HomeMy WebLinkAboutAgenda - 09-04-2018 7-a - Northern Campus Capital Project Progress UpdateORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 4, 2018 SUBJECT: Northern Campus Capital Project Progress Update DEPARTMENT: County Manager, Asset Management Services ( "AMS "), Finance & Administrative Services ATTACHMENT(S): 1- Moseley Architects Amendment 2 -HH Architects Amendment 3- Bordeaux Construction CMAR Agreement Action Agenda Item No. 7 -a INFORMATION CONTACT: Bonnie Hammersley, 919 - 245 -2306 Travis Myren, 919 - 245 -2308 Jeff Thompson, 919 - 245 -2658 1 PURPOSE: To receive a report on the progress of the Orange County Northern Campus capital project. The update will include information regarding: a) the execution of a professional services agreement amendment to Moseley Architects, the designers of the Detention Center, as delegated to the Manager by the Board on June 19, 2018; b) the execution of a professional services agreement amendment to HH Architects, the designers of the Environment and Agriculture Center and Park Operations Base, as delegated to the Manager by the Board on June 19, 2018; c) the award and execution of the Construction Manager at Risk ( "CMAR ") Agreement to Bordeaux Construction of Raleigh, NC as delegated to the Manager by the Board on June 19, 2018; and d) a progress report on the project provided by Bordeaux Construction. BACKGROUND: On April 3, 2018, the Board of Orange County Commissioners authorized the acquisition of approximately 21 acres of property to serve as the site for the Orange County Northern Campus. This campus location contemplates housing the Orange County Detention Center, Environment and Agriculture Center ( "EAC "), and the Park Operations Base. On June 19, 2018, the Board authorized the Manager to amend existing design agreements with Moseley Architects, the Detention Center designer, and HH Architects, the EAC designer, that would align the professional design services with the Northern Campus site and the addition of the Park Operations Base. The fee for Moseley Architects is amended from $1.418 million to a not to exceed $1.647 million for the detention center and major site construction for the overall campus. The difference in the fee relates to the major site work associated with the Northern Campus. The Moseley Architects amendment is located in Attachment 1. PIA The fee for HH Architects is amended from $214,000 to a not to not to exceed $518,000 for the EAC, Park Operations Base, Construction Administration, and related minor site construction more specific to these facilities. The difference in the fee relates to the addition of the Park Operations Base components of the Northern Campus Project and the addition of Construction Administration services once construction begins. The HH Amendment is located in Attachment 2. The total not to exceed professional services fees for the two designers is $2.165 million or 8.87% of the estimated construction budget of $24.4 million. The Board also authorized the Manager to continue the selection process of the Construction Manager at Risk ( "CMAR ") over the summer break. Upon the solicitation of the May 23, 2018 Request for Qualifications, two firms responded and were interviewed by a staff panel of stakeholders representing the County Manager's Office, the Sheriff's Office, the Department of Environment, Agriculture, Parks and Recreation ( "DEAPR "), the Orange County Cooperative Extension Office, Asset Management Services, and Finance & Administrative Services. The panel recommended Bordeaux Construction of Raleigh, NC to negotiate with the County for its services as the overall project's Construction Manager at Risk, and the resulting CMAR agreement is located in Attachment 3. The CMAR is a delivery approach in which a construction management firm acts as an owner's consultant during the pre - development phase of the project. During this process, the owner of the project will rely on the CMAR to contract multiple subcontractors and is acknowledged as the sole point of responsibility for the project delivery. During this process, the CMAR possesses the role of hiring the subcontractors who will eventually develop the project. A CMAR will establish a GMP or guaranteed maximum price from subcontractors once the project has been designed. The final construction price is the sum of the CMAR's fee, the subcontractors' bids, and allowances. The CMAR is responsible for managing all subcontracts during the pre - development stage as well as execution stage. The CMAR is responsible for assisting the owner in the following areas: -Construction Schedule -Project Budget -Cash Flow Analysis -Discussion and acceptance of Means and Methods -Value Engineering -Cost Projects During the early stages of a project, the focus of the CMAR will be on cost control and schedule coordination, but once the project kicks off, its role will turn to design, structure and execution issues. The projected timeline for this project is as follows: Activity Estimated Date Range Stakeholder Input, Site Design and Review Activities Summer, Fall, Winter, 2018 Schematic Design Review with the BOCC November, 2018 Program Completed, GMP Presentation to BOCC March -May, 2019 Construction Period Summer, 2019 — Summer, 2021 Occupation Fall, 2021 K A public information sharing session will precede the Board's September 4, 2018 regular meeting at 6pm and will be held in the Whitted Meeting Facilities Room 240. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable for this item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONIOMIC SELF - SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation FINANCIAL IMPACT: There is no financial impact associated with receiving this report. RECOMMENDATION(S): The Manager recommends the Board receive a report on the progress of the Orange County Northern Campus capital project. DocuSign Envelope ID: 48ED1D41- DA40- 49D1- A586- 23C127C5137EF El! NORTH CAROLINA CONTRACT AMENDMENT ORANGE COUNTY THIS CONTRACT AMENDMENT ( "Amendment ") is made and entered into this 30th day of July, 2018 by and between ORANGE COUNTY (hereinafter referred to as "County ") and Moseley Architects, P.C. (hereinafter referred to as "Provider "). WITNESSETH: THAT WHEREAS, the County and Provider entered into a contract dated August 24th, 2015, (hereinafter the "Original Agreement "), for the provision of consulting services for the design of the Orange County Detention Center; and WHEREAS, the County and Provider amended the Original Agreement on December 10th, 2015 ( "Suspension Amendment ") in order to suspend Basic Services design activities, and is now ready to lift the suspension and continue Basic Services design activities; and WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to amend the Original Agreement as follows: 1. In order to ensure the completion of the Services identified in the term of the Original Agreement is amended to reflect an end date by which all Services shall be completed of April 30th, 2021. 