDROOM: 1. Install a six panel, wood door unit and lockset. 2. Install a vinyl, insulated, replacement window unit and trim. 3. Paint the ceiling with ceiling white latex paint, the walls with flat latex paint and the trim with semigloss latex paint. Paint to cover completely. BASEMENT BATH: 1. Secure the loose paneling on the shower wall. Install trim. 2. Finish the ceiling sheetrock smooth, 3. Paint the ceiling, walls and trim with semigloss latex paint. Paint to cover completely. ELECTRIC: 1. Install one outlet in the basement, right/rear bedroom. 2. Install GFI outlets in both baths and the kitchen. 3. Install the rear door floodlight properly. f 17 Jacobs 4. Install a fixture in the basement entrance . 5. Secure all loose wire in the attic. d. Install electric smoke detectors. 7. Install a fixture and switch in the crawl space entrance. S. Repair the hot water heater wiring. PLUMBING: 1. Replace the kitchen sink, faucet, p-trap, drain lines to the wall, supply lines and GutOffs. 2. Secure the shower faucet in the basement bath. 3. Replumb the water lines in the basement bath properly. 4. Install a washerless faucet on the basement vanity. 5. Install a'/. inch pipe on the pressure relief valve. MECHANICAL: 1. Install a register in the basement bath. Z. Install a gas pack, propane, heat and air system with insulated ductwork. Make all necessary mechanical and electric connections. INSULATION: 1. Install R-30 insulation ixi the attic. 2. Install R l9 insulation under the floor. 18 Jacobs 3. Install a 6 mill vapor barrier in the crawlspace. TERNIITE TREATMENT: Provide a termite inspection and treatment. TOTAL: 19 :7 ~ `.' ~~ ~~ ~~ ~ --~ ~ _" 0