2. Consistent with the Suspension Amendment, Section 3(a)(ii) of the Original Agreement is stricken and replaced with the Tasks and Milestones listed in Exhibit 1 of this Amendment. 3. Article 5, Section a. is amended to reflect a maximum payable not -to- exceed amount of $1,686,400.00, described as the sum of lines 1,2,3,4,5,6,9 &10 according to the attached proposal titled "Orange County Detention Center - Design Amendment #4" dated June 20, 2018. 4. Section 11 b. is stricken in its entirety and replaced with: This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. Provider shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal anti - discrimination laws, policies, rules, and regulations and the Orange County Non - Discrimination Policy and the Orange County Living Wage Policy (both policies are incorporated herein by reference and may be viewed at http: / /www.orangecountync.gov /departments/ purchasing _division /contracts.php). Any violation of this requirement is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County. This paragraph is not intended to limit the definition of breach to discrimination. 5. Section 11 c. is stricken in its entirety and replaced with: By executing this Agreement Provider affirms that Provider and any subcontractors of Provider are and shall remain in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable, failure to maintain compliance with the requirements of Article 2 of Chapter 64 of the General Statutes constitutes Provider's breach of this Agreement. By executing this Agreement Provider affirms Provider is in compliance with Article 2 of DocuSign Envelope ID: 48ED1D41- DA40- 49D1- A586- 23C127C5137EF 5 Chapter 64 of the North Carolina General Statutes. By executing this Agreement, Provider certifies that Provider has not been identified, and has not utilized the services of any agent or subcontractor identified, on the Iran divestment list created by the State Treasurer pursuant to G.S. 147 -86.58 or the Israel boycott list created pursuant to G. S. 147 - 86.81. 6. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent it is not inconsistent with this Amendment. In the event that there is a conflict between the Original Agreement and this Amendment, this Amendment shall control. IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above written. ORANGE COUNTY cuSl9neE by: Bonnie B. Hammersley MOSELEY ARCHITECTS, P.C. bY: V;: M-1 Daniel R. Mace County Manager Principal DocuSign Envelope ID: 48ED1D41- DA40- 49D1- A586- 23C127C5137EF EXHIBIT 1 The Basic Services will be performed by the Provider in accordance with the following schedule: Task 1. Program Verification 2. Schematic Design 3. Design Development 4. Construction Documents 5. State and Local Approvals 6. Guaranteed Maximum Price 7. Construction Administration 8. Final Occupancy /Project Closeout 9. Training/Transition Milestone Date July 31 ", 2018 August 24th, 2018 November 16th, 2018 February 28th, 2019 March 29th, 2019 May 24th, 2019 Jun 1 st, 2019 - January 29th, 2021 February 26th, 2021 April 30th, 2021 L DocuSign Envelope ID: 48ED1D41- DA40- 49D1- A586- 23C127C5B7EF INA MOSELEYARCHITECTS 11430 N. Community House Road Suite 225 Charlotte, NC 28277 June 20, 2018 P: (704) 540 -3755 RE: Orange County Detention Center — Design Amendment #4 Orange County, North Carolina Mr. Jeff Thompson, Director, Asset Management Services Orange County Post Office Box 8181 131 West Margaret Lane Hillsborough, North Carolina 27278 Dear Jeff: We are pleased to offer this Additional Services Proposal #4 in accordance with our Services Agreement Over $90,000.00 RFQ -No Reimbursable Expenses dated August 24, 2015. These services consist of the following: 1. To re -start the Project on the new approved site, an additional Schematic Design (SD) service will be required, but it is anticipated that the base SD "radial" layout generated originally will be used and re- verified for the Project. The previous effort had completed the SD phase, so some re- work is anticipated based upon current needs. 2. The Project has incurred cost escalations since 2015 with associated increases in project design overhead. 3. The Site / Civil Engineering effort will be all new, with additional work to incorporate the additional future County buildings to be master planned and engineered for the new site. The Additional Services for our civil engineering consultant (Civil Consultants, Inc.) include: cost escalation since 2015; increased onsite area, grading, drainage, utilities; offsite water extension; offsite sewer extension; road widening and adjacent sidewalk; more storm water management; additional landscaping design; land swap coordination; Town of Hillsborough approvals; and additional master planning for the new site. This service includes overall campus rough grading, storm drainage, stormwater management, onsite and offsite utility mains, interior driveway, road widening, erosion control, and perimeter landscaping for the overall campus property, as well as detailed site design, fine grading, parking and service areas, utility connections, interior landscaping, etc. for the jail facility. It does not include detailed site development design for the DEAPR facilities. 4. The approximate design schedule is revised as follows starting from notice to proceed from the County: Schematic Design (SD) Phase — 60 days; Design Development Phase (DD) — 90 days; Construction Document Phase (CD) — 120 days; Bidding Phase — 60 days (there may be an early site package and sequential bidding per CMAR input); Construction Designing solutions. Building trust. Enriching lives. DocuSign Envelope ID: 48ED1D41- DA40- 49D1- A586- 23C127C5137EF E -7 RE: Orange County Detention Center — Additional Services Mr. Jeff Thompson, Director, Asset Management Services Paae 2 June 20. 2018 Administration Phase (CA) — 20 months; Transition / Activation Phase — 60 days 5. The Owner will be retaining the services of a Construction Manager at Risk (CMAR), which will require additional coordination meetings during the pre- construction duration, and potential multiple and sequential bidding efforts. Compensation shall be the lump sums revised from the original Agreement as follows: 1. Original Schematic Design Phase (SD) Services: $212,737.50 (Completed and paid in full) 2. Additional Schematic Design Phase (SD) Services: $34,312.50 3. Design Development Phase (DD) Services: $329,400.00 4. Construction Document Phase (CD) and Approval Services: $658,800.00 5. Bidding Phase Services: $82,350.00 6. Construction Administration and Closeout Services: $329,400.00 7. Detention Training and Transition Services: $82,500.00 8. Amendment #1 — Add Sheriff's Offices: $0 (original Amendment for $28,500.00 is no longer included in the scope of Work and hereby deducted from the services to be rendered) 9. Amendment #2 — Analyze Two New Sites: $32,750.00 (Completed and paid in full) 10. Amendment #3 — Update Jail Bed Need Projections: $6,650.00 (Completed and invoicing in June monthly billing) Except as to provisions of this proposal, all terms and conditions of the Agreement between Owner and Architect remain in full force and effect. If this Additional Services Proposal is acceptable, please indicate your acceptance of, and agreement to its terms and your authorization to proceed by signing below and returning one fully executed original for our files. Thank you for this opportunity to be of service Orange County. Should you have any questions, please do not hesitate to call me. Sincerely Daniel R. Mace, AIA, LEED AP 550352 Accepted and Agreed: ORANGE COUNTY, NORTH CAROLINA By: Printed Name and Title: Date: NORTH CAROLINA CONTRACT AMENDMENT ORANGE COUNTY 9 THIS CONTRACT AMENDMENT ( "Amendment ") is made and entered into this 20th day of August, 2018 by and between ORANGE COUNTY (hereinafter referred to as "County ") and HH Architecture, P.A. (hereinafter referred to as "Provider "). WITNESSETH: THAT WHEREAS, the County and Provider entered into a contract dated April 51h, 2016, (hereinafter the "Original Agreement "), for the provision of consulting services for the design of the Orange County Environment and Agriculture Center; and WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to amend the Original Agreement as follows: In order to ensure the completion of the Services identified in the term of the Original Agreement is amended to reflect an end date by which all Services shall be completed of no later than April 30', 2021. Section 3 aJ is amended to reflect the Basic Services as depicted in the attached proposal titled "Orange County Environment and Agricultural Center — Amendment #1" dated August 161h, 2018 to include the proposal's additional design scope related to the Park Operations Base components. Section 3.a.ii is amended to reflect the Tasks and Milestones listed in Exhibit 1 of this Amendment. 4. Section 5 a. is amended to reflect a maximum payable not -to- exceed amount of $554,450, which is the sum of the scope of services equaling $518,650 described in the attached proposal titled "Orange County Environment and Agricultural Center - Amendment #1" dated August 16th, 2018 and the $35,800 related to the initial preliminary study included in the Original Agreement. 5. Section 11 b. is stricken in its entirety and replaced with: This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. Provider shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal anti - discrimination laws, policies, rules, and regulations and the Orange County Non - Discrimination Policy and the Orange County Living Wage Policy (both policies are incorporated herein by reference and may be viewed at http: / /www.orangecountync.gov /departments /pur chasing _division /contracts.php). Any violation of this requirement is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County, This paragraph is not intended to limit the definition of breach to discrimination. 6. Section I 1 c. is stricken in its entirety and replaced with: By executing this Agreement Provider affirms that Provider and any subcontractors of Provider are and shall remain in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable, failure to maintain compliance with the requirements of Article 2 of Chapter 64 of the General Statutes constitutes Provider's breach of this irt, Agreement. By executing this Agreement Provider affirms Provider is in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. By executing this Agreement, Provider certifies that Provider has not been identified, and has not utilized the services of any agent or subcontractor identified, on the Iran divestment list created by the State Treasurer pursuant to G.S. 147 -86.58 or the Israel boycott list created pursuant to G.S. 147- 86.81. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent it is not inconsistent with this Amendment. In the event that there is a conflict between the Original Agreement and this Amendment, this Amendment shall control. IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above written. ORANGE COUNTY HH ARCHITECTURE, P.A. Bonnie B. Hammersley Kristen Hess County Manager Principal EXHIBIT 1 The Basic Services will be performed by the Provider in accordance with the following schedule: Task 1. Program Verification, Schematic Design 2. Design Development 3. Constr. Documents, Review, Approval 4. Bidding 5. Guaranteed Maximum Price (CMAR) 6. Construction Administration 7. Final Occupancy /Project Closeout Milestone Date October 15th, 2018 December 31st, 2018 March 30t1i, 2019 May 15",, 2019 May 24t1, 2019 Jun 1st, 2019 - January 291h, 2021 February 26`', 2021 11 (or before; this aligns with Detention) 12 I !,,o DItL Vlk 000 fl RAL.EIC 1, NC ?/A:)Y 5' 1`1352;701 F H. 71?11?ii [AX 111 *:k.(:Qd L) Jeffrey E. Thompson Director, Asset Management Services Orange County Government 131 West Margaret Lane, Suite 300 PO Box 8181 Hillsborough, NC 27278 Sent via email to: jethompson @orangecountync.gov Re: Orange County Environment and Agricultural Center — Amendment #1 HH Project Number: 15 -082 Dear Jeff, HH Architecture is pleased to present this Amendment #1 proposal for the design of the Orange County Environment and Agricultural Center and the Department of Environment, Agriculture, Parks, and Recreation Park Operations Facility in the planned Orange County Northern Campus. Our project understanding, scope of services, schedule, proposed consultants, and fees are described below. 1. Basic Scope: A. This proposal is an amendment to the original contract dated April 5, 2016 for full design services on the Orange County Environment and Agricultural Center (EAC). The project will no longer pursue a building renovation on the Revere Road property and will instead pursue new single -story construction on a greenfield site recently acquired off Highway 70. The new site will be part of the larger, planned Orange County Northern Campus, and will include utilities and primary access to the site from Highway 70 under a separate agreement. In addition to the design services on the EAC, the design team has also been tasked with similar full design services for a separate Department of Environment, Agriculture, Parks, and Recreation ( DEAPR) Park Operations Facility, also to be located within,the Northern Campus on an adjacent portion of the site. B. EAC: The program for the Environment and Agricultural Center will remain similar to the space needs assessment outlined in part 3. of the January 2017 Preliminary Study Report, with minor updates to the work spaces for staffing changes, and with the addition of a new 2,000 SF office suite for DEAPR Park Operations administrative staff. With the added suite, the building will grow to approximately 17,000 SF. 13 C. Park Operations Facility: The new Park Operations Facility will consist of a 6,000 SF pre- engineered park operations support building and surrounding secure outdoor storage yard. Programming for the support building includes several pull- through shop bays for small equipment maintenance, indoor storage cages, incidental support spaces, and an exterior covered storage area. It is our understanding that shop functions within the facility will be limited to small equipment maintenance and repair. Additional design provisions for hazardous material storage and vehicle maintenance are not included in this agreement and are not permitted by zoning. Administrative support spaces, including offices, work stations, and conference rooms, will be located in the new office suite within the Environment and Agricultural Center. D. Site Design: A preliminary site layout for both facilities on the Northern Campus was provided by the Civil /Site designer. For the purposes of this proposal, it is assumed the site design will continue from the Civil /Site designer's concept sketch "Cornelius Street Property Concept," dated January 30, 2018. Additional considerations for site design within the Northern Campus include the following: 1. It is understood that the County is currently in negotiations with the adjacent parcel holder for a "land swap" agreement affecting the eastern parcel boundary. Any work that the Design Team is instructed to perform in anticipation of the future parcel boundaries and prior to a fully executed land swap agreement is at the County's risk. Substantial redesign caused by a later change to the parcel boundaries will be considered a change in project scope and is not covered under this agreement. 2. The Civil /Site designer will be concurrently working for another client to provide services for the overall Orange County Northern Campus, of which the Environment and Agricultural Center and Park Operations Facility will be a part. The larger project will provide basic onsite and offsite campus infrastructure, site development for a separate detention center facility, and rough grading and utility stubs for this project. 3. Orange County will realize some cost efficiencies using a campus approach with some common infrastructure elements. However, the site design and fees do not fully reflect all of these efficiencies, since the various campus uses will have two different design teams with unique team coordination needs, different protocols and contacts for client review, and different design / approval schedules. For the purposes of this proposal, we anticipate that the Environment and Agricultural Center and Park Operations Facility will require a regulatory review process separate from any other campus site review. 4. For the new site, Orange County will provide geotechnical reports, environmental and hazardous materials reports, flow tests, and a site survey by early July 2018. 5. At the end of the construction phase for each facility, Orange County will provide an as -built site survey as needed. E. Budget: The construction budget for both the Environment and Agriculture Center and Park Operations facility is $4.6 million total with $3,876,000 (17,000 SF at $228/SF) for the EAC and $720,000 (6,000 SF at $120 /SF) for the Park Operations Facility. It is our understanding that these costs only include the base building cost with contractor mark- up. Site costs and soft costs are not included. For the purposes of this proposal, it is assumed site construction costs beyond the extents of the building footprint will be allocated from the overall Northern Campus construction budget. It is assumed that the Owner does not intend to pursue certification in enhanced energy standards for either facility, including LEED or Triangle J High Performance guidelines. Therefore, documentation procedures for certification are not included in our scope of work. The Design Team will work to pursue energy efficient design in compliance with the North Carolina State Building Code and will work with the Owner's consultants to provide information for the purposes of enhanced energy modeling under a separate agreement. 2 14 G. For the purposes of this proposal, we have assumed that both projects will be designed as part of a single design package and will be bid and constructed concurrently. The construction delivery method shall be Construction Manager at Risk by a qualified Construction Manager under a separate contract. The project will be permitted through the Town of Hillsborough. H. Basic Design Scope: The scope of work for each discipline is as follows: 1. Architectural design includes: a. Overall leader of the project b. Confirm programmatic requirements c. Conduct meetings with Owner and stakeholders d. Design of the 17,000 SF Environment and Agricultural Center and 6,000 SF Park Operations Facility e. Provide code summary and compliance f. Coordinate all disciplines of design g. Present work at each of the phases listed in section 4 h. Secure approvals from all authorities having jurisdiction i. Assist with questions j. Assist the Construction Manager with cost estimates at each phase k. Assist with bidding I. Oversee construction administration services m. Oversee closeout documentation 2. Site /Civil design includes: a. Engineer's work will include necessary coordination to secure approvals by the Owner, Town of Hillsborough, and North Carolina Department of Environmental Quality. b. The overall campus project will require design of at least one stormwater detention and treatment device, which will be covered under separate agreement with others. No additional stormwater management strategies are anticipated for the Environmental and Agricultural Center and Park Operations Facility. c. Water and sewer main extensions for the overall campus will be covered under separate agreement with others. The DEAPR facilities will connect to these using individual service lines. d. The project will require an onsite water main service to supply a fire protection sprinkler system for the Environment and Agricultural Center. Engineer will provide a fire protection flow analysis for the project to verify water system flow and pressure. Engineer will rely on fire hydrant flow test data provided by the Town of Hillsborough for this purpose. e. Landscape planting design for code minimum compliance. Design and selection of landscape plantings within the outdoor demonstration gardens is not included. It is assumed any landscape irrigation system will be vendor designed, and irrigation design is not covered under this agreement. f. A traffic impact study is not anticipated and not included under this agreement. Work related to roadway widening for a left -turn lane along Highway 70, as well as sidewalk improvements along the Highway 70 frontage, is covered under a separate agreement with others. g. Solid waste facilities to serve the Orange County Northern Campus will be provided under a separate agreement, including the Solid Waste Management Plan. It is assumed the DEAPR facilities will have access to the campus solid waste facilities. 3. Plumbing design includes: Domestic Water System Design within and beneath the extents of the building 3 15 b. Sanitary waste system design within and beneath the extents of the building c. Roof drainage design shall be limited to piping only (no roofing or drains) within and beneath the extents of the building. d. Natural gas piping design shall be limited to piping beyond the load side of the meter e. Specialty equipment (food service, lab, etc.) plumbing infrastructure design shall be based on the equipment layout and equipment consumption /use data 4. Mechanical design includes: a. Design shall include air handling and heat transfer systems in and around the building structure b. HVAC controls design c. Natural gas piping design shall be limited to piping beyond the load side of the meter d. Specialty equipment (food service, lab, etc.) HVAC infrastructure design shall be based on equipment consumption /use data 5. Electrical design includes: a. Design shall include power, lighting, and fire alarm systems for the building b. Design of electrical site utilities shall be limited to the secondary distribution beyond the service transformer c. Design for special systems (audio /visual, voice reinforcement, security, etc.) shall include empty raceway system for future inclusion of cabling and equipment by the Owner. Electrical infrastructure design shall be based on equipment layout and consumption /use data d. Design for telecommunications shall include passive equipment only defined as outlets and associated cabling in structured raceway /cabletray systems terminating at the patch panels within the extents of the building. Fiber (data) and copper (telephone) backbones shall be included within the extents of the building. Design for active equipment (patch cords and active electronic components) is not included. Active equipment shall be provided by the Owner e. Specialty equipment (food service, lab, etc.) electrical infrastructure design shall be based on equipment layout and consumption /use data. Fire Sprinkler Protection design includes: a. To the extent required by Code, fire sprinkler design within and beneath the extents of the building structure will consist of establishing the criteria and performance requirements. Final design will be by the Construction Contractor 7. Structural design includes: a. Prior to the start of design, a project specific geotechnical report is needed b. Assumes a seismic class D or better c. Assumes shallow foundations are acceptable with a first floor concrete slab - on -grade d. Assumes a relatively flat site that will not require retaining walls e. Environment and Agricultural Center: design will pursue a conventional steel structure. Assumes simple structural steel framed rectangular building with a flat/low slope roof with braced frames for lateral load resistance and exterior metal stud walls or load bearing masonry walls. 4 Park Operations Facility: design will pursue a pre- engineered metal building (PEMB). Structural design will be limited to foundation design for a slab -on- grade foundation. Engineer will review the building manufacturer's design criteria and final foundation reactions and will be considered the structural engineer of record. 2. Additional Scope A. In the event that any of the following items are requested and /or required, the corresponding fees in section 4 will be needed: 1. Security system component design 2. Site lighting design 3. Consultants A. For Structural Engineering, we propose: Lynch Mykins Structural Engineers, PC Contact: Anna E. Lynch, PE 415 Hillsborough Street Raleigh, NC 27603 Phone: (919) 782 -1833 B. For Mechanical Electrical, and Plumbing (MEP) Engineering, we propose: 1. Stanford White, Inc. Contact: William M. Smith, PE P.O. Box 19944 Raleigh, NC 27619 Phone: (919) 832 -8118 C. For Site /Civil Engineering, we propose: Civil Consultants, Inc. Contact: Tony Whitaker, PE 3708 Lyckan Parkway, Suite 201 Durham, NC 27707 Phone: (919) 490 -1645 4. Basic Design Phases A. Basic Design Phase 1 Schematic Design (SD): Perform preliminary code analysis. Provide written project narrative, site plan, building floor plans, and cost estimate. Attend all meetings required by Owner. Submit to Owner and AHJ and coordinate for approval. 2. Design Development (DD): Respond to all SD comments. Continue design process in all disciplines. Provide outline specifications, code summary sheet, site plans, floor plans, and wall sections. Provide room /door schedules, engineering drawings, and cost estimate. Attend all meetings required by Owner. Submit to Owner and AHJ and coordinate for approval. irk 3. Construction Documents (CD): Respond to all DD comments. Provide full working drawings and specifications. Submit to Owner and AHJ and coordinate for approval. Provide cost estimate. Attend /lead all meetings required by Owner. 5 17 4. Bidding: Assumes Construction Manager at Risk delivery method. Assist with prequalification and bidding of the Construction Manager's subcontractors. B. Basic Desiqn Phase 2 (estimated Summer 2019 start, pending progress on the separate total site package) Construction Administration (CA): Basic fee includes construction administration for an estimated duration of ten (10) months. Assumes Construction Manager at Risk delivery method. Perform architectural coordination, submittal review, and related Construction Administration. Lead the pre- construction meeting. Provide bi- weekly jobsite visits (up to 22 visits anticipated) and lead monthly construction meetings (up to 10 meetings anticipated), punch list and final inspection. 2. Closeout (CO): Record drawings and closeout of project. 5. Schedule A. We understand the goal is for construction to begin in the Summer of 2019. The following is an estimated schedule for the scope upon receipt of Notice to Proceed: 1. Schematic Design ( SD) ................................ ............................... 8 weeks 2. SD Owner review ......................................... ............................... 3 weeks 3. Design Development (DD) ........................... ............................... 8 weeks 4. DD Owner review ......................................... ............................... 3 weeks 5. Construction Documents (CD) ..................... .............................12 weeks 6. CD Owner /AHJ review* ................................ ..............................6 weeks* 7. Bidding ......................................................... ............................... 5 weeks 8. Contract Negotiation .................................... ............................... 4 weeks 9. Construction Duration ................................ ............................... 44 weeks B. *Permitting review times may vary 6. Fee A. The following fees are intended to replace all design fees (with the exception of the Preliminary Study fee) provided on our original proposal dated March 1, 2016. EAC Building (Conventional) Schematic Design $46,970 Design Development $65,990 Construction Documents $95,230 Bidding $10,180 Construction Administration $87,500 Closeout $11,580 Subtotal $317,450 Park Ops Building (Pre - Engineered) Schematic Design $18,800 Design Development $24,900 Construction Documents $36,100 Bidding $6,300 Construction Administration $32,100 Closeout $7,100 Subtotal $125,300 Site /Civil Engineering Schematic Design $9,200 Design Development $18,400 Construction Documents $25,300 Bidding $4,600 Construction Administration $13,800 Closeout $4,600 Subtotal $75,900 Total Basic Design Fee $518,650 Additional Services (if requested) Security System Design $4,600 Site Lighting Design $4,600 * Note: The fees detailed above are not intended to be "a la carte" and are broken up purely for informational purposes. 7 W 7. Excluded Services A. Not required by code, or otherwise not anticipated: 1. Rezoning of property 2. Chapter 17 special inspections 3. Traffic impact analysis 4. LEED design and certification B. Provided under separate contract: 1. Surveying 2. Geotechnical investigations 3. Environmental investigations 4. Permitting fees 5. Hydraulic analysis 6. New driveway permit or utility encroachment permit from NCDOT 7. Off -site utility design C. Excluded design services, to be billed as Additional Services only if required: General: a. Project scope increase or change b. Design of the additional space beyond what is listed in the programming document c. Design for complex or large -scale bid alternates d. Express review e. Life cycle and operating cost analysis f. Any other service not listed in scope 2. Additional Meetings: a. Additional monthly construction meetings beyond the anticipated 10 b. Additional architectural CA visits beyond the anticipated 22 c. Additional MEP CA visits beyond the anticipated 12 d. Additional structural CA visits beyond the anticipated 5 e. Additional site /civil CA visits beyond the anticipated 4 f. Public meeting attendance g. Fundraising meeting attendance 3. Additional Architectural Services: a. Renderings for fundraising b. Furniture, Fixtures, and Equipment (FF &E) selection and design c. Site signage design d. Commercial kitchen design, including equipment and walk -in freezers and coolers (warming kitchen is included) 4. Additional Site Design: a. Involvement in stormwater runoff management or mitigation issues that may be raised by regulatory agencies beyond typical requirements, due to site - specific characteristics or concerns b. Unusual site work associated with conditions discovered during construction or geotechnical exploration (i.e. underground storage tanks /hazardous materials, unusually large quantities of rock or unsuitable material, on -site disposal area /landfills, etc.) c. Water re -use or water supply well system design d. Site retaining wall design above 48 inches e. Wetlands delineation /permitting f. Irrigation design 180 5. Additional Mechanical, Electrical, and Building Systems Design: a. Energy measurement and verification plans b. Computer day - lighting simulations c. Design of emergency /stand -by generator system d. Design of voice reinforcement wiring /equipment e. Audio Visual systems design f. Design for hazardous material storage g. Design for vehicle maintenance Please let me know if you need additional information. We are very excited to continue this project! Sincerely, Kristen Hess, AIA, LEED AP Principal DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 21 B O R D E A U X Construction Company, Inc. June 29, 2018 Mr. Jeff Thompson Director, Asset Management Services Orange County Government jethompson @orangecountync.gov (sent via email only) 131 West Margaret Lane Hillsborough, NC 27278 Reference: Orange County Detention Cost Proposal Rev. 5 Dear Jeff, Thank you for the opportunity to provide our revised cost proposal. The fee and GC proposal is based on a budget of $24,400,000 +/- "Orange County Northern Campus Concept" as provided by Civil Consultants and dated February 4, 2018. Scope of work is assumed to include the construction of the proposed 47,000 + /- sf Detention Center, Park Operations Facility, Pole Barn, and associated Storage Yard, and the 17,000 + /- sf Agriculture Building and associated site work. Offsite work including the extension of water /sewer and road widening is also assumed to be in the scope of work. Agricultural skills demonstration, Park Ops Office, geo- thermal, Law Enforcement Center, photovoltaic system, etc. are not assumed to be in the scope of work, but may be incorporated with further study of the project budget. Construction of the proposed Detention project is to be built in an 18 month duration plus an additional month for Final Completion and an additional month for DHSR inspection and punchlist completion for a total of 20 months. Construction of the proposed Agriculture Building is to be built in a 12 month total duration and is assumed to be concurrent with the Detention Center schedule. We offer the following fee proposal for the proposed project: Preconstruction fee: $85,000 General Conditions: $1,184,693 Construction Management Fee: 3.75% General Conditions estimates of the proposed layout and a matrix of general conditions, fee, cost of work, A /E, and owner responsibilities are attached to this proposal. We are looking forward to working with you on the Orange County Detention project. Should you have any questions, please contact me. Very truly yours, Bordeaux Construction Company, Inc. /41�airBorcleaux, P.E. President, Bordeaux Construction Company, Inc. Enclosure 135 E. Martin St., Suite 101, Raleigh, NC 27601 (919) 220 -1141 tel (919) 220 -1147 fax www.bordeauxconstruction.com DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 rroraeaux t;onstruct/on t;ompany, Inc. Page 1A 2241212018 7:53 AM Spreadsheet Level Takeoff Quantity Labor Price Labor Amount Material Price Material Amount Sub Price Sub Amount Equip Price Equip Amount L Other Price Other Amount Total Amount unassigned * 1100.01 Division 1 Subcontractors 12,000 Scheduling(sub) 1.00 Isum 12,000.00 /Isum 12,000 1131.00 Personnel: Pro . Managmnt General Supervision (10% time 82.00 WK 375.00 /WK 30,750 - - - - 32.25 /WK 2,645 0.00 /WK 0 33,395 Project Manager (50% time 87.00 WK 1,800.00 /WK 156,600 - - - - 161.25 /WK 14,029 0.00 /WK 0 170,629 Superintendent- Detention 87.00 WK 2,750.00 /WK 239,250 - - - - 161.25 /WK 14,029 0.00 /WK 0 253,279 Asst. Superintendent Superintendent - Ag& Park O - 12 mo 82.00 WK 2,000.00 /WK 164,000 - - - - - 161.25 /WK 13,223 /WK 0 0 177,223 133,185 176,338 - 15,000 52.00 WK 2,400.00 /WK 124,800 - - 161.25 /WK 8,385 /WK Project Engineer (100% time 87.00 WK 2,000.00 /WK 174,000 - _ - - 26.88 /WK 2,338 0.00 /WK Admin Assistant 2000 . MTH 750.00 /MTH 15,000 0.00 /MTH 0 0.00 /MTH Mgmnt Vehicle Maintenance 78.00 MTH - - 268.75 /MTH 20,963 /MTH - - 0.00 /MTH 0 20,963 M mnt Vehicle Fuel 78.00 MTH 1 430.00 /MTH 33,540 /MTH 1 0.00 /MTH 0 33,540 1132.00 Construction P o ress Docume tation - 2,688 1.4,513 Digital Cameras /Misc Pictures 1.00 LS - - _ 2,687.50 /LS 2,688 - - - - - Document Printing 30.00 SET 483.75 /SET 14,513 - 1135.00 Project Safety General Safety Superintendent 82.00 WK 120.00 /WK 9,840 - - - 25.80 /WK 2,116 - - 11,956 Drinking Water and lee 20.00 MTH 53.75 /MTH 1,075 1,075 First Aid Supplies 20.00 MTH 53.75 /MTH 1,075 1,075 1143.00 Building Infortration Management Building Intormadon Modell, 8 VD C BIM 0.00 SF - - - - - - 0.00 /SF 0 0 1158.00 Project Identification Owner Project Sin 1.00 EA 806.25 /EA 806 806 Si na a 2.00 EA 806.25 /EA 1;813 1,613 1591.00 Office Equipment UPS /Courier Service 20.00 MTH 150.00 /MTH 3,0001 3,000 Hook-up Phone 1.00 LS 1,200.00 /LS 1,200 1,200 Temp Toilet 0.00 MTH 0.00 /MTH 0 0.00 /MTH 0 0 Co Machine 20.00 MTH 0.00 /MTH 0 320.00 /MTH 6;400 6,400 Field Office Supplies 20.00 MTH 161.25 /MTH 2t,226 3,225 Contractor Office 19.00 MTH 0.00 /MTH '0 806.25 /MTH 15,319 15,319 Tool Trailer 19.00 MTH /MTH 268.75 /MTH 5,106 5,106 Computer Data Line 19.00 MTH 0.00 /MTH 0 150.00 /MTH 2,850 2,850 Cell Phone Service 78.00 MTH - 0.00 /MTH 0 100.00 /MTH 7,8001 7,800 Computer S stems 1.00 LS - - - - - - 0.00 /LS 0 7,500.00 /LS 7,5001 7,500 Project Management Software License 1.00 LS - - - - - - /LS 14,000.00 IS 14,0001 14,000 Contractor Office Setu /Cleanu /Maint 19.00 MTH 150.00 /MTH 2850 107.50 /MTH 2,043 - - 53.75 /MTH 1,021 0.00 /MTH 0 5,914 Office Security System 19.00 MTH - - - 150.00 /MTH 2,850 0.00 /MTH 01111 0 /MTH 7601 ,610 1705.00 Clean Up Weekly Cleanup 16.00 MTH 2,500.00 /MTH 40,000 150.00 /MTH 2,400 107.50 /MTH 1,720 0.00 /MTH 0 44,120 1730.00 Tools & Equip ent 0.00 /MTH 0 - 5,375. _ Supt_ Misc. Tools 20.00 MTH - - - 268.75_/MTH 5,375 - - Description Amount Lahnr 957.090 Material 81.539 Suhcontract 17250 Enuinment 85.304 Other 43 51 n 1,184,693 Total Estimate Totals Totals Rate 1,184,693 1,184,693 Cost Basis Percent of Total 80.79% 6.88°/ 146% 720% 367% 100.00 100.00% DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 23 APPENDIX A Division of Project Cost Elements I. CONSTRUCTION MANAGEMENT SERVICES DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Project Superintendent(s) X Assistant Superintendent(s) X Field Engineer X On -Site Clerical X Project Engineer X Project Manager X Superintendent's Transportation X Assistant Supt's Transportation X Project Engineer's Transportation X Project Manager Trans. X Project staff after Final Completion X Project staff during Owner's post - construction audit X Corporate Executives X Principal in Charge X Project Executive X Legal Services X Accounting X Scheduling X BIM X Life -Cycle Analysis X Energy Management X Production Engineering X Purchasing X Value Engineering X Systems Development X Estimating X Cost Engineers X Project Coordinator X Project Expediter X Drafting Detailer X Drawing Checker X Safety Officer X E.E.O. Officer X Time Keeper /Checker X Safety Engineer X Off -Site Staff Travel Costs X Off -Site Staff Transportation X Engineers' Transportation X Project Staff Moving Expense X Project Staff Subsistence Costs X Project Budget Estimating X Project Phasing X NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 M! ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 1 of 5 APPENDIX A Division of Project Cost Elements II. SAFETY, SECURITY, AND SERVICES DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Safety Equipment X X First Aid Supplies X Handrails and Toe Boards X X Opening Protection X X Fire Extinguishers X Security Guard/Watchman Svcs. X Weekly Cleanup X Final Cleanup X Temporary Fencing X Covered Walkways X Barricades X X Safety Nets X X Dumpster Rental/Removal X Public Traffic Control X Construction Roadway Maintenance X X Dust Controls X X 2 -Way Radios /Cell Phones X Trash Chute & Hoppers X Snow and Ice Removal X III. FACILITIES, EQUIPMENT AND SERVICES DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Office Trailer Rental X Tool/Utility Trailer Rental X Water /Ice X Food/Drinks (other than water) X Temporary Lighting/Wiring X* Power Expenses — Trailers X* Permanent Power X* Temporary Water Services X* Temporary Heat Expenses X* Temporary Cooling Expenses X* Temporary Toilets /Sewer Services X Change /Shower Rooms X Temporary Stairs X Temporary Enclosures/Partitions X Project Signs/Bulletin Boards X On -site Telephone Expenses X Temporary Roads Construction X Utility Trucks X Air Compressors X Dewatering Equipment X Generators X Miscellaneous Equipment X FueURepairs /Maintenance X * Utility usage costs will be carried as a reimbursible CM allowance DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 25 ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 2 of 5 DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 C. APPENDIX A Division of Project Cost Elements IV. VERTICAL HOISTING DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Less than 25 Ton X X X 25 Ton and Greater X X X NOTE: ALL PERSONNEL COSTS SHALL INCLUDE SALARIES AND APPROVED LABOR BURDEN V. REPRODUCTION AND PRINTING DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Design Phase X X Cost Study Documents X X Systems Study Documents X X Bid Package Documents X X Post Bid Construction Documents X X Accounting Forms X X Field Reporting Forms X X Contract Agreements X X Schedule Report Forms X X Estimating Forms X X Cost Reporting Forms X Presentation Charts and Graphics X X Value Analysis Studies X X Data Processing (In- House) X X Reference Materials X X Duplication Expense (Misc.) X Shop Drawing Printing X Assemble and Print Maintenance Manuals X Assemble and Print Operation Manuals X Special Forms X Postage and Delivery Expense X NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN VI. QUALITY CONTROL DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Special Inspection Consultants X Special Testing Consultants X Concrete Testing X Masonry Testing X Compaction Testing X Welding Inspections X Soils Investigations X Special Testing Services X Field Office Supplies /Materials X Project Photographs X Warranty Inspection Coordination X Air & Water Balancing X Operator On -site Training X Prepare Operation Manuals X Prepare Maintenance Manuals X NOTE: ALL PERSONNEL COSTS SHALL INCLUDE SALARIES AND APPROVED LABOR BURDEN DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 M ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 3 of 5 APPENDIX A Division of Project Cost Elements VIL PERMITS AND SPECIAL FEES DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Storage Yard Rental X Parking Lot Rentals X X Parking Fees X Curb & Gutter Permits X X Sign Permits X X Staking & Layout Fees /Costs X Sidewalk Perm its X X Landscape Permits X X Street/Curb Design Charge X X Building Permits X X Plan Check Fees X X Water Connection Fee* X X Sanitary Connection Fee* X X Storm Connection Fee* X Gas Service Charge* X Power Service Charge* X Special Tap Fees X Contractors' Licenses X Royalties X Zoning Fees /Consultants X Use Fees X A.G.C. Fees X NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN *Represent final connection costs, not temporary. VIII. INSURANCE AND BONDS DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Builder's Risk Insurance * X Designer's Errors and Omissions X General Liability X Completed Operations Liability * X Excess Liability Coverage * X CM Payment Bond * X CM Performance Bond * X Subcontractor Payment Bonds ** X Subcontractor Performance Bonds ** X Subcontractor Payment Bonds using Subguard) ** X Subcontractor Performance Bonds (using Subguard) ** X Off -Site Insurance X Off -Site Taxes X NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN * Insurance and bonds, while shown under the General Conditions heading, will each be separate NTE reimbursable costs. ** If subcontractors are to be bonded, then the CM must determine to use one or the other type of bond. The CM cannot split between the two; for example, use all Subguard or all subcontractor bonds, not part Subguard and part subcontractor bonds. If Subguard is used, it will be a separate NTE reimbursable cost. ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 4 of 5 DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 q i APPENDIX A Division of Project Cost Elements IX. OTHER COSTS DESCRIPTION BASIC FEE GEN CONDS. A/E COST OWNER COST COST OF WORK Project Taxes X Construction Equipment X Construction Labor Costs X Construction Materials X Subcontractor Layout & Staking X Survey Controls and Benchmarks X Cost of Design & Engineering X A/E Cost for Bid Packages X Preliminary Soils Inspections X Title/Development Cost X Land Costs X Financing /Interest Cost X Interim Financing Costs X Owner Change Contingency X Building Operation after Move -in X Building Maint. after Move -in X Moving Coordination X Moving Costs X Corrective Work X Asbestos Abatement X Lead Abatement X C.M. General Overhead Cost X C.M. Profit/Margin X Costs Over GMP X NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 5 of 5